1 DRAYTON GARDEN VILLAGE Environmental Statement Non Technical Summary

2

3 1 DRAYTON GARDEN VILLAGE / ENVIRONMENTAL STATEMENT Contents > 01 Introduction > 02 Description of Site and Surroundings > 03 The Proposed Development Construction and Phasing > 04 Planning Framework > 05 Socio-Economic > 06 Transport, Accessibility and Movement > 07 Ground Conditions and Hydrogeology > 08 Flood Risk and Water Resources > 09 Noise and Vibration > 10 Air Quality > 11 Biodiversity > 12 Archaeology and Cultural Heritage > 13 Townscape and Visual Analysis > 14 Conclusion

4 2 01 Introduction This document provides a Non-Technical Summary of the Environmental Statement (ES) which accompanies the outline planning application for the redevelopment of the former National Air Traffic Services headquarters (NATS) in West Drayton (now referred to as Drayton Garden Village). The outline planning application relates to a hectare site located in West Drayton, to the west of central London. Locally, the Site lies west of the town centre, 2.4km north of Heathrow Airport, 1km west of Stockley Business Park. The planning application is for 775 dwellings together with a range of commercial facilities. The application is submitted by Inland Homes Limited. The Environmental Impact Assessment Regulations 1999 require that this development proposal is accompanied by an ES. The primary purpose of an ES is to inform the decision making process by reporting the results of an Environmental Impact Assessment (EIA). This is a recognised process for identifying the significant environmental effects of a project and is a formal part of the UK planning regime. The ES considers the environmental effects of the Proposed Development, during construction and completion, and proposes ways to prevent or reduce and where possible offset any significant adverse effects on the environment, known as mitigation measures. These measures are described in Chapters The Non-Technical Summary provides the background to the planning application and describes the Proposed Development. The bulk of the Non-Technical summary sets out the findings of the ES (in non-technical language). Nevertheless, it contains formal definitions that are an essential language of the ES which may be unfamiliar to some readers. A Glossary of Terms is provided in Volume 1 of the ES. Background to the Environmental Statement As part of the formal EIA process a formal screening request was submitted to the London Borough of Hillingdon (LBH) on the 29 May 2009 and a request was made to the Government Office for London (GOL) on 4 July It was considered by GOL that the redevelopment proposals fell within the classification of an urban development project for a site where the development area exceeds 0.5 Hectares (Ha) and that the scale and intensity of the Proposed Development could have a significant impact upon a number of areas. GOL therefore advised the planning application should be subject to an EIA. A copy of the adopted Screening Opinion can be found in Appendix 1.1 of the ES. Following the initial screening of the proposals, a formal Scoping Request was submitted to LBH for determination on 17 August The Scoping Report is an important part of the EIA process. It involves scoping the issues of potential significance, which may arise from the Proposed Development. The Scoping Report sets out the key environmental issues that may result in the implementation of the Proposed Development.

5 3 DRAYTON GARDEN VILLAGE / ENVIRONMENTAL STATEMENT A Scoping Opinion was adopted by LBH on 5 October in response to the Scoping Request. The Scoping Opinion contained specific details and recommendations relevant to each of the topics covered in the ES and also included the following response: Need to include and describe receptors in the methodology; Need to elaborate on public consultation undertaken; Statements should be verifiable and supported by evidence; Acceptance that chapters for Townscape and Visual analysis and Archaeology only require brief treatment; Agreement that waste and daylight/sunlight issues do not need to be assessed as part of the Environmental Statement. A copy of the Council s Scoping Opinion is contained at Appendix 1.2 of the ES. Consultation Inland Homes has carried out an extensive exercise in community consultation on the future of the NATS site. The main stages of consultation were: A number of leaflets outlining the potential development of the Site, information of public consultation events and details of the planning application were circulated during different phases of the schemes evolution. These leaflets were sent to 6,300 homes and businesses over a wide area of West Drayton and Yiewsley; 2 public exhibitions were held showcasing ideas for residential - led regeneration of the Site and invited peoples views and feedback; Continuous liaison and pre-application discussions with the relevant statutory consultees and Officers at LBH. Overall Approach to the Environmental Statement This ES has been prepared by an appointed consultant team in accordance with the requirements set out in the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 1999 and DCLG Circular 02/99: EIA. It follows the format and assessment methodologies set out in the Department for Communities and Local Government document Environmental Impact Assessment: A Guide to Procedures (2000). A list of the Consultant Team can be found in paragraph 2.3 of Chapter 2 of the ES Document. The ES identifies and records the results of the EIA undertaken to examine the impacts of the Proposed Development. The assessment relates to the demolition, construction works and the completed development and the EIA considers the environmental impact/s the development will have on a range of topics. These topics were formally agreed with LBH as part of a scoping process. The ES suggests a range of measures to mitigate the identified effects and, where opportunities exist, to introduce improvement measures. Where possible these improvements have been incorporated in the outline planning application and will inform future

6 4 01 Introduction detailed reserved matters submissions. The content and extent of coverage of the ES is based on the following: Review of the current situation through existing information, data and reports; Desk-top studies; Site surveys; Modelling; Consideration of relevant planning policies (national, regional and local); Identification of likely environmental impacts and an evaluation of their likely duration, magnitude and significance; Consideration of potentially sensitive receptors; Expert opinion; Use of technical guidance and best practice. The following topics (as agreed with LBH) are considered in the ES: The Planning Framework Socio-Economic Transport, Accessibility and Movement Ground Conditions and Hydrogeology Flood Risk and Water Resources Noise and Vibration Air Quality Biodiversity Archaeology and Cultural Heritage Townscape and Visual Analysis The findings of the assessments undertaken on each of these topics is set out in sections 4-13 of this document

7 5 DRAYTON GARDEN VILLAGE / ENVIRONMENTAL STATEMENT 02 Description of Site and Surroundings The Site The former National Air Traffic Services headquarters (NATS) site is located to the east of West Drayton town centre, and to the west of central London. It is only 2.4km north of Heathrow Airport and 1km west of Stockley Business park. Key transport routes that surround the Site include West Drayton railway and bus stations which are approximately 1km walk to the north west of the Site. In addition, there is a bus stop immediately outside the Site on Porters Way which provides links to the local area including Uxbridge Underground Station, Hayes and Harlington mainline railway station and Hounslow. The Site is bounded by the main London Reading railway line to the north, Porters Way to the south, and residential curtilages abut the eastern and western boundaries. The main vehicular access to the Site is from Porters Way which is located to the south of the Site. Porters Way provides good accessibility to the local road network and motorway network beyond (namely, M25, M40 and M3). Heathrow Airport is also in close proximity to the Site via Junction 4 of the M4 motorway (approx 1 mile). Pedestrians and cyclists will also access the Site from Porters Way. In total the Site comprises hectares of large industrial style sheds, power generation buildings, hard-surfaced car parking areas (with up to 1,300 car parking spaces) and large interconnecting office blocks (up to 7 storeys). It provides one of the largest regeneration opportunities within the West Drayton Area. The main office buildings dominate the central and southern boundary areas of the Site fronting Porters Way. There are a number of mature trees on the southern, eastern and north eastern boundaries and the entire Site is located on a major aquifer consisting of Taplow Gravels, which is found at depths of up to 5m below ground level. Site Considerations and Constraints Over the development design period, which began early 2009, a range of considerations and constraints were identified which have influenced the layout and the design of the scheme. These are set out in Table 1 below. These factors are primarily a result of the location of the Site, infrastructure and transport conditions, consultation and the nature of the surrounding built environment. Consequently, the proposals have evolved to respond to these key factors. Issue Urban Design Layout Natural Environmental Conditions Physical Conditions Social Utilities Table 1: Site Considerations and Constraints Considerations and Constraints Regularity of existing urban grain, variety of building heights (particularly Parkwest), massing and scale, long and short distance views of the Site. Creation of Home Zones and clear framework of streets, open areas and public spaces, prioritise sustainable modes of transport. Sunlight orientation, prevailing winds. Proximity to railway line, layout to enable provision of CHP/Energy Centre. Relationship to surrounding buildings. Integration with the community and provision of facilities, provision of affordable housing, provision of elderly accommodation. Existing layout of utilities on-site.

