1 Combined Planning Scheme Amendment and Permit Application On behalf of Golf View Estates Pty Ltd David Lock Associates 08 April 2016

2

3 David Lock Associates Combined Planning Scheme Amendment and Permit Application Contents 1.0 Executive Summary Rezoning Planning Permit Native Vegetation Arboricultural Assessment Removal/ Variation to Easements Planning Scheme Compliance Documentation Site Description Location Site Details Title Particulars Easements and Reserves Site Analysis Diamond Valley and Surrounds Subject Land Planning Controls Existing Zoning Overlays Request for Rezoning and Subdivision Application Subdivision Design Ecological Values Arboricultural Values Access Servicing Capability... 17

4 Combined Planning Scheme Amendment and Permit Application David Lock Associates 6.0 Planning Consideration and Assessment Ministerial Direction No.11 Strategic Assessment of Amendments Compliance with State Planning Policy Compliance with Local Planning Policy Compliance with Zoning Compliance with Existing Overlays Other Planning Considerations Conclusion

5 David Lock Associates Combined Planning Scheme Amendment and Permit Application 1.0 Executive Summary This report accompanies Planning Scheme Amendment C98 to the Banyule Planning Scheme. The submission has been prepared on behalf of Golf Views Estate Pty Ltd (the Proponent) and sets out the proposal to facilitate a joint planning scheme amendment and planning permit application under S.96A of the Planning and Environment Act. The purpose of the Amendment is to rezone land previously used by Eastern Energy for an electricity substation which has recently been made redundant. The rezoning proposed facilitates the subdivision of the land into nine (9) lots with a minimum lot size of 0.4 ha ranging to 0.63 ha, including: Amendment of the Banyule Planning Scheme to rezone the subject land from Public Use Zone 1 (PUZ1) to Low Density Residential Zone Schedule 1 (with a minimum lot size of 0.4ha). This report provides: A detailed description of the proposed development; A detailed site analysis of the area in which it is located; A design response to show how the proposal has been designed in response to local conditions; and An assessment of the proposal against the state and local policy requirements of the Banyule Planning Scheme. On the basis of the detailed assessment of the proposal, it is considered that it satisfies all of the relevant planning requirements for a rezoning and a planning permit should be issued for subdivision into nine (9) lots and native vegetation removal. The retention of the Significant Landscape Overlay 1 (SLO1) and Vegetation Protection Overlay 1 (VPO1) over the site. Amendment to the existing Special Building Overlay 2 (SBO2) to reflect proposed changes to the drainage condition on site. The granting of a planning permit to: Subdivide the land into nine (9) lots Remove native vegetation under Clauses 42.02, and of the Banyule Planning Scheme Construct buildings and works associated with the subdivision pursuant to Clause Remove redundant easements pursuant to Clause

6 Combined Planning Scheme Amendment and Permit Application David Lock Associates 1.1 Rezoning The land is presently within Schedule 1 Service and Utility to the Public Use Zone (PUZ1) and is covered by the Significant Landscape Overlay (SLO1) and Vegetation Protection Overlay (VPO1). A drainage line through the site is affected by the Special Building Overlay 2 (SBO2). The purpose of the PUZ1 is to recognise land for public utility and to provide for uses that are consistent with the intent of the public land. The rezoning is requested as it considered that: The Public Use Zone 1 (PUZ1) is considered to be inappropriate zoning for the subject site given the land was purchased privately from Eastern Energy as their substation has since been removed. As such, the PUZ is now redundant. The site can achieve a low-density residential subdivision whilst protecting existing vegetation and scattered trees. The site abuts Low Density Residential Zoned land to the north, east and south. The land is presently serviced by all urban services that are available to nearby residential areas. The site can be readily accessed via the existing road network. 1.2 Planning Permit The proposed plan of subdivision has been designed having regard to the following: Creating a subdivision layout that responds to the established subdivision pattern in the surrounding area; Responding to the low density nature and character of the surrounding area; Avoiding major impacts on existing vegetation particularly the remnant patch of vegetation located generally at the eastern portion of the site; and Siting the boundaries of lots and crossovers and utilising building envelopes to avoid impacts on existing vegetation and any easements existing within the site. 1.3 Native Vegetation The subject site has been assessed by Paul Kelly & Associates, to understand its ecological values. In summary, the results found the site supports one remnant patch of vegetation largely located within the area enclosed with cyclone fencing and 10 scattered trees. The EVC for the site is Grassy Dry Forest, which has a low native vegetation location risk status, being of lowest concern. There are no species within the site that trigger EPBC referral nor is there any listed species of Fauna due to the highly modified condition of the land. The subdivision proposed has been designed to avoid major impacts to existing vegetation, particularly the remnant patch of vegetation located generally in the eastern portion of the site. Some vegetation is being removed to facilitate the property development. However, careful attention has been paid to limit the impacts. A permit would be required for future landowners to remove vegetation in accordance with Clause and Clause of the Planning Scheme. 1.4 Arboricultural Assessment An arboricultural assessment of the site has been undertaken by Rob Gailbrath & Associates. The assessment found there are approximately 310 trees on site and within the road reserve adjacent to the site. Of these, the majority are self-sown and are of relatively low significance (1-5 worthiness retention rating). There are only 7 trees with a WOR of 7 or more. The subdivision design and location of crossovers and access in general have been designed to limit tree removal. 1.5 Removal/ Variation to Easements As part of this application, a permit is sought to vary existing drainage easements in accordance with Clause The variation to the existing easements is required to align with the location of the extended drainage pipe. 1.6 Planning Scheme Compliance It is considered the proposed rezoning development will have a high level of compliance with the requirements of the Banyule Planning Scheme and also meets the requirements of Council s policies, in particular Clause Natural Environment, Clause 2

7 David Lock Associates Combined Planning Scheme Amendment and Permit Application Natural Environment and Clause Residential Neighbourhood Character Policy. The proposed subdivision has been designed to both protect significant vegetation wherever possible on the site whilst also responding positively to the character of the area, adding some additional housing supply to Lower Plenty. 1.7 Documentation The report provides: A detailed description of the proposed development; A detailed site analysis of the site and the area in which it is located; A design response to show how the proposal has been designed in response to the local conditions, topography and vegetation; and An assessment of the proposal against the state and local policy requirements of the Banyule Planning Scheme. This planning report draws upon the work of several consultants. As part of the S.96A submission, the following reports are provided: Ecological (Flora & Fauna) Assessment Paul Kelly & Associates Ecological Services, February 2016 Tree Assessment- Galbraith & Associates, January 2016 Features Survey Reeds Consulting, 2015 Storm Water Management Strategy Report Reeds Consulting, 2016 Engineering Servicing Report Reeds Consulting, 2016 On the basis of the detailed assessment of the proposal it is considered that it satisfies all of the relevant planning requirements for a rezoning and a planning permit should be issued for a nine (9) lot subdivision and vegetation removal in accordance with Clauses , and

8 Combined Planning Scheme Amendment and Permit Application David Lock Associates 2.0 Site Description 2.1 Location The subject site is located on the north western corner of the intersection of Bonds Road and Rosehill Road, directly abutting the Heidelberg Golf Course to the west and the Plenty River further to the south west. It is approximately 1km from Lower Plenty Road, a main arterial connecting towards Rosanna in the west and Eltham to the north east. 2.2 Site Details The subject land is slightly irregular in shape and comprises five titles with frontages of m to Bonds Road, m to Rosehill Road and 268 m to the Heidelberg Golf Course. The subject site has a total area of approximately 4.48 ha with a differential fall of approximately 30m from the northeast corner down to the southwest. An existing gully traverses the site in a north-south direction approximately 30m from the west title boundary. Figure 1: Location Map 2.3 Title Particulars The property is contained with five (5) Certificates of Title: Volume 8354 Folio 395 Volume 8317 Folio 347 Volume 8248 Folio 912 Volume 8061 Folio 433 Volume 8125 Folio 139 See Appendix B for a copy of titles. 2.4 Easements and Reserves The site is affected by the following encumbrances: E-1 and E-3 for the purpose of transmission of electricity. E-2 for the purpose of a gas pipeline. 2 x drainage easements to be expunged and replaced with realigned drainage easements. Figure 2: Site Map 4

9 David Lock Associates Combined Planning Scheme Amendment and Permit Application 3.0 Site Analysis 3.1 Diamond Valley and Surrounds The subject site is located in the Diamond Valley, approximately 16 kilometres north-east of Melbourne s CBD. Diamond Valley is located within the Municipality of Banyule, directly to the north of the Yarra Valley Parklands which stretch along the Yarra River, a major waterway corridor within Metropolitan Melbourne. To the west of the site is the Heidelberg Golf Course of Diamond Valley. North east of the site is Lower Plenty, which includes a local convenience shopping strip, primary school and recreational facilities including the Plenty River Trail. Further north from Lower Plenty is Montmorency which includes a neighbourhood activity centre, primary school and the Montmorency Train Station approximately 2 kilometres from the subject site. The suburb of Eltham is located approximately 3.5 kilometres north east of the site. The site and its well established surrounding low density character are well serviced by public transport, with both local and smart bus services travelling along Lower Plenty Road and Fitzsimons Lane allowing for convenient travel to Greensborough, Rosanna and Heidelberg to the west, and Eltham and Doncaster to the east and south east. Figure 3 details the sites accessibility to services, schools and public transport services. 5

