Planning Committee 20/07/2016 Schedule Item No. 02

Size: px
Start display at page:

Download "Planning Committee 20/07/2016 Schedule Item No. 02"

Transcription

1 Ref: Address: Ward: Proposal: FUL 6 Portal Way, North Acton, W3 6RY East Acton Demolition of all of the existing buildings, and comprehensive redevelopment to provide a double storey basement with four buildings of 9, 11, 32 and 42 storeys above (including a two storey pavilion adjoining the 42 storey building). The proposals will deliver 578 new residential homes (use class C3) (mix of 1 bed, 2 bed and 3 bed flats) and sqm (GIA) of flexible use class A1 and/or A2 and/or A3 and/or A4 and/or B1 and/or D1 and/or D2 floorspace, a new landscaped east-to-west public route between Victoria Road and Portal Way, together with associated amenity and play space, roof gardens, cycle parking, car parking, servicing, public realm improvements, landscaping and infrastructure works Drawing numbers/plans: 1254 PL 001 SITE LOCATION PLAN, 1254 PL 002 EXISTING SITE LAYOUT PLAN, 1254 PL 003 EXISTING ELEVATION BUILDING 1, 1254 PL 004 EXISTING ELEVATION BUILDING 2, 1254 PL 005 EXISTING ELEVATION BUILDING 3, 1254 PL 006 EXISTING COMPOSITE ELEVATION, 1254 PL 097 GA BASEMENT 2 PLAN, 1254 PL 098 GA BASEMENT 1 PLAN, 1254 PL 099 GA LOWER GROUND PLAN, 1254 PL 100 GA UPPER GROUND PLAN, 1254 PL 105 GA LOWER TYPICAL PLAN, 1254 PL 120 GA UPPER TYPICAL PLAN, 1254 PL 143 GA ROOF PLAN, 1254 PL A 100 BLOCK A PLANS 1/2, 1254 PL A 101 BLOCK A PLANS 2/2, 1254 PL B 100 BLOCK B PLANS, 1254 PL C 100 BLOCK C PLANS ¼, 1254 PL C 101 BLOCK C PLANS 2/4, 1254 PL C 102 BLOCK C PLANS ¾, 1254 PL C 103 BLOCK C PLANS 4/4, 1254 PL D 100 BLOCK D PLANS ½, 1254 PL D 101 BLOCK D PLANS 2/2, 1254 PL A 200 BLOCK A ELEVATIONS, 1254 PL B 200 BLOCK B ELEVATIONS, 1254 PL C 200 BLOCK C ELEVATIONS, 1254 PL D 200 BLOCK D ELEVATIONS, 1254 PL 200 COMPOSITE EAST ELEV, 1254 PL 201 COMPOSITE NORTH ELEV, 1254 PL 202 COMPOSITE SOUTH ELEV, 1254 PL 203 COMPOSITE WEST ELEV, 1254 PL 204 COURTYARD EASTERN ELEV, 1254 PL 205 COURTYARD WESTERN ELEV, 1254 PL300 SECTIONS A & B, 1254 PL301 SECTIONS C & D, 1254 PL302 SECTIONS E & F, 1254 PL303 SECTIONS G & H, 1254 PL304 SECTIONS J & K, 1254 PL A 310 DETAIL 1.50 BLOCK A, 1254 PL A 311 DETAIL 1.50 BLOCK A, 1254 PL B 312 DETAIL 1.50 BLOCK B, 1254 PL C 313 DETAIL 1.50 BLOCK C, 1254 PL D 314 DETAIL 1.50 BLOCK D, 1254 PL400 WHEELCHAIR FLAT TYPE 1, 1254 PL401 WHEELCHAIR FLAT TYPE 2, 1254 PL402 WHEELCHAIR FLAT TYPE 3, 1254 PL403 WHEELCHAIR FLAT TYPE 4, 1254 PL404 WHEELCHAIR FLAT TYPE 5, 1254 PL405 WHEELCHAIR FLAT TYPE 6, 1254 PL406 WHEELCHAIR FLAT TYPE 7, 1254 PL407 WHEELCHAIR FLAT TYPE 8, 1254 PL408 Page 1 of 49

2 WHEELCHAIR FLAT TYPE 9, 1254 PL409 WHEELCHAIR FLAT TYPE 10, 1254 PL410 WHEELCHAIR FLAT TYPE 11, 1254 PL411 WHEELCHAIR FLAT TYPE 12, 1254 PL412 WHEELCHAIR FLAT TYPE 13, 1254 PL413 WHEELCHAIR FLAT TYPE 14, 1254 PL414 WHEELCHAIR FLAT TYPE 15, 1254 PL415 WHEELCHAIR FLAT TYPE 16, 1255 PL416 WHEELCHAIR FLAT TYPE 17, LN00_405_L-00 ILLUSTRATIVE PLAN GROUND FLOOR, LN00_405_L-01 ILLUSTRATIVE PLAN ROOF PLAN, TCP_PORTALWAY_1 TREE CONSTRAINTS PLAN EXISTING SITE, TCP_PORTALWAY_2 TREE REMOVAL PLAN EXISTING SITE, Arboricultural Impact Assessment (Arboricultural Solutions), Design and Access Statement (BUJ), Dayligh and Sunlight Report (GVA/SB), Energy Strategy (Metropolis Green), Evironmental Statement Volumes 1-4 (Metropolis Green), Health Impact Assessment (Savills), Heritage DBA (Cotswold Archaeology), Landscape Report (Outerspace), Ecological Appraisal (Aspect Ecology), Statement of Community Involvement (Four Communications), Sustainability Statement (Metropolis Green), Town Planning Regeneration Statement (Savills), Transport Assessment (Steer Davies Gleave) Type of Application: Full application Application Received: 16/03/2016 Revised: 22/06/2016 Report by: Chris Maltby Recommendation: Grant planning permission subject to - 1. Stage II referral to the Mayor of London; 2. Signing of a Section 106 agreement; and 3. Planning Conditions of Consent Executive Summary: The proposals comprise a detailed planning application for this hectare site located in North Acton. The site is bounded by Portal Way and Victoria Road and is located approximately 200m south of North Acton Station. The site has a PTAL rating of 5. The site is located within the Old Oak Common Opportunity Area which has been identified as having a capacity to deliver 24,000 new homes and 55,000 new jobs. The site also falls within site allocation OIS1 Park Royal Southern Gateway as identified in the London Borough of Ealing s Development sites DPD which identifies the site as being suitable for mixed uses including residential and employment. The application site is currently occupied by 4,697sq.m of warehouse and manufacturing space with ancillary office accommodation. The existing buildings are two storeys in height and arranged around a central courtyard accessed from Portal Way and providing 43 car parking spaces. The surrounding area contains a wide mix of land uses including residential, commercial and retail and buildings of various heights up to 18 storeys. Immediately to the east of the application site is the Dixons Carphone site which is the subject of a resolution to grant planning permission for a residential led mixed use development with a number of significant public open spaces and buildings of up to 33 storeys in height. Page 2 of 49

3 Immediately north and north west of the application site there have been a number of recent developments comprising predominantly residential uses in the form of apartments and student accommodation. North west of the application site beyond the recently built student accommodation is North Acton Cemetery, a site of Local Importance for Nature Conservation. The application site is entirely located within Flood Zone 1 at the lowest risk of flooding. There are no listed buildings or tree preservation orders either within or adjacent to the site and the site does not fall within a conservation area. The detailed scheme comprises: 578 residential units (including bed units, bed units and 34 3 bed units) at a density of 1005 units per hectare (2483 habitable rooms per hectare) sq.m of flexible commercial and community uses which can included A1, A2, A3, A4, B1, D1 and D sq.m of basement space A series of amenity spaces including a centrally located courtyard (1,380sq.m) and roof top terraces (1,362sq.m) Private amenity space in the form of balconies and terraces to all units 1400sq.m of children s play spaces for ages 0 up to 11 Public realm improvements to the perimeter of the site to include widening of footways, hard landscaping and tree planting Car parking within a double basement for up to 76 car parking spaces (including 68 for residential use and 8 for commercial staff and visitors) 66 of the bays are sized as disabled parking bays. 20% of all spaces will have electric vehicle charging points Plant, refuse storage and servicing will all be accommodated within the basement. Servicing will also be accommodated by a proposed loading bay on Portal Way 816 cycle parking spaces for residents in secure stores within the basement and 20 cycle space for commercial staff. A further 38 visitor spaces are provided within the public realm A new pedestrian link through the site between Victoria Road and Portal Way The detailed scheme seeks to demolish all of the existing buildings and the construction of a double basement extending across the majority of the site above which a series four blocks arranged around a central communal courtyard are proposed. The four blocks comprise Block A, 42 storey, Block B, 9 storey, Block C, part 11 and part 32 storey and Block D, part 9 and part 11 storey. With the exception of Block B which is residential only all blocks comprise two storeys of commercial use at ground and first floor with residential above. A mixed palette of materials is proposed including red brick setts, grey buff brick, Portland stone, glazing and nickel and bronze coloured metal panels and glazing. The location of the tall buildings responds to the emerging and surrounding form of development and have been designed and sited to protect residential and visual amenity and positively contribute to the emerging cluster of tall buildings in the Southern Gateway. The applicant has undertaken an Environmental Impact Assessment (EIA) of the proposals which includes the following topic areas: air quality, daylight and sunlight, ground conditions and contamination, noise and vibration, socio-economics, transport, waste, wind micro climate and cumulative effects. Page 3 of 49

