STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

Size: px
Start display at page:

Download "STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO"

Transcription

1 STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO March 1, 2012 I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa. PRELIMINARY 03/01/12 Raymond H. Frankenberg II P.E. #5888 State of South Dakota My license renewal date is December 12, 2012 Date Prepared By: 1

2 SECTION TABLE OF CONTENTS PAGE 1.0 INTRODUCTION CRITERIA METHODOLOGY DRAINAGE AREA DESCRIPTIONS (ONSITE) DRAINAGE AREA DESCRIPTIONS (OFFSITE) WATER QUALITY DETENTION BASIN DETENTION CALCULATIONS SUMMARY (ONSITE) DETENTION CALCULATIONS SUMMARY (OFFSITE) PROPOSED SITE STORM SEWER SIZING SUMMARY PRE-DEVELOPED AND POST-DEVELOPED DRAINAGE AREAS PRE-DEVELOPED AND POST-DEVELOPED WATERSHED DRAINAGE AREAS CONSTROL STRUCTURE DETAIL

3 1.0 INTRODUCTION The following stormwater water quality, detention, and storm sewer design calculations were performed for the proposed Walmart in Sioux Falls, Lincoln County, South Dakota. The proposed site is located on the northeast corner of the S Cliff Avenue / E 69 th Street intersection. The site is approximately acres and includes a 150,236 sf Walmart building and a 1.04 acre outlot. The majority of the site is zoned commercial with a portion of the site zoned office. The site is bordered to the north and west by residential buildings. To the east, a large wetland borders the site. Special care was taken during the site design to ensure that the wetland is not impacted by this development. 2.0 CRITERIA Stormwater Quality Design As per our conversations with the City and a detailed review of the stormwater quality criteria, it was determined that water quality will be required for this development. As per Chapter 11.8, Best Management Practices section of the Sioux Falls Drainage Improvements Manual, stormwater quality design is considered to be a two-step process. This process includes employing runoff reduction practices and providing water quality capture volumes. The first portion of this process, runoff reduction, can be achieved by reducing pavement area, implementing grass buffers and swales, and maximizing travel time for stormwater to enter a stormwater collection system. The second portion of this process, provide water quality capture volume, can be achieved by implementing an extended detention basin with a control orifice plate. Stormwater Detention Design In addition to water quality, detention must be implemented to ensure that Post-Developed peak flows do not adversely affect neighbors or the environment. The design storm shall be the 2- year and 100-year storm events. The post-developed release rate cannot exceed the Pre- Developed release rate for the design storm events. The design criterion is outlined in the Sioux Falls Drainage Improvement Manual. Storm Sewer Design The City of Sioux Falls requires that site storm sewers shall be sized to the 5-year rainfall event. The stormwater Hydraulic Grade Line elevation at each structure is to be below surface grades. Walmart requirements state that during the 10-year rainfall event water shall not be allowed to pond greater than 0.5 feet on any portion of the parking lot. In addition, the 100-year rainfall event water shall not be allowed to pond greater than 1.0 feet. 3

4 3.0 METHODOLOGY Stormwater Quality Design Stormwater quality design was achieved by incorporating the two-step process that is outlined by the City of Sioux Falls. First, consideration and design reduced pavement area as much as possible. This reduction in pavement area allows water to infiltrate, buffer, and travel slower, thus reducing the pollutants that could be transported to major drainage ways. Second, it was determined that implementing and designing an Extended Detention Basin would meet and exceed the second portion of the stormwater quality requirement. The Extended Detention Basin was designed in accordance with the City of Sioux Falls Drainage Improvement Manual and will incorporate flood control volume. A perforated outlet and trash rack are proposed to be used to achieve the desired water quality results. Stormwater Detention Design The Pre-Development and Post-Development peak flows and runoff hydrographs were determined by modeling the watershed using the Modified Rational Method. The Modified Rational Method uses the assumption that maximum flow rate is produced by a constant rainfall which is maintained for a time equal to the period of concentration of flow at the point under consideration. This process must be completed multiple times in order to find the critical storm duration that will yield the necessary detention volume. After modeling the runoff rates from the proposed site, the runoff rates from the existing site were compared to the results. From this set of calculations, a detention pond and control structure was designed to release the Post-Developed rates at or below the Pre-Developed rates. This calculation shows that after development occurs the site alone would not release stormwater at a higher rate than what was previously experience by the site. In addition to modeling the release rates from the proposed acre site alone, models were created for the overall watershed that the existing and proposed site contributes to. The point of ultimate release from the overall watershed is located just south of existing wetlands and northwest of the University of Sioux Falls parking lot. Flow rates were determined for Pre and Post-Development conditions. This additional calculation was doe to determine the calculate Pre and Post-Developed flow from the watershed as it enters the wetlands area adjacent to the near-by school property. Rainfall data and intensities were taken from the intensity-duration-frequency chart in Figure 11.1A in the Sioux Falls Drainage Improvements Manual. Stormwater modeling for the detention basin design was performed using AutoCAD Hydraflow Detention calculations were only required for the minor and major storms (2-year and 100-year event). However, we analyzed the 2-year, 5-year, 10-year, 25-year, 50-year and 100-year storm events for both the Pre-Development and Post-Development conditions to determine what Pre-Developed return frequency release rates would be for a broader storm event. Storm Sewer Design Rainfall data and intensities were taken from the intensity-duration-frequency chart in Figure 11.1A in the Sioux Falls Drainage Improvements Manual. Storm sewer sizing calculations were performed using AutoCAD Hydraflow