10 MONTMORENCY STATION ST. FRANCIS XAVIER PRIMARY SCHOOL MONTMORENCY NEIGHBOURHOOD ACTIVITY CENTRE MONTORENCY PRIMARY SCHOOL LOWER PLENTY NEIGHBOURHOOD ACTIVITY CENTRE MONTMORENCY SOUTH PRIMARY SCHOOL BOLTON STREET LOWER PLENTY PRIMARY SCHOOL LO WE RP HEIDELBERG GOLF CLUB ELT HAM TY RD ROA D NE ONS LA SUBJECT SITE BO ND SR OA D OLD LEN YAR RA LEGEND SUBJECT SITE TRAIN LINE WATERWAY OPEN SPACE ACTIVITY CENTRES SCHOOLS FITZSIM ROSEHILL ROAD RIV ER FIGURE 3: CONTEXT AND ACCESS MAP JOB : BONDS ROAD, LOWER PLENTY CODE : NPG009 DATE : MARCH 2016 SCALE : NTS LOCAL AND SMART BUS Level 2, 166 Albert Road South Melbourne Vic 3205 t f

11 David Lock Associates Combined Planning Scheme Amendment and Permit Application 3.2 Subject Land The subject land is 4.48 ha and is located on Bonds Road between Rosehill Road and Old Eltham Road. The site is located in an urban, semi-rural landscape and contains which has been cleared of most structures. Some parts of a hard stand area and a chain mesh fence remain on site. The land surrounding the fenced area appears to have been used for grazing as boundary post and wire fences along with water troughs are present. There are patches of trees and vegetation on the site, particularly along Bonds Road. The site forms a small valley running up the western boundary of the site. A drainage line occurs through the western side (the valley) of the site which drains into Cleveland Avenue Drain and ultimately discharges into the Plenty River. The site is accessed at the southern section of Bonds Road. See figures 4 to 9 for further images of the subject land. Figure 4 - View towards western boundary Figure 5- View towards northern boundary 7

12 Combined Planning Scheme Amendment and Permit Application David Lock Associates Figure 6 View north along drainage corridor Figure 7 View south along Bonds Road Figure 8 View looking east from north-west corner Figure 9 Subject Site looking west 8

13 David Lock Associates Combined Planning Scheme Amendment and Permit Application 4.0 Planning Controls 4.1 Existing Zoning The subject land is zoned Public Use Zone 1 Service and Utility (PUZ1) in the Banyule Planning Scheme (see Figure 10 below). There is also a slither of PUZ1 running west from the south west corner of the site. The land to the north, south, south east and west is in a Low Density Residential Zone (LDRZ) with a minimum subdivision area of 0.4 ha specified. Further north of the site is Neighbourhood Residential Zone 3 (NRZ3). Further south is Rural Conservation Zone (RCZ). The land directly to the west is within the Special Use Zone 1 Private Sportsground (SUZ1) which includes the Heidelberg Golf Course. In the PUZ1, the use must be for the purpose described in the table to Clause Service and Utility. Pursuant to Clause , a permit is required to subdivide land. As the previous land manager, Eastern Energy has removed the substation and the site is no longer needed for public utility purposes, the PUZ1 is no longer an appropriate zoning for the site. To undertake a subdivision within the PUZ1, consent of the landowner is required. Though the land is proposed to be rezoned, a letter of consent to subdivide the land has been obtained from Eastern Energy. See Appendix A. 9

14 Combined Planning Scheme Amendment and Permit Application David Lock Associates 4.2 Overlays The site is affected by three Overlays as demonstrated in Figures 11, 12 and 13 below. Significant Landscape Overlay 1 The subject site is covered by the Significant Landscape Overlay 1 Watercourse Environs (SLO1). The purpose of the overlay is to protect areas along watercourse and their immediate environs from visual intrusion cause by the inappropriate siting or appearance of buildings. Pursuant to Clause 3.2, a permit is required to remove, destroy or lop any vegetation. Before deciding on an application for buildings, works or subdivisions, the responsible authority must consider any approved concept plan and whether the local, bulk and appearance of buildings or works will be keeping with the character of the area and will enhance the vista when viewed from the watercourse, its banks, nearby streets, adjoining public open space, or from prominent scenic viewpoints within the watercourse environs. Special Building Overlay 2 The drainage corridor running north south along the western boundary of the site is covered by the Special Building Overlay 2 (SBO2). Clause triggers a permit for buildings and works and triggers a permit to subdivide land. Vegetation Protection Overlay 1 The subject land is covered by the Vegetation Protection Overlay 1 Plenty River East Area (VPO1). The area contains developed and developing urban areas which have significant natural, habitat and environmental qualities. A key objective of the overlay is to conserve the existing pattern of vegetation, landscape quality and ecosystems within the area, protecting the area as a habitat for local fauna and as an important habitat link. In accordance with Clause 3.0 of VPO1, a permit is required to remove destroy or lop native vegetation. Figure 11 : SLO1 Figure 12: SBO2 Figure 13: VPO1 10

15 David Lock Associates Combined Planning Scheme Amendment and Permit Application 5.0 Request for Rezoning and Subdivision Application It is proposed to rezone all of the land to the Low Density Residential Zone (LDRZ). The proposed rezoning of the land to LDRZ is intended to allow for the subdivision of the land into nine (9) lots between 0.4 and 0.7 hectares. The purpose of the zone is to provide for low-density residential development on lots. The LDRZ reflects the intended use of the land as a low density subdivision. In accordance with Clause of the LDRZ, a permit is required to subdivide land. Each lot must be in area specified for the land in a schedule to this zone. The Schedule to the LDRZ imposes a minimum 0.4 ha subdivision area on all land. The proposed subdivision proposes lots of 0.4 ha or greater, therefore compliant with the Schedule to the LDRZ. Furthermore, the rezoning the site to LDRZ forms a logical extension to the low density land on the sites north east and southern boundaries. It is also proposed to retain all the overlays affecting the site, with the proposed subdivision design meeting the purpose and objectives of each overlay. The subdivision design, its access and location of internal roads have been designed to avoid vegetation where possible. The Subdivision Plan includes building envelopes which detail the best location for the built form to avoid vegetation within each lot. The low density nature of the proposed subdivision, along with the retention of the balance of the vegetation, helps to ensure the views and vistas from the creek are not significantly impacted upon. Figure 14 displays the proposed Subdivision Plan for the subject site. The design process that has been employed in the production of the subdivision layout has resulted in a proposal that does justice to the site s qualities and realises the potential of the land to developed efficiently yet sustainably by retaining its environmental values, responding to its topographical features, minimising its impact on views and vistas from the creek whilst offering a very high standard of amenity. The following sections provide an explanation of the key issues pertaining to the site and how the design responds to them. 11

16 Q C 0 DJ:: U) Q z 0 m m 2 : ',. - -, ' ' ' ' ' ' ' ' : ' -- 0 TREE 0 DEAD TREE VEGETATION SITE AREA : ha AREA OF ROAD : ha No. OF LOTS : 9 AVERAGE AREA : 4589m 2 This plan has been prepared for review and comment only and should not be used for any other purpose without the written consent of Reeds Consulting PTY LTD. The plan is subject to survey, title and easement verification, engineering design and approval from council and all other relevant authorities. Findings from flora and fauna reports, cultural heritage assessments and other site investigations may result in changes to the design. All landscape and paving detail shown hereon is indicative only. No reliance should be placed on the information on this plan for detailed design or for any financial dealings involving the land. FIGURE 14: PROPOSED SUBDIVISION PLAN BONDS ROAD, LOWER PLENTY SCALE 1: 1000 REF VERSION D SHEET A3 DATE 08/02/16 G:\22760\0ffice Work\Plans\ln Progress\ PSP-D.dgn LEVEL6 440 ELIZABETH STREET MELBOURNE VIC 3000 ( 03) SURVEY@REEDSCONSULTING.COM.AU R 5

17 David Lock Associates Combined Planning Scheme Amendment and Permit Application 5.1 Subdivision Design The proposed rezoning of the land to LDRZ is intended to allow for the subdivision of the land into nine (9) lots between 0.4 and 0.7 hectares as outlined in the able below: Lot Area (m2) Number m m m m m m m m m2 Table 1: Proposed Lot numbers and Areas The subdivision layout and design was developed based on the following design objectives: Limit the loss of scattered trees; To minimise the number of new crossovers to Bonds Road to avoid impacts on remnant vegetation; To design the internal road to minimise crossovers and vegetation removal; To ensure building envelopes are place to avoid the removal of vegetation within lots; and To develop a subdivision layout that responds to the established pattern and character surrounding the site. The subdivision design responds to the above design objectives, and is described in more detail in the following sections. There are 10 scattered trees. The EVC for the site is Grassy Dry Forest, which has a low native vegetation location risk status, being of lowest concern under the assessment framework. The area outside the fence is heavily disturbed and degraded due to slashing and past activities. There are no threatened species on the site that would trigger the EPBC Act. There are no listed specifies of fauna due to the sites highly modified condition. It should also be noted that the vegetation located along the southern boundary of the site along Rosehill Road is found to be planted and not remnant vegetation. Figure 15 explains the sites biological features further. The subdivision proposed has been designed to avoid major impacts to existing vegetation, particularly the remnant patch of vegetation located generally at the eastern portion of the site. The location of boundaries to lots have also been design to avoid impacts on vegetation. This coupled with the siting of building envelopes and building exclusion zones around trees to avoid impact on the remnant patch of vegetation and scattered trees wherever possible. Furthermore the minimum lot size of 0.4 ha will ensure that vegetation that is being shown to be retained is protected under the Planning Scheme as a permit would be required for future landowners to remove vegetation in accordance with Clause of the Planning Scheme. See Appendix D for full report. 5.2 Ecological Values An Ecological Assessment (Flora and Fauna) Assessment has been completed by Paul Kelly & Associates. In summary, the results found that the site supports the following: One remnant patch of vegetation being largely the area within the cyclone fencing on site. 13

18 FIGURE Bonds Road Location & Biological Features Mesh Fence Drainage line D Wetland o Scattered Tree D Plantation - Remnant Native Vegetation - Site Boundary Vicmap Photography flown 22/03/2015, pixel size 10cm