4 The key determining issues in considering this detailed application are: Environmental Statement Principle of development and the appropriateness of the proposed uses Design including scale, form, siting, appearance and amenity Design including energy efficiency, sustainability and environmental protection Affordable housing/viability; Transport; and Planning obligations and the Mayor s Community Infrastructure Levy. Conclusions The report includes recommendations to grant detailed planning permission subject to any direction from the Mayor of London and subject to compliance with the relevant planning conditions and the completion of a satisfactory legal agreement. In reaching this recommendation specific consideration has been given to the key determining issues identified above. The site occupies an important position in the Southern Gateway and the site has been identified as being suitable for an intensification of use and for a mix of uses. A residential led mixed use development is proposed that will deliver 578 new residential units in a mix of units sizes, types and tenures including affordable units. The proposed commercial uses would replace and increase employment opportunities on the site and would promote activity and animate street frontages. The form, scale and density of the proposed development is considered acceptable in this well connected and highly sustainable location. The proposed development would make the best and most efficient use of this brownfield site optimising housing delivery. The proposed redevelopment represents an opportunity to significantly enhance this low density site within a highly accessible location with a high quality, high density scheme. The scheme proposes high quality architecture that would contribute positively to the character of the area and other emerging and committed development on this strategically important site. The development is proposed to be highly sustainable incorporating measures such a passive design and energy efficiency measures, a CHP plant and Air Source Heat Pumps which are anticipated to deliver a reduction in carbon dioxide emissions of 44.5%. The proposal includes a variety of welcoming and attractive public spaces and a mix of commercial, retail and community uses that will ensure a new vibrant place which will benefit both future and existing residents. The proposed height of the taller buildings is considered to be acceptable and will contribute to a cluster of taller buildings at this important gateway site. The height has been assessed in terms of short, medium and longer distance views and is considered to be acceptable with impacts that are considered to be acceptable. The buildings would be well designed and their location within the site has been chosen to ensure they respond positively to the residential amenity currently enjoyed by surrounding residential occupiers. The environmental impact of the scheme has been comprehensively assessed and it has been demonstrated that the massing of the buildings would not lead to any environmental harm that is not normal in an urban environment and cannot be appropriately mitigated. Page 4 of 49

5 The proposals include flexible commercial spaces that can come forward for a variety of uses including retail, restaurants/cafes, office space and public uses such as health clinic/surgery, children s crèche and community spaces. It is envisaged that the commercial spaces will yield up to a maximum of 270 jobs. The proposed residential mix includes 2483 habitable rooms per hectare which equates to a density of 1005 dwellings per hectare. This would be significantly above the upper guideline in the Mayors density matrix of 1100hrh, however the Mayor also advises that this guideline should not be applied mechanistically and outlines circumstances where exceeding this range can be acceptable. In this case a number of attributes of the proposed development including exemplary design in terms of both the buildings, private amenity spaces and public realm, excellent transport connections with a PTAL rating of 5, delivery of a significant number of new homes (including affordable) and new jobs and the contributions to the making of place all support a higher density scheme on this site within this strategically important location. In summary the proposed development is considered acceptable for the following reasons: The proposals are for the redevelopment of an underutilised brownfield site in a strategically important location within an identified Opportunity Area; The proposed residential led mixed use development complies with the site s allocation in the Ealing Development Sites DPD 2013; The proposed development is of a very high architectural standard and includes new public and private spaces as well as significant improvements to the public realm; The proposed development will create a significant number (578) of new dwellings to help address the existing shortfall of new housing within London; The proposals include 30% affordable housing (164 dwellings) in the form of discounted market rent for a period of 20 years at various discounts ranging from 20% to 30% below market rents; The proposed commercial floor space comprising retail, restaurants, office and community spaces are supported and will ensure vitality within the development and the surrounding area and will provide up to 270 jobs; The location and form of development is considered to have an acceptable relationship with neighbouring uses and ensures that visual and residential amenity is protected; It complies with policies to locate high-density residential development in appropriate, accessible locations; The layout which includes a public space through the site connecting Victoria Road with Portal Way ensures high levels of permeability that will complement and connect with approved development on neighbouring sites; The proposed dwellings are designed to high standards with generous living accommodation meeting and exceeding standards set out within the development plan with each unit providing access to private balcony or terraces; The proposed dwellings are also provided with access to generous semi private spaces at ground floor comprising of a large courtyard garden with integral play spaces and large roof terraces accessed internally; The proposals provide well designed and accessible facilities for cyclists including cycle storage for visitors at surface level and secure cycle stores accessed by dedicated cycle lifts at basement level; A proposed double basement level provides for an appropriate level of parking and also accommodates the servicing of the commercial units and sufficient space for the storage of refuse and recycling. A site wide Management Plan is to be secured by a planning condition to ensure servicing, parking and other management issues are robustly planned for; The proposals incorporate renewable energy technologies and complies with policies relating to energy efficiency and sustainable design and construction; Page 5 of 49

6 It has the potential to satisfy relevant policies in relation to noise, air quality, contamination and sustainable drainage and appropriate planning conditions are proposed to ensure the detailed design responds positively to these; The applicant has agreed to enter into a Section 106 Agreement which includes clauses and financial contributions relating to a range of issues; The development will be subject to the Mayor s Community Infrastructure Levy and it is confirmed will be liable to a payment of 1.6m. Referable application This planning application is referable to the Mayor of London pursuant to the Town and Country Planning (Mayor of London) Order 2008 under Category 1A of the schedule to the Order, as it would comprise: Development which comprises or includes the provision of more than 150 houses, flats, or houses and flats The application was referred to the GLA and a Stage 1 response was issued on 25 th April 2016 which states that the Mayor considers that the principle of a residential led mixed use redevelopment of the site is supported by strategic planning policy. The response also confirmed that the proposed development was considered acceptable in terms of design, layout, massing and height as was the architectural approach and the public realm and play space strategy. The response also required further information with regard to the affordable housing offer, transport and energy. Further discussion has taken place on these issues following the Stage 1 response. Further details including both the applicants and officer s response to the issues raised by the GLA are given later within this report. If Ealing Council resolves to make a draft decision on the application, it must consult the Mayor again under Article 5 of the Mayor of London Order 2008 and allow him fourteen days to decide whether to allow the draft decision to proceed unchanged, or direct the Council under Article 6 to refuse the application, or issue a direction under Article 7 that he is to act as the local planning authority for the purpose of determining the application. Overall the development proposes a high quality mixed use scheme that will secure the regeneration of this important Southern Gateway site and act as a catalyst for further regeneration within the area helping to secure strategic and local regeneration and spatial objectives. The objections from third parties have been reviewed and acknowledged in this report, however, these are insufficient to outweigh the recommendation for approval. It is therefore recommended that planning permission be Approved with Conditions subject to the signing of the Section 106 agreement. Recommendation: (a) (b) Subject to Stage II referral to the Mayor of London Subject to the satisfactory completion of a Section 106 agreement under the Town and Country Planning Act 1990 (as amended) in order to secure the following: (i) 30% discounted market rented units with a rate of discount of between 20% and 30% for a period of 20 years; Page 6 of 49

7 (c) (ii) review mechanism at 2 years (if the development has not commenced and at 80% practically complete to assess viability to deliver more than 30% discounted market rented units; (iv) financial contributions to cover transport and accessibility; trees, public realm and open space; education and health for a total of 2,601,000 (index linked) (v) Travel Plan including monitoring (vii) Payment of the Council s reasonable legal and other professional costs incurred preparing the Section106 agreement. Conditions: and GRANT planning permission subject to the following conditions and informatives 1. Time Limit Full Planning Permission The development hereby permitted shall be begun before the expiration of five years from the date of this permission. Reason: In order to comply with the provisions of the Town and Country Planning Act Approved Plans and Documents The development hereby approved shall be carried out in accordance with the following approved plans and documents: 1254 PL 001 SITE LOCATION PLAN, 1254 PL 002 EXISTING SITE LAYOUT PLAN, 1254 PL 003 EXISTING ELEVATION BUILDING 1, 1254 PL 004 EXISTING ELEVATION BUILDING 2, 1254 PL 005 EXISTING ELEVATION BUILDING 3, 1254 PL 006 EXISTING COMPOSITE ELEVATION, 1254 PL 097 GA BASEMENT 2 PLAN, 1254 PL 098 GA BASEMENT 1 PLAN, 1254 PL 099 GA LOWER GROUND PLAN, 1254 PL 100 GA UPPER GROUND PLAN, 1254 PL 105 GA LOWER TYPICAL PLAN, 1254 PL 120 GA UPPER TYPICAL PLAN, 1254 PL 143 GA ROOF PLAN, 1254 PL A 100 BLOCK A PLANS 1/2, 1254 PL A 101 BLOCK A PLANS 2/2, 1254 PL B 100 BLOCK B PLANS, 1254 PL C 100 BLOCK C PLANS ¼, 1254 PL C 101 BLOCK C PLANS 2/4, 1254 PL C 102 BLOCK C PLANS ¾, 1254 PL C 103 BLOCK C PLANS 4/4, 1254 PL D 100 BLOCK D PLANS ½, 1254 PL D 101 BLOCK D PLANS 2/2, 1254 PL A 200 BLOCK A ELEVATIONS, 1254 PL B 200 BLOCK B ELEVATIONS, 1254 PL C 200 BLOCK C ELEVATIONS, 1254 PL D 200 BLOCK D ELEVATIONS, 1254 PL 200 COMPOSITE EAST ELEV, 1254 PL 201 COMPOSITE NORTH ELEV, 1254 PL 202 COMPOSITE SOUTH ELEV, 1254 PL 203 COMPOSITE WEST ELEV, 1254 PL 204 COURTYARD EASTERN ELEV, 1254 PL 205 COURTYARD WESTERN ELEV, 1254 PL300 SECTIONS A & B, 1254 PL301 SECTIONS C & D, 1254 PL302 SECTIONS E & F, 1254 PL303 SECTIONS G & H, 1254 PL304 SECTIONS J & K, 1254 PL A 310 DETAIL 1.50 BLOCK A, 1254 PL A 311 DETAIL 1.50 BLOCK A, 1254 PL B 312 DETAIL 1.50 BLOCK B, 1254 PL C 313 DETAIL 1.50 BLOCK C, 1254 PL D 314 DETAIL 1.50 BLOCK D, 1254 PL400 WHEELCHAIR FLAT TYPE 1, 1254 PL401 WHEELCHAIR FLAT TYPE 2, 1254 PL402 WHEELCHAIR FLAT TYPE 3, 1254 PL403 WHEELCHAIR FLAT TYPE 4, 1254 PL404 WHEELCHAIR FLAT TYPE 5, 1254 PL405 WHEELCHAIR FLAT TYPE 6, 1254 PL406 WHEELCHAIR FLAT TYPE 7, 1254 PL407 WHEELCHAIR FLAT TYPE 8, 1254 PL408 WHEELCHAIR FLAT TYPE 9, 1254 PL409 WHEELCHAIR FLAT TYPE 10, 1254 PL410 WHEELCHAIR FLAT TYPE 11, 1254 PL411 WHEELCHAIR FLAT TYPE 12, 1254 PL412 WHEELCHAIR FLAT TYPE 13, 1254 PL413 WHEELCHAIR FLAT TYPE 14, 1254 PL414 WHEELCHAIR FLAT TYPE 15, 1254 PL415 WHEELCHAIR FLAT TYPE 16, 1255 PL416 WHEELCHAIR FLAT TYPE 17, LN00_405_L-00 ILLUSTRATIVE PLAN GROUND FLOOR, LN00_405_L-01 ILLUSTRATIVE PLAN ROOF PLAN Page 7 of 49

