1 60 South Broadway Rezoning Project City of White Plains Westchester County, NY Final Generic Environmental Impact Statement

2 60 SOUTH BROADWAY CB-3 REZONING FINAL GENERIC ENVIRONMENTAL IMPACT STATEMENT (FGEIS) Submitted: Accepted: October 6, 2014

3 FINAL GENERIC ENVIRONMENTAL IMPACT STATEMENT (FGEIS) 60 SOUTH BROADWAY CB-3 REZONING 60 South Broadway City of White Plains, Westchester County, New York Lead Agency: City of White Plains Common Council City of White Plains 255 Main Street, White Plains, NY Contact: Hon. Thomas M. Roach, Mayor (914) Applicant: Urstadt Biddle Properties, Inc. 321 Railroad Avenue Greenwich, CT Contact: John Cannon (203) Prepared by: See following page Date DGEIS Accepted: July 7, 2014 Date of Public Hearing: August 4, 2014 and September 2, 2014 Closing Date of Comment Period: September 12, 2014 Date FGEIS Submitted: Date FGEIS Accepted: October 6, 2014 Web address for electronic copy of this FGEIS: cityofwhiteplains.com

4 LIST OF PREPARERS Planner BFJ Planning 115 5th Avenue New York, NY (212) Contacts: Sarah K. Yackel, AICP, Principal Isabel Aguirre-Martinez, Planner Georges Jacquemart, PE, AICP, Principal Lauren Rennée, Planner Legal Counsel Cuddy & Feder LLP 445 Hamilton Avenue, Fourteenth Floor White Plains, New York (914) Contact: William S. Null, Esq. Architect Perkins Eastman 422 Summer Street Stamford, CT (203) Contact: Stuart Lachs, Principal Socioeconomic Consultant Urbanomics 115 5th Avenue New York, NY (212) Contact: Tina Lund, AICP, Principal Civil Engineer The Chazen Companies 21 Fox Street Poughkeepsie, NY (845) Contact: Chris Lapine

5 TABLE OF CONTENTS 1.0 INTRODUCTION GENERIC ENVIRONMENTAL IMPACT STATEMENT 1.2 PROPOSED ACTION 2.0 CHANGES TO THE PROPOSED ACTION COMMENTS AND RESPONSES ON THE DRAFT GENERIC ENVIRONMENTAL IMPACT STATEMENT PUBLIC HEARING AND COMMENT PERIOD PROCESS 3.2 PUBLIC COMMENTS AND RESPONSES LIST OF FIGURES Figure 1-1: Figure 1-2: Figure 1-3: Figure 1-4: Regional Location Site Location Map Existing Zoning Map Proposed Zoning Map APPENDIX Appendix A: Zoning Petition Appendix B: Public Hearing Transcripts and Written Comment Letters iv

6 1.0 INTRODUCTION This document is the Final Generic Environmental Impact Statement (FGEIS) for the 60 South Broadway Rezoning project ( the Proposed Action ). Urstadt Biddle Properties, Inc., the owner of 60 South Broadway ( the Project Site ), is requesting an amendment to the City of White Plains Zoning Ordinance to re-map the property s zoning classification from the B-6 District to the CB-3 District and to extend the boundary of the Central Parking Area ( the CPA ) to include the Project Site. The Common Council is the State Environmental Quality Review (SEQR) lead agency for the Proposed Action. This FEIS addresses all substantive comments made on the Draft Generic Environmental Impact Statement (DGEIS) during the DGEIS public hearing and DGEIS comment period. Those comments are summarized and responded to in Chapter 3.0, Comments and Responses on the Draft Generic Environmental Impact Statement. At its July 1, 2013 meeting, the Common Council adopted an environmental findings resolution whereby the Common Council (a) designated itself Lead Agency for the environmental review of the Proposed Action; (b) determined that the Proposed Action is a Type I Action under SEQR regulations; and (c) determined that an Environmental Impact Statement must be prepared for the Proposed Action to systematically assess potential impacts, alternatives and measures to mitigate potential impacts. At its September 3, 2013 meeting, the Common Council adopted a resolution which: (a) reconfirmed that an EIS must be prepared for the Proposed Action, as modified by the August 19, 2013 communication from the Applicant s representative; (b) determined the revised Scoping Outline dated _ to be adequate for the purpose of commencing public review and comment regarding issues to be addressed in the DGEIS; and (c) scheduled a comment period to receive written comments regarding the Scoping Outline until September 27, At its October 7, 2013 meeting, the Common Council adopted the Scoping Outline as the Final Scope of Work for the Preparation of a Draft Generic Environmental Impact Statement for the 60 South Broadway Rezoning Project (the Final Scope of Work ). On July 7, 2014, the White Plains Common Council accepted the DGEIS dated July 2, 2014, as adequate for the purpose of commencing public review and comment regarding issues addressed in the Final Scope of Work for the Proposed Action. A public hearing regarding the DGEIS was held on August 4, 2014, adjourned to September 2, 2014 and, then, closed following public comment. Written comments regarding the DGEIS were 1

7 accepted for a total of 66 days, from July 7, 2014 to September 12, 2014, including a 10-day period following the close of the public hearing. This Final Generic Environmental Impact Statement (FGEIS) has been prepared pursuant to the State Environmental Quality Review Act (SEQR) and its implementing regulations (6 NYCRR Part 617). Under those regulations, the FGEIS serves as the basis for the Lead Agency Findings. This FGEIS has been prepared to respond to all significant environmental comments made on the Draft Generic Environmental Impact Statement (DGEIS). In accordance with Section 617.9(b) (7) of the SEQR regulations, this FGEIS incorporates by reference the DGEIS. The Proposed Action analyzed in the DGEIS is the request, on behalf of Urstadt Biddle Properties, Inc. ( Applicant ), for the following amendments to the City of White Plains Zoning Ordinance ( Proposed Action ): 1) Re-Mapping of premises located at 60 South Broadway known and designated on the Tax Assessment Map of the City of White Plains as Section , Block 3, Lot 1 (also known as the Westchester Pavilion ) from the B-6 (Enclosed Mall) District into the CB-3 (Core Business 3) District; and (2) Extension of the boundary of the Central Parking Area ( CPA ) to include the 60 South Broadway site ( Project Site ). This FGEIS is organized into three sections: Section 1.0 describes the Proposed Action and the purpose of the Generic Environmental Impact Statement. Section 2.0 describes any changes that have been made to the Proposed Action in response to concerns raised during the public comment period; and Section 3.0 contains a summary of all written comments and comments received at the public hearing and provides responses to each of those comments (public and agency comment letters and public hearing transcripts are located in Appendix B). 1.1 Generic Environmental Impact Statement Importantly, the Proposed Action is legislative and generic in nature, not project-specific, and does not directly result in physical changes to the environment. The proposed rezoning and extension of the CPA would affect the size, type and form of development permitted to be developed on the Project Site. As such, the Proposed Action is generic in nature in that it is not a specific development change, but rather a regulatory change that would alter the range of future development options for the Project Site. As a result, this Environmental Impact Statement (EIS) was prepared as a Generic Environmental Impact Statement (GEIS) in accordance with NYCRR Section A GEIS, according to the New York State Department of Environmental Conservation (NYSDEC) SEQR handbook, is a type of EIS that is more general than a site-specific EIS, and typically is used to consider broad- based actions or related groups of actions that agencies are likely to approve, fund, or directly undertake A Generic EIS differs from a site or project specific EIS by being more general or 2

8 conceptual in nature The DGEIS presented estimates of a range of potential impacts utilizing alternative development scenarios that could result if the Proposed Action were adopted. It is important to note that the conceptual plans appended to the Zoning petition (see FGEIS Appendix A) are theoretical in nature and present alternative potential redevelopment options that could occur under the CB- 3 rezoning, but many potential development options exist and a final detailed site plan may be of a similar design or may have a different design as the CB-3 District allows for a range of potential development scenarios. As a result, the analysis in the DGEIS considered the maximum permitted development within the proposed zone (CB-3) for the Project Site and three maximum build-out scenarios. The DGEIS studied development impacts for various uses under the maximum build-out scenarios that present the worst-case scenario for each technical area of assessment (see DGEIS Chapter 3.0). Each technical section included a discussion of the scenario considered and why it constitutes the worst case for that specific development use or configuration. Finally, the DGEIS identified analyses that will be required at the time a sitespecific development project is proposed (see DGEIS Chapter 6.0: Future Actions). Upon approval of the Proposed Action, any future redevelopment of the 60 South Broadway site under the new zoning scheme will be subject to Site Plan review and approval by the Common Council of the City of White Plains, including project-specific review of any potential impacts associated with the proposed redevelopment project under SEQR. It is at this time that sitespecific review of environmental impacts will be required. 1.2 Proposed Action Project Location The Applicant is the owner of approximately 3.58 acres (156,016 square feet) of real property located at 60 South Broadway, a site commonly known as the Westchester Pavilion and referred to herein as the Project Site. The Project Site is bounded on the northerly side by land containing the Westchester One office building at 44 South Broadway, on the southerly side by Maple Avenue (with approximately 360 feet of frontage), on the easterly side by Hale Avenue (with approximately 400 feet of frontage), and on the westerly side by South Broadway (with approximately 500 feet of frontage). The Project Site is located in Downtown White Plains approximately one-mile southeast of the White Plains TransCenter, which provides access to mass transit, including the Metro-North railroad and Westchester County Beeline bus transportation, among other things. Please see Figure 1-1: Regional Location Map and Figure 1-2: Project Site Map. 3

