The Place Solar Farm
|
|
- Chrystal Thomas
- 5 years ago
- Views:
Transcription
1 The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB
2 Contents Contents Introduction Environmental Impact Assessment Consultation Alternatives Existing Environment The Proposed Development Construction Environmental Impacts and Mitigation Introduction Transport Statement Landscape and Visual Effects Archaeology and Cultural Heritage Ecology and Nature Conservation Flood Risk Assessment Cumulative Environmental Effects Additional Information
3 1 Introduction BE Renewables is seeking planning permission for a solar farm at The Place, located in Tilbury, Essex in accordance with the Town and Country Planning Act 1990 (TCPA). The Planning Authority for the proposed development is Thurrock Council. Plate 1-1: Location of Proposed Development The proposed development is located on 46.1 hectares of agricultural land between the settlements of Tilbury to the south, Chadwell St Mary to the north and Grays to the east. It occupies two parcels of land either side of the A126, St Chad s Road. Plate 1-2 shows the red line boundary of the proposed development sites. Plate 1-2: The Place Solar Farm Location Plan 3
4 1.1 Environmental Impact Assessment The proposed development has been subject to a formal process of Environmental Impact Assessment (EIA) in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (The Regulations). This Environmental Statement (ES) reports the findings of the detailed EIA. The Regulations allow the promoters of a proposed development to seek the opinion of the planning authority on the content and scope of the EIA through a Scoping Opinion and this has been undertaken for the proposed development. 1.2 Consultation Consultation has taken place for the proposed development to obtain feedback upon the proposals from statutory environmental and non-statutory consultees to the planning process as well as the public through a consultation event. A consultation event where members of the public were invited to share their views was held on Monday the 17th of July 2014 at Linford Methodist Church. In July 2014 a formal Scoping Opinion was received from the Planning Authority. 1.3 Alternatives The selection of a suitable site for the proposed development was principally dictated by the availability of a land parcel of sufficient size in single ownership within Thurrock Council and in proximity to a substation or power connection. The consideration of alternative site layouts within the proposed sites were primarily influenced by the need to maximise the solar radiation reaching each panel and the need to ensure the existing drainage network on the site was unaltered. 1.4 Existing Environment The proposed development lies on agricultural land that is presently used for sheep grazing and arable crops with a network of drainage channels cross the site. Agricultural land surrounds the site to the east, south and west. To the north of the site is the Gateway Academy and to the south lies the settlement of Tilbury. 1.5 The Proposed Development The proposed development involves the installation of 74,839 solar panels which are mounted upon steel and aluminium structures. The panels will lie at an angle of between 20 and 25 degrees and will be arranged in racks which will be south facing. The panels are static and do not follow the path of the site during the day. The rows of panels, known as arrays are spaced approximately 4m apart and 10m from any existing vegetation on the site boundaries to avoid any overshadowing. Installation of the panels in this manner allows access around the perimeter of the site as well as continued grazing of the land by sheep. 4
5 Plate 1-3: The Place Solar Farm Site Layout A network of internal roads will be installed as part of the proposed development which will allow access for maintenance. These roads will follow the route of the existing drain crossings which are present on site and used for agricultural purposes. 1.6 Construction Construction of the proposed development is scheduled to begin in 2014 lasting approximately 4 months. Mitigation of construction related impacts would be addressed through the adoption and implementation of a fully compliant Construction Environmental Management Plan (CEMP). 5
6 2 Environmental Impacts and Mitigation 2.1 Introduction The scope of the EIA has been based on three main topics. Landscape and Visual Effects Archaeology and Cultural Heritage Ecology and Nature Conservation A Transport Statement was prepared to address any construction traffic issues. A Flood Risk Assessment was also undertaken to assess the proposed development s impact on the flood plain. 2.2 Transport Statement Up to 16 Heavy Goods Vehicles per day will deliver construction materials to the site during the peak of the construction process. To minimise potential impacts upon the highway delivery vehicles will be restricted to the hours of 10am to 2:30pm on Monday to Friday. Access to the site during the operation of the solar farm will be very modest. Light goods vehicles will need to access the site on a very infrequent basis at approximately one visit every six months. The EIA has demonstrated that suitable access is available to the site and there will be no detriment to the operation of the highway network as a result of the proposed development. Plate 1-3: Environmental Constraints Plan 6