5 Hydraulic Grade Lines were determined and tabulated for the 5-year, 10-year, and 100 year rainfall events. 4.0 DRAINAGE AREA DESCRIPTIONS (ONSITE) 4.1 PRE-DEVELOPMENT (See Pre-Developed Drainage Areas plan) To determine the allowable release rates from the site during the 2 and 100 year storm the site was divided into 8 drainage areas. In addition to the 2 and 100 year storms, the 5, 10, 25, and 50 year storm events were also calculated. Pre-Developed Site Drainage Area 5-A totals acres. The area is currently being utilized as an open field in good condition. (C=0.30). Pre-Developed Site Drainage Area 5-B totals 1.67 acres. The area is currently being utilized as an open field in good condition. (C=0.30). Pre-Developed Site Drainage Area 5-C totals 0.24 acres. The area is currently being utilized as an open field in good condition. (C=0.30). Pre-Developed Site Drainage Area 5-D totals 0.07 acres. The area is currently being utilized as an open field in good condition. The area also has a communications antennae located with a parking area. (C=0.56). Pre-Developed Site Drainage Area 5-E totals 0.20 acres. The area is currently being utilized as an open field in good condition with a partial area in a rock driveway. (C=0.31). Pre-Developed Site Drainage Area 5-F totals 0.40 acres. The area is currently being utilized as an open field in good condition with a partial area in a rock driveway. (C=0.38). Pre-Developed Site Drainage Area 5-G totals 0.71 acres. The area is currently being utilized as an open field in good condition. (C=0.30). Pre-Developed Site Drainage Area 5-H totals 0.12 acres. The area is currently being utilized as an open field in good condition with a partial area in a paved driveway. (C=0.35). The stormwater runoff from the site discharges at three separate areas on the site. Drainage Area 5-B discharges to the northeast. Drainage Area 5-H discharges to the west. Drainage areas 5-A, 5-C, 5-D, 5-E, 5-F, and 5-G are released to the southeast along E 69 th Street. All discharges from the current site are undetained. The combined peak Pre-Developed runoff rates for the entire acre site during the 2- year, 5-year, 10-year, 25-year, 50-year, and 100-year storm are CFS, CFS, CFS, CFS, CFS, and CFS respectively. The 2-year and-100 year runoff rates will be considered the Allowable runoff rates for the Post-Developed plan. 5

6 4.2 POST-DEVELOPMENT (See Post-Development Drainage Areas Plan) Post-Development drainage areas 5-A, 5-B, 5-C, and 5-D are collected and routed underground via the proposed storm sewers directly into a Proposed Detention Basin (P-DB). All other drainage areas 5-E and 5-F will release undetained. The combination of the release rates from P-DB, 5-E, and 5-F will be considered the release rate from the total site, and shall be less than the Pre-Development Allowable Release Rates whose Calculations Summary is in Section 4.1 of this report. Post-Developed Site Drainage Area 5-A totals 9.76 acres. The area will be utilized as parking, building, and site greenspace. (C=0.82). Post-Developed Site Drainage Area 5-B totals 2.45 acres. The area will be utilized as parking, building, and site greenspace. (C=0.89). Post-Developed Site Drainage Area 5-C totals 1.04 acres. The area will be utilized as an outlot. Due to unknown future development of this outlot, the drainage area was assumed to be impervious. (C=0.90). Post-Developed Site Drainage Area 5-D totals 2.84 acres. The area will be utilized as greenspace and detention. (C=0.34). Post-Developed Site Drainage Area 5-E totals 0.22 acres. The area will be utilized as greenspace. (C=0.30). Post-Developed Site Drainage Area 5-F totals 0.90 acres. The area will be utilized as greenspace. (C=0.30). Post-Developed Drainage Area 5-A, 5-B, 5-C, and 5-D were combined to form one drainage area Post-Developed Drainage Area 5-Combined. This combination drainage area totals acres with a runoff coefficient value of C=0.75. The runoff hydrograph from this drainage area was then routed through the proposed detention basin. The undetained runoff rate from Post-Developed Drainage Area 5-E and 5-F when combined with the detained release rates from (P-DB), for the entire acre site during the 2-year, 5-year, 10-year, 25-year, 50-year and 100-year storm has peak release rates of 0.84 CFS, 1.32 CFS, 2.28 CFS, 3.94 CFS, 5.20 CFS and 6.57 CFS respectively. These runoff rates will be referred to as the Post-Developed Release Rates and are significantly less than the Allowable Release Rates as summarized in Section 4.1 of this report. See SECTION 8.0 to see the detention calculation summaries. See the Post-Development Site Stormwater Drainage Area Plan for Post-Development. 5.0 DRAINAGE AREA DESCRIPTIONS (OFFSITE) In order to analyze the impact of the development to the overall watershed, the land usages and conditions must be analyzed to determine peak flows from the other contributing sub-basins. The offsite sub-basins will not be modified from the Pre-Developed condition, thus there will be no change to the hydrologic characteristics of these sub-basins. 6

7 Offsite Drainage Area 1 totals acres. The area is currently being utilized as an open field in good condition, open space / lawn, and impervious residential buildings and roads. (C=0.36). Offsite Drainage Area 2 totals acres. The area is currently being utilized as an open field in good condition. (C=0.30). Offsite Drainage Area 3 totals 4.91 acres. The area is currently being utilized as an open field in good condition. (C=0.30). Offsite Drainage Area 4 totals 4.19 acres. The area is currently being utilized as open space and impervious roadway. (C=0.65). Offsite Drainage Area 6 totals acres. The area is currently being utilized as an open field in good condition, open space / lawn, and impervious residential buildings and roads. (C=0.50). 6.0 WATER QUALITY Water quality will be addressed by incorporating an Extended Detention Basin. It was determined that we would need to provided extended detention for approximately 30,056 cubic feet. This will be accomplished by implementing an orifice plate on the detention basin outlet control structure. This orifice plate will require 6 rows and 2 columns of 25/32 circular orifices. Incorporating this plate configuration into our detention basin will exceed the City s recommended drain down time of 40 hours. In addition to sizing an orifice to meet the requirements, we will be providing a trash rack to protect against the extended detention orifice plate from becoming clogged. Additional volume and an additional orifice will be used to control the runoff for the flood volume. 7.0 DETENTION BASIN Proposed Detention Basin (P-DB) is located on the eastern side of the property. The basin has a total design volume of 131,963 cf with an additional 96,624 cf of volume located within the 1.45 of freeboard provided. Therefore the total amount of storage volume provided by the proposed detention basin is approximately 228,586 cf. The stormwater runoff is detained and released at a controlled rate via the Proposed Control Structure. The control structure incorporates the previously mentioned water quality orifice plate and trash rack, along with a x 12 rectangular orifice with and invert elevation of The combination of the water quality orifice plate and the rectangular orifice will be used to detain the required flood volumes. Finally, a 5.4 x 24 rectangular orifice with a invert elevation of will also be incorporated to provide an emergency overflow. 7