19 David Lock Associates Combined Planning Scheme Amendment and Permit Application 5.3 Arboricultural Values An Arboricultural Assessment has been completed by Rob Gailbrath & Associates. In summary, the results were as follows: There are approximately 310 trees on site and within the road reserve. Based on an analysis of the Aboricultural Assessment and the proposed subdivision layout, the following table highlights the trees predicted to be lost within road crossovers, road reserves or building envelopes. The numbering and trees to be affected are also highlighted Figure 16. See Appendix E for full report. The majority of trees on site are self-sown individual trees of relatively low significance. Individually the trees have low significance and generally poor structure however their value is higher when considered in groups. The most numerous species is Leave Box, with also Yellow Box and Manna Gum present. The majority of trees on site have been graded as having worthiness of retention rating (WOR) of 1-5. There are only seven trees that have a WOR of 7 or more. Table 2: Trees predicted to be lost through subdivision Tree Number Species WOR Rating Impacted by: 15 Acacia melanoxylon (blackwood) 4 Remnant self-sown. Condition Fair/Poor Proposed building envelope in Lot 9 23 Acacia implexa (lightwood) 2 Remnant self-sown. Condition - Poor Road reserve construction 68 Eucalyptus camaldulensis (River Red Gum) 4 Planted. Condition Fair/Poor. One sided, leans heavily to SW Proposed driveway to Lot 6 69 Eucalyptus camaldulensis (River Red Gum) 4 Planted. Condition Fair/Poor Proposed driveway to Lot 6 71 Eucalyptus Ovata (Swamp Gum) 5 Planted. Condition Fair lopsided to north Proposed driveway to Lot 6 80 Eucalyptus botryoides (Southern Mahogany) 3 Condition Fair/ Poor Proposed building envelope in Lot 5 81 Eucalyptus camaldulensis (River Red Gum) 4 Condition Fair/ Poor healthy but has inferior structure Proposed building envelope in Lot Eucalyptus melliodora (Yellow Box) 7 Remnant self-sown. Condition Fair/ Good Proposed crossover to enter subdivision. 106 Eucalyptus globulus (Tasmanian Blue Gum) 3 One sided to west, heavy lean. Condition - Fair/Poor Proposed building envelope of Lot Eucalyptus globulus (Tasmanian Blue Gum) 2 Remnant self-sown. Condition Poor Proposed building envelope of Lot Eucalyptus globulus (Tasmanian Blue Gum) 2 Remnant self-sown. Condition Poor Proposed building envelope of Lot Acacia implexa (Light wood) 4 to 5 Remnant self-sown. Condition Fair Proposed building envelope of Lot Acacia Mearnsii (Late Black Wattle) 2 Remnant self-sown. Condition Fair/poor Proposed building envelope in Lot Acacia Implexa (lightwood) 2 Remnant self-sown. Condition Poor Proposed building envelope in Lot Eucalyptus globulus (Tasmanian Blue gum) 4 Remnant self-sown. Condition Fair /Poor Proposed building envelope in Lot Eucalyptus globulus (Tasmanian Blue gum) 4 Remnant self-sown. Condition Fair/Poor Proposed building envelope in Lot Eucalyptus globulus (Tasmanian Blue gum) 3 Remnant self-sown. Branch dropper. Condition Fair/poor 310 Acacia baileyana (Cootamundra Wattle) 2 Has a thicket of smaller stems (of same species around it). Condition Poor Proposed building envelope in Lot 3 Proposed crossover to enter subdivision. 15

20 m² m² SMIS SION ELEC TRICIT MENT OF Y 59 EASE MENT 56 5 PIPEL 58 INE EASE MENT A A 90OPOS AY ED R W P IVE DR D SE PO AY O PR IVEW DR L L I H AD O R E S RO m² m² ELEC GAS TRICIT SION SMIS Y EASE TRAN m² OF 5779m² TRAN BONDS ROAD ROAD m² DRAINA MENT GE EASE MOVED 22 TO BE RE m² & SEMENT E EA DRAINAG TO BE RE m² NE ZO 60 EP MOVED ROAD A94 MG VEGETATION TREE This plan has been prepared for review and comment only and should not be used for any other purpose without the written consent of Reeds Consulting PTY LTD. The plan is subject to survey, title and easement verification, engineering design and approval from council and all other relevant authorities. Findings from flora and fauna reports, cultural heritage assessments and other site investigations may result in changes to the design. All landscape and paving detail shown hereon is indicative only. No reliance should be placed on the information on this plan for detailed design or for any financial dealings involving the land. SITE AREA : ha AREA OF ROAD : ha No. OF LOTS : 9 AVERAGE AREA : 4589m² DEAD TREE TREE PROTECTION ZONES TREES LIKELY TO BE REMOVED FIGURE 16 TREE REMOVAL PLAN BONDS ROAD, LOWER PLENTY SCALE 1: 1000 REF SHEET A3 VERSION E DATE 21/03/16 G:\22760\Office Work\Plans\In Progress\ PSP-E.dwg 50 LEVEL ELIZABETH STREET MELBOURNE VIC 3000 (03) SURVEY@REEDSCONSULTING.COM.AU

21 David Lock Associates Combined Planning Scheme Amendment and Permit Application 5.4 Access The entrance road into the proposed subdivision is from Bonds Road. The accessway will have a width of 16m, the minimum requirement for Banyule City Council. This will include a fully sealed 5.5m wide carriageway including kerb and channel. Lots that aren t accessed via the proposed internal road, 5 and 6, will be accessed via independent driveways and crossovers from Rosehill Road. Lots 1, 2 and 9 will be access via the internal road through a proposed crossover and driveway, lots 4, 7 and 8 will be accessed via the proposed court bowl. The lot layout, access road and driveways have been designed and to have minimal impact on vegetation. 5.5 Servicing Capability The sites serviceability has been assessed by Reeds Consulting. The assessment confirmed the site can be adequately serviced with essential infrastructure to enable residential subdivision of the site in an orderly and economical manner with services to be extended and/ or augmented to the site by agreement with the relevant servicing authority. Local drainage associated with the subdivision will be designed to Council standards consisting of an underground drainage system catering for a 1 in 5 year storm frequency and allowance for the passage of overland flows generated from 1 in 100 year storm events within the road and/ or reserve network. A 1 in 100yr pipe will be required to link the trapped low-point in the court bowl to the existing overland flow gully. It is proposed that the existing upstream drainage pipe entering lot 9 will be extended to align with the existing drainage gully and discharge the north the existing electricity and gas transmission easements. This will mean that the existing drainage easements would be expunged and replaced with a new drainage easements to align with location of the extended drainage pipe. The existing drainage gully would also be shifted and/ or re-profiled to maximise clearance from the proposed building envelopes within Lots 7, 8 and 9. This will affect the location the existing SBO2 and requires further discussion with Council. The Stormwater Management Strategy Report at Appendix F provides further clarity on the proposed extent of changes to the SBO2. reticulation mains within Bonds Road along the full frontage of the subject site. The proposed development is likely to be serviced by constructing a 63mm PE looped main within the new court as part of the development works to service lots 1-4 & 7-9. It is anticipated that lots 5 & 6 will be serviced via the existing 150mm CICL main along the south side of Rosehill Road. Confirmation of existing water assets and capacities to service the subject site is pending Yarra Valley Water s Preliminary Servicing Advice. The water supply infrastructure internal to the site will be designed and constructed in accordance with Yarra Valley Water s requirements. With regards to sewerage reticulation, Yarra Valley Water is the Responsible Authority. The nearest gravity sewer point is currently located at the northeast corner of 1 Lakeside Drive. Yarra Valley Water GIS records show a planned sewer extension from the existing termination point, where the sewer is proposed to continue northeast along the west boundary of the subject site. It is expected that this sewer will form the basis of satisfactory capacity and gravity reticulation service to the developed subject site. Confirmation of existing and planned sewer assets and capacities to service the subject site is pending Yarra Valley Water s Preliminary Servicing Advice. The proposed development will be required to extend reticulation sewers within the property to provide sewerage facilities for all proposed lots. The sewerage infrastructure internal to the site will be designed and constructed in accordance with Yarra Valley Water s requirements. Preliminary discussions and investigations with Yarra Valley water support the implementation of reticulated sewerage. AusNet Electricity Services is the electrical company responsible for the supply of electricity to the subject land and surrounding area. AusNet Electricity Services has an existing overhead power line along the full frontage of the subject site in Bonds Road which is expected to form the basis of electrical supply to the subject site. Yarra Valley Water is the Responsible Authority for the provision of water supply facilities. There are existing 100mm and 150mm 17

22 Combined Planning Scheme Amendment and Permit Application David Lock Associates APA Group Networks is the responsible authority for the provision of gas supply to the subject land and the surrounding development area. APA Group currently has 50mm diameter mains in Bonds Road which are expected to have sufficient capacity to service the subject land. For further detail regarding servicing, refer to Appendices G and H. 18

23 David Lock Associates Combined Planning Scheme Amendment and Permit Application 6.0 Planning Consideration and Assessment Matters to be considered when determine this amendment request and application for a planning permit include: Provision Clause State Planning Policy Framework Settlement Clause 11 Metropolitan Melbourne Clause Environmental and Landscape Values Clause 12 Protection of biodiversity Clause Native vegetation management Clause Housing Clause Housing Form Clause Rural residential development Transport Clause 18 Sustainable personal transport Management of the road system Infrastructure Clause 19 Water supply, sewerage and drainage Clause Local Planning Policy Framework Municipal Strategic Statement Clause 21 Vision and Strategic Framework Natural Environment Built Environment Transport and Infrastructure Residential Neighbourhood Character Policy Clause Zones Low Density Residential Zone Clause Overlays Vegetation Protection Overlay Clause Significant Landscape Overlay Clause Significant Building Overlay Clause

