1 PURCHASING DEPARTMENT LOUISVILLE, KENTUCKY Date: June 14, 2017 Invitation No: IB Title: Student Activity Center Renovation and Addition, Bid Package V Addendum No. Three (3) The following shall clarify and/or modify the original bid document(s) as issued by the University of Louisville. 1. Bid Due Dates remain unchanged. 2. Questions/Clarifications as of 6/14/17 3. Sheet P3.0 4 Storm Sewer line at CL WG between 7.8 and 9 (Loading W106Y) has been installed by previous Trade Contractor. This work has been removed from project and shall not be included in bids. Reference to Cut and Patch Slab shall be removed from project. 4. proposal attached. BC-21 Plumbing and Mechanical Trade Contractor s to include this pricing in their bids. 5. Sanitary Napkin Receptacle s shall be CONTRACTOR furnished, Contractor Installed and should be by BC- 09 General Trades Contractor. 6. BC-09 General Trades Contractor shall furnish and install toilet seat cover dispensers at each new toilet location. Toilet seat dispenser shall be able to accept Reliable Toilet Seat Covers, Model , Half-Fold Sheets. 7. Sheet A1.10 Level 2-West Bldg-Enlarged North Plan, Change Wall Type from Type 3 to Type 1, directly West of exterior wall along CL WK and between W5/W6. Same wall line with Openings W200C and W200E. 8. All porcelain wall tile within Rooms W106-Servery, W106B International, W106C Aqua Sushi, W106D Traditions, and W106E Greens to Go, shall be Owner Furnished, Contractor Installed. 9. Luxury Vinyl Tile (LVT) to be used on project is Mohawk Group, Product Line C0059 Metal. a. LVT1 Proper Gray b. LVT2 Rave Red 10. Reference below detail for W106-Servery Floor Pattern- 11. Owner is furnishing (36) 4 Gallon pails of LVT Acrylic Adhesive M95C M95.0, and (22) 4 Gallon pails of XL23 Primecoat Concrete Primer for LVT located on 1 st floor of SAC West and SAC East buildings. BC- 16 Trade Contractor to provide balance of required LVT adhesives and concrete primer as required for 1 st floor, and remaining locations.

2 12. Trade Contractors shall provide offloading of materials direct purchased by Owner, and proper storing/staging at the project site. 13. Carpet Tile at W104 Servery will be Tandus Centiva, 24x24, Color New Age #71601, with Ethos Backing. Remaining Carpet on project will be 24x24 unless noted otherwise on plans. Carpet material furnished by owner, installed by Trade Contractor. 14. All new fire alarm work associated with AHU-1 shall remain in project. Bidder must acknowledge receipt of this and any addenda either with bid or by separate letter. Acknowledgement must be received in the office of Purchasing, Service Complex Building, University of Louisville not later than June 21, 2017 at 2:00 PM. If by separate letter, the following information must be placed in the lower left hand corner of the envelope: Invitation No: IB Title: Student Activity Center Renovation and Addition, Bid Package V Open Date: June 21, 2017 at 2:00 PM Reference Addendum #2 for specific opening times related to each Bid Category. BY: Curtis Monroe Authorized Purchasing Office Receipt Acknowledged: FIRM BY:

3 U OF L SAC RENOVATION AND ADDITION Bid Package V - WRITTEN QUESTIONS, ANSWERS, AND CLARIFICATIONS NO. QUESTION BY RESPONSE Questions 1-9 Addressed in Addendum #1 Questions Addressed in Addendum #2 62 Do you have any details on the cable rail system in the last bid package? Detail CG SD3.0 States to match the guardrail in previous package. Is the framing powdercoated steel or stainless? Also any idea on cable sizes? SCB/SSC Reference Spec Section Exterior Pedestrian Rails. No information yet available on last bid package railing. Framing shall be Stainless and Cable size shall be 1/8" dia. Braided per spec. 63 Tag W202A, W202B, W202C, W202D, W202E are listed in the hardware door-set index, however, these doors are not listed on the door/frame schedule. Per the demo plans, these doors do not have any notes. Are we to assume these doors/frames are existing to remain with new hardware? SSC/SCB These doors, frames, and hardware shall remain as existing. No new work required. 64 Specification PUMPS-Are Grundfos and Paco approved Pump Manufacturers CMTA Yes

