1 WELCOME TO THE EASTERN SECTION CODE BREAKFAST CODE BREAKFAST QUESTIONS FOR THE EASTERN SECTION ANNUAL MEETING 93 rd ANNUAL EASTERN SECTION MEETING, KING OF PRUSSIA, PA RESIDENTIAL ALL QUESTIONS BASED ON THE 2017 NEC FRIDAY 1. In a dwelling unit bathroom a 2- gang plastic device box containing a light switch and an exhaust fan timer switch is located three feet from a hydromassage bathtub. Are any bonding connections required for this switch and control? If yes, describe how the connections are to be made. 2. Does a four inch long, 1- inch trade size RMC (1 short nipple) connecting a PV disconnect to a utility meter enclosure as would be the case when making a supply side connection of a PV system, as per Articles 705 and 690, require bonding locknuts or are standard locknuts acceptable? Assume there are no concentric or eccentric knockouts encountered. 3. If the spaces adjacent to each side of a dishwasher are drawer units, is it permissible to route the cord through one of the drawer units and install the receptacle in the second cabinet away from the dishwasher? 4. Would it be permissible to hard- wire the dishwasher in question 3? If so, under what conditions? 5. A contractor installed a 125- volt, 15- ampere grounded receptacle to replace a 125- volt, 15- ampere ungrounded receptacle in a dwelling unit bedroom. The contractor installed a 14 AWG equipment grounding conductor (EGC) from the receptacle box to the first five feet of water piping in the basement of the dwelling. The inspector rejected the installation and required the contractor to install a 6 AWG EGC because the inspector felt that the EGC was subject to physical damage. Was the inspector correct? OVER
2 6. Does the wall- mounted blower unit of a split- system HVAC system require a disconnect within sight of the blower unit inside the dwelling. Assume the blower unit consumes 725 volt- amperes of energy and contains a ¼ HP motor operating at 125- volts. Would a disconnect be required if the blower unit operated at 24- volts? 7. A contractor installed a listed, ¾ diameter, ten- foot ground rod inside the electrical room of a department store. He drove the rod to a depth of 9 feet, leaving 1 foot above the earth floor. (This is an old South Philadelphia mob headquarters repurposed as retail space.) She then installed a 4 AWG aluminum grounding electrode conductor (GEC) from the service equipment to the ground rod. Neither the ground rod nor the grounding electrode connection are subject to physical damage. Is this installation code compliant? If the electrical room had a 4 thick concrete slab floor, would that change the answer? 8. An inspector rejected an installation because the electrical contractor ran a white THWN 6 AWG stranded copper conductor to a ground rod. The inspector stated that the conductor had to be green. Was the inspector, who incidentally was an old South Philly mobster, correct? 9. Is a red emergency disconnect switch required at the top of the basement stairs, in a dwelling unit, if the basement has a oil burner? What about a gas- fired central heating unit? What standard governs this intallation? 10. At a dwelling unit, a contractor installed a 100- ampere service and connected the service conductors to a 100- ampere, four- position service- rated panelboard in the basement in which a 100- amp two- pole breaker was installed. He then ran 2 AWG aluminum SER cable to a panelboard on the first floor of the building. The panelboard on the first floor was properly wired as a load- side panel. The inspector, who has since met with an untimely end involving cement sneakers, turned down the installation. She required the contractor to run 1 AWG aluminum conductors from the main panel to the sub- panel on the first floor citing Table (B)(16). Was the inspector correct? 11. A split- level home has a staircase with an entry at the middle landing between the upper and lower floors. The contractor installed a three- way dimmer switch at the top of the stairs, a four- way snap switch at the landing, and a three- way snap switch at the lower level. Is the contractor likely to pass his final inspection?