24 Combined Planning Scheme Amendment and Permit Application David Lock Associates 6.1 Ministerial Direction No.11 Strategic Assessment of Amendments Ministerial Direction No.11 applies to all planning scheme amendments and seeks to ensure a comprehensive strategic evaluation of a planning scheme amendment and the outcomes it produces. Clause 3.1 sets out the matters that must be addressed in any amendment. These are: Why an amendment is required; How the amendment implements the objectives of planning in Victoria; How the amendment addresses any environmental effects; How the amendment addresses any relevant social and economic benefits; Whether the amendment complies with the requirements of any other Minister s Directions; Whether the supports or implements the Local Planning Policy Framework and specifically the Municipal Strategic Statement; Whether the amendment makes proper use of the Victorian Planning Provisions; and How the amendment addresses the views of any relevant agency. And under Criteria 3.2: What impact will the new planning provisions have on the resource and administrative costs of the responsible authority. These matters have been addressed in the Amendment s Explanatory Report. 6.2 Compliance with State Planning Policy There are a number of State planning policies which are applicable to both the rezoning of the land, the application of Overlays and the consideration of the application for a town planning permit. The State Planning Policy Framework (SPPF) outlines the strategic vision for planning in Victoria, and is consistent across all municipalities in the state. Each municipality has its own local strategies and tools to implement the SPPF as it pertains to their area of governance. Clause 11 Settlement Key strategies ensure planning anticipates and responds to the needs of existing and future communities through provision of zoned and serviced land for housing, employment, recreation and open space, commercial and community facilities and infrastructure. Clause Supply of urban land Key objective is to ensure sufficient supply of land is available for residential and other uses to accommodate projected population growth over at least a 15 year period. Clause Housing choice and affordability Key strategies promote the provision of a diversity of housing in defined locations that cater for different households and are close to jobs and services. Response: The proposed rezoning and subdivision will add additional housing supply on land currently underutilised. The low density nature of the proposed subdivision responds to the surrounding subdivision character. It provides additional housing close to jobs and services. Clause : Protection of biodiversity Strategies seek to assist in the protection and conservation of Victoria s Biodiversity. Clause Native vegetation management Strategies seek to ensure that permitted clearing of native vegetation results in not net loss in the contribution made by native vegetation to Victoria s biodiversity. 20

25 David Lock Associates Combined Planning Scheme Amendment and Permit Application Response: As confirmed by the ecological assessment, there is only one remnant patch of vegetation on the site which is to be avoided wherever possible. Furthermore, the subdivision proposed has been designed to avoid major impacts to existing vegetation. The location of boundaries to lots have also been designed to avoid impacts on vegetation. This coupled with the siting of building envelopes and exclusion zones around trees to avoid impact on the remnant patch of vegetation and scattered trees wherever possible. Clause seeks to manage the road system to achieve integration, choice and balance by developing an efficient and safe network and making the most of existing infrastructure. Response: The proposal presents sustainable transport options and has been carefully designed so that residents can enjoy a practical, safe and attractive public realm within the site. Clause 16: Housing The key objective of Clause is to promote a housing market that meets community needs. Key Strategies include increasing the supply of housing in existing urban areas by facilitating increased housing yield in appropriate locations, including under-utilised land; and to ensure housing developments are integrated with infrastructure and services. The key objective of Clause is to identify land suitable for rural living and rural-residential development. Key strategies include ensuring land is only zoned for rural living or rural residential development where it: Is located close to existing towns and urban centres, but not in areas that will be required for fully serviced urban development. Can be supplied with electricity and water and good quality road access. Response: The proposed rezoning allows for additional rural living located close to existing centres that can be supplied with electricity, water and good quality road access on land that is no longer required for public use. Clause 18: Transport Clause promotes the use of sustainable personal transport. Key strategies seek to develop high quality pedestrian environments, and to ensure options such as walking, cycling and public transport. 21

26 Combined Planning Scheme Amendment and Permit Application David Lock Associates 6.3 Compliance with Local Planning Policy MSS The Municipal Strategic Statement (MSS) outlines the key strategic vision for Banyule City Council, providing the key strategic planning, land use and development objectives for the municipality, and the strategies and actions for achieving Council s objectives and strategies of the MSS. A range of MSS objectives are applicable with varying degrees to the proposal. Clause 21.02: Vision and Strategic Framework Clause outlines the Vision for Banyule which is: Banyule will be regarded as a city offering a range of quality lifestyles in an urban setting enhanced by the natural environment, and served by an efficient and committed Council. Key objectives include managing the natural and built environment to ensure its diversity and well-being for present and future generations. The adopted vision for the MSS: To develop a city that combines the best features of the natural and urban environments with safety, convenience and the ability to manage social and economic change. Of particular note is the emphasis on diversity, maintain, support and enhance the diversity of population, land use and development and natural environment which give Banyule its distinctive character. Response: The proposed rezoning and subdivision responds to vision and key objectives for Banyule. The design will retain and enhance the natural features of the land, whilst responding to the distinctive character of the area. Clause Natural Environment Clause seeks to protect, conserve and enhance areas of floral, faunal and habitat significance through protecting remnant vegetation and protecting and enhancing the amenity of Banyule s diverse landscape values. Response: The proposed subdivision design was developed consideration of the sites native vegetation constraints. The subdivision will not limit the removal of any remnant vegetation on the site. The low density nature of the development will protect Banyule s landscape values. Clause 21.06: Built Environment Clause seeks to ensure that development respects and contributes to the desired future character of residential neighbourhoods through encouraging the retention and planting of significant trees, substantial trees and other vegetation to protect and improve the landscape character, streetscapes, habitat links and biodiversity of the area. Objective 4 Housing Change, seeks to increase the diversity of housing types and promote new housing that meets the needs of the broader community in a manner that respects and contributes to the desired future character of residential neighbourhoods. To achieve this, strategies include the protection of Low Density Residential Zoned land. Response: The subject site has existing low density residentially zoned land to the north, south and east. The proposed rezoning, in a sense, will provide a logical extension to the existing low density residential zoning, with the character of the area replicated within the site Transport and Infrastructure Clause seeks to promote a safe, efficient and effective integrated transport network. A key objective of relevance is to reduce the detrimental effects of transport on the natural environment of Banyule by increasing the use of public transport and reduced dependency on private vehicles. Response: The site is well serviced by existing public transport. Both local and smart buses run along Lower Plenty Road and Fitzsimmons Lane which is 1km from the subject site. Montmorency Train Station is approximately 2km from the subject site. 22

27 David Lock Associates Combined Planning Scheme Amendment and Permit Application Clause Residential Neighbourhood Character Policy Key policy objectives include ensuring development complements and respects the preferred future character of the area. The subject site is located within the Bush Woodland Area. Clause describes the key characteristics of the Bush Woodland Area as rural, undeveloped character with significant indigenous vegetation, a farmland landscape character; meandering or straight country roads without made kerbs, and various dwelling types. The most dominant characteristics of the area type are the dominant landscape setting of rolling hills and the Yarra River flood plain, together with remnant indigenous vegetation. The policy provides a Statement of Preferred Future Neighbourhood Character, of which the character of the precinct is to be retained and enhanced by: Positioning new dwellings within the landscape and well back from the road (over 20 metres). Retaining indigenous and native canopy trees on public and private land. Removing environmental weeds where appropriate. Encouraging new development to replant indigenous trees and plants wherever possible, and to incorporate natives in the new planting schemes. Designing site layouts with spacing around dwellings that allows for planting and the future growth of trees to maturity. Minimising the excavation and designing buildings and driveways to follow the topography. Constructing only post and rail or wire fencing coupled with well vegetated front gardens. Constructing driveways with a porous surface such as gravel or toppings. Designing developments with only one single width crossover and a driveway that is softened with curves and vegetation. Protecting and enhancing the scenic and environmental qualities of treed ridgelines. Protecting and enhancing informal planting of street trees, as well as the views of trees on private property form the street. Obscuring household services form street view. Clause details the application requirements within this character area which includes: An arborist report when tree removal is proposed. The report should be prepared as described in AS Protection of trees on development sites. Response: The proposed subdivision responds to the Preferred Neighbourhood Character as follows: New dwellings are positioned within the landscape well back from the road and will sit in below the high point, being the golf course land and the notional end of Bonds Road. Indigenous and native canopy trees are retained where possible. The design of building envelopes allows for both tree retention and the future planting to further blend the low density subdivision with the surrounding landscape. Driveways are designed to follow the topography and minimise excavation. It is expected that land management plans will be used to ensure ongoing maintenance of retained vegetation and ensure appropriate land management practices are followed. Retaining existing informal street treatments including, footpaths and nature strips. Planting trees and shrubs in the front setback to improve the bush setting and discourage car parking in front of dwellings. 23