4 Scope To: CMTA Engineering Date: June 14, 2017 Job Name: University of Louisville Student Activities Center Phase 4 We propose to modify and add to the existing Schneider Electric TAC I/A Series Building Automation system at the U of L Student Activities Center. We will provide a control system in accordance with the plans and specifications section , as detailed below, and as designed by CMTA Engineering. We acknowledge 1 addendum. Base Control Price $ 592, Alternate Deduct A-1 West Restroom Finish Upgrades ($ 13,120.00) Alternate Deduct A-2 Boilers & HW System in existing NW Penthouse ($ 33,410.00) Unit Price for VAV Box $ 1, Breakout Pricing for N4 Upgrade for East Side AHU s and HW/CW System $ 13, Breakout Pricing for AHU-19 including 8 VFDs $ 34, Breakout Pricing for AHU-20 including 8 VFDs $ 33, We include the following: 1. Schneider Electric - Tridium Niagara Based N4 Building Controller, interfaced with the existing U of L Campus N4 Server. 2. The complete N4 Server Graphic User Interface conversion of all remaining East Side existing BAS Control Systems serving AHUs 10, 14, 15, 16, 17, 18, 19, East HW Control System, and CW Control System. 3. A New Graphical User Interface for this building. 4. Upgrade of existing BAS Software to the latest security patches and version. 5. Labor and wiring for installation of controls provided by CSUSA for Building Automation System. 6. CSUSA will adhere to and follow the directions dictated to us in the U of L Facilities Automation & Control Systems, Owner Project Requirement Guidelines. 7. Submittal data creation, programming, pre-commissioning, and commissioning of system, including 8 hours of opposite season testing. 8. Commissioning with Third Party Commissioning Agent. 9. BAS Lighting Controls provided for Interior and Exterior lighting as detailed on sheets E4.1, E4.2, E4.3, E4.4, E4.5, E4.6, E4.7, E4.8, E4.9, and E9.0, Power wiring by Electrical Contractor, Low Voltage Wiring by CSUSA. Including Factory Startup and Commissioning. Stand-Alone Lighting Controls not included, provided by Electrical Contractor. BAS Connected Lighting Controls will be Wattstopper. 10. All control wiring above a drop ceiling will be open wire in rings or wireway. All exposed or concealed wiring will be in conduit. 11. One year warranty. 12. Demo of existing controls. All existing controls not reused will be removed. Patching pneumatics as demo d to ensure stability of existing pneumatic control system that remain serving other areas Hours of On Site Engineer assistance for programming changes Hours of On Site Hands On Training.

5 15. Direct Digital Controls and or Standalone Controls as specified for the following equipment One (1) Existing Chilled Water System, including 1 New Remote Building Differential Sensor provided with isolation discs, and Resequencing of 2 Existing Chilled Water Pumps for Differential Pressure Control, All Sensors will be reused and calibrated. Reuse Existing Controller and Control Panel. One (1) Hot Water System, including 2 Boilers, 1 Boiler Control System Common Hot Water Supply Temperature Sensor, Boiler Control System Communication wiring between the two boilers, BACnet Integration to the new Boilers, 2 Boiler Pumps, 2 Boiler Temperature Supply Sensors, 3 Emergency Boiler Shutoff Switches for 2 Boilers, Disabling the Gas Trains when pressed. All part of Alternate Deduct 2. Also including 2 Heat Exchangers with 2 6 isolation valves, 1-8 Bypass Valve, and steam valves for 1/3, 2 3 for 2/3 steam valves, 2 Hot Water Pumps with VFDs and integration via BACnet, 1 HW Building Differential Sensor provided with isolation discs, 1 Steam Consumption/Flow Meter, 4 HW Temperature Sensors for Supply and Return water, Monitor Condensate Pump System for Pump Status and High Alarm, Make-Up Water Valve and F-1310 Flow Meter. Two (2) Variable Air Volume Air Handling Units (AHU-19 & 20) including Supply and Return Fans VFDs and Speed, Static, and Minimum OA CFM Control, Economizer Damper Actuators and positive proof OA and EA damper close statuses, CO2 Control of Minimum OA, Differential Pressure Sensors for Factory Furnished Piezo Air Flow Measuring Stations for Supply and Return Fans, Supply and Return DP Fan Status Switches, Pre and Final Filter Diff. Pressure Status Sensor, Temperature and Humidity Sensors as required, Freezestats, Status and Safeties as required, Chilled Water Control Valve, CW Return Water Temperature Sensor, Hot Water Control Valve, and Hot Water Coil Pump. One (1) Existing Variable Air Volume Air Handling Unit (AHU-2E), including control of Supply and Return Fans Existing VFDs and Speed, and New Static Pressure controls, New Duct mounted Economizer Dampers with actuators and positive proof OA and EA damper close statuses, Differential Pressure Sensors for New Fan Inlet Air Flow Measuring Stations for Supply and Return Fans, Supply and Return DP Fan Status Switches, Filter Diff. Pressure Status Sensor, New Mixed Air Temperature Sensor, Temperature and Humidity Sensors as required, New Freezestats, Status and Safeties as required, Chilled Water Control Valve, CW Return Water Temperature Sensor, Hot Water Control Valve, Hot Water Coil Pump. Reuse Existing Controller, all end control devices will be new. Smoke Evac/Train Override sequence to be reconfirmed for operation. One (1) Existing Variable Air Volume Multizone Air Handling Unit (AHU-4E), including control of Supply and Relief Fans Existing VFDs and Speed controls, New Duct mounted Economizer Dampers with actuators and positive proof OA and EA damper close statuses, New 5 Zone Multizone Damper with 5 Zone Damper Actuators, CO2 Control of Minimum OA, Differential Pressure Sensors for New Fan Inlet Air Flow Measuring Stations for Supply and Return Fans, Supply and Return DP Fan Status Switches, Filter Diff. Pressure Status Sensor, New Mixed Air Temperature Sensor, Temperature and Humidity Sensors as required, New Freezestats, Status and Safeties as required, Cold Deck Chilled Water Control Valve, CW Return Water Temperature Sensor, Hot Deck Hot Water Control Valve, Preheat Coil Hot Water Valve for New Preheat Coil,