8 6 02 Description of Site and Surroundings Site location and proximity to Heathrow Airport

9 7 DRAYTON GARDEN VILLAGE / ENVIRONMENTAL STATEMENT Surrounding Area The site lies within an area that is predominantly in residential use. To the east, are the single and two-storey residential properties in Rutters Close and Mulberry Crescent, and the 3-storey shopping parade/flats at Mulberry Parade. To the west is St George s Parkwest residential development which includes large flatted buildings, between 4 and 7 storeys in height. The southern part of Parkwest is largely complete and construction work continues on the northern blocks comprising mainly affordable housing for Notting Hill Trust. The existing residential area to the south of Porters Way comprises mainly bungalows and 2 and 3-storey terraced and semi-detached housing with a relatively open, suburban character. Committed Developments West Drayton station is identified as a future Crossrail Station with fast trains serving central London 6 times an hour from Following consultation with LB Hillingdon, the following committed developments have been considered within the future baseline assessment: Parkwest; Stockley Park Phase 3; Tesco, Yiewsley; and Honeywell; Beyond the railway to the north is the Grand Union Canal which links London to the Midlands. The MOD s retained Air Cadets facility is located adjacent to the north-east corner of the Site and Rutters Close. There are local retail facilities, including a food store, chemist and post office, at Mulberry Parade which is located immediately adjacent to the south-east corner of the Site fronting Porters Way. Mulberry Parade is a Council-owned building comprising 12 shops at ground floor level and flats at first and second floor levels. Residents parking and a service yard are located at the rear of the building. Stockley recreation ground is located a short distance to the south-east of the Site off Porters Way. Site Context Plan

10 8 03 The Proposed Development This section sets out the main components of the proposed scheme. The planning application is in outline with Access, Siting and Scale fixed for determination. Therefore, details such as the proposed materials/appearance and landscaping are only illustrative at this stage. The Proposed Development will comprise of 775 dwellings (504 flats and 271 houses) providing a number of studio, one, two and three bedroom flats as well as two, three, four and five bedroom houses. The average density will equate to 86 dwellings per hectare (dph). A Nursing Home (up to 3,630m 2 GEA ) for elderly people who need 24hr supervision is also included as part of the redevelopment. The scheme will be residential led with a number of other community/service uses. A Primary Healthcare facility including a room for joint community use (up to 1,085m 2 GEA ) with space for up to 9 GP s. Small scale retail accommodation will be included within the footprint of the medical centre to complement Mulberry Parade (up to 185m 2 GEA depending on the size of the Primary Healthcare building), small scale business units including site management office are proposed (up to 185m 2 GEA ) and an Energy Centre (up to 220m 2 GEA ) comprising a Combined Heat and Power (CHP) facility and Biomass boiler to provide heating of hot water and space heating for the whole site. This will not only enhance the environmental sustainability of the development but will ensure the development can reduce its Carbon Dioxide emission by 20% through the use of renewable energy. In addition the development will include: Access roads The main vehicle and cycle access will be off Porters Way, with a secondary access provided off Rutters Close. The scheme is designed to incorporate Home Zone principles ensuring the safety and comfort of pedestrians and minimising vehicle speeds. Car and cycle parking - A total of 1,122 car parking spaces will be provided within the development, 68 spaces are allocated to commercial uses and the remaining 1,054 spaces will be set out around the scheme relating to building typology. Cycle parking will be provided for every flat at a ratio of 1 space per unit and 2 spaces per unit for the houses. Public open space areas - The scheme provides two principle areas of Public Open Space which are known as Village Greens. The total area of these including surrounding footpaths and access routes is 9,967 sq. m. Contained within these village greens will be one LEAP (Local Equipped Area of Plan) and one LAP (Local Area of Play) for children. Further incidental play areas are incorporated into the pedestrian home zones and the promenade areas. Cycle ways and footpaths This includes a new permanent pedestrian link running from east to west through the Site, providing connections to West Drayton railway station and local shops and will also be used by cyclists, further minimising their journey times.

11 9 DRAYTON GARDEN VILLAGE / ENVIRONMENTAL STATEMENT Master Plan

12 10 03 The Proposed Development Landscaping works The landscaping details at this stage are indicative, however the scheme proposes two new village greens, new ecology areas located on the northern, and eastern boundaries, rear gardens for the houses, private amenity courtyards, balcony spaces for the flats and hard and soft landscaping. The outline planning application provides indicative detail for materials. It is intended that traditional materials will be used, such as combinations of brick, render, rainscreen cladding and timber boarding with either tiled or flat roofs dependant upon location and urban design characteristics. Construction and Phasing The current expectation is that the construction would take approximately 7 years (84 months/364 weeks) to complete in full, with defined development stages shown below: Enabling works - The enabling works and site preparation will be ongoing as difference phases in the demolition and construction commence. Hoardings would be erected around the Site perimeter (in accordance with the Health and Safety Executive and LBH requirements) It is anticipated the enabling stage will include: Preparation of services and diversion of public surface water sewer Further intrusive investigations for soils and groundwater, to be undertaken prior to soil and groundwater remediation. Completion of a geotechnical assessment of the ground conditions. Demolition - Demolition phase 1 commenced on site on 7 September 2009 and is expected to occur in 7 phases as set out in detail in Figure 5.1 of the ES, Chapter 5. The demolition works will take approximately 36 weeks in total to complete and will be phased over a year. The demolition phasing plan indicates that Phase 1 to 6 of demolition and excavation is scheduled to take 16 weeks with phase 7 anticipated to take 20 weeks, however the time period will depend largely upon asbestos removal, oil cleaning, and remediation. A Discovery Strategy (Appendix 5.2 of the ES) is being implemented during demolition and construction phases to ensure that in the event that any unidentified areas of contamination are identified they are managed appropriately. A Dust Monitoring and Management system (Appendix 5.2 of the ES) is also being implemented to reduce dust during demolition. Reuse and recycling of materials obtained from the existing buildings and concrete ground slabs would be undertaken wherever possible on-site (e.g. the use of some crushed material of a suitable grade for fill material or using sub-base for roads and hard cover). A Site Waste Management Plan (SWMP) (submitted with the planning application) is in place to ensure the reduction, reuse, recycling and appropriate disposal of waste as well as the appropriate storage of waste on-site, prior to disposal Approximately 9,000m 3 of materials would be removed from the Site during the demolition process. This would equate to approximately 300 HGV movements during the demolition and excavation stages of the development

13 11 DRAYTON GARDEN VILLAGE / ENVIRONMENTAL STATEMENT Aerial view looking west across site