3 WELCOME TO THE EASTERN SECTION CODE BREAKFAST CODE BREAKFAST QUESTIONS FOR THE EASTERN SECTION ANNUAL MEETING 93 rd ANNUAL EASTERN SECTION MEETING, KING OF PRUSSIA, PA COMMERCIAL ALL QUESTIONS BASED ON THE 2017 NEC SATURDAY 1. A contractor renovated existing 2 x 4 lay- in fluorescent luminaires. She removed the ballasts and retrofitted the luminaires with LED double- ended lamps. These lamps fit into the same non- shunted T- 8 lampholder as the original ballasted fluorescent tubes. The installation instructions for the lamps called for the 125- volt power to be connected directly to the lampholders. Are these replacement lamps listed? Is there a concern with the wrong lamps being used as replacements in the future as a T- 8 fluorescent lamp will fit into the same lampholder as a 125- volt LED retrofit lamp that does not require a ballast? Do the double ended lamps require a disconnect for each luminaire per Section (G)? 2. A show window at a retail establishment is five feet wide. During the rough inspection the inspector pointed out the need for at least one 125- volt, 15- or 20- ampere rated receptacle outlet within 18 of the top of the show window. The contractor objected saying that such a receptacle is not required unless the show window is over six linear feet wide. 3. A small conference room that requires emergency illumination has four 2 x 4 lay- in, two- tube fluorescent luminaires in the ceiling. One of these luminaires has an emergency ballast in it that illuminates a single tube in the event of a power failure. Does this installation satisfy the minimum requirements of the NEC? 4. What is the definition of a lighting element as used in Section OVER
4 5. Is an array of 16 LEDs connected to a single driver considered to be one lighting element or sixteen lighting elements? 6. A contractor installed a hard- wired connection, with a switch, to a vending machine at the entrance to a shopping mall. Next to that, he hard- wired, with a switch, a connection to a kiddie horse ride. At the time of the final inspection the inspector red tagged the installation. The inspector cited the need for GFCI protection for both machines. Was the inspector correct? 7. Is it permissible to use aluminum EMT fittings with stainless steel EMT? 8. A contractor wired a rental space that will be a chiropractor s office, providing new circuits for the accounting office, the waiting room, and the office of the head of the HR department. The circuits fed new receptacles and new lighting. He installed tamper- resistant receptacles in the waiting room and standard receptacles in the two offices. The inspector wrote a violation at the time of the final inspection stating that all of the new receptacles had to be tamper- resistant. Is the inspector out of his mind? 9. Section (H)(2) requires conductors in parallel to be the same length. In reality, how much tolerance of length differential is permitted? 10. A contractor and her apprentice, a fella by the name of Rocky Balboa, at a commercial printing company, were contracted to withdraw a bucket out of a MCC and replace the existing 300- ampere circuit breaker with a 250- ampere circuit breaker and reconnect the existing wires to the new circuit breaker. Assume that the wiring connections are legal. The inspector red- tagged the installation citing the need to now mark the equipment as Reconditioned. Was the contractor correct in calling the inspector a dimwit?
5 WELCOME TO THE EASTERN SECTION CODE BREAKFAST CODE BREAKFAST QUESTIONS FOR THE EASTERN SECTION ANNUAL MEETING 93 rd ANNUAL EASTERN SECTION MEETING, KING OF PRUSSIA, PA POT LUCK ALL QUESTIONS BASED ON THE 2017 NEC SUNDAY 1. A contractor makes up the connections to interconnect the two halves of a factory- inspected modular home. The factory inspection label and information sheet is located on the electrical panel. After installation of a service to the home, he calls for a final inspection. The inspector will not approve the job, as the receptacle under the metallic kitchen sink is not GFCI protected. Citing that the receptacle is within six feet of the top inside edge of the metallic sink, the inspector said GFCI protection must be provided. The contractor argued that a cord would need to pass through a cabinet door to reach from the top inside edge of the sink to the receptacle. If the cord has to pass through a door, then the receptacle does not need GFCI protection. Who is correct? 2. A building inspector told me that in order to determine if a testing laboratory is recognized, that is, they are the real deal, that I should go to the OSHA website. Can this ja- moke* possibly be correct? 3. In an electrical vault with volt transformers and 480- volt switchgear, an inspector required a contractor to install a partition between the high- voltage equipment and the low- voltage equipment. The contractor responded Outta which fairy tale didja dig this little gem from? The inspector told him to read his NEC. Is there such a rule in the NEC? 4. A homeowner, widely known to be a Betty Crocker groupie, purchased a commercial mixer for her home. The installation instructions called for the appliance to be supplied by an individual branch circuit rated at 125- volts, 15- amperes. An electrical contractor installed a GFCI protected 125- volt, 15- ampere individual branch circuit with a single receptacle on the wall above the kitchen countertop to supply the appliance. Two 20- ampere small appliance branch circuits supply the remaining existing counter receptacles. The electrical inspector failed the installation claiming that all receptacles that serve the kitchen counter must be on a small appliance branch circuit rated at 20- amperes. Is the inspector wrong, or is the electrician correct? OVER
6 5. A contractor replaced twenty 50- ampere, 250- volt, 3- pole, 4- wire site receptacles at an RV park. Do these receptacles require GFCI protection? 6. A contractor, clearly out of his ever- loving mind, installed a 100- ampere aluminum SER cable underground, in a raceway, for a construction office trailer. Jimmy Rogers, being the inspector of record, told the contractor that he would approve it. Did Jimmy make the correct call? 7. As the inspector arrived on site and poured himself a cup of coffee, he casually asked the contractor to show him the torque screwdriver that was used to terminate the grounded conductors in the panelboards. What in tarnation are you going on about? asked the electrician, clearly unaware. The inspector repeated his request and, upon learning that no such tool was ever on site, told the contractor to get a calibrated torque screwdriver or torque wrench and to make up all of his terminations again using the torque tools. Does the inspector have a leg to stand on? 8. EMT was added to the list of acceptable wiring methods to provide protection from physical damage for conductors installed underground. Section allows EMT to be installed underground if protected by corrosion protection and approved as suitable for the condition. Does such a product exist? Who approves the EMT as suitable for the conditions? Does a listed tape wrap exist that provides protection from corrosion? Other products? 9. A contractor installs a length of 3 EMT to supply a 50 kva transformer. Approximately four feet before the transformer, he transitions to Flexible Metal Conduit (FMC) that terminates with a connector on the side of the transformer. He installs the feeder conductors and a wire- type equipment grounding conductor within this raceway system. The inspector red tags the job and tells the electrician to provide an equipment bonding jumper (EBJ) between the EMT connector and either the FMC connector or the transformer enclosure. Does the NEC require this EBJ? 10. Is it required to provide a permanent switching means to allow the connection of a portable or temporary source of power, which shall be available for the duration of a repair, to a single alternate power source used as an emergency system? *Ja- moke Urban Dictionary: A local dimwit or shiftless lay- about, primarily from the urban Boston Area.
MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 8/10/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions
MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 8/10/11 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Is low voltage cable allowed to be run through drilled
More informationRocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004
Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004 1. A 2 PVC conduit was installed in the ground prior to setting a factory manufactured home on the foundation. The required service
More informationAPPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL
This Appendix (2000 IRC Appendix-L) is produced, copyrighted, and maintained by the National Fire Protection Association Association, all rights reserved. Use of this Appendix is pursuant to license with
More informationRESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS
RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS Key Questions for Residential Inspections 1. What wiring methods will be used, and are the wiring methods suitable for the conditions? 2. Will multiwire branch
More informationBuilding Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS
BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used
More informationll. Consistency Questions
Our Goal is FOR ALL STAKEHOLDERS TO HAVE A SUCCESSFUL PROJECT with us and that together we keep people and structures safe and buildings economically viable to serve the needs of our community. We strive
More informationInformational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017
Informational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017 It has come to the attention of the electrical authorities having jurisdiction (AHJs) at the DOE sites there is inconsistency
More informationMichigan Chapter IAEI Annual Meeting Ann Arbor, Michigan Code Panel Questions December 5 th and 6 th, 2013
Michigan Chapter IAEI Annual Meeting Ann Arbor, Michigan Code Panel Questions December 5 th and 6 th, 2013 1. Is a standard wire-nut approved for a wet location as in an outside j-box? Is there a listed
More information2017 NEC Presented by: Russ LeBlanc
2017 NEC Presented by: Russ LeBlanc 1. 90.2(A)-installation and removal 2. 90.3-code layout 3. 100-readily accessible 4. 100-field evaluation body (FEB) 5. 100-field labeled 6. 100-receptacle 7. 100-structure
More informationSDEC 2017 Questions, Group 1
SDEC 2017 Questions, Group 1 1. Do the factory wings that many fluorescent troffers have designed to fold out over the grid meet the requirements for securely fastened to the framing? Answer: NEC 410.36(B)
More information2011 and 2014 National Electrical Code Changes Residential Only
2011 and 2014 National Electrical Code Changes Residential Only Sponsored By: and.net Instructor: Fritz Gunther, Chief Electrical Inspector 585-436-4460 www.nyeia.com NEW YORK ELECTRICAL INSPECTION AGENCY
More informationResidential Wiring (2014 NEC) (Homestudy)
Residential Wiring (2014 NEC) (Homestudy) Oregon Electrical License This course will cover the requirements in the 2014 NEC for installing electrical systems in dwelling units. Code sections for residential
More information2009 WESTERN SECTION CODE PANEL QUESTIONS
2009 WESTERN SECTION CODE PANEL QUESTIONS 1. The local inspector red-tagged the temporary wiring for a new store of type III construction because he said Romex wasn t allowed to be run in the open according
More informationONE- AND TWO-FAMILY DWELLING ELECTRICAL CODE HANDOUT (2015 Michigan Residential Code Effective February 8, 2016)
Cheboygan County Department of Building Safety 870 South Main Street P.O. Box 70 Cheboygan, Michigan 49721 TX: (231) 627-8813 FX: (231) 627-8454 www.cheboygancounty.net Service Entrance ONE- AND TWO-FAMILY
More informationSW District 1. 1 Tony Tadysak Craig Mulder
STATE OF WISCONSIN Department of Safety and Professional Services 1400 E Washington Ave. Madison WI 53703 Web: dsps.wi.gov Governor Scott Walker Secretary Dave Ross Electrical Program Web: Electrical Program
More informationChapter 1 General... 5
About This Textbook...xi About the National Electrical Code...xv About the Authors and Illustrator...xix About the Team...xxi Article 90 Introduction to the National Electrical Code... 1 90.1 Purpose of
More informationTABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51
TABLE OF CONTENTS About This Textbook...xi How to Use the National Electrical Code... 1 Article 90 Introduction to the National Electrical Code... 7 90.1 Purpose of the NEC... 7 90.2 Scope of the NEC...
