1 Analysis University of Iowa Campus Lighting Strategy... Fall Page 1

2 (Back of Analysis Divider) Page 2... Fall University of Iowa Campus Lighting Strategy

3 University of Iowa Campus Lighting Strategy The Campus Lighting Strategy is a response by the University of Iowa to lighting issues on campus. Issues, documented in previous studies and gathered from current comments, include concerns about safety, visual quality, cost efficiency, and light pollution. A Campus Lighting Master Plan Committee - consisting of University staff and students - with assistance from additional staff and students, members of adjoining communities, and representatives of various service groups and advocacy programs was established to address issues and define solutions. The process for defining the Campus Lighting Strategy includes Analysis and Recommendations: Analysis Series of workshops with the Campus Lighting Master Plan Committee to define a Mission Statement, establish goals, and define methods to measure success. Review of existing "Lighting Studies" from 1989 to present to identify previously identified problem areas. Review of existing "problem areas" identified in previous lighting studies through on site visual survey of each problem area, day time photographs of selected areas, and nighttime photographs of those selected areas from the same location as daytime photographs. Also, to establish a basis for comparison, collect nighttime footcandle measurements of some of the selected areas. Recommendations Establish recommendations based on a multi-year implementation plan for effective, long-term, solutions that address security, appearance, economy, and pollution. Establish fixture types for specific locations and define footcandle levels and uniformity ratios. Establish routes through campus where lighting efforts will be concentrated, define timing for implementing recommendations, and define specific recommendations for locations through analysis of existing conditions and application of general recommendations. University of Iowa Campus Lighting Strategy... Fall Page 3

4 Mission Statement The mission of UI lighting is to enhance campus safety as much as possible. In the process, lighting should improve the appearance of the campus, be energy efficient, and minimize light pollution. Lighting must be adaptable to future campus development and changing technologies, and responsive to input from campus users. The Mission Statement was defined through analysis and summary of information gathered in an initial workshop with the Campus Lighting Master Plan Committee. Five questions were asked at the workshop. The statement was refined and finalized with the Committee at a succeeding workshop. Complete results of the initial workshop are in Appendix C and are summarized as follows: 1. What is the purpose for lighting on campus? Lighting provides safe, secure passageway throughout the campus at night and enhances and unifies the appearance of the campus at all times. 2. What is different about campus lighting now than three years ago? Safety awareness and concerns have increased. The campus has more buildings and walkways. Parking lot lighting has been improved and lighting is being extended into the neighborhoods. Campus lighting variety, amount, and levels have proliferated. 3. How should campus illumination be different five years from now? Lighting should be at a perceived safe level along designated "secure" walkways and bikeways. Lighting levels should be pleasant and energy efficient, and not cause light pollution. A plan should eliminate problem areas, and be flexible enough to respond to changing campus patterns. 4. What should campus illumination be? Planning for campus illumination should address issues of personal safety, aesthetics, and energy efficiency for the entire campus. 5. What unique features will help to reach the goals? A lighting plan should respond to input from concerned parties. It should have a series of standard lighting fixtures and place them based on targeted light levels. The plan should search for new technologies that will conserve energy, keep costs down, and minimize light pollution. Page 4... Fall University of Iowa Campus Lighting Strategy

5 Goals Goal 1 To provide sufficient levels of illumination at building entrances and along routes between campus buildings, parking lots, bike racks, bus stops, campus entrances, and isolated areas so that pedestrians, drivers, bicyclists, and other users can travel safely at night. Goal 2 To establish a system that provides a unity and continuity to the campus and enhances the character of the campus architecture and landscape. Goal 3 To balance energy efficiency and cost issues with other goals. Goal 4 To minimize the nuisance effects of light pollution. Goals were defined through analysis and summary of information gathered in a workshop with the Campus Lighting Master Plan Committee that asked for lists of critical needs for campus lighting. (Complete results of the workshop are in Appendix C.) The lists were combined, sorted, and distilled into four goals and were refined with the Committee at succeeding workshops. Objectives and specific tasks were defined for each of the goals. Goals, objectives, and tasks are as follows: GOAL 1 Provide sufficient levels of illumination at building entrances, for signage, and along routes between campus buildings, parking lots, bike racks, bus stops, and campus entrances so that pedestrians, drivers, bicyclists, and other users can travel safely at night. Objective 1.1 Task Task Task Task Task Task Task Task Task Task Objective 1.2 Define minimum illumination at each place. Define places. Define users. Research legal definitions. Define light level standard for safety. Define light level standard for perceived sufficiency. Look at structure -- context. Determine minimum standard for multiple use areas, e.g. roads with walkways. Look at lighting uniformity or lack thereof. Inventory light levels of areas surrounding campus. Identify places where lighting can be improved by landscape trimming for visibility. Identify areas that are problems and deal with them. Task Inventory existing lighting at areas (see Tasks 1.3.3, and 3.4.4). Task Determine why area is a problem. Task Photograph areas in daylight and at night. Task Verify problem areas by checking crime statistics. Task List solutions. Task Implement standards so areas will conform. Objective 1.3 Task Task Task Task Task Task Task Task Task Better use of lighting already in place through improved maintenance and servicing. Define better maintenance. Determine if less than adequate maintenance is a perception or reality. Inventory all exterior lighting fixtures by type, location, condition, etc. (see Tasks 1.2.1, and 3.4.4) Establish a fixture cleaning schedule. Set up group relamping schedules. Review maintenance systems technology, equipment, processes. Monitor lighting system frequently by campus security or other personnel. Set up method for public to report non-working lights. Establish measures of success for maintenance: number of lamps serviced per year, complaints/responses, etc. University of Iowa Campus Lighting Strategy... Fall Page 5

6 GOAL 2 Establish a system that provides a unity and continuity to the campus and enhances the character of the campus architecture and landscape. Objective 2.1 Identify various types of campus spaces, e.g., historic,, building, parking, celebrative, ceremonial, institutional, walkways, connectors, streetscape. Task Identify types of spaces: Bike rack Bridge Building entrance Building facade Bus stop Campus edge Campus entrance Campus street/roadway City street/roadway Emergency entrance Gathering/celebrative space Historic area: Historic area: other Hospital area Isolated area Landmark building Task Task Task Task Task Task Objective 2.2 Task Task Task Objective 2.3 Task Task Identify character of spaces. Identify campus edges and how they interface with city. Refine and expand current list. Inventory each space under each type Identify circulation types and level of use for each space. Determine whether areas have historic status/character. Create a lighting system/hierarchy. Landscape feature: monument, fountain Lawn Maintenance/Service Mall/Commons Parking lot Recreation facility Remote area River corridor Signage Storage area Terminus/focal point Walkway along street Walkway near building Walkway through open space Wooded area Other Define unity, continuity, level of light, type of light rendering, style/character of fixture, times lights are on. Create a vocabulary for each type of space; include color rendering index (CRI), consolidated color temperature (CCT). Set up standards for use by Campus Planning Committee. Coordinate with Campus Planning Committee. Meet with Campus Planning Committee representatives. Set up a hierarchy of review for new lighting and revisions to existing lighting. Page 6... Fall University of Iowa Campus Lighting Strategy

7 GOAL 3 Balance energy efficiency and cost issues with other goals. Objective 3.1 Stop the proliferation of the number and type of fixtures. Task Define and quantify proliferation. Task Existing fixtures and use: are appropriate lights serving appropriate functions. Task Define each building's immediate vicinity and limit special lights to that area. Task Use the hierarchy established as part of Objective 2.2. Task Establish criteria for Campus Planning Committee to use to review and approve new lighting and revisions to existing lighting (Task 2.3.2). Task Set requirements for non-standard lighting components. Objective 3.2 Task Task Task Task Objective 3.3 Use the most cost effective way of meeting other goals. Determine how to optimize cost effectiveness. Cost effectiveness to include energy consumption, light distribution, and whether other goals will be met. Determine whether cost effectiveness can be formula-driven. Determine short-term and long-term costs. Develop changeover process to high pressure sodium (HPS). Task Inventory type, age, condition of all existing exterior lighting. Task Determine strategic areas for changeover process. Task Determine quantity of fixtures involved for each area. Task Determine cost of changeover for each area. Task Prioritize based on Tasks 3.3.2, and Objective 3.4 Set up a computerized system to keep track of age, condition, and type of all exterior fixtures. Task Determine department responsible for setting up and updating system. Task Determine department responsible for implementing system. Task Determine the department responsible for data entry. Task Identify and code each lamp/fixture (see Tasks 1.2.1, 1.3.3, and 3.3.1) Task Wire new lights to the computer as new lighting systems are installed. Task Wire existing lights to the computer as part of changeover-retrofitting processes. GOAL 4 Minimize the effects of light pollution. Objective 4.1 Task Task Task Task Task Objective 4.2 Task Task Task Objective 4.3 Ensure new lighting is directed to minimize light pollution, through distribution and aiming. Define light pollution. Define light distribution and aiming. Identify areas/conditions where light pollution occurs. Develop light distribution and aiming standards. Review Flagstaff, Arizona lighting ordinance. Identify area/criteria for uplighting. Define uplighting. Identify types of areas/focal points where uplighting would be beneficial. Establish uplighting criteria. Review existing condition of lighting and how to retrofit. Task Review inventory of existing lighting (see Tasks 1.2.1, 1.3.3, 3.3.1, and 3.4.4) Task Determine if fixtures can be modified to meet aiming and distribution standards. Task Determine whether fixtures can be adapted to other standards established. Task Determine cost-effectiveness of retrofitting vs. new. Task If fixtures are removed, determine feasibility of storing them for spare parts. University of Iowa Campus Lighting Strategy... Fall Page 7