14 12 03 The Proposed Development Temporary provisions These will be delivered as required to resolve infrastructure requirements and will be ongoing for duration of the construction and demolition programme. The temporary works are timetabled to commence in March 2010 and be competed in There are four components to the temporary works: The preservation of a safe and secure access across the Site for the ATC who retain the right to a route from Porters Way to their premises; Definition and control of each phase to ensure that occupants and tenants can live and access a safe environment; The remediation strategy and external works requirements, including the use of demolition material which will require stockpiling, movement of levels and preparation of construction access and compounds. Site remediation - In accordance with the remediation strategy it is anticipated that remediation works will commence towards the end of 2009 and will take approximately 2 years to complete and will be carried out in 3 phases. It is the intention that almost all of the soil arisings produced during remediation will be reused on-site as soft cover or below hard cover. The reuse of soil will be undertaken in line with current policies on the definition of waste, so that once emplaced the material is expected to no longer be classed as waste. Ground works this will include preparation of new site ground levels, includes preparation of foundations and forms part of the overall landscaping strategy. The construction of groundworks will be ongoing for the duration of the construction programme and is expected to commence in May 2010 and be completed by Construction - The application is outline and therefore at this stage a full detailed construction specification is yet to be agreed and will be developed over 7 years from A Construction Management Plan (CMP) has been prepared and will be agreed with LBH. The CMP will provide details on-site planning, construction traffic, noise and dust associated with the demolition works and construction activities. The prescribed hours of work would be agreed with LBH. However, due to the proximity of residential dwellings and commercial activities to the Site it is likely that the standard hours of work would be restricted by condition to the following times: 08:00 to 18:00 hours Monday to Friday; 08:00 to 13:00 hours Saturday; and No working on Sundays or Bank Holidays. All noise generated during such works should be controlled in compliance with BS5228 and use best practice means as defined in Section 72 of the Control of Pollution Act 1974.

15 13 DRAYTON GARDEN VILLAGE / ENVIRONMENTAL STATEMENT 04 Planning Framework 04 Planning Framework Chapter 7 of the Environment Statement examines the planning policy framework within which these redevelopment proposals for the NATS site must be considered. This planning framework is provided by the following range of documents: Government planning policy and guidance set out in national planning policy statements (PPSs) and planning policy guidance notes (PPGs); The GLA s London-wide policies set out principally in the London Plan (2008) and associated policy statements; and Local planning policies comprising the saved policies from the 1998 Hillingdon Unitary Development Plan, the Council s adopted Supplementary Planning Guidance (SPG) and Supplementary Planning Documents (SPD), including the Former NATS site, Porters Way, West Drayton SPD adopted in September The London Borough of Hillingdon Sustainable Community Strategy which sets out the aims and ambitions of the Hillingdon Local Strategic Partnership members for the next 10 years. LBH is in the process of formulating the new Local Development Framework for Hillingdon Borough and intends to publish the Core Strategy Development Plan Document (DPD) for public consultation before the end of This DPD is still at an early stage of preparation and consequently is not yet a material consideration for development control purposes. The proposed redevelopment of the Site accords with the main objectives of national, London-wide, and LBH planning policies in the following ways: It makes effective and efficient use of a vacant, previously developed site within a predominantly residential area; It will provide a high quality and sustainable residential-led, mixed-use development which will integrate well with its surroundings and provide improved pedestrian and cycle links to West Drayton and Yiewsley town centres and railway station; It will provide new community facilities (primary healthcare centre, care-home, and community meeting room), built to DDAcompliant standards, which will be of benefit to existing and new residents in this part of the Borough; It will provide a range of accessible dwelling types, sizes and tenures to meet the housing needs and demands of the West London subregional area. All dwellings will be built to Lifetime Homes standards and 10% will be wheelchair adaptable; It will provide additional small-scale convenience shopping facilities to complement and reinforce the existing shops in Mulberry Parade, for the benefit of existing and new residents in this part of the Borough; It will provide small-scale business accommodation (Class B1) in an attractive landscaped setting within walking and/or cycling distance of bus and train services;

16 14 04 Planning Framework The proposed greening of the Site will enhance its nature conservation and biodiversity value, and provide new open space and recreation facilities for the local area, including childrens play spaces, cycle and pedestrian routes and high quality landscaped amenity areas; It will result in a significant environmental enhancement for the local area by removing the unsightly large buildings and hostile boundary fencing, and opening up the Site both functionally and visually to the whole community. The potential environmental impacts of the development are examined in detail in the other chapters of this Environmental Statement. Where appropriate, mitigation measures are proposed to ensure that the development does not result in any significant harm to the local environment in this part of West London. For all the above reasons, it is considered that the Proposed Development is in accordance with all relevant national, London-wide and local planning guidance and policies. This proposed mixed-use redevelopment scheme makes efficient and effective use of this large previously-developed site in accordance with sustainable development principles. The scheme is designed to a high standard and integrates well with its surroundings. It will provide a range of housing types, sizes and tenures that is appropriate for the local area. The principle of a residential-led redevelopment scheme is accepted by LBH. Implementation of the scheme will assist LBH in meeting its strategic housing targets and other Community Strategy objectives over the next 5 10 year period.

17 15 DRAYTON GARDEN VILLAGE / ENVIRONMENTAL STATEMENT 05 Socio-Economic In considering the socio economic impacts of the development, regard has been had to the baseline data established in chapter 8 of the ES. The Borough has high rates of economic activity and a successful local economy relating mainly to knowledge industries, which make up 41.5% of the total. About two thirds of jobs are filled by people commuting into Hillingdon, rather than by residents themselves reflecting some of the levels of low skills in the area. West Drayton has higher percentage proportion of households with 3 or more people and a high number of owner occupied residential accommodation. Despite this there are pockets of deprivation in proximity to the site. Development proposals will contribute to improving the socio economic characteristics of West Drayton ward and the wider area. The main benefit for local people will be the delivery of a range of housing types as well as other community facilities provision. The benefits of this development will impact directly and positively upon the lives of local people. a result of improved connectivity of the Site, providing higher levels of natural surveillance over the Site than currently exists and creating an attractive pubic realm. The development will provide 775 new dwellings providing a range of housing types and tenure which will help to meet local housing need and alleviate some of the pressure to provide new housing in LBH. The Healthcare facility and other commercial facilities will offer good secure employment opportunities, in addition to construction opportunities. The new medical facilities will have a positive affect on the population s health. In addition, the provision of a care home on the Site will represent a significant improvement to the care for elderly people, and will help to ensure that some of the elderly population can be housed in the local area. In the longer term, once all units are occupied and any off-site improvements are made, the development has the potential to act as a catalyst to enhance local lifestyles. During the construction phase, the development will generate a number of job opportunities that will match local skill levels and provide opportunity for local training. It is predicated that the construction phase will have a negligible impact on the local health conditions, due to the possible increase in dust particles and air pollution, particularly during the site clearance phase. Once complete, the socio-economic impact of the development is likely to be positive. The area will be accessible to all members of the community more as

