1 Broadmoor Farm, West Saltash Environmental Statement Volume 1: Non-Technical Summary March 2014

2 West Saltash: Environmental Statement (March 2014) 1.0 Introduction & Methodology Purpose of Document 1.1 This document is a summary in non-technical language of an Environmental Statement ( ES ) prepared on behalf of Commercial Estates Projects Limited (the developer ) and WH Bond & Sons Limited and Bond Holdings Limited ( the Landowner ) (together the applicant ). It accompanies an application for part outline and part detailed planning permission (a hybrid application) for a mixed-use residential-led development to the west of Saltash ( West Saltash ). 1.2 The proposed development falls within part 10(b) (Infrastructure Projects) of Schedule 2 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (the 2011 Regulations ). Part 10(b) relates to urban development projects where sites are over 0.5 hectares. For such developments, EIA is required in situations where the development could give rise to significant environmental effects. The applicant has determined to undertake an EIA in respect of the proposed development. 1.3 The document includes the following information:- Section 1.0 background to the assessment process and the scheme; Sections 2.0 to 3.0 description of the site and the current proposals; Sections 4.0 to 12.0 a topic by topic review of the findings of the EIA; Section 13.0 a review of whether other direct or indirect effects may arise when the scheme is considered with other schemes in the area; Section 14.0 details of how to obtain a full copy of the ES; Section 15.0 key scheme plan. The EIA Process 1.4 The ES sets out the findings of an Environmental Impact Assessment ( EIA ) of the development. 1.5 The EIA process aims to ensure that any significant effects arising from a development are systematically identified, assessed and presented to help a local planning authority, statutory consultees and other key stakeholders in their understanding of the impacts arising from development. If measures are required to minimise or reduce effects then these are clearly identified. 1.6 For the West Saltash scheme, EIA has been carried out to consider the likely significant effects that may arise during the construction and operation of the development and due to its potential relationship to future developments in the area. It has been completed with regard to best practice and relevant P1

3 West Saltash : Environmental Statement (February 2014) legislation and has addressed the following matters agreed with Cornwall Council as being required to assess the impacts of the development:- 1 Landscape & Visual Effects 6 Ecology & Nature Conservation 2 Water Environment 7 Socio-Economics 3 Transport 8 Heritage 4 Air Quality 9 Ground Conditions & Contamination 5 Noise & Vibration 1.7 Likely effects are identified based on current knowledge of the site and surroundings, desk top assessment, survey and fieldwork and information available to the EIA team. All those matters that could be reasonably required to assess the effects of the proposals are set out in the ES; this includes effects arising from the scheme itself as well as those temporary effects arising during the construction of the proposed residential development. 1.8 The EIA team has worked with the design team to ensure that the scheme for which planning permission is sought incorporates those revisions or modifications that are necessary or appropriate to avoid or reduce significant adverse effects on the environment. 1.9 Consultation has also informed the EIA process in relation to the methods by which the EIA has been carried out, as a means to seek environmental data, to review the effectiveness of any identified mitigation measures and as a means to keep interested bodies informed on the process of EIA undertaken. Background to the Scheme 1.10 The development has emerged against the background of a national housing shortage. Cornwall has a growing population and there is a significant housing market pressure In January 2014, Members resolved to increase the draft Local Plan housing requirement to 47,500 for the next round of public consultation on the emerging policy documentation. The emerging draft Local Plan currently specifies an identified need for 1,000 units in Saltash but this remains under review. These matters will be subject to further consultation and will be discussed at an Examination into the draft Local Plan in due course In addition to the emerging Local Plan, Cornwall Council is also preparing a Saltash Town Framework Plan and published an overall strategy in August 2012 and an Update Report in September The development site which is the subject of the EIA has been identified in these documents as a possible location for the delivery of the additional housing in Saltash. A Sustainability Appraisal reviewing the site in comparison with a further location known as Latchbrook concludes that the site benefits from:- 1 Prospects for short term employment development; 2 Topographical benefits; 3 Fewer landscape and urban design constraints than those at Latchbrook; P2

4 West Saltash: Environmental Statement (March 2014) 4 Developer interest increasing the potential for the proposals to come forward; and 5 A local consultation preference for development at the site rather than at Latchbrook. 2.0 Site Description Site Location 2.1 The site is located to the north/north-west of Saltash and to the west of Carkeel. The south-eastern and eastern boundaries adjoin employment, retail and service areas on the edge of Saltash and residential development on the edge of Carkeel. The land to the north, south-west and west of the site is primarily used for agricultural purposes. 2.2 The site is bounded by the A388 to the north and east, Stoketon Cross road to the west and the A38 to the south. The nearest railway station is Saltash Railway Station located two miles to the south-east. 2.3 To the north and north-east (the Tamar-Tavy area) and the south west (the Lynher area) of the site is Tamar Valley Area of Outstanding Natural Beauty (TVAONB), designated as a protected landscape of great importance and beauty. To the south-west is a designated landscape, Open Area of Local Significance. This local designation means that a development proposal which would adversely affect the predominantly open or underdeveloped character of the area is not permitted. 2.4 Just beyond the eastern boundary of the site are four Grade II listed buildings. Site Location P3

5 West Saltash : Environmental Statement (February 2014) The Site 2.5 The majority of the site is currently in agricultural use (Grade 3, therefore requiring no further assessment) with field boundaries marked by hedgerows, fencing and tree belts/woodlands. This woodland comprises Bell Wood, Broadmoor Wood, Behest Wood and Marsh Wood. The only built development is the buildings of Broadmoor Farm to the west. 2.6 The site s topography is undulating; with areas of higher ground in the northwest of the site and along the north/north-eastern edge of the site. 2.7 The majority of the site is within Flood Zone 1 being an area of low probability of flooding. A very narrow band is identified as within Flood Zone 2 and 3; no development is proposed within these areas. There are two river corridors running through the site; Latchbrook Leat and Saltmill Creek. 2.8 The site contains an access road to Broadmoor Farm from Stoketon Cross/A38, and Dirty Lane which runs in a south-western direction from the north-east of the site. There is a minor access point to the east from A388. The site includes two definitive rights of way; a footpath and a bridleway. 3.0 Description of Development 3.1 A hybrid application seeking part detailed and part outline consent:- 1 The outline part of the development: permission for a mixed use residential-led development, preparatory works including the demolition of existing farm buildings as necessary; up to 1,000 residential units (Use Class C3); care home up to 80 beds or sheltered housing up to 50 units, or combination thereof (Use Classes C2/C3); up to six hectares of employment land (Use Classes B1/B2/B8); one neighbourhood centre approximately one hectare, including uses in Use Classes A1/A2/A3/A4/A5 (up to 1,000 sqm, including convenience store up to 400 sqm), B1a, C3, D1/D2, with associated car parking, landscaping works (including a village square') and public realm; one commercial centre approximately 0.5 hectares (including uses in Use Classes A1/A2/A3/A4/A5 (including convenience store up to 60 sqm), C1 (including hotel of up to 60 bedrooms), C3, D1/D2 ) with associated car parking, landscaping works (including a central space) and public realm; education facilities (including a minimum 1.3 hectare site for a primary school); open space including parks, amenity green space, natural and semi-natural green spaces, outdoor sports provision, facilities for children and young people, allotments, community orchards and forest gardens; associated infrastructure works (undergrounding of overhead electrical power lines, internal access roads, footpaths/cycleways including a pedestrian bridge across the A38); and landscaping works (including surface water drainage and levelling/creation of earth bunds/mounds). P4

