Groundwater Flow Modeling of ROW Bioswales Adjacent to Residential Buildings

Size: px
Start display at page:

Download "Groundwater Flow Modeling of ROW Bioswales Adjacent to Residential Buildings"

Transcription

1 Groundwater Flow Modeling of ROW Bioswales Adjacent to Residential Buildings 2016 AWRA Summer Specialty Conference: GIS and Water Resources IX Zachary Benedetto Arup

2 Outline Background on NYC Green Infrastructure Program Issues during construction Groundwater Modeling for Risk Analysis Next Steps 2

3 Outline Background on NYC Green Infrastructure Program Issues during construction Groundwater Modeling for Risk Analysis Next Steps 3

4 CSOs

5 30 billion gallons combined sewer overflow from 490 outfalls in NY Harbor each year Background

6 NYC Waterways

7 NYC DEP Green Infrastructure 7 NYC DEP Green Infrastructure

8 8 ROW Bioswale

9 9 ROW Bioswale

10 Arup NYC Green Infrastructure Projects

11

12 Tributary Drainage Area Analysis high points low points slopes catch basins Sidewalk width type Site Selection pictures offsets LIRR NYCT Rail Coordination Amtrak CSX Geotechnical Investigation borings permeability tests bedrock groundwater Survey utilities properties offsets grades sizes efficiency Design Documents trees coordinates obstructions plantings Construction submittals RFIs 12 Project Phases

13 Outline Background on NYC Green Infrastructure Program Issues during construction Groundwater Modeling for Risk Analysis Next Steps 13

14 14

15

16 Outline Background on NYC Green Infrastructure Program Issues during construction Groundwater Modeling for Risk Analysis Next Steps 16

17 Sites with Issues during Construction f - Adjacent buildings have a history of basement water leakage. - Structural defects likely contributed to water issue b - Seepage into basement occurred after the location was excavated e - pit was excavated, and was in the process of being filled with the bioswale material, when the flooding occurred - Infiltration causing groundwater levels to rise to basement floor vs. lateral flow in unsaturated zone from bioswale to basement wall during large storm events 17

18 Site Selection Geotechnical Investigation Site Survey Design & Construction Seepage Rejection 18 Current Workflow

19 Site Selection Geotechnical Investigation Site Survey Groundwater Modeling Design & Construction Seepage Rejection 19 Ideal Workflow

20

21

22 22 Data Collection

23 Available Data from Bioswale Soil Boring Logs Permeability Tests Soil Samples w/ Lab Results Bioswale Design Infiltration Rates Bioswale and proposed site dimensions 23

24 Available Data from Overall Site Rainfall Rates Soils Types Groundwater Levels Overall History of Issues Historic Boring Tests 24

25 Groundwater Modeling Software GeoStudio 2012 Suite - Geo-Slope International - SEEP/W - 2D finite element model that allows for both unsaturated zone flow and transient flow simulations - analyzes groundwater flow within porous materials. Its formulation enables analyses ranging from simple saturated steady-state problems to sophisticated saturated/unsaturated timedependent problems. 25

26 SEEP / W First Steps - Build and run test model with base case cross section and data assumptions - Expand to case study bioswales and their unique data - Validate - Run tests for proposed bioswales 26

27 27 Model Domain

28 28 4 hour storm duration in bioswale (modeled as constant head)

29 29 Pore water pressure profile t = 4 hrs (end of storm event) Fully saturated soil conditions beneath bioswale

30 30 Pore water pressure profile t = 10 hrs (post storm) Saturated conditions progressively moving vertically through soil (declining in size)

31 31 Pore water pressure profile t = 3 days Partially saturated conditions as water progressively fills voids

32 32 Pore water pressure profile t = 20 days

33 Outline Background on NYC Green Infrastructure Program Issues during construction Groundwater Modeling for Risk Analysis Next Steps 33

34 Next Steps Refine models with site data and determine if they align with what happened on site during construction Propose this risk analysis modeling to NYC DEP Conduct the modeling on proposed sites that are nearby to adjacent underground structures Pre-emptively reject seepage prone sites before incidents occur 34

35 Thank you! Questions? Contact Info - Zachary Benedetto - Civil Engineer - Zachary.Benedetto@arup.com - Vincent Lee - Project Manager - Vincent.Lee@arup.com 35

NYC Green Infrastructure Program

NYC Green Infrastructure Program NYC Green Infrastructure Program 2013 Green Infrastructure Annual Report Kevin Dahms, Assistant Director, NYC DEP Office of Green Infrastructure Pre-Release Briefing for DEC ENGS 44 Sustainable Design

More information

Planning & Designing for Green Infrastructure: Implementation in the Public Right-of-way

