1 General Notes. See V sheets for scope of work details on thermostats, terminal units, air handling units and exhaust fans. Abbreviations: T.C.C. = Temperature Controls Contractor, M.C. = Mechanical Contractor. All work to be in electrical metallic tubing (EMT) in mechanical rooms, plenum rated cable above accessible ceilings for Class II circuits per all applicable state, local and federal codes including but not limited to NEC.. M.C.C. shall be the prime contractor and shall assume the responsibility to prevent service outages during construction through coordination with subcontractors and the Owner. 5. Blank plates shall be installed to cover variance in opening left by existing thermostat as comparted to the new thermostat X KEYED NOTES:. M.C. to replace existing finned tube radiation thermostatic control valve assembly with new electric actuated control valve assembly. T.C.C. shall tie valve to nearest VAV controller. This is Bid Alternate. M.C. to cut and cap unit heater pneumatic air lines as required. T.C.C. to provide new DDC current switch and enable/disable relay, wiring to controller specified in V... M.C. to demo radiant heat system existing wet differential pressure switch and existing three way control valve assembly and provide new three three way control valve assembly. T.C.C. to provide start/ stop relay, current switch, supply and return temperature sensors, wiring to controller specified in V..

2

3

4

5 General Notes. See H sheets for scope of work details on finned tube radiation valves, hot and chilled water system components, unit heaters and heat pumps.. Abbreviations: T.C.C. = Temperature Controls Contractor, M.C. = Mechanical Contractor. All work to be in electrical metallic tubing (EMT) in mechanical rooms, plenum rated cable above accessible ceilings for Class II circuits per all applicable state, local and federal codes including but not limited to NEC.. M.C.C. shall be the prime contractor and shall assume the responsibility to prevent service outages during construction through coordination with subcontractors and the Owner. 5. Blank plates shall be installed to cover variance in opening left by existing thermostat as comparted to the new thermostat.. Test and Balance scope X. Test and balance required at each air flow at each VAV, use original air flow schedule, adjust flow as required to satisfy load. Grilles and diffusers not included in test and balance work. Re-sheaving is not part of this scope of work. Intent of this project is to have a neutral to slightly positive building at the conclusion of the project KEYED NOTES:. T.C.C. to replace existing pneumatic VAV unit controls with new DDC VAV controller with integral actuator and discharge air temp sensor. Connect tubing to air flow sensor from controller. Extend bus communications and power to each DDC controller. M.C. to replace existing pneumatic reheat control valve actuator with electric control valve actuator and cut and cap pneumatic air lines at each VAV.. M.C. to cut and cap pneumatic air lines as required and remove existing thermostat. T.C.C. to provide new DDC thermostat in same location and wire to controller specified in V. (if unspecified wire to nearest DDC controller).. T.C.C to provide DDC start/stop relay and current switch for exhaust fan and wire to controller specified in V.. M.C. to cut and cap pneumatic air lines as required.. T.C.C. to replace existing pneumatic fan powered box controls with new DDC VAV controller with integral actuator, discharge air temp sensor, and relays as required. Connect tubing to air flow sensor from controller. Extend bus communications and power to each DDC controller. M.C. to replace existing pneumatic reheat control valve actuator with electric control valve actuator and cut and cap pneumatic air lines at each VAV. 5. Provide ceiling mounted occupancy sensor as required. Wire to controller specified in V.. Install relays as required. 6. M.C. to cut and cap pneumatic air lines as required and remove existing thermostat and humidistat. T.C.C. to provide a DDC thermostat in the same location and a wall mounted CO sensor. Wire both devices to controllers specified in V

