Type approval testing of miscellaneous smoke and heat detectors for marine applications

Size: px
Start display at page:

Download "Type approval testing of miscellaneous smoke and heat detectors for marine applications"

Transcription

1 We help ideas meet the real world DELTA Test Report TEST Reg. no. 19 Type approval testing of miscellaneous smoke and heat detectors for marine applications Performed for Consilium Marine AB DANAK Project no.: A Page 1 of 44 including 3 annexes 15 February 2007 DELTA Danish Electronics, Light & Acoustics Venlighedsvej Hørsholm Denmark Tel. (+45) Fax (+45) This report is issued under the rules of DANAK (Danish Accreditation) and ILAC (International Laboratory Accreditation Cooperation) including its MRA (Mutual Recognition Arrangement). Further information can be found at and The report must not be reproduced, except in full, without the written approval of DELTA. Version m

2 Page 2 of 44 Title Test objects Type approval testing of miscellaneous smoke and heat detectors for marine applications Five analogue addressable detector types: Salwico, EV-H-A1R Heat detector, class A1R Salwico, EV-H-CS Heat detector, class CS Salwico, EV-P Optical smoke detector Salwico, EV-DP Double optical smoke detector Salwico, EV-PH Optical smoke/ heat detector, class A1R A photo of all the tested objects is given on Page 4. Photos of each of the test objects are given in Annex 1. The detectors were received by DELTA for testing on 2 June Report no. Project no. DANAK A Test period June - December 2006 Client Consilium Marine AB Salsmästaregatan 21 Box Göteborg Sweden Telephone: Fax: Contact person Manufacturer Specifications Mr. Björn Lindström bjorn.lindstrom@consilium.se Nittan (UK) Limited IACS E10 "Test Specification for Type Approval", Rev. 4, May 2004, ", issued by the International Association of Classification Societies (IACS)

3 Page 3 of 44 Results The results are given in a summary in Chapter 4 Technical documentation The technical documentation is listed in Annex 1. Test personnel Peter Tjell Jan B. Nielsen Claus M. Thomsen Chris J. Pilbeam Olling Truelsen Poul Terkelsen Bjørn B. Petersen Date 15 February 2007 Responsible Ebbe Christensen, B.Sc.E.E. DELTA

4 Page 4 of 44 The five tested types of Consilium detectors. Auxiliary control panel and detector bases shown with 4 of the detectors. These bases were used during environmental exposures.

5 Page 5 of 44 Table of contents Page 1. General Introduction Test set-up Functional test procedure Simple functional testing Measurements of response time for heat detectors and response threshold value for smoke detectors General criteria for passing the tests Modifications of test objects during testing References Tests in standard environment Insulation resistance High voltage Environmental tests Dry heat Damp heat, cyclic Vibration Cold Salt mist Radiated emission Summary 31 Annex 1 Documentation for the test objects 32 Annex 2 Documentation for the test set-up 36 Annex 3 Test set-up and test record sheets regarding radiated emission 38

6 Page 6 of General 1.1 Introduction This report describes the marine type approval testing of five types of analogue addressable smoke and heat detectors carried out to achieve compliance with the specification: IACS E10 "Test Specification for Type Approval", Rev. 4, May 2004, issued by the International Association of Classification Societies (IACS) An assessment to verify if the detectors fulfil the relevant requirements of the IACS E10 by evaluation of the validity of the previous tests and the standards used at that time compared with the IACS E10 has previously been carried out and reported. The assessment was reported in Ref. /1/ of Section 1.6. The assessment report describes which supplementary marine tests should be carried out to achieve compliance with the IACS E10 specification. In addition to these tests, Consilium Marine AB also requested dry heat and damp heat cyclic to be included for the heat detectors class A1R. This resulted in the following test plan, where the notation is defined in Table 1: Table 1 IACS E10 Test no. Salwico EV-H-A1R Salwico EV-H-CS Salwico EV-P Salwico EV-DP Salwico EV-PH 1. Visual inspection X X X X X 2. Performance test X X X X X 3. External power supply failure NR NR NR NR NR 4. Power supply variation a) electric NR NR NR NR NR 5. Dry heat, 70 C X X X X X 6. Damp heat cyclic 55 C X X X X X (+ insulation resistance) 7. Vibration, 4 g X X X X 8. Inclination NR NR NR NR NR 9. Insulation resistance X X X X 10. High voltage X X X X (+ insulation resistance) 11. Cold, -25 C X X X X (+ insulation resistance) 12. Salt mist X X X X (+ insulation resistance) 13. Electrostatic discharge OK OK OK OK OK

7 Page 7 of 44 IACS E10 Test no. Salwico EV-H-A1R Salwico EV-H-CS Salwico EV-P Salwico EV-DP Salwico EV-PH 14. Electromagnetic field OK OK OK OK OK 15. Conducted low frequency NR NR NR NR NR 16. Conducted radio frequency OK OK OK OK OK 17. Burst/Fast transients OK OK OK OK OK 18. Surge/voltage OK OK OK OK OK 19. Radiated emission (limits for bridge and deck zone) X X X X 20. Conducted emission NR NR NR NR NR X OK NR in the table means that the test will be performed. in the table means that the test has already been performed. See assessment report, DELTA project A530269, as given in Ref. /1/ of Section 1.6. in the table means that the testing of the detector type EV-H-A1R also covers the detector type EV-H-CS. in the table means that the test is not relevant. See assessment report, DELTA project A530269, as given in Ref. /1/ of Section 1.6. The marine base type SPB-ADAPT is used for all the types of tested detectors. Since the detector type EV-H-CS is exactly the same detector as the EV-H-A1R, except for the detector class and suffix, the type testing of the EV-H-A1R also covers the type testing of the EV-H-CS for some of the tests as described in the test programme in Table 1. The functional testing of the test objects was carried out by measuring the Response Time (RT) of the heat detectors and the Response Threshold Value (RTV) of the smoke detectors before and after the environmental conditioning as described in Section Also, a simple functional test was carried out before, during if specified, and after the environmental testing as described in Section The results of the tests in standard environment and the environmental tests are given in Chapters 2 and 3. A summary of all the test results is given in Chapter 4. All measuring equipment used during the tests has been calibrated according to the requirements given by the accreditation. The test results relate to the tested objects only.

8 Page 8 of Test set-up Test set-up connection diagram is enclosed in Annex 2. Consilium Marine AB delivered three test set-ups, control unit/power supplies, and 4-7 samples of each detector type for the marine type testing. Each of the three test set-ups consists of an analogue addressable detection circuit, where it is possible to connect different numbers of detectors and different types of detectors to the analogue loop. The first control unit/power supply is used for the measurements of all response times and response threshold values in the test tunnel. This control unit has 1 or 2 detectors connected to the loop at a time and a relay output for signalling alarm condition from the individual detectors to the test tunnel data acquisition system. For the detector type EV-PH, there are two separate relay outputs, one for the smoke detector part and one for the heat detector part. The second control unit/power supply is used for the salt mist testing. This unit has one of each type of the detectors type EV-H-A1R, EV-P, EV-DP and EV-PH connected to the loop during the test. This means that 4 marine bases are connected to the analogue loop with 10 cm between the bases and 6 m between the detectors and the control unit. The third control unit/power supply is used for all other environmental tests. This unit can have one of each type of all 5 detectors connected to the loop during the testing, including the detector type EV-H-CS. It is possible to remove the detector type EV-H-CS from the loop during certain tests without removing the base from the loop. 5 marine bases are connected to the analogue loop with 3 m between the detectors and 20 m between the detectors and the control unit. The detectors are mounted in IP55 marine bases type SPB-ADAPT during the type testing. The cable used in the test set-up is a typical unshielded installation cable. The revision numbers of the different types of tested detectors at the start of the marine type testing and during the complete marine type testing period are given in Table 2. The revision number is for the complete detector.