6 and Hot Water Coil Pump. Reuse Existing Controller, all end control devices will be new. Smoke Evac/Train Override sequence to be re-confirmed for operation. Eighteen (18) ABB VFD s w/ NEMA 12 Enclosures, provided and installed by CSUSA as per specs, including factory startup and 2-year warranty. VFD s are provided for the following equipment. o (2) Hot Water Pumps 1A, & 1B o (4) AHU-19 Supply Fans o (4) AHU-19 Return Fans o (4) AHU-20 Supply Fans o (4) AHU-20 Return Fans One Hundred Four (104) VAV Boxes (VAV-XX) with Hot Water Reheat 2 or 3 Way Control Valves as required, Discharge Air Temperature, Space Temperature Sensor with Space Setpoint Adjustment, Interlock to 19 Electrician Provided Occupancy Sensors, 17 VAV box Controllers with CO2 and Humidity Sensors. Eight (8) Cooling Only VAV Boxes (VAV-XX) Discharge Air Temperature, Space Temperature Sensor with Space Setpoint Adjustment. Two (2) Fan Powered VAV Boxes (FVAV-XX) with Hot Water Reheat 2 or 3 Way Control Valves as required, Discharge Air Temperature, Return Air Temperature Sensor. Two (2) Cabinet Unit Heaters (CH-1) including Fan Control and Status, Hot Water Valve, Discharge Air Sensor, and Space Temperature Sensor. One (1) Onicon Natural Gas Flow Meter, provide, monitor, and report readings. One (1) BAS interfaced Lighting Control System interface as stated above. 51 Interior Room Controllers, 49 MS/TP Interfaces, 138 Occupancy Sensors, and 20 Photocells. Factory Startup and Configuration. One (1) Fan Coil Unit including Supply Fan Control and Diff. Pressure Fan Status, Chilled Water 3 Way Valve Spring Return, Hot Water 3 Way Valve Spring Return, Supply Air Temperature, Space Temperature w/ Setpoint Control. Two (2) Domestic Hot Water Heaters (WH-1, & WH-2) each with a DHW Loop Supply Temp Sensor (total of 2), 1 DHW Recirculation Temp Sensor, 2 Common DHW Header Supply Temp Sensor, and 3 Domestic Water Recirculation Pumps. Ten (10) Exhaust Fans (EF-1, EF-2, & EF-4) with Factory Furnished Integral Exhaust Dampers and Actuators, Start/Stop and Status of the Exhaust Fans. Two (2) Exhaust Fans (EF-5, EF-6) interlocked with dishwashers. Status of Exhaust Fan. Five (5) Existing Air Handling Units (AHU-3, 5, 6, 7, & 9), Recommissioning of all existing controls including New Chilled Water Valve, New Discharge Air Sensor, and New Chilled Water Coil Leaving Water Temperature Sensor. New Sequence of operation for Chilled Water Coil. New

7 Mixed Air Temperature Sensor and New Freezestats, Reuse Existing Control Panel, Controller, HW Valves, Dampers, and Existing Actuators for HW Valve and Dampers. One (1) Existing Smoke Evacuation Sequence serving the West Building, involving AHUs 1, 2, 3, 4, 5, 6, 7, 9, and W13, W14, and Associated Smoke Dampers. Preconstruction Testing, and implementation on AHUs being modified. Eight (8) Hot Water Fin Tube 3 Way Control Valves will be interlocked to operate in conjunction with the local VAV box serving the same space. Seven (7) Ruskin CD-60 OA, Return, and Relief Control Dampers, including 1-5 Zone Multizone Damper and Belimo Actuators for AHU-2E, and AHU-4E. All New Dampers, Factory Furnished with equipment or furnished by CSUSA will be provided with Belimo Actuators by CSUSA. Three (3) Air Curtains (VAC-1), interlocked to Door Position Switch, no BAS interface. Two (2) Temperature Sensors for Freezer / Cooler Temperature Monitoring, on M3.7. Modifications to existing control sequences and panels as detailed on demo pages. We do not include the following: 1. Cutting, Patching or Painting of any nature. 2. Installation of Control Valves, Water Flow Meters, Steam Flow Meters, Water Differential Pressure Sensors, and Temperature Sensor Wells by Mechanical Contractor. 3. Installation of Control Dampers by Sheet Metal Contractor. 4. Installation of Natural Gas Flow Meter by Plumbing Contractor. 5. Vacancy Sensors, and Lighting Controls not a part of the BAS Lighting Control System, but part of the Stand Alone Lighting Controls Detail on E9.0, EC Provided and Installed, are by the Electrical Contractor. 6. Power Wiring to and from VFD s provided by Electrical Contractor. 7. Power Wiring to Shown BAS Control Panels Detailed in the Electrical Drawing is provided by the Electrical Contractor. 8. Smoke Detectors provided and installed by others. 9. Smoke and Fire Dampers provided by others. 10. Humidity Sensors for VAV are provided only when an H is depicted on the Mechanical Drawings or sheets M8.1- M Automatic Flow Balancing Valves are by the Mechanical Contractor. 12. Discharge Air Dial Thermometer detailed as Note 8 in VAV box detail, on Sheet M7.3, is not included. 13. VAV boxes are provided by the Mechanical Contractor. 14. VAV box controllers are provided by CSUSA to the box manufacturer for factory installation. 15. Controls provided with the Mechanical Equipment and Interfaced to the BAS, are the responsibility of the supplier for meeting interface sequences. Adherence to the specifications is the responsibility of the equipment manufacturer and the provider. The BAS contractor is limited by what is provided and approved by the Mechanical Engineer. 16. Any items not specifically stated above are not included. 17. Control Dampers and Control Valves not listed for replacement by Mechanical Contractor are not included. If you have any questions please contact Scott Carter at (502)