6 General Notes. See H sheets for scope of work details on finned tube radiation valves, hot and chilled water system components, unit heaters and heat pumps.. Abbreviations: T.C.C. = Temperature Controls Contractor, M.C. = Mechanical Contractor.. All work to be in electrical metallic tubing (EMT) in mechanical rooms, plenum rated cable above accessible ceilings for Class II circuits per all applicable state, local and federal codes including but not limited to NEC.. M.C.C. shall be the prime contractor and shall assume the responsibility to prevent service outages during construction through coordination with subcontractors and the Owner. 5. Blank plates shall be installed to cover variance in opening left by existing thermostat as comparted to the new thermostat X Test and Balance scope. Test and balance required at each air flow at each VAV, use original air flow schedule, adjust flow as required to satisfy load. Grilles and diffusers not included in test and balance work. Re-sheaving is not part of this scope of work. Intent of this project is to have a neutral to slightly positive building at the conclusion of the project KEYED NOTES:. T.C.C. to replace existing pneumatic VAV unit controls with new DDC VAV controller with integral actuator and discharge air temp sensor. Connect tubing to air flow sensor from controller. Extend bus communications and power to each DDC controller. M.C. to replace existing pneumatic reheat control valve actuator with electric control valve actuator and cut and cap pneumatic air lines at each VAV.. M.C. to cut and cap pneumatic air lines as required and remove existing thermostat. T.C.C. to provide new DDC thermostat in same location and wire to nearest DDC controller.. T.C.C to provide DDC start/stop relay and current switch for exhaust fan and wire to controller specified in V. (if unspecified wire to nearest DDC controller). M.C. to cut and cap pneumatic air lines as required.. T.C.C. to replace existing pneumatic fan powered box controls with new DDC VAV controller with integral actuator, discharge air temp sensor, and relays as required. Connect tubing to air flow sensor from controller. Extend bus communications and power to each DDC controller. M.C. to replace existing pneumatic reheat control valve actuator with electric control valve actuator and cut and cap pneumatic air lines at each VAV.

7

8

9

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment. SECTION 23 09 93 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1 WORK INCLUDES A. Base Bid: Heating Contractor provide: Control sequences for HVAC systems, subsystems, and equipment. B. Alternate

More information

CHAPTER 4. HVAC DELIVERY SYSTEMS

CHAPTER 4. HVAC DELIVERY SYSTEMS CHAPTER 4. HVAC DELIVERY SYSTEMS 4.1 Introduction 4.2 Centralized System versus Individual System 4.3 Heat Transfer Fluids 4.4 CAV versus VAV Systems 4.5 Common Systems for Heating and Cooling 4.6 Economizer

More information

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL SECTION 15910 SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Job Name Control Systems Description Date

Job Name Control Systems Description Date Job Name Control Systems Description Date Project Overview The project is a describe the building and its major HVAC systems (e.g. three-story office building, served by a rooftop unit VAV system ). In

More information

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum

More information

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES HVAC non CENTRAL PLANT 1) Zone Level Scheduling & Override for all air handlers (supply and exhaust) to match occupied hours by zone DDC or occupancy sensors (OS) allowed. (403.2.4.3,

More information

Florida Department of Transportation

Florida Department of Transportation Page 1 of 7 RICK SCOTT GOVERNOR Florida Department of Transportation 1109 S. Marion Avenue Lake City, Florida 32025 ANANTH PRASAD SECRETARY September 27, 2011 To: Proposal Holders Addendum No: 1, E2Q23,

More information

ASHRAE JOURNAL ON REHEAT

ASHRAE JOURNAL ON REHEAT Page: 1 of 7 ASHRAE JOURNAL ON REHEAT Dan Int-Hout Chief Engineer Page: 2 of 7 Overhead Heating: A lost art. March 2007 ASHRAE Journal Article Dan Int-Hout Chief Engineer, Krueger VAV terminals provide

More information

Computing Services Center

Computing Services Center Continuous Commissioning Report for the Computing Services Center Building #516 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

Case Study: Furman University Charles H. Townes Center for Science. Michael K. Mantai, PE, CCP President System WorCx

Case Study: Furman University Charles H. Townes Center for Science. Michael K. Mantai, PE, CCP President System WorCx Case Study: Furman University Charles H. Townes Center for Science Michael K. Mantai, PE, CCP President System WorCx AIA Quality Assurance Learning Objectives 1. Case study example of Chilled Beam technology

More information

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story

More information

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog H3/V3 Series Horizontal and Vertical Indoor Air Handling Units Engineering Catalog Table of Contents AAON H3/V3 Series Features and Options Introduction... 6 H3/V3 Base Model Description... 7 Unit Size...

More information

1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is.