8 8.0 DETENTION CALCULATIONS SUMMARY (ONSITE) The following chart is a summary of the routing of the developed storm water runoff through the proposed detention basin and combining it with the offsite drainage areas runoff. STORMWATER DETENTION AND DETENTION BASIN ROUTING SUMMARY Storm Frequency (Year) Pre-Development Site Peak Release Rate (CFS) (ALLOWABLE RELEASE RATES) Post- Development Site Peak Undetained Runoff Rate (CFS) Peak P-DB Detention Basin Discharge (CFS) (POND OUT) (WITH AREAS 5-A, 5-B, 5-C, AND 5-D ROUTED) Detention Basin Peak Water Surface Elevations (FT) Detention Volume at peak elevations (FT³) Combined Detained + undetained (P-3) Post Development Release Rates to Release Pt. A Area 5-E Area 5-F , , , , , , The Post-Development site stormwater release rates of 0.84 CFS, 1.32 CFS, 2.28 CFS, 3.94 CFS, 5.20 CFS, and 6.57 CFS for the 2-year, 5-year, 10-year, 25-year, 50-year, and 100-year rainfall events respectively, are far less than the Pre-Development allowable site release rates of CFS, CFS, CFS, CFS, CFS, and CFS for the same storm events. In addition to reducing Post-Developed flow rates to below the Pre-Developed rates, the 100-yr Post-Developed flow rate was reduced to approximately half the 2-yr Pre-Developed flow rate. The high water surface elevation in the Proposed Detention Basin during the 100-year rainfall event is ft., which leaves a freeboard of 1.45 ft (an additional 96,624 cf of storage volume). 8

9 9.0 DETENTION CALCULATIONS SUMMARY (OFFSITE) The following chart is a summary of the routing of the developed storm water runoff through the proposed detention basin. COMBINED STORMWATER DETENTION AND OFFSITE STORMWATER RUNOFF SUMMARY TO POINT X (SEE PRE AND POST-DEVELOPED WATERSHED DRAINAGE AREA MAPS) Storm Frequency (Year) Existing OFFSITE Peak Release Rate (CFS) Pre- Development ONSITE Peak Release Rate (CFS) Pre- Development COMBINED Peak Release Rate (CFS) Post- Development ONSITE Peak Release Rate (CFS) Post- Development COMBINED Peak Release Rate (CFS) The Post-Development offsite stormwater watershed release rates to point x of CFS, CFS, CFS, CFS, CFS, and CFS for the 2-year, 5-year, 10-year, 25-year, 50-year, and 100-year rainfall events respectively, are less than the Pre- Development watershed release rates of CFS, CFS, CFS, CFS, CFS, and CFS for the same storm events. In addition to reducing Post- Developed flow rates to less than the Pre-Developed rates, the 100-yr Post-Developed watershed flow rate to point x is calculated to be less than to the 50-yr Pre-Developed watershed flow rate PROPOSED SITE STORM SEWER SIZING The storm sewer networks will be designed as outlined in the Sioux Falls Drainage Improvements Manual. Storm sewer should have the capacity to convey a 5-year storm within the pipe. In addition to the City of Sioux Falls criteria, per Walmart Design Criteria, the site storm sewers shall be sized such that during the 10-year rainfall event, the stormwater Hydraulic Grade Line elevation at each structure will be less than 0.50 ft above the pavement elevation in parking areas. Furthermore, during the 100-year rainfall event, the Hydraulic Grade Line elevation at each structure is to be less than 1.0 ft. above the pavement elevation in parking areas. 9

10 CALCULATED SITE STORMSEWER HYDRAULIC GRADE LINE (HGL) ELEVATIONS STRUCTURE No. GROUND ELEVATION (FT.) 5-YEAR HGL.(FT.) 10-YEAR HGL.(FT.) 100-YEAR HGL.(FT.) STORM SECTION A JB CB CB GI GI GI GI JB CB CB CB CB CB GI CB CONCRETE HEADWALL STORM SECTION B GCI CB GI STORM SECTION C CO CO CO CB JB CB CB CB JB CB STORM SECTION D CB CB STORM SECTION E SRD JB

11 STORM SECTION F SRD CB STORM SECTION G SRD CB STORM SECTION H SRD * CB SUMMARY Based on the design calculations, during the rainfall events having an expected return frequency of 2, 5, 10, 25, 50, and 100-years, the Post-Development site does not increase the runoff rate as calculated from the Pre-Development site. In fact, the site reduces flow rates to less than the Pre-Developed 2-year release rate. This over detention on the proposed Walmart acre site reduces the 100-year Post-Developed flow rate for the entire watershed to point x less than the 50-year Pre-Developed watershed flow rate. As designed, our calculations show that the proposed onsite detention basin should impact the rate of downsteam stormwater flow at point x in a positive way. Calculations show that during the 5-year rainfall event the stormwater Hydraulic Grade Line elevation at each structure will remain within the system. In addition, the 10-year rainfall event Hydraulic Grade Line elevation at each structure is less than 0.50 ft above the pavement elevation in parking areas; and that during the 100-year rainfall event, the Hydraulic Grade Line elevation at each structure is less than 1.0 ft. above the pavement elevation in parking areas. Should you have any questions or comments, please feel free to contact John Nilges, Rick Rohlfing, or myself. 11

12 SECTION 12.0 PRE-DEVELOPED AND POST-DEVELOPED DRAINAGE AREAS 12

13 13

14 14

15 SECTION 13.0 PRE-DEVELOPED AND POST-DEVELOPED WATERSHED DRAINAGE AREAS 15

16 16

17 17

18 SECTION 13.0 CONTROL STRUCTURE DETAIL 18

19 19

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report October 7, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report and

More information

PHASE III DRAINAGE REPORT

PHASE III DRAINAGE REPORT PHASE III DRAINAGE REPORT FOR Eastlake Assisted Living & Memory Care April 20, 2016 June 3, 2016 August 5, 2016 Prepared for: 3301 E 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite 150 Greenwood Village

More information

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT INTRODUCTION In recent years, the University of Cincinnati (University) has demonstrated a commitment to identifying and implementing sustainable goals and objectives throughout University s Uptown Campuses.