Planning & Designing for Green Infrastructure: Implementation in the Public Right-of-way Planning & Designing for Green Infrastructure: Implementation in the Public Right-of-way Presenters Terra Ishee, Acting Director, Pedestrian Projects Group, NYC DOT Rosanna Collars, Urban Planner & Designer,

More information

Prof. B V S Viswanadham, Department of Civil Engineering, IIT Bombay

Prof. B V S Viswanadham, Department of Civil Engineering, IIT Bombay 22 Module 5: Lecture -4 on Stability of Slopes Sudden drawdown Determination of most critical slip surface Criteria for most critical slip surface = Minimum factor of safety Trial and error approach involves

More information

NYC Green Infrastructure Program

NYC Green Infrastructure Program NYC Green Infrastructure Program Parks Without Borders May 24, 2016 NYC Water Quality Improvement Program $10B investment since the early 2000s has yielded the highest water quality observed in the NYC

More information

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT INTRODUCTION In recent years, the University of Cincinnati (University) has demonstrated a commitment to identifying and implementing sustainable goals and objectives throughout University s Uptown Campuses.

More information

Monitoring and Modeling of the Hydrologic Performance of the Carroll Street. Right-of-Way Bioswale. Wei Chen

Monitoring and Modeling of the Hydrologic Performance of the Carroll Street. Right-of-Way Bioswale. Wei Chen Monitoring and Modeling of the Hydrologic Performance of the Carroll Street Right-of-Way Bioswale Wei Chen Master of Science in Environmental Engineering August 2014 Department of Civil, Architectural,

More information

Village of Forest Park. July 27, Sewer Separation Evaluation

Village of Forest Park. July 27, Sewer Separation Evaluation Village of Forest Park July 27, 2015 Sewer Separation Evaluation Presentation Overview Study Background Historic Nature of Forest Park Drainage Scale of Flooding Problem Forest Park Sewer System Background

More information

Building Green: An Update on Atlanta's Green Infrastructure Approach

Building Green: An Update on Atlanta's Green Infrastructure Approach City of Atlanta Mayor Kasim Reed Department of Watershed Management Building Green: An Update on Atlanta's Green Infrastructure Approach Todd Hill, PE, LEED AP, EnvSP Watershed Director 2016 Eastern Regional

More information

Appendix D - Technical Design Criteria for BMPs

Appendix D - Technical Design Criteria for BMPs Appendix D - Technical Design Criteria for BMPs City of Wayzata Page 3 On-site infiltration features Definitions and Scope: Infiltration facilities are constructed basins or depressions located in permeable

More information

FLEET AVENUE GREEN STREET USES VACANT LOT FOR CSO REDUCTION. Thomas M. Evans, AECOM Cleveland, Ohio

FLEET AVENUE GREEN STREET USES VACANT LOT FOR CSO REDUCTION. Thomas M. Evans, AECOM Cleveland, Ohio FLEET AVENUE GREEN STREET USES VACANT LOT FOR CSO REDUCTION Thomas M. Evans, AECOM Cleveland, Ohio INTRODUCTION As part of the Northeast Ohio Regional Sewer District s (Sewer District) Green Infrastructure

More information

Reducing New York City s CSOs Using Green Infrastructure

Reducing New York City s CSOs Using Green Infrastructure Reducing New York City s CSOs Using Green Infrastructure Think Blue Maine Conference November 21-22, 2013 Portland, ME Anne Kitchell, LEED AP, Horsley Witten Group John McLaughlin, NYCDEP Matthew Jones,

More information

MSD Project Clear s Rainscaping Program - Neighborhood Scale Rain Gardens

MSD Project Clear s Rainscaping Program - Neighborhood Scale Rain Gardens MSD Project Clear s Rainscaping Program - Neighborhood Scale Rain Gardens Outline MSD Project Clear Rainscaping Program Overview Pilot Program Overview Neighborhood Scale Raingardens Siting Design Construction

More information

Slope Stability in Harris County

Slope Stability in Harris County Slope Stability in Harris County Slope Stability in Harris County Slope Stability in Harris County Overview of slope stability. Conditions, causes, and types of slope failures. HCFCD geotechnical investigation

More information

Green Infrastructure Implementation Planning for Multiple Objectives

Green Infrastructure Implementation Planning for Multiple Objectives Green Infrastructure Implementation Planning for Multiple Objectives Hazem Gheith, ARCADIS September 10, 2014 Imagine the result Integrated Plan for Stormwater Control Integrated Plan Objective Sanitary

More information

SITING CONSIDERATIONS

SITING CONSIDERATIONS Bioretention: Siting and Applications Presentation Overview Siting Considerations Native Soil Characterization Lessons Leaned Feasibility & Performance Applications ALICE LANCASTER, PE alancaster@herrerainc.com

More information

EFFECT OF RELICT JOINTS IN RAIN INDUCED SLOPE FAILURES IN RESIDUAL SOIL

EFFECT OF RELICT JOINTS IN RAIN INDUCED SLOPE FAILURES IN RESIDUAL SOIL EFFECT OF RELICT JOINTS IN RAIN INDUCED SLOPE FAILURES IN RESIDUAL SOIL Neethimappiriya Tharmalingam, Student (Email: neethi_26@yahoo.com) N.W.H. Lakshamana, Student (Email: hansaka8888@yahoo.com) R.D.T.B.