8 , TCP_PORTALWAY_1 TREE CONSTRAINTS PLAN EXISTING SITE, TCP_PORTALWAY_2 TREE REMOVAL PLAN EXISTING SITE Reason: For the avoidance of doubt and in the interest of proper planning. 3. Demolition Method Statement and Management Plan Prior to the commencement of development, a site demolition method statement and management plan shall be submitted to and approved in writing by the Local Planning Authority. The submission shall include the following: a) The number of on-site construction workers and details of the transport options and parking facilities for them; b) details of construction hours; c) anticipated route, number, frequency and size of construction vehicles entering/exiting the site per day; d) delivery times and booking system (which is to be staggered to avoid morning and afternoon school-run peak periods); e) route and location of site access for construction traffic and associated signage; f) management of consolidated or re-timed trips; g) Details of noise and vibration mitigation measures and monitoring arrangements for noise and vibration by suitably qualified noise specialists. Noise and vibration mitigation measures must accord with the Mayor s 'Best Practice Guidance ; h) details of site security, temporary lighting and the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; i) secure, off-street loading and drop-off facilities; j) wheel washing provisions; k) vehicle manoeuvring and turning, including swept path diagrams to demonstrate how construction vehicles will access the site and be able to turn into and emerge from the site in forward gear and including details of any temporary vehicle access points; l) details as to the location(s) for storage of building materials, plant and construction debris and contractors welfare facilities and offices; m) procedures for on-site contractors to deal with complaints from members of the public; n) measures to consult cyclists, disabled people and the local schools with regard to delivery times and necessary diversions; o) details of all pedestrian and cyclist diversions; p) a commitment to be part of Considerate Constructors Scheme; and q) confirmation of use of TfL's Freight Operator Recognition Scheme (FORS) or similar. r) The submission of evidence of the condition of the highway prior to-construction and a commitment to make good any damages caused during construction. s) Details of parking restrictions which may need to be implemented during construction work. Page 8 of 49

9 Prior to the commencement of any demolition work, all sensitive properties surrounding the site shall be notified in writing of the nature and duration of the works to be undertaken, and the name and address of a responsible person to whom enquiries/complaints should be directed. These details shall also be displayed at regular intervals around the site construction compound. The development shall be carried out strictly in accordance with the details so approved. Any areas to be used for the storage of building materials or other site activities outside of the relevant phase of the development shall be returned to the original condition immediately following the practical completion of the development. Such details shall be implemented and phasing agreed in writing, prior to the commencement of works on site and thereafter retained for the duration of the works. Reason: To protect the amenity of local residents, to ensure adequate highway and site safety in accordance with policies 1.1, 1.2, 2.1 & 2.8 of the Ealing Core Strategy (2012), policies 6.3, 6.14, & of the London Plan (2015), the National Planning Policy Framework (2012), Greater London Authority 'The Control of Dust and Emissions from Construction and Demolition Supplementary Planning Guidance (20014), BS :2009+A1:2014 Code of practice for noise and vibration control on construction and open sites: Noise. 4. Construction Method Statement and Management Plan Prior to the commencement of development, a site construction method statement and management plan shall be submitted to and approved in writing by the Local Planning Authority. The submission shall include the following: a) The number of on-site construction workers and details of the transport options and parking facilities for them; b) details of construction hours; c) anticipated route, number, frequency and size of construction vehicles entering/exiting the site per day; d) delivery times and booking system (which is to be staggered to avoid morning and afternoon school-run peak periods); e) route and location of site access for construction traffic and associated signage; f) management of consolidated or re-timed trips; g) Details of noise and vibration mitigation measures and monitoring arrangements for noise and vibration by suitably qualified noise specialists. Noise and vibration mitigation measures must accord with the Mayor s 'Best Practice Guidance ; h) details of site security, temporary lighting and the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; i) secure, off-street loading and drop-off facilities; j) wheel washing provisions; k) vehicle manoeuvring and turning, including swept path diagrams to demonstrate how construction vehicles will access the site and be able to turn into and emerge from the site in forward gear and including details of any temporary vehicle access points; Page 9 of 49

10 l) details as to the location(s) for storage of building materials, plant and construction debris and contractors welfare facilities and offices; m) procedures for on-site contractors to deal with complaints from members of the public; n) measures to consult cyclists, disabled people and the local schools with regard to delivery times and necessary diversions; o) details of all pedestrian and cyclist diversions; p) a commitment to be part of Considerate Constructors Scheme; and q) confirmation of use of TfL's Freight Operator Recognition Scheme (FORS) or similar. r) The submission of evidence of the condition of the highway prior to-construction and a commitment to make good any damages caused during construction. s) Details of parking restrictions which may need to be implemented during construction work. Prior to the commencement of any construction work, all sensitive properties surrounding the site shall be notified in writing of the nature and duration of the works to be undertaken, and the name and address of a responsible person to whom enquiries / complaints should be directed. These details shall also be displayed at regular intervals around the site construction compound. The development shall be carried out strictly in accordance with the details so approved. Any areas to be used for the storage of building materials or other site activities outside of the relevant phase of the development shall be returned to the original condition immediately following the practical completion of the development. Such details shall be implemented and phasing agreed in writing, prior to the commencement of works on site and thereafter retained for the duration of the works. Reason: To protect the amenity of local residents, to ensure adequate highway and site safety in accordance with policies 1.1, 1.2, 2.1 & 2.8 of the Ealing Core Strategy (2012), policies 6.3, 6.14, & of the London Plan (2015), the National Planning Policy Framework (2012), Greater London Authority 'The Control of Dust and Emissions from Construction and Demolition Supplementary Planning Guidance (20014), BS :2009+A1:2014 Code of practice for noise and vibration control on construction and open sites: Noise. 5. Air Quality/Dust Management Before the development is commenced, (including demolition and site clearance) an Air Quality and Dust Management Plan (AQDMP) that includes an Air Quality (Dust) Risk Assessment shall be produced in accordance with current guidance The Control of Dust and Emissions during Construction and Demolition, SPG, GLA, July 2014, for the existing site and the proposed development. A scheme for air pollution mitigation measures based on the findings of the report shall be submitted to and approved by the Local Planning Authority prior to the commencement of any works on the site. Reason: To safeguard the amenities for future occupiers of the development in accordance with policies 3.5 and 7.15 of the London Plan (2015), policies 1.1(j) & 1.2(f) of the Ealing Development (or Core) Strategy (2012) and with policy 7.3 of the Ealing Development Management Development Plan Document (2013). Page 10 of 49

11 6. Delivery and Servicing Plan A delivery and servicing plan shall be submitted to and approved in writing by the Local Planning Authority, prior to first occupation of any part of the development hereby approved. The plan shall cover the following: Vehicle tracking - Swept paths drawings for a refuse lorry vehicle, 10-metre rigid vehicle and also a fire appliance vehicle; Deliveries and collections; including how deliveries will be scheduled to avoid several Lorries arriving at the site simultaneously; Servicing trips (including maintenance); and measures to reduce the number of freight trips to the site (freight consolidation); Cleaning and waste removal; including arrangements for refuse collection; Monitoring and review of operations. The delivery and servicing plan shall be implemented on first occupation of any part of the development hereby approved and the site shall be managed in accordance with the approved plan for the life of the development, or as otherwise agreed in writing by the Local Planning Authority. Reason: To ensure that the development can be adequately serviced in the interests of pedestrian and highway safety, in accordance with policy 6.11 and 6.13 of the London Plan 2015 and Local Variation policy 6.13 of the Development Management DPD Site Waste Management Plan (Demolition) Prior to the commencement of demolition, a Site Waste Management Plan shall be submitted to and approved in writing by the Local Planning Authority. The Site Waste Management Plan shall demonstrate how the procurement of materials for the development during construction would promote sustainability, including by use of low impact, sustainably sourced, reused and recycled materials, including reuse of demolition waste, use of local suppliers and by reference to the BRE s Green Guide Specification. The development shall be carried out in accordance with the particulars so approved. Reason: To ensure sustainable procurement of materials which minimises the negative environmental impacts of construction in accordance with policies 5.3 and 5.18 of the adopted London Plan 2015, policies 1.1 (k) and 1.2 (f) of the adopted Ealing Development Strategy (2012) and interim guidance in Ealing s SPG4 Storing waste for recycling and disposal 8. Site Waste Management Plan (Construction) Prior to the commencement of development (except demolition, site clearance and preparation works), a Site Waste Management Plan shall be submitted to and approved in writing by the Local Planning Authority. The Site Waste Management Plan shall demonstrate how the procurement of materials for the development during construction would promote sustainability, including by use of low impact, sustainably sourced, reused and recycled materials, including reuse of demolition waste, use of local suppliers and by reference to the BRE s Green Guide Specification. The development shall be carried out in accordance with the particulars so approved. Reason: To ensure sustainable procurement of materials which minimises the negative environmental impacts of construction in accordance with policies 5.3 and 5.18 of the adopted Page 11 of 49