28 Combined Planning Scheme Amendment and Permit Application David Lock Associates 6.4 Compliance with Zoning Appropriateness of Public Use Zone It is considered inappropriate that land continues to exist within the public use zone when it is now privately owned and the previous public use conducted on the site no longer exists. Public Use Zone Clause The purpose of the Public Use Zone is: To implement the State Planning Policy Framework and the Local Planning Policy Framework, including the Municipal Strategic Statement and local planning policies. To recognise public land use for public utility and community services and facilities. To provide for associated uses that are consistent with the intent of the public land reservation or purpose. In having regard to the purposes of the zone, it is considered that the land does not meet these requirements as it is no longer used as a public utility and is now privately owned. Directly to the northern, eastern and southern boundaries is existing low density residential land within the Lower Plenty and Diamond Valley. Rezoning the site to LDRZ forms a logical extension of the LDRZ adjacent, extending the residential development to the edge of the Heidelberg Golf Course. The land allows for 9 low density residential lots that will contribute additional housing within a well-serviced area of the municipality whilst also protecting any environmental and landscape values within the site and which will fit comfortably in the existing context. 6.5 Compliance with Existing Overlays Significant Landscape Overlay 1 The subject site is covered by the Significant Landscape Overlay 1 Watercourse Environs (SLO1). The purpose of the overlay is to protect areas along watercourse and their immediate environs from visual intrusion cause by the inappropriate siting or appearance of buildings. Pursuant to Clause 3.2, a permit is required to remove, destroy or lop any vegetation. It is proposed to retain the SLO1 on the site, as its purpose is just as applicable to the proposed low density residential subdivision Special Building Overlay 2 The drainage corridor running north south along the western boundary of the site is covered by the Special Building Overlay 2 (SBO2). Clause triggers a permit to subdivide land. The SBO2 is to be retained on site, as its purpose of identifying land in urban areas liable to inundation by overland flows from the urban drainage system is even more important once the land is rezoned to LDRZ. However, its location is to be slightly modified to allow for the proposed building envelopes and to maintain the existing easements within the site. Please note, at this stage, the SBO map has not been modified as we would like to work through any modifications with Council prior to requesting any map changes Vegetation Protection Overlay 1 The subject land is covered by the Vegetation Protection Overlay 1 Plenty River East Area (VPO1). The area contains developed and developing urban areas which have significant natural, habitat and environmental qualities. A key objective of the overlay is to conserve the existing pattern of vegetation, landscape quality and ecosystems within the area, protecting the area as a habitat for local fauna and as an important habitat link. In accordance with Clause 3.0 of VPO1, a permit is required to remove destroy or lop native vegetation. It is proposed to retain the VPO1 on the site, which will ensure the natural, habitat and environmental qualities are retained once the land is rezoned. 6.6 Other Planning Considerations Native Vegetation, Clause To ensure permitted clearing of native vegetation results in no net loss in the contribution made by native vegetation to Victoria s biodiversity. This is achieved through the following approach: Avoid the removal of native vegetation that makes a significant contribution to Victoria s biodiversity. Minimise impacts on Victoria s biodiversity from the removal of native vegetation. 24

SCHEDULE THREE TO THE DEVELOPMENT PLAN OVERLAY EASTERN GOLF COURSE KEY REDEVELOPMENT SITE

SCHEDULE THREE TO THE DEVELOPMENT PLAN OVERLAY EASTERN GOLF COURSE KEY REDEVELOPMENT SITE DD/MM/YY SCHEDULE THREE TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO3 EASTERN GOLF COURSE KEY REDEVELOPMENT SITE 1.0 A permit may be granted before a development plan has been

More information

Draft Ada Street Cardiff Area Plan

Draft Ada Street Cardiff Area Plan Draft Ada Street Cardiff Area Plan (Draft Amendment to Lake Macquarie Development Control Plan 2014) Exhibition: The draft Area Plan is on public exhibition from 29 February 2016 to 29 March 2016. Submissions:

More information

DAREBIN PLANNING SCHEME AMENDMENT C137

DAREBIN PLANNING SCHEME AMENDMENT C137 Who is the planning authority? Planning and Environment Act 1987 DAREBIN PLANNING SCHEME AMENDMENT C137 EXPLANATORY REPORT This amendment has been prepared by the Darebin City Council, who is the planning

More information

GREENBANK DEVELOPMENT MASTERPLAN

GREENBANK DEVELOPMENT MASTERPLAN DEVELOPMENT MASTERPLAN POTENTIAL TRAIN STATION COMMUNITY CENTRE Greenbank will be a connected masterplanned community providing easy access to local and surrounding amenity. Affordable quality homes, green

More information

I611. Swanson North Precinct

I611. Swanson North Precinct I611. Swanson North Precinct I611.1. Precinct Description Swanson North is located in the north eastern foothills of the Waitakere Ranges. It is outside the Waitakere Ranges Heritage Area Act and the Waitakere

More information

I539. Smales 2 Precinct

I539. Smales 2 Precinct I539. Smales 2 Precinct I539.1. Precinct Description The Smales 2 Precinct applies to a 4.8 hectare block of land located on the southern side of Northcote Road and fronting Lake Pupuke, Takapuna. The

More information

I602. Birdwood Precinct

I602. Birdwood Precinct I602. Birdwood Precinct I602.1. Precinct description The Birdwood Precinct applies to an area west of Don Buck Road and south of Red Hills Road in west Auckland. It incorporates subdivision and development

More information

I403 Beachlands 1 Precinct

I403 Beachlands 1 Precinct I403. Beachlands 1 I403.1. Precinct Description Beachlands is a rural and coastal village located on the eastern side of Auckland, adjoining the Tamaki Strait coastline. The original Beachlands village

More information

INCREMENTAL CHANGE AREA REVIEW March 2015 Page 1

INCREMENTAL CHANGE AREA REVIEW March 2015 Page 1 INCREMENTAL CHANGE AREA REVIEW March 2015 Page 1 Table of Contents Introduction... 3 Background to Review... 3 Comparison of the Schedules to the General Residential Zone... 7 Methodology... 7 Policy Context...

More information

Mollers Lane, Leopold, Victoria Significant Landscape Overlay Re-assessment

Mollers Lane, Leopold, Victoria Significant Landscape Overlay Re-assessment XURBAN Mollers Lane, Leopold, Victoria Significant Landscape Overlay Re-assessment For: TGM Group November 2016 Final Mollers Lane, Leopold, Victoria Significant Landscape Overlay Re-assessment Client

More information

Re: Amendment C234 Cardinia Planning Scheme Pakenham East Precinct Submission by Earldean Pty Ltd and Auscare Commercial Pty Ltd

Re: Amendment C234 Cardinia Planning Scheme Pakenham East Precinct Submission by Earldean Pty Ltd and Auscare Commercial Pty Ltd 23 February 2018 Victorian Planning Authority amendments@vpa.vic.gov.au Dear Sir / Madam Re: Amendment C234 Cardinia Planning Scheme Pakenham East Precinct Submission by Earldean Pty Ltd and Auscare Commercial

More information

Northern Territory Compact Urban Growth Policy

Northern Territory Compact Urban Growth Policy Northern Territory Compact Urban Growth Policy A Reference Policy Document to clause 2.7 (Reference to Policy) of the NT Planning Scheme May 2015 Table of Contents 1 Policy Setting... 3 1.1 Context for

More information

Part 12 Precinct Area Plans - Wyee West

Part 12 Precinct Area Plans - Wyee West TABLE OF CONTENTS 1 INTRODUCTION... 1 1.1 BACKGROUND... 1 1.2 EXTENT OF AREA PLAN... 1 1.3 EXISTING CHARACTER... 2 1.4 ENVIRONMENTAL ATTRIBUTES AND CONSTRAINTS... 2 1.5 DESIRED FUTURE CHARACTER... 3 1.6

More information

LAND USE AMENDMENT CORNERSTONE (WARD 3) 60 STREET NE AND COUNTRY HILLS BOULEVARD NE MAP 26NE BYLAW 22D2017

LAND USE AMENDMENT CORNERSTONE (WARD 3) 60 STREET NE AND COUNTRY HILLS BOULEVARD NE MAP 26NE BYLAW 22D2017 Page 1 of 14 EXECUTIVE SUMMARY This Land Use Amendment application covers an area of 43.76 hectares ± (108.14 acres ±) located in northeast Calgary, bound by Country Hills Boulevard NE to the south and

More information

SECTION 7A: WHAKARONGO RESIDENTIAL AREA

SECTION 7A: WHAKARONGO RESIDENTIAL AREA SECTION 7A: WHAKARONGO RESIDENTIAL AREA CONTENTS 7A.1 Introduction 1 7A.2 Resource Management Issues 1 7A.3 Objectives and Policies 1 7A.4 Methods 4 7A.5 Residential Zone 4 7A.5.1 Rules: Controlled Activities

More information

C176. Amendment C176 Riverdale Precinct Structure Plan List of Document Changes for Planning Panels Victoria. Version th November 2013

C176. Amendment C176 Riverdale Precinct Structure Plan List of Document Changes for Planning Panels Victoria. Version th November 2013 C176 Amendment C176 Riverdale Precinct Structure Plan List of Document Changes for Planning Panels Victoria Version 1.0 18 th November 2013 Amendment C176 Riverdale Precinct Structure Plan List of Document

More information

SCHEDULE 10 TO THE URBAN GROWTH ZONE. Shown on the planning scheme map as UGZ10. Truganina Precinct Structure Plan. 1.0 The Plan

SCHEDULE 10 TO THE URBAN GROWTH ZONE. Shown on the planning scheme map as UGZ10. Truganina Precinct Structure Plan. 1.0 The Plan SCHEDULE 10 TO THE URBAN GROWTH ZONE Shown on the planning scheme map as UGZ10 Truganina Precinct Structure Plan 1.0 The Plan Map 1 shows the future urban structure proposed in the Truganina Precinct Structure

More information

Rural (Urban Expansion) Environment

Rural (Urban Expansion) Environment RUEE.1 Rural (Urban Expansion) Environment Subsequent to the receipt of appeals, a 'marked up' version of the Proposed District Plan was prepared. The provisions of the Proposed Version of the Plan subject

More information

Section 12C Subdivision in the Rural Residential Zone

Section 12C Subdivision in the Rural Residential Zone Section 12C 12C Subdivision in the Rural Residential Zone The Rural Residential Zone provides part of the range of residential opportunities within the City. Land zoned rural residential is considered

More information

CASEY PLANNING SCHEME AMENDMENT C188

CASEY PLANNING SCHEME AMENDMENT C188 Who is the planning authority? Planning and Environment Act 1987 CASEY PLANNING SCHEME AMENDMENT C188 EXPLANATORY REPORT This amendment has been prepared by the Growth Areas Authority (now known as the