6 West Saltash: Environmental Statement (March 2014) 2 The detailed part of the development: permission for the construction of a western access, comprising a roundabout and link road off the A38 and associated highways work; an eastern access comprising a roundabout off the A388; footpaths/cycleways, landscaping and associated engineering/infrastructure works; and improvements to the existing highway (including Carkeel/A38 and Avery Way/A388 roundabouts). 3.2 Plans showing the form of development are provided at Section 15.0 of this Non-Technical Summary. Construction Methodology 3.3 Construction of the development is anticipated to take approximately 5 to 7 years; with works predicted to commence in 2015 leading to completion of the development in The residential dwelling development is likely to proceed from east to west. The following phases indicate one way in which construction may proceed:- Possible Phasing for the West Saltash Development Number of Houses Approximate Year Infrastructure (2018) Primary School; Health facilities; Bus service funding starts; Eastern access to A388; and Western access at Stoketon Cross 500 4/5 (2019/20) Works to main Carkeel Roundabout (2020) Completion of main site access road; and sports pitches, MUGA, LEAPs (2021) Pedestrian/Cycle Bridge (2022) A Construction Environmental Management Plan ( CEMP ) will be developed to incorporate mitigation measures identified in the EIA. Alternatives Considered 3.5 As part of the EIA, alternative forms of the development have been considered and also the relevance of reviewing alternative sites. This helps in clarifying the main advantages for taking forward the current scheme, taking account of the environmental effects. 3.6 Consideration of a scenario where the development does not proceed and the site remains in its current agricultural use has been dismissed as it is considered that the emerging allocation of the site and the significant demand for housing in the area means that it is likely that a similar form of development would proceed in this location. Consultation and Design Evolution 3.7 The proposals have been refined to their current form through a series of consultation processes. These have involved meetings with Cornwall Council P5

7 West Saltash : Environmental Statement (February 2014) and stakeholders, two public exhibitions (July 2013 and January 2014), a workshop in November 2013 and two presentations to the Cornwall Design Review Panel ( DRP ) in September and December Landscape & Visual Impact 4.1 An assessment has been carried out to identify the potential implications of the proposed development on the existing landscape character and on views towards the site. The assessment complies with guidance from the Landscape Institute and Institute of Environmental Management and Assessment. 4.2 Changes to the landscape character can arise as a result of changes to the fabric of a landscape (e.g. through the loss of key elements or features) and from changes to the way in which the landscape is perceived or appreciated. Changes to a view occur when changes occur to the dominance of particular features, to a skyline, due to the creation of a new visual focus or from other changes relating to scale or enclosure. 4.3 Paragraph 109 of the NPPF states that valued landscapes should be protected and enhanced; that local authorities should be encouraged to allocate land with the least environmental or amenity value ; and that criteria should be set as to how landscape areas will be judged. Existing and emerging local policies for Cornwall Council have regard to these policy objectives. 4.4 The existing landscape character and identification of views to be assessed were established through a review of available policy and documentary evidence, GIS visual mapping and site visits including through establishing the Zone of Theoretical Visibility at various distances from the site. Zone of Theoretical Visibility (1 kilometre from the site) P6

8 West Saltash: Environmental Statement (March 2014) 4.5 The topography, built form and intervening layers of vegetation have resulted in limited views to adjacent private residential properties, immediate surrounding fields on lower ground, and land on either side of the A388. Parts of the site are visible from the north western edge of Saltash, including Moorland Industrial Estate and Tamar View Industrial Estate, as well as from central parts of Saltash. 4.6 The assessment has concluded that the construction phase will be the most disruptive stage and considers there will be longer term, minor adverse effects on hedgerows, woodland and streams, and short term, minor adverse effects on PRoWs and Dirty Lane. Impacts on Local Character Areas will be moderately adverse on Broadmoor Mixed Farmland and Woodland, Small Villages (Carkeel) and the site s relationship with the Tamar AONB. Minor adverse effects will be generated on the Motel/Travel Lodge and Services, Industrial Estates, Small Villages (Trematon), Wooded River Corridors, Tamar Nurseries and the relationship of the site to the Open Area of Local Significance. The impact on Townscape Regular and the Lynher Area of Great Landscape Value will be negligible. 4.7 After completion there will be long term moderate adverse localised effects on the relationship of the site with the Tamar Valley AONB and associated with Broadmoor Mixed Farmland and Woodland. Minor adverse to negligible effects are associated with the Motel/Travel Lodge and on Small Villages (Trematon). No further change will be experienced by Townscape Regular and Industrial Estates Local Character Areas or by the relationship of the site to Lynher Area of Great Landscape Value. effects will be experienced on the Open Area of Local Significance. 4.8 The delivery of a multi-functional landscape framework, whilst respecting and enhancing key landscape assets, has been a fundamental part of the design process and has led to the development of a series of different types of open spaces (in excess of the standard open space requirements of Cornwall Council) with multiple uses, connected by a variety of routes. New planting has served to not only enhance existing features and visual amenity but also to create ecological corridors and new habitats; filter views; break up the overall development; and, control access to ecologically sensitive areas, as well as offering new functions (for instance food production). 4.9 In conclusion, the assessment considers that the proposed development will complement, respect and fit within the existing scale, landform and pattern of its surroundings. It will protect existing features, enhance the functionality of the settlement edge and address some policy and landscape character aspirations. Whilst some effects will remain adverse, these effects are localised and will over time become assimilated as the development integrates within the visual composition of its surroundings and forms part of views across the built edge beyond the site. In terms of the site s relationship with the Tamar Valley AONB it has to be accepted that the effects on its character and views are localised and need to be considered in context with other issues. P7