12 London Plan 2015, policies 1.1 (k) and 1.2 (f) of the adopted Ealing Development Strategy (2012) and interim guidance in Ealing s SPG4 Storing waste for recycling and disposal 9. Soil Contamination Investigation and Risk Assessment Prior to the commencement of any works on site (except demolition, site clearance and preparation works) the following shall be submitted to and subject to the approval in writing of the Local Planning Authority: (a) (b) An intrusive contaminated land investigation and risk assessment of the site. This shall be carried out in accordance with BS1075:2011+A1:2013 and CR11 guidance to assess the nature and extent of any contamination on the site. This assessment must be undertaken by a competent person, and shall assess any contamination on the site, whether or not it originates on the site. If required, as a result of part (a), a remediation (de-contamination) scheme to bring the site to a condition suitable for the intended end use. It shall include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation. Following completion of measures identified in the approved remediation (de-contamination) scheme part (b) (c) A verification report that demonstrates the completion of measures identified in the approved contamination remediation scheme shall be produced. The report shall be compiled in accordance with the Environment Agency guidance Verification of Remediation of Land Contamination, Report: SC030114/R1. Reason: To ensure that the site is not hazardous in the interest of public health and safety, in accordance with policy 5.21 of the adopted London Plan (2015), policy 1.1(e), of the adopted Ealing Development (or Core) Strategy (2012), and policy 5.21 of the adopted Ealing Development Management DPD (2013) 10. Material Samples Samples of all facing materials shall be submitted to and approved in writing by the Local Planning Authority prior to work commencing on the above ground superstructure. The samples shall include: a) Brickwork (including brick panels and mortar courses); b) Cladding and colours; c) Re-constituted stone; d) All window treatments (including sections and reveals); e) Balcony structures and balustrading treatment (including sections); f) Privacy screens; g) Metal, cement and render facing and banding detail; h) Ventilation and extraction louvres; i) Shop fronts; and j) All other external materials to be used. Page 12 of 49

13 The development shall be carried out strictly in accordance with the details so approved. Reason: To ensure that the materials harmonise with the surroundings, in accordance with policies Ealing Local Variation to London Plan Policy 7.4 and 7B of the Ealing Development Management Development Plan (2013), policies 1.1 (h) and 1.2 (g) of the adopted Local Development Framework (Core) Strategy (2012) and policies 7.4 and 7.6 of the London Plan (2015). 11. Material Samples Hard Landscaping Samples of all materials to be used in the hard landscaping and boundary treatments of the internal courtyard, east west pedestrian route, roof terraces and other areas of public realm shall be submitted to and approved in writing by the Local Planning Authority prior to work commencing the external landscaping works. The development shall be carried out strictly in accordance with the details so approved. Reason: To ensure that the materials harmonise with the surroundings, in accordance with policies Ealing Local Variation to London Plan Policy 7.4 and 7B of the Ealing Development Management Development Plan (2013), policies 1.1 (h) and 1.2 (g) of the adopted Local Development Framework (Core) Strategy (2012) and policies 7.4 and 7.6 of the London Plan (2015). 12. Insulation of building envelopes for residential units Details shall be submitted to the Local Planning Authority for approval prior to the commencement of superstructure works for the insulation of the building envelope, with windows shut and other means of ventilation provided, which will achieve the internal criteria for sensitive rooms, as specified in BS8233:2014. The details should also include the provision of alternative means of ventilation. The approved insulation shall be implemented before the development is occupied and retained permanently thereafter. Reason: To safeguard the future occupiers of the development against unacceptable noise and disturbance, in accordance with policies 3.5 and 7.15 of the London Plan (2015), policies 1.1(j) of the Ealing Development (or Core) Strategy (2012), Local Variation policy 3.5 and policy 7A of Ealing Development Management Development Plan Document (2013). 13. Insulation between ground floor commercial uses (A1, A2, A3, B1, D1), Plantroom and dwellings above Details shall be submitted for approval of the Local Planning Authority prior to the commencement of superstructure works, for the insulation of the floor/ceiling between the commercial premises, Plantroom and the dwellings above to demonstrate that an acoustic standard not exceeding NR 25 Leq 5mins, (octaves) or NR 20 Leq 5mins, (one-third octaves) will be met inside a bedroom and NR 30 Leq,5mins (octaves), 0r NR 25 Leq,5mins (one-third octaves), inside a living room when noise is generated from the commercial use or Plantroom. Reason: To safeguard the future occupiers of the development against unacceptable noise and disturbance, in accordance with policies 3.5 and 7.15 of the London Plan (2015), policies 1.1(j) of the Ealing Development (or Core) Strategy (2012), Local Variation policy 3.5 and policy 7A of Ealing Development Management Development Plan Document (2013). 14. Insulation between ground floor D2 Gymnasium use and dwellings above Should any commercial units be occupied by a D2 gymnasium use or ancillary gymnasium use, details shall be submitted for approval of the Local Planning Authority prior to occupation of relevant commercial unit, of the insulation and anti-vibration works to the floors, walls and ceiling, forming transmission paths with dwellings, to demonstrate that the works are sufficient Page 13 of 49

14 to prevent disturbance from airborne noise transmission, including amplified music and also structure borne vibration and noise. The works shall meet the criteria set at BS8233:2014 as measured or predicted within attached dwellings or at the façade of surrounding dwellings. The approved insulation and anti-vibration measures shall be implemented before occupation of the D2 gymnasium use or ancillary gynamsium use and shall be retained permanently. Reason: To safeguard the future occupiers of the development against unacceptable noise and disturbance, in accordance with policies 3.5 and 7.15 of the London Plan (2015), policies 1.1(j) of the Ealing Development (or Core) Strategy (2012), Local Variation policy 3.5 and policy 7A of Ealing Development Management Development Plan Document (2013). 15. Details of Plant and Machinery Details of plant and machinery shall be submitted and approved by the Local Planning Authority prior to installation to demonstrate that the rating sound level emitted from the proposed external plant and machinery at the proposed development, as assessed under BS4142: 2014, will not exceed the existing background sound level, as measured at the nearest noise sensitive facades, during the relevant periods of operation. Reason: To safeguard future and existing occupiers of the area against unacceptable noise and disturbance, in accordance with policies 3.5 and 7.15 of the London Plan (2015), policies 1.1(j) of the Ealing Development (or Core) Strategy (2012), Local Variation policy 3.5 and policy 7A of Ealing Development Management Development Plan Document (2013). 16. Vibration from an extract or other duct fixed to a wall for A3 ground floor use Prior to the occupation of any commercial units for A3 use, the ventilation duct from the commercial premises, shall be fixed to the exterior wall with suitable anti - vibration isolators and the fan motor shall be vibration isolated from the duct, so as to satisfy an acoustic standard of not exceeding LFNR25 Leq 5mins (octaves) or LFNR20 Leq 5mins (one-third octaves) inside a bedroom and LFNR 30 (Leq 5mins) (octaves) or LFNR 25 (Leq 5mins) (one-third octaves) inside a living room. Reason: To safeguard the future occupiers of the development against unacceptable noise and disturbance, in accordance with policies 3.5 and 7.15 of the London Plan (2015), policies 1.1(j) of the Ealing Development (or Core) Strategy (2012), Local Variation policy 3.5 and policy 7A of Ealing Development Management Development Plan Document (2013). 17. Noise Mitigation for Collection and Deliveries during Noise Sensitive Hours (23:00-07:00) Prior to occupation of any commercial units details shall be submitted for the approval of the Local Planning Authority for a Quiet Delivery Scheme (QDS). The Scheme shall be compiled in accordance with the Quiet Deliveries Good Practice Guidance, - Key Principles and Processes for Retailers, Department Of Transport, April The noise mitigation measures emanating from the site assessment report shall be implemented prior to the commencement of the QDS and shall be retained permanently thereafter. Reason: To safeguard future and existing occupiers of the area against unacceptable noise and disturbance, in accordance with policies 3.5 and 7.15 of the London Plan (2015), policies 1.1(j) of the Ealing Development (or Core) Strategy (2012), Local Variation policy 3.5 and policy 7A of Ealing Development Management Development Plan Document (2013). 18. Ventilation for residential dwellings Details shall be submitted to and approved by the Local Planning Authority prior to superstructure works, for the installation in the relevant dwellings of a fresh air ventilation Page 14 of 49

15 system capable of mitigating elevated concentrations of nitrogen oxides and particulate matter in the external air. The details shall include: Details of the type of fresh air ventilation system to be installed; and The arrangements for maintaining the operational efficiency of the system. The ventilation system as approved shall be completed prior to occupation of the relevant units and shall be retained permanently thereafter. Reason: To safeguard the amenity of future occupiers, in accordance with policy 5.21 of the adopted London Plan (2015), policy 1.1(e), of the adopted Ealing Development (or Core) Strategy (2012), and policy 5.21 of the adopted Ealing Development Management DPD (2013) 19. Emissions from CHP Plant Details shall be submitted for the approval of the Local Planning Authority prior to the commencement of superstructure works to demonstrate the CHP plant that may be installed complies with a minimum NOx Emission Standard of 20 mg/nm -3 (at Reference O2). Reason: To monitor the effectiveness of the equipment in order to confirm compliance with energy policies and establish an evidence base on the performance of such equipment in accordance with policies 5.2, 5.3, 5.5, 5.6 and 5.7 of the London Plan 2015, adopted Ealing s Development (Core) Strategy 2026 (3rd April 2012) and Development Management DPD (December 2013). 20. Odour Abatement of Any A3 Use Prior to the occupation of any commercial units for A3 use details shall be submitted for the approval of the Local Planning Authority, for the installation, operation, and maintenance of the best practicable cooking extract system, including the provision of a suitable extract fan, odour control equipment, with a vertical discharge terminus without any cap or cover, at a minimum of 1.5 metres above the highest roof eaves of the building. The details shall satisfy the advice at DEFRA, 2005: Guidance on the Control of Odour and Noise from Commercial Kitchen Exhaust Systems. The system, as approved, shall be completed before occupation of the relevant commercial unit and thereafter permanently retained and maintained. Reason: To safeguard the amenity of future and adjoining occupiers, in accordance with policy 5.21 of the adopted London Plan (2015), policy 1.1(e), of the adopted Ealing Development (or Core) Strategy (2012), and policy 5.21 of the adopted Ealing Development Management DPD (2013) 21. Non road mobile machinery Details shall be submitted for approval of the Local Planning Authority before the development has commenced of all Non-Road Mobile Machinery (NRMM) to be used on the development site. All NRMM should meet as minimum the Stage IIIB emission criteria of Directive 97/68/EC and its subsequent amendments unless it can be demonstrated that Stage IIIB equipment is not available. An inventory of all NRMM must be registered on the NRMM register All NRMM should be regularly serviced and service logs kept on site for inspection. Records should be kept on site which details proof of emission limits for all equipment. Reason: To safeguard adjoining occupiers of the development against unacceptable noise, disturbance and emissions, in accordance with policies 3.5 and 7.15 of the London Plan 2015, policies 1.1(j) of the Ealing Development (Core) Strategy 2012, Local Variation policy 3.5 and policy 7A of Ealing s Development Management DPD Page 15 of 49