More information

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT LOTS B, RECORDED EXEMPTION 1211-2-1, RECX13-0096 LOCATED IN THE NORTH 1/2 OF SECTION 2, TOWNSHIP 3 NORTH, RANGE 66 WEST, 6 TH PRINCIPAL

More information

BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT

BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT PRELIMINARY STORM DRAIN CALCULATIONS ASSOCIATED WITH BRISBANE BAYLANDS REDEVELOPMENT BRISBANE, CALIFORNIA Prepared by BKF Engineers

More information

Figure 1 Cypress Street Study Area Location Map

Figure 1 Cypress Street Study Area Location Map July 20, 2016 TO: FROM: Jim Massarelli Director of Engineering Jeff Julkowski, PE Michael Burke, PE SUBJECT: Cypress Street Study Area Stormwater Analysis (CBBEL Project No. 16-0058) At the request of

More information

PSLS Surveyors' Conference Workshop Information Form Workshop Number: (leave blank if unknown) Hours: Workshop Title: Workshop Description: Suggested Speaker(s), affiliation/contact information 1. 2. 3.

More information

4. CONCEPT PLAN DEVELOPMENT

4. CONCEPT PLAN DEVELOPMENT 4. CONCEPT PLAN DEVELOPMENT Concept Plan Step 1: Identify Site Constraints and Opportunities Review the existing site to identify constraints and opportunities for GI Practices to meet the RRv. Constraints

More information

6.1. INTRODUCTION AND SUMMARY OF FINDINGS

6.1. INTRODUCTION AND SUMMARY OF FINDINGS Chapter 6: Stormwater Management 6.1. INTRODUCTION AND SUMMARY OF FINDINGS A Stormwater Pollution Prevention Plan (SWPPP) has been prepared for the Proposed Project in accordance with the requirements

More information

City of Waco Stormwater Management Regulations

City of Waco Stormwater Management Regulations 1.0 Applicability: City of Waco Stormwater Management Regulations These regulations apply to all development within the limits of the City of Waco as well as to any subdivisions within the extra territorial

More information

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS May 2007 SECTION 1 Responsibility of Applicant TABLE OF CONTENTS A. Stormwater Management Plan Required Information

More information

A. Regional Detention Requirements

A. Regional Detention Requirements I. GENERAL DESIGN GUIDELINES A. Full-spectrum detention is provided for all new development, redevelopment or expansion of a site to provide for water quality and flood control detention. B. Detention

More information

NAPA COUNTY PUBLIC WORKS Standards & Specifications

NAPA COUNTY PUBLIC WORKS Standards & Specifications Roadway Design & Construction Manual (Table of Contents) 1. Chapter 1: General Provisions 1.1 Short Title 1.2 Jurisdiction 1.3 Purpose and Effect 1.4 Enactment Authority 1.5 Amendment and Revisions 1.6

More information

Pollutant Removal Benefits

Pollutant Removal Benefits Bioswales Bioswales Similar to biocells, but have a slight, but positive grade toward an outlet Designed to convey the WQv event at very low velocities Promote filtration through native vegetation, infiltration

More information

DRAINAGE CALCULATIONS

DRAINAGE CALCULATIONS DRAINAGE CALCULATIONS For the Carroll Single Family Residence At Santa Clara County Saratoga, California APN: 517-26-010 December 18, 2015 Prepared For: John and Peggy Carroll Prepared By: RI Engineering,

More information

Table of Contents G.1.a Water Resources - Surface Water - Drainage

Table of Contents G.1.a Water Resources - Surface Water - Drainage Table of Contents G.1.a Water Resources - Surface Water - Drainage 1. INTRODUCTION... 1335 2. ENVIRONMENTAL SETTING... 1335 a. Regional Hydrology... 1335 b. Local Hydrology... 1337 c. On-site Hydrology...

More information

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

TENNESSEE GAS PIPELINE COMPANY, L.L.C. TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC AND HYDRAULIC CALCULATIONS FOR ACCESS ROADS ALONG THE CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,

More information

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013 Lincoln 270 City of Lincoln Stormwater Management Plan April 2, 2013 # 2005.48 Prepared By: Civil Engineering Solutions, Inc. 590 E Street Lincoln, Ca 95648 (916) 645 5700 1.0 Background: The project site

More information

3. Are there any projects exempt from the definition of Regulated Projects?

3. Are there any projects exempt from the definition of Regulated Projects? STORMWATER REQUIREMENTS: OVERVIEW OF PROVISION C.3 Background: On October 14, 2009, the Regional Water Quality Control Board, San Francisco Bay Region, issued a municipal regional stormwater permit (MRP)

More information

CHECKLIST FOR PHASE II DRAINAGE REPORT

CHECKLIST FOR PHASE II DRAINAGE REPORT I. COVER SHEET CHECKLIST FOR PHASE II DRAINAGE REPORT A. Name of Project B. Address C. Owner D. Developer E. Engineer F. Submittal date and revision dates as applicable II. GENERAL LOCATION AND DESCRIPTION

More information

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection Stormwater Retrofitting: The Art of Opportunity Presented by the Center for Watershed Protection What Are Stormwater Retrofits? Retrofits are stormwater management measures inserted in an urban or ultra-urban

More information

Chapter 14. Stormwater Quality Introduction

Chapter 14. Stormwater Quality Introduction 14.0 Introduction This chapter addresses requirements and design criteria related to post-construction stormwater best management practices (requirements for construction erosion and sediment control are

More information

Chapter 4 - Preparation of Stormwater Site Plans

Chapter 4 - Preparation of Stormwater Site Plans Chapter 4 - Preparation of Stormwater Site Plans The Stormwater Site Plan is the comprehensive report containing all of the technical information and analysis necessary for the City to evaluate a proposed

More information

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE Codes analyses for each subcommittee were completed to assist participants of the Richland County Site Planning Roundtable.