9 Page 9 of 44 Table 2 Item Revision no. Parts list Build standard EV-H-A1R 7 2 EV-H-CS 7 2 EV-P 6 2 EV-DP 8 1 EV-PH 9 1 During the marine type testing, including the test tunnel measurements and the environmental testing, the analogue addressable detectors were connected to the control and indicating equipment type CS4000 from Consilium Marine AB, Sweden. The CS4000 was equipped with the following software versions during the marine type testing. Type Name Hardware version Software version BB Base Board R2d LB3 Loop Board R1D Functional test procedure Simple functional testing A simple functional test of all the tested detectors was performed. The simple functional test was carried out before, during (if specified) and after each of the environmental tests. The simple functional test included the following activities: Smoke detectors : Smoke from a match or test gas was blown into the detector (alarm condition and reset). Heat detectors : Heat from a hair dryer was blown into the detector (alarm condition and reset). The LED on the detector and the readings on the control unit to which the detector was connected were observed.

10 Page 10 of Measurements of response time for heat detectors and response threshold value for smoke detectors The sensitivity of the test objects was found by measuring the Response Time (RT) of the heat detectors and the Response Threshold Value (RTV) of the smoke detectors. These measurements were performed before and after the environmental conditioning. The response time for each type of heat detector was measured after the conditioning at rate of rise of air temperatures of 3 K min -1 and 20 K min -1 in the orientation which gave the maximum response time in the directional dependence test according to EN54-5, as specified in the LPCB reports from previous type testing (see the report ref. /1/ in Section 1.6), and compared with the response time measured for the same detector before the environmental test. The response threshold value of each type of smoke detector was measured after the conditioning in the least sensitive orientation of the detector as measured in the directional dependence test according to EN54-7, as specified in the LPCB reports from previous type testing (see the report ref. /1/ in Section 1.6), and compared with the response time measured for the same detector before the environmental test. Directional dependence - least sensitive orientation: Detector Heat [Maximum response time] Smoke [m max ] EV-H-A1R 180º - EV-H-CS 180º - EV-P - 315º EV-DP - 135º EV-PH 315º 270º For the heat detectors, the least sensitive orientation is the orientation which resulted in the maximum response time in the previous directional dependence testing. For optical smoke detectors, the least sensitive orientation is the orientation which resulted in the maximum response threshold value which is designated m max. For all the tested detectors, the 0 orientation was defined as the direction with the alignment notch pointing downstream with regard to the airflow in the test tunnel. The test object was rotated clockwise when viewed from below with the detector mounted at the ceiling. The results of the functional tests are given in Chapters 2 and 3.

11 Page 11 of General criteria for passing the tests The following general criteria have been used as a basis for passing the tests in this report: Functioning The testing in standard environment and the environmental testing shall not cause malfunctioning of the test object. The test object shall function correctly when subjected to the simple functional testing as specified in Section above. The RT and RTV values measured before and after the environmental testing as specified in Section above are compared. For the heat detectors, the response time measured shall be above the lower limit of response time and below the maximum deviation in response times measured before and after the environmental testing according to EN54-5. For the optical smoke detectors, the ratio between the maximum and minimum response threshold values (m max and m min ) measured before and after the environmental testing according to EN54-7 shall be equal to or below 1.6. Visual inspection The testing shall not cause damage or degradation likely to jeopardise the correct functioning of the test object. 1.5 Modifications of test objects during testing The type approval testing revealed that modifications of some of the test objects were necessary to pass certain tests. The modifications are described in the summary in Annex 4 and mentioned in the relevant sections of Chapters 2 and References /1/ Assessment of compliance with the IACS E10 "Test Specification for Type Approval", Rev. 4, May 2004, issued by the international Association of Classification Societies (IACS) for miscellaneous smoke and heat detectors from Consilium Marine AB Performed for Consilium Marine AB DANAK Project no.: A Date: 2 June 2006

12 Page 12 of Tests in standard environment Standard environment IEC (1988), Part 1: General and guidance, Amendment 1 (1992). Temperature : 15 C to 35 C Humidity : 25 %RH to 75 %RH Air pressure : 86 kpa to 106 kpa (860 mbar to 1060 mbar) 2.1 Insulation resistance Test objects EV-H-A1R EV-H-CS (only measured before and after the damp heat, cyclic test) EV-P EV-DP EV-PH Specification IACS E10 Req. 1993/Rec.4, 2004, Test No. 9 Procedure The insulation resistance is measured for each detector between shorted supply terminals (loop or detector line) and an earth plane to which the detector is mounted, with a test voltage of 100 VDC. The rated supply voltage is 37 VDC. The insulation resistance shall be above 10 MΩ initially, and above 1 MΩ after the cold, the damp heat and the high voltage exposures. Results These results apply to all the test objects as follows: Initially : >20,000 MΩ After cold test : >20,000 MΩ After damp heat test : >20,000 MΩ After high voltage test : >20,000 MΩ The detectors all passed the insulation resistance test without comments.

13 Page 13 of High voltage Test objects EV-H-A1R EV-P EV-DP EV-PH. Specification IACS E10 Req. 1993/Rec.4, 2004, Test no. 10. Procedure One of each type of detector in its marine base is tested as specified in the standard, except for the EV-H-CS detector, which was not included in this test. With respect to this test it is similar to EV-H-A1R, as described in Section 1.1, Introduction For each type of detector, a test voltage of 574 VAC, 50 Hz is applied for one minute between shorted supply terminals (loop or detection line) and an aluminium earth plate to which the detector is mounted. During the conditioning, it is monitored that no flashover, breakdown, etc. occurs. A simple functional test is performed after the conditioning. The insulation resistance is measured after the high voltage test and compared with the initial measurements of the insulation resistance as described in Section 2.1. The response times for each type of heat detector are measured after the conditioning and compared with the results achieved before the conditioning. The response threshold value for each smoke detector is measured after the conditioning and compared with the results achieved before the conditioning. Results No flashover or breakdown was observed during the conditioning, and the simple functional test was OK after the conditioning. The insulation resistance measured was within the required limits. Please see results in Section 2.1. The response time of each type of heat detector was measured and compared with the measurement before the conditioning as follows:

14 Page 14 of 44 EV-H-A1R Orientation of test object: 180 Rate of rise of air temp. Response time measured before env. test Response time measured after env. test Deviation in response times before and after env. test Upper limit of deviation [K min -1 ] [min] [s] [min] [s] [min] [s] [min] [s] EV-PH (heat detector part) Orientation of test object: 315 Rate of rise of air temp. Response time measured before env. test Response time measured after env. test Deviation in response times before and after env. test Upper limit of deviation [K min -1 ] [min] [s] [min] [s] [min] [s] [min] [s] The response threshold value of each type of smoke detector was measured and compared with the measurement before the conditioning as follows: EV-P Orientation of test object: 315 Measurement m [db m -1 ] m max & m min Requirements Before conditioning 0.17 m min After conditioning 0.17 m max Ratio = m max : m min = 1.00 m max : m min 1.6 EV-DP Orientation of test object: 135 Measurement m [db m -1 ] m max & m min Requirements Before conditioning 0.23 m min After conditioning 0.25 m max Ratio = m max : m min = 1.09 m max : m min 1.6

15 Page 15 of 44 EV-PH (smoke detector part) Orientation of test object: 270 Measurement m [db m -1 ] m max & m min Requirements Before conditioning 0.17 m min After conditioning 0.17 m max Ratio = m max : m min = 1.00 m max : m min 1.6 For all the heat detectors, the deviation between response time measured before and after the environmental test was below the upper limit as required. The requirements for the ratio of m max : m min 1.6 for all the tested smoke detectors were fulfilled. The detectors all passed the high voltage test without comments.