16 22. Landscaping, Play Space and Public Realm Prior to commencement of landscaping works, and notwithstanding the indications in the submitted application; details of the hard and soft landscaping works, within the internal courtyard, east west pedestrian route, roof terraces and other areas of public realm including the details of: a. the location, species and densities of planting; b. finishes to the hard surfaced areas; c. the amount, location of play space and full details of any play equipment proposed d. associated furniture (including bins, bollards, seating) and other hard landscape works, and lighting e. disabled access and security measures shall be submitted and approved by the Local Planning Authority and implemented. Any trees or other plants, which die or are removed within the first five years following the implementation of the landscaping scheme, shall be replaced during the next planting season. Reason: To ensure a high quality living environment is provided in interests the future occupiers of the development and the visual character and appearance of the conservation area, in accordance with policies 1.1 (e) (i) and 1.2 (d) of the adopted Local Development Framework (Core Strategy 2012), policies 7.4 and 7.6 of the London Plan (2015) and policy 7.4 of the Ealing Development Management Development Plan Tree Planting Prior to the commencement of the landscaping works, a detailed scheme of proposed tree planting shall be submitted for the approval of the Local Planning Authority. The scheme shall include the following comprehensive details of all trees to be planted: Full planting specification Tree size, species and the numbers of trees; Positions of all proposed species; Comprehensive details of ground preparation; Staking/tying method(s); and 5 year post planting maintenance schedule with an agreed inspection schedule. All tree-planting shall be carried out in full accordance with the approved scheme in the nearest planting season (1st October to 31st March inclusive) to the completion of the approved development, unless agreed otherwise in writing by the Local Planning Authority. The quality of all approved landscape works shall be in accordance with British Standard 4428:1989 Code Of practice For General Landscape Operations or any subsequent revision. All trees included within the approved scheme shall be healthy, well-formed specimens with single leading shoots and shall be of a minimum quality compatible with British Standard 3936:1992 (Part 1) Specifications For Trees & Shrubs and British Standard 4043 (where applicable) or any subsequent revisions. Any trees which within a period of 5 years from the completion of all tree planting die, are removed, uprooted are significantly damaged, become diseased or malformed shall be replaced during the nearest planting season (1st October to 31st March inclusive) with others of the same size, species and quality as approved, unless the Local Planning Authority gives written consent to any variation. Page 16 of 49

Planning Committee 17/05/2017 Schedule Item 01

Planning Committee 17/05/2017 Schedule Item 01 Ref: Address: Ward: Proposal: 165514OPDFUL The Portal, Land at Wales Farm Road and Portal Way, Acton, W3 6EJ East Acton Redevelopment of the site to provide a single storey basement with a part 10, part

More information

Planning Committee 16/08/2017 Schedule Item No. 02

Planning Committee 16/08/2017 Schedule Item No. 02 Ref: Address: Ward: Proposal: Drawing numbers/plans: Type of Application: 172682FUL 140 Wales Farm Road, Acton, W3 6UG East Acton Demolition of all existing buildings and the redevelopment of the site

More information

Planning Committee 23/04/2014 Schedule Items 7 & 8

Planning Committee 23/04/2014 Schedule Items 7 & 8 Planning Committee 23/04/2014 Schedule Items 7 & 8 Ref : Address: Ward: Proposal: APPLICATION A - P/2013/5186 FORMER GSK SITE, GREENFORD ROAD, GREENFORD, UB6 OHE Greenford Green Hybrid (part outline and

More information

an Inspector appointed by the Secretary of State for Communities and Local Government

an Inspector appointed by the Secretary of State for Communities and Local Government Appeal Decision Site visit made on 11 October 2016 by Mike Hayden BSc DipTP MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 21 November 2016 Appeal

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities)

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities) SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 12 January 2011 AUTHOR/S: Executive Director (Operational Services) Corporate Manager (Planning and New Communities) Notes: S/1848/10

More information

REFERENCE: 15/01661/FUL Registered: 16 March 2015 Expiry date: 25 October 2016

REFERENCE: 15/01661/FUL Registered: 16 March 2015 Expiry date: 25 October 2016 LOCATION: Land North Of Charcot Road, Colindale REFERENCE: 15/01661/FUL Registered: 16 March 2015 Expiry date: 25 October 2016 WARD: Colindale APPLICANT: PROPOSAL: Fairview New Homes (Colindale) Ltd Erection

More information

Reference: 16/1447/FUL Received: 7th March 2016 Accepted: 7th March 2016 Ward: East Finchley Expiry 2nd May 2016

Reference: 16/1447/FUL Received: 7th March 2016 Accepted: 7th March 2016 Ward: East Finchley Expiry 2nd May 2016 Location 374B Long Lane London N2 8JX Reference: 16/1447/FUL Received: 7th March 2016 Accepted: 7th March 2016 Ward: East Finchley Expiry 2nd May 2016 Applicant: Ms Katrin Hirsig Proposal: Single storey

More information

The term 'development' in the conditions below means the development permitted by this consent.

The term 'development' in the conditions below means the development permitted by this consent. APPENDIX 1 Conditions The term 'development' in the conditions below means the development permitted by this consent. 1 Approved plans The development hereby permitted shall be carried out in accordance

More information

Departure from the Development Plan. Town Council objection to a major application. DETERMINE

Departure from the Development Plan. Town Council objection to a major application. DETERMINE Item No. 9 APPLICATION NUMBER CB/17/01642/OUT LOCATION Land rear of 43 to 91 Silver Birch Avenue South of Alder Green and Aspen Gardens, Aspen Gardens, Stotfold PROPOSAL Outline application for up to 95

More information

CA//16/00504/FUL. Canterbury City Council Military Road Canterbury Kent CT1 1YW. Crown copyright and database rights 2016 Ordnance Survey

CA//16/00504/FUL. Canterbury City Council Military Road Canterbury Kent CT1 1YW. Crown copyright and database rights 2016 Ordnance Survey O Scale 1:1,250 Map Dated: 09/05/2016 CA//16/00504/FUL Crown copyright and database rights 2016 Ordnance Survey 100019614 Canterbury City Council Military Road Canterbury Kent CT1 1YW AGENDA ITEM NO 13

More information

Planning Committee 04/02/2015 Schedule Item 6. Smith Farm Estate, Old Bridge Close, Northolt, UB5 6UA.

Planning Committee 04/02/2015 Schedule Item 6. Smith Farm Estate, Old Bridge Close, Northolt, UB5 6UA. Planning Committee 04/02/2015 Schedule Item 6 Ref: Address: Ward: Proposal: PP/2014/5145 Smith Farm Estate, Old Bridge Close, Northolt, UB5 6UA. Greenford Broadway Installation of sports pitch, reconstruction

More information

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

1 The development hereby permitted shall be carried out in accordance with the following approved plans: Location 59 Greenway Close London N20 8ES Reference: 16/00011/HSE Received: 30th December 2015 Accepted: 7th January 2016 Ward: Totteridge Expiry 3rd March 2016 Applicant: Mr Ankit Shah Proposal: Part

More information

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

1 The development hereby permitted shall be carried out in accordance with the following approved plans: Location The Avenue Tennis Club The Avenue London N3 2LE Reference: 16/6509/FUL Received: 10th October 2016 Accepted: 10th October 2016 Ward: Finchley Church End Expiry 5th December 2016 Applicant: Mrs

More information

DELEGATED DECISION on 1st September 2015

DELEGATED DECISION on 1st September 2015 Application N o : 14/04810/OUT LONDON BOROUGH OF BROMLEY TOWN PLANNING RENEWAL AND RECREATION DEPARTMENT DELEGATED DECISION on 1st September 2015 14/04810/OUT Claire Harris 4 Oaklands Road Bromley BR1

More information

Derry City and Strabane District Council Planning Committee Report

Derry City and Strabane District Council Planning Committee Report Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 23 rd March 2016 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: LA11/2015/0395/F Residential Development

More information

RECOMMENDATION APPROVE THE APPLICATION SUBJECT TO:

RECOMMENDATION APPROVE THE APPLICATION SUBJECT TO: LOCATION: Gateway House, 318-330 Regents Park Road, Finchley Church End, London, N3 REFERENCE: F/03933/13 Received: 03/09/2013 Accepted: 30/09/2013 WARD: Finchley Church End Expiry: 30/12/2013 APPLICANT:

More information

Application Recommended for Approval Hapton with Park Ward

Application Recommended for Approval Hapton with Park Ward Application Recommended for Approval Hapton with Park Ward APP/2017/0036 Outline Planning Application Outline application for the construction of a new 3 bedroom dwelling (with all matters reserved for

More information

Planning and Regeneration PO Box 28, Birmingham B1 1TU DECISION DOCUMENT APPLICATION NUMBER: 2017/05933/PA TOWN AND COUNTRY PLANNING ACT 1990

Planning and Regeneration PO Box 28, Birmingham B1 1TU DECISION DOCUMENT APPLICATION NUMBER: 2017/05933/PA TOWN AND COUNTRY PLANNING ACT 1990 Planning and Regeneration PO Box 28, Birmingham B1 1TU DECISION DOCUMENT APPLICATION NUMBER: 2017/05933/PA TOWN AND COUNTRY PLANNING ACT 1990 APPLICANT EDSI 1 Lancaster Circus Queensway Birmingham B4 7DJ

More information

18 Birkbeck Road London NW7 4AA. Reference: 15/02994/HSE Received: 14th May 2015 Accepted: 26th May 2015 Ward: Mill Hill Expiry 21st July 2015