9 Project Site 60 South Broadway Rezoning FGEIS WHITE PLAINS NY Figure 1-1: Regional Location source: Urbanomics, 2013

10 60 South Broadway Rezoning fgeis Figure 1-2: site location map Westchester one White Plains, NY source: perkins eastman

11 Existing Zoning and Land Use The Project Site is mapped in the B-6 (Enclosed Mall) District and is improved with the Westchester Pavilion, an enclosed mall which contains approximately 209,874 gross square feet of retail and restaurant space (194,874 SF) and administrative office space (15,634 SF) and 634 parking spaces in a structured garage. The Westchester Pavilion covers 100% of the Project Site s land area. The Project Site is situated within Downtown White Plains in the designated Core Area, as defined in the City of White Plains 1997 Comprehensive Plan and 2006 Plan Update. It also abuts the Central Parking Area ( CPA ), which encircles the Core Area and continues south from the Project Site along South Broadway to Maple Avenue and then turns westerly toward Mamaroneck Avenue. Please see Figure 1-3: Existing Zoning Map, which shows the Project Site and the CPA boundary. Zoning Map Amendments The Applicant is requesting that the Common Council of the City of White Plains remap the Project Site from the existing B-6 (Enclosed Mall) District to the CB-3 (Core Business 3) District. The B-6 District permits a maximum Floor Area Ratio ( FAR ) of 2.5, outside of the CPA and an FAR of 6.00 within the CPA, whereas the CB-3 District would permit a maximum FAR of 5.5 if the proposed FAR for the development included fifty percent (50%) or more as residential uses, given the size of the Project Site and its frontage on two streets; an FAR of 3.0 is permitted for developments containing less than 50% residential. The change in District classification from the B-6 District to the CB-3 District would facilitate residential and hotel development, among other things, that currently are not permitted in the B-6 District. The Proposed Action would not only allow for a greater range of uses on the site, but would also allow for the development of taller (maximum of 280 in the CB-3 versus a maximum of 90 in the B-6) and lower coverage (85% lot coverage in the CB-3 versus 100% lot coverage in the B-6). The map of the Proposed Rezoning is included as Figure 1-4. In addition, the Applicant is requesting that the Common Council extend the boundary of the CPA to encompass the Project Site running easterly to Hale Avenue and then southerly to Maple Avenue (see Figure 1-4: Proposed Zoning). The location of the Project Site in the downtown core and in proximity to mass transit, as well as the provision of the required on-site parking supports the realignment of the CPA boundary to include the Project Site. Importantly, the Zoning Ordinance generally provides a lower requirement for parking and loading areas when properties are classified in the B-6 District with regard to the following uses: retail, restaurants, offices, personal services, theaters, real estate offices, consumer financial service establishments, bars, cabarets, and cafeterias. 6

12 60 South Broadway Rezoning fgeis Figure 1-3: Existing Zoning Map Project site study area boundary (1/4 mile) central parking area boundary.25 miles.5 miles White Plains, NY source: bfj planning

13 60 South Broadway Rezoning fgeis Figure 1-4: proposed Zoning Map CB-3 Project site study area boundary (1/4 mile) central parking area boundary White Plains, NY source: bfj planning

14 The Project Site is currently subject to the lower parking requirements applicable to the B-6 District (e.g., 3 spaces/1,000 square feet of gross floor area (GFA) for retail or restaurant for the B-6 District, as compared to 3.3 spaces/1,000 square feet in the CPA, or 5.7 spaces/1,000 square feet for retail outside of the CPA). The B-6 District also has lower requirements for loading. Thus, reclassifying the Project Site to the CB-3 District, without placing it within the CPA, would substantially increase its on-site parking burden, which would increase the cost of development and could detrimentally affect its redevelopment potential. The inclusion of the Project Site within the CPA also would encourage multi-use development thereon, including multiple dwellings, strengthening the urban environment and its economy and bringing pedestrian traffic and vitality to the downtown. With regard to residential uses, sites not located within the CPA have higher parking requirements sites in the CPA. The lower CPA parking requirement reflects both better access to public transportation options and the greater availability of public parking facilities in the downtown area 9

15 2.0 CHANGES TO THE PROPOSED ACTION No changes have been made to the Proposed Action (as described above) since acceptance of the DGEIS by the City of White Plains Common Council on July 7,

16 3.0 COMMENTS AND RESPONSES ON THE DRAFT GENERIC ENVIRONMENTAL IMPACT STATEMENT 3.1 Public Hearing and Comment Period Process The public comment period on the DGEIS opened on July 7, 2014 and extended through September 12, Written comments were received from the public during this time and submitted to the White Plains Common Council. A public hearing on the DGEIS was also held on August 4, 2014 and continued to and closed on September 2, 2014 in the Common Council Chambers, White Plains Municipal Building, 255 Main Street, White Plains, New York. Concurrent with the DGEIS public hearing, the public hearing on the Zoning petition (see Appendix A) was also opened on August 4, 2015 and continued to and closed on September 2, No public comments were made on the Proposed Action during the concurrent DGEIS or Zoning public hearings held on September 2, This FGEIS includes responses to comments received during both the DGEIS and Zoning public hearings and to written comments received during the comment period. 3.2 Comments and Responses The following summarizes and responds to substantive comments received on the DGEIS and Proposed Action; copies of all DGEIS comments received, including transcripts from the public hearing, are provided in Appendix B. A summary of the substantive comments made in each of the referenced comment letters and public testimony is presented in this section, where applicable, and a response to each substantive comment is also provided. Table 3-1: Commenters at the Public Hearing on August 4, 2014 and September 2, 2014 Speaker Affiliation Date of Comments 1. Claudia Murphy Resident of 60 DeKalb Avenue and Small Business Owner 2. Ken Kristal President, Resident of 24 Carhart Avenue and Carhart Neighborhood Association DGEIS public hearing, August 4, 2014 Zoning public hearing, August 4, Claudia Murphy Resident of 60 DeKalb Avenue and Small Business Owner Zoning public hearing, August 4,

17 Table 3-2: Written Comments Received on the DGEIS Letter Author Author Affiliation Date of Letter 1. Edward Buroughs, AICP Westchester County Planning Board August 12, David Chong City of White Plains Department of Public Safety July 29, Kent Johnsson City of White Plains Design Review Board August 4, Damon Amadio, PE City of White Plains Department of Building August 21, Elizabeth Cheteny, AICP City of White Plains Department of Planning August 21, Thomas Soyk, PE, PTEO City of White Plains Department of Parking, Traffic Division August 21, Michael Quinn City of White Plains Planning Board August 21, Thomas Soyk City of White Plains Transportation Commission August 21, John Larson City of White Plains Department of Parking September 2,2014 Verbal Comments 1. Claudia Murphy, Resident of 60 DeKalb Avenue and Small Business Owner, Comment made during DGEIS Public Hearing, August 4, Comment: One concern is I know that the City has already taken care of the storm drain issue on Maple around the Westchester Mall area to Bloomingdale Road. I have noticed in the past few storms that the water issue continues up Maple towards Mamaroneck; you see the water coming up through the sewer covers, as well as in my building. You know we constantly are clearing out our drainage into our garage, but when there is a storm like we've had in the past few weeks, we get a wash-up into our garage, and into our courtyards. So I'm hoping that this project is passed at some capacity and that the zoning is changed, but also, that those situations would be mitigated if it is going to be a large residential-type place. 1-1 Response: The Applicant will be required to prepare a Storm Water Pollution Prevention Plan (SWPPP) as well as to mitigate all impacts identified due to the construction or ongoing operation of the project, as directed by the City of White Plains and/or the Westchester County Department of Health. This will include, but not be limited to storm water, sanitary sewer, potable water, etc. to prevent an increased risk of flooding to surrounding and downstream properties. Any attempt to construct building levels below grade, beneath the water table, cannot result in active pumping or a gravity transfer of groundwater into the City s storm drainage system. Further, the applicant utilized 24-hour rainfall data (in inches) from The latest informal New York State data (soon-to-be-adopted) informs design engineers to expect more rainfall, reflecting the increases and intensity of storms associated with climate change. In addition, in contrast to the 1961 statewide data, the new data is tailored to Westchester County. 12