More information2010 Residential Ques. & Ans.
1.I am replacing several existing receptacles in an older apartment building because they no longer hold the plug securely. Do I need to install tamper resistant receptacles? Ans. No 406.11, 210.52, Comm.
More informationNATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY
A new twist on the National Electrical Code - a practical application workshop. If you sign up in this class, prepare to work! Day 1: Fundamentals of OSHA requirements for performing electrical work -
More informationResidential Wiring (2017 NEC) (Homestudy)
Residential Wiring (2017 NEC) (Homestudy) Idaho Electrical License This course will cover the requirements in the 2017 NEC for installing electrical systems in dwelling units. Code sections for residential
More informationA. Connected to the equipment ground B. Bonded to the box C. Connected to nearest water pipe D. Connected to a ground rod
Journeyman and Master Common Exam 2 1 The grounding terminal of a grounding-type receptacle installed in a metal box shall be? A. Connected to the equipment ground B. Bonded to the box C. Connected to
More informationCONTINUING EDUCATION FOR OREGON ELECTRICIANS. AMERICAN ELECTRICAL INSTITUTE PO Box Spokane, WA
American Electrical Institute 2014 PART 2 83 CONTINUING EDUCATION FOR OREGON ELECTRICIANS AMERICAN ELECTRICAL INSTITUTE PO Box 31131 Spokane, WA 99223 www.aeitraining.com 84 PART 3 American Electrical
More informationSpring Test 6 due 04/26/2013
Spring Test 6 due 04/26/2013 Multiple Choice Identify the letter of the choice that best completes the statement or answers the question. 1. The article that covers TV wiring installations in residences
More informationElectrical Tech Note 107
Electrical Tech Note 107 Biosystems & Agricultural Engineering Department Michigan State University Understanding the Construction Code Rules, Part 8 1 Based on the 2014 NEC and the 2015 MRC The State
More informationDistrict 1. 1 Tony Tadysak Craig Mulder
STATE OF WISCONSIN Department of Safety and Professional Services 1400 E Washington Ave. Madison WI 53703 Web: dsps.wi.gov Governor Scott Walker Secretary Dave Ross Electrical Program Web: Electrical Program
More informationOverview of Significant 2017 NEC Changes
Overview of Significant 2017 NEC Changes National Fire Protection Association. All rights reserved. Five New NEC Articles Article 426 Fixed Resistance and Electrode Industrial Heating Equipment Article
More informationNEC CODE QUESTIONS. Western Section IAEI 103 rd Annual Meeting September 17-19, 2007
NEC CODE QUESTIONS Western Section IAEI 103 rd Annual Meeting September 17-19, 2007 1. Can a fire pump controller be fed from a UPS? Or is a separate service and separate transfer switch required? 2. Section
More informationNEC CODE QUESTIONS and ANSWERS Wisconsin Chapter IAEI Green Lake, Wisconsin May 16-18, 2012
NEC CODE QUESTIONS and ANSWERS Wisconsin Chapter IAEI Green Lake, Wisconsin May 16-18, 2012 1. Can we install 120 Volt conductors in the same space with 277 Volt conductors? If the answer is yes, are there
More informationResidential Wiring According to 2011 NEC (Homestudy)
Residential Wiring According to 2011 NEC (Homestudy) Utah Electrical License This course will cover the requirements in the 2011 NEC for installing electrical systems in dwelling units. Code sections for
More information2009 ELECTRICAL CODE REQUIREMENTS
2009 ELECTRICAL CODE REQUIREMENTS ANTRIM COUNTY BUILDING DEPARTMENT PO BOX 188 205 CAYUGA STREET BELLAIRE, MI 49615 (231) 533-8373 FAX (231) 533-6041 Inspection Request Line (231) 533-3510 Electrical requirements
More informationTABLE OF CONTENTS CHAPTER 2 WIRING AND PROTECTION CHAPTER 1 GENERAL RULES... 19
TABLE OF CONTENTS About This Textbook...xi How to Use the National Electrical Code... 1 Article 90 Introduction to the National Electrical Code... 7 90.1 Purpose of the NEC... 7 90.2 Scope of the NEC...