More information

Appendix G. Detailed Design

Appendix G. Detailed Design Appendix G Detailed Design G1: Construction details Construction detail drawings usually include important details and specifications for required project design elements. This section provides information

More information

CHECKLIST FOR PHASE II DRAINAGE REPORT

CHECKLIST FOR PHASE II DRAINAGE REPORT I. COVER SHEET CHECKLIST FOR PHASE II DRAINAGE REPORT A. Name of Project B. Address C. Owner D. Developer E. Engineer F. Submittal date and revision dates as applicable II. GENERAL LOCATION AND DESCRIPTION

More information

SITING CONSIDERATIONS

SITING CONSIDERATIONS Bioretention: Siting and Applications Presentation Overview Siting Considerations Native Soil Characterization Lessons Leaned Feasibility & Performance Applications ALICE LANCASTER, PE alancaster@herrerainc.com

More information

Key Environmental Issues in U.S. EPA Region 2 Panel 4 Water Issues

Key Environmental Issues in U.S. EPA Region 2 Panel 4 Water Issues Key Environmental Issues in U.S. EPA Region 2 Panel 4 Water Issues Angela Licata, Deputy Commissioner for Sustainability New York City Department of Environmental Protection May 29, 2014 Consumption Declining,

More information

Flooding Hearing: Long and Short Term Strategies

Flooding Hearing: Long and Short Term Strategies Services of the San Francisco Public Utilities Commission Flooding Hearing: Long and Short Term Strategies Presentation to San Francisco Board of Supervisors Public Safety and Neighborhood Services Subcommittee

More information

Modeling Rain Garden LID Impacts on Sewer Overflows

Modeling Rain Garden LID Impacts on Sewer Overflows 7 Modeling Rain Garden LID Impacts on Sewer Overflows Uzair (Sam) M. Shamsi In September 2010, the U.S. Environmental Protection Agency (USEPA) released a new version (5.0.021) of Storm Water Management

More information

Going Green with the NYS Stormwater Design Standards

Going Green with the NYS Stormwater Design Standards Going Green with the NYS Stormwater Design Standards Shohreh Karimipour, P.E. NYSDEC History of Stormwater Management Ancient Greek Cisterns Water Cistern Systems in Greece from Minoan to Hellenistic Period,

More information

When planning stormwater management facilities, the following principles shall be applied where possible.

When planning stormwater management facilities, the following principles shall be applied where possible. 2.0 Principles When planning stormwater management facilities, the following principles shall be applied where possible. 2.0.1 Drainage is a regional phenomenon that does not respect the boundaries between

More information

Sustainable Stormwater Retrofit Best Practices

Sustainable Stormwater Retrofit Best Practices Sustainable Stormwater Retrofit Best Practices Presenter Zach Sample, PE Stormwater Products Manager XP Solutions XP Solutions has a long history of Providing original, high-performing software solutions

More information

Monitoring Performance and Effectiveness of Urban Stormwater Best Management Practices. Jim Duncker, USGS Kuldip Kumar, MWRDGC David Leopold, CDOT

Monitoring Performance and Effectiveness of Urban Stormwater Best Management Practices. Jim Duncker, USGS Kuldip Kumar, MWRDGC David Leopold, CDOT Monitoring Performance and Effectiveness of Urban Stormwater Best Management Practices Jim Duncker, USGS Kuldip Kumar, MWRDGC David Leopold, CDOT Stormwater Management Water Efficiency Transportation Energy

More information

Separate Storm Sewer System Study Questions/Answers

Separate Storm Sewer System Study Questions/Answers 1 Separate Storm Sewer System Study Questions/Answers Village of Wilmette, Illinois March 13, 2018 Green Infrastructure 2 3 Role of Green Infrastructure Green Stormwater Infrastructure (GSI) can reduce

More information

Post Construction BMP Inspection. Scott Taylor, P.E. Stormwater

Post Construction BMP Inspection. Scott Taylor, P.E. Stormwater Post Construction BMP Inspection Scott Taylor, P.E. Learning Objectives To Understand: Types of post construction BMPs Typical construction process of BMPs Construction errors that impact BMP operation

More information

David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012

David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012 David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012 The City of Indianapolis is undergoing the completion of RebuildIndy projects. Through Mayor Ballard s RebuildIndy initiative, investments