18 16 06 Transport, Accessibility and Movement The impact of the development on the surrounding local area and transport network has been assessed in terms of transport, access and mobility. A range of computer models have assessed the amount of vehicle movements around the site and calculated the impact of the proposals on the immediate and surrounding road network. In terms of demolition and construction, a certain level of disruption will be expected during these phases with the most disruption forecasted to be during the construction phase of the development. It is expected that all construction traffic will use Stockley Road before turning into Porters Way and entering the Site from there. This disruption will be managed so that it will last for as short a period as possible. The disruption will be managed by the onsite management company so that vehicles arrive at times causing as little disruption on the road network as possible. The number of vehicles expected to the Site during any given hour will have very little impact on the roads surrounding the Site. The construction phase will have little impact on the local community accessibility. It is not anticipated the construction will affect any local routes in terms of the number of vehicles generated and contractors will be required to adopt considerate contractor procedures. Lorry routing will wherever possible avoid residential roads and neighbourhood centres while the existing cycle routes surrounding the Site will be retained. In addition, improvements to the Site frontage on the main vehicular access will improve pedestrian safety with an improved crossing facility and landscaping of the Site access. The operational phase of the development will increase road traffic surrounding the Site. The increases in traffic caused by Drayton Garden Village will have no significant impact on the local road network with the increase in traffic being minimal in comparison to the existing traffic surrounding the Site. Junctions surrounding the Site have been assessed to see how the traffic generated by the development will impact the surrounding junctions. These have been shown to work within capacity with the additional traffic distributed onto the surrounding network. The additional trips that are expected to take place on public transport services as a result of the development will have no negative impact on the local public transport facilities within the vicinity of the Site. In terms of accessibility, the development will not negatively affect accessibility in the area and will be beneficial as the Site will provide a new pedestrian route through the Site improving permeability. The new link will provide a connection through to West Drayton railway station reducing walk and cycle times. New signage is proposed through the Site which will illustrate routes through to the railway station, bus services and local facilities. Sustainable modes of transport (for example walking, cycling and public transport) will be encouraged to reduce the number of car journeys associated with the Proposed Development. To facilitate this, the Proposed Development will provide cycle parking spaces in accordance with

19 17 DRAYTON GARDEN VILLAGE / ENVIRONMENTAL STATEMENT standards set by the London Borough of Hillingdon and Transport for London. In addition to the above, a Travel Plan has been prepared for the Proposed Development. As part of the implementation of this Plan initial travel surveys will be undertaken once the development reaches 75% occupation. The Travel Survey will be undertaken thereafter one, three and five years after the initial survey.

20 18 07 Ground Conditions and Hydrogeology The soils beneath the Site are mainly Taplow Gravels (sand and gravel) and overlying London Clay (firm brown clay). Groundwater is encountered at approximately 2.5m depth that is flowing towards the south-west. Minor contamination was identified in sub-surface soils, mainly in the northern portion of the Site and associated with the former diesel powered generators, engine workshops & vehicle repairs. Prior to any redevelopment, there will be a requirement to remediate this contamination such that the Site will be suitable for residential occupation. This will involve both soil and groundwater remedial treatment, which will extend to any additional areas of contamination that are encountered during the development. All remedial treatment will be conducted on-site, using sustainable technologies where practical. A robust waste strategy will be in place during the redevelopment that will limit the amounts of waste materials exported from the Site. Where possible, materials will be re-used on-site to reduce the amount of materials imported onto the Site. With suitable precautions, the completed development will have a negligible impact on the Site and surrounding area. It is anticipated that there will be minimal imported material brought onto the Site, further reducing the impact on the Site in relation to contaminated land. With suitable precautions, the construction phase will have a minor adverse to negligible impact on the Site and surrounding area. Furthermore, the Operation phase will have a negligible to minor beneficial impact on the Site and surrounding area.

21 19 DRAYTON GARDEN VILLAGE / ENVIRONMENTAL STATEMENT 08 Flood Risk and Water Resources A Flood Risk Assessment (FRA) has been prepared and accompanies the Planning Application. The FRA has been prepared in response to Government guidance in the form of Planning Policy Statement 25: Development and Flood Risk (PPS25) which requires a FRA for all sites greater than 1 hectare, regardless of their flood status. The Site is located in an area of Low Flood Risk as defined by the Environment Agency. It is a requirement that the Site must be shown not to contribute to any flooding off-site by allowing flows to either pass directly to the adjoining land or to increase any discharge to a piped sewer system which may then cause flooding downstream. It is also a requirement that, if disposal of surface water is direct into the ground (by way of soakaways or similar devices), contaminants are not introduced into the sub-strata. Geotechnical testing of the Site has revealed that the Site in general is underlain by up to 5 metres depth of terrace gravels, a highly permeable material which is suitable for the use of infiltration devices (soakaways or similar) as a means of surface water disposal. The use of SUDS devices results in the elimination of any surface water from the Site flowing into the existing surface water sewer which crosses the Site from north to south. The consequent significant reduction in flow within this sewer would reduce the likelihood of any downstream flooding problems which may arise at times of heavy storms. Any contaminants within the existing ground will be remediated before the installation of any SUDS device thereby removing the risk of contaminants being introduced into the sub-strata. Through consultation with Thames Water a foul discharge point has been agreed together with a discharge limit (the maximum rate of flow allowed to enter the sewer system). The entire Site s foul drainage will gravitate to an on-site pumping station whereupon it will be pumped at the agreed rate to the public foul sewer located to the south-east of the Site on the south side of Porters Way. The entire Site is intended to deal with surface water run-off by the use of infiltration devices. These devices form part of the recommendations for Sustainable Drainage Systems (SUDS). The systems will be designed to allow for a 1 in 100 year storm without any above ground flooding and also includes a climate change factor allowing for a 30% increase in the rate of rainfall.

22 20 09 Noise and Vibration The noise climate of the Site is characterised by road traffic and railway noise. The assessment considers both the potential noise and vibration impacts of these existing sources on the suitability for residential occupation at the Proposed Development and whether the demolition, construction and operation of the development has the potential to increase these levels at the nearest existing residential receptors. The assessment has shown that the proposed properties situated adjacent to the railway line require mitigation measures in the form of enhanced glazing to ensure that suitable internal noise levels are achieved. During the demolition and construction phases the assessment has concluded that there will be a temporary increase in the noise and vibration levels at the nearest existing residential receptors; however these impacts can be kept to a minimum through the use of appropriate site equipment, the use of temporary screens and appropriate operating hours. Finally the assessment has shown that the growth in traffic levels due to the development is sufficiently low so as not to generate noticeable noise effects and noise generated by the fixed plant associated with the commercial areas of the development are below the prevailing background noise levels at the nearest existing residential receptors.