18 1-2 Comment: We've spoken in the past about the parking in our neighborhood. A lot of people don't want to pay to park in the malls and the stores like that, so we just want to make sure that the island is maintained down the center of Maple Avenue, so that you cannot make that left-hand turn up to DeKalb and park for free on our street. 1-2 Response: Following the adoption of the Proposed Action, any specific development plans proposed for the Project Site would be subject to Site Plan review by the City of White Plains Common Council and project-specific review under SEQR. As such, any alteration to area roadways or intersections, and any associated impacts, would be assessed during this future review process and will require approval from the City Department of Public Works, as well as the Westchester County Department of Public Works. Both the Site Plan review process and the SEQR process include opportunities for public comment. 2. Ken Kristal, Resident of 24 Carhart Avenue and President, Carhart Neighborhood Association, Zoning Public Hearing, August 4, Comment: I'm the President of the Carhart Neighborhood Association. We held a board meeting recently on this particular topic, because we ve known that it was coming before you. And then we polled the members of the Carhart Association, and there was virtual unanimity in terms of being in favor of changing the zoning from the current enclosed mall to the central CB-3 district multiple use. You know we have our normal concerns, particularly about traffic, pollution, parking and the aesthetic in terms of the height, because we understand from the DGEIS that the heights can go from 90 feet up to 280 feet. We're not particularly convinced of the tentative plans that were shown, so the aesthetic in terms of how the final site plan will be presented, you know, we will follow it. And we trust that it would be adequately addressed at that time, and that we would have an opportunity to speak when a final plan is presented. 2-1 Response: Following the adoption of the Proposed Action, any specific development plans proposed for the Project Site would be subject to Site Plan review by the City of White Plains Common Council and project-specific review under SEQR. The Site Plan review process will include a public review and will allow the public time to comment on any detailed site plan for redevelopment of the Project Site. Regarding the specific impact areas listed by the commentator, any future development proposed on the site under the new zoning would be subject to Site Plan review under Section 7 of the Zoning Ordinance, and would be required to meet the following standards: Section Safe, adequate and convenient vehicular and pedestrian traffic 13

19 circulation both within and without the site, as well as adequate parking and loading facilities, Section A quality of building and the overall site design which will enhance and protect the character and property values of the adjacent neighborhood. 3. Claudia Murphy, Resident of 60 DeKalb Avenue and Business Owner, Comment made during Zoning Public Hearing, August 4, Comment: I would like to speak as a resident and a small business owner. As a resident, when I bought my apartment in 1999, the Border Books mall was a pretty thriving place, and you could walk down to Border Books on a Friday night, get a cup of coffee, have a cappuccino, listen to a jazz band. It was a whole different dynamic. And since a lot of the stores have moved out of that mall, it changes the dynamic of our neighborhood and the walking destinations that we have. 3-1 Response: Consistent with this comment, the proposed CB-3 zoning would allow for residential, hotel, mixed-use and development not currently permitted on the site. 3-2 Comment: As a small business owner, I will tell you that the last four to five new clients that I have gotten over the past few months have been young professionals from Manhattan renting in various apartment buildings in White Plains. I'd say like midthirties to mid-forties, either they have small children or they're going to have small children, and they're looking to White Plains as an alternative from Manhattan. For me, this is great for my business; you know, I can create jobs. If a project like this gets passed, and the zoning gets changed, and there are residential units included in this, I could maybe expand my company, hire a few more employees, or make some of my part- time people full-time. And I'm sure I'm not the only business that would benefit from something like this. I know some of the small business owners on Post Road have been waiting for a project like this to come along for a while. So I'm hoping that you all vote to change the zoning for this, and that we can proceed as soon as possible to get something viable in that space. 3-2 Response: The current zoning limits redevelopment options for the site to predominantly retail and commercial uses. The proposed zoning would allow for a much wider range of uses to be built on the site, including residential, hotel, and mixed-use development. If developed on the site, residential and hotel uses would add a 24/7 population that would enliven the area and support businesses providing goods and services. Written Comments 14

20 1. Edward Buroughs, AICP, Commissioner, Westchester County Planning Board August 12, 2014 letter to City of White Plains 1-1 Comment: The rezoning of this downtown site to change it from a district specific to enclosed malls to another existing zoning district which permits a wider range of uses and development configurations is consistent with the County Planning Board's longrange planning policies set forth in Westchester 2025-Context for County and Municipal Planning and Policies to Guide County Planning, adopted by the County Planning Board on May 6, 2008, amended January 5, 2010, and its recommended strategies set forth in Patterns for Westchester: The Land and the People, adopted December 5, The allowance for residential units and the creation of more mixeduse development in downtown White Plains would continue the trend of directing new development to existing centers, where infrastructure can support growth, where public transportation can be provided efficiently and where redevelopment can enhance economic vitality. 1-1 Response: See response 3-2, above. 1-2 Comment: The subject site has frontage on South Broadway (County Road 87) at its intersection with East Post Road (County Road CR 108). We note that the conceptual site plan shows a proposed roundabout at this intersection (which is currently signalized); however, there is no discussion of this treatment in the draft generic EIS. Any alteration to this intersection will require an approval from the County Department of Public Works and Transportation under Section 239F of the General Municipal Law and must adequately address vehicular capacity, the turning requirements of trucks and buses and the crossing of the streets by pedestrians. We recommend that this approval process and the need for Section 239F submittal be noted in the final generic EIS. 1-2 Response: Following the adoption of the Proposed Action, all actions coming before the City of White Plains Common Council, Planning Board, and Zoning Board of Appeals for redevelopment of the Project Site will be required to follow a project-specific SEQR process. Any future redevelopment activities proposed on the project site would be subject to project-specific approvals, including Site Plan Review and project-specific review under SEQR. As such, any alteration to area roadways or intersections would be subject to the review processes of the appropriate governing jurisdiction. Specifically, should alterations to the intersection of South Broadway and East Post Road (County Road CR 108) be proposed as part of a specific development plan proposed for the site, any such alteration will require an approval from the County Department of Public Works and Transportation under Section 239F of the General Municipal Law and must adequately address vehicular capacity, the turning 15

21 requirements of trucks and buses and the crossing of the streets by pedestrians. 1-3 Comment: In 2013, a Mass Transit Task Force examined the potential to create bus rapid transit (BRT) service across the I-287 corridor and concluded with a set of recommendations for both east-west and north-south services that would intersect in White Plains. Although full detailed routing was not included in the final recommendations, conceptual plans presented a BRT route along South Broadway and Maple Avenue, directly along the frontage of the subject site. The draft generic EIS does not discuss this transit planning process and its potential relationship to development on the site. In fact, the transit discussion is limited to the comment, "it is assumed that the property owner would provide a shuttle service to the White Plains train station." We recommend that the final generic EIS include a discussion of BRT planning, current to the time of its drafting. The document should also include a conceptual discussion of how transit infrastructure (e.g. a new BRT station) and enhanced transit services could, or should, be incorporated into future development plans for the site. 1-3 Response: The New NY Bridge Mass Transit Task Force has recommended a new Bus Rapid Transit (BRT) system as a component of the New NY Bridge, the planned replacement for the Tappan Zee Bridge. The BRT system would improve and expand existing transit system serving Westchester and Rockland Counties with enhanced routing and transit infrastructure. Of the seven proposed alternative routes, four would terminate in Downtown White Plains. Three of these routes, the Red, Navy, and Gold lines, would terminate at The Westchester, located within 1,500 feet of the Project Site. The task force has recommended these routes to travel along South Broadway and Maple Avenue when traveling between The Westchester and TransCenter stations. The routes are expected to operate at 15-minute headways during peak hours. If the BRT system is implemented as recommended, stations will be larger in size than existing bus stops and will be equipped with pre-boarding payment machines and enhanced amenities. The current plan does not propose the construction of dedicated bus lanes or use of Transit System Priority (TSP) technology within the study area. The BRT system, would be developed in phases, with the first phase having an eastern terminus at the former County bus terminal site on Bronx Street on the west side of the railroad tracks. The portion of the BRT east of the Harlem line railroad tracks will likely require a new tunnel under the rail line. A more detailed feasibility study is expected to be conducted by the County within the next five years. The provision of a BRT station adjacent to the Project Site would be beneficial to the project accessibility and would probably reduce its traffic impacts. The implications of a BRT route along South Broadway and Maple Avenue in the area of the Project Site would be reviewed during the site plan approval phase, and, if appropriate, the site plan may maintain sufficient space for a BRT station on one of its sides. 16