8 Measures of Success The Campus Lighting Master Plan Committee identified measures to determine if the campus lighting strategy goals are being achieved within each goal. Complete results of the workshop are in Appendix C and are summarized as follows: Goal One: SECURITY Nighttime campus safety includes lighting as a component, but other factors exist. Crimes and incidents reported may or may not relate to lighting levels. Perceived security also includes the presence of police or security personnel and other people in the area, visibility into and within an area, Safewalk, level of Cambus service, and other alternatives. Campus security is an on-going process that involves constant education and improvement to resolve security issues and perceptions. Surveys and other public input need to be monitored. The public is entitled to timely, understandable, and readily available explanations of how concerns and problem areas will be corrected, and afforded the opportunity to comment. Goal Two: APPEARANCE Meeting appearance goals involves not only footcandle needs and fixture types but guidelines and performance standards. Campus lighting unity and harmony could be addressed by a variety of solutions. Potentials might include absolute uniformity throughout campus, conformity within campus districts, conformity based on function, conformity based on circulation type and density, or other methods. Goal Three: ECONOMY The long term view of economy and efficiency is part of the performance standards. Lighting decisions in the design stage often reflect initial cost constraints rather than lighting needs or performance and become short-term solutions for long-term issues. Periodic scheduled maintenance is necessary to maintain optimum performance of all fixtures and cannot wait for crisis management. This means that lighting decisions must include initial and continuing costs when assessing value. Periodic globe maintenance and selective tree and shrub pruning must be included in maintenance tasks. Economy goes beyond minimizing costs, and must be weighed against other goals to arrive at an acceptable compromise. Goal Four: MINIMIZATION OF LIGHT POLLUTION Illuminating the sky is not an effective use of lighting resources and compromises two goals: economy and minimizing light pollution. Complaints are the result of light pollution and are not simply a problem for astronomers. Page 8... Fall University of Iowa Campus Lighting Strategy

9 Previous Lighting Studies A series of existing "Lighting Studies" from 1989 through 1995 were used to define "problem areas" on campus. Dave Ricketts Memo dated , "Lighting and Safety Priorities for 1991" This memo identified Lot 8 west of the Chemistry-Botany building, Newton Road meters near Student Health, upper-level parking at the International Center, Lot 26A at the Chicano House, and the Nursing Building circle as priority areas for lighting. "Parking Lighting & Security Evaluation Tour" This memo from Dave Ricketts, is a summary of observations made on a tour and subsequent follow up evaluation of 88 sites on campus. Each site was review for lighting, visibility, openness, and activity. Hospital Staff Relations Suggestion Box Message dated This memo identified concerns about the lack of pedestrian lighting along the blacktop path from Finkbine parking lot. Robert J. Walton: "University of Iowa Lighting Review," June 12, This study evaluated lighting throughout the campus based on information provided by the Security Department, Department of Parking and Transportation, College of Law, and the Liberal Arts College. Approximately twenty-five areas were documented. "Campus Safety Survey," Spring Illumination adequacy was analyzed as part of a broadbased survey of campus security by the Committee on University Security. There were approximately fifty survey responses indicating specific locations of inadequate lighting. College of Liberal Arts Campus Safety Surveys, Oct.-Nov., Surveys on off-hours campus safety were distributed and responses about inadequate interior and/or exterior lighting were documented. Each of these surveys generated a list of problem areas related to inadequate lighting. The individual lists were then combined into a single master list, sorted into groups based on parking areas, buildings, walks, streets, and other common factors. This Campus Areas With Lighting Problems List, in Appendix A, is used throughout this report as the basis for analysis and recommendations. Day/Night Photographs After the Lighting Problems List was compiled, a series of day/night photographs were taken on June , 1996 of many of the locations identified on the list. Sites were located during the day, a photograph was taken, the location was marked on the ground, and was documented in notes. After dark, a second photograph was taken from the same location using the markings established during the day. This resulted in a pair of comparison photographs for a number of the sites identified on the Lighting Problems List. All photographs are in Appendix B and are numbered according to the numerical listing in the List in Appendix A. Nighttime photographs are useful tools but must be interpreted knowing how the photographic methods and equipment used affect the results. 1. Areas with the most uniformity in night lighting appear to be evenly exposed across the photograph. This is true whether the area is dark (i.e., has low footcandle readings) or is bright (high footcandle readings). For instance, the night photograph looking south from the west end of the pedestrian bridge near the Art Building shows a relatively even distribution of light even though footcandle readings along the walk were less than 0.1 and most people would describe University of Iowa Campus Lighting Strategy... Fall Page 9

10 the area as quite dark. (See Appendix B, #114 Bridge at Art looking south - Night, page A- 74.) 2. Areas with high contrast between light and dark areas appear as unevenly exposed photographs no matter if the area has generally high or low footcandle readings. Light Meter Readings At many of the nighttime photograph locations, light meter readings were taken for further documentation of existing conditions. A hand-held, Sylvania Digital Light Meter with a range of 0.1 to 1999 footcandles was used to determine readings. The human eye easily adapts to different footcandle levels, but the meter accurately measures those different levels and is more sensitive to minor illumination changes. Footcandle readings are included in many of the captions that accompany the nighttime photographs in the Appendix B. NOTE See Amendment for updated information on footcandle measurements. Page Fall University of Iowa Campus Lighting Strategy

11 Recommendations University of Iowa Campus Lighting Strategy... Fall Page 11

12 (Backside of Recommendations divider) Page Fall University of Iowa Campus Lighting Strategy

13 Summary of Recommendations Both general and specific recommendations are part of the University of Iowa Campus Lighting Strategy. General recommendations define standards for fixture types based on use or type of an area and establish footcandle guidelines. Recommendations also include methods of measuring existing and proposed lighting to determine the best lighting solution for an area. Specific recommendations apply standards and guidelines to individual sites. Recommendations include: 1. Implement Non-Light Fixture Recommendations - Effective, long-term solutions to real and perceived lighting problems include implementation of non-light fixture recommendations. 2. Establish a Procedure for Assessing Lighting - A lighting assessment procedure combines the four goals established by the Lighting Committee to determine appropriate lighting solution for any given situation. Components include Security, Appearance, Economy, and Pollution. 3. Define a Lighting Fixture Selection Matrix - Light fixtures are defined for various land uses and areas across campus. Fixtures are defined for walks, river walks, historic areas, public gathering spaces, supplemental lighting, building lights, and streets and parking. 4. Establish Footcandle Standards - Footcandle levels and uniformity ratios are defined for various areas on campus including areas and fixtures listed in the Lighting Fixture Selection Matrix. 5. Define Lighting Framework Plan - While all areas of campus need to be addressed for lighting, the routes shown on the Lighting Framework Plan are the walks, sidewalks, bridges, and other pedestrian ways where lighting efforts will be concentrated and prioritized to meet the needs of pedestrians. 6. Establish a Three-Year Plan for Implementation - Priorities and timing are set forth for action on the suggested route, maintenance, Lighting Advocate, alternative solutions, monitoring program, lighting committee, and implementing other solutions. 7. Define Guidelines - Establish guidelines for addressing lighting needs on campus. 8. Define Recommendations for Specific Areas - Apply guidelines to certain campus sites identified in previous studies as lighting problem areas, and recommend solutions to resolve the problems. University of Iowa Campus Lighting Strategy... Fall Page 13

14 Non-Light Fixture Recommendations Success of a campus lighting strategy goes beyond simply selecting fixtures and establishing footcandle criteria. An effective, long-term solution to real and perceived lighting problems includes efforts on multiple fronts. Specific lighting recommendations presume the following steps are implemented. 1. Maintain an effective Lighting Committee. Establish a group to continuously monitor status of campus lighting Schedule night walks to review current conditions and update prioroties Review information on maintenance program Review information from Lighting Advocate Review status of non-light fixture recommendations Review surveys and other monitoring data Update guidelines for maintenance, Lighting Advocate, non-light fixture solutions, and other lighting issues 2. Establish an effective maintenance program. A person or crew is specifically responsible only for lighting Continuous visual/physical inspection of all fixtures Immediate replacement of broken or defective fixtures Scheduled maintenance (i.e., periodic cleaning) of all fixtures Effectiveness evaluation - i.e., authority and ability to do minor pruning of light-blocking branches on trees and shrubs Identify and code each fixture and pole to organize maintenance scheduling 3. Create a Lighting Advocate. (Assign an existing staff person, not a new position) A person (group) to assess current and future lighting issues Advocate has knowledge and authority to insist not on more lighting but on more effective lighting Serve as a "clearing house" for lighting concerns and correction of deficiencies 4. Implement alternative solutions. Extended Cambus schedule Increase in visible security personnel Promotion of Safewalk Safety brochure distributed Education / Information / Publication Alternative routes 5. Continue monitoring and data collection. Periodic survey of existing conditions Collect information on light levels crime incidents perceptions of safety amount of use of areas maintenance costs energy costs User survey of perceptions Page Fall University of Iowa Campus Lighting Strategy