16 Page 16 of Environmental tests This chapter describes the environmental tests. The tests are described with reference to test objects, specification and procedure. 3.1 Dry heat Test objects EV-H-A1R EV-H-CS EV-P EV-DP EV-PH. Specification IACS E10 Req. 1993/Rec.4, 2004, Test no. 5. Procedure IEC (1974), Test Bd: Dry heat for heat-dissipating object with gradual change of temperature, Amendment 1 (1993), Amendment 2 (1994). Temperature : +70 C Duration : 2 hours Humidity : Below 50 %RH One of each type of detector in its marine base is tested as specified in the standard. The test objects are energised and monitored in quiescent condition during the conditioning, except for the EV-H-A1R and EV-PH which are in heat alarm condition at this temperature, and it is monitored that they cannot be reset. During the last hour of the conditioning, a simple functional test is performed. After recovery, the simple functional test is repeated in standard environment. The response times for each type of heat detector are measured after the conditioning and compared with the results achieved before the conditioning. The response threshold value for each smoke detector is measured after the conditioning and compared with the results achieved before the conditioning. Since the same EV-H-A1R detector and EV-PH detector was used for the three tests: dry heat, cold and damp heat, cyclic, carried out in this sequence, the intermediate functional test for these detectors was deleted. Only before and after the end of this sequence of tests, a functional test was carried out. Therefore, the measured response threshold

17 Page 17 of 44 levels/response times for these detectors are included in the test results of the dry heat test. Results Except as mentioned below, no malfunction was observed during the conditioning and the simple functional test was OK during the last hour of the conditioning period at the high temperature as well as after recovery. At +70 C the EV-H-A1R and EV-PH were correctly in heat alarm condition and could not be reset. The response time of each type of heat detector was measured and compared with the measurement before the conditioning as follows: EV-H-A1R Orientation of test object: 180 Rate of rise of air temp. Response time measured before env. test Response time measured after env. test Deviation in response times before and after env. test Upper limit of deviation [K min -1 ] [min] [s] [min] [s] [min] [s] [min] [s] EV-H-CS Orientation of test object: 180 Rate of rise of air temp. Response time measured before env. test Response time measured after env. test Deviation in response times before and after env. test Upper limit of deviation [K min -1 ] [min] [s] [min] [s] [min] [s] [min] [s]

18 Page 18 of 44 EV-PH (heat detector part) Orientation of test object: 315 Rate of rise of air temp. Response time measured before env. test Response time measured after env. test Deviation in response times before and after env. test Upper limit of deviation [K min -1 ] [min] [s] [min] [s] [min] [s] [min] [s] The response threshold value of each type of smoke detector was measured and compared with the measurement before the conditioning as follows: EV-P Orientation of test object: 315 Measurement m [db m -1 ] m max & m min Requirements Before conditioning 0.18 m max After conditioning 0.17 m min Ratio = m max : m min = 1.06 m max : m min 1.6 EV-DP Orientation of test object: 135 Measurement m [db m -1 ] m max & m min Requirements Before conditioning 0.23 m max After conditioning 0.22 m min Ratio = m max : m min = 1.05 m max : m min 1.6 EV-PH (smoke detector part) Orientation of test object: 270 Measurement m [db m -1 ] m max & m min Requirements Before conditioning 0.20 m max After conditioning 0.16 m min Ratio = m max : m min = 1.25 m max : m min 1.6

19 Page 19 of 44 For all the heat detectors, the deviation between response time measured before and after the environmental test was below the upper limit as required. The requirements for the ratio of m max : m min 1.6 for all the tested smoke detectors were fulfilled. The detectors all passed the dry heat test, but with the comments given below. Comments The dry heat test revealed that the built-in LED of the detector type EV-H-A1R did not light up when in alarm condition. Otherwise, it functioned correctly in all other aspects, and the alarm signal was correctly received by the CS4000 control panel. A subsequent failure analysis made by Nittan showed that the fault was caused by a bad soldering. The detector was repaired and sent back to DELTA for inspection and found to be functioning correctly. Please see information regarding the fault in Chapter Damp heat, cyclic Test objects EV-H-A1R EV-H-CS EV-P EV-DP EV-PH. Specification IACS E10: Req. 1993/Rec.4, 2004, 1997, Test no. 6.

20 Page 20 of 44 Procedure IEC (1980), Test Db: Damp heat cyclic ( hours' cycle), Variant 1, Amendment 1 (1985). Lower temperature : 25 C Humidity at lower temperature : >95 %RH Upper temperature : 55 C Humidity at upper temperature : 93 %RH Number of cycles : 2 One of each type of detector in its marine base is tested as specified in the standard. The test objects are energised and in quiescent condition during the first cycle. A simple functional test is performed during the first 2 hours of the 55 C phase. During the rise of temperature to the high temperature, condensation on the test objects is ensured. During the second cycle, the test objects are deenergised. However, once within the last 2 hours of the second 55 C phase, the test objects are energised temporarily for a simple functional test to be performed. After recovery, a simple functional test is carried out. The insulation resistance is measured after the high voltage test and compared with the initial measurements of the insulation resistance as described in Section 2.1. The response times for each type of heat detector are measured after the conditioning and compared with the results achieved before the conditioning. The response threshold value for each smoke detector is measured after the conditioning and compared with the results achieved before the conditioning. Since the same EV-H-A1R detector and EV-PH detector were used for the three tests: dry heat, cold and damp heat, cyclic, carried out in a sequence, the intermediate functional test for these detectors was deleted. Only before and after the end of this sequence of tests, a functional test was carried out. Therefore, the measured response threshold levels /response times for these detectors is included in the test results of the dry heat test in Section 3.1. Similarly, the same EV-P detector and EV-DP detector were used for the two tests: cold and damp heat, cyclic, carried out in a sequence, the intermediate functional test was deleted. Only before and after the end of these tests, a functional test was carried out. Therefore, the measured response threshold levels/response times for these detectors is included in the test results of the cold test in Section 3.4.