22 1-3 Comment: Additional development on the site wills most likely increase sewage flows from the site into the existing infrastructure and will add to the volume requiring treatment at the Mamaroneck Wastewater Treatment Plant operated by Westchester County. As a matter of County Department of Environmental Facilities policy, the County recommends that municipalities require development applicant to offset the projected increase in flow through reductions in inflow/infiltration (I&I) at a ratio of three for one. While the draft generic EIS discusses other improvements that may need to be made to add capacity to existing City-owned infrastructure to allow for additional development on the site, the document does not detail any I&I mitigation. We recommend the County policy on I&I be discussed in the final generic EIS and that the document present conceptual details on how implementation of I&I improvements may be accomplished. For example, will the applicant be required to place funds into a dedicated account for I&I work based on a per gallon cost of removal of flow through I&I? How will I&I projects to be identified? Who will conduct the work and in what timeframe? 1-4 Response: The City of White Plains has not yet identified specific locations for off-site mitigation of inflow and infiltration (I & I) as part of the project. The City of White Plains Department of Public Works has identified areas where improvements will be needed to increase capacity of the existing sanitary sewer infrastructure. As the City s infrastructure is generally in very good condition, (e.g., manholes, pipes/joints, sealed manhole covers), not much infiltration benefit is likely to be derived from replacement pipes. Of course, any development of the Project Site will comply with I & I requirements and attempt to address County goals. 1-5 Comment: The NYC Department of Environmental Protection (NYC DEP) has introduced a demand management program to conserve water. We recommend that the Final Generic EIS reference this program and include a conceptual discussion on water conservation measures that could be considered as part of additional development on the subject site. 1-5 Response: The New York City Department of Environmental Protection (NYC DEP) released its Water Demand Management Plan in 2013, which outlined NYCDEP s plan for implementation of water demand management projects to conserve water between now and As noted in the DGEIS, there are currently no specific development plans for the Project Site and the exact mix of future uses is unknown. Rather, the DGEIS provided analysis for each of the potential impact categories (DGEIS Chapter 3.0) for three potential scenarios: 1) a Maximum Residential Development Scenario; 2) a Maximum Commercial Development Scenario; and 3) a Maximum Mixed-Use Development Scenario. Following the adoption of the Proposed Action, any project-specific development plans for the Project Site would be subject to Site Plan 17

23 review by the City of White Plains Common Council and project-specific review under SEQR. As part of these review processes, the City Department of Public Works would provide recommendations (in the spirit of the NYCDEP water conservation program and similar LEED protocol) related to water conservation measures, including the use of high efficiency toilets, showerheads, faucets, appliances, and other fixtures. 2. David Chong, Commissioner, City of White Plains Department of Safety July 29, 2014 letter to City of White Plains 2-1 Comment: The Department of Public Safety has reviewed these plans. There are no objections. 2-1 Response: The statement of no objection is directed solely to the proposed zoning ordinance amendments. It is important to note that any future development proposed on the site under the new zoning would be subject to Site Plan review under Section 7 of the Zoning Ordinance, including the review of vehicular and traffic safety conditions under Section , the adequacy of fire lanes and other emergency zones under Section , and project-specific SEQR review. 3. Kent Johnsson, Member, City of White Plains Design Review Board August 4, 2014 letter to City of White Plains 3-1 Comment: The Design Review Board reviewed this application and had no comment until Site Plan application has been submitted. 3-1 Response: This statement is directed solely to the proposed zoning ordinance amendments. It is important to note that any future development proposed on the site under the new zoning would be subject to Site Plan review under Section 7 of the Zoning Ordinance, including a review under Section 7.5.4, which addresses project design. Specifically, a proposed project must meet the following standard: A quality of building and the overall site design which will enhance and protect the character and property values of the adjacent neighborhood. 4. Damon Amadio, Commissioner, City of White Plains Department of Building August 21, 2014 letter to City of White Plains 4-1 Comment: We have reviewed the zoning amendment, including the latest text referred to the Building Department on July 23, 2014, and the DGEIS dated July 2nd 2014 and have no objection to the request being granted. 4-1 Response: The statement of no objection is directed solely to the proposed zoning 18

24 ordinance amendments. It is important to note that any future development proposed on the site under the new zoning would be subject to Site Plan review under Section 7 of the Zoning Ordinance, including a detailed review by the Building and Planning Departments to ensure compliance with all zoning requirements, including site plan standards. 5. Elizabeth Cheteny, Commissioner, City of White Plains Department of Planning August 21, 2014 letter to City of White Plains 5-1 Comment: The expansion of permitted uses on the Project Site, as well as additional height and bulk, with limited coverage, would provide the City with opportunities for productive re-use of the Project Site that are in line with the goals of the Comprehensive Plan. The expanded range of permitted uses on the site will give future redevelopments the ability to better respond to market conditions and provide for the type of development that is consistent with development patterns in the downtown and have been expressly stated in the Comprehensive Plan. The Planning Department recommends that the Common Council approve the proposed amendment to the Zoning Ordinance. 5-1 Response: The statement of no objection is directed solely to the proposed zoning ordinance amendments. It is important to note that any future development proposed on the site under the new zoning would be subject to Site Plan review under Section 7 of the Zoning Ordinance, including a detailed review by the Building and Planning Departments to ensure compliance with all zoning requirements, including site plan standards. In addition, project-specific SEQR review will be required. 6. Thomas Soyk, PE, PTOE, City of White Plains Deputy Commissioner, Department of Parking, Traffic Division August 21, 2014 letter to City of White Plains 6-1 Comment: The major traffic concern of allowing a change in zoning for this site would be that future maximum build outs could result in traffic conditions that could not be handled by the existing roadway infrastructure. For the maximum residential and commercial scenarios, the majority of the intersections operate better than under an existing zoning full build out and any negative traffic impacts are minimal and easily mitigated for. 6-1 Response: For all maximum development scenarios, the DGEIS identified potential impacts at various intersections, days, and times. Some or all of such impacts may require mitigation such as changes in signal timing, new roadway infrastructure, or other measures to minimize delays. Any application for site plan approval will require a project-specific traffic study to evaluate the impacts and mitigation measures which 19

25 would be required for that specific future development project. 6-2 Comment: The mixed use scenario has more significant impact during the AM peak than the existing zoning build out but the area roadways are best able to accept traffic during this time period due to the presence of mostly retail development (which does not generate much traffic in the AM) in the immediate vicinity. The mixed use scenario has the benefit of creating more internal trips (residential to commercial) that will reduce impact on local streets. The potential for residents to walk to and from downtown sites, for both the mixed use and full residential scenarios, reduces the potential for increased vehicle trips. The mixed use scenario has the greatest potential for shared parking which allows for reduced provision of structure parking spaces. 6-2 Response: If the Proposed Action is approved, future development proposed on the Project Site under the CB-3 zoning would be subject to project-specific approvals, including Site Plan review and project-specific SEQR review. See Response 6-1, above. This review may include a project-specific analysis of traffic and transportation related impacts, if determined necessary by the City. 6-3 Comment: While traffic impact mitigation was not required for all of the proposed action scenarios, mitigation for an existing zoning full build would consist of changes in signal timing and phasing at numerous locations and more significant improvements necessary at several key intersections. The Department of Parking/Traffic Division recommends approval of the proposed changes. 6-3 Response: See Responses 6-1 and 6-2 above. 7. Michael Quinn, Chairman, City of White Plains Planning Board August 21, 2014 letter to City of White Plains 7-1 Comment: The Board recommends acceptance of the DGEIS, and supports rezoning the property. The Board notes that in any development proposal, it will be looking for public open space and residential development that appeals to families by providing larger units. 7-2 Response: Comment noted. It should be noted that the Zoning Ordinance requires Usable Open Space to be provided in developments, but the Zoning Ordinance does not require dedication of public open space. Usable Open Space is a defined term in the Zoning Ordinance that includes private space that may be located either indoors or outdoors and is not required to be made accessible to the public. Specifically, the Zoning Ordinance defines Usable Open Space as follows: An outdoor area or areas, each containing not less than 250 square feet and with a 20