7 2.3 Landscape and Visual Effects The assessment of the effects on landscape character has identified that with the exception of a single character area the proposed development would not result in significant environmental effects. The assessment of potential effects on visual amenity concluded that the majority of the receptors (those with a view of the site) would be subject to a visual impact no greater than slight adverse, therefore the proposed development would not represent a significant effect. 2.4 Archaeology and Cultural Heritage The EIA has identified the presence of known heritage assets within the development boundary, including post-medieval field boundaries and World War II infrastructure. There is the potential for Palaeolithic, Roman and medieval assets to be present within the site boundary given their known presence in the wider study area. A watching brief during the construction of trenches and building foundations will ensure that any features encountered are duly recorded. Two Grade II listed buildings are present to the north east of the development area. The proposed solar farm development would impact upon the long view setting of these buildings although existing screening will minimise the degree of impact. 2.5 Ecology and Nature Conservation The site of the proposed solar farm has the potential for the presence of protected species including great crested newt, water voles, migrating birds and nesting birds. Avoidance of impacts related to ecology has been an integral part of the planning and design process for the proposed development. This has included: The avoidance of work in or near the existing drainage channels that could support water voles and great crested newt; The retention of all vegetation along site boundaries and along the drainage ditch network; The creation of an offset from any existing vegetation, reducing the risk of impact during the construction process; The use of low reflective panels to reduce the likelihood of the panels being mistaken for water bodies by migrating birds. The implementation of good construction practices, outlined in a CEMP, will reduce the potential for impacting upon any protected species. The inclusion of additional planting will provide opportunities for habitat creation. 2.6 Flood Risk Assessment The site lies partially within the flood plain of the River Thames and its tributaries. 7
8 There will be no significant increase in discharge or runoff of surface water as a result of the development and solar panels will be installed at a height to avoid damage in the event of a flood. 2.7 Cumulative Environmental Effects Potential interactions have been identified between Cultural Heritage and Visual Amenity; and Ecology and Nature Conservation and Landscape Character. No cumulative effects greater than those identified within the individual chapters and against the environmental aspects have been identified as part of the assessment of cumulative environmental effects. 8
9 3 Additional Information A copy of the Environmental Statement has been deposited at the offices of Thurrock Planning Authority and will be available for inspection, free of charge, during normal opening hours. The application will also be available for inspection on the website of Thurrock Council. Hard copies of this Non-Technical Summary are available as a separate stand alone document and copies of the whole ES are available in hard copy for a fee of 100. Expressions of support, representations, or opinions should be sent to the Planning Authority via the Planning and Growth section of their website ( 9
Barvills Solar Farm Environmental Statement Non-Technical Summary
Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development
More informationUniversity Park, Worcester Non Technical Summary December 2011
University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to
More informationGrantham Southern Quadrant Link Road Environmental Statement
Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of
More informationReplacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary
Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller
More informationNON-TECHNICAL SUMMARY
Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland
More informationThe Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion
Mr Graham Clark Berrys Newchurch Farm Kinnersley Hereford HR3 6QQ BY EMAIL The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion SC/2017/0001
More informationLondon Road, Derker. Non Technical Summary. Introduction
London Road, Derker Non Technical Summary Introduction The Oldham Rochdale Housing Market Pathfinder was set up to tackle longstanding problems of poor quality housing and to provide the framework for
More informationLAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433
LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY March 2017 Our Ref: Q70433 Contents 1 INTRODUCTION AND SITE DESCRIPTION... 1 2 EIA METHODOLOGY... 5 3 ALTERNATIVES... 6 4 DESCRIPTION
More informationBREEDON NORTHERN LIMITED
Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...
More informationTown and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION
Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION Application Site and Description of Development Proposed new quarry at Culham, Oxfordshire Land and Mineral
More informationTOWN AND COUNTRY PLANNING ACT 1990 (AS AMENDED).