21 Page 21 of 44 Results Except as mentioned below, no malfunction was observed during the conditioning, and the simple function of the test objects was OK during the first and second cycle at 55 C, 93 %RH and after recovery. No corrosion attack was observed after the conditioning. The insulation resistance measured was within the required limits. Please see results in Section 2.1. The response time of each type of heat detector was measured and compared with the measurement before the conditioning. The results for the detectors type EV-H-A1R and EV-PH are included in the test results of the dry heat test in Section 3.1. The response time for the heat detector type EV-H-CS was measured and compared with the measurement before the conditioning as follows: EV-H-CS Orientation of test object: 180 Rate of rise of air temp. Response time measured before env. test Response time measured after env. test Deviation in response times before and after env. test Upper limit of deviation [K min -1 ] [min] [s] [min] [s] [min] [s] [min] [s] The response threshold value of each type of smoke detectors was measured and compared with the measurement before the conditioning. The results for the detector type EV-PH are included in the test results of the dry heat test in Section 3.1. The results for the detectors type EV-P and EV-DP are included in the test results of the cold test in Section 3.4. For all the heat detectors, the deviation between response time measured before and after the environmental test was below the upper limit as required. The requirements for the ratio of m max : m min 1.6 for all the tested smoke detectors were fulfilled. The detectors all passed the damp heat, cyclic test, but with the comments given below.

22 Page 22 of 44 Comments The damp heat test revealed that the built-in LED of the detector type EV-H-A1R did not light up when in alarm condition. Otherwise, it functioned correctly in all other aspects, and the alarm signal was correctly received by the CS4000 control panel. A subsequent failure analysis made by Nittan showed that the fault was caused by a bad soldering. The detector was repaired and sent back to DELTA for inspection and found to be functioning correctly. Also, the damp heat test revealed that when switching on at the second simple functional test during the exposure, the EV-PH gave the indication SENSOR FAULT (129) on the control panel. The fault could not be reset before heat and smoke alarms had been subsequently provoked. A new detector type EV-PH from an improved controlled production was tested at DELTA in a second damp heat, cyclic test, including initial and final response parameters, insulation resistance and simple function check. The new detector passed the damp heat, cyclic test without comments. Please see information regarding the fault in Chapter Vibration Test objects EV-H-A1R EV-P EV-DP EV-PH. Specification IACS E10 Req. 1993/Rec.4, 2004, Test no. 7. Procedure IEC (1985), Test Fc: Vibration (sinusoidal). Response investigation (test objects switched off) followed by endurance by frequency dwelling (switched on) is carried out in each of three axes using the following parameters:

23 Page 23 of 44 Frequency range : Hz Frequency/amplitude : 2-25 Hz : ±1.6 mm Hz : ±4 g Sweep rate : Max. 1 octave/min. Number of axes : 3 mutually perpendicular One of each type of detector in its marine base is tested as specified in the standard, except for the EV-H-CS detector, which was not included in this test. With respect to this test, it is similar to EV-H-A1R, as described in Section 1.1, Introduction During the response investigation, resonance frequencies are determined by means of stroboscopic light with slow-motion facility and accelerometer measurements of the amplification factors (Q). Resonance frequencies with Q 2 are recorded. Endurance by frequency dwelling is carried out for 90 minutes at each resonance frequency with a Q 2, or 90 minutes at 30 Hz if no such resonances are found. A simple functional test and visual inspection is performed after the conditioning. Results No resonance frequencies with an amplification factor above 2 were recorded for any of the tested detectors. No damage or malfunction was observed during or after the exposures and the simple function test was OK after the test. The response time of each type of heat detector was measured and compared with the measurement before the conditioning as follows: EV-H-A1R Orientation of test object: 180 Rate of rise of air temp. Response time measured before env. test Response time measured after env. test Deviation in response times before and after env. test Upper limit of deviation [K min -1 ] [min] [s] [min] [s] [min] [s] [min] [s]

24 Page 24 of 44 EV-PH (heat detector part) Orientation of test object: 315 Rate of rise of air temp. [K min -1 ] [min ] Response time measured before env. test Response time measured after env. test Deviation in response times before and after env. test [s] [min] [s] [min] [s] [min ] Upper limit of deviation [s] The response threshold value of each type of smoke detector was measured and compared with the measurement before the conditioning as follows: EV-P Orientation of test object: 315 Measurement m [db m -1 ] m max & m min Requirements Before conditioning 0.19 m max After conditioning 0.16 m min Ratio = m max : m min = 1.19 m max : m min 1.6 EV-DP Orientation of test object: 135 Measurement m [db m -1 ] m max & m min Requirements Before conditioning 0.25 m min After conditioning 0.25 m max Ratio = m max : m min = 1.00 m max : m min 1.6 EV-PH (smoke detector part) Orientation of test object: 270 Measurement m [db m -1 ] m max & m min Requirements Before conditioning 0.18 m min After conditioning 0.18 m max Ratio = m max : m min = 1.00 m max : m min 1.6 For all the heat detectors, the deviation between response time measured before and after the environmental test was below the upper limit as required.

25 Page 25 of 44 The requirements for the ratio of m max : m min 1.6 for all the tested smoke detectors were fulfilled. The detectors all passed the vibration test without comments. 3.4 Cold Test objects EV-H-A1R EV-P EV-DP EV-PH. Specification IACS E10: Req. 1993/Rec.4, 2004, Test no. 11. Procedure IEC (1990), Test Ad: Cold for heat-dissipating object with gradual change of temperature, Amendment 1 (1993), Amendment 2 (1994). Temperature : -25 C Duration : 2 hours One of each type of detector in its marine base is tested as specified in the standard, except for the EV-H-CS detector, which was not included in this test. With respect to this test, it is similar to EV-H-A1R, as described in Section 1.1, Introduction The test objects are deenergised during the conditioning. However, during the last hour of the conditioning at the low temperature, the test objects are energised and a simple functional test is performed. After recovery, a simple functional test is carried out. The insulation resistance is measured after the high voltage test and compared with the initial measurements of the insulation resistance as described in Section 2.1. The response times for each type of heat detector are measured after the conditioning and compared with the results achieved before the conditioning. The response threshold value for each smoke detector is measured after the conditioning and compared with the results achieved before the conditioning. Since the same EV-H-A1R detector and EV-PH detector were used for the three tests: dry heat, cold and damp heat, cyclic, carried out in a sequence, the intermediate functional test for these detectors was deleted. Only before and after the end of this sequence of tests, a functional test was carried out. Therefore, the measured response threshold

26 Page 26 of 44 levels /response times for these detectors is included in the test results of the dry heat test in Section 3.1. Similarly, the same EV-P detector and EV-DP detector were used for the two tests: cold and damp heat, cyclic, carried out in a sequence, the intermediate functional test was deleted. Only before and after the end of these tests, a functional test was carried out. Therefore, the measured response threshold levels/response times for these detectors is included in the test results of the cold test in Section 3.4. Results No malfunction was observed when energising the test objects, and the simple functional test was OK during the last hour of the conditioning period at the low temperature and after recovery. (It is noted that the same detector type EV-H-A1R as tested during the previous dry heat test now functioned correctly with its LED lighting up in alarm condition, both during and after this exposure.) The insulation resistance measured was within the required limits. Please see results in Section 2.1. The response time of each type of heat detector was measured and compared with the measurement before the conditioning. The results for the detectors type EV-H-A1R and EV-PH are included in the test results of the dry heat test in Section 3.1. The response threshold value of each type of smoke detectors was measured and compared with the measurement before the conditioning. The results for the detector type EV-PH is included in the test results of the dry heat test in Section 3.1. EV-P Orientation of test object: 315 Measurement m [db m -1 ] m max & m min Requirements Before conditioning 0.16 m min After conditioning 0.17 m max Ratio = m max : m min = 1.06 m max : m min 1.6