26 minimum dimension of 10 feet, designed, constructed and maintained for active and passive pedestrian "use." It may include plazas, "courts," lawns, gardens sitting areas and similar types of areas, and shall be provided with such paving, planting beds, fountains, sculptures and works of art, seating, and comparable facilities as may be appropriate to the location. The design shall complement the architecture of the "building" or "buildings" on the same "lot." Up to 50 percent of the required "usable open space" may be beneath a "building" or overhang, canopy, arcade or similar projection at least 12 feet above such "space" provided it is fully open along at least 40 percent of its perimeter. All "usable open space" shall be designed, constructed and maintained so as to be readily accessible. (White Plains Zoning Ordinance Section 2.4) 8. Thomas Soyk, Acting Chairman, City of White Plains Transportation Commission August 21, 2014 letter to City of White Plains 8-1 Comment: The Transportation Commission has no objection to approving this amendment. 8-2 Response: The statement of no objection is directed solely to the proposed zoning ordinance amendments. It is important to note that any future development proposed on the site under the new zoning would be subject to Site Plan review under Section 7 of the Zoning Ordinance, including the review of transportation and parking conditions under Section and project-specific SEQR review. (See responses, above, to Comments 6-1 to 6-3 from the Deputy Commissioner of Parking). 9. John Larson, Commissioner, City of White Plains Department of Parking September 2, 2014 letter to City of White Plains 9-1 Comment: The Department of Parking has no objection to this proposed Zoning Ordinance and Zoning Map Amendment. 9-2 Response: The statement of no objection is directed solely to the proposed zoning ordinance amendments. It is important to note that any future development proposed on the site under the new zoning would be subject to Site Plan review under Section 7 of the Zoning Ordinance, including the review of transportation and parking conditions under Section and project-specific SEQR review. (See responses, above, to Comments 6-1 to 6-3 from the Deputy Commissioner of Parking). 21

CHARLES PUTMAN CHARLES PUTMAN AND ASSOCIATES, INC

CHARLES PUTMAN CHARLES PUTMAN AND ASSOCIATES, INC MEMORANDUM CHARLES PUTMAN & ASSOCIATES, INC. LAND DEVELOPMENT CONSULTANTS PLANNING ZONING PERMITTING 4722 NW Boca Raton Boulevard, Suite C-106 Boca Raton, Florida 33431 Phone: 561/994-6411 FAX: 561/994-0447

More information

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT MAY 8, 2014 The Planning and Development Department hereby forwards to the Planning

More information

Appendix C. Community Facilities Correspondence

Appendix C. Community Facilities Correspondence Appendix C Community Facilities Correspondence From: Sent: To: Subject: Thursday, February 06, 2014 4:30 PM dhughes@wpccos.org Westchester Pavilion EIS: Parks/Open Space Statistics Hello Mr. Hughes, I

More information

CITY OF PUYALLUP. Background. Development Services

CITY OF PUYALLUP. Background. Development Services CITY OF PUYALLUP Development Services 333 South Meridian Puyallup WA 98371 To: City Council From: Katie Baker, AICP, Planning Division Re: South Hill Neighborhood Plan Adoption Date: (Meeting date: February

More information

Policies and Code Intent Sections Related to Town Center

Policies and Code Intent Sections Related to Town Center Policies and Code Intent Sections Related to Town Center The Town Center Vision is scattered throughout the Comprehensive Plan, development code and the 1994 Town Center Plan. What follows are sections

More information

Planning Commission Staff Report June 5, 2008

Planning Commission Staff Report June 5, 2008 Owner/Applicant Taylor Village Sacramento Investments Partners, LP c/o Kim Whitney 1792 Tribute Road #270 Sacramento, CA 95815 Staff Recommendation Planning Commission Staff Report Project: File: Request:

More information

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension RESOLUTION NO. R2018-32 Refining the route, profile and stations for the Downtown Redmond Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 09/13/2018

More information

Executive Summary. NY 7 / NY 2 Corridor

Executive Summary. NY 7 / NY 2 Corridor Executive Summary NY 7 / NY 2 Corridor Transportation and Land Use Study December 2005 Prepared for: Town of Colonie Capital District Transportation Committee Prepared by: Introduction: Land use decisions

More information

that the Town Board of the Town of East Greenbush will hold a public hearing on April 11,

that the Town Board of the Town of East Greenbush will hold a public hearing on April 11, TOWN OF EAST GREENBUSH NOTICE OF PUBLIC HEARING PLEASE TAKE NOTICE that the Town Board of the Town of East Greenbush will hold a public hearing on April 11, 2018, at 5:45 p.m. at the East Greenbush Town

More information

2900 Steeles Avenue East at Don Mills Road in the Town of Markham

2900 Steeles Avenue East at Don Mills Road in the Town of Markham STAFF REPORT INFORMATION ONLY 2900 Steeles Avenue East at Don Mills Road in the Town of Markham Date: January 23, 2008 To: From: Wards: Reference Number: North York Community Council Director, Community

More information

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN 5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN The Planning and Economic Development Committee recommends the following: 1. The communication from Brendan O Callaghan,

More information

Planning Commission Report

Planning Commission Report Planning Commission Report To: From: Subject: Planning Commission Meeting: January 6, 2016 Agenda Item: 8-B Planning Commission David Martin, Planning & Community Development Director Introduction to the

More information

The principal elements of the NTC Strategic Vision plan are as follows.

The principal elements of the NTC Strategic Vision plan are as follows. The proposed project would improve the NTC site plan, circulation, visitor amenities, and landscaping, and would include construction of two new stadiums to replace the existing Louis Armstrong Stadium

More information

Bloor St. W. Rezoning - Preliminary Report

Bloor St. W. Rezoning - Preliminary Report STAFF REPORT ACTION REQUIRED 1638-1644 Bloor St. W. Rezoning - Preliminary Report Date: April 1, 2008 To: From: Wards: Reference Number: Toronto and East York Community Council Acting Director, Community

More information

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Appendix F Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Introduction and Purpose of the Plan The Gold Line Bus Rapid Transit facility is an eleven-mile dedicated

More information

TOWN COUNCIL / PLANNING COMMISSION

TOWN COUNCIL / PLANNING COMMISSION Workshop #3 TOWN COUNCIL / PLANNING COMMISSION January 20, 2011 Consultant Team In Attendance Tonight BMS Design Group Nevada City and San Francisco Michael Smiley, AICP, ASLA Partner-in-Charge Nancy L.

More information

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC 2018 November 15 Page 1 of 10 EXECUTIVE SUMMARY This land use amendment application was submitted by Rick Balbi Architect on 2017 August 31 on behalf of Sable Developments Ltd, and with authorization from

More information

REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT AUGUST 18, 2016

REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT AUGUST 18, 2016 REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT AUGUST 18, 2016 AWH The Planning and Development Department hereby forwards to the Planning

More information

REQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional)

REQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional) Rezoning Petition 2016-117 Zoning Committee Recommendation January 4, 2017 REQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional) LOCATION

More information

EXPANDED ENVIRONMENTAL ASSESSMENT FORM PART III Bear Mountain Triangle Rezoning

EXPANDED ENVIRONMENTAL ASSESSMENT FORM PART III Bear Mountain Triangle Rezoning EXPANDED ENVIRONMENTAL ASSESSMENT FORM PART III Bear Mountain Triangle Rezoning Town of Yorktown, NY Introduction The Environmental Assessment Form (EAF) examines the environmental implications of the

More information

SPECIFIC PLAN Requirements

SPECIFIC PLAN Requirements CITY OF LANCASTER PLANNING DEPARTMENT 44933 Fern Avenue, Lancaster, California 93534 (661) 723-6100 SPECIFIC PLAN Requirements Purpose The purpose of a specific plan is to provide for the logical development

More information

Advance Engineering & Surveying PLLC

Advance Engineering & Surveying PLLC Advance Engineering & Surveying, PLLC Consulting in: Civil & Environmental Engineering Land Surveying Land Development 11 Herbert Drive Phone: (518) 698-3772 Latham, N.Y. 12110 Email:ncostape@gmail.com

More information

ORDINANCE WHEREAS, this Ordinance is consistent with the City of Winter Garden Comprehensive Plan; and