18 Birkbeck Road London NW7 4AA. Reference: 15/02994/HSE Received: 14th May 2015 Accepted: 26th May 2015 Ward: Mill Hill Expiry 21st July 2015 Location 18 Birkbeck Road London NW7 4AA Reference: 15/02994/HSE Received: 14th May 2015 Accepted: 26th May 2015 Ward: Mill Hill Expiry 21st July 2015 Applicant: Proposal: Mrs Tania Kallis Single storey

More information

Mr & Mrs Connolly per Pump House Designs Pump House Yard The Green SEDLESCOMBE, East Sussex. TN33 0QA

Mr & Mrs Connolly per Pump House Designs Pump House Yard The Green SEDLESCOMBE, East Sussex. TN33 0QA AGENDA ITEM NO: 5 (c) Report to: PLANNING COMMITTEE Date: 03 June 2015 Report from: Head of Housing and Planning Services Application Address: Proposal: Application No: Recommendation: Ward: File No: Applicant:

More information

Annington Property Limited

Annington Property Limited LOCATION: Land between Sweets Way and Oakleigh Road North, London, N20 REFERENCE: B/04309/14 Received: 08 August 2014 Accepted: 08 August 2014 WARD: Totteridge Expiry: 10 November 2014 APPLICANT: PROPOSAL:

More information

26 September 2014 CONSULTATION EXPIRY : APPLICATION EXPIRY : 22 July 2014 SUMMARY RECOMMENDATION: PERMISSION

26 September 2014 CONSULTATION EXPIRY : APPLICATION EXPIRY : 22 July 2014 SUMMARY RECOMMENDATION: PERMISSION Item No.: 5 The information, recommendations and advice contained in this report are correct as at the date of preparation, which is more than one week in advance of the Committee meeting. Because of the

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 1 April 2015 AUTHOR/S: Planning and New Communities Director Application Number: Parish(es): Proposal: Site address: Applicant(s): Recommendation:

More information

Planning Committee 18/12/2013 Schedule Item: 10 & DRAYTON GREEN WEST EALING W13 0JE

Planning Committee 18/12/2013 Schedule Item: 10 & DRAYTON GREEN WEST EALING W13 0JE Ref : Address: Ward: Proposal: P/2012/5103 53 DRAYTON GREEN WEST EALING W13 0JE Cleveland Provision of new church building, ancillary floorspace to the church use and two replacement residential units,

More information

PLANNING COMMITTEE REPORT

PLANNING COMMITTEE REPORT PLANNING COMMITTEE REPORT TO: BY: Planning Committee South Head of Development DATE: 19 December 2017 DEVELOPMENT: SITE: WARD: APPLICATION: APPLICANT: Conversion of existing water storage reservoir to

More information

3 Abbey View Mill Hill London NW7 4PB

3 Abbey View Mill Hill London NW7 4PB Location 3 Abbey View Mill Hill London NW7 4PB Reference: 15/03203/HSE Received: 26th May 2015 Accepted: 16th June 2015 Ward: Mill Hill Expiry 11th August 2015 Applicant: Proposal: Mr Richard Benson Alterations

More information

TRANSPORT AND WORKS ACT 1992 TRANSPORT AND WORKS (APPLICATIONS AND OBJECTIONS PROCEDURE)(ENGLAND AND WALES) RULES 2006

TRANSPORT AND WORKS ACT 1992 TRANSPORT AND WORKS (APPLICATIONS AND OBJECTIONS PROCEDURE)(ENGLAND AND WALES) RULES 2006 TRANSPORT AND WORKS ACT 1992 TRANSPORT AND WORKS (APPLICATIONS AND OBJECTIONS PROCEDURE)(ENGLAND AND WALES) RULES 2006 THE MIDLAND METRO (BIRMINGHAM CITY CENTRE EXTENSION LAND ACQUISITION AND VARIATION)

More information

Site Location Plan. Land on the North West of Epsom Road Waddon Croydon. 1 : A4 September The. Waddon. Waddon.

Site Location Plan. Land on the North West of Epsom Road Waddon Croydon. 1 : A4 September The. Waddon. Waddon. 138 140 44.3m MP 11.5 El Sub Sta EPSOM ROAD 13 Bank 1 to 5 154 Trough 19to21 1 to 5 156 The Waddon (PH) 23 FB Waddon Station 45.0m Posts 29to31 1 to 9 Stafford Court 39 37 Meridian Court 10 43 to 45 1

More information

British Library Newspapers, 130 Colindale Avenue, London, NW9 5HE

British Library Newspapers, 130 Colindale Avenue, London, NW9 5HE LOCATION: British Library Newspapers, 130 Colindale Avenue, London, NW9 5HE REFERENCE: H/05856/13 Received: 29/11/2013 Accepted: 12/12/2013 WARD: Colindale Expiry: 13/03/2014 Final Revisions: 30/06/2014

More information

Description Details submitted pursuant to discharge of condition 5 (Design Code) attached to planning permission 13/01729/OUT.

Description Details submitted pursuant to discharge of condition 5 (Design Code) attached to planning permission 13/01729/OUT. ITEM 9 Application Number: 18/00266/DISCON Description Details submitted pursuant to discharge of condition 5 (Design Code) attached to planning permission 13/01729/OUT. AT The Point, 602 Midsummer Boulevard,

More information

Report Author/Case Officer: Joanne Horner Contact Details:

Report Author/Case Officer: Joanne Horner Contact Details: APP 04 Application Number: 16/00140/FUL Other Two storey side extension to existing dwelling and formation of hard standing to provide parking for number 54 (Resubmission of withdrawn application 15/02852/FUL)

More information

SUBJECT TO ATTACHED SCHEDULE OF THIRTY SIX CONDITIONS

SUBJECT TO ATTACHED SCHEDULE OF THIRTY SIX CONDITIONS Stratton House 58/60 High West Street Dorchester Dorset DT1 1UZ Duchy of Cornwall Poundbury Farmhouse Poundbury Farm Way Poundbury Dorchester DT1 3RT Tel: (01305) 251010 Fax: (01305) 251481 Minicom: (01305)

More information

Planning Committee 26/11/2014 Schedule Item: 06 ADELAIDE WHARF AND GORDON ROAD, SOUTHALL UB2 5QE

Planning Committee 26/11/2014 Schedule Item: 06 ADELAIDE WHARF AND GORDON ROAD, SOUTHALL UB2 5QE Ref : Address: Ward: Proposal: Drawing numbers: Type of Application: PP/2014/4494 ADELAIDE WHARF AND GORDON ROAD, SOUTHALL UB2 5QE Southall Green Provision of a six-storey block of 20 apartments (comprising

More information

TOWN AND COUNTRY PLANNING ACT 1990

TOWN AND COUNTRY PLANNING ACT 1990 To: Keele Seddon Ltd c/o Gratton Planning Services - Mr Philip Gratton Barn Bank Vanity Close Oulton Stone Staffordshire ST15 8TZ Description of development Proposed student accommodation with carparking

More information

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

REFERENCE: B/03745/12 Received: 02 October 2012 Accepted: 05 October 2012 WARD(S): Totteridge Expiry: 30 November 2012.

REFERENCE: B/03745/12 Received: 02 October 2012 Accepted: 05 October 2012 WARD(S): Totteridge Expiry: 30 November 2012. LOCATION: 15A Pyecombe Corner, London, N12 7AJ REFERENCE: B/03745/12 Received: 02 October 2012 Accepted: 05 October 2012 WARD(S): Totteridge Expiry: 30 November 2012 Final Revisions: APPLICANT: PROPOSAL:

More information

Site north of Hattersley Road West (east of Fields Farm Road), Hattersley

Site north of Hattersley Road West (east of Fields Farm Road), Hattersley Application Number 17/00982/REM Proposal Site Applicant Recommendation Reason for report Application for the approval of reserved matters (means of access, landscaping, layout, scale and appearance) relating

More information

Homebase, Rookery Way, London, NW9 6SS. REFERENCE: H/05828/14 Registered: 30/10/2014

Homebase, Rookery Way, London, NW9 6SS. REFERENCE: H/05828/14 Registered: 30/10/2014 LOCATION: Homebase, Rookery Way, London, NW9 6SS REFERENCE: H/05828/14 Registered: 30/10/2014 WARD: Colindale APPLICANT: PROPOSAL: Neat Developments Ltd and DTZ Investment Management Demolition of the

More information

5 Gratton Terrace London NW2 6QE. Reference: 17/5094/HSE Received: 4th August 2017 Accepted: 7th August 2017 Ward: Childs Hill Expiry 2nd October 2017

5 Gratton Terrace London NW2 6QE. Reference: 17/5094/HSE Received: 4th August 2017 Accepted: 7th August 2017 Ward: Childs Hill Expiry 2nd October 2017 Location 5 Gratton Terrace London NW2 6QE Reference: 17/5094/HSE Received: 4th August 2017 Accepted: 7th August 2017 Ward: Childs Hill Expiry 2nd October 2017 Applicant: WSD (Gratton) Ltd Proposal: The

More information

Garages To Rear Of The Willows 1025 High Road London N20 0QE

Garages To Rear Of The Willows 1025 High Road London N20 0QE Location Garages To Rear Of The Willows 1025 High Road London N20 0QE Reference: 15/03944/FUL Received: 25th June 2015 Accepted: 2nd July 2015 Ward: Totteridge Expiry 27th August 2015 Applicant: Mr Alex

More information

Ground Floor Flat 15 Redbourne Avenue London N3 2BP

Ground Floor Flat 15 Redbourne Avenue London N3 2BP Location Ground Floor Flat 15 Redbourne Avenue London N3 2BP Reference: 17/4160/FUL Received: 28th June 2017 Accepted: 29th June 2017 Ward: West Finchley Expiry 24th August 2017 Applicant: Proposal: Mr

More information

Final Revisions: Provision of single storey modular classroom and associated works.

Final Revisions: Provision of single storey modular classroom and associated works. LOCATION: St Catherines Catholic Primary School, Vale Drive, Barnet, Herts, EN5 2ED REFERENCE: B/01924/12 Received: 17 May 2012 Accepted: 28 May 2012 WARD(S): Underhill Expiry: 23 July 2012 Final Revisions:

More information

3 Tretawn Gardens London NW7 4NP

3 Tretawn Gardens London NW7 4NP Location 3 Tretawn Gardens London NW7 4NP Reference: 16/7886/HSE Received: 12th December 2016 Accepted: 19th December 2016 Ward: Mill Hill Expiry 13th February 2017 Applicant: Proposal: Mr Murray Two storey

More information

6B Bertram Road London NW4 3PN

6B Bertram Road London NW4 3PN Location 6B Bertram Road London NW4 3PN Reference: 16/6621/RCU Received: 14th October 2016 Accepted: 19th October 2016 Ward: West Hendon Expiry 14th December 2016 Applicant: Proposal: Ms Kavita Singh Erection

More information

Ward: West Wittering. Proposal Change of use from public highway pavement to residential garden use.