27 Page 27 of 44 EV-DP Orientation of test object: 135 Measurement m [db m -1 ] m max & m min Requirements Before conditioning 0.19 m min After conditioning 0.22 m max Ratio = m max : m min = 1.16 m max : m min 1.6 For all the heat detectors, the deviation between response time measured before and after the environmental tests was below the upper limit as required. The requirements for the ratio of m max : m min 1.6 for all the tested smoke detectors were fulfilled. The detectors all passed the cold test without comments. 3.5 Salt mist Test objects EV-H-A1R EV-P EV-DP EV-PH. Specification IACS E10 Req. 1993/Rec.4, 2004, Test no. 12. Procedure IEC ( ), Test Kb: Salt mist, cyclic (sodium, chloride solution) Severity 1: Salt solution (spray) : 5% NaCl Spray duration : 2 hours Humidity storage : 40 C and 93%RH Storage period : 7 days Number of cycles : 4 (total of 28 days) One of each type of detector in its marine base is tested as specified in the standard, except for the EV-H-CS detector, which was not included in this test. With respect to this test, it is similar to EV-H-A1R, as described in Section 1.1, Introduction

28 Page 28 of 44 The test objects are deenergised during the conditioning. After recovery, a simple functional test is carried out. The insulation resistance is measured after the high voltage test and compared with the initial measurements of the insulation resistance as described in Section 2.1. A visual inspection of the test objects were carried out after the conditioning. Results No corrosion was observed after the conditioning and the simple functional test was OK after recovery. The insulation resistance measured was within the required limits. Please see results in Section 2.1. No corrosion attack was observed after the conditioning. The response time of each type of heat detector was measured and compared with the measurement before the conditioning as follows: EV-H-A1R Orientation of test object: 180 Rate of rise of air temp. Response time measured before env. test Response time measured after env. test Deviation in response times before and after env. test Upper limit of deviation [K min -1 ] [min] [s] [min] [s] [min] [s] [min] [s] EV-PH (heat detector part) Orientation of test object: 315 Rate of rise of air temp. Response time measured before env. test Response time measured after env. test Deviation in response times before and after env. test Upper limit of deviation [K min -1 ] [min] [s] [min] [s] [min] [s] [min] [s] The response threshold value of each type of smoke detector was measured and compared with the measurement before the conditioning as follows:

29 Page 29 of 44 EV-P Orientation of test object: 315 Measurement m [db m -1 ] m max & m min Requirements Before conditioning 0.18 m max After conditioning 0.17 m min Ratio = m max : m min = 1.06 m max : m min 1.6 EV-DP Orientation of test object: 135 Measurement m [db m -1 ] m max & m min Requirements Before conditioning 0.24 m max After conditioning 0.23 m min Ratio = m max : m min = 1.04 m max : m min 1.6 EV-PH (smoke detector part) Orientation of test object: 270 Measurement m [db m -1 ] m max & m min Requirements Before conditioning 0.20 m max After conditioning 0.19 m min Ratio = m max : m min = 1.05 m max : m min 1.6 For all the heat detectors, the deviation between response time measured before and after the environmental test was below the upper limit as required. The requirements for the ratio of m max : m min 1.6 for all the tested smoke detectors were fulfilled. The detectors all passed the salt mist test without comments. 3.6 Radiated emission Test objects EV-H-A1R EV-P EV-DP EV-PH.

30 Page 30 of 44 Specification IACS E10: Req. 1993/Rec.4, 2004, Test no. 19 (bridge and deck zone). Procedure CISPR 16-1 ( ), Specification for radio disturbance and immunity measuring apparatus and methods - Part 1: Radio disturbance and immunity measuring apparatus. CISPR 16-2:2002, Specification for radio disturbance and immunity measuring apparatus and methods - Part 2: Methods of measurement of disturbances and immunity. Frequency range : MHz Limits (quasi-peak) : MHz : dbμv/m MHz : dbμv/m MHz : 54 dbμv/m, except for MHz : 24 dbμv/m Photo of test set-up : See annex 3 One of each type of detector in its marine base is tested as specified in the standard, except for the EV-H-CS detector, which was not included in this test. With respect to this test, it is similar to EV-H-A1R, as described in Section 1.1, Introduction The electric field is measured with antennas at a distance of 3 m. The test objects are energised and in quiescent condition during the measurement. Results The measured emission from 0.15 to 2000 MHz was below the limits for all the test objects. The detectors all passed the salt mist test without comments.

31 Page 31 of Summary The five smoke and heat detector types from Consilium Marine AB as listed on Page 2 have been subjected to type approval testing based on IACS E10 test procedures. The tests carried out and the results are listed in the table below. According to the assessment report A mentioned in Ref. /1/ in Section 1.6, the requirements of the IACS E10 are covered by including the selected E10 tests listed below, since the E10 tests not included here are covered by previous testing as described in Ref. /1/ in Section 1.6. All functional testing before and after the environmental tests was carried out according to EN54-5 for heat detectors and EN54-7 for smoke detectors. The test results can be summarised as follows. (Detailed information is given in Chapters 2 and 3) Test Specification Results Visual inspection IACS E10, test no. 1 OK Performance test IACS E10, test no. 2, OK EN54-5, EN54-7 Insulation resistance IACS E10, test no. 9 OK High voltage IACS E10, test no. 10 OK Dry heat, +70ºC IACS E10, test no. 5 OK, See note 1) Damp heat, cyclic, 55ºC IACS E10, test no. 6 OK, See note 1) and 2) Vibration IACS E10, test no. 7 OK Cold, -25ºC IACS E10, test no. 11 OK Salt mist IACS E10, test no. 12 OK Radiated emission IACS E10, test no. 19 (bridge and deck zone) OK Note 1:The dry heat test and the damp heat cyclic tests revealed that the built-in LED of the detector type EV-H- A1R did not light up when in alarm condition. Otherwise, it functioned correctly in all other aspects, and the alarm signal was correctly received by the CS4000 control panel. A subsequent failure analysis made by Nittan showed that the fault was caused by a bad soldering. The detector was repaired and sent back to DELTA for inspection and found to be functioning correctly. For more details please see the Nittan, UK failure analysis report as listed in Annex 1. Note 2:The first damp heat test revealed that when switching on at the second simple functional test during the exposure, the EV-PH gave the indication SENSOR FAULT (129) on the control panel. The fault could not be reset before heat and smoke alarms had been subsequently provoked. Application of heat produced both heat and smoke alarm indications. Application of smoke correctly produced only smoke alarm. A subsequent failure analysis made by Nittan showed that the fault was caused by contamination of the circuit board during the soldering process as well as errors in the conformal coating applied at the manufacturing. A new detector type EV-PH from an improved controlled production was tested at DELTA in a second damp heat, cyclic test, including initial and final response parameters, insulation resistance and simple function check. The new detector passed the damp heat, cyclic test without comments. For more details please see the Nittan, UK failure analysis report as listed in Annex 1.