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section

More information

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section

More information

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL SECTION 15910 SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

November 11, City of Sparks 215 S. 21 st St. Sparks, NV

November 11, City of Sparks 215 S. 21 st St. Sparks, NV November 11, 2014 City of Sparks 215 S. 21 st St. Sparks, NV 89432-0857 Attn: Brian Cason Re: Sparks City Hall HVAC Upgrade Project-Alerton Direct Digital HVAC Control System to Match Existing City of

More information

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment. SECTION 23 09 93 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1 WORK INCLUDES A. Base Bid: Heating Contractor provide: Control sequences for HVAC systems, subsystems, and equipment. B. Alternate

More information

Virginia Tech Standards for Building Automation System

Virginia Tech Standards for Building Automation System March 1, 2016 Virginia Tech Standards for Building Automation System A. Existing Conditions: The Campus Building Automation System is Siemens Apogee and controls all significant campus facilties. Virginia

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-23 09 93 (November 2015) ----------------------------- Preparing Activity: USACE Superseding UFGS-23 09 23 (May 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story

More information

Updated: September 12, 2018 DIVISION INTEGRATED AUTOMATION. INTEGRATED AUTOMATION Page 1 of INTEGRATED AUTOMATION

Updated: September 12, 2018 DIVISION INTEGRATED AUTOMATION. INTEGRATED AUTOMATION Page 1 of INTEGRATED AUTOMATION Page 1 of 7 25 00 00 25 10 00 NETWORK EQUIPMENT Standby Power 1. Consider whether the controls system should be on standby/emergency power, or UPS when central applications are controlled or the equipment

More information

Florida Department of Transportation

Florida Department of Transportation Page 1 of 7 RICK SCOTT GOVERNOR Florida Department of Transportation 1109 S. Marion Avenue Lake City, Florida 32025 ANANTH PRASAD SECRETARY September 27, 2011 To: Proposal Holders Addendum No: 1, E2Q23,

More information

FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK

FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK ENERGY CONSERVATION MEASURE 1 Partial Steam System Decentralization SIEMENS will Furnish and Install condensing hot water boilers with associated

More information

Job Name Control Systems Description Date

Job Name Control Systems Description Date Job Name Control Systems Description Date Project Overview The project is a describe the building and its major HVAC systems (e.g. three-story office building, served by a rooftop unit VAV system ). In

More information

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT February 29, 2012 RFP NO: 17 PROJECT: Josephine County Justice Center HVAC Upgrades BID CLOSING DATE: NO CHANGE: March 8, 2012 / NOT LATER

More information

ADDENDUM 1. Southeast High School Auditorium & Gymnasium HVAC Improvements

ADDENDUM 1. Southeast High School Auditorium & Gymnasium HVAC Improvements ADDENDUM 1 CLIENT: PROJECT: TO: FROM: Guilford County Schools (GCS) Southeast High School Auditorium & Gymnasium HVAC Improvements All Prospective Bidders Derrick Giles, SAMR, PLLC. DATE: 6/6/2018 The

More information

Technical Assignment 3 11/15/04. Executive Summary

Technical Assignment 3 11/15/04. Executive Summary Executive Summary This report is an analysis of the existing systems within the Outreach Innovation Building in University Park, PA. One significant design criteria was a lower than average noise criteria

More information

Building Automation System (BAS) Design Criteria

Building Automation System (BAS) Design Criteria 25 0520 Building Automation System (BAS) Design Criteria 1. Design Statement a. During the various design phases of this project, the Engineer will develop options and strategies for selection of the appropriate

More information

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended

More information

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 23 0993 SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS A. This section defines the manner and method by which controls function. Requirements for each type of

More information

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES HVAC non CENTRAL PLANT 1) Zone Level Scheduling & Override for all air handlers (supply and exhaust) to match occupied hours by zone DDC or occupancy sensors (OS) allowed. (403.2.4.3,

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information Charles M. LeMaistre PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and

More information

ADDENDUM NO.1. March 4, 2013 HEAT PUMP REPLACEMENT FOR: GATE CITY ELEMENTARY SCHOOL

ADDENDUM NO.1. March 4, 2013 HEAT PUMP REPLACEMENT FOR: GATE CITY ELEMENTARY SCHOOL ADDENDUM NO.1 March 4, 2013 HEAT PUMP REPLACEMENT FOR: GATE CITY ELEMENTARY SCHOOL The data included hereinafter is issued by the Engineer (Engineered Systems Associates, 1355 East Center, Pocatello, ID

More information

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for: Date: 05/21/2001 Time: 02:57:44 PM Job Name: EarthWise VAV Terminal Units Full Spec Location: AnyTown, Earth Prepared by: Phone Number: Prepared for: Guide Spec Summary Option List SINGLE & DUAL DUCT UNIT

More information

ADDENDUM NO. 1. for. MARQUETTE HOUSING COMMISSION Pine Ridge Apartments Fire Alarm Replacement Project #A1140. Marquette, Michigan.