23 21 DRAYTON GARDEN VILLAGE / ENVIRONMENTAL STATEMENT 10 Air Quality The assessment of the possible impacts of the proposed redevelopment of the Site on local air quality has been undertaken. It looked at potential impacts during both the construction and operational phases. A generic assessment of the potential air quality impacts during construction using local wind speed and direction data, climate data (e.g. rainfall etc) and the location of sensitive receptors (e.g. residential dwellings etc.) was undertaken to determine the likely significance of any impacts on areas in and around the Site. This showed that during site construction activities releases of dust and particulate matter (PM10) were likely to occur. However, through good site practice and the implementation of suitable mitigation measures, the impact of dust and PM10 releases will be reduced and excessive releases prevented. The residual effects of the construction phase on air quality are considered to be moderate to minor adverse. anticipated year of the first occupation of the Proposed Development) and 2017 (when the whole of the Proposed Development will be completed and occupied). The results of the dispersion modelling showed that the Proposed Development would cause a small increase in NO2 concentrations at all of the assessment receptors and a small increase or no change at the assessment receptors for PM10. According to the assessment significance criteria the residual effects of the Proposed Development are considered to be negligible for NO2 and negligible to neutral for PM10. For the operational phase of the development (i.e. completed and occupied), a quantitative assessment of the potential impacts was undertaken. A computer model was used to predict concentrations of nitrogen dioxide (NO2) and fine particulate matter (referred to as PM10) at locations (existing and proposed) sensitive to changes in air quality, resulting from changes in traffic flows on the surrounding roads associated with the Proposed Development Predictions were made for a number of years, including 2009 (the current year), 2011 (the

24 22 11 Biodiversity Surveys have been carried out to inform the ES. An Extended Habitat Survey was carried out during the summer of 2009, accompanied by a Tree Survey and a Landscape Assessment which were carried out simultaneously. The Habitat Surveys revealed that the Site is comprised of a series of buildings, hard standing areas, amenity grassland and ornamental planting. The Site boundary hedgerows and the off-site boundary hedgerows are considered to fall within the definition of the UK BAP hedgerows. All the Site s habitats are relatively common and widespread. No notable plant species were recorded during the site visit. The Site s habitats have been identified to support breeding birds and fox. The Tree Survey identified that there are two groups of trees; a group of Horse Chestnuts to the south of the Site adjacent to Porters Way, and four trees in the northeast corner. It has been confirmed that there are no Tree Preservation Orders covering the Site. The Landscape Assessment revealed that the main feature of the Site is the boundary vegetation; there are no other landscape features within these boundaries and that supplementary planting would be required to create boundary features to benefit screening and site biodiversity. The current proposals include the retention of the boundary hedge vegetation and a number of the surveyed trees of value. The proposals also include supplementary planting along the north, east and western boundaries creating wilderness corridors. The supplementary planting will comprise of a mixture of native trees, hedgerows and shrub planting to provide the main visual screening with further enhancement to the biodiversity through careful selection of native herbaceous, wildflower and grass areas. This diversity in vegetation will provide a variety of habitats and feeding grounds for existing and new species. Artificial refugia is to be incorporated along these boundaries to provide instant habitats for insects and invertebrates, with the long term aim that the wilderness corridors will be created and managed to ensure that other, natural refugia, are provided. The tree survey identified a number of Horse Chestnut trees along the Porters Way frontage that are to be retained, as far as practically possible, and enhanced with additional avenue tree, hedge and ornamental planting beds. Whilst the proposed species along this frontage will not all be native in origin they will however provide potential diversity of vegetative habitats and foraging opportunities. Within the development a large proportion of the Site is being landscaped with green connections of the wilderness corridors through boulevard, avenue and strategic hedgerow planting. This will create a network of open spaces, landscaped corridors, soft landscaped front gardens, landscaped streets and car parking areas. The installation of the proposed native and non-native tree, hedgerow, shrub, herbaceous, bulb, wildflower and grass areas will have a large beneficial effect on not only the Site, but also its immediate surroundings.

25 23 DRAYTON GARDEN VILLAGE / ENVIRONMENTAL STATEMENT 12 Archaeology and Cultural Heritage A desktop survey including relevant consultation has established that no known elements of archaeological or cultural heritage resource have been identified within the Site that would be directly or indirectly affected by the proposed scheme. It is considered that overall there is a low potential for the presence of previously unrecorded buried archaeological remains within the Site.

26 24 13 Townscape and Visual Analysis The NATS Site is a large industrial site occupied by a number of vacant large industrial-style sheds, power generation buildings/equipment, and large interconnecting office blocks and is surrounded predominantly by 2/3 storey residential properties. It is considered to be barren, featureless and lacking a coherent landscape and urban design character. A number of urban design and landscape assessments have been carried out which have informed the design proposals and have demonstrated that the development will create a high quality residential community. During the construction stage there will be temporary changes to the character of the townscape resulting from the demolition, construction activity and hoardings. These visual impacts are negligible owing to their temporary nature and limited duration and will be mitigated through the erection of hoardings around the active areas of demolition and construction. Once construction is complete it is considered that the visual impact of the development upon the local area will result in significant improvements.

27 25 DRAYTON GARDEN VILLAGE / ENVIRONMENTAL STATEMENT 14 Conclusion The site is currently occupied by a range of industrial style buildings. A thorough and complete assessment of the Proposed Development has been undertaken and the likely significant environmental effects, in terms of the demolition and construction process and the completed development. Overall, the Proposed Development will result in number of benefits to the Site and surrounding area as well as the wider West Drayton area Whilst negative impacts are identified during the construction phase in respect of noise, air quality and trees, these are limited and generally of a temporary nature. Very few adverse impacts are identified at the completed development and operational phase. These are limited to the impact that the development will have on the surrounding roads of Porters Way and North Road. The traffic surveys have shown that these roads are currently lightly trafficked, thereby accounting for the high impact rating. Both roads have significant existing capacity to accommodate the Proposed Development. The scheme provides a well designed mixed use development that will deliver housing, social and economic benefits. View looking east towards Rutters Close over northern green

28 26 Further Information This document is a Non-Technical Summary of the Environmental Statement in support of the planning application for the redevelopment of the NATS site, Porters Way. The full ES statement is a more detailed study of the environmental effects of the planning application. The full statement can be inspected at: Planning and Community Services Department London Borough of Hillingdon Civic Centre High Street Uxbridge UB8 1UW Or online at

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

London Road, Derker. Non Technical Summary. Introduction

London Road, Derker. Non Technical Summary. Introduction London Road, Derker Non Technical Summary Introduction The Oldham Rochdale Housing Market Pathfinder was set up to tackle longstanding problems of poor quality housing and to provide the framework for

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2

More information

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts Chapter 4 Route Window C12: Mile End Park and Eleanor Street Shafts 48 Crossrail Amendment of Provisions 4 Route Window C12: Mile End Park and Eleanor Street Shafts Location plan of Mile End Park and Eleanor

More information

CA//16/00504/FUL. Canterbury City Council Military Road Canterbury Kent CT1 1YW. Crown copyright and database rights 2016 Ordnance Survey

CA//16/00504/FUL. Canterbury City Council Military Road Canterbury Kent CT1 1YW. Crown copyright and database rights 2016 Ordnance Survey O Scale 1:1,250 Map Dated: 09/05/2016 CA//16/00504/FUL Crown copyright and database rights 2016 Ordnance Survey 100019614 Canterbury City Council Military Road Canterbury Kent CT1 1YW AGENDA ITEM NO 13

More information

Meridian Water Phase 1 Application

Meridian Water Phase 1 Application Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

South Whitehaven, Cumbria EIA

South Whitehaven, Cumbria EIA South Whitehaven, Cumbria EIA Environmental Statement - Non Technical Summary June 2013 in association with 1. Introduction Story Homes is applying to Copeland Borough Council (CBC) for a new residential

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal Option SWH1 Balanced Communities Option SWH1 1 To ensure the delivery of high quality sustainable communities where people want to live and work Will it ensure the phasing of infrastructure, including

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities)

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities) SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 12 January 2011 AUTHOR/S: Executive Director (Operational Services) Corporate Manager (Planning and New Communities) Notes: S/1848/10

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 Dear Resident This Special Edition of the Whiteley Voice which has been prepared in conjunction with the North Whiteley Consortium is to