32 Page 32 of 44 Annex 1 Documentation for the test objects

33 Page 33 of 44 Documentation for the test objects Type Title Number Version Date Pages Data sheet Heat detector Salwico EV-H 54 C EV-H 54C.06.1.E Data sheet Heat detector Salwico EV-H 84 C EV-H 84C.06.1.E Diagram EV-H Parts list PCB Assembly Part List EV-H - Rev 2 28/01/03 3 Certificate of product conformity EV-H-A1R and EV- H-CS Heat Detectors 041h - 12 May Layout drawing Data sheet EV-PH/EV-H PCB Silkscreen (Top) Optical smoke detector Salwico EV-P /12/ EV.P.06.1.E Diagram EV-P Circuit Parts list Layout drawing PCB Assembly Part llist EV-P EV-P PCB Silkscreen - Rev 2 28/01/ /12/02 1 Certificate of product conformity EV-P and EV-DP Optical Smoke Detectors 041f - 12 May Data sheet Combined optical smoke/heat Detector Salwico EV-PH EV- PH.06.1.E Diagram EV-PH Circuit Parts list PCB Assembly Part List EV-PH - Rev2 28/01/03 4 Layout drawing EV-PH/EV-H /12/02 1

34 Page 34 of 44 Certificate of product conformity EV-PH Optical Smoke/Heat Detector 041g - 12 May Data sheet Dual optical smoke detector Salwico EV- DP EV- DP.06.1.E Diagram EV-DP Circuit Parts list Layout drawing PCB Assembly Part List EV-DP EV-DP PCB Silkscreen (Top) - Rev 2 28/01/ /12/02 1 Label drawing EV-H-A1R Label /08/05 1 Label drawing EV-H-CS Label /08/05 1 Label drawing EV-P Label /08/05 1 Label drawing EV-DP Label /04/06 1 Label drawing EV-PH Label /08/05 1 Failure report Delta EV failures /10/06 3

35 Page 35 of 44 Photos of test objects Each type of test object is shown in its normal appearance. 3.1 EV-H-A1R Heat detector, class A1R 3.2 EV-H-CS Heat detector, class CS 3.3 EV-P Smoke detector 3.4 EV-DP Double optical smoke detector 3.5 EV-PH Optical smoke/heat detector, class A1R

36 Page 36 of 44 Annex 2 Documentation for the test set-up

37 DANAK Page 37 of 44

38 Page 38 of 44 Annex 3 Test set-up and test record sheets regarding radiated emission

39 Page 39 of 44 Test set-up for measurements of radiated emission MHz. Test set-up for measurements of radiated emission GHz.

40 Page 40 of 44 Test set-up for measurements of radiated emission 1-2 GHz.

41 Page 41 of 44 DELTA Electronics Testing, EMC Section EUT: Salwico: EV-HA1R, EV-P, EV-DP and EV-PH Manufacturer: Consilium Marine AB Operating Condition: Ant 1 m Vertical. Test Site: EMC-5 Operator: CMT - A Test Specification: IACS E10:2004 Comment: Sheet 1 Start of Test: Level [dbµv/m] x x x x x x 0 30M 50M 70M 100M 200M 300M 500M 700M 1G Frequency [Hz] x MES Maximering_fin QP MES IEC945 1m 30 MaxPk 1 LIM RE, E10, QP Radiated Emission MEASUREMENT RESULT: "Maximering_fin QP" :20 Frequency Level Transd Limit Margin Height Azimuth Polarisation MHz dbµv/m db dbµv/m db cm deg VERTICAL VERTICAL VERTICAL VERTICAL VERTICAL VERTICAL

42 Page 42 of 44 DELTA Electronics Testing, EMC Section EUT: Salwico: EV-HA1R, EV-P, EV-DP and EV-PH Manufacturer: Consilium Marine AB Operating Condition: Ant 4 m horizontal Test Site: EMC-5 Operator: CMT - A Test Specification: IACS E10:2004 Comment: Sheet 2 Start of Test: Level [dbµv/m] x x x x x x 0 30M 50M 70M 100M 200M 300M 500M 1G 2G Frequency [Hz] x MES Maximering_fin QP MES IEC945 4m 30 MaxPk 1 LIM RE, IEC Radiated Emission

43 Page 43 of 44 DELTA Electronics Testing, EMC Section EUT: Salwico: EV-HA1R, EV-P, EV-DP and EV-PH Manufacturer: Consilium Marine AB Operating Condition: Ant. 0 deg. Test Site: EMC-5 Operator: CMT - A Test Specification: IACS E10:2004 Comment: Sheet 3 Start of Test: Level [dbµv/m] x k 300k 500k 1M 2M 3M 5M 7M 10M 30M Frequency [Hz] x MES mfield_0001_fin QP MES ME IEC 945 (0 MaxPk LIM ME, E10, QP Magnetic Emission MEASUREMENT RESULT: "mfield_0001_fin QP" :51 Frequency Level Transd Limit Margin Azimuth MHz dbµv/m db dbµv/m db deg

44 Page 44 of 44 DELTA Electronics Testing, EMC Section EUT: Salwico: EV-HA1R, EV-P, EV-DP and EV-PH Manufacturer: Consilium Marine AB Operating Condition: Ant. 90 deg. Test Site: EMC-5 Operator: CMT - A Test Specification: IACS E10:2004 Comment: Sheet 4 Start of Test: Level [dbµv/m] x k 300k 500k 1M 2M 3M 5M 7M 10M 30M Frequency [Hz] x MES mfield_0001_fin QP MES ME IEC 945 (90 MaxPk LIM ME, E10, QP Magnetic Emission MEASUREMENT RESULT: "mfield_0001_fin QP" :06 Frequency Level Transd Limit Margin Azimuth MHz dbµv/m db dbµv/m db deg

Supplementary type approval testing of Selco modules

Supplementary type approval testing of Selco modules We help ideas meet the real world DELTA Test Report DANAK TEST Reg. no. 19 Supplementary type approval testing of Selco modules Performed for Selco A/S DANAK-198611 Project no.: A504377-1 Page 1 of 20

More information

COMITÉ EUROPÉEN DES ASSURANCES

COMITÉ EUROPÉEN DES ASSURANCES COMITÉ EUROPÉEN DES ASSURANCES SECRETARIAT GENERAL 3bis, rue de la Chaussée d'antin F 75009 Paris Tél. : +33 1 44 83 11 73 Fax : +33 1 44 83 11 85 Web : cea.assur.org DELEGATION A BRUXELLES Square de Meeûs,

More information

E-17 Flammable Gas Detection and Alarm System

E-17 Flammable Gas Detection and Alarm System Guideline No.E-17 (201705) E-17 Flammable Gas Detection and Alarm System Issued date: May 9, 2017 China Classification Society Foreword This Guideline is a part of CCS Rules, which contains technical requirements,

More information

DELTA Classification Report

DELTA Classification Report DELTA Classification Report TEST Reg. no. 19 Reaction to fire classification report for electric cables: Cat 6A U/FTP 500 MHz FRNC Performed for Caleb Cable Industrial Ltd. no.: Page 1 of 9 19 December

More information

Procedure for the Approval of New Fire Detection and Alarm Technologies

Procedure for the Approval of New Fire Detection and Alarm Technologies VdS Guidelines for Automatic Fire Detection and Fire Alarm Systems VdS 3469en Procedure for the Approval of New Fire Detection and Alarm Technologies VdS 3469en : 2016-01 (01) Publisher and publishing

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 ARTESYN PRODUCT TESTING SERVICES 2900 South Diablo Way, Suite 190 Tempe, AZ 85282 Tom Tuttle Phone: 602 228 7869 Email: tom.tuttle@artesyn.com ELECTRICAL (EMC)