ADDENDUM NO. 1. for. MARQUETTE HOUSING COMMISSION Pine Ridge Apartments Fire Alarm Replacement Project #A1140. Marquette, Michigan. ADDENDUM NO. 1 for MARQUETTE HOUSING COMMISSION Pine Ridge Apartments Fire Alarm Replacement Project #A1140 Marquette, Michigan December 12, 2016 TO: ALL BIDDERS OF RECORD This addendum forms a part of

More information

Air Handler Unit (AHU) Equipment Purchase and Delivery Invitation to Bid

Air Handler Unit (AHU) Equipment Purchase and Delivery Invitation to Bid DATE: February 1, 2018 SUBJECT: Letter of Clarification #2 RE: TO: Air Handler Unit (AHU) Equipment Purchase and Delivery Invitation to Bid All Prospective Bidders Houston First Corporation ( HFC ) issues

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and Element Z for technical

More information

4. OVERVIEW OF MECHANICAL SYSTEM

4. OVERVIEW OF MECHANICAL SYSTEM 4. OVERVIEW OF MECHANICAL SYSTEM The 87,000 SF SLCC is served by six (6) Trane M-Series Climate Changer Air Handing Units (AHUs). Each unit serves a distinct zone within the facility that is unique in

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES To qualify the upgrade must add or substantially modify 3 or more sequences/system capabilities. Also, all sequences and items listed under the required section are needed in

More information

Power and Energy Management Solutions

Power and Energy Management Solutions Selection Guide Power and Energy Management Solutions Heating, Ventilating and Air Conditioning (Bulletin 1414) Selection Guide 2 HVAC Selection Guide Instrumentation Selection Checklist Use the following

More information

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN September 30, 2015 PBA Project No. 2015.0140.00 PETER BASSO ASSOCIATES INC. CONSULTING ENGINEERS 5145 LIVERNOIS ROAD,

More information

CxA to Answer this Section

CxA to Answer this Section EXHIBIT 01 91 13-3, SAMPLE Construction checklist items are to be completed as part of initial checkout and subsequent startup, preparatory to Functional testing. This checklist does not take the place

More information

Digital Precise Air Control - DPAC

Digital Precise Air Control - DPAC Digital Precise Air Control - DPAC Mode Enable Sensor Options The temperature of this sensor will determine if the unit is in heating, cooling or vent mode during Occupied operation. The following options

More information

ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards

ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards PROJECT Chicago Vocational Career Academy Chicago, Illinois OWNER Chicago Public Schools PREPARED FOR American Society of Heating Refrigerating

More information

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012) Madeira City Schools Madeira, Ohio HVAC Assessment December 2011 (Revised February 2012) Prepared by: CMTA Engineering Consultants, Inc. 10411 Meeting Street Prospect, KY 40059 www.cmtaegrs.com (502) 326-3085

More information

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3 Existing System Evaluation Executive Summary The MBNA Career Services Center is a 44,000 square foot, 4-story office type building at Penn State University, University Park Campus. The building is located

More information

DACC - NMDA BUILDINGS

DACC - NMDA BUILDINGS A PROJECT FOR: LAS CRUCES, NEW MEXICO PROJECT LOCATION LOCATION MAP INDEX OF DRAWINGS: CV001 - COVER SHEET M101 - OVERALL CAMPUS STEAM UTILITY PLAN M102 - DACC DAMA 341 PLAN M103 - DACC LRC & CLASSROOM

More information

DDC POINT LIST. 004 Harry Griffith Hall. RFP #PW17-2 Exhibit J Page 1 of 9 AHU 1 BOILER BOX DUAL DUCT MIXING. Building: HUMBOLDT STATE UNIVERSITY

DDC POINT LIST. 004 Harry Griffith Hall. RFP #PW17-2 Exhibit J Page 1 of 9 AHU 1 BOILER BOX DUAL DUCT MIXING. Building: HUMBOLDT STATE UNIVERSITY Page 1 of 9 004 Harry Griffith Hall AHU 1 OUTSIDE AIR TEMPERATURE 1 OA T AT LEAST ONE HARDWIRED OA SENSOR PER BUILDING HOT DUCT SUPPLY AIR TEMPERATURE 1 HD T 1ST FLOOR HOT DUCT STATIC PRESSURE 2 HD PRESS*

More information

SECTION FIRE DETECTION AND ALARM

SECTION FIRE DETECTION AND ALARM PART 1 - GENERAL 1.1 RELATED SECTIONS: Refer to Section 15300 for requirements regarding fire protection systems. 1.2 SCOPE OF SECTION: This section contains the requirements for equipment and installation

More information

DX-9100 Applications from Engineering Services

DX-9100 Applications from Engineering Services System 9100 Technical Manual 636.4 Application Examples Section Technical Bulletin Issue Date 0896 DX-9100 Applications from Engineering Services Introduction Page 3 Overview 3 Air Handling Unit Applications

More information

General Notes. See V sheets for scope of work details on thermostats, terminal units, air handling units and exhaust fans. Abbreviations: T.C.C. = Temperature Controls Contractor, M.C. = Mechanical Contractor.

More information

FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE. Harper College. Palatine, Illinois

FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE. Harper College. Palatine, Illinois FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE Palatine, Illinois Grumman/Butkus Associates Energy Efficiency Consultants and Sustainable Design Engineers 820 Davis Street, Suite 300 Evanston, Illinois

More information

American University Design Standards

American University Design Standards 25 95 00 CONTROL SEQUENCES FOR HVAC PART 1. GENERAL 1.01 SECTION INCLUDES A. Description of Work B. Control Sequences General Requirements C. System Specific Control Sequences 1.02 RELATED DOCUMENTS A.