15 Procedure for Assessing Lighting SECURITY + APPEARANCE + ECONOMY + POLLUTION = LIGHTING (perceived safety) (visual fit) (total cost) (amount of light) = (solution) A campus lighting strategy must establish a method for assessing future lighting solutions. The Procedure for Assessing Lighting combines the four goals established by the Campus Lighting Master Plan Committee to determine the appropriate lighting solution for any given situation. Components of the procedure are as follows: SECURITY = Footcandles in area + Uniformity ratio + Alternative availability APPEARANCE = Fit/no fit immediate area + Fit/no fit campus ECONOMY = Ratio of long term cost (high to low) to initial cost (high to low) POLLUTION = Continuum from no stray light to no shield Low Total Total of Security + Appearance + Economy + Pollution High Total Not Minimum Acceptable Acceptable Acceptable To assess the appropriateness of a proposed lighting solution, combine the individual assessments for each of the four components (Security, Appearance, Economy, and Pollution) to determine where the proposed solution is on the continuum from Not Acceptable to Acceptable. Graph showing Procedure for Assessing Lighting Note that the Procedure assumes the non-light fixture recommendations are implemented: 1. A Lighting Committee is in place and has periodic meetings to monitor changes in campus lighting. 2. An effective maintenance program is in effect. 3. A Lighting Advocate exists. 4. Implementation of alternative solutions has been completed. 5. Continued monitoring and data collection takes place. University of Iowa Campus Lighting Strategy... Fall Page 15

16 Security Component of the Procedure Chart not available on this electronic version See printed version available at Facilities Services Group - Administration Footcandles in Area Footcandles for proposed or existing lighting can be computed or measured and compared to desired levels established for an area and use. Excess footcandle levels or less than needed levels result in low scores while footcandles that measure within desired levels score high. Chart not available on this electronic version See printed version available at Facilities Services Group - Administration Uniformity Ratio Uniformity levels for proposed or existing lighting can be computed or measured and compared to desired levels established for an area and use. Lighting that closely matches desired ratios score high while those that exceed or fall short of desired levels score low. Chart not available on this electronic version See printed version available at Facilities Services Group - Administration Alternative Availability Availability of alternate routes, Cambus access, visible security and other alternative solutions to lighting affects security. Existence or implementation of alternate solutions scores high while a lack of implementation scores low. Low Total Total of Footcandles in Area + Uniformity Ratio + Alternative Availability High Total Not Minimum Acceptable Acceptable Acceptable Security is a combination of footcandles, uniformity, and alternative availability as defined above. To assess the appropriateness of a proposed lighting solution based on Security, combine the individual scores to determine where the proposed solution is on the continuum from Not Acceptable to Acceptable. Security Notes: Footcandle: Uniformity: Coverage: Measurement equal to the light intensity of one candle at a distance of one foot. Ratio of average horizontal illumination to the minimum horizontal illumination. Percentage of area with horizontal illumination at least one tenth of average illumination. Page Fall University of Iowa Campus Lighting Strategy

17 Appearance Component of the Procedure Chart not available on this electronic version See printed version available at Facilities Services Group - Administration Fit/No Fit in Area The Lighting Fixture Selection Matrix defines fixture types based on specific areas of the campus. This graph reflects a fixture's fit with criteria established in the matrix. If a fixture matches the type defined in the matrix it receives a high score. If it does not match, the fixture receives a low score. Chart not available on this electronic version See printed version available at Facilities Services Group - Administration Fit/No Fit Campus The Lighting Fixture Selection Matrix defines fixture types for the overall campus. This graph reflects an existing or proposed fixture's fit with criteria established in the matrix. If a fixture matches the type defined in the matrix it receives a high score. If it does not match, the fixture receives a low score. Low Total Total of Fit/No Fit in Area + Fit/No Fit Campus High Total Not Minimum Acceptable Acceptable Acceptable Appearance is a combination of lighting visually fitting the parameters of an area and the campus. Combining scores from those two factors results in a total score. High total score reflects high totals for the two factors while low total score is the result of less than desired scores for the factors. To assess the appropriateness of a proposed lighting solution based on Appearance, combine the individual scores to determine where the proposed solution is on the continuum from Not Acceptable to Acceptable. Appearance Notes: Color: Color rendering ability affects appearance; where important, use source with high Color Rendering Index Site Match: Glare: (i.e., metal halide). Define circulation, emphasize aesthetic features, contribute to attractiveness of space and surroundings. Reduces comfort, distracts from view, and makes it difficult to see. University of Iowa Campus Lighting Strategy... Fall Page 17

18 Economy Component of the Procedure Chart not available on this electronic version See printed version available at Facilities Services Group - Administration Chart not available on this electronic version See printed version available at Facilities Services Group - Administration Long-Term Cost Existing or proposed light fixtures have continuing costs that are part of the true total cost for that fixture. Maintenance, replacement, energy use, and other long-term expenses are part of that cost. This graph assigns high scores to low longterm cost fixtures and low scores to fixtures with high long-term expenses. Short-Term Cost The initial cost of a fixture is typically its purchase and installation price. This graph assigns a high score to a fixture with low-short term costs and a low score to a fixture with high short-term expenses. Low Total Total of Long-Term Cost + Short-Term Cost High Total Not Minimum Acceptable Acceptable Acceptable The true total cost for a fixture is a combination of long-term and short-term expenses. Combining scores from those two factors results in a total score. A high total score reflects high scores for the two factors while a low total score is the result of less than desired scores for the factors. To assess the appropriateness of a proposed lighting solution based on Economy, combine the individual scores to determine where the proposed solution is on the continuum from Not Acceptable to Acceptable. Economy Notes: First Cost: Maintenance: Energy Cost: Cost of luminaires, lamps, controls, poles, wiring, installation, etc. Pro-rated annual labor and material cost of cleaning, replacement of lamps, ballast, and controls, a other continuing costs. Savings in energy cost can easily pay for larger investment in efficient lighting. Hours of operation can be reduced with motion sensors, time clocks, and photo cells. Page Fall University of Iowa Campus Lighting Strategy

19 Pollution Component of the Procedure Excess Stray Light Stray Light No Stray Light Not Minimum Acceptable Acceptable Acceptable One method of determining light pollution is to assess the amount of stray light emanating from a fixture. A high score on this graph reflects minimal stray light while a low score means there is too much stray light. To assess the appropriateness of a proposed lighting solution based on Pollution, determine where the proposed solution is on the continuum from Not Acceptable to Acceptable. Pollution Minimization Notes: Full Cut-off: Hours: Additional: Use fully shielded light fixtures that direct light to objects, not to the sky Hours of operation can be reduced to only necessary times. Support legislation, HF 2014 "Standards for Outdoor Lighting." University of Iowa Campus Lighting Strategy... Fall Page 19

20 Lighting Fixture Selection Matrix Light fixtures are defined for walks, river walks, historic areas, public gathering spaces, supplemental lighting areas, building lights, streets and parking. Classification Typical Light Example Notes Area Fixture Area Walks Walks, sidewalks along Box fixture Walk from All pedestrian streets, walks through on pedestrian commuter walks should have parking areas scale pole parking lot pedestrian lights River Walks Walks along the Iowa Globe fixture Walk between Cut-off on top of River from Burlington on pedestrian Music and fixture to restrict St. north to Park Rd. scale pole Park Road stray light Historic Pentacrest & Cleary Queen Anne fixture Walk along Pedestrian fixture Areas walkway to North Hall on pedestrian east side of in historic areas scale pole MacLean Hall (white light only in Pentacrest area) Public Gathering sites Feature North side of Gathering lights Library Spaces Supplemental Special lighting needs Feature lights Walk to Law Special fixtures areas along walks or Sign lighting building from off walk edges to drives Supplemental lights Myrtle parking light wooded area Uplighting Buildings & Entries Building mounted Fixtures Streets & Street rights-of-way Cobra fixture on Stadium Drive Cobra fixture Parking and parking areas vehicular scale pole by Kinnick for vehicles throughout campus Queen Anne Fixture on a Pedestrian Scale Pole Walks Box Fixture on a Pedestrian Scale Pole River Walks Globe Fixture on a Pedestrian Scale Pole NOTE See Amendment for updated information on light fixtures and poles. Historic Areas Page Fall University of Iowa Campus Lighting Strategy

21 Gathering Space Cutoff Fixture on a Pedestrian Scale Pole Streets/Parking Cobra Fixture on a Vehicular Scale Pole University of Iowa Campus Lighting Strategy... Fall Page 21