More information

Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi

Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi Dennis S. Painter, Tennessee Valley Authority, Nashville, Tennessee Donald Becker, Tennessee Valley

More information

South Bismarck Watershed Model Update and Stormwater Improvement Project

South Bismarck Watershed Model Update and Stormwater Improvement Project Preliminary Engineering Report Bismarck Tribune South Bismarck Watershed Model Update and Stormwater Improvement Project City of Bismarck, ND January 2017 14.105.0046 1.0 Executive Summary The focus of

More information

Moon Brook FRP BMP Summary Sheet. Ownership of Land where BMP is Located

Moon Brook FRP BMP Summary Sheet. Ownership of Land where BMP is Located Outlet Retrofit Hitzel Terrace The town owned parcel along Hitzel Terrace is a natural wetland area which currently provides some level of stormwater detention and peak-flow attenuation. The proposed project

More information

STAFFORD TRACT NORTH OF US90A 1.0 INTRODUCTION 1.1 OBJECTIVE

STAFFORD TRACT NORTH OF US90A 1.0 INTRODUCTION 1.1 OBJECTIVE 1.0 INTRODUCTION 1.1 OBJECTIVE This report, prepared for submittal to TxDOT, analyzes existing and proposed detention facilities draining into the TxDOT US90A storm sewer system. The results of the detailed

More information

Huntington Stormwater Utility

Huntington Stormwater Utility Huntington Stormwater Utility Stormwater Management & Sediment and Erosion Control Requirements for Construction Sites Authorized by Huntington City Code Articles: 971, 970, 930, 935, 955, Revised April

More information

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment CHAPTER 9 STORM DRAINAGE 9.01 General The standards established by this chapter are intended to represent the minimum standards for the design and construction of storm drainage facilities. 9.02 Design

More information

6.1. INTRODUCTION 6.2. EXISTING CONDITIONS

6.1. INTRODUCTION 6.2. EXISTING CONDITIONS Chapter 6: Stormwater Management 6.1. INTRODUCTION This Chapter describes the current drainage patterns on the Project Site, the stormwater management system that is proposed as part of the Proposed Project,

More information

New Development Stormwater Guidelines

New Development Stormwater Guidelines New Development Stormwater Guidelines CITY OF MOUNTLAKE TERRACE Table of Contents Introduction... 2 Ecology s Minimum Requirements for stormwater management... 2 Description of the 9 Minimum Requirements...

More information

Going Green with the NYS Stormwater Design Standards

Going Green with the NYS Stormwater Design Standards Going Green with the NYS Stormwater Design Standards Shohreh Karimipour, P.E. NYSDEC History of Stormwater Management Ancient Greek Cisterns Water Cistern Systems in Greece from Minoan to Hellenistic Period,

More information

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS DRAINAGE REPORT STATEMENT ENGINEER'S STATEMENT: The attached drainage plan and report were prepared under my direction and supervision and are correct

More information

Bioretention cell schematic key

Bioretention cell schematic key Bioretention Cells Bioretention cell schematic key 1 3 Hardwood mulch 2 Curb cut 3 18-30 Modified soil 4 Stone aggregate choker layer 5 Stone aggregate base layer 6 Subdrain 7 Undisturbed soil 8 Overflow/Cleanout

More information

Preliminary Sediment & Stormwater Management Plan Review Checklist DATE RECEIVED: PROJECT NUMBER: PROJECT NAME:

Preliminary Sediment & Stormwater Management Plan Review Checklist DATE RECEIVED: PROJECT NUMBER: PROJECT NAME: Preliminary Sediment & Stormwater Management Plan Review Checklist DATE RECEIVED: PROJECT NUMBER: PROJECT NAME: General Information: 1. Completed application signed by the owner, review fee, one set of

More information

Draft Rhode Island Stormwater Design and Installation Standards Manual

Draft Rhode Island Stormwater Design and Installation Standards Manual Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately

More information

STORMWATER MANAGEMENT PLAN: ERAND GARDENS X70

STORMWATER MANAGEMENT PLAN: ERAND GARDENS X70 STORMWATER MANAGEMENT PLAN: ERAND GARDENS X70 Client: Central Developments 09 April 2018 _ Rev00 Report no: SWMP/410/00 SWMP FOR ERAND GARDENS X70 TABLE OF CONTENTS 1 INTRODUCTION... 1 2 GENERAL INFORMATION...

More information

Old Mill Community Association Bioretention Facility

Old Mill Community Association Bioretention Facility Project Overview This project will install a bioretention facility in a community recreation area owned by the Old Mill Community Association, Inc. Drainage from the area is currently unmanaged and has

More information

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks 2019 NEORSD GIG Eligibility and Technical Requirements Project must be located in the Sewer District s combined sewer area Location Applicant

More information

NPDES - PCSM. Permit Preparation

NPDES - PCSM. Permit Preparation NPDES - PCSM National Pollutant Discharge Elimination System Post Construction Stormwater Management Permit Preparation Jim Pillsbury, PE Engineer s Workshop - March 4 and 5, 2010 Who needs NPDES? Earth

More information

General Technical Guidance for Treatment Measures

General Technical Guidance for Treatment Measures Chapter 5 General Technical Guidance for Treatment Measures The technical guidance in this Chapter applies to all types of stormwater treatment measures. This chapter contains general technical information

More information

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS In West Sadsbury Township, Chester County, Pennsylvania TABLE OF CONTENTS I. Introduction 3 II. Importance of Stormwater Management

More information

West Virginia Stormwater Management Manual: Methods.