9 West Saltash : Environmental Statement (February 2014) 5.0 Water Environment 5.1 An assessment has been carried out of the effect of the development on surface water (hydrology), groundwater (hydrogeology) and flood risk. The assessment has been informed by a site-specific Flood Risk Assessment. 5.2 There is a wide range of international and national legislation relevant to the assessment of potential impacts to hydrology and drainage. In addition, there are many guidance and policy documents concerned with mitigating potential impacts. 5.3 In terms of existing conditions, the dominant watercourse in the area is the Latchbrook Stream; the source of which originates within the site boundary. From its point of origin in the centre of the site, this watercourse flows generally in a southerly direction, before meeting with the Lynher River. 5.4 With regard to flood risk, the majority of the Site lies within Flood Zone 1; being an area of Low Probability of flooding, however the Latchbrook Stream is identified to flood during both the 1 in 100 (1%) and 1 in 1,000 (0.1%) year events. The site lies in an area that has a Low Probability of flooding from other sources. Environment Agency Flood Zone Map showing 1 in 100 and 1 in 1000 year floodplains P8

10 West Saltash: Environmental Statement (March 2014) 5.5 The following table summarises the key findings from the assessment:- Potential effect Construction stage Direct and indirect contamination of surface water Direct and indirect flooding and changes to baseline drainage hydrology Significance (premitigation) Minor - Minor - Adverse Post-construction/operational stage Direct and indirect flooding of surroundings due to increases in surface water runoff from positively drained hard areas Direct flooding of the proposed Development Direct contamination of deterioration of surface water quality due to leakages Direct and indirect contamination of surface water, soil and potential groundwater contamination Minor - Adverse Minor - Adverse Minor - Adverse Minor - Adverse Mitigation measures Works will be completed in accordance with the Environment Agency guidelines together with current best practice measures Implementation of appropriate working practices The development has been designed to avoid significant hydrological effects and provides for site run off controlled to below the baseline rate Best practice principles of flooding resilience and residual flood risk management will be implemented Providing appropriate sustainable drainage features Delivery of an appropriate foul drainage scheme Significance of residual effect Beneficial 5.6 The assessment has shown that once the mitigation measures have been implemented, the potential effects on the water environment will be reduced or eliminated. 6.0 Transportation 6.1 The transport chapter sets out the results of an assessment of the trafficrelated environmental effects of the proposed development. The approach to the assessment has been based on the Institute of Environmental Assessment guidance. 6.2 The A388 and A38 border the site to the north and south respectively. The A38 forms part of the Strategic Road Network. Bus routes 572 and 592 P9

11 West Saltash : Environmental Statement (February 2014) operate close to the site and the closest train station is located east of Saltash town centre. 6.3 Traffic flow data has been obtained from a traffic model for Saltash (the Saturn traffic model ) and the highway safety record has been assessed to identify any problems that are likely to be exacerbated by the additional traffic generated by the development. 6.4 An assessment of the potential traffic-related environmental effects and their significance has been undertaken. This concluded that there would not be significant environmental effects. The following table summarises the likely effects. Potential effect Significance (premitigation) Construction stage Construction Minor adverse traffic Mitigation measure Measures as detailed in a Construction Environment Management Plan ( CEMP ) Post-completion stage Severance Improved facilities within the Site and provision of appropriate linkages to the existing facilities within the local road network, including new bridge across the A38. Driver delay Minor adverse Junction mitigation as identified above Pedestrian delay Pedestrian amenity Fear and intimidation Accidents and safety Significance of residual effect Minor Beneficial Minor adverse Improved facilities within the Site and provision of appropriate linkages to the existing facilities within the local road network, including new bridge across the A38. As for Pedestrian delay above As for Pedestrian delay above Minor adverse No specific mitigation required 6.5 The results of this assessment have indicated that the potential environmental effects resulting from the increase in traffic generated by the development are predicted to be negligible. 7.0 Air Quality 7.1 An assessment has been carried out of the potential for effects on air quality arising from the development to ensure that, if necessary, mitigation can be identified to minimise those effects. The assessment has focused on dust P10

12 West Saltash: Environmental Statement (March 2014) emissions during construction and air quality effects arising from changes to transport flows. 7.2 In the UK, the Air Quality Standards Regulations (2010) consolidate European legislation with other national standards and sets various limits/standards for air quality. In addition, and under the Environment Act 1995, all local authorities are required to periodically review and assess air quality under the system of Local Air Quality Management ( LAQM ) including the declaration if required of Air Quality Management Areas ( AQMA ) in areas where standards for any particular pollutant may be breached. The main controls with respect to dust are set out in Part III of the Environmental Protection Act (1990), which contains the legal framework for regulating statutory nuisances which includes dust, steam or odour. 7.3 For the West Saltash site, the nearest designated AQMAs are at Tideford, 4-5km west of the development site and Gunislake (due to be designated in 2014) 8km north. Both AQMAs are not considered relevant, however, they are located along the main traffic routes through Cornwall. Traffic generated by the development proposals may impact on air quality in these locations. 7.4 An assessment of the potential impacts during the construction phase has been carried out. This has shown that during this phase releases of dust and particulate matter ( PM 10 ) are likely to occur during site activities. Through good site practice and suitable mitigation measures, the impact can be mitigated and the resultant impacts are considered to be minor adverse. 7.5 Roads dispersion modelling has been carried out to assess the operational impacts associated with the proposed development. The assessment has shown that nitrogen dioxide (NO 2 ) and PM 10 concentrations will remain well below the relevant air quality objectives across the development site therefore future occupants will not be exposed to elevated concentrations. Traffic generated by the proposed development is predicted to result in a negligible impact on NO 2 and PM 10 concentrations at all the selected receptors. 7.6 Based on the above information, it is considered that effects on air quality does not pose a constraint to the proposed development. 8.0 Noise & Vibration 8.1 An assessment of the noise effects of the West Saltash development has been carried out. Government planning policy seeks to avoid adverse noise effects but, as it does not set specific noise measures such as limits or thresholds, the assessment has used relevant criteria from currently available guidance documents and standards such as the World Health Organisation Guidelines and Calculation of Road Traffic Noise to inform the methodology used. P11