FAO: D. Williams Isle of Anglesey County Council Council Offices Llangefni Anglesey LL77 7TW 16 November 2017 DCRM Ref. No: WN0904-QUD-OS-LET-00002_English Dear Mr Williams TOWN AND COUNTRY PLANNING ACT
More informationEverton s Neighbourhood Plan. Site Allocation - Assessment Criteria
Everton s Neighbourhood Plan Site llocation - ssessment Criteria Introduction 1.1 This report assesses all the sites identified through the emerging Neighbourhood Plan for Everton and their potential for
More informationKings Road Industrial Development, Immingham. Environmental Impact Assessment. Non Technical Summary
Environmental Impact Assessment Non Technical Summary Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 December 2013 Page left intentionally blank INTRODUCTION
More informationABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD
ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June
More informationNon-technical summary
Non-technical summary Introduction NTS.1 is applying for outline planning permission for a residential development of up to 80 dwellings on land at Hambrook, on the northern fringe of Bristol. NTS.2 An
More informationDevelopment of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site
Welcome Welcome to this event to discuss the development of land adjacent to Braggs Farm Lane. is currently in the preliminary stages of designing proposals to sensitively develop this site with high-quality
More informationFormer RAF Sealand Site EIA
Praxis (Holdings) Ltd. Former RAF Sealand Site EIA Environmental Statement - Non Technical Summary February 2012 in association with P a g e 1 1. Introduction Praxis (Holdings) Ltd. is applying to Flintshire
More informationEnvironmental Impact Assessment for Waterway Restoration Projects. Chris John, Technical Director Ecus Ltd.
Environmental Impact Assessment for Waterway Restoration Projects Chris John, Technical Director Ecus Ltd. Environmental Impact Assessment for Waterway Restoration Projects What is Environmental Impact
More informationWELCOME. Welcome and thank you for visiting today.
WELCOME Welcome and thank you for visiting today. Bellway Homes Ltd (Yorkshire) are preparing a reserved matters planning application for a residential development of 293 homes at land North of Yew Tree
More informationDEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental
DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics
More informationM4 Corridor around Newport Environmental Statement Volume 3: Appendices
Environmental Statement Volume 3: Appendices Environmental Statement Volume 3: Appendices At Issue March 2016 CVJV/AAR 3 rd Floor Longross Court, 47 Newport Road, Cardiff CF24 0AD Volume 3: Contents 1
More informationPANSHANGER QUARRY, Hertfordshire
PANSHANGER QUARRY, Hertfordshire Proposed enhanced restoration of Phases F & H Briefing Note 1 March 2015 INERT (INACTIVE) RESTORATION MATERIALS, CONTROLS AND OPERATIONS 1 Introduction This briefing note
More informationThornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016
Thornton Road, Pickering Environmental Statement Non-Technical Summary January 2016 EIA Quality This Environmental Statement, and the Environmental Impact Assessment (EIA) carried out to identify the significant
More informationLongbridge Town Centre Phase 2 Planning Application
Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham
More informationRe-location of Rugby Farmers Mart
Re-location of Rugby Farmers Mart LaSalle Investment Management Barberry Logo here Environmental Statement Non-Technical Summary August 2017 Re-location of Rugby Farmers Mart Non-Technical Summary Report
More informationLAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP
LAND AT WEST YELLAND Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP May 2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft FINAL Date
More informationPINEWOODS HOLIDAY PARK: HORSE PADDOCK. Non-Technical Summary
PINEWOODS HOLIDAY PARK: HORSE PADDOCK June 2014 1 Introduction 1.1 The existing Pinewoods Holiday Park is located approximately 1 km to the north of Wells-nextthe-Sea on the north Norfolk coast. Pinewoods
More informationLAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY
LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY May 2016 CONTENTS CONTENTS... i 1 Introduction... 1 2 The Proposed Development... 3 3 Need and Alternatives
More informationSouth Whitehaven, Cumbria EIA
South Whitehaven, Cumbria EIA Environmental Statement - Non Technical Summary June 2013 in association with 1. Introduction Story Homes is applying to Copeland Borough Council (CBC) for a new residential
More informationSchedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:
Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the
More informationAppendix 1 Structure plan guidelines
Appendix 1 Structure plan guidelines This appendix forms part of the regional policy statement [rps]. 1.1. Introduction Structure plans are an important method for establishing the pattern of land use
More informationLower Herne Village Hollamby Estates (2005) Ltd Environmental Statement Non-Technical Summary June 2015 INSERT PICTURE HERE
Environmental Statement Non-Technical Summary June 2015 INSERT PICTURE HERE Table of Contents 1 INTRODUCTION 1 2 SITE LOCATION AND PROPOSED DEVELOPMENT 3 3 THE ASSESSMENT 8 4 CONCLUSIONS 16 5 WHAT HAPPENS
More informationWelcome to our exhibition
Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes
More informationROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document
ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL
More informationElvetham Chase, Fleet. Environmental Statement: Non-Technical Summary. November New Fetter Lane London EC4A 1AZ United Kingdom
Elvetham Chase, Fleet Environmental Statement: Non-Technical Summary November 2016 A Ne w F e tte r P lace 8-10 New Fetter Lane London EC4A 1AZ United Kingdom T +44 (0) 20 7467 1470 F +44 (0) 20 7467 1471
More informationABOUT CALA HOMES CALA HOMES
WELCOME Welcome to this public consultation event for our proposed development on land to the east of Salisbury Road, in Hungerford. Thank you for taking the time to come along today. Homes and Wates Developments
More informationSOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)
SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) 1 DONINGTON S PLACE IN THE SPATIAL STRATEGY 1.1 Policy 2 of the South East Lincolnshire Local Plan 2011-2036 Draft for Public Consultation
More informationLAND NORTH OF NETHERHOUSE COPSE, FLEET
REPORT N O 70020067 LAND NORTH OF NETHERHOUSE COPSE, FLEET ENVIRONMENTAL STATEMENT VOLUME 3:NON-TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT PUBLIC JUNE 2016 LAND NORTH OF NETHERHOUSE COPSE, FLEET
More informationƱ ± ªº Œª ºª ø ª ª ± ª
Ʊ ± ªº Œª ºª ø ª ª ± ª ø º Õ± ± ± Œ±øºÙ Õ ß Æª ø檺 ±Æ ƪ ø檺 æß Æ± Ʊ ª ø ø fl ª ª ± ê ø Õ øæß ª ª æªæ Ó ÔÌ Non-Technical Summary Introduction A planning application has been submitted to the Vale
More informationCauseway Farm, Petersfield Environmental Statement Non-Technical Summary October 2015
Causeway Farm, Petersfield Environmental Statement October 2015 2 Contents 1.0 Introduction... 1 1.1 Background... 1 1.2 Environmental Assessment... 1 1.3 Site Description... 3 2.0 The Proposals... 6 2.1
More informationRannoch 132 / 33 kv Substation Extension
Who we are Scottish and Southern Energy Power Distribution is part of the SSE plc group of companies. We own, maintain and invest in the networks in the north of Scotland the electricity transmission network
More informationWyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015
Wyvern Park Skipton Environmental Statement Non-technical Summary - April 2015 BWB Consulting Ltd Whitehall Waterfront 2 Riverside Way Leeds LS1 4EH Telephone: +44(0)113 233 8000 Copyright This Report
More informationBurgess Hill, Land South of Freeks Farm Phase 1 of Burgess Hill Northern Arc East Environmental Statement Non-Technical Summary September 2016
Burgess Hill, Land South of Freeks Farm Phase 1 of Burgess Hill Northern Arc East Environmental Statement September 2016 Contents 1.0 Introduction... 1 1.1 Background... 1 1.2 Environmental Assessment...
More informationWiltshire Council s Core Strategy
HAWKE Wiltshire Council s Core Strategy 2006-2026 As part of its Core Strategy (master plan), Wiltshire Council needs to find areas to develop for employment purposes up to 2026. This land was first suggested
More informationStatement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE
LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback
More informationRef: A073350/SM/sm Date: 13 September 2013
Ref: A073350/SM/sm Date: 13 September 2013 Ian Parkinson Development Control Team Leader Planning Portsmouth City Council Civic Offices Guildhall Square Portsmouth PO1 2AY Dear Ian LIGHT & GLEAVE VILLA
More informationSouth Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017
South Macclesfield Development Area Environmental Statement March 2017 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description... 2 2.0 The Proposals...