Ward: West Wittering. Proposal Change of use from public highway pavement to residential garden use. Parish: West Wittering Ward: West Wittering WW/17/03295/FUL Proposal Change of use from public highway pavement to residential garden use. Site Izora 1 Watersedge Gardens West Wittering PO20 8RA Map Ref

More information

Persimmon Homes Thames Valley Date received: 2 nd April week date(major): 2 nd July 2014 Ward: Nascot

Persimmon Homes Thames Valley Date received: 2 nd April week date(major): 2 nd July 2014 Ward: Nascot PART A Report of: DEVELOPMENT MANAGEMENT SECTION HEAD Date of Committee: 26 th June 2014 Site address: Rounton, 28, Nascot Wood Road Reference Number: 14/00497/REM Description of Development: Reserved

More information

PLANNING COMMITTEE REPORT

PLANNING COMMITTEE REPORT PLANNING COMMITTEE REPORT TO: BY: Planning Committee South Head of Development DATE: 21 August 2018 DEVELOPMENT: SITE: WARD: APPLICATION: APPLICANT: Erection of a new chalet bungalow with associated parking

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 9 January 2013 AUTHOR/S: Planning and New Communities Director S/2064/12/FL WATERBEACH Demolition of existing 35 no. shared amenity apartments

More information

Planning Committee 03/02/2016 Schedule Item No: 10

Planning Committee 03/02/2016 Schedule Item No: 10 Ref: Address: Ward: Proposal: PP/2015/5442 Chiswick Business Park and Bollo Lane/ Colonial Drive, Chiswick W4 5NU Southfield Construction of a pedestrian footbridge between Chiswick Business Park and Bollo

More information

Planning Committee 18 July 2018 Schedule Item 01

Planning Committee 18 July 2018 Schedule Item 01 Ref : Address: Ward: Proposal: 180366FUL Land to the Rear of Red Lion Public House, 19 and 21 St Marys Road, Ealing, W1 5RA Ealing Common Construction of two pairs of semi-detached residential dwellinghouses

More information

PARISH / WARD: Peacehaven / Peacehaven East PROPOSAL:

PARISH / WARD: Peacehaven / Peacehaven East PROPOSAL: APPLICATION ITEM LW/16/0802 NUMBER: NUMBER: 7 APPLICANTS NAME(S): Mr J Robison & Ms S Teng PARISH / WARD: Peacehaven / Peacehaven East PROPOSAL: Planning Application for Conversion of existing garage to

More information

Chief executive's department Planning division Development management (5th floor - hub 2) PO Box LONDON SE1P 5LX

Chief executive's department Planning division Development management (5th floor - hub 2) PO Box LONDON SE1P 5LX Mr Guy Bransby JLL 30 Warwick Street W1B 5NH Dear Mr Bransby Chief executive's department Planning division Development management (5th floor - hub 2) PO Box 64529 LONDON SE1P 5LX Your Ref: Our Ref: 17/EQ/0421

More information

Outh SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Joint Director for Planning and Economic Development S/0179/18/OL. Histon. Approval.

Outh SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Joint Director for Planning and Economic Development S/0179/18/OL. Histon. Approval. Outh SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 4 April 2018 AUTHOR/S: Joint Director for Planning and Economic Development Application Number: Parish(es): Proposal: Site address:

More information

Brookside Walk Children's Play Area, London, NW4

Brookside Walk Children's Play Area, London, NW4 LOCATION: Brookside Walk Children's Play Area, London, NW4 REFERENCE: H/05584/13 Received: 26 November 2013 Accepted: 11 December 2013 WARD(S): Hendon Expiry: 05 February 2014 Final Revisions: APPLICANT:

More information

Stanryck House, 38 Totteridge Village, London, N20 8JN

Stanryck House, 38 Totteridge Village, London, N20 8JN LOCATION: Stanryck House, 38 Totteridge Village, London, N20 8JN REFERENCE: B/02895/14 Received: 28 May 2014 Accepted: 28 May 2014 WARD(S): Totteridge Expiry: 23 July 2014 Final Revisions: APPLICANT: PROPOSAL:

More information

Southend-on-Sea Borough Council Department for Place! Peter Geraghty Head of Planning & Transport

Southend-on-Sea Borough Council Department for Place! Peter Geraghty Head of Planning & Transport Southend-on-Sea Borough Council Department for Place! Peter Geraghty Head of Planning & Transport Our ref: 15/00889/PREAPF Telephone: 01702 215004 ext 4848 Your ref: Fax: 01702 215672 Date: 3 rd August

More information

PLANNING STATEMENT. Market House Market Place Kingston upon Thames KT1 1JS

PLANNING STATEMENT. Market House Market Place Kingston upon Thames KT1 1JS PLANNING STATEMENT To support planning and listed building consent applications for change of use from Class A1 shop and Class A3 cafe to Class A3 restaurant at: Market House Market Place Kingston upon

More information

REFERENCE: B/00601/12 Received: 11 February 2012 Accepted: 21 February 2012 WARD(S): High Barnet Expiry: 17 April 2012

REFERENCE: B/00601/12 Received: 11 February 2012 Accepted: 21 February 2012 WARD(S): High Barnet Expiry: 17 April 2012 LOCATION: 37 Kings Road, Barnet, Herts, EN5 4EG REFERENCE: B/00601/12 Received: 11 February 2012 Accepted: 21 February 2012 WARD(S): High Barnet Expiry: 17 April 2012 Final Revisions: APPLICANT: PROPOSAL:

More information

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2 11.1 OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11.2 POLICIES RELEVANT TO ALL WORKSITES IN ISLINGTON... 3 11.3 FARRINGDON

More information

The Compton School, Summers Lane, London, N12 0QG

The Compton School, Summers Lane, London, N12 0QG LOCATION: The Compton School, Summers Lane, London, N12 0QG REFERENCE: F/04511/12 Received: 30 November 2012 Accepted: 30 November 2012 WARD(S): Woodhouse Expiry: 01 March 2013 Final Revisions: APPLICANT:

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 5 June 2013 AUTHOR/S: Planning and New Communities Director S/0747/13/FL HISTON Construction of Car Park at Histon Baptist Church, Station

More information

St Marys Church Of England High School Downage London NW4 1AB

St Marys Church Of England High School Downage London NW4 1AB Location St Marys Church Of England High School Downage London NW4 1AB Reference: 16/2877/FUL Received: 29th April 2016 Accepted: 10th May 2016 Ward: Hendon Expiry 5th July 2016 Applicant: Proposal: Governors

More information

Planning Area Committee 25 June 2018 Addendum to Officers Report RESTRICTION OF PERMITTED DEVELOPMENT RIGHTS - EXTENSIONS

Planning Area Committee 25 June 2018 Addendum to Officers Report RESTRICTION OF PERMITTED DEVELOPMENT RIGHTS - EXTENSIONS Planning Area Committee 25 June 2018 Addendum to Officers Report 17/8150/RMA West Hendon Regeneration Area (Phase 6) Pages 11 54 The conditions section shall be changed as follows: RESTRICTION OF PERMITTED

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

PHASE III: Reserved Matters Submission

PHASE III: Reserved Matters Submission Statement of Compliance with the outline approval for the proposed residential development of land at: BURGES LANE, WIVELISCOMBE PHASE III: Reserved Matters Submission Foreword Contents: This Statement

More information

Construction of 9 dwellings and associated infrastructure.

Construction of 9 dwellings and associated infrastructure. Application Number 16/00653/FUL Proposal Site Applicant Recommendation Construction of 9 dwellings and associated infrastructure. Land at Grange Road South, Hyde McDermott Developments Ltd Approve REPORT

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

DONCASTER METROPOLITAN BOROUGH COUNCIL. PLANNING COMMITTEE - 15th October Expiry Date:

DONCASTER METROPOLITAN BOROUGH COUNCIL. PLANNING COMMITTEE - 15th October Expiry Date: DONCASTER METROPOLITAN BOROUGH COUNCIL PLANNING COMMITTEE - 15th October 2013 Application 3 Application Number: 13/01158/FUL Application Expiry Date: 31st July 2013 Application Type: Full Application Proposal

More information

Site: Essex Police & La Plata House London Road Brentwood Essex CM14 4QJ

Site: Essex Police & La Plata House London Road Brentwood Essex CM14 4QJ Reference: 16/01805/OUT Ward: Brentwood West Site: Essex Police & La Plata House London Road Brentwood Essex CM14 4QJ Proposal: Outline application for demolition of existing police station buildings,

More information

Town And Country Planning Act 1990 (As Amended) Town And Country Planning (General Development Procedure) Order 1995

Town And Country Planning Act 1990 (As Amended) Town And Country Planning (General Development Procedure) Order 1995 Cornwall Council Council Offices St Clare Penzance TR18 3QW Tel: 01736 331166 Email: planning.west1@cornwall.gov.uk Web: www.cornwall.gov.uk Agent: Mr Paul Connelly LDA Design Kings Wharf The Quay Exeter

More information

I615. Westgate Precinct

I615. Westgate Precinct I615. Westgate Precinct I615.1. Precinct Description The Westgate Precinct is located approximately 18km west of the Auckland city centre. There are seven Sub-precincts in the Westgate Precinct: Sub-precinct

More information

LAND & DEVELOPMENT OFFICE. 170 Church Road, Hove, BN3 2DJ mishonmackay.com

LAND & DEVELOPMENT OFFICE. 170 Church Road, Hove, BN3 2DJ mishonmackay.com LAND & DEVELOPMENT OFFICE 170 Church Road, Hove, BN3 2DJ 01273 829300 land@mishonmackay.com mishonmackay.com APPLICATION NUMBER: APPLICANTS NAME(S): PROPOSAL: LW/15/0462 Seaview Developments ( Sussex )