1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is. 2018 NC Energy Conservation Code Commercial Mechanical Module 7 CHAPTER 5 [CE] WORKSHEET 1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the

More information

HVAC 101. The Basics of Heating, Ventilation and Air Conditioning

HVAC 101. The Basics of Heating, Ventilation and Air Conditioning HVAC 101 The Basics of Heating, Ventilation and Air Conditioning HVAC Heating, Ventilation and Air Conditioning Provides comfort for people Allows humans to exist under adverse conditions. Comfort Comfort

More information

November 11, City of Sparks 215 S. 21 st St. Sparks, NV

November 11, City of Sparks 215 S. 21 st St. Sparks, NV November 11, 2014 City of Sparks 215 S. 21 st St. Sparks, NV 89432-0857 Attn: Brian Cason Re: Sparks City Hall HVAC Upgrade Project-Alerton Direct Digital HVAC Control System to Match Existing City of

More information

Engineering Guide VAV Diffusers. Please refer to the Price Engineer s HVAC Handbook for more information on VAV Diffusers.

Engineering Guide VAV Diffusers. Please refer to the Price Engineer s HVAC Handbook for more information on VAV Diffusers. VAV Diffusers lease refer to the rice Engineer s HVAC Handbook for more information on VAV Diffusers. Diffuser Types Ceiling Diffusers Conventional air distribution systems typically group several rooms

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES To qualify the upgrade must add or substantially modify 3 or more sequences/system capabilities. Also, all sequences and items listed under the required section are needed in

More information

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 23 0993 SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS A. This section defines the manner and method by which controls function. Requirements for each type of

More information

BULLETIN. Temperature Controls (VAV) (3/11/2010)

BULLETIN. Temperature Controls (VAV) (3/11/2010) BULLETIN Temperature Controls (VAV) (3/11/2010) This bulletin is to advise you of the fees and responsibilities associated with Tenant s temperature controls. Tenant Responsibility: 1. Unit power is by

More information

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012) Madeira City Schools Madeira, Ohio HVAC Assessment December 2011 (Revised February 2012) Prepared by: CMTA Engineering Consultants, Inc. 10411 Meeting Street Prospect, KY 40059 www.cmtaegrs.com (502) 326-3085

More information

SECTION FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION

SECTION FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION Montgomery County Public Schools Facilities DIVISION 1 - GENERAL REQUIREMENTS SECTION 01915 - FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION PART 1 GENERAL 1.1 Section includes:

More information

Single Zone System. One duct system Used mostly in small buildings Forced air system All spaces controlled by a single thermostat Single air return

Single Zone System. One duct system Used mostly in small buildings Forced air system All spaces controlled by a single thermostat Single air return Single Zone System One duct system Used mostly in small buildings Forced air system All spaces controlled by a single thermostat Single air return Multi Zone System Used in small to medium sized buildings

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-23 09 93 (November 2015) ----------------------------- Preparing Activity: USACE Superseding UFGS-23 09 23 (May 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

BULLETIN. Temperature Controls (Chilled Water) Phase III only (3/11/2010)

BULLETIN. Temperature Controls (Chilled Water) Phase III only (3/11/2010) BULLETIN Temperature Controls (Chilled Water) Phase III only (3/11/2010) This bulletin is to advise you of the fees and responsibilities associated with the tenant s temperature controls. Tenant Responsibility:

More information

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

This is only the scope of work for the project. For more information, interested parties should contact Procurement at "This is only the scope of work for the project. For more information, interested parties should contact Procurement at purchasing@stpgov.org to ensure receipt of a full bid package, to be listed as a

More information

Chilled Water DOAS Fan Powered Terminal Units

Chilled Water DOAS Fan Powered Terminal Units Chilled Water DOAS Fan Powered Terminal Units CHILLED WATER DOAS FAN POWERED TERMINAL UNITS DOAS TERMINAL UNITS FEATURES AND BENEFITS MINIMUM VENTILATION CONTROL The DOAS unit provides the Designer, Owner

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and

More information

PURCHASING DEPARTMENT LOUISVILLE, KENTUCKY

PURCHASING DEPARTMENT LOUISVILLE, KENTUCKY PURCHASING DEPARTMENT LOUISVILLE, KENTUCKY Date: June 14, 2017 Invitation No: IB-096-17 Title: Student Activity Center Renovation and Addition, Bid Package V Addendum No. Three (3) The following shall

More information

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS AND APPLICATIONS Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS Earliest air conditioning system used only for heating (winter) Provided heated air for comfort

More information

BULLETIN. Temperature Controls (Chilled / Hot Water)

BULLETIN. Temperature Controls (Chilled / Hot Water) BULLETIN Temperature Controls (Chilled / Hot Water) (05-07-2013) This bulletin is to advise you of the fees and responsibilities associated with the tenant s temperature controls. Tenant Responsibility:

More information

HAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001

HAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001 This HAP e-help provides a high-level overview of induction beams, how they work and how to model them in HAP 4.8 (and later versions). The first half of the article explains how induction beams work.