More informationHARDWICK GREEN, King s Lynn. Welcome to our Exhibition. What are your views? Introduction to the site and proposals. About us
HARDWICK GREE, King s Lynn Welcome to our Exhibition Welcome to our exhibition, which is being held to provide you with the opportunity to understand and comment upon our proposals for new residential
More informationNON-TECHNICAL SUMMARY
Hybrid outline/detailed planning application comprising an outline planning application for 196 residential dwellings, landscaping, open space, estate roads and infrastructure, plus 4 permanent gypsy and
More informationLAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433
LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2017 Our Ref: Q70433 Contents 1 INTRODUCTION... 2 2 SITE DESCRIPTION... 5 3 EIA METHODOLOGY...
More informationUnity Square, Nottingham Environmental Statement Non Technical Summary December 2013
Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 in association with 1. Introduction Peel Holdings is applying to Nottingham City Council (NCC) for Outline planning
More informationEnvironmental Statement (Volume 1) Non Technical Summary
Environmental Statement (Volume 1) Non Technical Summary Prepared by: The Environment Partnership Haydock Point Environmental Statement (Volume 1): Non-Technical Summary March 2017 Contents 1. Introduction
More informationand Netherhall Road and Camp Farm EIA
and Netherhall Road and Camp Farm EIA Environmental Statement - Non Technical Summary December 2012 in association with 1. Introduction Story Homes applied to Allerdale Borough Council (ABC) in May 2011
More informationBloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY
Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY December 2016 Environmental Statement: Non-Technical Summary Stubbocks Walk, North Hertfordshire J S Bloor
More informationSustainability Statement. Whitby Business Park Area Action Plan
Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan
More informationvolume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08
DESIGN MANUAL FOR ROADS AND BRIDGES volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08 glossary of terms Used in DMRB Volume 11, Sections 1 and 2 SUMMARY This
More informationA6 to Manchester Airport Relief Road
Document Control Sheet A6 to Manchester Airport Relief Road Volume 1 - - Non Technical Summary 1007/6.15.2/188 October 2013 Contents Document Control Sheet... i Contents... ii 1... 4 1.1 Introduction...
More informationES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd
Drakelow Park ES 5 Environmental Statement Volume 5: Non Technical Summary Lead Author Waterman Energy, Environment and Design Ltd April 2009 Environmental Statement Volume 5: Non-Technical Summary DRAKELOW
More informationHounsome Fields, Basingstoke Environmental Statement Non- Technical Summary. For Wates Developments Ltd and Pellipar Investments Ltd
Hounsome Fields, Basingstoke Environmental Statement Non- Technical Summary For Wates Developments Ltd and Pellipar Investments Ltd December 2015 Contents 1 Introduction 3 2 The Proposals 8 3 Environmental
More informationLand at Rampton Road. Cottenham
Land at Rampton Road Cottenham Introduction TEP is preparing an outline planning application for 54 dwellings on 6.9 hectares of land adjacent to Rampton Road, Cottenham on behalf of the owners Cambridgeshire
More informationSouth Oxford Garden Neighbourhood Environmental Impact Assessment Scoping Report
Environmental Impact Assessment Scoping Report Prepared by Savills for Magdalen Development Company and Thames Water Property March 2016 Document Control Document title: Project: Client: Job number: File
More informationHS2 Environment. Protecting the environment
HS2 Environment Protecting the environment Approach to mitigation EIA Regulations require an ES to include a description of the measures envisaged in order to avoid, reduce and, if possible, remedy significant
More informationVALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd.
VALLEY PARK, DIDCOT Non-Technical Summary December 2014 On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd. CONTENTS 1 Introduction... 2 2 The Proposed Development...