More information

4 RESIDENTIAL ZONE. 4.1 Background

4 RESIDENTIAL ZONE. 4.1 Background 4 RESIDENTIAL ZONE 4.1 Background The residential areas within the City are characterised by mainly lowrise dwellings sited on individual allotments. Past architectural styles, settlement patterns and

More information

Appendix H: Easement cross sections

Appendix H: Easement cross sections Appendix H: Easement cross sections SHARED PATH 1.5m FOOTPATH NATURE STRIP 7.3m CARRIAGEWAY 2.7m NATURE STRIP EXISTING PIPELINE 150mm DIA 5.0m (approx.) LOCAL ACCESS ROAD EXISTING PIPELINE 500mm DIA 2.7m

More information

AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON

AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON Subject: Boyne Survey Secondary Plan and Related Official Plan Amendments The following text and schedules constitute Amendment No. 30 to the

More information

1 The decision of the Responsible Authority is affirmed. 2 In permit application WH/2014/851, no permit is granted.

1 The decision of the Responsible Authority is affirmed. 2 In permit application WH/2014/851, no permit is granted. VICTORIAN CIVIL AND ADMINISTRATIVE TRIBUNAL ADMINISTRATIVE DIVISION PLANNING AND ENVIRONMENT LIST VCAT REFERENCE NO. P754/2015 PERMIT APPLICATION NO.WH/2014/851 CATCHWORDS Section 77 of the Planning and

More information

PUBLIC NOTICE UNDER CLAUSE 5 OF SCHEDULE 1 OF THE RESOURCE MANAGEMENT ACT 1991 PLAN CHANGE 12 TO THE OPERATIVE CITY OF NAPIER DISTRICT PLAN

PUBLIC NOTICE UNDER CLAUSE 5 OF SCHEDULE 1 OF THE RESOURCE MANAGEMENT ACT 1991 PLAN CHANGE 12 TO THE OPERATIVE CITY OF NAPIER DISTRICT PLAN PUBLIC NOTICE UNDER CLAUSE 5 OF SCHEDULE 1 OF THE RESOURCE MANAGEMENT ACT 1991 PLAN CHANGE 12 TO THE OPERATIVE CITY OF NAPIER DISTRICT PLAN Public notice is given in accordance with Clause 5 of Schedule

More information

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high

More information

EASTERN GOLF COURSE DEVELOPMENT PLAN OCTOBER 2013

EASTERN GOLF COURSE DEVELOPMENT PLAN OCTOBER 2013 DEVELOPMENT PLAN OCTOBER 2013 SECTION HEADING 2 DEVELOPMENT PLAN - OCTOBER 2013 TABLE OF CONTENTS PAGE INTRODUCTION 1.1 COMPONENTS OF THE DEVELOPMENT PLAN 5 SITE ANALYSIS 2.1 OVERALL SITE CONTEXT 6 2.2

More information

Amendment C205. Expert Urban Design Evidence. Hume Planning Scheme. Julia Bell February 2018

Amendment C205. Expert Urban Design Evidence. Hume Planning Scheme. Julia Bell February 2018 Julia Bell February 2018 Instructed by KING&WOOD MALLESONS On behalf of Hume City Council Contents 1.0 Introduction... 3 2.0 Context... 4 2.1 Physical Context... 4 2.2 Strategic Context... 8 3.0 Assessment...

More information

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED 9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO. 631 - BOCA EAST INVESTMENTS LIMITED The Planning and Economic Development Committee recommends the adoption of the recommendations contained in the following

More information

LAND USE AMENDMENT CORNERSTONE (WARD 3) COUNTRY HILLS BOULEVARD AND STONEY TRAIL NE BYLAW 9D2017

LAND USE AMENDMENT CORNERSTONE (WARD 3) COUNTRY HILLS BOULEVARD AND STONEY TRAIL NE BYLAW 9D2017 Page 1 of 12 EXECUTIVE SUMMARY This Land Use Amendment application covers an area of 54.92 hectares ± (135.71 acres ±) located in northeast Calgary, bound by Country Hills Boulevard NE to the north and

More information

Greater Geelong Planning Scheme Proposed Planning Scheme Amendment C and 5-19 Princes Highway, Norlane

Greater Geelong Planning Scheme Proposed Planning Scheme Amendment C and 5-19 Princes Highway, Norlane Greater Geelong Planning Scheme Proposed Planning Scheme Amendment C253 PLANNING SUBMISSION prepared for Bunnings Group Ltd by SJB Planning Pty Ltd Level 1, Building D 80 Dorcas Street SOUTHBANK VIC 3006

More information

Site layout, density and housing type

Site layout, density and housing type Site layout, density and housing type How can the high densities (up to 30 lots/hectare) be justified in this area and protect adjoining neighbourhood character? The overall site density (15-18 lots/ha)

More information

Rural (Urban Expansion) Environment

Rural (Urban Expansion) Environment RUEE.1 Rural (Urban Expansion) Environment Index RUEE.1 RUEE.1.1 RUEE.1.2 RUEE.1.3 RUEE.1.4 RUEE.2 RUEE.2.1 RUEE.2.2 RUEE.2.3 RUEE.2.4 RUEE.3 Rural (Urban Expansion) Environment Description and Expectations

More information

TIDAPA Structure Plan

TIDAPA Structure Plan TIDAPA Structure Plan Prepared by Tract Consultants 28 MARCH 2017 0217-0074 Table of Contents 01 STRATEGIC CONTEXT Executive Summary Regional Context Page 3 Page 4 02 LOCAL CONTEXT Aerial Photograph Local

More information

I615. Westgate Precinct

I615. Westgate Precinct I615. Westgate Precinct I615.1. Precinct Description The Westgate Precinct is located approximately 18km west of the Auckland city centre. There are seven Sub-precincts in the Westgate Precinct: Sub-precinct

More information

Subdivision Design Criteria. Penihana North GUIDELINES TO THE RULES

Subdivision Design Criteria. Penihana North GUIDELINES TO THE RULES Created September 2013 Penihana North Subdivision Design Criteria GUIDELINES TO THE RULES This part of the Plan sets out the design criteria for subdivision in Penihana North. The criteria will be considered

More information

Extract from Whitehorse Planning Scheme - LOCAL PLANNING POLICIES - CLAUSE Preferred Character Statements

Extract from Whitehorse Planning Scheme - LOCAL PLANNING POLICIES - CLAUSE Preferred Character Statements Extract from Whitehorse Planning Scheme - LOCAL PLANNING POLICIES - CLAUSE 22.03 22.03-5 Preferred Character Statements Bush Environment The streetscapes will be dominated by vegetation with subservient

More information

ADMINISTRATION RECOMMENDATION 2016 November 03. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment.

ADMINISTRATION RECOMMENDATION 2016 November 03. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment. Page 1 of 12 EXECUTIVE SUMMARY This Land Use Amendment application covers an area of 75.76 hectares ± (187.20 acres ±) located in northeast Calgary, bound by Stoney Trail NE to the north, 128 Avenue NE

More information

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 July 27, 2009 TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Plan Area Location & Context... 1 1.2 Ownership

More information

ADMINISTRATION RECOMMENDATION(S) 2017 February 09. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment.

ADMINISTRATION RECOMMENDATION(S) 2017 February 09. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment. Page 1 of 10 EXECUTIVE SUMMARY This land use amendment application is to accommodate changes to the location of a stormwater retention pond and land use boundaries adjacent to Environmental Reserve in

More information

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17 Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS A New Garden Neighbourhood Matford Barton 17 2.1. SUMMARY AND STATUS OF THE PROPOSALS 2.1.1. The parameter plans and associated wording in this chapter

More information

RURAL ZONE - POLICY. Rural Zone Policy. Issue: Rural Environment. Ruapehu District Plan Page 1 of 8

RURAL ZONE - POLICY. Rural Zone Policy. Issue: Rural Environment. Ruapehu District Plan Page 1 of 8 Rural Zone Policy RU2 RURAL ZONE - POLICY RU2.1 Introduction The natural resources of the rural environment in the Ruapehu District provide the basis for the existing and potential character, intensity

More information

Introduction How to read this document Land to which this Precinct Structure Plan applies Background information...

Introduction How to read this document Land to which this Precinct Structure Plan applies Background information... Introduction... 4 How to read this document... 6 Land to which this Precinct Structure Plan applies... 6 Background information... 6 Shepparton North East Development Contributions Plan... 7... 8 OUTCOMES...