More information

6.1 Bioretention Areas

6.1 Bioretention Areas SAN MATEO COUNTYWIDE WATER POLLUTION PREVENTION PROGRAM 6.1 Bioretention Areas Figure 6-1. Bioretention Area. Source: City of Brisbane Bioretention areas 1, or rain gardens, are concave landscaped areas

More information

Michael Clark, P.E. & Michael Moonan, RLA Weston and Sampson Engineers & David Lachance Woodbury Ridge Developer

Michael Clark, P.E. & Michael Moonan, RLA Weston and Sampson Engineers & David Lachance Woodbury Ridge Developer Michael Clark, P.E. & Michael Moonan, RLA Weston and Sampson Engineers & David Lachance Woodbury Ridge Developer Woodbury Ridge An LID Conservation Subdivision Presentation to: Low Impact Development

More information

DC Clean Rivers Project Green Infrastructure Program

DC Clean Rivers Project Green Infrastructure Program District of Columbia Water and Sewer Authority George S. Hawkins, General Manager Briefing on: DC Clean Rivers Project Green Infrastructure Program Briefing for: American Water Resources Association National

More information

Ken Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA

Ken Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA Ken Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA Development Process of San Francisco s GI Typical Details SCVURPPP GI Workshop April 19, 2017 Outline How to develop GI details

More information

Green Infrastructure Modeling in Cincinnati Ohio. Small Scale Green Infrastructure Design Using Computer Modeling

Green Infrastructure Modeling in Cincinnati Ohio. Small Scale Green Infrastructure Design Using Computer Modeling Green Infrastructure Modeling in Cincinnati Ohio Small Scale Green Infrastructure Design Using Computer Modeling Presenters Jason Abbott is a Design Engineer with over 17 years of experience. Jason is

More information

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS May 2007 SECTION 1 Responsibility of Applicant TABLE OF CONTENTS A. Stormwater Management Plan Required Information

More information

BY GEOFF DEIGAN 2 0 I l l i n o i s P a r k s a n d R e c r e a t i o n w w w. I L i p r a. o r g

BY GEOFF DEIGAN 2 0 I l l i n o i s P a r k s a n d R e c r e a t i o n w w w. I L i p r a. o r g BY GEOFF DEIGAN 20 Illinois Parks and Recreation www.ilipra.org Often nature is the inspiration for cutting-edge technology. So it is with emerging systems for managing stormwater, which in today s heavily

More information

Development and Design of Cost-Effective, Real-Time Implementable Sediment and Contaminant Release Controls

Development and Design of Cost-Effective, Real-Time Implementable Sediment and Contaminant Release Controls Development and Design of Cost-Effective, Real-Time Implementable Sediment and Contaminant Release Controls Richard Warner, Ph.D. Biosystems and Agricultural Engineering Department University of Kentucky

More information

FACT SHEET: Pervious Pavement with Infiltration

FACT SHEET: Pervious Pavement with Infiltration FACT SHEET: Pervious Pavement with Infiltration DESCRIPTION Pervious pavement is a Green Infrastructure (GI) technique that combines stormwater infiltration, storage, and structural pavement consisting

More information

Green Roofs and CSO Mitigation:

Green Roofs and CSO Mitigation: Green Roofs and CSO Mitigation: Evaluating green infrastructure expansion in partnership with Newtown Creek Alliance Kingsland Wildflowers Green Roof Brooklyn, NYC Sulekha Gangopadhyay Capstone Presentation

More information

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks 2019 NEORSD GIG Eligibility and Technical Requirements Project must be located in the Sewer District s combined sewer area Location Applicant

More information

4. Contractor (and subcontractors if applicable) certification statement(s)

4. Contractor (and subcontractors if applicable) certification statement(s) CHEMUNG COUNTY STORMWATER COALITION STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SUBMITTAL CHECKLIST GENERAL INFORMATION: 1. Owner/Operator name, legal address, phone number 2. Copy of signed Notice of

More information

Green Infrastructure on Brownfields

Green Infrastructure on Brownfields Green Infrastructure on Brownfields Tysen O. Miller, PE, LEED AP, CPESC KU Resources, Inc. tmiller@kuresources.com Jim Pillsbury, MS, PE Westmoreland Conservation District jim@wcdpa.org October 3, 2018

More information

SMALL PROJECTS SIMPLIFIED APPROACH

SMALL PROJECTS SIMPLIFIED APPROACH SMALL PROJECT APPLICATION AND STORMWATER MANAGEMENT DESIGN ASSISTANCE MANUAL FOR SMALL PROJECTS IN FULTON TOWNSHIP LANCASTER COUNTY, PENNSYLVANIA SMALL PROJECTS SIMPLIFIED APPROACH Prepared By: Light-Heigel

More information

Successful Green Infrastructure Planning: A Micro-Scale Modeling and Field Investigation Approach