More informationPublic Consultation. Land at Monks Farm, North Grove. Welcome
Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open
More information8.0 Design and Form of Development 43/
42/ 8.0 Design and Form of Development 43/ Rothwells Farm, Golborne/ Development Statement Figure 7. Site Constraints Key 44/ Site Boundary 360 Bus Route/Stops Existing Trees Underground Water Pipe Sensitive
More informationCardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement
Greenbank Partnerships Ltd October 2012 Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Environmental Statement - Non Technical
More informationCopyright Nigel Deeley and licensed for reuse under this Creative Commons Licence
1 Copyright Nigel Deeley and licensed for reuse under this Creative Commons Licence Prepared by the Neighbourhood Plan Steering Group on behalf of Garway Parish Council with assistance from 2 Table of
More informationCENTRAL BEDFORDSHIRE COMMITTED TO WORKING TOGETHER WITH LOCAL COMMUNITIES
WELCOME Thank you for coming to our consultation event to find out more about our emerging proposals for Hayfield Park, a residential development jointly promoted by the Hayfield Consortium: Martin Grant
More informationMoat Lane Regeneration Project Environmental Statement
AECOM Environment Towcester Regeneration Ltd. October 2012 Moat Lane Regeneration Project Environmental Statement Non-Technical Summary Prepared by:... Checked by:... Sophie Collins Scott Wilson Environmental
More informationMeridian Water Phase 1 Application
Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed
More informationReserved Matters application for a site that straddles the boundary between CBC and BBC
BBC APPLICATION 15/02682/MAR NUMBER CBC APPLICATION CB/15/04294/RM NUMBER LOCATION Wixams Land at former storage depot, Bedford Road, Wilstead Bedfordshire PROPOSAL Reserved Matters Application for Strategic
More informationRequest for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire
Request for a Scoping Opinion by Provectus Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire January 2012 Contents 1 Introduction & Background... 1 2 Site
More informationvolume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments
DESIGN MANUAL FOR ROADS AND BRIDGES volume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments SUMMARY This Advice Note provides
More informationSite Assessment Technical Document Appendix A: Glossary
Central Bedfordshire Council www.centralbedfordshire.gov.uk Site Assessment Technical Document Appendix A: Glossary July 2017 1.1.11-1 - ii Appendix A: Glossary Term Agricultural Land Classification AONB
More informationPerth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager
Perth and Kinross Council Development Management Committee 8 June 2016 5(3)(i) 16/259 Pre-Application Report by Development Quality Manager Residential development at St Martins Road, Land 120 metres West
More informationApplication Recommended for Approval Hapton with Park Ward
Application Recommended for Approval Hapton with Park Ward APP/2017/0036 Outline Planning Application Outline application for the construction of a new 3 bedroom dwelling (with all matters reserved for
More informationCarterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.
Welcome Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of. We are at the early stages of designing our proposals and have a number
More informationWELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of
WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high
More informationLAND WEST OF ST ANDREWS ROAD
LAND WEST OF ST ANDREWS ROAD ENVIRONMENTAL STATEMENT VOLUME 3 - NON-TECHNICAL SUMMARY Submitted by Nathaniel Lichfield & Partners on behalf of Redrow Homes Limited July 2014 Applicant: Consultant Team:
More informationE16: MAINTENANCE OF LANDSCAPED AREAS
HIGH SPEED TWO INFORMATION PAPER E16: MAINTENANCE OF LANDSCAPED AREAS This paper outlines the proposed approach to the maintenance of landscaped areas created for HS2 Phase One. It will be of particular
More informationNRP North Environmental Statement Non Technical Summary. Norwich Research Park North Environmental Statement Non Technical Summary.
Norwich Research Park North Environmental Statement Non Technical Summary Non Technical Summary Introduction The Norwich Research Park (NRP) is an important component of the East of England life sciences
More informationDevelopment of Land at Thorp Arch Estate, Wetherby. Environmental Statement Non-Technical Summary July 2013
Development of Land at Thorp Arch Estate, Environmental Statement July 2013 Contents 1. Introduction... 3 1.1 Background... 3 1.2 Environmental Assessment... 3 1.3 Site Description... 4 2. The Proposals...