22 Footcandle Standards Footcandle levels and uniformity ratios are defined for areas and fixtures listed in the Lighting Fixture Selection Matrix. Footcandle Standards were outlined with the University of Iowa Campus Lighting Master Plan Committee using IES Lighting Standards for Areas as a basis. Area Recommendation (in footcandles) Bike Rack Building Entrance Bus Stop Campus Edge maximum 6 to 1 uniformity Campus Entrance maximum 3 to 1 uniformity Emergency Entrance Landmark Building Varies according to site and building - use least light necessary and incorporate light pollution control Landscape feature: monument, fountain Varies according to site and function - use least light necessary and incorporate light pollution control Maintenance/Service Parking Lot - Open lot , 0.6, to 1 uniformity Parking Lot - Covered lot (Ramp) Recreation Facility Varies according to function - incorporate light pollution control Signage Externally Lighted ambient light level - low ambient light level - medium ambient light level - high Signage Internally Lighted ambient light level - low ambient light level - medium ambient light level - high Walkways Footcandle RangeUniformity Min Max Maximum Walks :1 uniformity River Walks :1 uniformity Walks in Historic Areas: Pentacrest :1 uniformity Walks in Historic Areas: Other :1 uniformity Walks along streets :1 uniformity Isolated walks :1 uniformity Walks near buildings :1 uniformity Walks through public gathering spaces :1 uniformity Other Walks :1 uniformity Footcandle: Uniformity: Measurement equal to the light intensity of one candle at a distance of one foot. Ratio of average horizontal illumination to the minimum horizontal illumination. NOTE See Amendment for additional information on footcandle standards. Page Fall University of Iowa Campus Lighting Strategy

23 Lighting Framework Plan Definition The routes shown on the Lighting Framework Plan are the walks, sidewalks, bridges, and other pedestrian ways where lighting efforts will be concentrated to meet the needs of pedestrians. While all areas of campus need to be addressed for lighting, areas along major pedestrian traffic routes are important because of the concentration of users. These routes provide connections between dormitories. classrooms, parking areas, and other facilities and are the pedestrian connections across the Iowa River. The routes will not necessarily provide the most direct connections through campus but will provide lighted routes that are reasonably direct. Defining these routes allows prioritization and concentration of lighting efforts. Designation Individual members of the Campus Lighting Master Plan Committee and others identified the highest pedestrian traffic areas and highest priority (for lighting) areas on campus. Identified areas were combined and documented on campus maps and gaps between the areas were filled to create continuous connected routes. This resulted in a map that defines the routes in the Lighting Framework Plan. NOTE See Amendment for an updated Lighting Framework Plan map. University of Iowa Campus Lighting Strategy... Fall Page 23

24 (Lighting Framework Plan map goes here) NOTE See Amendment for an updated Lighting Framework Plan map. Page Fall University of Iowa Campus Lighting Strategy

25 (Back side of the Lighting Framework Plan map) NOTE See Amendment for an updated Lighting Framework Plan map. University of Iowa Campus Lighting Strategy... Fall Page 25

26 Three-Year Plan for Implementation Establish Lighting Framework Plan Concur on identification Immediate ----X Address known problems x Assess Plan by Procedure X Develop a plan X Implement X Maintenance Inventory and identify fixtures X Inspection program x Group re-lamping On-going-----X Effectiveness evaluation x Lighting Advocate (Designate existing personnel, not new position) Create title/description x Identify X Alternative Solutions Extend X Security X Promote Safewalk X Users guide to campus Immediate ----X Alternative routes x Monitoring Program Periodic survey x Information collection on incidents X User survey perceptions X X Lighting Committee Establish Immediate ----X Review goals/objectives X Evaluate and alter implementation x Other Identified Problems - (Campus Wide) Assess by formula X Develop a plan X Implement X Page Fall University of Iowa Campus Lighting Strategy

27 Guidelines Guidelines are the result of analysis of existing conditions and they direct the application of recommendations to specific sites. The guidelines are applicable across campus and address concerns at sites identified in previous studies as lighting problem areas. All pedestrian routes should be defined by pedestrian lights. Street lights typically are adequate for vehicular traffic but light levels along adjoining walks do not always address the needs of pedestrians. Pedestrian routes along streets should be defined by pedestrian lights. Parking lot lights typically are adequate for vehicles but light levels do not always address the needs of drivers and passengers once they are outside of their vehicles. Pedestrian routes within parking lots should be defined by pedestrian lights. Routes between parking lots and potential destinations should be defined by pedestrian scale lighting. Adequate lighting, determined by standardized procedure for assessing lighting and analysis, should not be compromised by budget constraints. Convert existing fixtures to High Pressure Sodium or Metal Halide. New fixtures should be High Pressure Sodium or Metal Halide. Remove mis-located fixtures (i.e., globe lights that are not along river walks) and salvage for placement in appropriate locations. Phase out non-appropriate fixtures (i.e., fixtures not specified in Lighting Fixture Selection Matrix). Periodic, scheduled maintenance is an essential component of any effective lighting strategy. Code and connect existing and new fixtures/poles to a computerized system to allow uniform identification and maintenance. Install cut-offs in existing globe fixtures to eliminate uplighting. Timers and photo cells can ensure that feature lighting is on only during appropriate hours. Pedestrian scale lights along walks near buildings should position reflectors to aim light to the walk and not into windows of adjoining rooms. Certain locations such as at building corners, near areas of dense vegetation, at walk intersections with other walks or vehicular routes, or near bridges or other elements in the landscape, may require additional lighting beyond the standard density or spacing. service that meets the needs of remote parking area users at non-peak use hours is important if commuter students are expected to use remote parking. A building's immediate lighting vicinity is defined as those lights on the building. Campus walks, with pedestrian scale lighting as shown in the Lighting Fixture Selection Matrix, go to the entrances of campus buildings. University of Iowa Campus Lighting Strategy... Fall Page 27

28 Along many campus walks through wooded areas, modifications can increase the sense of safety on routes without compromising what otherwise are enjoyable, well designed alignments. 1. Selective, minor pruning of overhanging branches allows light from fixtures to reach the walk. 2. Lighting placed within the vegetation on both sides of the walks extends the width of the lighted area, highlights the vegetation, and eliminates the narrow light tunnel and uneasy sense of enclosure that may exists. The Pentacrest is one of the pedestrian hubs on campus and should feel safe for pedestrians. Like other campus locations, pedestrian level light fixtures selected to fit with the architecture, site, and historical nature of this area will provide a sense of safety and identify pedestrian routes through the area. For historical reasons, the Pentacrest is the only area on campus with white light. Page Fall University of Iowa Campus Lighting Strategy

29 Specific Area Recommendations Recommendations for specific areas are the result of analysis of existing conditions and application of general recommendations and guidelines. The following are recommendations, shown on photographs, of specific sites primarily along the Lighting Framework Plan routes through campus. In the captions beneath each photograph, the # followed by a numeral and the description that follows the numeral refer to the Campus Areas with Lighting Problems List numbers and descriptions found in Appendix A. For instance; #1 Tunnel from EPB to Library. Footcandle levels along the walk are 0.5 beneath the lights and 0.1 between. #1 beneath the photograph on opposite page refers to the first location identified on the Lighting Problems List and describes the footcandle levels measured and recorded. University of Iowa Campus Lighting Strategy... Fall Page 29

30 Photographs not available in this electronic version See printed version available at Facilities Services Group - Administration #1 Tunnel from EPB to Library. Footcandle levels along the walk are 0.5 beneath the lights and 0.1 between. The walk east of the EPB connects to the Library through the tunnel beneath the railroad tracks. The night photograph shows an even distribution of light across the adjoining parking lot and along the walk. The even distribution, however, has a low footcandle illumination. Lighting within the vegetation along the track would eliminate some of the uncomfortableness of using this walk. Additional lighting at the tunnel entrances and within the tunnel would brighten the walk within the enclosure. Recommendations (Note: Current construction at the Library will address some light concerns at the tunnel. A post-construction review of this area is appropriate and may affect prioritization.) 1. Install additional Pedestrian Lights along sidewalk adjoining tracks and at the tunnel entrances. 2. Install Supplemental Lights within plant material along the tracks and within the tunnel. Page Fall University of Iowa Campus Lighting Strategy

31 Photographs not available in this electronic version See printed version available at Facilities Services Group - Administration #62 Bridge on walkway south of Law. Footcandle levels are 0.7 near the Emergency pole, 2.0 under light between the pole and bridge, 5.1 under light at the bridge, 1.3 at bridge center, <0.3 at the darkest spot on the bridge, and 4.4 at the far end. The bridge is a prime example of a perceived "unsafe" area that by most standards has adequate footcandle levels indicating that additional pedestrian lighting would not add a greater sense of safety. Other modifications can increase that sense without compromising what is seen as an enjoyable, well designed alignment. Selective, minor pruning would allow existing fixtures to better light the bridge deck. Lighting within vegetation adjoining the bridge would extend the width of the lighted area and highlight the vegetation. Mowed turf to the tree edge would bring a sense of "civilization" as would an organized, formal annual/perennial flower area at the north end of the bridge. A second route, not aligned through the wooded ravine, would provide an alternate connection. Recommendations 1. Complete selective, minor pruning of overhanging branches to allow light from existing fixtures to reach the bridge. 2. Install Supplemental Lights within plant material along edge of walk. 3. Mow turf up to the edge of the trees to bring a sense of "civilization" to the bridge approaches. 4. Install an organized, formal annual and perennial flower area in the widened clearing at the north end of the bridge to bring a sense of "civilization" to this walk through the woods. 5. Establish a second marked route, not aligned through the wooded ravine, between the Law School and Myrtle Avenue parking lot to provide an alternate connection. University of Iowa Campus Lighting Strategy... Fall Page 31