13 West Saltash : Environmental Statement (February 2014) 8.2 To assess effects, regard has been given to the sensitivity of existing and proposed land uses and the change in noise levels during construction and operation of the West Saltash development. 8.3 Measures included in the CEMP will ensure that any environmental effects are negligible during construction stage and the layout and design features incorporated into the scheme to mitigate against the impacts of noise will ensure that any environmental effects post-completion are negligible. 8.4 The assessment has concluded that the noise effects are unlikely to have an adverse effect on health or quality of life. The chapter concludes that the change in road traffic noise levels will be barely, if at all, perceptible. No significant vibration impacts are predicted during the construction or operational phases of the proposed development. 9.0 Ecology & Nature Conservation 9.1 The ecology chapter assesses the potential impacts on nature conservation and biodiversity. A number of statutory legislation documents provide legal protection for habitats and species in this country. This suite of legislation provides protection for designated sites, and prevents harm to a range of species and their habitats. The assessment of the effects of the proposed development on ecology and nature conservation has been undertaken in line with current guidance produced by the Institute of Ecology and Environmental Management. 9.2 The site is predominately arable farmland with a small number of pasture fields, surrounded by Cornish hedges, mature woodland and a number of springs and streams scattered through the site. The site is situated close to the internationally designated sites Plymouth Sound and Estuaries Special Area of Conservation and Tamar Estuaries Complex Special Protection Area which both lie to the east and the south of the site, connecting to the Lyner Estuary Site of Special Scientific Interest to the west. Information has been provided as part of the ES to assist the Council in determining whether the proposed development will have a Likely Significant Effect upon these designated sites with reference to the European Habitats Directive. 9.3 The key habitats on site and summary of potential construction and operational impacts pre and post mitigation are shown in the table below. Category Geographical Value Construction Phase Operational Phase Pre- Post- Pre- Post- Mitigation Mitigation Mitigation Mitigation Designated site SPA/SAC International Neutral Neutral Neutral Neutral Designated site SSSI National Neutral Neutral Neutral Neutral Designated site CWS County Adverse Neutral Adverse Adverse Arable Site Adverse Adverse Neutral Neutral P12

14 West Saltash: Environmental Statement (March 2014) Category Geographical Value Construction Phase Operational Phase Pre- Post- Pre- Post- Mitigation Mitigation Mitigation Mitigation Woodland and scrub County Neutral Neutral Adverse Neutral Arable margins Local Neutral Neutral Neutral Neutral Hedgerows District Adverse Neutral Positive Positive Mature trees Local (District for veteran) Adverse Neutral Neutral Neutral Watercourse Local Adverse Adverse Adverse Neutral Grassland Site Neutral Positive Positive Positive Badger Site Adverse Neutral Adverse Neutral Bat District Adverse Neutral Adverse Neutral Otter Local Adverse Neutral Neutral Neutral Hedgehog Site Positive Positive Positive Positive Breeding birds District Positive Positive Adverse Neutral Winter birds Local Positive Positive Adverse Neutral Amphibians Site Neutral Positive Adverse Positive 9.4 In summary, the change of land use will result in the loss of farmland and some connecting hedgerows. However, as part of the proposed development, new habitats are proposed which will benefit existing valuable receptors on site and may also encourage an increase in numbers or new species in the long term. The residual impact of development will largely be neutral and positive with only an adverse impact towards the County Wildlife Site due to unavoidable impacts of development pressure changing the woodland over time. Active management will be undertaken to protect this site as far as possible through appropriate mitigation, management and buffer zones. An overall Neutral impact will arise from development Socio-Economics 10.1 The assessment of socio-economics effects has examined population, housing supply, education, health and other community facilities and also considers the impacts that the scheme will have upon employment and the local labour market. Since there are no generally accepted criteria for assessing the significance of socio-economic impacts, these have been assessed based on the scale of any increase over the existing position, as well as the nature and context of the impact The assessment has shown that the most significant social and economic effects of the development would be:- 1 Provision of a new community centre; 2 Provision of a large amount of open space and recreation opportunities; 3 A capital investment of approximately 125m; 4 Up to 1,465 person-years of temporary construction work; P13

15 West Saltash : Environmental Statement (February 2014) 5 2.4bn to the regional economy as a result of operational jobs; m annual expenditure by new residents; and 7 Stamp Duty, New Homes Bonus and Council Tax income The population and housing impacts of the proposals will largely be positive and will not give rise to a requirement for mitigation measures. Similarly, other impacts are assessed as negligible with no mitigation required. Other specific measures to mitigate or enhance impacts include the restrictions and obligations placed on the development through the Section 106 Agreement. The impacts following these measures are summarised below. Theme/Area Impact Magnitude Employment (construction related) Positive Major Employment (operational) Positive Major Population Positive Moderate Local Labour Market Positive Moderate Deprivation Positive Moderate Expenditure Positive Major Fiscal Positive Moderate Housing Positive Moderate Commuting Positive Moderate Primary Education Positive Moderate Secondary Education Neutral Health Neutral Recreation Positive Moderate Community Facilities Positive Minor Emergency Services Neutral 11.0 Heritage 11.1 An assessment has been carried out to review the effects of the development on both archaeology and cultural heritage. Planning policy in relation to heritage seeks to increase understanding of the wider social, cultural, economic and environmental benefits brought by the conservation of the historic environment, conserve heritage assets in a manner appropriate to their importance and recognise that heritage contributes to knowledge and understanding of the past No designated heritage assets are present within the development site. Identified heritage assets within the site include the historic landscape, Cornish Hedges and farm buildings at Broadmoor Farm. Additionally uncertain heritage assets have been identified, comprising cropmarks and an undated trackway. P14

16 West Saltash: Environmental Statement (March 2014) Recorded Heritage Assets 11.3 The assessment considered that the effects of the proposed development upon the Cornish Hedges would be of minor adverse significance, with a moderate adverse significance of effect identified upon the historic landscape. The significance of the effects of the proposed development upon the cropmarks, trackway and farm buildings are uncertain. P15

17 West Saltash : Environmental Statement (February 2014) 11.4 Mitigation strategies have also been outlined including a watching brief on all areas of Cornish Hedge to be removed and historic building recording at Broadmoor Farm The assessment considered that following mitigation measures the impacts of the proposed development upon designated heritage assets would be no greater than of negligible or neutral significance Ground Conditions and Contamination 12.1 An assessment has been carried out to determine the potential effects of the proposed development on ground conditions. Methods of assessment have been employed that are consistent with current guidance and recommendations in the form statutory documents and recognised publications The site is not reported to be subject to any sensitive land designations in terms of contamination, hazardous substances and waste. A number of pollution and waste designations have been found within 500m of the site The following table identifies potential effects of the development, significance and identified mitigation measures. Potential effect Construction stage Direct contamination of the soil and potential groundwater contamination. Post-completion stage Contamination of Flora, Fauna, Controlled Waters and Building Fabric due to existing contaminated materials. Contamination of the soil and potential groundwater contamination due to leakages of fuel oils, general operational spillages and other contaminants from within the Proposed Development. Significance (premitigation) Minor - Minor - Adverse Minor - Adverse Mitigation measure Development of a CEMP coupled with good working practices. A detailed site investigation will be completed prior to development to identify any potential threat. Hard paving of all parking areas and commercial use service yards. Efficient collection of surface water run-off by way of a positive drainage system. Provision of a Sustainable Drainage System (SuDS). Significance of residual effect P16