More informationWelcome to our public exhibition
About our development Welcome to our public exhibition This public exhibition gives you the opportunity to view and comment on our proposals to create a new residential development on land adjacent to
More informationLONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY
LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2
More informationOngar. Residential Sites. Vision for Ongar
5.58 Located in the east of the district, is a District Centre of medieval origin that boasts a retail and service offer benefiting the local community and those in other settlements further afield. 5.59
More informationDEVELOPMENT MANAGEMENT REPORT
ITEM A07-1 DEVELOPMENT MANAGEMENT REPORT TO: BY: Development Management Committee (South) Development Manager DATE: 21 June 2016 DEVELOPMENT: SITE: WARD: APPLICATION: APPLICANT: Outline application for
More informationA payment of 1080 is due in this instance, for a meeting and follow up written response, and will be made by card over the phone.
JPPC ref: AG/6002 18 th September 2014 Planning Services Vale of White Horse District Council Benson Lane Crowmarsh Gifford Wallingford OX10 8ED Dear Sir/Madam REQUEST FOR PRE-APPLICATION ADVICE RE: RESIDENTIAL
More informationVelindre Cancer Centre Environmental Statement Vol.1: Environmental Statement Text. Chapter 1: Introduction
Velindre Cancer Centre Environmental Statement Vol.1: Environmental Statement Text Chapter 1: Introduction Draft - March 2017 Prepared by: Address: Email: Website: Mott McDonald, The Urbanists and HLM
More informationWelcome to our public exhibition
About our development Welcome to our public exhibition This exhibition gives you the chance to view and comment on our proposals for a new residential development of 165 high-quality homes, along with
More informationLand East of Horndean, Hampshire. Environmental Statement Non-Technical Summary October 2014
Land East of Horndean, Hampshire Environmental Statement October 2014 Contents 1.0 Introduction... 1 1.1 Background... 1 1.2 Environmental Assessment... 1 1.3 Site Description... 3 2.0 The Proposals...
More informationSite north of Hattersley Road West (east of Fields Farm Road), Hattersley
Application Number 17/00982/REM Proposal Site Applicant Recommendation Reason for report Application for the approval of reserved matters (means of access, landscaping, layout, scale and appearance) relating
More informationMAIDSTONE MEDICAL CAMPUS LTD LAND AT NEWNHAM PARK, MAIDSTONE
MAIDSTONE MEDICAL CAMPUS LTD LAND AT NEWNHAM PARK, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Maidstone Medical Campus Ltd is applying to Maidstone Borough Council for
More informationi.6 Under this Key Area of Change the Daresbury Strategic Site will deliver:
I.0 NON-TECHNICAL SUMMARY Introduction i.1 Redrow Homes NW Ltd is applying to Halton Borough Council for planning permission for the development of up to 300 high quality residential dwellings, including
More informationThe Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary
1 The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary 1. Introduction This report summarises the results of an assessment that has been undertaken to determine how a proposed
More informationNeighbourhood Planning Site Assessment Pro-forma and Guide Version 2
Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2 September 2014 Site HNP 006 Land East of Stanbridge Road and North of Lower Road 1. Background information Site location and use Site
More informationLonghorsley Neighbourhood Plan
Site Assessment 1. The availability of the site 1.1 Is the land owner willing for their site to be made available for development? 1.2 If yes, do you have any written evidence to back this up? Planning
More informationSOUTH WOKINGHAM STRATEGIC DEVELOPMENT LOCATION PUBLIC CONSULTATION
01 WELCOME Croudace Homes, Gleeson Strategic Land, Kier Ventures, Lightwood Strategic and Miller Homes are delighted to welcome you to this public exhibition. Proposals for the site have been developing
More informationFollingsby Park South Environmental Statement: Volume 1: Non Technical Summary (March 2018)
Follingsby Park South Environmental Statement: Volume 1: Non Technical Summary (March 2018) 1.0 Introduction and Methodology 1.1 This document is a summary in non-technical language of an Environmental
More informationList of Policies. SESPlan. None applicable. Consolidated Scottish Borders Local Plan 2011: POLICY G1 - QUALITY STANDARDS FOR NEW DEVELOPMENT
List of Policies Local Review Reference: 15/00021/RREF Planning Application Reference: 15/00616/FUL Development Proposal: Installation of 16no solar photovoltaic (PV) panels to roof Location: Raebank,
More informationPROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM
PROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM PUBLIC CONSULTATION YOUR VIEW MATTERS TO US LOCATION PLAN Thank you for taking the time to read this information leaflet regarding a proposed residential
More information