More information

23" PANEL MOUNT INDUSTRIAL MONITOR REVISION C PRODUCT RELIABILITY TEST REPORT

23 PANEL MOUNT INDUSTRIAL MONITOR REVISION C PRODUCT RELIABILITY TEST REPORT 23" PANEL MOUNT INDUSTRIAL MONITOR REVISION C PRODUCT RELIABILITY TEST REPORT Model No. HIS-ML23- _ C Table of Contents Test Report Overview... 3 Testing Rationale...3 Test Plan...4 Test 1 Cold (Steady

More information

ETSI TS V1.2.1 ( )

ETSI TS V1.2.1 ( ) TS 100 783 V1.2.1 (2004-08) Technical Specification Transmission and Multiplexing (TM); Passive optical components; Fibre optic fusion splices for single-mode optical fibre transmission systems for indoor

More information

Fire detection and fire alarm systems

Fire detection and fire alarm systems BRITISH STANDARD BS EN 54-5:2001 Incorporating Amendment No. 1 Fire detection and fire alarm systems Part 5: Heat detectors Point detectors The European Standard, with the incorporation of amendment A1:2002,

More information

Audible warning devices for external alarm

Audible warning devices for external alarm VdS SCHADENVERHÜTUNG VdS Publisher: Gesamtverband der Deutschen Versicherungswirtschaft e.v. (GDV) Büro Schadenverhütung Publishing house: VdS Schadenverhütung Rules for Intruder Alarm Systems Audible

More information

Test Report. Appliance EMF Testing

Test Report. Appliance EMF Testing Project: 11014506A Date: November 6, 2015 Model: 120V_WWF13NW Test Report On Appliance EMF Testing Copyright 2005 UL LLC UL LLC authorizes the above-named company to reproduce this Report provided it is

More information

Product Tests Report

Product Tests Report TO WHOM IT MAY CONCERN Page: 1 of 5 Product name: Model number and description: MIC IP starlight 7000i Product Tests Report MIC-7502-Z30B, PTZ camera 2MP HDR 30x IP68 IK10, black MIC-7502-Z30W, PTZ camera

More information

17" UNIVERSAL MOUNT INDUSTRIAL MONITOR REVISION E, F & G PRODUCT RELIABILITY TEST REPORT

17 UNIVERSAL MOUNT INDUSTRIAL MONITOR REVISION E, F & G PRODUCT RELIABILITY TEST REPORT 17" UNIVERSAL MOUNT INDUSTRIAL MONITOR REVISION E, F & G PRODUCT RELIABILITY TEST REPORT Model No. HIS-UM17- _ E, HIS-UM17- _ F and HIS-UM17- _ G Table of Contents Test Report Overview... 3 Testing Rationale...3

More information

Laboratory Honeywell Technology Solutions, Bangalore-EMC Lab, 19/2, Devarabisanahalli Village, K.R. Puram, Varthur Hobli, Bangalore, Karnataka

Laboratory Honeywell Technology Solutions, Bangalore-EMC Lab, 19/2, Devarabisanahalli Village, K.R. Puram, Varthur Hobli, Bangalore, Karnataka Last Amended on 07.10.2015 Page 1 of 18 I. EMC Test Facility 1. Electrical and Electronic Products, Process Control Devices, Lighting Control Products, Sensing and Control Devices, Electromechanical Products,

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 62052-11 First edition 2003-02 Electricity metering equipment (AC) General requirements, tests and test conditions Part 11: Metering equipment This English-language version is

More information

Test Report Garvan Enterprises Limited

Test Report Garvan Enterprises Limited Test Report 8526255. Garvan Enterprises Limited Page 1 of 14 Introduction. This report has been prepared by A Reeve and relates to the activity detailed below: Job/Registration Details Job number: 8526255

More information

Sunlight Supply, Inc.

Sunlight Supply, Inc. FCC Part 18 Subpart C Consumer For RF Lighting Equipment Electromagnetic Compatibility Test Report Sunlight Supply, Inc. December 19, 2017 Tests Conducted by:, LLC 20811 NW Cornell Road, Suite 600, Hillsboro,

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK Langer Road Contact: Mr I Frost Felixstowe Tel: +44 (0)1394 694000 Suffolk Fax: +44 (0)1394 276030 IP11 2ER E-Mail: ian.frost@itron.com Website:

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60092-504 Third edition 2001-03 Electrical installations in ships Part 504: Special features Control and instrumentation Installations électriques à bord des navires Partie 504:

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60044-7 First edition 1999-12 Instrument transformers Part 7: Electronic voltage transformers This English-language version is derived from the original bilingual publication

More information

Loss Prevention Standard

Loss Prevention Standard Loss Prevention Standard LPS 1279: Issue 1.1 of point multisensor fire detectors using optical or ionization smoke sensors and electrochemical cell CO The purpose of this standard is to ensure that Point

More information

ENVIRONMENTAL TEST REPORT

ENVIRONMENTAL TEST REPORT MECHANICAL TESTING 0839.04 Hermon Laboratories Ltd. Harakevet Industrial Zone, Binyamina 30500, Israel Tel. +972-4-6288001 Fax. +972-4-6288277 E-mail: mail@hermonlabs.com ENVIRONMENTAL TEST REPORT ACCORDING

More information

F-03 FIXED FIRE DETECTION AND FIRE ALARM SYSTEM

F-03 FIXED FIRE DETECTION AND FIRE ALARM SYSTEM Guideline No.: F-03(201605) F-03 FIXED FIRE DETECTION AND FIRE ALARM SYSTEM Issued date: May 31,2016 China Classification Society Foreword: This Guideline is a part of CCS Rules, which contains technical

More information

VdS SCHADENVERHÜTUNG. VdS-Rules for Intruder Alarm Systems

VdS SCHADENVERHÜTUNG. VdS-Rules for Intruder Alarm Systems VdS SCHADENVERHÜTUNG VdS Publisher: Gesamtverband der Deutschen Versicherungswirtschaft e.v. (GDV) Büro Schadenverhütung Publishing house: VdS Schadenverhütung. All rights reserved. VdS-Rules for Intruder

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60770-3 First edition 2006-04 Transmitters for use in industrial-process control systems Part 3: Methods for performance evaluation of intelligent transmitters IEC 2006 Copyright

More information

Vibration tests on a TNAML Luminaire

Vibration tests on a TNAML Luminaire Sebert Trillingstechniek B.V. Report M13.001-P13.001 rev.01 Date 26 august 2013 Vibration tests on a TNAML Luminaire Client Technor Benelux B.V. Veersteeg 15 4212 LR Spijk The Netherlands Contact Person

More information

FT702LT Turbine control wind sensor gives durability a new meaning FT702LT. series

FT702LT Turbine control wind sensor gives durability a new meaning FT702LT. series FT702LT Turbine control wind sensor......gives durability a new meaning FT702LT series Proven High Availability The FT702LT ultrasonic anemometer is the result of FT Technologies 10 years of experience

More information

Product Specification EMI Shielded Duplex LC Sealed Receptacle (ODVA Conforming)

Product Specification EMI Shielded Duplex LC Sealed Receptacle (ODVA Conforming) Product Specification EMI Shielded Duplex LC Sealed Receptacle (ODVA Conforming) 02Oct08 Rev A 1. SCOPE 1.1. Content This specification, based on IEC 61753-1 Edition 1.0 tests for Category E (Extreme Environment),

More information

evolution EV-H ANALOGUE ADDRESSABLE HEAT SENSOR INSTRUCTION MANUAL LPCB REF: 041h/01&02 and 842c/03&04

evolution EV-H ANALOGUE ADDRESSABLE HEAT SENSOR INSTRUCTION MANUAL LPCB REF: 041h/01&02 and 842c/03&04 Document No: Date: SEPT 2015 EV-H ANALOGUE ADDRESSABLE LPCB REF: 041h/01&02 and 842c/03&04 Quality System Certificate No. 041 Assessed to BS EN ISO 9001:2008 Hipley Street, Old Woking, Surrey, England,

More information

AUGUST 2016 CONTENTS:

AUGUST 2016 CONTENTS: EMC SERVICES NEWSLETTER AUGUST 2016 CONTENTS: RECENT STANDARD CHANGES NEW FCC REGULATIONS IEC 60601-1-2 4TH EDITION LOW VOLTAGE DIRECTIVE EU DIRECTIVES EMC DIRECTIVE 2014/30/EU KOREA UPDATE: KN32/35 1.