More information

Departure from the Development Plan. Town Council objection to a major application. DETERMINE

Departure from the Development Plan. Town Council objection to a major application. DETERMINE Item No. 9 APPLICATION NUMBER CB/17/01642/OUT LOCATION Land rear of 43 to 91 Silver Birch Avenue South of Alder Green and Aspen Gardens, Aspen Gardens, Stotfold PROPOSAL Outline application for up to 95

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition housing development A46 Wildmoor Alcester Road Canal Quarter A422 Town Centre housing development Warwickshire-based IM Properties, one of the UK s largest privately owned property

More information

BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY

BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY November 2014 Introduction 1.1 St George Central London (the Applicant ) is seeking to obtain planning

More information

49 Broughton Avenue London N3 3EN

49 Broughton Avenue London N3 3EN Location 49 Broughton Avenue London N3 3EN Reference: 17/3448/RCU Received: 30th May 2017 Accepted: 1st June 2017 Ward: Finchley Church End Expiry 27th July 2017 Applicant: Mr P Atwal Proposal: Erection

More information

Site north of Hattersley Road West (east of Fields Farm Road), Hattersley

Site north of Hattersley Road West (east of Fields Farm Road), Hattersley Application Number 17/00982/REM Proposal Site Applicant Recommendation Reason for report Application for the approval of reserved matters (means of access, landscaping, layout, scale and appearance) relating

More information

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Land Securities plc is applying to Maidstone Borough Council

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 1 April 2015 AUTHOR/S: Planning and New Communities Director Application Number: Parish(es): Proposal: Site address: Applicant(s): Recommendation:

More information

Ground Floor Flat 15 Redbourne Avenue London N3 2BP

Ground Floor Flat 15 Redbourne Avenue London N3 2BP Location Ground Floor Flat 15 Redbourne Avenue London N3 2BP Reference: 17/4160/FUL Received: 28th June 2017 Accepted: 29th June 2017 Ward: West Finchley Expiry 24th August 2017 Applicant: Proposal: Mr

More information

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY SITE LOCATION The site of the existing AECC lies in an area of predominately residential and business use in Bridge of Don and extends approximately 50 acres.

More information

Environmental statement

Environmental statement Stockley Park Phase 3 Environmental statement Volume 3: Non-technical Summary Prepared by Arup Stockley Park Consortium Ltd Stockley Park Phase 3 Environmental Statement Non-Technical Summary Stockley

More information

ABOUT CALA HOMES CALA HOMES

ABOUT CALA HOMES CALA HOMES WELCOME Welcome to this public consultation event for our proposed development on land to the east of Salisbury Road, in Hungerford. Thank you for taking the time to come along today. Homes and Wates Developments

More information

Derry City and Strabane District Council Planning Committee Report

Derry City and Strabane District Council Planning Committee Report Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 23 rd March 2016 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: LA11/2015/0395/F Residential Development

More information

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion Mr Graham Clark Berrys Newchurch Farm Kinnersley Hereford HR3 6QQ BY EMAIL The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion SC/2017/0001

More information

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION Application Site and Description of Development Proposed new quarry at Culham, Oxfordshire Land and Mineral

More information

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback

More information

I615. Westgate Precinct

I615. Westgate Precinct I615. Westgate Precinct I615.1. Precinct Description The Westgate Precinct is located approximately 18km west of the Auckland city centre. There are seven Sub-precincts in the Westgate Precinct: Sub-precinct

More information

I539. Smales 2 Precinct

I539. Smales 2 Precinct I539. Smales 2 Precinct I539.1. Precinct Description The Smales 2 Precinct applies to a 4.8 hectare block of land located on the southern side of Northcote Road and fronting Lake Pupuke, Takapuna. The

More information

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs Welcome Welcome to our consultation on our proposals for new homes on land north east of Soham Road, Fordham. Members of the project team are available to answer any questions you have and listen to feedback.

More information

5 Gratton Terrace London NW2 6QE. Reference: 17/5094/HSE Received: 4th August 2017 Accepted: 7th August 2017 Ward: Childs Hill Expiry 2nd October 2017

5 Gratton Terrace London NW2 6QE. Reference: 17/5094/HSE Received: 4th August 2017 Accepted: 7th August 2017 Ward: Childs Hill Expiry 2nd October 2017 Location 5 Gratton Terrace London NW2 6QE Reference: 17/5094/HSE Received: 4th August 2017 Accepted: 7th August 2017 Ward: Childs Hill Expiry 2nd October 2017 Applicant: WSD (Gratton) Ltd Proposal: The

More information

Sustainability Statement. Whitby Business Park Area Action Plan

Sustainability Statement. Whitby Business Park Area Action Plan Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan

More information

Kibworth Harcourt. Introduction. Introduction

Kibworth Harcourt. Introduction. Introduction Introduction Introduction Welcome to this public exhibition on the proposals for the delivery of new homes on land at The Kibworths. The purpose of today s exhibition is to give you the opportunity to

More information

Planning Committee 04/02/2015 Schedule Item 6. Smith Farm Estate, Old Bridge Close, Northolt, UB5 6UA.

Planning Committee 04/02/2015 Schedule Item 6. Smith Farm Estate, Old Bridge Close, Northolt, UB5 6UA. Planning Committee 04/02/2015 Schedule Item 6 Ref: Address: Ward: Proposal: PP/2014/5145 Smith Farm Estate, Old Bridge Close, Northolt, UB5 6UA. Greenford Broadway Installation of sports pitch, reconstruction

More information

Welcome to our public exhibition

Welcome to our public exhibition About our development Welcome to our public exhibition This exhibition gives you the chance to view and comment on our proposals for a new residential development of 165 high-quality homes, along with

More information

DESIGN & ACCESS STATEMENT

DESIGN & ACCESS STATEMENT DESIGN & ACCESS STATEMENT January 2016 Contents Introduction section 1 Section 1 - Introduction Section 2 - Assessment Section 3 - Involvement Section 4 - Evaluation Section 5 - Design Section 6 - Layout

More information

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford. Welcome Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of. We are at the early stages of designing our proposals and have a number

More information

Construction of 9 dwellings and associated infrastructure.

Construction of 9 dwellings and associated infrastructure. Application Number 16/00653/FUL Proposal Site Applicant Recommendation Construction of 9 dwellings and associated infrastructure. Land at Grange Road South, Hyde McDermott Developments Ltd Approve REPORT

More information

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

1 The development hereby permitted shall be carried out in accordance with the following approved plans: Location 59 Greenway Close London N20 8ES Reference: 16/00011/HSE Received: 30th December 2015 Accepted: 7th January 2016 Ward: Totteridge Expiry 3rd March 2016 Applicant: Mr Ankit Shah Proposal: Part

More information

Reference: 16/1447/FUL Received: 7th March 2016 Accepted: 7th March 2016 Ward: East Finchley Expiry 2nd May 2016

Reference: 16/1447/FUL Received: 7th March 2016 Accepted: 7th March 2016 Ward: East Finchley Expiry 2nd May 2016 Location 374B Long Lane London N2 8JX Reference: 16/1447/FUL Received: 7th March 2016 Accepted: 7th March 2016 Ward: East Finchley Expiry 2nd May 2016 Applicant: Ms Katrin Hirsig Proposal: Single storey