32 Photographs not available in this electronic version See printed version available at Facilities Services Group - Administration #99 Riverside Drive to Hancher. (along the east side of Riverside Drive between the railroad bridge and Hancher) Riverside Drive is a vehicular and pedestrian route connecting Hancher Auditorium to campus areas west of the river. There is a combination of street lights and pedestrian lights along the route. Lighting appears adequate for vehicles and light levels along the walk are generally acceptable although they vary and do not always address the needs of pedestrians. Supplemental pedestrian scale lights in a few key locations would increase the sense of safety along this route. Recommendations 1. Analyze necessity of installing additional Pedestrian Lights along the east side of Riverside Drive between the railroad bridge and Hancher by identifying areas, if any, where lighting falls below established standards. 2. Phase out/replace Queen Anne fixtures from railroad bridge to Alumni Center. Page Fall University of Iowa Campus Lighting Strategy

33 Photographs not available in this electronic version See printed version available at Facilities Services Group - Administration #139 Pentacrest. MacLean Hall. Footcandle levels are 0.5 at the entrance and <0.1 on most of the walk. Some areas of the Pentacrest are not well lit for pedestrian use. This area is particularly dark with most of the lighting coming from building lights and entrances. The Pentacrest is one of the pedestrian hubs on campus and should feel safe for users. Pedestrian level light fixtures (Queen Anne fixtures with white light) will provide a sense of safety and identify routes through the Pentacrest. Also, like other campus areas, pedestrian scale lights should be selected to fit with the architecture, site, and historical nature of this area. Recommendations 1. Install Queen Anne Lights along walks through the Pentacrest as part of the pedestrian route through campus. University of Iowa Campus Lighting Strategy... Fall Page 33

Uniformity Avg. : Min. Maintained Use/Task

Uniformity Avg. : Min. Maintained Use/Task WEST WHITELAND TOWNSHIP SUBDIVISION AND LAND DEVELOPMENT ORDINANCE OUTDOOR LIGHTING SECTION 03/10/04 REVISION Section 428. Lighting Control 1. Purpose. The standards established in this section set forth

More information

How Photometric Design Enhances Energy Savings and Asset Management

How Photometric Design Enhances Energy Savings and Asset Management How Photometric Design Enhances Energy Savings and Asset Management WHITE PAPER This paper shows how photometric design should be included in any streetlight upgrade as good design provides optimal energy

More information

Campus Outdoor Lighting Plan

Campus Outdoor Lighting Plan University of Oregon November 2004 Campus Planning Committee and Ad Hoc Committee on Campus Lighting I. Purpose: The purpose of this plan is to interpret and enhance the existing Long Range Campus Development

More information

Sidewalks Street Lights

Sidewalks Street Lights Boston Complete Streets Guidelines 013 Boston Transportation Department Sidewalks Introduction 17 Sidewalk Design Principles 18 Sidewalk Zones 0 Sidewalk Zones Widths Preferred and Minimum Widths for Sidewalk

More information

Lighting Guidelines. Planning Services Department Corporation of the Municipality of Clarington

Lighting Guidelines. Planning Services Department Corporation of the Municipality of Clarington Lighting Guidelines Planning Services Department Corporation of the Municipality of Clarington APPROVED BY COUNCIL ON MARCH 22, 2010 PREFACE In 2005, the area municipalities of Durham Region began the

More information

LIGHTING DESIGN STANDARDS SECTION City of Maryland Heights ZONING CODE

LIGHTING DESIGN STANDARDS SECTION City of Maryland Heights ZONING CODE SECTION 25-18 City of Maryland Heights ZONING CODE The Zoning Code text contained in the Interpretive Version is current as of Ordinance #2018-4308 adopted on February 15, 2018. The City Planner comments

More information

Lindsey Beane. Executive Summary

Lindsey Beane. Executive Summary Executive Summary The purpose of this technical assignment is to compile lighting information and make an analysis about the existing spaces. This report will include a list of the equipment used, required

More information

BIRMINGHAM TOWNSHIP CHESTER COUNTY, PENNSYLVANIA Subdivision and Land Development Ordinance No Dated 02/18/03

BIRMINGHAM TOWNSHIP CHESTER COUNTY, PENNSYLVANIA Subdivision and Land Development Ordinance No Dated 02/18/03 BIRMINGHAM TOWNSHIP CHESTER COUNTY, PENNSYLVANIA Subdivision and Land Development Ordinance No. 0302 Dated 02/18/03 Section 103-40. OUTDOOR LIGHTING A. Purpose. The standards in this section shall require

More information

UPPER DUBLIN TOWNSHIP MONTGOMERY COUNTY, PA STAND-ALONE LIGHTING ORDINANCE

UPPER DUBLIN TOWNSHIP MONTGOMERY COUNTY, PA STAND-ALONE LIGHTING ORDINANCE UPPER DUBLIN TOWNSHIP MONTGOMERY COUNTY, PA STAND-ALONE LIGHTING ORDINANCE 158-14. Outdoor lighting. [Added 10-8-2002 by Ord. No. 1093] A. Purpose. To require and set minimum standards for outdoor lighting

More information

Monterey Downtown Lighting Strategy

Monterey Downtown Lighting Strategy Monterey Downtown Lighting Strategy design standards and guidelines July 2013 public review draft 1 content Introduction 1 Scope of the Project 1 Project Process 2 Character Areas 3 Project Goals 3 The

More information

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004 City of Farmington Amendment to the 1998 Master Plan Adopted October 11, 2004 Introduction Planning Background 1 Scope and Components of the Plan Amendment 2 Concept Introduction 3 Plan Concepts 3 Conceptual

More information

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies Vision, Objectives & Strategies The is the public framework and guide for future development of the Grand Traverse Commons. The establishes public polices for infrastructure, the preservation of natural

More information

Urban Design 9Identity

Urban Design 9Identity Urban Design 9Identity URBAN DESIGN IDENTITY Urban design is about connecting people to their places through the built environment, nature, and overall urban form. Done well, it creates a memorable space

More information

Landscape and Streetscape Design 2.5

Landscape and Streetscape Design 2.5 Landscape and Streetscape Design 2.5 2.5.1 Goals 2.5.2 Planting 2.5.3 Sidewalks and Pavement 2.5.4 Furnishings 2.5.5 Walls 2.5.6 Lighting 2.5.7 Stormwater 2.5.8 Street Cross Sections 2.5 LANDSCAPE AND

More information

PD-32: Light Pollution

PD-32: Light Pollution : Light Pollution Goal: To safely illuminate roadways while minimizing unnecessary and potentially harmful illumination of the surrounding sky, communities, and habitat. 1-3 points Sustainability Linkage

More information

Public Hearing, July 12, 2018

Public Hearing, July 12, 2018 Draft Lighting Ordinance Public Hearing, July 12, 2018 Planning and Development Services staff has developed a draft lighting ordinance for Winston-Salem and Forsyth County at the direction of the City-County

More information

THE COMPLETE GUIDE TO OUTDOOR WALL LIGHTS

THE COMPLETE GUIDE TO OUTDOOR WALL LIGHTS THE COMPLETE GUIDE TO OUTDOOR WALL LIGHTS CONTENTS 1. INTRODUCTION 2. TYPES OF OUTDOOR WALL LIGHTS 3. LIGHT SOURCES IN OUTDOOR WALL LIGHTS 4. FACTORS IN SELECTING OUTDOOR WALL LIGHTS 5. SUMMARY lighting

More information

Outdoor Lighting for Julian Dark Sky Network, 2/10/18. Paul Ericson, PE San Diego IDA Board Member / Design Principal, Stantec

Outdoor Lighting for Julian Dark Sky Network, 2/10/18. Paul Ericson, PE San Diego IDA Board Member / Design Principal, Stantec Outdoor Lighting for Julian Dark Sky Network, 2/10/18 Paul Ericson, PE San Diego IDA Board Member / Design Principal, Stantec Introduction to Outdoor Lighting And How it Affects Light Pollution Nighttime

More information

CHAPTER ADDITIONAL REQUIREMENTS IN THE NC, NEIGHBORHOOD COMMERCIAL ZONE

CHAPTER ADDITIONAL REQUIREMENTS IN THE NC, NEIGHBORHOOD COMMERCIAL ZONE CITY OF MOSES LAKE MUNICIPAL CODE CHAPTER 18.31 ADDITIONAL REQUIREMENTS IN THE NC, NEIGHBORHOOD COMMERCIAL ZONE Sections: 18.31.010 Purpose 18.31.020 Minimum Lot Area 18.31.030 Setbacks 18.31.040 Maximum

More information

REVISIONS Summary of Change. 6/1/12 All Replaced entire document with new revision

REVISIONS Summary of Change. 6/1/12 All Replaced entire document with new revision Revision Date Section REVISIONS Summary of Change 6/1/12 All Replaced entire document with new revision REV 6/12 1 of 5 UNIVERSITY CONTACT: EXTERIOR LIGHTING Electrical Services, Maintenance & Operations

More information

EXISTING CONDITIONS 41. Existing Conditions

EXISTING CONDITIONS 41. Existing Conditions EXISTING CONDITIONS 41 Existing Conditions The Existing Analysis phase of the planning process involved a study of the existing conditions on the campus in order to identify key planning issues to be addressed

More information

This is the East Carolina University Comprehensive Facilities Master Plan Final Draft Plan Review. This workbook reviews the campus draft master plan

This is the East Carolina University Comprehensive Facilities Master Plan Final Draft Plan Review. This workbook reviews the campus draft master plan This is the East Carolina University Comprehensive Facilities Master Plan Final Draft Plan Review. This workbook reviews the campus draft master plan first presented on campus on June 29 and June 30, 2011.