Successful Green Infrastructure Planning: A Micro-Scale Modeling and Field Investigation Approach Successful Green Infrastructure Planning: A Micro-Scale Modeling and Field Investigation Approach Hazem Gheith and Vinnie Treatment, Water Division, ARCADIS-US Hunter Kelly, Department of Sewage and Drainage,

More information

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS Introduction As required by federal and state law, the Borough of Swarthmore has adopted regulations that affect stormwater runoff and surface

More information

Keywords: Unsaturated flow, infiltration, marginal fill, rainfall, nonwoven geotextile, sand cushion 1 INTRODUCTION

Keywords: Unsaturated flow, infiltration, marginal fill, rainfall, nonwoven geotextile, sand cushion 1 INTRODUCTION Numerical study of infiltration into unsaturated clay slopes with nonwoven geotextile drains sandwiched in sand cushions: featuring the capillary barrier effect Joseph Nganga Thuo & Kuo-Hsin Yang Department

More information

Building Green: An Update on Atlanta's Green Infrastructure Approach

Building Green: An Update on Atlanta's Green Infrastructure Approach City of Atlanta Mayor Kasim Reed Department of Watershed Management Building Green: An Update on Atlanta's Green Infrastructure Approach Cory Rayburn, CPESC, CFM Environmental Program Manager SESWA Spring

More information

Drainage Control Plans

Drainage Control Plans 2016 Drainage Design and Erosion Control Manual - Guide Sheet 1C Drainage Control Plans A Drainage Control Plan is the comprehensive submittal package containing all of the technical information, analysis,

More information

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018 Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018 Potential Impacts of New Development Urban development can significantly increase stormwater runoff Water quality considerations

More information

Rainscaping. Rainscaping includes rain gardens, bioswales, combinations of. A guide to local projects in St. Louis

Rainscaping. Rainscaping includes rain gardens, bioswales, combinations of. A guide to local projects in St. Louis Rainscaping A guide to local projects in St. Louis Rain garden on South Grand Boulevard in the city of St. Louis. Rainscaping includes rain gardens, bioswales, combinations of plantings, water features,

More information

Water Sensitive Urban Design Site Development Guidelines and Practice Notes. Appendix

Water Sensitive Urban Design Site Development Guidelines and Practice Notes. Appendix Water Sensitive Urban Design Site Development Guidelines and Practice Notes Appendix 108 Appendix A Water sensitive developments involve simple design and management practices that take natural site features

More information

Brigitte A. Berger, Director of Engineering

Brigitte A. Berger, Director of Engineering Brigitte A. Berger, Director of Engineering Wilmette s Sewer System Overview of Wilmette s Sewer System Green vs. Gray? Stormwater Action Plan Regulatory Compliance Why Homes Flood What can

More information

4. CONCEPT PLAN DEVELOPMENT

4. CONCEPT PLAN DEVELOPMENT 4. CONCEPT PLAN DEVELOPMENT Concept Plan Step 1: Identify Site Constraints and Opportunities Review the existing site to identify constraints and opportunities for GI Practices to meet the RRv. Constraints

More information

Rainwater Harvesting: Soil Storage and Infiltration Systems

Rainwater Harvesting: Soil Storage and Infiltration Systems Rainwater Harvesting: Soil Storage and Infiltration Systems Justin K. Mechell Texas Cooperative Extension Department of Biological and Agricultural Engineering Texas A&M University How Rainwater Harvesting

More information

New Development Stormwater Guidelines

New Development Stormwater Guidelines New Development Stormwater Guidelines CITY OF MOUNTLAKE TERRACE Table of Contents Introduction... 2 Ecology s Minimum Requirements for stormwater management... 2 Description of the 9 Minimum Requirements...

More information

Green Infrastructure & Low Impact Development

Green Infrastructure & Low Impact Development Green Infrastructure & Low Impact Development CITY OF COVINGTON STORMWATER MANAGEMENT WHAT IS GREEN INFRASTRUCTURE? Green infrastructure uses vegetation, soils and natural processes to manage water and

More information

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20 What is stormwater runoff? Stormwater is any form of natural precipitation (including ice and snow melt) that flows across undeveloped or developed land. In a natural setting, a majority of the water seeps

More information

Citywide Integrated Stormwater Management Plan (ISMP) DRAFT ACTION PLAN REVIEW Public Consultation November 16 th, 2016

Citywide Integrated Stormwater Management Plan (ISMP) DRAFT ACTION PLAN REVIEW Public Consultation November 16 th, 2016 Citywide Integrated Stormwater Management Plan (ISMP) DRAFT ACTION PLAN REVIEW Public Consultation November 16 th, 2016 1 Agenda DRAFT ACTION PLAN REVIEW Public Consultation Time 6:00 6:05 6:05 6:20 6:20