More information

Armourers Court, Woolwich

Armourers Court, Woolwich Armourers Court, Woolwich Environmental Statement, Non-Technical Summary December 2013 DESIGN PACKAGE C158 WOOLWICH STATION East End Over Site Development (Armourers Court, Arsenal Way, Woolwich) Environmental

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY NON-TECHNICAL SUMMARY THE HIDE, BISHOP AUCKLAND PROPOSED ECO CHALET DEVELOPMENT NON-TECHNICAL SUMMARY 1 Introduction 1.1.1 This non-technical summary for the (ES) prepared in relation to the proposed eco-chalet

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

DEVELOPMENT MANAGEMENT REPORT

DEVELOPMENT MANAGEMENT REPORT ITEM A08-1 DEVELOPMENT MANAGEMENT REPORT TO: BY: DATE: DEVELOPMENT: SITE: WARD: APPLICATION: APPLICANT: Development Management Committee Development Manager Proposed live/work unit in connection with existing

More information

Barvills Solar Farm Environmental Statement Non-Technical Summary

Barvills Solar Farm Environmental Statement Non-Technical Summary Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development

More information

The Place Solar Farm

The Place Solar Farm The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

DESIGN & ACCESS STATEMENT

DESIGN & ACCESS STATEMENT DESIGN & ACCESS STATEMENT Land to the South East of the A495, Bronington Erection of 31 Dwellings (27 dwellings and 4 bungalows including 4 Affordable Dwellings), Realignment and Improvements to A495 (including

More information

an Inspector appointed by the Secretary of State for Communities and Local Government

an Inspector appointed by the Secretary of State for Communities and Local Government Appeal Decision Site visit made on 14 July 2015 by I Radcliffe BSc(Hons) MCIEH DMS an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 18 August 2015 Appeal

More information

PDP DESIGN & ACCESS STATEMENT

PDP DESIGN & ACCESS STATEMENT PDP The Planning & Design Partnership Planning.. Architecture.. Interiors.. Landscape The Chicory Barn Studio, The Old Brickyards, Moor Lane, Stamford Bridge York, The East Riding Of Yorkshire, YO41 1HU.

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

WELCOME. Land North of STEVENAGE.   We would like to thank you for attending our public exhibition today. WELCOME We would like to thank you for attending our public exhibition today. The purpose of this event is to share our proposals and hear your thoughts on our ideas. Members of the project team are on

More information

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager Perth and Kinross Council Development Management Committee 8 June 2016 5(3)(i) 16/259 Pre-Application Report by Development Quality Manager Residential development at St Martins Road, Land 120 metres West

More information

Introduction. Welcome to this consultation regarding the draft redevelopment proposals for the former CeramTec factory on Sidmouth Road, Colyton.

Introduction. Welcome to this consultation regarding the draft redevelopment proposals for the former CeramTec factory on Sidmouth Road, Colyton. Introduction Welcome to this consultation regarding the draft redevelopment proposals for the former CeramTec factory on Sidmouth Road, Colyton. We are currently considering options for the mixed-use redevelopment

More information

Frequently Asked Questions

Frequently Asked Questions 1. Where is Aylesbury Woodlands? Frequently Asked Questions Aylesbury Woodlands lies to the east of Aylesbury. It is bounded to the south by the A41. To the north is the Aylesbury Arm of the Grand Union

More information

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 1 st February 2017 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: Full Planning application Amended

More information

Mr & Mrs Connolly per Pump House Designs Pump House Yard The Green SEDLESCOMBE, East Sussex. TN33 0QA

Mr & Mrs Connolly per Pump House Designs Pump House Yard The Green SEDLESCOMBE, East Sussex. TN33 0QA AGENDA ITEM NO: 5 (c) Report to: PLANNING COMMITTEE Date: 03 June 2015 Report from: Head of Housing and Planning Services Application Address: Proposal: Application No: Recommendation: Ward: File No: Applicant:

More information

an Inspector appointed by the Secretary of State for Communities and Local Government

an Inspector appointed by the Secretary of State for Communities and Local Government Appeal Decision Site visit made on 11 October 2016 by Mike Hayden BSc DipTP MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 21 November 2016 Appeal

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 9 January 2013 AUTHOR/S: Planning and New Communities Director S/2064/12/FL WATERBEACH Demolition of existing 35 no. shared amenity apartments

More information

LONGDEN VILLAGE DEVELOPMENT STATEMENT

LONGDEN VILLAGE DEVELOPMENT STATEMENT LONGDEN VILLAGE DEVELOPMENT STATEMENT 2017-2027 1 Longden Development Statement 2017-2027 15/01/18 1. Background 1.1 Longden Village Longden village is a very rural and traditional community first mentioned

More information

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN Official Plan Amendment XX to the Official Plan for the City of Ottawa 1 INDEX THE STATEMENT OF COMPONENTS PART A THE PREAMBLE PAGE Purpose...

More information

Welcome to our public exhibition

Welcome to our public exhibition About our development Welcome to our public exhibition This public exhibition gives you the opportunity to view and comment on our proposals to create a new residential development on land adjacent to

More information

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane Proposed Land Use: Total Site Area (Ha): Housing 1.85 Ha Description: It is understood that the owner has no plans to dispose of the site

More information

London Borough of Lambeth. Lambeth Depots. Environmental Impact Assessment Environmental Statement: Non-Technical Summary.

London Borough of Lambeth. Lambeth Depots. Environmental Impact Assessment Environmental Statement: Non-Technical Summary. London Borough of Lambeth Lambeth Depots Environmental Impact Assessment Environmental Statement: Non-Technical Summary April 2009 This Non-Technical Summary (NTS) sets out the findings of an Environmental

More information

3 Tretawn Gardens London NW7 4NP

3 Tretawn Gardens London NW7 4NP Location 3 Tretawn Gardens London NW7 4NP Reference: 16/7886/HSE Received: 12th December 2016 Accepted: 19th December 2016 Ward: Mill Hill Expiry 13th February 2017 Applicant: Proposal: Mr Murray Two storey

More information

The Fairfield Partnership Vision for North-East Elsenham

The Fairfield Partnership Vision for North-East Elsenham The Fairfield Partnership Vision for North-East Elsenham August 2009 Frequently Asked Questions Who is The Fairfield Partnership? The Fairfield Partnership is a joint venture between Marchfield Developments

More information

17A. Wind Microclimate

17A. Wind Microclimate 17A. Wind Microclimate 17A.1 Introduction 17A.1.1 17A.1.2 17A.1.3 17A.1.4 This Chapter, which has been prepared by Waterman and BMT, provides further information with regard to the potential wind microclimate

More information

Application Recommended for Approval Hapton with Park Ward

Application Recommended for Approval Hapton with Park Ward Application Recommended for Approval Hapton with Park Ward APP/2017/0036 Outline Planning Application Outline application for the construction of a new 3 bedroom dwelling (with all matters reserved for

More information

8.0 Design and Form of Development 43/

8.0 Design and Form of Development 43/ 42/ 8.0 Design and Form of Development 43/ Rothwells Farm, Golborne/ Development Statement Figure 7. Site Constraints Key 44/ Site Boundary 360 Bus Route/Stops Existing Trees Underground Water Pipe Sensitive

More information

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

1 The development hereby permitted shall be carried out in accordance with the following approved plans: Location The Avenue Tennis Club The Avenue London N3 2LE Reference: 16/6509/FUL Received: 10th October 2016 Accepted: 10th October 2016 Ward: Finchley Church End Expiry 5th December 2016 Applicant: Mrs

More information

Land Adj. 63 Sunny Bank Road, Sutton Coldfield, Birmingham, B73 5RJ

Land Adj. 63 Sunny Bank Road, Sutton Coldfield, Birmingham, B73 5RJ Committee Date: 11/07/2013 Application Number: 2013/03520/PA Accepted: 20/05/2013 Application Type: Full Planning Target Date: 15/07/2013 Ward: Sutton Vesey Land Adj. 63 Sunny Bank Road, Sutton Coldfield,

More information

Welcome. Land adjacent Sandy Lane WALTHAM CHASE THE PROPOSED SITE

Welcome. Land adjacent Sandy Lane WALTHAM CHASE THE PROPOSED SITE Land adjacent Sandy Lane WALTHAM CHASE Existing Linden Homes developments Welcome Welcome to Linden Homes Southern s ( Linden ) public exhibition about its proposals for a range of high-quality homes for

More information

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP LAND AT WEST YELLAND Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP May 2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft FINAL Date

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.