West Virginia Stormwater Management Manual: Methods. West Virginia Stormwater Management Manual: Methods Created to deliver targeted training on new tools and practices to improve the quality of stormwater runoff. www.cbstp.org www.chesapeakestormwater.net

More information

Reducing Runoff with Green Infrastructure. Lake George, NY May 5, 2011

Reducing Runoff with Green Infrastructure. Lake George, NY May 5, 2011 Reducing Runoff with Green Infrastructure Lake George, NY May 5, 2011 The Duties of a Stormwater Designer: Reduce Peak Runoff Rates Remove Pollutants from Runoff Reduce Runoff Volume Runoff Reduction from

More information

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS 5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically

More information

General Technical Guidance for Treatment Measures

General Technical Guidance for Treatment Measures Chapter 5 General Technical Guidance for Treatment Measures This Chapter contains guidance on: Hydraulic sizing criteria, Applicability of non-landscape based treatment measures, Using Manufactured Treatment

More information

C-12. Dry Pond. Design Objective

C-12. Dry Pond. Design Objective C-12. Dry Pond Design Objective The primary purpose of dry pond is to attenuate and delay stormwater runoff peaks. Dry ponds hold water immediately after a storm event and drain to be almost complete dry

More information

Rainwater Management an issue for the 21 st Century. Hydrological Cycle

Rainwater Management an issue for the 21 st Century. Hydrological Cycle Canadian Society of Landscape Architects CONGRESS 2014 Rainwater Management an issue for the 21 st Century Don Crockett, BCSLA, CSLA Principal, Golder Associates Ltd. May 2014 Hydrological Cycle PRE- URBAN

More information

When planning stormwater management facilities, the following principles shall be applied where possible.

When planning stormwater management facilities, the following principles shall be applied where possible. 2.0 Principles When planning stormwater management facilities, the following principles shall be applied where possible. 2.0.1 Drainage is a regional phenomenon that does not respect the boundaries between

More information

Three Rivers Park District Administration Center Rain Garden

Three Rivers Park District Administration Center Rain Garden Three Rivers Park District Administration Center Rain Garden Introduction There are significant changes to the hydrologic regime and nutrient loading following urban and industrial development. The post-development

More information

Rain Gardens Water Quality the Way Mother Nature Intended

Rain Gardens Water Quality the Way Mother Nature Intended Rain Gardens Water Quality the Way Mother Nature Intended Maintenance Discussion Design Discussion Susan Morgan, Ph.D, PE Southern Illinois University Edwardsville smorgan@siue.edu (618) 650 5014 Michael

More information

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach Turgay Dabak, Joni Calmbacher, Sara DeGroot, Andrea Ryon Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach Presentation Outline Project Background Project Overview BMPs Evaluated

More information

Neighborhood Drainage Infrastructure Improvements Using Green Initiatives. Village of Hinsdale, IL

Neighborhood Drainage Infrastructure Improvements Using Green Initiatives. Village of Hinsdale, IL Neighborhood Drainage Infrastructure Improvements Using Green Initiatives Village of Hinsdale, IL Presentation Agenda Project Overview Goals and Objectives Design Approach Public Coordination Recap Questions

More information

Draft. Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey

Draft. Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey Draft Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey Prepared for Dunellen Borough by the Rutgers Cooperative Extension Water Resources Program September 22,

More information

26 Attachment 2. Township of New Britain APPENDIX B STORMWATER MANAGEMENT DESIGN CRITERIA

26 Attachment 2. Township of New Britain APPENDIX B STORMWATER MANAGEMENT DESIGN CRITERIA (26, APPENDIX B) 26 Attachment 2 Township of New Britain APPENDIX B STORMWATER MANAGEMENT DESIGN CRITERIA TABLE B-1 DESIGN STORM RAINFALL AMOUNT Source: Field Manual of Pennsylvania Department of Transportation

More information

Review Zone Application for D&R Canal Commission Decision

Review Zone Application for D&R Canal Commission Decision Review Zone Application for D&R Canal Commission Decision MEETING DATE: July 20, 2016 DRCC #: 16-4803 Latest Submission Received: June 13, 2016 Applicant: Robert McCarthy, PE PSE&G 4000 Hadley Road, 2

More information

Appendix I. Checklists

Appendix I. Checklists Appendix I Checklists Town of Greenwich Drainage Manual Department of Public Works - Engineering Division Town Hall - 101 Field Point Road, Greenwich, CT 06836-2540 Phone 203-622-7767 - Fax 203-622-7747

More information

Beyond Runoff Reduction: Thorough Green Infrastructure Design. Zach Sample, PE Innovyze

Beyond Runoff Reduction: Thorough Green Infrastructure Design. Zach Sample, PE Innovyze Beyond Runoff Reduction: Thorough Green Infrastructure Design Zach Sample, PE Innovyze Presenter Zach Sample, PE Stormwater Products Manager Innovyze Agenda Modern stormwater design (HINT: Runoff Reduction)

More information

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK MAY 19, 2014 Prepared By: Timothy M. Lavocat, P.E., CFM

More information

Appendix D - Technical Design Criteria for BMPs

Appendix D - Technical Design Criteria for BMPs Appendix D - Technical Design Criteria for BMPs City of Wayzata Page 3 On-site infiltration features Definitions and Scope: Infiltration facilities are constructed basins or depressions located in permeable

More information

Pond Siting Report Update

Pond Siting Report Update Pond Siting Report Update Prepared for: Florida Department of Transportation District 5 CR 46A Realignment from SR 46 to North of Arundel Way Lake County, Florida FPID No. 238275-8-32-02 October 2013 (Draft

More information

APPENDIX APPENDIX 6 STORMWATER MANAGEMENT REPORT

APPENDIX APPENDIX 6 STORMWATER MANAGEMENT REPORT APPENDIX APPENDIX 6 STORMWATER MANAGEMENT REPORT ECHO BAY NEW ROCHELLE, NEW YORK STORMWATER MANAGEMENT REPORT Prepared for: Forest City Residential Group 1 Metro Tech Center North Brooklyn, NY 11201 Prepared