18 West Saltash: Environmental Statement (March 2014) 13.0 Cumulative Effects & Summary of Findings 13.1 One scheme has been identified as reasonably foreseeable (i.e. usually those under construction or with planning permission) and has been assessed for cumulative effects with the proposed scheme subject of this ES. The assessment for this scheme, a new Tesco store, has identified that any environmental effects are likely to be neutral or negligible For completeness, a review has also been undertaken for recently submitted EIA Screening, Scoping and pre-application requests to Cornwall Council and emerging allocations in Cornwall (and specifically Saltash). Given the uncertainty over the details and that no timetable has been set for any of the schemes identified, no further schemes have been assessed for cumulative impacts The table below provides a summary of the main residual effects (post incorporation of mitigation measures), as identified above. Environmental Topic Landscape and Visual Effects Effects during construction Long term moderate adverse, short term minor adverse, moderate adverse, minor adverse and negligible impacts. Effects during operation Long term moderate beneficial and long term minor to moderate adverse impacts. Water impacts. impacts. Environment Transportation impacts. impacts. Air Quality impacts. impacts. Noise No impacts. No impacts. Ecology Positive and adverse impacts. Positive and adverse impacts. Socio- Major positive impact. Major positive impact. Economics Heritage impacts. Minor adverse, moderate adverse, negligible and uncertain impacts. Ground Conditions and Contamination No impacts. No impacts A range of mitigation measures have been identified throughout the ES which are capable of being enforced through planning conditions or a s106 Legal Agreement in relation to the development Some minor negative residual effects remain in relation to specific sensitive receptors in relation to landscape and visual impact, heritage and designated ecological sites. However, these must be balanced against the significant beneficial environmental effects on ecology, socio-economics, water environment and transport. P17

19 West Saltash : Environmental Statement (February 2014) 14.0 Availability of the Environmental Statement 14.1 If you would like to purchase a paper copy or CD Rom of the ES, please contact: Nathaniel Lichfield & Partners, 14 Regent s Wharf, All Saints Street, London N1 9RL (Tel: +44 (0) Alternatively, information on the ES can also be viewed on the Cornwall Council website at Scheme Plans [Illustration showing Suite of Parameter Plans (not provided at scale) and the Illustrative Masterplan showing one way in which the scheme may be developed] P18

20 West Saltash: Environmental Statement (March 2014) 1. Development Extents 2. Primary Access P19

21 West Saltash : Environmental Statement (February 2014) 3. Land Uses 4. Restricted Zones P20

22 West Saltash: Environmental Statement (March 2014) 5. Landscape & Open Space 6. Building Heights P21

23 West Saltash : Environmental Statement (February 2014) 7. Pedestrian/Cycle Routes Location of Detailed Highways Works P22

24 A38 KEY Boundary of hybrid planning application Higher density residential Lower density residential Commercial Employment Open space Water/SuDS Allotments Neighbourhood centre public space Spine road Indicative internal roads Existing footpaths/bridleway A Eastern access 2. Carkeel green 3. The Common 4. Retail and community centre 5. Primary school 6. School pitches 7. Dirty Lane 8. Care home 9. Latchbrook stream 10. SuDS 11. Existing barn 12. Existing dwelling 13. Outdoor sports pitches 14. New access road 15. Western access 16. Pedestrian/cycle route to bridge Cornish Knot 17. Pedestrian/cycle bridge 18. Allotments 14 A388 2 Carkeel This drawing is submitted for illustrative purposes only Stoketon Cross 15 Broadmoor Wood A38 16 Project West Saltash Trematon Title Illustrative Masterplan 17 Client CEG Date February Scale Drawn by A0 JC N Drg. No PS Rev C WE30947 Based upon Ordnance Survey mapping with the permission of Her Majesty s Stationery Office. Crown Copyright reserved. Licence number AL50684A

25 Client Commercial Estates Group Planning Consultant Masterplanning, Urban Design, Environmental Impact Assessment Co-ordination, Economics, Community Consultation and Graphic Design Nathaniel Lichfield & Partners Project Management DJCPM Hydrology, Transport Brookbanks Consulting Ltd Visual Impact and Landscape Tyler Grange Urban Morphology and Design Civic Studio Communications Michelle Sammons Communications Public Affairs Aston Getty Ltd Archaeology Cotswold Archaeology Ecology Baker Consultants Legal Advisor Clyde & Co LLP

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DECEMBER 2014 CRANBROOK EXPANSION AREAS ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY Submitted in support of Outline Planning

More information

South Whitehaven, Cumbria EIA

South Whitehaven, Cumbria EIA South Whitehaven, Cumbria EIA Environmental Statement - Non Technical Summary June 2013 in association with 1. Introduction Story Homes is applying to Copeland Borough Council (CBC) for a new residential

More information

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433 LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY March 2017 Our Ref: Q70433 Contents 1 INTRODUCTION AND SITE DESCRIPTION... 1 2 EIA METHODOLOGY... 5 3 ALTERNATIVES... 6 4 DESCRIPTION

More information

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June

More information

Sustainability Statement. Whitby Business Park Area Action Plan

Sustainability Statement. Whitby Business Park Area Action Plan Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan

More information

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433 LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2017 Our Ref: Q70433 Contents 1 INTRODUCTION... 2 2 SITE DESCRIPTION... 5 3 EIA METHODOLOGY...

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

Welcome to our Public Consultation

Welcome to our Public Consultation About our development This exhibition gives you the chance to view and comment on our emerging plans for a proposed residential development located on land to the West of Alwyn Road, Rugby. Welcome to

More information

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

Former RAF Sealand Site EIA

Former RAF Sealand Site EIA Praxis (Holdings) Ltd. Former RAF Sealand Site EIA Environmental Statement - Non Technical Summary February 2012 in association with P a g e 1 1. Introduction Praxis (Holdings) Ltd. is applying to Flintshire

More information

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD Land at Environmental Statement: Non-Technical Summary Introduction Brook Street Properties is applying to Cornwall Council for outline planning permission

More information

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd.

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd. VALLEY PARK, DIDCOT Non-Technical Summary December 2014 On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd. CONTENTS 1 Introduction... 2 2 The Proposed Development...