More information

COMPLETE GREEN STREET CHECKLIST

COMPLETE GREEN STREET CHECKLIST COMPLETE GREEN STREET CHECKLIST This document was developed to dissect the structure of an urban street and explore opportunities to make our streets more complete while also integrating green street strategies.

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

SECTION LIGHTING REGULATIONS

SECTION LIGHTING REGULATIONS SECTION 12-1300 LIGHTING REGULATIONS 12-1301 INTENT The purpose of the outdoor illumination standards are to: 1. Provide adequate for safety and security; 2. Reduce light pollution, light trespass, glare,

More information

SEATTLE PACIFIC UNIVERSITY MIMP Condition Status Matrix: July 1, 2015 June 30, 2016

SEATTLE PACIFIC UNIVERSITY MIMP Condition Status Matrix: July 1, 2015 June 30, 2016 SEATTLE PACIFIC UNIVERSITY MIMP Condition Status Matrix: July 1, 2015 June 30, 2016 # CITY COUNCIL CONDITION FULFILLED/ 1 Modify the MIMP to replace the last sentence of the first paragraph on page 43

More information

ARTICLE 22, DIVISION 10 LIGHTING

ARTICLE 22, DIVISION 10 LIGHTING ARTICLE 22, DIVISION 10 LIGHTING 22.100 PURPOSE: THE PURPOSE OF THIS SECTION IS TO ENCOURAGE GOOD LIGHTING PRACTICES THAT PROMOTE SAFETY, SECURITY, AND ENERGY CONSERVATION BY REDUCING THE IMPACTS OF GLARE,

More information

CHAPTER 7 DEVELOPMENT STANDARDS

CHAPTER 7 DEVELOPMENT STANDARDS 7-20-140: LIGHTING (a) Applicability Shrubs shall be planted within ten (10) feet of the foundation of the primary structure along each building façade visible from an adjacent public road, at the rate

More information

Exterior Façade Lighting Design

Exterior Façade Lighting Design Exterior Façade Lighting Design Duques Hall is located on George Washington campus in downtown Washington DC. It is located amidst some other university buildings, however, the façade is very visible from

More information

8implementation. strategies

8implementation. strategies PROGRAM STRATEGIES 8implementation strategies T he implementation actions of this chapter are designed to support and carry out the land use, economic development, transportation, urban design, and program

More information

APPLICATION BRIEFING Prepared For: Submitted by: Date: Subject:

APPLICATION BRIEFING Prepared For: Submitted by: Date: Subject: Planning & Development APPLICATION BRIEFING Prepared For: Submitted by: Date: Subject: Planning Advisory Committee Jason Fox, Director of Planning & Development Development Agreement application by Godfrey

More information

8.6 EXTERIOR LIGHTING

8.6 EXTERIOR LIGHTING Sec. 8.5.5 / Operational/Physical Compatibility 8.6 EXTERIOR LIGHTING 8.6.1 Purpose and Intent The provision of outdoor lighting heightens nighttime safety and visibility, and is used to enhance the security

More information

ARTICLE 10 EXTERIOR LIGHTING

ARTICLE 10 EXTERIOR LIGHTING ARTICLE 10 EXTERIOR LIGHTING Section 10.01 Purpose. The purpose of this Article is to preserve the lawful nighttime use and enjoyment of all properties in the City through the establishment and enforcement

More information

DRAFT DESIGN GUIDELINES

DRAFT DESIGN GUIDELINES IHZ Booklet #7 May 6, 2010 DRAFT DESIGN GUIDELINES CANTERBURY 7 Overview During the recent planning process for the Plan of Conservation and Development community character was identified as an important

More information

Glenborough at Easton Land Use Master Plan

Glenborough at Easton Land Use Master Plan Implementation 114 9.0 IMPLEMENTATION 9.1 OVERVIEW This chapter summarizes the administrative procedures necessary to implement the proposed land use plan, infrastructure improvements, development standards,

More information

County of Loudoun. Department of Planning MEMORANDUM. SUBJECT: ZMOD , Dulles North Business Park Comprehensive Sign Plan, 2 nd Referral

County of Loudoun. Department of Planning MEMORANDUM. SUBJECT: ZMOD , Dulles North Business Park Comprehensive Sign Plan, 2 nd Referral County of Loudoun Department of Planning MEMORANDUM DATE: May 30, 2014 TO: FROM: Ginny Rowen, Project Manager Land Use Review Pat Giglio, Planner III Community Planning SUBJECT: ZMOD 2013-0001, Dulles

More information

Union Township Berks County Outdoor Lighting 08/18/03 ORDINANCE NO

Union Township Berks County Outdoor Lighting 08/18/03 ORDINANCE NO Union Township Berks County Outdoor Lighting 08/18/03 ORDINANCE NO. 2003-02 SECTION 1. SHORT TITLE This Ordinance shall be known as, and may be cited as the Union Township Outdoor Lighting Ordinance of

More information

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT 2. AGENCY COORDINATION AND PUBLIC INVOLVMENT This chapter discusses the process carried out for conducting agency coordination and public involvement activities. TECHNICAL ADVISORY COMMITTEE A Technical

More information

Applications for correctional facilities. Greater efficiency and cost-effectiveness with GAMMA building control. Answers for infrastructure.

Applications for correctional facilities. Greater efficiency and cost-effectiveness with GAMMA building control. Answers for infrastructure. The world-wide standard for home and building control Applications for correctional facilities Greater efficiency and cost-effectiveness with GAMMA building control Answers for infrastructure. Successful

More information

Wayfinding. North Gateway: Integrate a vertical gateway marker on the west side of Ward Street at the south corner of Vernon Street.

Wayfinding. North Gateway: Integrate a vertical gateway marker on the west side of Ward Street at the south corner of Vernon Street. 3.3.6.2 Wayfinding Existing Conditions Wayfinding signage is important to direct visitors and tourists to different locations in the downtown. A significant part of the wayfinding signage in the downtown

More information

Sign System Recommendations

Sign System Recommendations 4.1 Sign System Recommendations 4.2 Recommended sign types required for a complete wayfinding system on the TCNJ campus are described below. Detailed sign messages and their typical locations are included

More information

FREEWAY/TOURIST DISTRICT

FREEWAY/TOURIST DISTRICT FREEWAY/TOURIST DISTRICT DESIGN STANDARDS FOR THE CITY OF MOUNTLAKE TERRACE March, 2014 MOUNTLAKE TERRACE FREEWAY/TOURIST DESIGN STANDARDS March, 2014 1 TABLE OF CONTENTS Introduction...1 Design Site Design

More information

BUG stands for Backlight, Uplight and Glare. The acronym

BUG stands for Backlight, Uplight and Glare. The acronym Specifier Bulletin for Dark Sky Applications volume 2: issue 1 : 2009 International Dark-Sky Association The BUG System A New Way To Control Stray Light from Outdoor Luminaires A Classification System

More information

COMMERCIAL DESIGN REVIEW APPLICATION

COMMERCIAL DESIGN REVIEW APPLICATION CITY OF LACEY Community Development Department 420 College Street Lacey, WA 98503 (360) 491-5642 COMMERCIAL DESIGN REVIEW APPLICATION OFFICIAL USE ONLY Case Number: Date Received: By: Related Case Numbers:

More information

Campus Sign Plan. Adopted by the Campus Planning Committee Adopted: June 26, 2006 Revised: April 14, 2016

Campus Sign Plan. Adopted by the Campus Planning Committee Adopted: June 26, 2006 Revised: April 14, 2016 Campus Sign Plan Adopted by the Campus Planning Committee Adopted: June 26, 2006 Revised: April 14, 2016 INTRODUCTION Oregon State University requires an effective system of visual communication that projects

More information

Surface Materials. Surface Material Reflectance. Acoustic Ceiling 80% Tile. Painted Gypsum 75% Wall Board. Vinyl Composition 32% Tile

Surface Materials. Surface Material Reflectance. Acoustic Ceiling 80% Tile. Painted Gypsum 75% Wall Board. Vinyl Composition 32% Tile Genetics Laboratory Space Description The Genetics Laboratory is located on the second floor of the laboratory building. The main functions of this space are as a learning and research area. There is a

More information

TOWN COUNCIL / PLANNING COMMISSION

TOWN COUNCIL / PLANNING COMMISSION Workshop #3 TOWN COUNCIL / PLANNING COMMISSION January 20, 2011 Consultant Team In Attendance Tonight BMS Design Group Nevada City and San Francisco Michael Smiley, AICP, ASLA Partner-in-Charge Nancy L.