ORDINANCE WHEREAS, this Ordinance is consistent with the City of Winter Garden Comprehensive Plan; and ORDINANCE 17-06 AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF WINTER GARDEN, FLORIDA, CREATING ARTICLE XIV OF CHAPTER 118 OF THE CITY OF WINTER GARDEN CODE OF ORDINANCES PROVIDING FOR THE EAST PLANT

More information

A. INTRODUCTION B. PROJECT LOCATION

A. INTRODUCTION B. PROJECT LOCATION Chapter 1: Project Description A. INTRODUCTION The Lower Manhattan Development Corporation (LMDC), a subsidiary of the New York State Urban Development Corporation, doing business as the Empire State Development

More information

Planning Commission April 4, 2013 BOCC Workshop Page 1

Planning Commission April 4, 2013 BOCC Workshop Page 1 Planning Commission April 4, 2013 BOCC Workshop Page 1 Planning Commission April 4, 2013 BOCC Workshop Page 2 Planning Commission April 4, 2013 BOCC Workshop Page 3 Planning Commission April 4, 2013 BOCC

More information

COLVER ROAD INDUSTRIAL CONCEPT PLAN

COLVER ROAD INDUSTRIAL CONCEPT PLAN COLVER ROAD INDUSTRIAL CONCEPT PLAN A CONCEPTUAL LAND USE AND TRANSPORTATION PLAN FOR TA-4 AN URBAN RESERVE AREA OF THE CITY TALENT City of Talent Adopted by City Council Resolution No., June, 2015 PART

More information

Chapter Master Planned Communities (MPC) District

Chapter Master Planned Communities (MPC) District Sections 14.53.010 Purpose and Intent 14.53.020 Applicability 14.53.030 Procedure 14.53.040 MPC Standards 14.53.050 Required Findings 14.53.010 Purpose and Intent Chapter 14.53 Master Planned Communities

More information

2.7 ac park. TOTAL 5,403 DU 1,297,900 sf 1,105,450 sf 3.87 ac 5,563 DU 1,121,200 sf 1,105,450 sf 3.87 ac

2.7 ac park. TOTAL 5,403 DU 1,297,900 sf 1,105,450 sf 3.87 ac 5,563 DU 1,121,200 sf 1,105,450 sf 3.87 ac PLAN AMENDMENT 2013-I-B1: SEVEN CORNERS SPECIAL STUDY Summary of Pre-staffing Comments Planner: Bernard Suchicital bsuchi@fairfaxcounty.gov (703) 324-1254 Background On October 29, 2013, the Board of Supervisors

More information

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved. COMMITTEE OF THE WHOLE AUGUST 18, 2003 THORNHILL CENTRE STREET STUDY PLANNING FILE: 15.92 Recommendation The Commissioner of Planning recommends: THAT the attached Terms of Reference for the Thornhill

More information

Project Name: MELWOOD HOTEL. Date Accepted: 1/12/04. Waived. Planning Board Action Limit: Plan Acreage: 1.7 Zone: Dwelling Units:

Project Name: MELWOOD HOTEL. Date Accepted: 1/12/04. Waived. Planning Board Action Limit: Plan Acreage: 1.7 Zone: Dwelling Units: The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.

More information

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS 4.4 STATION AREA FINDINGS Each station is different, and each one requires a separate set of recommendations based on the vision for the site. This section outlines an initial TOD strategy and recommendations

More information

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Welcome. Walk Around. Talk to Us. Write Down Your Comments Welcome This is an information meeting introducing the applications for proposed redevelopment of the Yorkdale Shopping Centre site at 3401 Dufferin Street and 1 Yorkdale Road over the next 20+ years,

More information

Review of Opportunity Area C Draft Comprehensive Plan and Draft BOS Follow-On Motions. Special Working Group Meeting March 4, 2015

Review of Opportunity Area C Draft Comprehensive Plan and Draft BOS Follow-On Motions. Special Working Group Meeting March 4, 2015 Review of Opportunity Area C Draft Comprehensive Plan and Draft BOS Follow-On Motions Special Working Group Meeting March 4, 2015 The slides that follow identify where the draft Comprehensive Plan has

More information

Description of Preferred Alternative

Description of Preferred Alternative Chapter 2 Description of Preferred Alternative 2.1 Introduction This chapter of the programmatic Sammamish Town Center Sub-area Plan Final EIS provides a more detailed description of the Preferred Alternative

More information

Issues Requiring Future Study

Issues Requiring Future Study Issues Requiring Future Study Transportation planning is an ongoing process that tends to identify new issues as it finds solutions for others. Some issues are so complex that a solution to one problem

More information

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004 City of Farmington Amendment to the 1998 Master Plan Adopted October 11, 2004 Introduction Planning Background 1 Scope and Components of the Plan Amendment 2 Concept Introduction 3 Plan Concepts 3 Conceptual

More information

City Of Sparks Planning Commission Item

City Of Sparks Planning Commission Item Page 1 of 12 City Of Sparks Planning Commission Item Meeting Date: May17, 2012 Subject: PCN12009, Public Hearing, Consideration and possible action on a Master Plan Amendment and Rezoning request to change

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE 20000 Prairie St. DOT Case No. 41443 Date: November 5, 2014 To: R. Nicolas Brown, Associate Zoning Administrator Department of City Planning From:

More information

S A C R A M E N T O C O U N T Y JACKSON HIGHWAY & GRANT LINE EAST VISIONING STUDY

S A C R A M E N T O C O U N T Y JACKSON HIGHWAY & GRANT LINE EAST VISIONING STUDY JACKSON HIGHWAY & GRANT LINE EAST S A C R A M E N T O C O U N T Y P L A N N I N G D E P A R T M E N T SUMMARY AND WORKBOOK November 19, 2008 History of the Visioning Study Sacramento County has two growth

More information

1071 King Street West Zoning Amendment Application - Preliminary Report

1071 King Street West Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 1071 King Street West Zoning Amendment Application - Preliminary Report Date: August 9, 2012 To: From: Wards: Reference Number: Toronto and East York Community Council Director,

More information

master plan of highways bus rapid transit amendment

master plan of highways bus rapid transit amendment Scope of Work master plan of highways bus rapid transit amendment September 2011 Montgomery County Planning Department M-NCPPC MontgomeryPlanning.org 1 Scope of Work master plan of highways bus rapid transit

More information

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208)

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208) MEMORANDUM Archuleta County Development Services Planning Department 1122 HWY 84 P. O. Box 1507 Pagosa Springs, Colorado 81147 970-264-1390 Fax 970-264-3338 TO: Archuleta County Planning Commission FROM:

More information

EXISTING COMPREHENSIVE PLAN

EXISTING COMPREHENSIVE PLAN EXISTING COMPREHENSIVE PLAN Town Center Land Use Element: V. LAND USE POLICIES Town Center Mercer Island's business district vision as described in "Your Mercer Island Citizen-Designed Downtown" was an

More information

Welcome to the Oakridge Centre Open House

Welcome to the Oakridge Centre Open House Welcome to the Oakridge Centre Open House Why is the City hosting this event? This open house is to inform you of a rezoning application submitted to the City of Vancouver to amend the existing CD-1 (Comprehensive

More information

Queen Street West - Zoning Amendment Application - Preliminary Report

Queen Street West - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 944-952 Queen Street West - Zoning Amendment Application - Preliminary Report Date: February 6, 2013 To: From: Wards: Reference Number: Toronto and East York Community Council

More information

CITY OF ALAMEDA PLANNING BOARD Draft RESOLUTION

CITY OF ALAMEDA PLANNING BOARD Draft RESOLUTION CITY OF ALAMEDA PLANNING BOARD Draft RESOLUTION A RESOLUTION OF THE PLANNING BOARD OF THE CITY OF ALAMEDA APPROVING DESIGN REVIEW AND DEVELOPMENT PLAN AMENDMENT APPLICATION PLN13-0157 TO CONSTRUCT ELEVEN

More information

R E S O L U T I O N. Single-Family Residence/ Church. 2,488 sq. ft. 2,488 sq. ft. Area Parking Required: Church

R E S O L U T I O N. Single-Family Residence/ Church. 2,488 sq. ft. 2,488 sq. ft. Area Parking Required: Church R E S O L U T I O N WHEREAS, the Prince George s County Planning Board is charged with the approval of Detailed Site Plans pursuant to Part 3, Division 9 of the Zoning Ordinance of the Prince George s