More information

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to Introduction WCC have indicated that in advance of the surveys and assessments being undertaken consultation should be undertaken with technical officers of both Warwickshire CC and Nuneaton and Bedworth

More information

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Greenbank Partnerships Ltd October 2012 Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Environmental Statement - Non Technical

More information

3. Neighbourhood Plans and Strategic Environmental Assessment

3. Neighbourhood Plans and Strategic Environmental Assessment 1. Introduction This report sets out a draft Screening Determination for the Preston Parish Council s Neighbourhood Plan and has been prepared by rth Hertfordshire District Council. The purpose of the

More information

Moat Lane Regeneration Project Environmental Statement

Moat Lane Regeneration Project Environmental Statement AECOM Environment Towcester Regeneration Ltd. October 2012 Moat Lane Regeneration Project Environmental Statement Non-Technical Summary Prepared by:... Checked by:... Sophie Collins Scott Wilson Environmental

More information

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents Interim Advice Note 76 / 06 VOLUME 11 SECTION 1: ENVIRONMENTAL ASSESSMENT INTRODUCTION PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT Contents 1. Introduction and Application 2. Aims and Objectives

More information

Florida Farm North. Environmental Statement. Non-Technical Summary. July /04/MW/PN

Florida Farm North. Environmental Statement. Non-Technical Summary. July /04/MW/PN Florida Farm North Environmental Statement Non-Technical Summary July 2016 41575/04/MW/PN Nathaniel Lichfield & Partners 3rd Floor One St James's Square Manchester M2 6DN 01618376130 www.nlpplanning.com

More information

Non-technical summary

Non-technical summary Non-technical summary Introduction NTS.1 is applying for outline planning permission for a residential development of up to 80 dwellings on land at Hambrook, on the northern fringe of Bristol. NTS.2 An

More information

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd Drakelow Park ES 5 Environmental Statement Volume 5: Non Technical Summary Lead Author Waterman Energy, Environment and Design Ltd April 2009 Environmental Statement Volume 5: Non-Technical Summary DRAKELOW

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2

More information

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP LAND AT WEST YELLAND Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP May 2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft FINAL Date

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017 South Macclesfield Development Area Environmental Statement March 2017 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description... 2 2.0 The Proposals...

More information

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion Mr Graham Clark Berrys Newchurch Farm Kinnersley Hereford HR3 6QQ BY EMAIL The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion SC/2017/0001

More information

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford. Welcome Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of. We are at the early stages of designing our proposals and have a number

More information

London Road, Derker. Non Technical Summary. Introduction

London Road, Derker. Non Technical Summary. Introduction London Road, Derker Non Technical Summary Introduction The Oldham Rochdale Housing Market Pathfinder was set up to tackle longstanding problems of poor quality housing and to provide the framework for

More information

Hounsome Fields, Basingstoke Environmental Statement Non- Technical Summary. For Wates Developments Ltd and Pellipar Investments Ltd

Hounsome Fields, Basingstoke Environmental Statement Non- Technical Summary. For Wates Developments Ltd and Pellipar Investments Ltd Hounsome Fields, Basingstoke Environmental Statement Non- Technical Summary For Wates Developments Ltd and Pellipar Investments Ltd December 2015 Contents 1 Introduction 3 2 The Proposals 8 3 Environmental

More information

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015 Wyvern Park Skipton Environmental Statement Non-technical Summary - April 2015 BWB Consulting Ltd Whitehall Waterfront 2 Riverside Way Leeds LS1 4EH Telephone: +44(0)113 233 8000 Copyright This Report

More information

Frequently Asked Questions

Frequently Asked Questions 1. Where is Aylesbury Woodlands? Frequently Asked Questions Aylesbury Woodlands lies to the east of Aylesbury. It is bounded to the south by the A41. To the north is the Aylesbury Arm of the Grand Union

More information

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

WELCOME. Land North of STEVENAGE.   We would like to thank you for attending our public exhibition today. WELCOME We would like to thank you for attending our public exhibition today. The purpose of this event is to share our proposals and hear your thoughts on our ideas. Members of the project team are on

More information

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Land Securities plc is applying to Maidstone Borough Council

More information

Land to the North of Main Road, Wybunbury

Land to the North of Main Road, Wybunbury Land to the North of Main Road, Wybunbury Environmental Statement Non-Technical Summary November 2014 Land to the North of Main Road, Wybunbury Environmental Statement Non-Technical Summary Prepared on

More information

Land at Rampton Road. Cottenham

Land at Rampton Road. Cottenham Land at Rampton Road Cottenham Introduction TEP is preparing an outline planning application for 54 dwellings on 6.9 hectares of land adjacent to Rampton Road, Cottenham on behalf of the owners Cambridgeshire

More information

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016 Thornton Road, Pickering Environmental Statement Non-Technical Summary January 2016 EIA Quality This Environmental Statement, and the Environmental Impact Assessment (EIA) carried out to identify the significant

More information

Velindre Cancer Centre Environmental Statement Vol.1: Environmental Statement Text. Chapter 1: Introduction

Velindre Cancer Centre Environmental Statement Vol.1: Environmental Statement Text. Chapter 1: Introduction Velindre Cancer Centre Environmental Statement Vol.1: Environmental Statement Text Chapter 1: Introduction Draft - March 2017 Prepared by: Address: Email: Website: Mott McDonald, The Urbanists and HLM

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Hybrid outline/detailed planning application comprising an outline planning application for 196 residential dwellings, landscaping, open space, estate roads and infrastructure, plus 4 permanent gypsy and

More information

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics

More information

Neighbourhood Planning Local Green Spaces

Neighbourhood Planning Local Green Spaces Neighbourhood Planning Local Green Spaces Introduction... 2 1. Why green space is important... 4 2. Neighbourhood plans and green space... 6 3. Evidence... 8 Statutory designations... 9 Green space audit...

More information

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation REPRESENTATIONS... Plumpton Parish Council Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation Representations submitted on behalf of: Cala Homes (South

More information

Settlement Boundaries Methodology North Northumberland Coast Neighbourhood Plan (August 2016)

Settlement Boundaries Methodology North Northumberland Coast Neighbourhood Plan (August 2016) Introduction This background paper sets out a methodology for the definition of settlement boundaries in the North Northumberland Coast Neighbourhood Plan. The neighbourhood plan is planning positively

More information

PINEWOODS HOLIDAY PARK: HORSE PADDOCK. Non-Technical Summary

PINEWOODS HOLIDAY PARK: HORSE PADDOCK. Non-Technical Summary PINEWOODS HOLIDAY PARK: HORSE PADDOCK June 2014 1 Introduction 1.1 The existing Pinewoods Holiday Park is located approximately 1 km to the north of Wells-nextthe-Sea on the north Norfolk coast. Pinewoods

More information

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback

More information

LAND WEST OF ST ANDREWS ROAD

LAND WEST OF ST ANDREWS ROAD LAND WEST OF ST ANDREWS ROAD ENVIRONMENTAL STATEMENT VOLUME 3 - NON-TECHNICAL SUMMARY Submitted by Nathaniel Lichfield & Partners on behalf of Redrow Homes Limited July 2014 Applicant: Consultant Team:

More information

Land East of Cromwell Lane

Land East of Cromwell Lane Land East of Cromwell Lane VISION DOCUMENT AUGUST 2016 The proposals for Land East of Cromwell Lane will be defined by existing landscape features, ensuring that the development offers a quality place