More information

Green Infrastructure Overview

Green Infrastructure Overview Green Infrastructure Overview Christopher C. Obropta, Ph.D., P.E. obropta@envsci.rutgers.edu Jeremiah Bergstrom, LLA, ASLA jbergstrom@envsci.rutgers.edu February 26, 2016 Water Resources Program NJDEP

More information

2016 WORKSHOP LVR Field Trip

2016 WORKSHOP LVR Field Trip 2016 WORKSHOP LVR Field Trip ***Note*** Many of the sites on this tour were NOT related to, or funded by, the DGLVR program. They are being shown to encourage discussion about the kinds of projects that

More information

Subsurface Infiltration Bed

Subsurface Infiltration Bed Subsurface Infiltration Bed The Subsurface Infiltration Bed BMP consists of a storage bed underlying either a vegetated or hardscaped surface for the purpose of temporary storage and infiltration of stormwater

More information

Transient Groundwater Analysis with Slope Stability

Transient Groundwater Analysis with Slope Stability Transient Groundwater Analysis with Slope Stability 19-1 Transient Groundwater Analysis with Slope Stability This tutorial describes how to use Slide to calculate factors of safety for a dam subjected

More information

Green Roofs and Stormwater Management Virginia Stovin

Green Roofs and Stormwater Management Virginia Stovin Green Roofs and Stormwater Management Virginia Stovin Department of Civil and Structural Engineering Pennine Water Group University of Sheffield Outline Urban stormwater management Conventional solutions,

More information

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017 Street Flooding Mitigation Plan KYOVA Interstate Planning Commission Presented to AMPO National Conference October 18, 2017 Saleem Salameh, Ph.D., P.E., M.ASCE Chet Parsons, AICP CTP Agenda: Background

More information

Urban Stormwater: Best Practice Environmental Management Guidelines. CSIRO This electronic edition published by CSIRO PUBLISHING, 2006.

Urban Stormwater: Best Practice Environmental Management Guidelines. CSIRO This electronic edition published by CSIRO PUBLISHING, 2006. Urban Stormwater: Best Practice Environmental Management Guidelines. Chapter 5 Water Sensitive Urban Design Key references Department of Planning, 1993, Better Drainage: Guidelines for the Multiple Use

More information

Detroit Stormwater Rules and Drainage Fee Updates

Detroit Stormwater Rules and Drainage Fee Updates 2016 Regional Stormwater Summit Detroit Stormwater Rules and Drainage Fee Updates Dan Christian, PE, D.WRE Tetra Tech INTRODUCTION 10/7/2016 DRAFT - For Discussion Purposes Only 2 Historically No formal

More information

GREATER NEW HAVEN WPCA. GREEN REDEVELOPMENT REDUCES CSOs IN NEW HAVEN. Tom Sgroi, P.E. Director of Engineering, GNHWPCA

GREATER NEW HAVEN WPCA. GREEN REDEVELOPMENT REDUCES CSOs IN NEW HAVEN. Tom Sgroi, P.E. Director of Engineering, GNHWPCA 1 GREATER NEW HAVEN WPCA GREEN REDEVELOPMENT REDUCES CSOs IN NEW HAVEN Tom Sgroi, P.E. Director of Engineering, GNHWPCA Bruce Kirkland, P.E. Senior Engineer, GNHWPCA 2 1975 GREEN INFRASTRUCTURE BACKGROUND

More information

Green Infrastructure and Low-Impact Development Technologies

Green Infrastructure and Low-Impact Development Technologies Green Infrastructure and Low-Impact Development Technologies The guiding principles of these technologies is to manage stormwater at their sources using natural means, and establish conditions so that

More information

Effect of characteristics of unsaturated soils on the stability of slopes subject to rainfall

Effect of characteristics of unsaturated soils on the stability of slopes subject to rainfall Japanese Geotechnical Society Special Publication The 15th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering Effect of characteristics of unsaturated soils on the stability of slopes

More information

Sustainable Stormwater Management through Green Infrastructure. Jersey City Public School #5

Sustainable Stormwater Management through Green Infrastructure. Jersey City Public School #5 Green Infrastructure Site Evaluation Friday, October 25 th, 2013 Sustainable Stormwater Management through Green Infrastructure Jersey City Public School #5 FORMAT: (15 minutes) An Introduction to Stormwater

More information

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.