More information

DRAFT. October Wheaton. Design Guidelines

DRAFT. October Wheaton. Design Guidelines October 2011 DRAFT Wheaton Design Guidelines 2 Draft - Design Guidelines - Wheaton Sector Plan Contents 04 Section 1: Introduction 06 Section 2: Context 08 Section 3: Design Guidelines 09 Goal 1: Create

More information

New York City Transit

New York City Transit 2 Broadway Veronique Hakim New York, NY 10004-2207 President 646 252-5800 Tel 646252-5815 Fax New York City Transit May 17,2016 Ms. Diane Barlow Murray Hill neighborhood Assoc. P.O.Box 1897 New York, NY

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 21, 2012 DATE: July 12, 2012 SUBJECT: SP #416 SITE PLAN AMENDMENT to modify condition #6 to eliminate requirement to provide a pedestrian

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

Subject: City of Richfield Cedar Avenue Corridor Plan Comprehensive Plan Amendment, Review File No

Subject: City of Richfield Cedar Avenue Corridor Plan Comprehensive Plan Amendment, Review File No Committee Report Business Item No. 2017-21 Community Development Committee For the Metropolitan Council meeting of January 25, 2017 Subject: City of Richfield Cedar Avenue Corridor Plan Comprehensive Plan

More information

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH 12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH STAFF PLANNER: Faith Christie REQUEST: Conditional Change of Zoning (from PD-H1 Planned

More information

PepsiCo R & D Facility Expansion Town of Mount Pleasant, Westchester County, NY Draft Environmental Impact Statement Scoping Outline

PepsiCo R & D Facility Expansion Town of Mount Pleasant, Westchester County, NY Draft Environmental Impact Statement Scoping Outline PepsiCo R & D Facility Expansion Town of Mount Pleasant, Westchester County, NY Draft Environmental Impact Statement Scoping Outline 10-17-2016 This document identifies the issues to be addressed in the

More information

UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose

UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose UAA School of Engineering Parking Garage Master Plan Amendment 1. Purpose Since the UAA campus master plan was drafted in 2003, adopted in 2004, and amended in 2009 a number of significant changes regarding

More information

Staff Report and Recommendation

Staff Report and Recommendation Community Planning and Development Planning Services 201 W. Colfax Ave., Dept. 205 Denver, CO 80202 p: 720.865.2915 f: 720.865.3052 www.denvergov.org/cpd TO: City Council Neighborhoods and Planning Committee

More information

ARTICLE V PLANNED UNIT DEVELOPMENT DISTRICT

ARTICLE V PLANNED UNIT DEVELOPMENT DISTRICT ARTICLE V PLANNED UNIT DEVELOPMENT DISTRICT A. Purpose and Objective The Planned Unit Development (PUD) procedure provides a flexible land use and design regulation through the use of performance criteria

More information

E O L A F I V E. Location Map SUMMARY G M P Z O N I T E M S # 1 A. & B.

E O L A F I V E. Location Map SUMMARY G M P Z O N I T E M S # 1 A. & B. N. Eola Drive Staff Report to the Municipal Planning Board August 18, 2015 G M P 2 0 1 5-0 0 0 1 9 Z O N 2 0 1 5-00016 I T E M S # 1 A. & B. A N X 2 0 1 2-0 0 0 0 5 G M P 2 0 1 2-0 0 0 0 6 Z O N 2 0 1

More information

LAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017

LAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017 Page 1 of 10 EXECUTIVE SUMMARY This Land Use Amendment application seeks to redesignate a full downtown block (currently the YWCA site) from a Direct Control based on the CM-2 District (Land Use Bylaw

More information

ONTARIO MUNICIPAL BOARD

ONTARIO MUNICIPAL BOARD PL 120483 ONTARIO MUNICIPAL BOARD Applicant/Appellant: 2124123 Ontario Limited Subject: OPA, Rezoning and Draft Plan of Subdivision Municipal Address: 3940 Highway 7 East Municipality: City of Markham

More information

3.0 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION 3.0 PROJECT DESCRIPTION 3.1 BACKGROUND Under California law (Government Code Section 65300 et seq.), every city and county is required to have a general plan. The general plan is to be comprehensive and

More information

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan 425 Hillside Avenue Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan I. INTRODUCTION The is seeking the services of a qualified consulting firm to prepare plans

More information

OFFICE CONSOLIDATION SECONDARY PLAN AREA 22 THE BRAMALEA SOUTH INDUSTRIAL SECONDARY PLAN

OFFICE CONSOLIDATION SECONDARY PLAN AREA 22 THE BRAMALEA SOUTH INDUSTRIAL SECONDARY PLAN OFFICE CONSOLIDATION SECONDARY PLAN AREA 22 THE BRAMALEA SOUTH INDUSTRIAL SECONDARY PLAN November 2010 EXPLANATORY NOTES (Secondary Plan Area 22) General (pertaining to all secondary plan office consolidations)

More information

1296 Kennedy Road - Zoning Amendment Application - Preliminary Report

1296 Kennedy Road - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 1296 Kennedy Road - Zoning Amendment Application - Preliminary Report Date: January 15, 2016 To: From: Wards: Reference Number: Scarborough Community Council Acting Director,

More information

GENERAL INFORMATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa

GENERAL INFORMATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa To: Planning and Zoning Commission From: City Staff Date: November 15, 2016 Re: Case #16026 Raymore Activity Center Site Plan GENERAL INFORMATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa Applicant/ Property Owner:

More information

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation Department of Community Development Michael J. Penrose, Acting Director Divisions Building Permits & Inspection Code Enforcement County Engineering Economic Development & Marketing Planning & Environmental

More information

ARTICLE 17 SITE PLAN REVIEW

ARTICLE 17 SITE PLAN REVIEW ARTICLE 17 SITE PLAN REVIEW 17.01 INTENT AND PURPOSE The intent of this section is to provide for consultation and cooperation between the applicant and the township planning commission so that the applicant

More information

Town of Windham. Planning Department 8 School Road Windham, ME voice fax

Town of Windham. Planning Department 8 School Road Windham, ME voice fax Town of Windham Planning Department 8 School Road Windham, ME 04062 voice 207.864-5960 fax 207.892.1916 MEMO DATE: TO: Staff Review Committee FROM: Amanda Lessard, Planner Cc: Ellen Rathbone, St. Germain

More information

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1 EXHIBIT A Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1 1 As amended by Resolution No. 2008-02-001(TR1R) of the Tax Increment Reinvestment Zone No.1, and approved to

More information

Borough of Staten Island, Community District 3, as shown on a diagram (for illustrative purposes only) dated August 22, 2005.

Borough of Staten Island, Community District 3, as shown on a diagram (for illustrative purposes only) dated August 22, 2005. CITY PLANNING COMMISSION December 7, 2005/Calendar No. 14 C 060063 ZMR IN THE MATTER OF an application submitted by the Department of City Planning, pursuant to Sections 197-c and 201 of the New York City

More information

Hudson Group North America LLC

Hudson Group North America LLC Hudson Group North America LLC Mr. John Palmieri, Director Boston Redevelopment Authority One City Hall Square Boston, MA 02201 August 30, 2010 RE: 120 Kingston Street Development, Notice of Project Change

More information

APPLICATION BRIEFING Prepared For: Submitted by: Date: Subject:

APPLICATION BRIEFING Prepared For: Submitted by: Date: Subject: Planning & Development APPLICATION BRIEFING Prepared For: Submitted by: Date: Subject: Planning Advisory Committee Jason Fox, Director of Planning & Development Development Agreement application by Godfrey

More information

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: December 16, 2013 Action Required: Adoption of Resolution Presenter: Staff Contacts: Title: James E. Tolbert, AICP, Director of NDS James

More information

Appendix C: Interim Mixed-Use Evaluation Criteria

Appendix C: Interim Mixed-Use Evaluation Criteria Appendix C: Interim Mixed-Use Evaluation Criteria C-1 Appendix C: Interim Mixed-Use Evaluation Criteria PURPOSE: The implementation of numerous policies contained within the Master Plan hinges on the creation

More information

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N Sheridan Boulevard S TAT I O N A R E A P L A N 1 City of Lakewood Adopted November, 2006 S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N The Vision The City of Lakewood s overall vision is

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 & PUD-0000102-2017 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 NAME SUBDIVISION NAME Dauphin Creek Estates Subdivision Dauphin Creek Estates Subdivision LOCATION CITY COUNCIL

More information

Appendix G Response to Comments

Appendix G Response to Comments Appendix G Response to Comments This appendix contains the comments received during the public circulation and comment period (May 27, 2008 to July 11, 2008). The comments have been numbered (Comment Set

More information

DRAFT SCOPE FOR THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HUDSON HIGHLANDS RESERVE TOWN OF PHILIPSTOWN, NEW YORK June 5, 2018

DRAFT SCOPE FOR THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HUDSON HIGHLANDS RESERVE TOWN OF PHILIPSTOWN, NEW YORK June 5, 2018 DRAFT SCOPE FOR THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HUDSON HIGHLANDS RESERVE TOWN OF PHILIPSTOWN, NEW YORK June 5, 2018 Project Name: Project Location SEQRA Classification of Project: Lead Agency:

More information

The broad range of permitted and special uses allowed in the district remain, but some descriptions have been clarified.