More information

Attachment 2: Permeable Pavement Design Guidelines

Attachment 2: Permeable Pavement Design Guidelines Attachment 2: Permeable Pavement Design Guidelines Design of permeable pavement systems is critical if they are to function properly and efficiently. The area and shape are dependent on the site design,

More information

Selecting Appropriate Stormwater Control Measures for Your Development Project

Selecting Appropriate Stormwater Control Measures for Your Development Project Phase II Post-Construction Stormwater Requirements Workshop - February 10, 2014 Selecting Appropriate Stormwater Control Measures for Your Development Project Jill Bicknell, P.E., EOA, Inc. Outline of

More information

WAKE COUNTY STORMWATER MAINTENANCE CHECKLIST

WAKE COUNTY STORMWATER MAINTENANCE CHECKLIST WAKE COUNTY STORMWATER MAINTENANCE CHECKLIST STORMWATER CONTOL STRUCTURE BIORETENTION MAINTENANCE AGREEMENT RESPONSIBLE PARTY: PHONE #: ADDRESS: a. Remove debris from bioretention area. b. Inspect for

More information

Chapter 3 Site Planning and Low Impact Development

Chapter 3 Site Planning and Low Impact Development CHAPTER 3 Site Planning and Low Impact Development Chapter 3 Site Planning and Low Impact Development 3.0 Introduction The City of Charleston requires that major residential, large commercial (>1 acre),

More information

Selecting Least Cost Green Infrastructure. James W. Ridgway, PE September 29, 2015

Selecting Least Cost Green Infrastructure. James W. Ridgway, PE September 29, 2015 Selecting Least Cost Green Infrastructure James W. Ridgway, PE September 29, 2015 Integrated Water Management?? IS GREEN INFRASTRUCTURE LESS COSTLY THEN GRAY INFRASTRUCTURE? Cost of Green Infrastructure

More information

SITE PLAN REVIEW APPLICATION AND CHECKLIST

SITE PLAN REVIEW APPLICATION AND CHECKLIST SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description

More information

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018 Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018 Potential Impacts of New Development Urban development can significantly increase stormwater runoff Water quality considerations

More information

2I-5 Bioswales (Numbering pending)

2I-5 Bioswales (Numbering pending) Iowa Stormwater Management Manual 2I-3 2I-5 Bioswales (Numbering pending) Source: Steve Anderson, 2011 BENEFITS Low =

More information

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council Introduction to Low Impact Development Fred Milch East Central Florida Regional Planning Council Low Impact Development (LID) Low impact development (LID) is a term used to describe a land planning and

More information

MDOT Stormwater BMPs: The Challenge of Design. Janeen McDermott, PE Dan DeVaun, PE

MDOT Stormwater BMPs: The Challenge of Design. Janeen McDermott, PE Dan DeVaun, PE MDOT Stormwater BMPs: The Challenge of Design Janeen McDermott, PE Dan DeVaun, PE June 25, 2018 Outline Water Quality Treatment Water Quality Treatment Volume Guidelines Example Project BMP Design Challenges

More information

POLE BRIDGE ROAD NEAR FIVE LOT FARM

POLE BRIDGE ROAD NEAR FIVE LOT FARM Drainage Improvements Village of Avon Pole Bridge Road near Five Lot Farm December 2014 POLE BRIDGE ROAD NEAR FIVE LOT FARM Pole Bridge Road is the eastern border of the Village south of NYS route 5 &

More information

Project: Mooney Lake Preserve Received: Location: 300 Sixth Ave. N., Orono Complete: Noticed:

Project: Mooney Lake Preserve Received: Location: 300 Sixth Ave. N., Orono Complete: Noticed: Permit Application No.: 15-445 Rules: Erosion Control, Wetland Protection, & Stormwater Management Applicant: BPS Properties, LLC Project: Mooney Lake Preserve Received: 8-24-15 Location: 300 Sixth Ave.

More information

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains Chapter 10: Stormwater Management A. INTRODUCTION AND SUMMARY OF FINDINGS This chapter describes existing and proposed stormwater management on the Site. Potential impacts to stormwater infrastructure

More information

ENVISIONING THE POSSIBILITIES OF A DIGITAL CITY: A CASE STUDY OF RAIN GARDENS AS FLOOD CONTROL IN AUSTIN, TEXAS CE 394K FALL 2011 PROF.

ENVISIONING THE POSSIBILITIES OF A DIGITAL CITY: A CASE STUDY OF RAIN GARDENS AS FLOOD CONTROL IN AUSTIN, TEXAS CE 394K FALL 2011 PROF. ENVISIONING THE POSSIBILITIES OF A DIGITAL CITY: A CASE STUDY OF RAIN GARDENS AS FLOOD CONTROL IN AUSTIN, TEXAS BY KIERSTEN TYSSELAND DUBE CE 394K FALL 2011 PROF. MAIDMENT INTRODUCTION With the advent

More information

Baltimore, MD Lt. Gov. Boyd Rutherford

Baltimore, MD Lt. Gov. Boyd Rutherford MODEL STANDARD PLAN FOR POULTRY HOUSE SITE DEVELOPMENT ON MARYLAND S EASTERN SHORE MARCH 2011 1800 Washington Boulevard 410-537-3000 Gov. Larry Hogan Baltimore, MD 21230-1718 800-633-6101 Lt. Gov. Boyd

More information

The Engineer/Developer s Perspective on Storm Water Management

The Engineer/Developer s Perspective on Storm Water Management The Engineer/Developer s Perspective on Storm Water Management CASE STUDY: An Innovative Approach to Storm Water Management for Small Parcel Site Development Presented by: James B. Leedom, P.E. The Sigma

More information

General Technical Guidance for Treatment Measures

General Technical Guidance for Treatment Measures Chapter 5 General Technical Guidance for Treatment Measures The technical guidance in this Chapter will help you with proper sizing and design concepts for various types of stormwater treatment measures.