More information

FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK

FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK ENERGY CONSERVATION MEASURE 1 Partial Steam System Decentralization SIEMENS will Furnish and Install condensing hot water boilers with associated

More information

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW... SECTION 230001 TABLE OF CONTENTS SECTION 230001 PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS... 1 1.00 FILED SUB BID... 1 1.01 PROJECT OVERVIEW... 2 1.02 DESIGN CRITERIA... 4 1.03 CODE ISSUES...

More information

4. OVERVIEW OF MECHANICAL SYSTEM

4. OVERVIEW OF MECHANICAL SYSTEM 4. OVERVIEW OF MECHANICAL SYSTEM The 87,000 SF SLCC is served by six (6) Trane M-Series Climate Changer Air Handing Units (AHUs). Each unit serves a distinct zone within the facility that is unique in

More information

Raised Access Floor - (AE Breadth Area)

Raised Access Floor - (AE Breadth Area) Raised Access Floor - (AE Breadth Area) Currently, the Plaza has a raised access flooring system on both the 7 th and 8 th floors. The 8 th floor is designed with an independent HVAC system utilizing an

More information

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

This is only the scope of work for the project. For more information, interested parties should contact Procurement at "This is only the scope of work for the project. For more information, interested parties should contact Procurement at purchasing@stpgov.org to ensure receipt of a full bid package, to be listed as a

More information

control sequences model QST / EST Series Table 47: QST / EST Analog Electronic Control Strategies Fan Powered Air Terminals

control sequences model QST / EST Series Table 47: QST / EST Analog Electronic Control Strategies Fan Powered Air Terminals control sequences Table 47: QST / EST Analog Electronic Control Strategies Control Package Number QST EST FS-A-5000 FSE-A-5000 FS-A-5001 FSE-A-5001 FS-A-5002 FSE-A-5002 FS-A-5003 FSE-A-5003 FS-A-5004 FSE-A-5004

More information

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended

More information

Technical Assignment 3 11/15/04. Executive Summary

Technical Assignment 3 11/15/04. Executive Summary Executive Summary This report is an analysis of the existing systems within the Outreach Innovation Building in University Park, PA. One significant design criteria was a lower than average noise criteria

More information

Civil Engineering Building

Civil Engineering Building Continuous Commissioning Report For the Civil Engineering Building Building 492 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December

More information

Displacement Ventilation

Displacement Ventilation Displacement Ventilation Displacement Ventilation Displacement Ventilation vs. Dilution Ventilation Characteristics Design Considerations Layout and Selection Product Overview Casino Case Study Dilution

More information

BULLETIN. Temperature Controls (10/2013)

BULLETIN. Temperature Controls (10/2013) BULLETIN Temperature Controls (10/2013) This bulletin is to advise you of the fees and responsibilities associated with the tenant s temperature controls. This applies to Phase I & II only. Tenant Responsibility:

More information

Application Guide siemens.com/thermostats

Application Guide siemens.com/thermostats RDG/RDF room thermostats Application Guide siemens.com/thermostats Application overview 2-pipe el. heater or radiator 4-pipe with el. heater Chilled/ heated ceiling Chilled/heated ceiling with el. heater

More information

Virginia Tech Standards for Building Automation System

Virginia Tech Standards for Building Automation System March 1, 2016 Virginia Tech Standards for Building Automation System A. Existing Conditions: The Campus Building Automation System is Siemens Apogee and controls all significant campus facilties. Virginia

More information

HVAC Mandatory Provisions Part II, Page 1

HVAC Mandatory Provisions Part II, Page 1 HVAC Mandatory Provisions Part II, Page 1 Mandatory Equipment Efficiency Worksheet (6.4.1.1) System Equipment Type Size Category (Tables 6.8.1A through K) Sub-Category or Rating Condition Units of Efficiency