More information

Oxford Green Belt Study. Summary of Final Report Prepared by LUC October 2015

Oxford Green Belt Study. Summary of Final Report Prepared by LUC October 2015 Oxford Green Belt Study Summary of Final Report Prepared by LUC October 2015 Project Title: Oxford Green Belt Study Client: Oxfordshire County Council Version Date Version Details Prepared by Checked by

More information

LAND NORTH OF NETHERHOUSE COPSE, FLEET

LAND NORTH OF NETHERHOUSE COPSE, FLEET REPORT N O 70020067 LAND NORTH OF NETHERHOUSE COPSE, FLEET ENVIRONMENTAL STATEMENT VOLUME 3:NON-TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT PUBLIC JUNE 2016 LAND NORTH OF NETHERHOUSE COPSE, FLEET

More information

Causeway Farm, Petersfield Environmental Statement Non-Technical Summary October 2015

Causeway Farm, Petersfield Environmental Statement Non-Technical Summary October 2015 Causeway Farm, Petersfield Environmental Statement October 2015 2 Contents 1.0 Introduction... 1 1.1 Background... 1 1.2 Environmental Assessment... 1 1.3 Site Description... 3 2.0 The Proposals... 6 2.1

More information

Former North Works, Lickey Road, Longbridge, Birmingham

Former North Works, Lickey Road, Longbridge, Birmingham Committee Date: 14/11/2013 Application Number: 2013/06431/PA Accepted: 27/08/2013 Application Type: Full Planning Target Date: 26/11/2013 Ward: Longbridge Former North Works, Lickey Road, Longbridge, Birmingham

More information

Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY December 2016 Environmental Statement: Non-Technical Summary Stubbocks Walk, North Hertfordshire J S Bloor

More information

Kier Infrastructure and Overseas Limited Greenburn Surface Mine, Dalgig Farm Site

Kier Infrastructure and Overseas Limited Greenburn Surface Mine, Dalgig Farm Site Kier Infrastructure and Overseas Limited Greenburn Surface Mine, Dalgig Farm Site Planning application pursuant to s.42 Town and Country Planning (Scotland) Act 1997 to amend the restoration scheme Volume

More information

HRA PLANNING Chartered Town Planning and Environmental Consultants

HRA PLANNING Chartered Town Planning and Environmental Consultants HRA PLANNING Chartered Town Planning and Environmental Consultants Screening Statement for the Purposes of Determining the need for Appropriate Assessment Proposed development of 74 no. residential units

More information

Kibworth Harcourt. Introduction. Introduction

Kibworth Harcourt. Introduction. Introduction Introduction Introduction Welcome to this public exhibition on the proposals for the delivery of new homes on land at The Kibworths. The purpose of today s exhibition is to give you the opportunity to

More information

LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY

LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY May 2016 CONTENTS CONTENTS... i 1 Introduction... 1 2 The Proposed Development... 3 3 Need and Alternatives

More information

Ʊ ± ªº Œª ºª ø ª ª ± ª

Ʊ ± ªº Œª ºª ø ª ª ± ª Ʊ ± ªº Œª ºª ø ª ª ± ª ø º Õ± ± ± Œ±øºÙ Õ ß Æª ø檺 ±Æ ƪ ø檺 æß Æ± Ʊ ª ø ø fl ª ª ± ê ø Õ øæß ª ª æªæ Ó ÔÌ Non-Technical Summary Introduction A planning application has been submitted to the Vale

More information

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal Option SWH1 Balanced Communities Option SWH1 1 To ensure the delivery of high quality sustainable communities where people want to live and work Will it ensure the phasing of infrastructure, including

More information

PANSHANGER QUARRY, Hertfordshire

PANSHANGER QUARRY, Hertfordshire PANSHANGER QUARRY, Hertfordshire Proposed enhanced restoration of Phases F & H Briefing Note 1 March 2015 INERT (INACTIVE) RESTORATION MATERIALS, CONTROLS AND OPERATIONS 1 Introduction This briefing note

More information

Cotswolds AONB Landscape Strategy and Guidelines. June 2016

Cotswolds AONB Landscape Strategy and Guidelines. June 2016 Cotswolds AONB Landscape Strategy and Guidelines June 2016 Cotswolds AONB Landscape Strategy and Guidelines Introduction The evolution of the landscape of the Cotswolds AONB is a result of the interaction

More information

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 Dear Resident This Special Edition of the Whiteley Voice which has been prepared in conjunction with the North Whiteley Consortium is to

More information

Barvills Solar Farm Environmental Statement Non-Technical Summary

Barvills Solar Farm Environmental Statement Non-Technical Summary Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development

More information

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire Request for a Scoping Opinion by Provectus Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire January 2012 Contents 1 Introduction & Background... 1 2 Site

More information

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane Proposed Land Use: Total Site Area (Ha): Housing 1.85 Ha Description: It is understood that the owner has no plans to dispose of the site

More information

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 1 st February 2017 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: Full Planning application Amended

More information

Kings Road Industrial Development, Immingham. Environmental Impact Assessment. Non Technical Summary

Kings Road Industrial Development, Immingham. Environmental Impact Assessment. Non Technical Summary Environmental Impact Assessment Non Technical Summary Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 December 2013 Page left intentionally blank INTRODUCTION

More information

DUNSFOLD NEIGHBOURHOOD PLAN Site Selection Policies

DUNSFOLD NEIGHBOURHOOD PLAN Site Selection Policies DUNSFOLD NEIGHBOURHOOD PLAN Site Selection Policies The criteria for assessing sites for future housing and business development in Dunsfold are set out below. (Development criteria, covering what it is

More information

Form to Submit Land for Residential Evidence Gathering Shepway Strategic Housing Land Availability Assessment (SHLAA) Partial Review

Form to Submit Land for Residential Evidence Gathering Shepway Strategic Housing Land Availability Assessment (SHLAA) Partial Review Form to Submit Land for Residential Evidence Gathering Shepway Strategic Housing Land Availability Assessment (SHLAA) Partial Review All organisations and individuals who wish to put forward land for consideration

More information

Development in the setting of the Cotswolds AONB

Development in the setting of the Cotswolds AONB COTSWOLDS CONSERVATION BOARD POSITION STATEMENT Development in the setting of the Cotswolds AONB.1. Introduction Areas of Outstanding Natural Beauty (AONBs) are designated by the Government for the purpose

More information

Land North of Hall Road, Rochford. Rochford District Council. Planning Application Index. Prepared on behalf of Bellway Homes Ltd

Land North of Hall Road, Rochford. Rochford District Council. Planning Application Index. Prepared on behalf of Bellway Homes Ltd Land North of Hall Road, Rochford Rochford District Council Planning Application Index Prepared on behalf of Bellway Homes Ltd April 2010 Land North of Hall Road, Rochford Rochford District Council Scope

More information

7 Scoping and Introduction to the Assessments

7 Scoping and Introduction to the Assessments 7 Scoping and Introduction to the Assessments 7.1 Scope of the assessments 7.1.1 Rule 8 of the TWR makes provision for an applicant to request a scoping opinion from the SoS indicating the information

More information

Longbridge East : Site Wide and Phase One Development

Longbridge East : Site Wide and Phase One Development Longbridge East : Site Wide and Phase One Development Non-Technical Summary of the August 2011 Introduction St Modwen Developments Ltd intend to submit a new outline planning application for Longbridge

More information

Site Assessment Technical Document Appendix A: Glossary

Site Assessment Technical Document Appendix A: Glossary Central Bedfordshire Council www.centralbedfordshire.gov.uk Site Assessment Technical Document Appendix A: Glossary July 2017 1.1.11-1 - ii Appendix A: Glossary Term Agricultural Land Classification AONB

More information

Story Homes. Land at Thirsk Road, Kirklevington. An Introduction to Story Homes. Our Foundations. Commitment to Consultation.