More information

Table of Contents CREATING GREEN BUFFERS IN THE GREENPOINT INDUSTRIAL AREA. Purpose...3 Background...3

Table of Contents CREATING GREEN BUFFERS IN THE GREENPOINT INDUSTRIAL AREA. Purpose...3 Background...3 Table of Contents Purpose...3 Background...3 Section One - General Green Infrastructure Framework & Considerations...7 1.1 Bioswales and Stormwater Greenstreets...9 1.1.1 Introduction to Bioswales and

More information

Two Sides of the Green Infrastructure Coin. Jaren Hiller, PE, LEED AP Nathan Guequierre

Two Sides of the Green Infrastructure Coin. Jaren Hiller, PE, LEED AP Nathan Guequierre Two Sides of the Green Infrastructure Coin Jaren Hiller, PE, LEED AP Nathan Guequierre May 5, 2016 Background Citywide Stormwater Planning WinSLAMM Analysis No Control Existing Conditions Proposed Conditions

More information

NYC Green Infrastructure Annual Report. Bill de Blasio Mayor Emily Lloyd Commissioner

NYC Green Infrastructure Annual Report. Bill de Blasio Mayor Emily Lloyd Commissioner NYC Green Infrastructure 2013 Annual Report Bill de Blasio Mayor Emily Lloyd Commissioner Emily Lloyd Commissioner Dear Friends: In 2010, the New York City Department of Environmental Protection (DEP)

More information

GREEN INFRASTRUCTURE FEASIBILITY STUDY HARRISON

GREEN INFRASTRUCTURE FEASIBILITY STUDY HARRISON GREEN INFRASTRUCTURE FEASIBILITY STUDY HARRISON ACKNOWLEDGEMENTS Designed to highlight green infrastructure opportunities within the Town of Harrison, this document has been prepared by the Rutgers Cooperative

More information

Green Bus Tour. International Water Association. Sponsored by the Metropolitan Sewer District of Greater Cincinnati and Greater Cincinnati Water Works

Green Bus Tour. International Water Association. Sponsored by the Metropolitan Sewer District of Greater Cincinnati and Greater Cincinnati Water Works International Water Association Sponsored by the Metropolitan Sewer District of Greater Cincinnati and Greater Cincinnati Water Works Cincinnati is gaining a national reputation in the sustainable management

More information

From a Census of 680,000 Street Trees to Smart Stormwater Management: A Study of Efficacy and Economics of Street Tree Guards in New York City

From a Census of 680,000 Street Trees to Smart Stormwater Management: A Study of Efficacy and Economics of Street Tree Guards in New York City From a Census of 680,000 Street Trees to Smart Stormwater Management: A Study of Efficacy and Economics of Street Tree Guards in New York City Elliott, R. M.i., Shetty N. H.i, Culligan P. J.i Green infrastructure

More information

NAPA COUNTY PUBLIC WORKS Standards & Specifications

NAPA COUNTY PUBLIC WORKS Standards & Specifications Roadway Design & Construction Manual (Table of Contents) 1. Chapter 1: General Provisions 1.1 Short Title 1.2 Jurisdiction 1.3 Purpose and Effect 1.4 Enactment Authority 1.5 Amendment and Revisions 1.6

More information

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO STORMWATER REPORT FOR WALMART SUPERCENTER STORE # 2443-00 SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO. 3286 March 1, 2012 I hereby certify that this engineering document was prepared by me

More information

Draft Rhode Island Stormwater Design and Installation Standards Manual

Draft Rhode Island Stormwater Design and Installation Standards Manual Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately

More information

Numerical Analysis of Leakage through Geomembrane Lining Systems for Dams

Numerical Analysis of Leakage through Geomembrane Lining Systems for Dams The First Pan American Geosynthetics Conference & Exhibition 25 March 2008, Cancun, Mexico Numerical Analysis of Leakage through Geomembrane Lining Systems for Dams C.T. Weber, University of Texas at Austin,

More information

Moving from Pilots to a Program: Seattle s Green Infrastructure Program: September 20, 2012

Moving from Pilots to a Program: Seattle s Green Infrastructure Program: September 20, 2012 Moving from Pilots to a Program: Seattle s Green Infrastructure Program: September 20, 2012 Overview Brief History: Getting Started to Now GSI Program: What s Working? GSI Program: What needs Improvement?

More information

North Street Reconstruction & Integrated Stormwater Management System

North Street Reconstruction & Integrated Stormwater Management System OWEA Watershed Workshop-October 30 th, 2014 North Street Reconstruction & Integrated Stormwater Management System Ted Blahnik, PE Principal-Williams Creek Consulting North Street: A Case Study for Integrated

More information

Each course is worth 1 American Institute of Architects CEU/HSW.

Each course is worth 1 American Institute of Architects CEU/HSW. Each course is worth 1 American Institute of Architects CEU/HSW. Introduction to Mobile Mapping Attendees will learn the basics of mobile mapping including history, trends, components, and uses. This course

More information

WQ-07 INFILTRATION TRENCH

WQ-07 INFILTRATION TRENCH Greenville County Technical Specification for: WQ-07 INFILTRATION TRENCH 1.0 Infiltration Trench 1.1 Description Infiltration Trenches are excavations filled with stone to create an underground reservoir

More information

Alternative Uses of Compost: Rain Gardens and Green Solutions for Stormwater Management

Alternative Uses of Compost: Rain Gardens and Green Solutions for Stormwater Management Alternative Uses of Compost: Rain Gardens and Green Solutions for Stormwater Management Photos: David Dods, URS David Dods, Senior Environmental Engineer URS Corporation, Overland Park, Kansas Agenda 1.