More information

Air Conditioning Clinic

Air Conditioning Clinic Air Conditioning Clinic VAV Systems One of the Systems Series July 2012 TRG-TRC014-EN VAV Systems One of the Systems Series A publication of Trane Preface VAV Systems A Trane Air Conditioning Clinic Figure

More information

HVAC DISTRIBUTION and DELIVERY SYSTEMS

HVAC DISTRIBUTION and DELIVERY SYSTEMS HVAC DISTRIBUTION and DELIVERY SYSTEMS (Part 1) Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1 REMINDER HVAC = Heating, Ventilating, Air-Conditioning The AC part of HVAC implies a system that

More information

Field Application of Advanced Residential Air Conditioning Systems

Field Application of Advanced Residential Air Conditioning Systems Field Application of Advanced Residential Air Conditioning Systems Presented By Greg Spencer, Residential Cooling Service Coordinator with Lennox Industries 1 How Ratings Are Established Size of Indoor

More information

Product Data. Features/Benefits. 33CS Carrier Comfort System Variable Volume and Temperature (VVT )

Product Data. Features/Benefits. 33CS Carrier Comfort System Variable Volume and Temperature (VVT ) Product Data 33CS Carrier Comfort System Variable Volume and Temperature (VVT ) The VVT Comfort System provides the following features and benefits: 365-day scheduling, daylight savings compensation, and

More information

Automatic Temperature Controls, Energy Management Systems and Metering

Automatic Temperature Controls, Energy Management Systems and Metering Design Standards Automatic Temperature Controls Energy Management Systems and Metering Automatic Temperature Controls Provide a temperature control/energy management system and control function for the

More information

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria Mechanical System Redesign Dedicated Outdoor Air System Design Criteria The outdoor air conditions used were for Philadelphia, Pennsylvania IAP at a 0.4% occurrence. The supply air conditions were developed

More information

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. SECTION 239950 MECHANICAL COMMISSIONING SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. B. Commissioning

More information

Vapor-Compression Refrigeration

Vapor-Compression Refrigeration Vapor-Compression Refrigeration condenser D C expansion device compressor A B evaporator Types of Heat Pumps water-source heat pumps water-to-water heat pump air-source heat pumps Cooling Heating

More information

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

********************************************************************************************************** SYSTEMS REQUIREMENTS HVAC TEMPLATE 02/18

********************************************************************************************************** SYSTEMS REQUIREMENTS HVAC TEMPLATE 02/18 6. ENGINEERING SYSTEMS REQUIREMENTS D30 HVAC SYSTEMS REQUIREMENTS HVAC TEMPLATE 02/18 Instructions for using this template: There are template files for each UNIFORMAT Level 2 Group Elements. This template

More information

Technical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer

Technical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer Technical Development Program PRESENTED BY: COMMERCIAL HVAC SYSTEMS Water Source Heat Pump Systems Ray Chow Sales Engineer TDP Updates Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section

More information

Improving Performance with a Building Tune-Up. Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks

Improving Performance with a Building Tune-Up. Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks Improving Performance with a Building Tune-Up Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks How much is too much? Most buildings can cut total energy use by 5-30% while

More information

Division 26 ELECTRICAL TABLE OF CONTENTS

Division 26 ELECTRICAL TABLE OF CONTENTS Division 26 ELECTRICAL TABLE OF CONTENTS 26 1000 GENERAL... 33 A. CODE... 3 B. RELATED SECTIONS... 3 C. ABBREVIATIONS... 3 D. DEFINITIONS... 3 E. DRAWING REQUIREMENTS... 3 F. EQUIPMENT SERVICE ACCESS AND

More information

Updated: September 12, 2018 DIVISION INTEGRATED AUTOMATION. INTEGRATED AUTOMATION Page 1 of INTEGRATED AUTOMATION

Updated: September 12, 2018 DIVISION INTEGRATED AUTOMATION. INTEGRATED AUTOMATION Page 1 of INTEGRATED AUTOMATION Page 1 of 7 25 00 00 25 10 00 NETWORK EQUIPMENT Standby Power 1. Consider whether the controls system should be on standby/emergency power, or UPS when central applications are controlled or the equipment