More information

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW... SECTION 230001 TABLE OF CONTENTS SECTION 230001 PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS... 1 1.00 FILED SUB BID... 1 1.01 PROJECT OVERVIEW... 2 1.02 DESIGN CRITERIA... 4 1.03 CODE ISSUES...

More information

AHU Air Handling Unit Fundamentals. j.ilangumaran

AHU Air Handling Unit Fundamentals. j.ilangumaran AHU Air Handling Unit Fundamentals j.ilangumaran Objectives Review primary components of an AHU Understand the basic progression and advantages of advanced AHU control Understand the basic control sequences

More information

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog H3/V3 Series Horizontal and Vertical Indoor Air Handling Units Engineering Catalog Table of Contents AAON H3/V3 Series Features and Options Introduction... 6 H3/V3 Base Model Description... 7 Unit Size...

More information

DACC Health Sciences Building Air Handler Assessment/Study

DACC Health Sciences Building Air Handler Assessment/Study DACC Health Sciences Building Air Handler Assessment/Study NMSU Facilities and Services Department P.O. Box 30001 Las Cruces, NM 88003-8001 June 14, 2016 Final Submittal 1065 S. Main St., Bldg. D, Ste.

More information

City of Duluth Festival Center 04/25

City of Duluth Festival Center 04/25 SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS 1 AIR HANDLING UNIT TRENDS 2 1. The trending charts provided on the following pages prepared as part of a retro-commissioning investigation. The

More information

Integrated Automation Instrumentation & Terminal Devices

Integrated Automation Instrumentation & Terminal Devices Sections Included In This Standard: 1.1 Building Systems Control 1.2 Building Aumotation Systems (BAS) 1.1 BUILDING SYSTEMS CONTROL A. HVAC CONTROLS: 1. General: Temperature control zones shall not combine

More information

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS SECTION 23 70 00 AIR HANDLING UNITS PART 1. GENERAL 1.1 Section includes air-handling units to 15,000 cfm and accessories. 1.2 Related Sections 1 : A. Division 01 - Brown University Standard for Narragansett

More information

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge ESL-TR-99/12-05 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Galveston (TAMU-G) Galveston, Texas Submitted to Texas A&M University

More information

PURCHASING SECTION th Street, Surrey, B.C. V3S 3C7 Tel: Fax: ADDENDUM NO.

PURCHASING SECTION th Street, Surrey, B.C. V3S 3C7 Tel: Fax: ADDENDUM NO. PURCHASING SECTION 6645 148 th Street, Surrey, B.C. V3S 3C7 Tel: 604-590-7274 Fax: 604-599-0956 E-mail: purchasing@surrey.ca ADDENDUM NO. 2 REQUEST FOR QUOTATIONS (RFQ) NO.: 1220-040-2014-001 TITLE: DISTRICT

More information

Computing Services Center

Computing Services Center Continuous Commissioning Report for the Computing Services Center Building #516 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

INSTRUMENTATION AND CONTROL DEVICES FOR HVAC PART 1 GENERAL 1.01 RELATED REQUIREMENTS SECTION 23 0913 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC A. Section 26 2717 - Equipment Wiring: Electrical characteristics and wiring connections. 1.02 ADMINISTRATIVE

More information

Integrated Automation

Integrated Automation Revision 04/27/2017 Purpose: The Architect and/or Engineer shall incorporate the Rice specific requirements indicated in this standard s section into their design. The Architect and/or Engineer shall further

More information

Linear Floor Heaters

Linear Floor Heaters Linear Floor Heaters The Price Linear Floor Heater family provides ultimate flexibility in terms of style, performance, and ease of installation. Using room-side heat virtually eliminates the requirement

More information

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge ESL-TR-99/12-04 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University-Corpus Christi (TAMU-CC) Corpus Christi, Texas Submitted to Texas

More information

Tenant Design Criteria Section t Technical Criteria Updated: October Chain Bridge Road, Suite 105 Tysons Corner, VA 22102

Tenant Design Criteria Section t Technical Criteria Updated: October Chain Bridge Road, Suite 105 Tysons Corner, VA 22102 1961 Chain Bridge Road, Suite 105 Tysons Corner, VA 22102 ADDENDUM LOG August, 2009 Full Update September, 2011 Waterproof membrane requirement updated May, 2012 Updated per TC August, 2012 Updated Chilled

More information

An HVAC Audit of the Canberra Institute of Technology

An HVAC Audit of the Canberra Institute of Technology An HVAC Audit of the Canberra Institute of Technology 30 th November 2016 Amnon Holland amnon.holland@esbsconsult.com.au www.esbsconsult.com.au Agenda Overview CIT and various other sites The sites Type

More information

University of Houston Master Construction Specifications Insert Project Name

University of Houston Master Construction Specifications Insert Project Name SECTION 23 05 93 - TESTING, ADJUSTMENT AND BALANCING PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN & CONSTRUCTION

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN & CONSTRUCTION SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN & CONSTRUCTION s Everett Middle School and Claire Lilienthal Elementary School ADDENDUM NO. 2 PROJECT: Everett MS 450 Church Street DATE: 25 MARCH

More information

SECTION FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION

SECTION FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION Montgomery County Public Schools Facilities DIVISION 1 - GENERAL REQUIREMENTS SECTION 01915 - FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION PART 1 GENERAL 1.1 Section includes:

More information

RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan

RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan ADDENDUM NO. 2 RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan TO: All Bidders Gentlemen: You are hereby directed to make the following changes in the Project Manual and/or

More information

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available. PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

Case Study: New York Marriott Marquis BAS & Commissioning. Bill Michell, RPA, FMA, CEOE Director of Engineering

Case Study: New York Marriott Marquis BAS & Commissioning. Bill Michell, RPA, FMA, CEOE Director of Engineering Case Study: New York Marriott Marquis BAS & Commissioning Bill Michell, RPA, FMA, CEOE Director of Engineering Retro-Commissioning ( 05-06) NYSERDA co-funded study Re-Commissioning of all major mechanical,

More information

Energy Recovery with Cooling and Heating Model ERCH

Energy Recovery with Cooling and Heating Model ERCH Energy Recovery with Cooling and Heating Model ERCH 100% Outdoor Air System Dedicated Outdoor Air System 1,000-10,000 cfm 1.75 in. wg External Static Pressure Indirect Gas, Hot Water, Electric Heating,

More information

Demonstration and Training of MEP Systems Page 1 of 15

Demonstration and Training of MEP Systems Page 1 of 15 Page 1 of 15 Last Update: May 17, 2018 A. General: 1. Demonstrations and Training of various MEP and other systems is very important to BSU Facilities, especially on new building or major renovation projects.

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION SECTION 237433, PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

Automatic Temperature Controls, Energy Management Systems and Metering

Automatic Temperature Controls, Energy Management Systems and Metering Design Standards Automatic Temperature Controls Energy Management Systems and Metering Automatic Temperature Controls Provide a temperature control/energy management system and control function for the

More information

Design Standard. Thermal Systems (Chilled Water and Hot Water Systems) Detailed specifications follow. CHW AND HHW SUPPLY TEMPERATURE RESET

Design Standard. Thermal Systems (Chilled Water and Hot Water Systems) Detailed specifications follow. CHW AND HHW SUPPLY TEMPERATURE RESET Design Standard Detailed specifications follow. PART 1 CHW AND HHW SUPPLY TEMPERATURE RESET 1.1 The Utilities & Energy Services Department (UES) at Texas A&M University is actively identifying and implementing

More information

15900 HVAC INSTRUMENTATION AND CONTROLS

15900 HVAC INSTRUMENTATION AND CONTROLS 15900 HVAC INSTRUMENTATION AND CONTROLS PART 1 GENERAL - Andover Controls BAS system is the standard for the University, and may be specified as a proprietary item. 1.0 RELATED DOCUMENTS A. Drawings and

More information

SECTION : MEPS IDENTIFICATION & LABELING

SECTION : MEPS IDENTIFICATION & LABELING SECTION 01 70 10: MEPS IDENTIFICATION & LABELING 1. GENERAL A. The intent of this section is to define the labeling and identification requirements for building mechanical, electrical, plumbing, and specialty

More information

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL) SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL) Basketball Courts 15 25 Built Improvements Playgrounds, Site Furniture, etc. 20 20 Catch Basin 40 40 Cold Water Lines 40 40 Compactors DHW Supply

More information

Continuous Commissioning Report

Continuous Commissioning Report Continuous Commissioning Report for the Bush Academic Facility (Bldg. 1607) Submitted to: Office of Energy Management Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

CHAPTER 4. HVAC DELIVERY SYSTEMS

CHAPTER 4. HVAC DELIVERY SYSTEMS CHAPTER 4. HVAC DELIVERY SYSTEMS 4.1 Introduction 4.2 Centralized System versus Individual System 4.3 Heat Transfer Fluids 4.4 CAV versus VAV Systems 4.5 Common Systems for Heating and Cooling 4.6 Economizer

More information

COMcheck Software Version Review Mechanical Compliance Certificate

COMcheck Software Version Review Mechanical Compliance Certificate COMcheck Software Version 4.0.7.2 Review Mechanical Compliance Certificate Section 1: Project Information Energy Code: 2014 Oregon Energy Efficiency Specialty Code Project Title: Benton County Health Project

More information

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. SECTION 239950 MECHANICAL COMMISSIONING SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. B. Commissioning

More information

CARNEGIE-STOUT PUBLIC LIBRARY REQUEST FOR PROPOSALS FOR HVAC MAINTENANCE

CARNEGIE-STOUT PUBLIC LIBRARY REQUEST FOR PROPOSALS FOR HVAC MAINTENANCE Carnegie-Stout Public Library 360 West 11th Street Dubuque, Iowa 52001-4697 (563) 589-4225 office (563) 589-4217 www.dubuque.lib.ia.us CARNEGIE-STOUT PUBLIC LIBRARY REQUEST FOR PROPOSALS FOR HVAC MAINTENANCE

More information

2009 IECC Commercial Mechanical Requirements

2009 IECC Commercial Mechanical Requirements BUILDING ENERGY CODES UNIVERSITY 2009 IECC Commercial Mechanical Requirements Ken Baker PNNL-SA-66171 Learning(Objec-ves(( ( 1. Find(minimum(equipment(efficiency(requirements( and(recite(at(least(3(common(terms(for(measuring(

More information

1.0 Digital Controller

1.0 Digital Controller Form CP-AHU D19_D21_D22 (11-17) D303072-A Obsoletes Forms CP-Preeva-D21 (1-16) Doc No 303072, CP-Preeva-D19 (1-16) Doc No 303071 Applies to: Preeva, MAPS, MAPS II, RPB, RPBL & SSCBL Series For Air Handler