More information

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010 City of Elmhurst City of Elmhurst Storm Sewer System Workshop November 22, 2010 1 City of Elmhurst Watershed divide (green dashed line) through Elmhurst Area east of divide drains to Addison Creek Area

More information

Third Ave CSO Integrated Green Infrastructure

Third Ave CSO Integrated Green Infrastructure Third Ave CSO Integrated Green Infrastructure Neil Myers Williams Creek Consulting OWEA Annual Conference June 2013 For growing municipalities to be perceived as world class communities, each must move

More information

Selecting Least Cost Green Infrastructure. James W. Ridgway, PE September 29, 2015

Selecting Least Cost Green Infrastructure. James W. Ridgway, PE September 29, 2015 Selecting Least Cost Green Infrastructure James W. Ridgway, PE September 29, 2015 Integrated Water Management?? IS GREEN INFRASTRUCTURE LESS COSTLY THEN GRAY INFRASTRUCTURE? Cost of Green Infrastructure

More information

Erosion & Sediment Control Plan Application Form & Checklist

Erosion & Sediment Control Plan Application Form & Checklist Erosion & Sediment Control Plan Application Form & Checklist GENERAL INFORMATION Application Date: Project Address: Tax Map / Parcel Number(s): PROPERTY OWNER / DEVELOPER Firm Name: Contact Person: Title:

More information

Bioretention cell schematic key

Bioretention cell schematic key Bioretention Cells Bioretention cell schematic key 1 3 Hardwood mulch 2 Curb cut 3 18-30 Modified soil 4 Stone aggregate choker layer 5 Stone aggregate base layer 6 Subdrain 7 Undisturbed soil 8 Overflow/Cleanout

More information

Green Innovation Grant Program

Green Innovation Grant Program Green Innovation Grant Program Southeast New York Stormwater Conference Beacon, NY October 15, 2014 What is Green Infrastructure? Green stormwater infrastructure includes a wide array of practices at multiple

More information

Managing Stormwater Runoff with Green Infrastructure "Enhancing Community Resiliency to the Changing Climate"

Managing Stormwater Runoff with Green Infrastructure Enhancing Community Resiliency to the Changing Climate Managing Stormwater Runoff with Green Infrastructure "Enhancing Community Resiliency to the Changing Climate" Presented at Stormwater Management on the Whale Pond Brook Watershed Meeting Christopher C.

More information

Figure 1 Cypress Street Study Area Location Map

Figure 1 Cypress Street Study Area Location Map July 20, 2016 TO: FROM: Jim Massarelli Director of Engineering Jeff Julkowski, PE Michael Burke, PE SUBJECT: Cypress Street Study Area Stormwater Analysis (CBBEL Project No. 16-0058) At the request of

More information

Public Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment

Public Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment November 26, 2014 Public Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment Study Area & Drainage System Legend Coronation Project Park

More information

DRAINAGE CALCULATIONS

DRAINAGE CALCULATIONS DRAINAGE CALCULATIONS For the Carroll Single Family Residence At Santa Clara County Saratoga, California APN: 517-26-010 December 18, 2015 Prepared For: John and Peggy Carroll Prepared By: RI Engineering,

More information

Draft. Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey

Draft. Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey Draft Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey Prepared for Dunellen Borough by the Rutgers Cooperative Extension Water Resources Program September 22,

More information

Retrofitting Sacramento State Campus with Low Impact Development Stormwater Control Measures: A Local Project with Regional Intent

Retrofitting Sacramento State Campus with Low Impact Development Stormwater Control Measures: A Local Project with Regional Intent Retrofitting Sacramento State Campus with Low Impact Development Stormwater Control Measures: A Local Project with Regional Intent Kevin Murphy, P.E. Joel Shinneman, EIT OWP at Sacramento State 1 Project

More information

Retrofitting SuDS. Virginia Stovin. Department of Civil and Structural Engineering Pennine Water Group University of Sheffield.

Retrofitting SuDS. Virginia Stovin. Department of Civil and Structural Engineering Pennine Water Group University of Sheffield. Retrofitting SuDS Virginia Stovin Department of Civil and Structural Engineering Pennine Water Group University of Sheffield Outline Urban stormwater management Conventional approach, problems and costs

More information

Attachment 2: Permeable Pavement Design Guidelines

Attachment 2: Permeable Pavement Design Guidelines Attachment 2: Permeable Pavement Design Guidelines Design of permeable pavement systems is critical if they are to function properly and efficiently. The area and shape are dependent on the site design,

More information