More information

Manual Supplement. Model Number: 8680-N2. Communications Protocol. Contents of this manual supplement include:

Manual Supplement. Model Number: 8680-N2. Communications Protocol. Contents of this manual supplement include: Model Number: 8680-N2 Product/System Title: Room Pressure AOC Controller with N2 Communications Protocol Contents of this manual supplement include: 1) Sequence of Operation 2) Variable map 3) Description

More information

Additions & Alterations to Ascension Parish Library Galvez Prairieville, Louisiana Project No. 1401

Additions & Alterations to Ascension Parish Library Galvez Prairieville, Louisiana Project No. 1401 Henry L. Chauvin, Architect, LLC 9429 Highway 941 Gonzales, Louisiana 70737 (225) 612-0707 Fax: (224) 612-4565 Email: henry.chauvin@outlook.com Additions & Alterations to Ascension Parish Library Galvez

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#56566/Page 1/May 23, 2017 HVAC Heating Plant The original Town Hall building and Addition building are primarily heated by a gas fired hot water plant that is located in the basement. The boiler plant

More information

Appendix 13. Categories of Cooling and Heating systems

Appendix 13. Categories of Cooling and Heating systems EcoShopping - Energy efficient & Cost competitive retrofitting solutions for Shopping buildings Co-funded by the European Commission within the 7 th Framework Programme. Grant Agreement no: 609180. 2013-09-01

More information

System Components with ` Emphasis on Packaged Rooftop Application and Installation. Jerry Cohen President Jacco & Assoc.

System Components with ` Emphasis on Packaged Rooftop Application and Installation. Jerry Cohen President Jacco & Assoc. System Components with ` Emphasis on Packaged Rooftop Application and Installation Jerry Cohen President Jacco & Assoc. Agenda Define and relate in practical terms the following components: System Effect

More information

State of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney

State of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney Frenger Radiant chilled beam performance at 3D Model Creation Daylight Analysis Comparison of the performance of various HVAC systems at 1 Shelly St, Sydney VAV fancoil Active chilled beam Passive chilled

More information

Challenges and Methods of Estimating a Conceptual HVAC Design

Challenges and Methods of Estimating a Conceptual HVAC Design Challenges and Methods of Estimating a Conceptual HVAC Design ABSTRACT In any conceptual HVAC design, estimators are faced with the challenge of trying to capture all of the pieces that complete a system.

More information

DACC Health Sciences Building Air Handler Assessment/Study

DACC Health Sciences Building Air Handler Assessment/Study DACC Health Sciences Building Air Handler Assessment/Study NMSU Facilities and Services Department P.O. Box 30001 Las Cruces, NM 88003-8001 June 14, 2016 Final Submittal 1065 S. Main St., Bldg. D, Ste.

More information

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION SECTION 15990 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION The purpose of this guide specification is to assist the Specifier in correctly specifying Mechanical System Testing Adjusting

More information

buildingscience.com Windows and Occupant Comfort EEBA Building Solutions 2003 Lincolnshire, IL

buildingscience.com Windows and Occupant Comfort EEBA Building Solutions 2003 Lincolnshire, IL Windows and Occupant Comfort EEBA Building Solutions 2003 Lincolnshire, IL Phil Kerrigan, Jim Larsen, Cardinal Glass Industries PR-0307: Windows and Occupant Comfort Page 1 of 56 Code House in Zone 5 R38

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section

More information

Radiant Exchange in Stratified Environments: Considerations and Challenges for Hourly Energy Simulation of UFAD, DV, and Radiant Cooling Systems

Radiant Exchange in Stratified Environments: Considerations and Challenges for Hourly Energy Simulation of UFAD, DV, and Radiant Cooling Systems Radiant Exchange in Stratified Environments: Considerations and Challenges for Hourly Energy Simulation of UFAD, DV, and Radiant Cooling Systems CBE Timothy Moore CENTER FOR THE BUILT ENVIRONMENT SimBuild

More information

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT February 29, 2012 RFP NO: 17 PROJECT: Josephine County Justice Center HVAC Upgrades BID CLOSING DATE: NO CHANGE: March 8, 2012 / NOT LATER

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION SECTION 237433, PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

Architectural Engineering Senior Thesis Mechanical System Redesign

Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Architectural Engineering Senior Thesis Mechanical System Redesign Chris Nicolais Building Description Existing Mechanical System Proposed Redesign Alternative Option Emergency

More information

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012 HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O INTRODUCTION HVAC systems or Heating, Ventilating and Air-Conditioning systems control the environment for people and equipment in our facilities.