More information

Armourers Court, Woolwich

Armourers Court, Woolwich Armourers Court, Woolwich Environmental Statement, Non-Technical Summary December 2013 DESIGN PACKAGE C158 WOOLWICH STATION East End Over Site Development (Armourers Court, Arsenal Way, Woolwich) Environmental

More information

2015/0141 Reg Date 17/02/2015 Bagshot

2015/0141 Reg Date 17/02/2015 Bagshot 2015/0141 Reg Date 17/02/2015 Bagshot LOCATION: WESTON PADDOCKS (LAND ADJACENT TO 1) WHITMOOR ROAD, BAGSHOT, GU19 5QE PROPOSAL: Outline application for the erection of 10 dwelling houses following the

More information

49 Broughton Avenue London N3 3EN

49 Broughton Avenue London N3 3EN Location 49 Broughton Avenue London N3 3EN Reference: 17/3448/RCU Received: 30th May 2017 Accepted: 1st June 2017 Ward: Finchley Church End Expiry 27th July 2017 Applicant: Mr P Atwal Proposal: Erection

More information

Peel Centre, Aerodrome Road, London, NW9 5JE. WARD: Colindale Expiry: 23 July Mayors Office for Policing and Crime

Peel Centre, Aerodrome Road, London, NW9 5JE. WARD: Colindale Expiry: 23 July Mayors Office for Policing and Crime LOCATION: Peel Centre, Aerodrome Road, London, NW9 5JE REFERENCES: H/01571/13 H/01613/13 Received: 23 April 2013 Accepted: 23 April 2013 WARD: Colindale Expiry: 23 July 2013 APPLICANT: PROPOSAL: Mayors

More information

PLANNING COMMITTEE REPORT

PLANNING COMMITTEE REPORT PLANNING COMMITTEE REPORT TO: BY: Planning Committee South Head of Development DATE: 20 March 2018 DEVELOPMENT: SITE: WARD: APPLICATION: APPLICANT: Proposed erection of 2 no. 3-bedroom dwellings and conversion

More information

DEVELOPMENT MANAGEMENT REPORT

DEVELOPMENT MANAGEMENT REPORT ITEM A08-1 DEVELOPMENT MANAGEMENT REPORT TO: BY: DATE: DEVELOPMENT: SITE: WARD: APPLICATION: APPLICANT: Development Management Committee Development Manager Proposed live/work unit in connection with existing

More information

CASE OFFICER Mark Spragg DATE REGISTERED 08 January 2009 EXPIRY DATE 09 April 2009 Southfield Hathway Properties Ltd REASON FOR

CASE OFFICER Mark Spragg DATE REGISTERED 08 January 2009 EXPIRY DATE 09 April 2009 Southfield Hathway Properties Ltd REASON FOR Item No. 7 SCHEDULE B APPLICATION NUMBER MB/09/00032/FULL LOCATION LAND AT BONDS LANE AND, FOUNDRY LANE, BIGGLESWADE PROPOSAL FULL:DEMOLITION OF EXISTING VACANT WAREHOUSE AND DERELICT BUILDINGS AND ERECTION

More information

10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS

10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS SCHEME EVOLUTION STARBUCKS The proposed Starbucks Drive Thru alongside the proposed food store provides an appropriate mix of uses, suitable for this location. The proposed store is bespoke, designed specifically

More information

PLANNING COMMITTEE. 14 October 2014

PLANNING COMMITTEE. 14 October 2014 AGENDA ITEM NO 8 PLANNING COMMITTEE 14 October 2014 APPLICATION NUMBER : CA//14/01744/FUL PROPOSAL : Extension and conversion of roof space of an existing detached bungalow together with enhanced parking

More information

Reserved Matters application for a site that straddles the boundary between CBC and BBC

Reserved Matters application for a site that straddles the boundary between CBC and BBC BBC APPLICATION 15/02682/MAR NUMBER CBC APPLICATION CB/15/04294/RM NUMBER LOCATION Wixams Land at former storage depot, Bedford Road, Wilstead Bedfordshire PROPOSAL Reserved Matters Application for Strategic

More information

DECISION NOTICE - PERMISSION GRANTED

DECISION NOTICE - PERMISSION GRANTED Tel: 020 8921 5222 Mr Hadley Robinson Escott Planning Downe House 303 High Street Orpington BR6 0NN Directorate of Regeneration, Enterprise & Skills The Woolwich Centre, 5th Floor 35 Wellington Street

More information

It is recommended that the Committee resolve to APPROVE the application and grant planning permission subject to the following conditions:

It is recommended that the Committee resolve to APPROVE the application and grant planning permission subject to the following conditions: LOCATION: Phase 2A Millbrook Park (Site of Former Inglis Barracks), Mill Hill East, London, NW7 1PZ REFERENCE: H/04606/12 Received: 04 December 2012 Accepted: 17 December 2012 WARD: Mill Hill Expiry: 18

More information

Site Address: Site Accessed off Bondfield Close, Bondfield Crescent, Wombwell, Barnsley, S73 8TX

Site Address: Site Accessed off Bondfield Close, Bondfield Crescent, Wombwell, Barnsley, S73 8TX 2017/0155 Applicant: Craig Hawley, Gleeson Regeneration Ltd Description: Residential development of 49 no dwelling houses. Site Address: Site Accessed off Bondfield Close, Bondfield Crescent, Wombwell,

More information

Land Fronting St Andrew's Road And Portsdown Avenue Golders Green London NW11 0PJ

Land Fronting St Andrew's Road And Portsdown Avenue Golders Green London NW11 0PJ Location Land Fronting St Andrew's Road And Portsdown Avenue Golders Green London NW11 0PJ Reference: 18/4546/FUL Received: 23rd July 2018 Accepted: 7th August 2018 Ward: Golders Green Expiry 2nd October

More information

Derry City and Strabane District Council Planning Committee Report. Environmental Improvement Scheme. Derry City & Strabane District Council

Derry City and Strabane District Council Planning Committee Report. Environmental Improvement Scheme. Derry City & Strabane District Council Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 7 th September 2016 APPLICATION No: APPLICATION TYPE: PROPOSAL: LA11/2015/0776/F Environmental Improvement Scheme Provision

More information

Date: TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2011: REGULATION 13 SCOPING OPINION

Date: TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2011: REGULATION 13 SCOPING OPINION PLANNING & BUILDING CONTROL Tracy Harvey Head of Planning & Building Control Rob Wells Savills Innovation Court 121 Edmund Street Birmingham B3 2HJ Our Ref: 5/16/3441 E-mail: Date: planning@stalbans.gov.uk

More information

Site off Hattersley Road West (bound by Hattersley Road West to the north west and Sandy Bank Avenue to the south and west), Hattersley

Site off Hattersley Road West (bound by Hattersley Road West to the north west and Sandy Bank Avenue to the south and west), Hattersley Application Number 17/00984/REM Proposal Site Applicant Recommendation Reason for report Application for the approval of reserved matters (means of access, landscaping, layout, scale and appearance) relating

More information

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

1 The development hereby permitted shall be carried out in accordance with the following approved plans: Location Victoria Park Ballards Lane London N3 Reference: 17/1030/FUL Received: 20th February 2017 Accepted: 20th February 2017 Ward: West Finchley Expiry 17th April 2017 Applicant: Mrs Mia Freedman Proposal:

More information

PLANNING DECISION NOTICE

PLANNING DECISION NOTICE PLANNING DECISION NOTICE TOWN AND COUNTRY PLANNING ACT, 1990 Applicant WILLITON VILLAGE HALL STEERING COMM. C/O ALISON CALLOWWAY 54 NORTHCROFT WILLITON TAUNTON TA4 4RT Date Registered 11/08/2006 Application

More information

Derry City and Strabane District Council Planning Committee Report

Derry City and Strabane District Council Planning Committee Report Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 23rd March 2016 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: LA11/2015/0263/O Outline Planning

More information

Derry City and Strabane District Council Planning Committee Report

Derry City and Strabane District Council Planning Committee Report Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 20.12.2017 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: A/2014/0495/F Full Construction of

More information

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY You will be aware that Scarborough borough council have adopted a new local plan that includes land at Church Cliff

More information

RE: THE MALL, WALTHAMSTOW PLANNING APPLICATION REF: 17/1355 RESPONSE TO LBWF NEIGHBOUR CONSULTATION

RE: THE MALL, WALTHAMSTOW PLANNING APPLICATION REF: 17/1355 RESPONSE TO LBWF NEIGHBOUR CONSULTATION Gavin Chinniah Planning Manager Majors Team Development Management London Borough of Waltham Forest Sycamore House Town Hall Complex Forest Road London E17 4JF 19278/A3/RM/MJ/sl 4 th October 2017 Dear

More information

Proposed Student Accommodation Development

Proposed Student Accommodation Development Statement of Response to the Notice of Pre- Application Consultation Opinion Former "Matts of Cabra" public house and lands to the rear, Fassaugh Avenue, Cabra, Dublin 7 Proposed Student Accommodation

More information

Report Author/Case Officer: Paul Keen Senior Planning Officer (Dev Control) Contact Details:

Report Author/Case Officer: Paul Keen Senior Planning Officer (Dev Control) Contact Details: APP 03 Application Number: 17/02060/FUL Description A full planning application for the demolition of an existing bungalow (C3 use class) and associated out buildings and the erection of two, two storey

More information

Salvation Army Hall, Albert Road, Barnet, EN4 9SH.

Salvation Army Hall, Albert Road, Barnet, EN4 9SH. LOCATION: Salvation Army Hall, Albert Road, Barnet, EN4 9SH. REFERENCE: 17/5522/FUL Received: 25 Aug 2017 Accepted: 01 Sept 2017 WARD: East Barnet Expiry: 01 Dec 2017 APPLICANT: PROPOSAL: One Housing Group

More information

4 Residential and Urban Living Zones

4 Residential and Urban Living Zones 4 Residential and Urban Living Zones Refer to Chapters 11 to 20 for additional rules that may apply to these zones. 4.1 OBJECTIVES AND POLICIES Objective Res1 Policy 1 Policy 2 Policy 3 Policy 4 Policy

More information