More informationIMPORTANT NOTICE BUILDERS AND CONTRACTORS WORKING IN NORTH RICHLAND HILLS, TEXAS. June 17th, 2016
IMPORTANT NOTICE BUILDERS AND CONTRACTORS WORKING IN NORTH RICHLAND HILLS, TEXAS June 17th, 2016 RE: City Council Adopts 2014 National Electrical Code with Pool Alarm Requirements On April 25th, 2016 the
More informationResidential Wiring According to the 2011 NEC
Residential Wiring According to the 2011 NEC Utah Electrical License This course will cover the requirements in the 2011 NEC for installing electrical systems in dwelling units. Code sections for residential
More informationIEC and NCCER Mapping for Year 1
Craft: 26102-14 Safety IEC and NCCER Mapping for Year 1 Perform a visual inspection on various types of ladders 102.4 STATE GENERAL SAFETY CONSIDERATIONS IN ELECTRICAL INSTALLATIONS (LADDER SAFETY, SLECTION
More informationNEC Study Guide CORRECT: C NEC (A)(1)
1 According to the NEC, the maximum distance from the point of entrance to the building that the water pipe may be used as a grounding electrode interconnect is: A. 3' B. 4' C. 5' D. 6' CORRECT: C NEC
More informationRevisions for the 2011 National Electrical Code - Part 1
PDHonline Course E355 (3 PDH) Revisions for the 2011 National Electrical Code - Part 1 Instructor: Patrick Ouillette 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone &
More informationCODE PANEL QUESTIONS
NORTH CAROLINA ELECTRICAL INSTITUTE 89 th ANNUAL MEETING APRIL 3-4, 2018 HILTON NORTH RALEIGH RALEIGH, NORTH CAROLINA CODE PANEL QUESTIONS Opinions of the Code Panelist are NOT interpretations issued by
More informationGraded Project. National Electrical Code
Graded Project National Electrical Code National Electrical Code INTRODUCTION This next portion of your program is a project-based assignment designed for you to demonstrate your understanding of the
More informationChapter 1 General...9 Article 100 Definitions...11 Article 100 Questions Article 110 Requirements for Electrical Installations...
Article 90 Introduction...1 90.1 Purpose of the NEC...1 90.2 Scope of the NEC...2 90.3 Code Arrangement...4 90.4 Enforcement...5 90.5 Mandatory Requirements and Explanatory Material...6 90.6 Formal Interpretations...6
More informationNEC {CODE CHANGES. OVERVIEW OF 2014 Related to Electrical Wiring Devices. Cablofil. Pass & Seymour. Wiremold
NEC {CODE CHANGES OVERVIEW OF 2014 Related to Electrical Wiring Devices { Cablofil Pass & Seymour Wiremold TABLE OF CONTENTS Page i NEC SECTION DESCRIPTION PAGE 210.8(A)(9) GFCI Protection of Receptacles
More informationTABLE OF CONTENTS CHAPTER 5 SPECIAL OCCUPANCIES CHAPTER 1 GENERAL RULES... 19
TABLE OF CONTENTS About This Textbook...xiii How to Use the National Electrical Code... 1 Article 90 Introduction to the National Electrical Code... 7 90.1 Purpose of the NEC... 7 90.2 Scope of the NEC...
More informationPANELBOARDS & BUILDING DISTRIBUTION
262416 PANELBOARDS & BUILDING DISTRIBUTION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Distribution panelboards 2. Power panelboards B. Related Sections: 1.02 POLICY 1. CU Standard 260500, Basic
More informationCHAPTER 15 PART IV NATIONAL ELECTRICAL CODE, 2017
CHAPTER 15 PART IV NATIONAL ELECTRICAL CODE, 2017 The City of Portsmouth adopts the State Building Code, which adopts by reference The National Electrical Code, 2017(NEC), as Chapter 15, Part IV, of the
More informationElectrical Program. Electrical Laws & Rules. Electrical RCW WAC B. Permits Inspections Access Description Directions Comments.
Electrical Laws & Rules Licensing Electrical Work Scope Administrator Duties Certification Supervision RCW 19.28 WAC 296-46B Permits Inspections Access Description Directions Comments Electrical Program
More information2014 National Electrical Code & NFPA 70E/Arc Flash
Gain an understanding of the 2014 NEC s latest additions, revisions and changes. Learn the precautions needed when working with and around electricity. People and property need to be safeguarded from the
More informationInstructor: L. Keith Lofland
One and Two Family Dwelling Electrical Systems 2014 NEC AFCIs, GFCIs, and Other Dwelling Unit Requirements Training Presentation by: International Association of Electrical Inspectors Instructor: L. Keith
More informationNational Electrical Code
National Electrical Code 409.30 Disconnecting Means Disconnecting means that supply motor loads shall comply with Part IX of Article 30. 410.81 Control (A) Disconnection Luminaires (fixtures) or lamp installation
More informationCHAPTER 20 SERVICE EQUIPMENT
SERVICE EQUIPMENT CHAPTER 20 SERVICE EQUIPMENT Service equipment includes service cabinets and the equipment and materials necessary for installation. 20.1 Signal Service Cabinet For MnDOT traffic control
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 26 0519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationGeneral Kitchen, Bath & Bedroom Remodeling Notes County of Marin, Building Inspection Division
These Notes are intended to assist in issuing simple remodel permits. It provides information on the most common requirements relating to the construction or remodeling of kitchens, bathrooms and bedrooms.