More information

Addendum # 2 Wicomico County Circuit Court Second Floor Renovations Date of Addendum: 2/6/2017

Addendum # 2 Wicomico County Circuit Court Second Floor Renovations Date of Addendum: 2/6/2017 Wicomico County Purchasing 125 N. Division St. Room B-3 Salisbury, MD 21801 Ph. 410-548-4805 Fax 410-334-3130 Email: purchasing@wicomicocounty.org Addendum # 2 Wicomico County Circuit Court Second Floor

More information

NOTICE TO ALL FIRMS. Bid RFI Questions and Answers

NOTICE TO ALL FIRMS. Bid RFI Questions and Answers Purchasing Department 227 West 27 th Street New York, NY 10001 Purchasing Dept. Tel. 212-217-3630 Purchasing Dept. Fax 212-217-3631 Purchasing@fitnyc.edu NOTICE TO ALL FIRMS Date: March 8, 2018 To: From:

More information

NC State University Design and Construction Guidelines Division 23 Basic Mechanical Requirements

NC State University Design and Construction Guidelines Division 23 Basic Mechanical Requirements 1.0 Purpose A. These guidelines provide requirements for designers to incorporate into bid documents for mechanical and plumbing systems. 2.0 General Requirements A. Warranty and Guarantee 1. Specifications

More information

JH Series Installation

JH Series Installation JH Series Installation Space Heating / Fresh Air Make-Up From the Manufacturers of Hi-Velocity Systems TM Includes: JH-15 JH-30 Module-JH-Series-Installation-Manual-010118 Installation JH fan coils by

More information

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December

More information

Continuous Commissioning: A Valuable Partner to Retrofit Projects

Continuous Commissioning: A Valuable Partner to Retrofit Projects Continuous Commissioning: A Valuable Partner to Retrofit Projects Yeqiao Zhu Aamer Athar Kenneth Banks Ph.D. PE, CEM PE, CEM Energy Systems Laboratory Sempra Energy Solutions Sempra Energy Solutions Charles

More information

RCE # April 30, 2013 Centennial School District William Tennent HS, Region 3 ES, Region 1 ES, Region 2 ES

RCE # April 30, 2013 Centennial School District William Tennent HS, Region 3 ES, Region 1 ES, Region 2 ES RCE #12-4181 April 30, 2013 Centennial School District William Tennent HS, Region 3 ES, Region 1 ES, Region 2 ES Commissioning Progress Report The Commissioning Technician returned to visit R2ES and R1ES

More information

Your Home. Jacco & Assoc.

Your Home. Jacco & Assoc. Your Home Fan on with call for heating or cooling Heating on with call from space thermostat Stage as required to maintain The 75F Basics adj. - First stage of heating shall be heat pump Cooling on with

More information

1.0 Digital Controller

1.0 Digital Controller 1.0 Digital Controller...1 1.1 Display Function Keys...1 1.2 Thermostat Display...2 1.3 Controller hardware input output points... 4 2.0 Sequence of Operation...5 2.1 States of Operation...5 2.2 Modes

More information

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER PART 1 GENERAL 1.01 RELATED DOCUMENTS A. ANSI Z21.13 American National Standard for Gas-Fired Low Pressure Steam and Hot Water Boilers B. ASME Section

More information

Building Automation System

Building Automation System University of New Hampshire University of New Hampshire Scholars' Repository Division 25 Integrated Automation Chapter 5 Technical Construction and Renovation Standards 8-1-2014 250000 - Building Automation

More information

ASHRAE WILL GIVE YOU THE WORLD. This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee

ASHRAE WILL GIVE YOU THE WORLD. This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee ASHRAE WILL GIVE YOU THE WORLD This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee Complete the Distinguished Lecturer Event Summary Critique CTTC

More information

Mechanical System Description

Mechanical System Description 1. Building Description: Mechanical System Description The building is a Type-1B construction, 9-levels, non-high rise building with 67 affordable family housing units. The first level of the structure

More information

DONALD H. BERG, ARCHITECT

DONALD H. BERG, ARCHITECT DONALD H. BERG, ARCHITECT DVA PROJECT 632-CSI-402 PET/CT ROOM #A0-10 RENOVATION BASEMENT LEVEL, BUILDING 200 ARCHITECT S PROJECT No. 0917-02 ADDENDUM NO. 1 JUNE 25, 2018 Page 1 of 1 ARCHITECTURAL 1. Specifications:

More information

Civil Engineering Building

Civil Engineering Building Continuous Commissioning Report For the Civil Engineering Building Building 492 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

TAP v2.10 Version Date: 6/12/13. Document Microprocessor Controller for Tempered Air Products

TAP v2.10 Version Date: 6/12/13. Document Microprocessor Controller for Tempered Air Products Document 475595 Microprocessor Controller for Tempered Air Products Reference Guide for the Microprocessor Controller Please read and save these instructions. Read carefully before attempting to operate

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 4.0.4. Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 205 IECC Dallas, Texas 3a New Construction Construction Site: 56

More information

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney FAST AND ROBUST BUILDING SIMULATION SOFTWARE Chilled Beam Performance: 1 Shelly Street, Sydney 3D Model Creation 1 Shelley Street, Sydney 3D Model Creation 1 Shelley Street, Sydney Daylight Analysis 1

More information