More information

MHNCCX DX with Hot Water Heat Ceiling Concealed 4-Pipe Heat / Cool Fan Coil 12,000-36,000 BTUH

MHNCCX DX with Hot Water Heat Ceiling Concealed 4-Pipe Heat / Cool Fan Coil 12,000-36,000 BTUH MHNCCX DX with Hot Water Heat Ceiling Concealed 4-Pipe Heat / Cool Fan Coil 12,000-36,000 BTUH 318 MHNCCX NOMENCLATURE BREAKDOWN 4-Pipe Heat/Cool Ceiling Concealed Fan Coil MHNCCW- XX - XX Ceiling Concealed

More information

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for: Date: 05/21/2001 Time: 02:57:44 PM Job Name: EarthWise VAV Terminal Units Full Spec Location: AnyTown, Earth Prepared by: Phone Number: Prepared for: Guide Spec Summary Option List SINGLE & DUAL DUCT UNIT

More information

Gas-Fired Indoor and Outdoor Duct Furnaces

Gas-Fired Indoor and Outdoor Duct Furnaces July, 2008 Gas-Fired Indoor and Outdoor Duct Furnaces INDOOR GRAVITY VENTED DFG, DBG, DCG INDOOR SEPARATED COMBUSTION DFS, DBS, DCS OUTDOOR GRAVITY AND POWER EXHAUSTED H Series table of contents A complete

More information

Linear Floor Heaters

Linear Floor Heaters Linear Floor Heaters The Price Linear Floor Heater family provides ultimate flexibility in terms of style, performance, and ease of installation. Using room-side heat virtually eliminates the requirement

More information

Electric Coils. Blower Coils. Product Information

Electric Coils. Blower Coils. Product Information Product Information General Information Electric heat coils are an available accessory for use with Price blower coil units. The electric heating coils have been specific ally designed to suit Price blower

More information

Application Data Part Numbers: 33ZCVVTZC-01, 33ZCBC-01, 33ZCVAVTRM, 33ZCFANTRM

Application Data Part Numbers: 33ZCVVTZC-01, 33ZCBC-01, 33ZCVAVTRM, 33ZCFANTRM 3V Control System Variable Volume and Temperature (VVT ) 33ZC Application Data Part Numbers: 33ZCVVTZC-01, 33ZCBC-01, 33ZCVAVTRM, 33ZCFANTRM CONTENTS Page GENERAL...2,3 Zone Controller Control Strategy...2

More information

HVAC REPAIR/REPLACEMENT 07/18/12 SECTION HVAC - MAJOR EQUIPMENT

HVAC REPAIR/REPLACEMENT 07/18/12 SECTION HVAC - MAJOR EQUIPMENT SECTION 15300 - HVAC - MAJOR EQUIPMENT PART 1 - GENERAL 1.1 MECHANICAL GENERAL A. Section 15010 is applicable. PART 2 - PRODUCTS 2.1 FANS A. General: 1. All fans shall bear the AMCA Certified Performance

More information

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney FAST AND ROBUST BUILDING SIMULATION SOFTWARE Chilled Beam Performance: 1 Shelly Street, Sydney 3D Model Creation 1 Shelley Street, Sydney 3D Model Creation 1 Shelley Street, Sydney Daylight Analysis 1

More information

Intelligent Heating for Your Home

Intelligent Heating for Your Home Intelligent Heating for Your Home A Better Way to Heat Your Home Conventional Heating Systems Leave Your Home Too Hot or Too Cold Conventional residential heating systems lack the subtlety and sophistication

More information

Commercial Heating Products. Our products do more in a wide range of applications. Expect More.