Story Homes. Land at Thirsk Road, Kirklevington. An Introduction to Story Homes. Our Foundations. Commitment to Consultation. Story Homes An Introduction to Story Homes Founded by Fred Story in 1987, Story Homes has a long and successful reputation of building high quality and high specification homes. The family owned business

More information

Everton s Neighbourhood Plan. Site Allocation - Assessment Criteria

Everton s Neighbourhood Plan. Site Allocation - Assessment Criteria Everton s Neighbourhood Plan Site llocation - ssessment Criteria Introduction 1.1 This report assesses all the sites identified through the emerging Neighbourhood Plan for Everton and their potential for

More information

Environmental Statement 2012 Non-Technical Summary

Environmental Statement 2012 Non-Technical Summary Environmental Statement 2012 Non-Technical Summary CONTENTS Page 1 Introduction 5 2 Description of Proposal 6 3 Methodology 9 4 Environmental Impact Assessment 11 5 Conclusion 16 Environmental Statement

More information

Neighbourhood Planning Guidance Local Green Spaces

Neighbourhood Planning Guidance Local Green Spaces Neighbourhood Planning Guidance Local Green Spaces Introduction This guidance note has been produced for communities preparing neighbourhood plans in North Dorset to help them to identify, assess and designate

More information

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager Perth and Kinross Council Development Management Committee 8 June 2016 5(3)(i) 16/259 Pre-Application Report by Development Quality Manager Residential development at St Martins Road, Land 120 metres West

More information

UTT/16/1466/DFO GREAT DUNMOW MAJOR

UTT/16/1466/DFO GREAT DUNMOW MAJOR UTT/16/1466/DFO GREAT DUNMOW MAJOR PROPOSAL: LOCATION: APPLICANT: AGENT: Reserved matters approval for the accesses to the site and principal roads within the site including spine road following outline

More information

Non-Technical Summary

Non-Technical Summary Introduction The Brent Cross Cricklewood regeneration scheme is located in northwest London and comprises 151 hectares (ha) of land within the London Borough of Barnet (LBB) (the Site ). In July 2014,

More information

LONGDEN VILLAGE DEVELOPMENT STATEMENT

LONGDEN VILLAGE DEVELOPMENT STATEMENT LONGDEN VILLAGE DEVELOPMENT STATEMENT 2017-2027 1 Longden Development Statement 2017-2027 15/01/18 1. Background 1.1 Longden Village Longden village is a very rural and traditional community first mentioned

More information

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017 Strategic Environmental Assessment Screening Report Dublin Port Masterplan Review 2017 Table of Contents 1 Introduction... 1 2 Purpose of the Masterplan... 2 3 Task 1.1 Pre-Screening Check... 5 4 Task

More information

The Place Solar Farm

The Place Solar Farm The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1

More information

Ref: A073350/SM/sm Date: 13 September 2013

Ref: A073350/SM/sm Date: 13 September 2013 Ref: A073350/SM/sm Date: 13 September 2013 Ian Parkinson Development Control Team Leader Planning Portsmouth City Council Civic Offices Guildhall Square Portsmouth PO1 2AY Dear Ian LIGHT & GLEAVE VILLA

More information

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary For Engine of the North April 2015 Contents Contents 3 1 Introduction 1 2 The Proposals 5 3 Alternative Options

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.

More information

Habitat Regulations Assessment (HRA) Screening Determination. May 2017

Habitat Regulations Assessment (HRA) Screening Determination. May 2017 Cholsey Parish Council Cholsey Neighbourhood Plan Habitat Regulations Assessment (HRA) Screening Determination May 2017 Cholsey Neighbourhood Plan Page! 1 of! 10 SASR - HRA v1.1 Page Left Intentionally

More information

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) 1 DONINGTON S PLACE IN THE SPATIAL STRATEGY 1.1 Policy 2 of the South East Lincolnshire Local Plan 2011-2036 Draft for Public Consultation

More information

Meridian Water Phase 1 Application

Meridian Water Phase 1 Application Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed

More information

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08 DESIGN MANUAL FOR ROADS AND BRIDGES volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08 glossary of terms Used in DMRB Volume 11, Sections 1 and 2 SUMMARY This

More information

Elvetham Chase, Fleet. Environmental Statement: Non-Technical Summary. November New Fetter Lane London EC4A 1AZ United Kingdom

Elvetham Chase, Fleet. Environmental Statement: Non-Technical Summary. November New Fetter Lane London EC4A 1AZ United Kingdom Elvetham Chase, Fleet Environmental Statement: Non-Technical Summary November 2016 A Ne w F e tte r P lace 8-10 New Fetter Lane London EC4A 1AZ United Kingdom T +44 (0) 20 7467 1470 F +44 (0) 20 7467 1471

More information

Re-location of Rugby Farmers Mart

Re-location of Rugby Farmers Mart Re-location of Rugby Farmers Mart LaSalle Investment Management Barberry Logo here Environmental Statement Non-Technical Summary August 2017 Re-location of Rugby Farmers Mart Non-Technical Summary Report

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY NON-TECHNICAL SUMMARY THE HIDE, BISHOP AUCKLAND PROPOSED ECO CHALET DEVELOPMENT NON-TECHNICAL SUMMARY 1 Introduction 1.1.1 This non-technical summary for the (ES) prepared in relation to the proposed eco-chalet

More information

Environmental Statement (Volume 1) Non Technical Summary

Environmental Statement (Volume 1) Non Technical Summary Environmental Statement (Volume 1) Non Technical Summary Prepared by: The Environment Partnership Haydock Point Environmental Statement (Volume 1): Non-Technical Summary March 2017 Contents 1. Introduction

More information

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 in association with 1. Introduction Peel Holdings is applying to Nottingham City Council (NCC) for Outline planning

More information