More informationInstallation Instructions
Installation Instructions Ordering Code: RF16UQT1XXC RF32UQT1XXC RF32UHT1XX RF45UQT1XXC RF45UHT1XX PLEASE READ THESE INSTRUCTIONS BEFORE INSTALLATION OF THE FOLLOWING: 4 STRIP FIXTURES 8 STRIP FIXTURES
More informationFIRE ALARM: BY OTHERS, IF REQUIRED.
x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. FLUORESCENT STRIP LIGHT FIXTURE,
More informationElectrical Design Guidelines Table of Contents
C: Compliant Rev. 3 Dated June 13 11 NC: Non-Compliant NA: Not Applicable Page1 16.1 General 16.2 Single Line Diagrams 16.3 Electric Motor Equipment and Controls 16.4 Lighting 16.5 Emergency Lighting 16.6
More informationM001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings
1 T Consultant: NOTES, SYMBOLS & ABBREVIATIONS - MECHANICAL Number Description M001 Vestibule 117 LAN/IT Coffee 115 116 Mail Room 118 114 113 112 Scanning 119 Open Office 101 FIRST FLOOR PLAN - MECHANICAL
More informationUnits 2, 3, 4, 5, 6, 8, 9, 10, Electrical Wiring Residential Unit 2 (Unit 5 Fourth Edition)
Units 2, 3, 4, 5, 6, 8, 9, 10, 11-22 Electrical Wiring Residential Unit 2 (Unit 5 Fourth Edition) 1. What is an outlet? Point on a wiring system where current is taken to supply utilization equipment 2.
More informationFIRE ALARM: BY OTHERS, IF REQUIRED.
x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT
More informationDivision 26 ELECTRICAL TABLE OF CONTENTS
Division 26 ELECTRICAL TABLE OF CONTENTS 26 1000 GENERAL... 33 A. CODE... 3 B. RELATED SECTIONS... 3 C. ABBREVIATIONS... 3 D. DEFINITIONS... 3 E. DRAWING REQUIREMENTS... 3 F. EQUIPMENT SERVICE ACCESS AND
More informationINSTALLATION, OPERATION AND MAINTENANCE MANUAL
GE Digital Energy Power Quality INSTALLATION, OPERATION AND MAINTENANCE MANUAL GE TRANQUELL Enhanced Thermal Protection (ETP) Series Integrally Mounted Medium and High Exposure Surge Protective Devices
More informationSubpanels. Bring Big Amps to Distant Spaces. A subpanel is a secondary breaker box BY CLIFFORD A. POPEJOY
Subpanels A subpanel is a secondary breaker box Instead of originating at the main service panel, electrical circuits can begin at a nearby subpanel that is powered from the main panel through one heavy-gauge
More informationGet it Right the First Time Avoid These Commonly Cited Errors
May 2014 Get it Right the First Time Avoid These Commonly Cited Errors By Mark Earley and Mark Hilbert Copyright 2014 National Fire Protection Association. All rights reserved. Good electrical contractors
More information.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.
Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code
More informationNational Electrical Code Forum. Your Questions Answered
National Electrical Code Forum Your Questions Answered Meet Your Distinguished Experts Moderator: Lloyd Osborn- Cheyenne, Wyoming Tom Lichtenstein Republican Organizer-Chicago, IL Tim McClintock NFPA Regional
More informationTABLE 1-E (2017) Effective July 1, 2017
TABLE 1-E (2017) Effective July 1, 2017 Oregon Amendments to the 2017edition of the National Fire Protection Association (NFPA) 70, National Electrical Code (NEC) for the 2017 Oregon Electrical Specialty
More informationELECTRICAL - WIRING DESIGN AND PROTECTION SELF INSPECTION CHECKLIST
Name of School: OPTIONAL INFORMATION Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: ELECTRICAL - WIRING DESIGN AND PROTECTION SELF INSPECTION CHECKLIST Guidelines: This checklist
More informationBulletin An application for inspection not required Rule 2-005
Bulletin 2-3-16 An application for inspection not required Rule 2-005 Scope Issued May 2016 Supersedes Bulletin 2-3-15 (1) Rule 2-005 - An application for inspection not required (Basic exemption) (a)
More information1 x4 Dimmable LED RetroFits
1 x4 Dimmable LED RetroFits Installation Instructions Ordering Code: RF16UQT1XXCDL RF16UHT1XXDL RF32UQT1XXCDL RF32UHT1XXDL PLEASE READ THESE INSTRUCTIONS BEFORE INSTALLATION OF THE FOLLOWING: 4 STRIP FIXTURES
More informationNEC Requirements for Standby Power Systems. New England Building Officials Education Association Annual Conference October 5, 2015
NEC Requirements for Standby Power Systems New England Building Officials Education Association Annual Conference October 5, 2015 Emergency & Standby Power Systems Alternative power sources are utilized
More informationSpa Control System OWNER S MANUAL
LIMITED WARRANTY ONE YEAR LIMITED WARRANTY: UNITED SPAS, INC. warrants, to the original purchaser, the Spa Equipment against defects in materials or workmanship for a period of one year from date of purchase.
More informationDESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES
2.07 ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES - 2.07 It is expected that the electrical design professional will conform to accepted good engineering design practices.
More information9/7/2010. Chapter , The McGraw-Hill Companies, Inc. AND BONDING. 2010, The McGraw-Hill Companies, Inc.
Chapter 1 GROUNDING AND BONDING 1 Proper grounding practices protect people from the hazards of electric shock and ensure the correct operation of overcurrent protection devices. Grounding is the intentional
More informationEFCOG Best Practice #213
EFCOG Best Practice #13 Facility: DOE Complex Best Practice Title: Adoption of NFPA 70 017 in place of NFPA 70 014 Point of Contact: Michael Hicks NE-ID, 08-56-374, hicksmd@id.doe.gov John McAlhaney SRS,
More informationAFCI. RECEPTACLEFAQs. What is an arc fault? What causes arc faults?
RECEPTACLEFAQs AFCI 1 What is an arc fault? UL provides a definition for an arc fault in UL 1699 (Standard for Safety Arc Fault Circuit Interrupters). It is an unintentional arcing condition in a circuit.
More informationPERMIT APPLICATION REQUIREMENTS FOR NON-RESIDENTIAL ROOF MOUNTED PHOTOVOLTAIC SYSTEMS
Butte County Department of Development Services PERMIT CENTER 7 County Center Drive, Oroville, CA 95965 Main Phone (530)538-7601 Permit Center Phone (530)538-6861 Fax (530)538-7785 FORM NO DBP-73 PERMIT
More informationPhotovoltaic (Solar) Array Installation Guide
Building & Safety Division Community Development Department 7351 Rosanna Street, Gilroy, CA 95020 Phone: 408 846-0451 Fax: 408 846-0429 Visit us: www.cityofgilroy.org Photovoltaic (Solar) Array Installation
More informationB. Shop Drawings: List of legends and description of materials and process used for premarking wall plates.
SECTION 262726 - WIRING DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationINDEX. Page 2 to 7 Electrical Specifications. Page 8 Electrical Schemes: Basement Plan. Page 9 Electrical Schemes: First Floor Plan
30 Greenway, NW Suite 11 Glen Burnie, Maryland 21061 tel 410.528.8899 fax 410.558.6312 www.gbalternatives.com INDEX Page 2 to 7 Electrical Specifications Page 8 Electrical Schemes: Basement Plan Page 9
More informationELECTRIC COOKTOP INSTALLATION INSTRUCTIONS
INSTALLATION AND SERVICE MUST BE PERFORMED BY A QUALIFIED INSTALLER. IMPORTANT: SAVE FOR LOCAL ELECTRICAL INSPECTOR'S USE. READ AND SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE. U.S.A. WARNING FOR YOUR
More informationINSTALLATION AND OPERATING INSTRUCTIONS. For Reliance Controls Emergency Power Transfer Switch Kit Model Number 30216BRK
INSTALLATION AND OPERATING INSTRUCTIONS For Reliance Controls Emergency Power Transfer Switch Kit Model Number 30216BRK Congratulations on your purchase of the Reliance Controls Generator Power Transfer
More informationThe following report was prepared for the buyers of the home and property at 1400 Main St. Anywhere City, Tennessee. The inspection was conducted on
HOME PROPERTY SCAN INSPECTIONS The following report was prepared for the buyers of the home and property at 1400 Main St. Anywhere City, Tennessee. The inspection was conducted on January 11, 2010 and
More informationSECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW)
SECTION 26 05 21 PART 1 - GENERAL 1.1 DESCRIPTION This section specifies the furnishing, installation, and connection of the low voltage power and lighting wiring. 1.2 RELATED WORK A. Excavation and backfill
More informationSECTION 2 NEC REFERENCES SECTION 1 LOW-VOLTAGE AND POWER- LIMITED SYSTEMS...1. CHAPTER 1 GENERAL Introduction...35
SECTION 1 LOW-VOLTAGE AND POWER- LIMITED SYSTEMS...1 Overview of Low-Voltage and Power-Limited Systems...3 Chapter 4 Equipment for General Use...3 Chapter 5 Special Occupancies...3 Chapter 6 Special Equipment...4
More informationBUILDING PERMIT APPLICATION REQUIREMENTS FOR GROUND MOUNTED PHOTOVOLTAIC SYSTEMS
Butte County Department of Development Services PERMIT CENTER 7 County Center Drive, Oroville, CA 95965 Main Phone (530) 538-7601 Permit Center Phone (530) 538-6861 Fax (530) 538-7785 FORM NO DBP-70 BUILDING
More informationRevisions for the 2011 National Electrical Code - Part 4
PDHonline Course E358 (3 PDH) Revisions for the 2011 National Electrical Code - Part 4 Instructor: Patrick Ouillette 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone &
More informationTroy's Home Inspection Services LLC