More information

Section 3b: Objectives and Policies Rural Environment Updated 19 November 2010

Section 3b: Objectives and Policies Rural Environment Updated 19 November 2010 Page 1 of Section 3b 3b RURAL ENVIRONMENT 3b.1 Introduction The Rural Environment comprises all the land outside of the Residential, Town Centre and Industrial Environments. Most land within the District

More information

Sandy Creek Road and 1720 Bacchus Marsh Road, Little River

Sandy Creek Road and 1720 Bacchus Marsh Road, Little River 405 455 Sandy Creek Road and 1720 Bacchus Marsh Road, Little River Planning Permit Application for Development and Use of Land for Stone (Sand and Soil) Extraction and Removal of Native Vegetation Reference:

More information

Barwon Heads Road. REGIONAL ACTIVE PUBLIC OPEN SPACE - Indicative Concept Only FIGURE C. Armstrong Creek East Precinct Structure Plan

Barwon Heads Road. REGIONAL ACTIVE PUBLIC OPEN SPACE - Indicative Concept Only FIGURE C. Armstrong Creek East Precinct Structure Plan 0 50 150 metres KEY Arterial Road (existing) Walking / Cycling link Residential Conventional Mixed Use Residential Medium Density Farming Drainage and Floodway Public Open Space Armstrong Creek Watercourse

More information

Town Planning Report. Combined Planning Permit and Planning Scheme Amendment Request under Section 96A of the Planning and Environment Act 1987

Town Planning Report. Combined Planning Permit and Planning Scheme Amendment Request under Section 96A of the Planning and Environment Act 1987 Town Planning Report Combined Planning Permit and Planning Scheme Amendment Request under Section 96A of the Planning and Environment Act 1987 1 Henry Street, Belmont Prepared by Tract Consultants for

More information

Asbury Chapel Subdivision Sketch Plan

Asbury Chapel Subdivision Sketch Plan Asbury Chapel Subdivision Sketch Plan PART 1: PROJECT SUMMARY Applicant: NVR Inc. Project Size: +/- 76.13 acres Parcel Numbers: 02101112,02116101,02116112, 02116113 Current Zoning: Transitional Residential

More information

DRAFT TARNEIT WEST Outline Development Plan MAY 2007

DRAFT TARNEIT WEST Outline Development Plan MAY 2007 DRAFT TARNEIT WEST Outline Development Plan MAY 2007 Department of Strategy and Tourism Draft May 2007 Page 1 Table of Contents 1.0 Introduction...4 1.1 Overview...4 1.2 Land and Locality...4 1.3 Purpose

More information

Subdivision and Development

Subdivision and Development Subdivision and Development 8.0 Introduction - Subdivision and Development The principle purpose of subdivision is to provide a framework for land ownership so that development and activities can take

More information

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN Official Plan Amendment XX to the Official Plan for the City of Ottawa 1 INDEX THE STATEMENT OF COMPONENTS PART A THE PREAMBLE PAGE Purpose...

More information

TABLE OF CONTENTS. Human Habitats, 155 Dorcas St South Melbourne, Victoria 3205

TABLE OF CONTENTS. Human Habitats, 155 Dorcas St South Melbourne, Victoria 3205 TARNEIT JUNCTION Town Planning Report DECEMBER 2013 TABLE OF CONTENTS Table of contents... 1 1 Introduction... 2 2 SIte context and surrounds... 4 2.1 Site Features... 4 2.2 Surrounding land uses... 4

More information

Appendix 1 Structure plan guidelines

Appendix 1 Structure plan guidelines Appendix 1 Structure plan guidelines This appendix forms part of the regional policy statement [rps]. 1.1. Introduction Structure plans are an important method for establishing the pattern of land use

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

Leduc Industrial Outline Plan SE W4

Leduc Industrial Outline Plan SE W4 Leduc Industrial Outline Plan SE 1-50-25-W4 Within the North Leduc Industrial ASP Prepared for: Leduc Energy Park Ltd. Prepared by: Stantec Consulting Ltd. File No. 1161 104655 V5 Table of Contents 1.0

More information

22.15 OUTDOOR ADVERTISING SIGNAGE POLICY

22.15 OUTDOOR ADVERTISING SIGNAGE POLICY 22.15 OUTDOOR ADVERTISING SIGNAGE POLICY This policy applies to all land where a planning permit is required to construct or display a sign under the provisions of the Kingston Planning Scheme. 22.15-1

More information

City of Grande Prairie Development Services Department

City of Grande Prairie Development Services Department City of Grande Prairie Development Services Department ROYAL OAKS NORTH OUTLINE PLAN OP-07-03 NW 35-71-6 W6M May 7, 2007 Royal Oaks North Outline Plan TABLE OF CONTENTS 1.0 INTRODUCTION........ 3 1.1 Purpose

More information

Lake Macquarie City. A copy of the published amendment including the instrument and maps, is provided in Attachment 7 of this report.

Lake Macquarie City. A copy of the published amendment including the instrument and maps, is provided in Attachment 7 of this report. Planning Proposal Amendment No. 77 to Lake Macquarie Local Environmental Plan 2004 and proposed Amendment to Draft Lake Macquarie Local Environmental Plan 2013 Minor Zone Boundary Adjustment - Pasminco

More information

Clyde Creek & Casey Fields South PRECINCT STRUCTURE PLAN

Clyde Creek & Casey Fields South PRECINCT STRUCTURE PLAN Clyde Creek & Casey Fields South PRECINCT STRUCTURE PLAN Major Town Centre at Clyde with potential future rail station, conservation of heritage and environmental values, diverse residential community,

More information

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018 Page 1 of 19 EXECUTIVE SUMMARY This application proposes redesignating two parcels in the community of Silver Springs from Special Purpose Future Urban Development (S-FUD) District and undesignated road

More information

CITY OF FREMANTLE LOCAL PLANNING SCHEME NO. 4 AMENDMENT NO. 68 SCHEME AMENDMENT REPORT

CITY OF FREMANTLE LOCAL PLANNING SCHEME NO. 4 AMENDMENT NO. 68 SCHEME AMENDMENT REPORT CITY OF FREMANTLE LOCAL PLANNING SCHEME NO. 4 AMENDMENT NO. 68 SCHEME AMENDMENT REPORT CITY OF FREMANTLE PLANNING AND DEVELOPMENT SERVICES 8 WILLIAM STREET FREMANTLE WA 6160 PLANNING AND DEVELOPMENT ACT

More information

DRAFT FOR YOUR FEEDBACK DRAFT LOGAN RESERVE PLAN

DRAFT FOR YOUR FEEDBACK DRAFT LOGAN RESERVE PLAN DRAFT FOR YOUR FEEDBACK CONTENTS INTRODUCTION... BACKGROUND... State Government... Council... PLANNING LEGISLATION AND RULES... CONSULTATION PROCESS...... ENVIRONMENT AND CONSERVATION... HOUSING... Proposed

More information

Planning Proposal Concurrent DA/LEP Amendment for Belmont North Pharmacy Amendment No. 24 to Lake Macquarie Local Environmental Plan (LMLEP) 2014

Planning Proposal Concurrent DA/LEP Amendment for Belmont North Pharmacy Amendment No. 24 to Lake Macquarie Local Environmental Plan (LMLEP) 2014 Planning Proposal Concurrent DA/LEP Amendment for Belmont North Pharmacy Amendment No. 24 to Lake Macquarie Local Environmental Plan (LMLEP) 2014 Local Government Area: Name of Draft LEP: Subject Land:

More information

The WAPC publications summarised in this report are (in order of policy importance):

The WAPC publications summarised in this report are (in order of policy importance): Summary of WAPC Publications Relevant to Local Biodiversity Planning As part of the delivery of the land use planning component of the Western Australian Natural Resource Management (NRM) program in 2011/12,

More information

MASTER PLAN NO. 60 (SITE DEVELOPMENT PLAN EASTBANK/REGATTA NORTH PRECINCTS 2 4) 2008

MASTER PLAN NO. 60 (SITE DEVELOPMENT PLAN EASTBANK/REGATTA NORTH PRECINCTS 2 4) 2008 Page 2 TABLE OF CONTENTS PAGE 1 PRELIMINARY... 5 1.1 CITATION... 5 1.2 TYPE OF MASTER PLAN... 5 1.3 LEGAL REQUIREMENT FOR MASTER PLAN... 5 1.4 LEGAL EFFECT OF THE MASTER PLAN... 5 2 DESCRIPTION OF LAND...

More information

STRATEGIC ADVICE REPORT

STRATEGIC ADVICE REPORT 1 STRATEGIC ADVICE REPORT BERWICK WATERWAYS PSP (PSP 09) PREPARED BY TAYLORS DEVELOPMENT STRATEGISTS P/L GROWTH AREAS AUTHORITY JULY 2010 DRAFT VERSION 0.1 TABLE OF CONTENTS EXECUTIVE SUMMARY... 3 1 INTRODUCTION...

More information

7.2.9 Eudlo local plan code

7.2.9 Eudlo local plan code 7.2.9 local plan code 7.2.9.1 Application (1) This code applies to assessable development:- (a) within the local plan area as shown on Map ZM29 contained within Schedule 2 (Mapping); and (b) identified

More information

Tāhuhu whakaruruhau ā-taone The sheltering ridge pole

Tāhuhu whakaruruhau ā-taone The sheltering ridge pole B2. Tāhuhu whakaruruhau ā-taone - Urban growth and form B2.1. Issues Tāhuhu whakaruruhau ā-taone The sheltering ridge pole Auckland s growing population increases demand for housing, employment, business,

More information

Complete Neighbourhood Guidelines Review Tool

Complete Neighbourhood Guidelines Review Tool Complete Neighbourhood Guidelines Review Tool Prepared By: City of Regina Planning Department October 2014 Page 1 of 14 Community Development Review Checklist for Secondary Plans and Concept Plans The

More information

The West Vaughan Employment Area Secondary Plan Policies

The West Vaughan Employment Area Secondary Plan Policies Part 2: The West Vaughan Employment Area Secondary Plan Policies 2.1 General Policies It is the policy of Council: 2.1.1. That the West Vaughan Employment Area (the WVEA), identified on Schedule 1, will

More information

Planning Proposal Charlestown Swim and Leisure Centre LEP Amendment

Planning Proposal Charlestown Swim and Leisure Centre LEP Amendment Planning Proposal Charlestown Swim and Leisure Centre LEP Amendment Amendment No. 4 to Lake Macquarie Local Environmental Plan 2014 (PP_2014_LAKEM_005_00) Local Government Area: Name of Draft LEP: Lake

More information

OP Council Resolution June 16, Planning and Development Services

OP Council Resolution June 16, Planning and Development Services OP-08-01 Council Resolution June 16, 2008 Planning and Development Services Kingsgate Landing Outline Plan Table of Contents 1.0 Introduction 1 1.1 Purpose of Plan 1 1.2 Plan Area Location 1 1.3 Ownership

More information

Water Sensitive Urban Design Site Development Guidelines and Practice Notes. Appendix

Water Sensitive Urban Design Site Development Guidelines and Practice Notes. Appendix Water Sensitive Urban Design Site Development Guidelines and Practice Notes Appendix 108 Appendix A Water sensitive developments involve simple design and management practices that take natural site features

More information

SECTION ONE North East Industrial Zone Design Guide Palmerston North City Council June 2004

SECTION ONE North East Industrial Zone Design Guide Palmerston North City Council June 2004 SECTION ONE North East Industrial Zone Design Guide Palmerston North City Council June 2004 young heart easy living 1 Preface Industrial areas are a very important component of the economic well-being

More information

Cardinia Creek South

Cardinia Creek South Cardinia Creek South Precinct Structure Plan March 2018 Your partner in planning great places for a growing Victoria Contents 1.0 INTRODUCTION 5 1.1 How to read this document 7 1.2 Land to which this PSP

More information

CANOPY AT AMSTEL (THE AMSTEL GOLF COURSE REDEVELOPMENT)

CANOPY AT AMSTEL (THE AMSTEL GOLF COURSE REDEVELOPMENT) CANOPY AT AMSTEL (THE AMSTEL GOLF COURSE REDEVELOPMENT) 1000 CRANBOURNE FRANKSTON ROAD, CRANBOURNE The former Amstel Golf Course was rezoned to a General Residential Zone in 2015 to facilitate its redevelopment

More information

ADMINISTRATION RECOMMENDATION(S) 2017 June 15. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment.