The broad range of permitted and special uses allowed in the district remain, but some descriptions have been clarified. Memorandum To: Emily Fultz, AICP City Planner, City of Edwardsville From: Michael Blue, FAICP Principal, Teska Associates Date: January 24, 2019 RE: B-1 Zoning District Update A draft, updated B-1 Central

More information

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018 Page 1 of 19 EXECUTIVE SUMMARY This application proposes redesignating two parcels in the community of Silver Springs from Special Purpose Future Urban Development (S-FUD) District and undesignated road

More information

Pennsylvania Stormwater Best Management Practices Manual. Chapter 1. Introduction and Purpose

Pennsylvania Stormwater Best Management Practices Manual. Chapter 1. Introduction and Purpose Pennsylvania Stormwater Best Management Practices Manual Chapter 1 Introduction and Purpose Chapter 1 Introduction and Purpose 1.1 Purpose of this Manual 1 1.2 How to Use this Manual...1 1.3 Overview

More information

(DC1) Direct Development Control Provision DC1 Area 4

(DC1) Direct Development Control Provision DC1 Area 4 . General Purpose (DC) Direct Development Control Provision DC Area 4 The purpose of this Provision is to provide for an area of commercial office employment and residential development in support of the

More information

WHEREAS, the current Comprehensive Plan was adopted in 2005; and

WHEREAS, the current Comprehensive Plan was adopted in 2005; and RESOLUTION 2018-06 RESOLUTION TO AMEND THE CITY S COMPREHENSIVE PLAN TO (1) AMEND CHAPTER 4 TO ADD A SPECIAL REVITALIZATION DISTRICT FOR EDUCATION AND ECONOMIC DEVELOPMENT ; (2) DESIGNATE ON THE FUTURE

More information

Eglinton Avenue East & 50 Thermos Road - Official Plan Amendment Application Preliminary Report

Eglinton Avenue East & 50 Thermos Road - Official Plan Amendment Application Preliminary Report STAFF REPORT ACTION REQUIRED 1966 2050 Eglinton Avenue East & 50 Thermos Road - Official Plan Amendment Application Preliminary Report Date: March 15, 2016 To: From: Wards: Reference Number: Scarborough

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. 6 Date: 7.22.13 Bethesda Purple Line Station Minor Master Plan Amendment, Scope of Work Elza

More information

POLICY AMENDMENT AND LAND USE AMENDMENT KILLARNEY/GLENGARRY (WARD 8) NW CORNER OF RICHMOND ROAD AND 33 STREET SW BYLAWS 1P2015 AND 7D2015

POLICY AMENDMENT AND LAND USE AMENDMENT KILLARNEY/GLENGARRY (WARD 8) NW CORNER OF RICHMOND ROAD AND 33 STREET SW BYLAWS 1P2015 AND 7D2015 Page 1 of 13 EXECUTIVE SUMMARY This application seeks to redesignate an RC-2 (Residential Contextual One/Two Dwelling) parcel to MC-Gd72 (Multi-Residential Contextual Grade-Oriented) to allow for multi-residential

More information

EXECUTIVE SUMMARY DRAFT CHAPTER 1 INTRODUCTION EXECUTIVE SUMMARY

EXECUTIVE SUMMARY DRAFT CHAPTER 1 INTRODUCTION EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY INTRODUCTION Through the joint efforts of the City of Tulsa planning staff and the Land Services division of Indian Nations Council of Governments (INCOG), the Berryhill Land

More information

TOWN OF NEW CASTLE - Master Plan Update

TOWN OF NEW CASTLE - Master Plan Update Our Presentation Today (1) Recap the Master Planning Process To Date (2) Present the Outline of the Master Planning Work Plan (3) Present the Calendar for the Master Plan (4) Outline the scope of a Downtown

More information

TOP TEN LIST OF COMMUNITY CONCERNS REGARDING PROPOSED AMENDMENTS TO CHAPTER 42

TOP TEN LIST OF COMMUNITY CONCERNS REGARDING PROPOSED AMENDMENTS TO CHAPTER 42 TOP TEN LIST OF COMMUNITY CONCERNS REGARDING PROPOSED AMENDMENTS TO CHAPTER 42 1. Extend the urban area to Beltway 8 in stages, over say a three-year period, prioritizing development in transit and declining

More information

East Corridor Final Environmental Impact Statement

East Corridor Final Environmental Impact Statement East Corridor Final Environmental Impact Statement Alternatives Considered Operating Plan The requirements for opening day operations versus year 2030 are based on ridership and operations. Opening day

More information

PLNPCM Carl s Jr. Commercial Parking Lot at Redwood Road and 1700 South

PLNPCM Carl s Jr. Commercial Parking Lot at Redwood Road and 1700 South Staff Report PLANNING DIVISION COMMUNITY & NEIGHBORHOODS To: Salt Lake City Planning Commission From: Casey Stewart; 801-535-6260 Date: November 4, 2016 Re: PLNPCM2015-00874 Carl s Jr. Commercial Parking

More information

WHEREAS, after consideration of the evidence presented at the public hearing on January 14, 2010, the Prince George's County Planning Board finds:

WHEREAS, after consideration of the evidence presented at the public hearing on January 14, 2010, the Prince George's County Planning Board finds: R E S O L U T I O N WHEREAS, the Prince George s County Planning Board has reviewed DDS-600 requesting a departure for the location of two loading spaces without driveway access along Toledo Terrace in

More information

Prepared by: Casey Kempenaar, Senior Planner

Prepared by: Casey Kempenaar, Senior Planner CITY OF CITRUS HEIGHTS PLANNING DIVISION STAFF REPORT PLANNING COMMISSION MEETING September 13, 2017 Prepared by: Casey Kempenaar, Senior Planner REQUEST The applicant requests a Design Review Permit Modification

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of September 19, 2015 DATE: September 11, 2015 SUBJECTS: Outdoor Café at Citizen Burger Bar A. SP# 418 Site Plan Amendment to modify an approved

More information

178 Carruthers Properties Inc.

178 Carruthers Properties Inc. 178 Carruthers Properties Inc. Planning Rationale for 178 Carruthers Avenue Site Plan Control Application June 2014 Table of Contents 1.0 Introduction 2.0 Overview of Subject Property 3.0 Current Zoning

More information

MacDonnell Heights Town Center

MacDonnell Heights Town Center Draft Environmental Impact Statement MacDonnell Heights Town Center Town of Poughkeepsie, Dutchess County, New York LEAD AGENCY Town of Poughkeepsie Planning Board One Overocker Road Poughkeepsie, NY 12603

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS REQUEST FOR QUALIFICATIONS VILLAGE OF HAMBURG COMPREHENSIVE ZONING/LAND USE REGULATIONS UPDATE Prepared By: Village of Hamburg 100 Main Street Hamburg, New York 14075 Village of Hamburg RFQ Page 1 of 10

More information

CHAPTER 12 IMPLEMENTATION

CHAPTER 12 IMPLEMENTATION CHAPTER 12 IMPLEMENTATION The 2010 Town of Denton Comprehensive Plan is intended to capture a vision of the future of Denton. As such, it provides a basis for a wide variety of public and private actions

More information

4 January 11, 2012 Public Hearing APPLICANT:

4 January 11, 2012 Public Hearing APPLICANT: . 4 January 11, 2012 Public Hearing APPLICANT: MID-ATLANTIC AUTO PROPERTY OWNER: DZR, LLC STAFF PLANNER: Leslie Bonilla REQUEST: Conditional Use Permit (truck rental, automobile service, and automotive/bulk

More information

PLAN ELEMENTS WORKSHOP. April 5, 2016

PLAN ELEMENTS WORKSHOP. April 5, 2016 PLAN ELEMENTS WORKSHOP April 5, 2016 needs more housing. But there is no one-size fits-all solution. Every neighborhood has its own character. In some places, density is not only appropriate it is badly

More information