More information

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433 LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2017 Our Ref: Q70433 Contents 1 INTRODUCTION... 2 2 SITE DESCRIPTION... 5 3 EIA METHODOLOGY...

More information

7 Scoping and Introduction to the Assessments

7 Scoping and Introduction to the Assessments 7 Scoping and Introduction to the Assessments 7.1 Scope of the assessments 7.1.1 Rule 8 of the TWR makes provision for an applicant to request a scoping opinion from the SoS indicating the information

More information

Welcome to our public exhibition

Welcome to our public exhibition About our scheme Welcome to our public exhibition Taylor Wimpey East Anglia intends to submit a detailed planning application for a new residential development of 39 high-quality homes at the B&M Concrete

More information

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015 Wyvern Park Skipton Environmental Statement Non-technical Summary - April 2015 BWB Consulting Ltd Whitehall Waterfront 2 Riverside Way Leeds LS1 4EH Telephone: +44(0)113 233 8000 Copyright This Report

More information

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics

More information

PLANNING COMMITTEE REPORT

PLANNING COMMITTEE REPORT PLANNING COMMITTEE REPORT TO: BY: Planning Committee South Head of Development DATE: 19 December 2017 DEVELOPMENT: SITE: WARD: APPLICATION: APPLICANT: Conversion of existing water storage reservoir to

More information

3 Abbey View Mill Hill London NW7 4PB

3 Abbey View Mill Hill London NW7 4PB Location 3 Abbey View Mill Hill London NW7 4PB Reference: 15/03203/HSE Received: 26th May 2015 Accepted: 16th June 2015 Ward: Mill Hill Expiry 11th August 2015 Applicant: Proposal: Mr Richard Benson Alterations

More information

Site off Hattersley Road West (bound by Hattersley Road West to the north west and Sandy Bank Avenue to the south and west), Hattersley

Site off Hattersley Road West (bound by Hattersley Road West to the north west and Sandy Bank Avenue to the south and west), Hattersley Application Number 17/00984/REM Proposal Site Applicant Recommendation Reason for report Application for the approval of reserved matters (means of access, landscaping, layout, scale and appearance) relating

More information

EXTRACT FROM THE CUDDINGTON NEIGHBOURHOOD PLAN The Policies

EXTRACT FROM THE CUDDINGTON NEIGHBOURHOOD PLAN The Policies EXTRACT FROM THE CUDDINGTON NEIGHBOURHOOD PLAN The Policies Environment and Landscape Policy 1 - Landscape Setting Development should respect and wherever possible enhance the landscape setting of Cuddington

More information

PANSHANGER QUARRY, Hertfordshire

PANSHANGER QUARRY, Hertfordshire PANSHANGER QUARRY, Hertfordshire Proposed enhanced restoration of Phases F & H Briefing Note 1 March 2015 INERT (INACTIVE) RESTORATION MATERIALS, CONTROLS AND OPERATIONS 1 Introduction This briefing note

More information

NON-TECHNICAL SUMMARY. October 2017 CLARENDON GAS WORKS WOOD GREEN

NON-TECHNICAL SUMMARY. October 2017 CLARENDON GAS WORKS WOOD GREEN NON-TECHNICAL SUMMARY October 2017 CLARENDON GAS WORKS WOOD GREEN CLARENDON GAS WORKS, HARINGEY ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY October 2017 Our Ref: Q70251 Contents 1 INTRODUCTION... 2 2

More information

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD Land at Environmental Statement: Non-Technical Summary Introduction Brook Street Properties is applying to Cornwall Council for outline planning permission

More information

Small Heath Rail Sidings, Anderton Road, Small Heath, Birmingham, B11 1TG

Small Heath Rail Sidings, Anderton Road, Small Heath, Birmingham, B11 1TG Committee Date: 20/03/2014 Application Number: 2013/07749/PA Accepted: 04/03/2014 Application Type: Full Planning Target Date: 03/06/2014 Ward: Sparkbrook Small Heath Rail Sidings, Anderton Road, Small

More information

BLETCHLEY PARK AREA - DEVELOPMENT FRAMEWORK

BLETCHLEY PARK AREA - DEVELOPMENT FRAMEWORK ANNEX A To Item 9 REVISED TEXT: additions shown bold and underlined, deletions in (brackets and in italics). BLETCHLEY PARK AREA - DEVELOPMENT FRAMEWORK This framework sets out the key objectives and requirements

More information

REFERENCE: 15/01661/FUL Registered: 16 March 2015 Expiry date: 25 October 2016

REFERENCE: 15/01661/FUL Registered: 16 March 2015 Expiry date: 25 October 2016 LOCATION: Land North Of Charcot Road, Colindale REFERENCE: 15/01661/FUL Registered: 16 March 2015 Expiry date: 25 October 2016 WARD: Colindale APPLICANT: PROPOSAL: Fairview New Homes (Colindale) Ltd Erection

More information

Welcome to our Public Consultation

Welcome to our Public Consultation About our development This exhibition gives you the chance to view and comment on our emerging plans for a proposed residential development located on land to the West of Alwyn Road, Rugby. Welcome to

More information

6B Bertram Road London NW4 3PN

6B Bertram Road London NW4 3PN Location 6B Bertram Road London NW4 3PN Reference: 16/6621/RCU Received: 14th October 2016 Accepted: 19th October 2016 Ward: West Hendon Expiry 14th December 2016 Applicant: Proposal: Ms Kavita Singh Erection

More information

Ref: A073350/SM/sm Date: 13 September 2013

Ref: A073350/SM/sm Date: 13 September 2013 Ref: A073350/SM/sm Date: 13 September 2013 Ian Parkinson Development Control Team Leader Planning Portsmouth City Council Civic Offices Guildhall Square Portsmouth PO1 2AY Dear Ian LIGHT & GLEAVE VILLA

More information

RESIDENTIAL ACTIVITY PERFORMANCE STANDARDS

RESIDENTIAL ACTIVITY PERFORMANCE STANDARDS Preferred Options Consultation Q&A Sheet RESIDENTIAL ACTIVITY PERFORMANCE STANDARDS What are the key goals for managing the design of residential buildings in the Second Generation Plan (2GP)? The key

More information

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 in association with 1. Introduction Peel Holdings is applying to Nottingham City Council (NCC) for Outline planning

More information