ADMINISTRATION RECOMMENDATION(S) 2017 June 15. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment. Page 1 of 7 EXECUTIVE SUMMARY The proposed land use amendment seeks to redesignate a Special Purpose Future Urban Development (S-FUD) District parcel in Residual Ward 3 Sub Area 3H to Industrial Outdoor

More information

LAND AT DALESTON, MAMBOURIN

LAND AT DALESTON, MAMBOURIN LAND AT DALESTON, MAMBOURIN Planning Report in Support of s96a Application Application for Subdivision Daleston, Mambourin October 2014 Daleston, Mambourin Our ref: 01486 Client: Phileo Australia Limited

More information

Authority. any changes required as a result of the approved CHMP.

Authority. any changes required as a result of the approved CHMP. PLANNING PERMIT Permit No. Planning Scheme Responsible Authority../2013 Greater Geelong Planning Scheme Greater Geelong City Council ADDRESS OF THE LAND 5, 15, 21, 23, 1/23, 25, 33, 40 and 50 Caddys Road;

More information

RE: AMENDMENT C375 GEELONG PLANNING SCHEME 1900 BARWON HEADS ROAD, BARWON HEADS

RE: AMENDMENT C375 GEELONG PLANNING SCHEME 1900 BARWON HEADS ROAD, BARWON HEADS Reference: #V157080 14 August 2018 Barwon Heads Lifestyle Group Pty Ltd C/- Best Hooper Lawyers Level 9, 451 Little Bourke Street MELBOURNE VIC 3000 Attention: Mr. Edward Mahony (Lawyer) Dear Edward RE:

More information

Wetland Design Manual. A1: Vision, core outcomes and aspirational outcomes

Wetland Design Manual. A1: Vision, core outcomes and aspirational outcomes Wetland Design Manual A1: Vision, core outcomes and aspirational outcomes Table of contents Introduction 5 Vision 6 Core outcomes 7 Effective pollutant removal and flow management... 7 Community safety...

More information

I511. Hatfields Precinct

I511. Hatfields Precinct I511. Hatfields Precinct I511.1. Precinct Description The Hatfields Precinct is a contiguous 183.8 hectare block of rural land held in 8 freehold titles, located immediately to the north of Hatfields Beach.

More information

S o u t h C e n t r a l O u t l i n e P l a n. Leduc Business Park. North Leduc Industrial Area Structure Plan C it y of Led u c.

S o u t h C e n t r a l O u t l i n e P l a n. Leduc Business Park. North Leduc Industrial Area Structure Plan C it y of Led u c. Leduc Business Park North Leduc Industrial Area Structure Plan C it y of Led u c Prepared for Farm Air Properties Inc. January, 2007 Table of Contents Page Number 1.0 Purpose of Plan and Definition of

More information

Division 13 Local Business and Industry Buffer Zone: Assessment Criteria and Assessment Tables

Division 13 Local Business and Industry Buffer Zone: Assessment Criteria and Assessment Tables Division 13 Local Business and Industry Buffer Zone: Assessment Criteria and Assessment Tables 4.13.1 Local Business and Industry Buffer Zone The provisions in this division relate to the Local Business

More information

Kaufland supermarket and complementary uses, part 1550 Pascoe Vale Road, Coolaroo Incorporated Document (Insert date) 2019

Kaufland supermarket and complementary uses, part 1550 Pascoe Vale Road, Coolaroo Incorporated Document (Insert date) 2019 Kaufland supermarket and complementary uses, part 1550 Pascoe Vale Road, Coolaroo Incorporated Document (Insert date) 2019 Page 1 of 7 Incorporated document pursuant to section 6(2)(j) of the Planning

More information

HURON COMMUNITY PLAN

HURON COMMUNITY PLAN CITY OF KITCHENER DEPARTMENT OF DEVELOPMENT AND TECHNICAL SERVICES PD 94/7 HURON COMMUNITY PLAN Recommended by Planning and Economic Development Committee: October 31, 1994 Adopted by Kitchener City Council:

More information

Ensure that development within the Arrowtown Urban Growth Boundary provides:

Ensure that development within the Arrowtown Urban Growth Boundary provides: URBAN DEVELOPMENT 4 4.2.5.2 Ensure that development within the Arrowtown Urban Growth Boundary provides: an urban form that is sympathetic to the character of Arrowtown, including its scale, density, layout

More information

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC 2018 November 15 Page 1 of 10 EXECUTIVE SUMMARY This land use amendment application was submitted by Rick Balbi Architect on 2017 August 31 on behalf of Sable Developments Ltd, and with authorization from

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 5 June 2013 AUTHOR/S: Planning and New Communities Director S/0747/13/FL HISTON Construction of Car Park at Histon Baptist Church, Station

More information

Eastern Golf Course, Doncaster Road, Doncaster

Eastern Golf Course, Doncaster Road, Doncaster , 463-535 Road, Heritage Assessment in accordance with Schedule to the Development Plan Overlay July 2013 bryce raworth conservation urban design 19 Victoria Street St Kilda Vic 3182 , 463-535 Road, Heritage

More information

Hume Planning Scheme Amendment C205 Lindum Vale Precinct Structure Plan

Hume Planning Scheme Amendment C205 Lindum Vale Precinct Structure Plan Planning and Environment Act 1987 Panel Report Hume Planning Scheme Amendment C205 Lindum Vale Precinct Structure Plan 9 April 2018 Planning and Environment Act 1987 Panel Report pursuant to section 25

More information

SECTION 2.4 URBAN DEVELOPMENT AND STRATEGIC URBAN DIRECTIONS

SECTION 2.4 URBAN DEVELOPMENT AND STRATEGIC URBAN DIRECTIONS SECTION 2.4 URBAN DEVELOPMENT AND STRATEGIC URBAN DIRECTIONS 2.4.1 INTRODUCTION In 1993/94 the Hastings District Council completed the Hastings Urban Development Strategy. The purpose of this study was:

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual 11 PARKS & OPEN SPACES 11.1 DEFINITIONS... 1 11.1.1 Neighbourhood Parks... 1 11.1.2 District Parks... 1 11.1.3. Sport Parks... 1 11.1.4 Urban Parks... 1 11.1.5 Civic Spaces... 1 11.1.6 Open Space System...

More information

EXAMPLE. Bushfire Management Statement Construction of a single dwelling in a Bushfire Management Overlay

EXAMPLE. Bushfire Management Statement Construction of a single dwelling in a Bushfire Management Overlay Bushfire Management Statement Construction of a single dwelling in a Bushfire Management Overlay EXAMPLE Bushfire Management Statement Construction of a single dwelling in a Bushfire Management Overlay

More information

Whittlesea Planning Scheme Amendment C183 English Street Precinct Structure Plan

Whittlesea Planning Scheme Amendment C183 English Street Precinct Structure Plan Planning and Environment Act 1987 Panel Report Whittlesea Planning Scheme Amendment C183 English Street Precinct Structure Plan 28 October 2015 Planning and Environment Act 1987 Panel Report pursuant to

More information

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations.

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations. This section of the Draft EIR addresses the existing land uses on and adjacent to the project site and discusses the potential impacts of the proposed project on existing land uses. Key issues addressed

More information

Section Three, Appendix 16C Medium Density Housing, Design Assessment Criteria (Residential 8A zone)

Section Three, Appendix 16C Medium Density Housing, Design Assessment Criteria (Residential 8A zone) APPENDIX 16C MEDIUM DENSITY HOUSING, DESIGN ASSESSMENT CRITERIA (RESIDENTIAL 8A ZONE) PURPOSE OF APPENDIX 16C (RESIDENTIAL 8A ZONE) In the Residential 8A Zone the following are defined as restricted discretionary

More information

4.3 Dudley Area Plan. Introduction. History and Existing Character. Desired Future Character for Dudley

4.3 Dudley Area Plan. Introduction. History and Existing Character. Desired Future Character for Dudley 4.3 Dudley Area Plan Introduction The suburb of Dudley has developed as a result of various circumstances including its topography, history and mineral resources. Dudley development has been identified

More information

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 The Planning and Economic Development Committee recommends the adoption of the recommendations contained

More information

Shepparton North East Precinct Structure Plan. February 2018

Shepparton North East Precinct Structure Plan. February 2018 Shepparton North East Precinct Structure Plan February 2018 Contents 1.0 INTRODUCTION 5 1.1 How to read this document 7 1.2 Land to which this Precinct Structure Plan applies 7 1.3 Background information

More information