More information

Executive Summary. NY 7 / NY 2 Corridor

Executive Summary. NY 7 / NY 2 Corridor Executive Summary NY 7 / NY 2 Corridor Transportation and Land Use Study December 2005 Prepared for: Town of Colonie Capital District Transportation Committee Prepared by: Introduction: Land use decisions

More information

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 DESIGN BRIEF CONTENTS PART A 1.0 INTRODUCTION 2.0 DESCRIPTION & ANALYSIS OF SITE CONTEXT 3.0 DESIGN CONSTRAINTS AND OPPORTUNITIES

More information

ORDINANCE NO. 14,767

ORDINANCE NO. 14,767 ORDINANCE NO. 14,767 AN ORDINANCE to amend the Municipal Code of the City of Des Moines, Iowa, 2000, adopted by Ordinance No. 13,827, passed June 5, 2000, amended by Ordinance No. 13,878 passed November

More information

Public input has been an important part of the plan development process.

Public input has been an important part of the plan development process. Lakewood s Comprehensive Plan recognizes that transportation helps shape the community, and that the way the community provides for the safe and efficient movement of people affects the character of the

More information

implementation r expression in landscape

implementation r expression in landscape 6 ubc okanagan implementation campus plan r expression in landscape 68 6 implementation campus plan sections The Campus Plan supports the academic mission, values and commitments of the University by providing

More information

Assessment of the Extent and Quality of the Landscape Features of the Campus.

Assessment of the Extent and Quality of the Landscape Features of the Campus. Assessment of the Extent and Quality of the Landscape Features of the Campus. 1. In 2012 the University used geographic information systems to create georeferenced layers for all landscape and hardscape

More information

242 neighborhoods NEIGHBORHOOD 4: JORDAN AVENUE CORRIDOR

242 neighborhoods NEIGHBORHOOD 4: JORDAN AVENUE CORRIDOR NEIGHBORHOOD 4: JORDAN AVENUE CORRIDOR Aerial View of Jordan Avenue Corridor EXISTING CHARACTER The Jordan Avenue Corridor is the portion of North Jordan Avenue that extends north from East Third Street

More information

Article 14. LIGHTING REGULATIONS

Article 14. LIGHTING REGULATIONS Article 14. LIGHTING REGULATIONS PART I. OUTDOOR LIGHTING Section 14-1: Intent and Purpose Outdoor lighting shall be designed to provide the minimum lighting necessary to ensure adequate safety, night

More information

Building Exterior Lighting Grant Program. Applications will be reviewed April 1, July 1 and October 1, 2019

Building Exterior Lighting Grant Program. Applications will be reviewed April 1, July 1 and October 1, 2019 Building Exterior Lighting Grant Program Applications will be reviewed April 1, July 1 and October 1, 2019 Table of Contents Building Exterior Lighting Grant Program Program Information Background... 3

More information

V. Gateways GATEWAYS / V-1

V. Gateways GATEWAYS / V-1 V. GATEWAYS / V-1 Many of Chesapeake s gateways are located on highways and call for bold and attractive designs that motorists can understand, appreciate, and enjoy. can also take the form of natural

More information

Attachment 1 TOWN OF NEW TECUMSETH. Manual for the Preparation of an Urban Design Report

Attachment 1 TOWN OF NEW TECUMSETH. Manual for the Preparation of an Urban Design Report Attachment 1 TOWN OF NEW TECUMSETH Manual for the Preparation of an Urban Design Report July 2010 TABLE OF CONTENTS Background, Policy Framework and the Preparation of Urban Design Reports 1. Introduction

More information

Corridor Identity. Section 9. Introduction. Corridor Guiding Principles

Corridor Identity. Section 9. Introduction. Corridor Guiding Principles Corridor Identity An attractive and healthy community is a critical element of a quality place, and the design of quality places is a balance between environmental, economic, and social considerations.

More information

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Welcome. Walk Around. Talk to Us. Write Down Your Comments Welcome This is an information meeting introducing the applications for proposed redevelopment of the Yorkdale Shopping Centre site at 3401 Dufferin Street and 1 Yorkdale Road over the next 20+ years,

More information

Harmony Technology Park Third Filing, Second Replat Custom Blending, Project Development Plan/Final Development Plan - FDP #130021

Harmony Technology Park Third Filing, Second Replat Custom Blending, Project Development Plan/Final Development Plan - FDP #130021 ITEM NO FDP #130021 MEETING DATE July 23, 2013 STAFF Pete Wray ADMINISTRATIVE TYPE I HEARING STAFF REPORT PROJECT: APPLICANT: OWNER: Harmony Technology Park Third Filing, Second Replat Custom Blending,

More information

ARTICLE XVI LIGHTING, NOISE AND ODOR/ODOROUS MATTER Shelby County Zoning Regulations 2013

ARTICLE XVI LIGHTING, NOISE AND ODOR/ODOROUS MATTER Shelby County Zoning Regulations 2013 ARTICLE XVI LIGHTING, NOISE AND ODOR/ODOROUS MATTER Shelby County Zoning Regulations 2013 Section 1600 Section 1601 Section 1602 Lighting Noise Odor/Odorous Matter Section 1600 Lighting A. Purpose and

More information

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas 111111 PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction The ION rapid transit system will link Waterloo, Kitchener and Cambridge through a central transit corridor (CTC). There are a number

More information

Highway Oriented Commercial Development Criteria

Highway Oriented Commercial Development Criteria 7.6 HOC-1 Highway Oriented Commercial District A. Statement of Purpose The Highway Oriented Commercial District (HOC-1) is intended to provide for the development of high density retail and service businesses

More information

CHAPTER 12 DESIGN GUIDELINES FOR PUBLIC IMPROVEMENTS

CHAPTER 12 DESIGN GUIDELINES FOR PUBLIC IMPROVEMENTS CHAPTER 12 DESIGN GUIDELINES FOR PUBLIC IMPROVEMENTS Introduction This chapter provides design guidelines for public sector improvements in the downtown. This includes streetscape design, as well as the

More information

Worthington Scranton. Campus Exterior Architectural Plan

Worthington Scranton. Campus Exterior Architectural Plan Contents Introduction and Purpose Existing Conditions Inventory s Introduction and purpose The stated mission, vision and strategic goals of Penn State clearly define the University s responsibility to

More information

from Warwick Township, Chester County, Zoning Ordinance, Amended April 7, 2008

from Warwick Township, Chester County, Zoning Ordinance, Amended April 7, 2008 from Warwick Township, Chester County, Zoning Ordinance, Amended April 7, 2008 SECTION 2700 - PURPOSE ARTICLE 27 LIGHTING A. In addition to the general goals listed in the statements of Purpose, Section

More information

The Chinese University of Hong Kong Campus Master Plan Stage 3 Stakeholders' Engagement Report

The Chinese University of Hong Kong Campus Master Plan Stage 3 Stakeholders' Engagement Report The Chinese University of Hong Kong Campus Master Plan Stage 3 Stakeholders' Engagement Report CONTENTS 1.0 OVERVIEW... 2 2.0 KEY FINDINGS... 3 2.1 Conserving Places of Value... 3 2.2 Places for Academic

More information

UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose

UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose UAA School of Engineering Parking Garage Master Plan Amendment 1. Purpose Since the UAA campus master plan was drafted in 2003, adopted in 2004, and amended in 2009 a number of significant changes regarding

More information

BUSINESS DISTRICT DESIGN GUIDELINES

BUSINESS DISTRICT DESIGN GUIDELINES Des Plaines, Illinois Prepared for the City of Des Plaines by: The Lakota Group Laurie Marston, AICP March 2005 Section 5: Streetscape Elements Business District Design Guidelines STREETSCAPE ELEMENTS

More information

EXISTING VEHICULAR & PEDESTRIAN CIRCULATION

EXISTING VEHICULAR & PEDESTRIAN CIRCULATION 46 EXISTING CONDITIONS EXISTING VEHICULAR & PEDESTRIAN CIRCULATION Vehicular and pedestrian circulation patterns are illustrated on this graphic. Campus entry points and major vehicular circulation routes

More information

Ballston Central Business Improvement District Lighting Design Concepts

Ballston Central Business Improvement District Lighting Design Concepts Ballston Central Business Improvement District Lighting Design Concepts 1 EXISTING STREET LIGHTING AND FURNITURE INVENTORY Wide range of styles, materials and finishes No standards holding it together

More information

lot flankage Y street 16m 6m landscape strip for large site 3m landscape strip for small medium site

lot flankage Y street 16m 6m landscape strip for large site 3m landscape strip for small medium site Commercial General Commercial Objectives Create developments compatible with adjacent land uses in scale, function and character Define a consistent and attractive street edge with quality landscaping,

More information

1.0 Circulation Element

1.0 Circulation Element 5/9/18 1.0 Circulation Element 1.1 Introduction As growth and development occur in Apache County, enhancements to its circulation system will be necessary. With time, more roads will be paved and air and

More information

Jennifer Mers. Rio Hondo Library and Learning Resource Center. Executive Summary. General Building. Lighting/Electrical Option

Jennifer Mers. Rio Hondo Library and Learning Resource Center. Executive Summary. General Building. Lighting/Electrical Option Executive Summary This assignment goes into depth into the existing lighting conditions of the Rio Hondo Library and Learning. The lobby, Reference Stacks and Microfilm Area, the Stack Area on the second

More information

Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land.

Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land. 2.0 Future Land Use Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land. Objective 1.1: Make available future building sites that

More information

APPLICATION FOR REZONING PROPERTY CITY OF HOLLAND, MICHIGAN. Name of Applicant. Address, and Phone # of Applicant

APPLICATION FOR REZONING PROPERTY CITY OF HOLLAND, MICHIGAN. Name of Applicant. Address,  and Phone # of Applicant APPLICATION FOR REZONING PROPERTY CITY OF HOLLAND, MICHIGAN Name of Applicant Address, Email and Phone # of Applicant Name and Address of Owner (if other than applicant) Ownership Interest of Applicant

More information

DESIGN PARAMETERS DESIGN OBJECTIVES. Design Focus and the Elements of the Corridor. Driver Confidence. Visual Organization.

DESIGN PARAMETERS DESIGN OBJECTIVES. Design Focus and the Elements of the Corridor. Driver Confidence. Visual Organization. Design Focus and the Elements of the Corridor LBJ Corridor DESIGN PARAMETERS For any project to be successful, the project goals must be clear. Therefore, with the assistance of TxDOT, the Urban Design

More information

SECTION 1000 HIGHWAY CORRIDOR OVERLAY DISTRICT REGULATIONS

SECTION 1000 HIGHWAY CORRIDOR OVERLAY DISTRICT REGULATIONS SECTION 1000 HIGHWAY CORRIDOR OVERLAY DISTRICT REGULATIONS 1001.00 INTENT AND PURPOSE... 1000-1 1002.00 CLASSIFICATIONS... 1000-1 1003.00 DEVELOPMENT STANDARDS TABLES Page 1003.01 Buffer Requirements...................................

More information

North Fair Oaks Community Plan Summary and Information

North Fair Oaks Community Plan Summary and Information North Fair Oaks Community Plan Summary and Information WHAT IS THE NORTH FAIR OAKS COMMUNITY PLAN? The North Fair Oaks Community Plan is part of the San Mateo County General Plan, and establishes policies

More information

Public may provide comments on the GDP within the next two weeks (December 24)

Public may provide comments on the GDP within the next two weeks (December 24) 25/70 General Development Plan (GDP) Public Meeting Wednesday, December 10, 2014 6:00 8:00 P.M. District 1 Police Station Community Room 1311 W 46th Ave, Denver, CO 80211 Council Woman Montero: This particular

More information

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM PUBLIC RIGHT-OF-WAY This section provides design guidelines for improvements in the public right-of-way. The public right-of-way refers to streets, sidewalks, non-vehicular thoroughfares, parks and greenways

More information

Chapter Master Planned Communities (MPC) District

Chapter Master Planned Communities (MPC) District Sections 14.53.010 Purpose and Intent 14.53.020 Applicability 14.53.030 Procedure 14.53.040 MPC Standards 14.53.050 Required Findings 14.53.010 Purpose and Intent Chapter 14.53 Master Planned Communities

More information

Long Lost Allies? Walking Advocates & Business District Organizations. Matt Kazinka Lake Street Council. Shaina Brassard Seward Redesign

Long Lost Allies? Walking Advocates & Business District Organizations. Matt Kazinka Lake Street Council. Shaina Brassard Seward Redesign Long Lost Allies? Walking Advocates & Business District Organizations Shaina Brassard Seward Redesign Rob Hanson West Broadway Business and Area Coalition Matt Kazinka Lake Street Council Jamie Schumacher

More information

PROJECTS AND THE PUBLIC ART MASTER PLAN

PROJECTS AND THE PUBLIC ART MASTER PLAN MEMO TO: PUBLIC ART STEERING COMMITTEE MEMBERS FROM: SHARI COOPER, DEVELOPMENT PROJECT COORDINATOR DATE: FEBRUARY 24, 2017 SUBJECT: AGENDA ITEM 5.A: PUBLIC ART PROJECT FOR 2017-18 BACKGROUND One of the

More information

Route 1 Corridor Study

Route 1 Corridor Study Route 1 Corridor Study Westbrook, Connecticut A Vision for the Connecticut Shoreline Public Informational Meeting July 28, 2015 Lower Connecticut River Valley Council of Governments Fitzgerald & Halliday,

More information

Lighting Design Criteria: Codes and Standards

Lighting Design Criteria: Codes and Standards EXTERIOR LIGHTING Lighting Design Criteria: Codes and Standards IESNA Lighting Handbook 10 th Edition RP-33-14 Lighting for Exterior Environments ASHRAE/IES Standard 90.1-2010 IBC 2012 2 Site Lighting

More information

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons West Dennis Center: Bass River to Old Main Street West Dennis Business District: Old Main Street to Dennis Commons Dennisport Center: Dennis Commons to Division Street Main Street Project Goals Project

More information

2. Measurements are to be made at ground level, with the light-sensor portion of the meter lying flat on the ground, pointing upward.

2. Measurements are to be made at ground level, with the light-sensor portion of the meter lying flat on the ground, pointing upward. 12.0 SITE LIGHTING 12.1 Applicability 1. A permit for the construction, reconstruction, or expansion of any structure or use of land shall be issued only if the site plan (or construction plan) is in compliance

More information

Urban Planning and Land Use

Urban Planning and Land Use Urban Planning and Land Use 701 North 7 th Street, Room 423 Phone: (913) 573-5750 Kansas City, Kansas 66101 Fax: (913) 573-5796 Email: planninginfo@wycokck.org www.wycokck.org/planning To: From: City Planning

More information

Official Plan Review: Draft Built Form Policies

Official Plan Review: Draft Built Form Policies PG.30.1 REPORT FOR ACTION Official Plan Review: Draft Built Form Policies Date: May 15, 2018 To: Planning and Growth Management Committee From: Chief Planner and Executive Director, City Planning Division

More information

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement Durham-Orange Light Rail Transit Project October 2016 1. Introduction The Combined FEIS/ROD summarizes the effects of the D-O LRT

More information

3.0 master plan concept

3.0 master plan concept 3.0 master plan concept 3.1 introduction The purpose of the Huron Church Road Master Plan Concept is to provide an overview of the Master Plan design process, identify preliminary streetscape installations

More information

WESTERN ILLINOIS UNIVERSITY

WESTERN ILLINOIS UNIVERSITY WESTERN ILLINOIS UNIVERSITY Quad Cities Riverfront Campus Preliminary Master Plan Presentation 2 February 1, 2006 Achieving Future Flexibility 1. Monitor space needs as the new buildings come on line and

More information

AMEND DMENT H HOSPITAL

AMEND DMENT H HOSPITAL AMEND DMENT TO LAND USE PLAN ELEMENT VILLAGE OF RIDGEWOOD MASTER PLAN H HOSPITAL ZONE DISTRICT Village of Ridgewood Planning Board February 28, 2014with technical revisions from June 9, 2014 Planning Board

More information

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2. Table of Contents Introduction 1 Existing Context 1 Figure 1 2 Plan Guidelines 3 Future Urban Form 4 The West-End 4 Main Street 6 The East-End 7 Figure 2 9 Public Improvement Recommendations 7 General

More information

Lighting Depth Part 1: Exterior Space

Lighting Depth Part 1: Exterior Space Lighting Depth Part 1: Exterior Space Metaphor and Ideas: The first space of my lighting redesign is the front façade of the Recreation Center shown below. Metaphorically, I want the front porch to act

More information

Solid State Lighting

Solid State Lighting Solid State Lighting LED Lighting Panel Discussion Department of Environmental Quality 2 Panelists: The Panel Dr. Lynn Davis, Fellow, RTI International Robert Talley, PE, NC Dept. of Administration, State

More information

Advanced Lighting For Office

Advanced Lighting For Office Advanced Lighting For Office Open-Plan Office Applications High-Density 1 This High-Density 1 lighting application module presents alternative energy effective lighting design options for open-plan offices.

More information

SOUTH DAKOTA STATE UNIVERSITY GROUNDS MANAGEMENT PLAN FY 2013

SOUTH DAKOTA STATE UNIVERSITY GROUNDS MANAGEMENT PLAN FY 2013 SOUTH DAKOTA STATE UNIVERSITY GROUNDS MANAGEMENT PLAN FY 2013 SOUTH DAKOTA STATE UNIVERSITY GROUNDS MANAGEMENT PLAN Table of contents: Introduction & Goals 03 Prioritization 03 Improvement Strategies 07

More information