More information

C.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook

C.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook C.3 STORMWATER TECHNICAL GUIDANCE Table of Contents Glossary... viii Chapter 1 Introduction/How to Use this Handbook... 1-1 1.1 Purpose of this Handbook... 1-1 1.2 What is the Countywide Program?... 1-2

More information

2012 Saginaw Bay Watershed Conference

2012 Saginaw Bay Watershed Conference 2012 Saginaw Bay Watershed Conference March 16, 2012 Russ Beaubien, P.E., CFM Low Impact Development Fundamentals Summary LID overview Education on LID Fundamentals of LID Examples of LID practices Other

More information

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways. SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways. Numerous ecosystem-based functional stormwater quantity and quality design alternatives are possible within the street ROW. Several

More information

Introduction Post-Construction Stormwater Management Performance Requirements

Introduction Post-Construction Stormwater Management Performance Requirements EZ MANUAL Introduction Post-Construction Stormwater Management Performance Requirements The primary objective of these Post-Construction Stormwater Management Performance Requirements is to minimize the

More information

Floodplain Technical Memorandum

Floodplain Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management Introduction to Low Impact Development Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management http://hawaii.gov/dbedt/czm/resource/publication.php A Comprehensive

More information

C. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water

C. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water C. WATER 1. Surface Water Runoff See Section C.3, Flood Hazard/Mudflow Hazard, page 67. 2. Ground Water Determined not significant by the October 1984 and January 1999 Initial Studies conducted by the

More information

Predicting Design Storm Runoff for the Six Mile Creek Watershed: Effects of the Potential Sprawl-Is-Us, Inc. Development

Predicting Design Storm Runoff for the Six Mile Creek Watershed: Effects of the Potential Sprawl-Is-Us, Inc. Development Predicting Design Storm Runoff for the Six Mile Creek Watershed: Effects of the Potential Sprawl-Is-Us, Inc. Development Ross Guida Faulkner Consulting Engineers, Inc. December 19, 2008 1 Table of Contents

More information

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT Source: City of Bend Chapter Organization 11.1 Purpose... 11-1 11.2 Applicability... 11-1 11.3 Low Impact Development Overview... 11-2 11.3.1 Key Strategies...

More information

Erosion & Sediment Control Plan Application Form & Checklist

Erosion & Sediment Control Plan Application Form & Checklist Erosion & Sediment Control Plan Application Form & Checklist GENERAL INFORMATION Application Date: Project Address: Tax Map / Parcel Number(s): PROPERTY OWNER / DEVELOPER Firm Name: Contact Person: Title:

More information

APPENDIX B. Hydrologic and Hydraulic Analysis

APPENDIX B. Hydrologic and Hydraulic Analysis APPENDIX B Hydrologic and Hydraulic Analysis HYDROLOGIC AND HYDRAULIC ANALYSIS PETERSBURG ROAD IMPROVEMENTS DOT&PF Project No. 67879 Prepared for: State of Alaska Department of Transportation and Public

More information

Article 20 Stormwater Management

Article 20 Stormwater Management Article 20 Section 20.01 Intent Article 20 The purpose of this Article is to protect the health, safety, and general welfare of the citizens by requiring compliance with accepted standards and practices

More information

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010 City of Elmhurst City of Elmhurst Storm Sewer System Workshop November 22, 2010 1 City of Elmhurst Watershed divide (green dashed line) through Elmhurst Area east of divide drains to Addison Creek Area

More information

Grass Buffer T-1. Description. Site Selection. Designing for Maintenance

Grass Buffer T-1. Description. Site Selection. Designing for Maintenance Description Grass buffers are densely vegetated strips of grass designed to accept sheet flow from upgradient development. Properly designed grass buffers play a key role in LID, enabling infiltration

More information

Draft Impervious Cover Reduction Action Plan for West New York, Hudson County, New Jersey

Draft Impervious Cover Reduction Action Plan for West New York, Hudson County, New Jersey Draft Impervious Cover Reduction Action Plan for West New York, Hudson County, New Jersey Prepared for the Town of West New York by the Rutgers Cooperative Extension Water Resources Program March 29, 2017

More information

Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey

Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey Prepared for the City of Vineland by the Rutgers Cooperative Extension Water Resources Program May 23, 2016 Table

More information

C ity of Grande Prairie Development Services Department

C ity of Grande Prairie Development Services Department C ity of Grande Prairie Development Services Department FAIRWAY DEVELOPMENT OUTLINE PLAN OP 08 09 Approved April 6, 2009 Prepared by: Focus Corporation Table of Contents 1.0. Introduction 2 3 1.1. Plan

More information

BASMAA Development Committee. Guidance for Identifying Green Infrastructure Potential in Municipal Capital Improvement Program Projects May 6, 2016

BASMAA Development Committee. Guidance for Identifying Green Infrastructure Potential in Municipal Capital Improvement Program Projects May 6, 2016 Background BASMAA Development Committee Guidance for Identifying Green Infrastructure Potential in Municipal Capital Improvement Program s May 6, 2016 In the recently reissued Municipal Regional Stormwater

More information

Draft Impervious Cover Reduction Action Plan for Newark, Essex County, New Jersey Volume 2

Draft Impervious Cover Reduction Action Plan for Newark, Essex County, New Jersey Volume 2 Draft Impervious Cover Reduction Action Plan for Newark, Essex County, New Jersey Volume 2 Prepared for the City of Newark by the Rutgers Cooperative Extension Water Resources Program April 16, 2018 Table

More information

ANSWER KEY MGSFlood v WWHM2012 (released 5/15/2015)

ANSWER KEY MGSFlood v WWHM2012 (released 5/15/2015) ANSWER KEY MGSFlood v. 4.35 --- WWHM2012 (released 5/15/2015) Name: Date: Module 6.0: Advanced Topics in LID Design: Hydrologic Modeling General instructions: You may model facility dimensions to the nearest

More information