Commercial Heating Products. Our products do more in a wide range of applications. Expect More. Commercial Heating Products Our products do more in a wide range of applications. Expect More. Indeeco pioneered the application of duct heaters in commmercial construction applications. Today, Indeeco

More information

AHU Air Handling Unit Fundamentals. j.ilangumaran

AHU Air Handling Unit Fundamentals. j.ilangumaran AHU Air Handling Unit Fundamentals j.ilangumaran Objectives Review primary components of an AHU Understand the basic progression and advantages of advanced AHU control Understand the basic control sequences

More information

SECTION PLUMBING/HVAC FINAL TESTING, ADJUSTING AND BALANCING

SECTION PLUMBING/HVAC FINAL TESTING, ADJUSTING AND BALANCING SECTION 15990 PLUMBING/HVAC FINAL TESTING, ADJUSTING AND BALANCING PROJECT NO. ####### PART I - GENERAL 1.01 WORK INCLUDED A. Final test and balance of air distribution systems. B. Final test and balance

More information

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection.

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection. Volume 5, Issue 1 CARRIER edesign SUITE NEWS Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC Equipment Selection A design challenge sometimes occurs when computing design loads using

More information

APPLICATION GUIDE BEAMS

APPLICATION GUIDE BEAMS BEAMS There is an increasing need for energy efficient air conditioning systems as energy codes become more stringent. Chilled beam systems are one such alternate to traditional all air conditioning systems.

More information

INSTALLATION INSTRUCTIONS FOR 9330F4552 FREE DELIVERY PLENUM KITS

INSTALLATION INSTRUCTIONS FOR 9330F4552 FREE DELIVERY PLENUM KITS RV Products Division INSTALLATION INSTRUCTIONS FOR 9330F4552 FREE DELIVERY PLENUM KITS 8330-752 CONTROL BOX KIT (12 VDC COOL ONLY) 9330C755 CONTROL BOX KIT (12 VDC HEAT READY) 8530-750 CONTROL BOX KIT

More information

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge ESL-TR-99/12-05 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Galveston (TAMU-G) Galveston, Texas Submitted to Texas A&M University

More information

The Art of Building Science

The Art of Building Science The Art of Building Science What is Building Science? Building Science seeks to apply the scientific fundamentals of building dynamics to the functional relationships between the house s components and

More information

Operation & Maintenance Manual

Operation & Maintenance Manual Operation & Maintenance Manual VUD, VUF, VDF & HCD Series Unit Ventilator IMPORTANT: Read and save this manual for future reference. This manual is to be left with the equipment owner 2006 TEMSPEC INCORPORATED

More information

PACKAGED ROOFTOP UNITS, AIR-SOURCE HEAT PUMPS, WATER-SOURCE / GEOTHERMAL HEAT PUMPS, & OUTDOOR AIR HANDLING UNTS. RQ Series.

PACKAGED ROOFTOP UNITS, AIR-SOURCE HEAT PUMPS, WATER-SOURCE / GEOTHERMAL HEAT PUMPS, & OUTDOOR AIR HANDLING UNTS. RQ Series. RN/RQ Series PACKAGED ROOFTOP UNITS, AIR-SOURCE HEAT PUMPS, WATER-SOURCE / GEOTHERMAL HEAT PUMPS, & OUTDOOR AIR HANDLING UNTS RQ Series Features: Air-cooled or water-cooled condenser, with unit capacities

More information

7. MECHANICAL SYSTEM DESIGN

7. MECHANICAL SYSTEM DESIGN 7. MECHANICAL SYSTEM DESIGN The second primary topic of this thesis is to investigate the application of a dedicated outdoor air system (DOAS) to the SLCC. The stated goals for this thesis of improved

More information

Mission Critical. Series 6, 8 & 9. vertical floor mount Ton Units. Air Conditioning Systems

Mission Critical. Series 6, 8 & 9. vertical floor mount Ton Units. Air Conditioning Systems Mission Critical Air Conditioning Systems vertical floor mount Series 6, 8 & 9 2-30 Ton Units Single Circuit for Superior Economy and Dual Circuit for Ultimate Protection Series 6 2-5 tons Compact Footprint

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 3.8.2 Mechanical Compliance Certificate 90.1 (2007) Standard Section 1: Project Information Project Type: New Construction Project Title : Rudy's Star Motors Construction Site:

More information

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS SECTION 23 70 00 AIR HANDLING UNITS PART 1. GENERAL 1.1 Section includes air-handling units to 15,000 cfm and accessories. 1.2 Related Sections 1 : A. Division 01 - Brown University Standard for Narragansett

More information