Cover Page Property Inspection Report 33706 Inspection prepared for: Cord King & Patricia King Real Estate Agent: Jane Freel - RE/MA Date of Inspection: 3/4/2017 Time: 8:30 Age of Home: 2008 Size: 3279
More informationSundance Spas SPA EQUIPMENT SYSTEM. Installation Instructions. P/N Rev. A
Sundance Spas SPA EQUIPMENT SYSTEM Installation Instructions P/N 6530-456 Rev. A Contents Important Notices 1 Important Safety Instructions 2 Where to Place the Equipment System 3 Connecting Pipes Between
More informationStudent Guide. Wiring Edition. Compliments of. Georgia EMC East Exchange Place Tucker, GA (770)
Student Guide to Wiring 2017 Edition Compliments of Georgia EMC 2100 East Exchange Place Tucker, GA 30084 (770) 270-6950 www.georgiaemc.com Electric Membership Cooperatives of Georgia In Georgia, the 41
More informationGPS 140 NEC Requirements for Generators. Professional Development Seminar Series NEC Requirements for Generators
GPS 140 NEC Requirements for Generators WHAT YOU WILL LEARN NEC requirements for on-site power generation. Recent events have created increased interest in standby power This module organizes NEC requirements
More informationCOMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods
1. BASIC ELECTRICAL MATERIALS 1. All conduit and raceway must be 3/4" or larger. Exposed raceway in finished areas shall be in 700 or larger wiremold. Exception: runs to individual devices 10 or less,
More informationRevisions for the 2014 National Electrical Code Part 3
PDH Course E430 Revisions for the 2014 National Electrical Code Part 3 Patrick S. Ouillette, P.E. 2014 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org
More informationPART GENERAL 1.01 SECTION INCLUDES
Specification Number: 26 24 16.06 Product Name: Emergency Lighting Control NQ Circuit Panelboards: 240 Vac, 48 Vdc Maximum SECTION 26 24 16.06 Emergency Lighting Control NQ Circuit Panelboards: 240 Vac,
More informationPart Two. Wiring Procedures CHAPTER 3. Design and Layout
Part Two. Wiring Procedures CHAPTER 3 Design and Layout The different wiring systems in common use for civilian and armed-forces construction are often called cable and conduit systems. Chapters 4 and
More informationPage 1 of General
Page 1 of 8 16.1 General 1. This section covers items common to sections of CSI s Master Format - Division 16. 2. Dalhousie University is certified by IBEW for new construction and all electrical contractors
More informationS U B S T I T U T E O R D I N A N C E BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CHICAGO: ARTICLE I ELECTRICAL CODE
S U B S T I T U T E O R D I N A N C E BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CHICAGO: This ordinance is organized into eight Articles, as follows: Article I. Article II. Article III. Article
More informationSECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the
More informationDIVISION 16 ELECTRICAL
DIVISION 16 ELECTRICAL Saratoga Springs / standards / 02-2004 Page - 0 ELECTRICAL SECTION 16060 GROUNDING AND BONDING PART 1 GENERAL 1.01 SECTION INCLUDES A. Grounding electrodes and conductors, equipment
More informationProgram, Code Panel Questions, & Survey/Comments
NORTH CAROLINA ELECTRICAL INSTITUTE 90 th ANNUAL MEETING APRIL 9 th 10 th, 2019 HILTON NORTH RALEIGH RALEIGH, NORTH CAROLINA Program, Code Panel Questions, & Survey/Comments Opinions of the Code Panelist
More informationTECHNICAL ARTICLE. Inspecting Existing Dwelling Electrical Systems Using NFPA 73 by Skip Walker September 2009
TECHNICAL ARTICLE Inspecting Existing Dwelling Electrical Systems Using NFPA 73 by Skip Walker September 2009 Many inspectors were contractors in some prior life. The progression from contractor to inspecting
More informationTown of Cicero Local Code Amendments
Town of Cicero Local Code Amendments 2009 International Residential Code Local Amendments: DELETE Table R302.1 (Exterior Walls), see Attachment A. DELETE Exception for Subsection R313.2 (One and Two-Family
More informationRevisions for the 2014 National Electrical Code
PDH Course E428 Revisions for the 2014 National Electrical Code Part 1 Patrick S. Ouillette, P.E. 2014 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org
More informationSECTION (16140) - WIRING DEVICES
SECTION 26 27 26 (16140) - WIRING DEVICES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Receptacles, Connectors, Switches, and Finish Plates. B. Related Sections: 1. Section 00 31 13.43 (00370) -