More information

IEC/TC IEC/TC44 IEC/TC44. Amd.1DC:201. Ed.3CD:2011. Ed.2.1:2008. Amd.1CDV ED.1: 一連番号 Ed.

IEC/TC IEC/TC44 IEC/TC44. Amd.1DC:201. Ed.3CD:2011. Ed.2.1:2008. Amd.1CDV ED.1: 一連番号 Ed. IEC/TC44 20-3-7 IEC/TC44 IEC/TC44 6 TC44 TC44 TC44 TC44 TC44 WD, CD, CDV TC44 一連番号 IEC 60027-:992 (Ed.) (995 corrected and reprinted) Letter symbols to be used in electrical technology Part : General 2

More information

SOUND RECEPTION SYSTEM

SOUND RECEPTION SYSTEM STANDARD FOR CERTIFICATION No. 2.9 SOUND RECEPTION SYSTEM APRIL 2009 Veritasveien 1, NO-1322 Høvik, Norway Tel.: +47 67 57 99 00 Fax: +47 67 57 99 11 FOREWORD (DNV) is an autonomous and independent foundation

More information

Report No 288/ Part 1 of 2 This report consists of 22 pages. Maxitone ZAMT Type A Addressable Sounder. See Assessment Summary for details

Report No 288/ Part 1 of 2 This report consists of 22 pages. Maxitone ZAMT Type A Addressable Sounder. See Assessment Summary for details Test Report Report No 288/7387780 Part 1 of 2 This report consists of 22 pages Licence/Certificate No KM 532936 Client GLT Exports Limited 72-78 Morfa Road Hafod Swansea SA1 2EN United Kingdom Authority

More information

Fire detection and fire alarm systems

Fire detection and fire alarm systems BRITISH STANDARD BS EN 54-12:2002 Fire detection and fire alarm systems Part 12: Smoke detectors Line detectors using an optical light beam The European Standard EN 54-12:2002 has the status of a British

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 SHANGHAI INSPECTION AND TESTING INSTITUTE OF INSTRUMENTS AND AUTOMATION SYSTEMS CO., LTD. 103 Cao Bao Road Shanghai, 200233 People s Republic of China Mr. Xu

More information

Spark Extinguishing Systems

Spark Extinguishing Systems VdS Guidelines for VdS 2518en Requirements and Test Methods VdS 2518en : 2008-08 (01) Publishing house: VdS Schadenverhütung GmbH Amsterdamer Str. 172-174 50735 Köln, Germany Phone: +49 221 77 66 0; Fax:

More information

Rules for Intruder Alarm Systems

Rules for Intruder Alarm Systems Rules for Intruder Alarm Systems Opening detectors (Magnetic contacts) Part 1: Requirements VdS 2120en 03/96 (03) Subject 44 1 General; 2 Terms and definitions; 3 Classification 1 General 1.1 Scope These

More information

Guideline No.: S-02(201510) S-02 Navigation Light and Signal Light Controllers. Issued date: October 20,2015. China Classification Society

Guideline No.: S-02(201510) S-02 Navigation Light and Signal Light Controllers. Issued date: October 20,2015. China Classification Society Guideline No.: S-02(201510) S-02 Navigation Light and Signal Light Controllers Issued date: October 20,2015 China Classification Society Foreword: This Guideline is a part of CCS Rules, which contains

More information

REA 105 Arc Protection Module. Operator s Manual

REA 105 Arc Protection Module. Operator s Manual REA 105 1MRS 751005-MUM Issued: 20.04.1998 Version: B2/26.5.2000 Checked: Approved: REA 105 We reserve the right to change data without prior notice. Contents: 1. General...4 1.1. Features...4 2. Safety...5

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 61514-2 First edition 2004-01 Industrial process control systems Part 2: Methods of evaluating the performance of intelligent valve positioners with pneumatic outputs IEC 2004

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 NATIONAL TECHNICAL SYSTEMS (NTS) - LONGMONT 1736 Vista View Drive Longmont, CO 80504-5242 Mr. Eric Loucks Phone: 303 776 7249 ELECTRICAL Valid To: August 31,

More information

Product Test report. Security Systems TO WHOM IT MAY CONCERN. Bosch Security Systems Torenallee 49 Eindhoven 5617 BA The Netherlands AT18-Q1616

Product Test report. Security Systems TO WHOM IT MAY CONCERN. Bosch Security Systems Torenallee 49 Eindhoven 5617 BA The Netherlands AT18-Q1616 TO WHOM IT MAY CONCERN Product Test report Bosch Security Systems Torenallee 49 Eindhoven 5617 BA The Netherlands AT18-Q1616 Product name: BOSCH FLEXIDOME IP outdoor 4000 HD/IR BOSCH FLEXIDOME IP outdoor

More information

ISO INTERNATIONAL STANDARD. Smoke alarms using scattered light, transmitted light or ionization

ISO INTERNATIONAL STANDARD. Smoke alarms using scattered light, transmitted light or ionization INTERNATIONAL STANDARD ISO 12239 Second edition 2010-12-15 Smoke alarms using scattered light, transmitted light or ionization Détecteurs de fumée à lumière dispersée, lumière transmise ou ionisation Reference

More information

COMITÉ EUROPÉEN DES ASSURANCES

COMITÉ EUROPÉEN DES ASSURANCES COMITÉ EUROPÉEN DES ASSURANCES SECRETARIAT GENERAL 3bis, rue de la Chaussée d'antin F 75009 Paris Tél. : +33 1 44 83 11 73 Fax : +33 1 44 83 11 85 Web : cea.assur.org DELEGATION A BRUXELLES Square de Meeûs,

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 COMPLIANCE CERTIFICATION SERVICES, INC. 1 Xindian Laboratory No.163-1, Jhongsheng Road Xindian District, New Taipei City 23151, Taiwan, R.O.C. Contact: Kurt

More information

E-16 Main Engine Remote Control System

E-16 Main Engine Remote Control System Guideline No.E-16 (201510) E-16 Main Engine Remote Control System Issued date: 20 October, 2015 China Classification Society Foreword This Guide is a part of CCS Rules, which contains technical requirements,

More information

Low-voltage switchgear and controlgear - rated voltage does not exceed 1000V AC or 1500V DC

Low-voltage switchgear and controlgear - rated voltage does not exceed 1000V AC or 1500V DC CLASS PROGRAMME Type approval DNVGL-CP-0396 Edition December 2015 Low-voltage switchgear and controlgear - rated voltage does not exceed 1000V AC or 1500V DC The electronic pdf version of this document,

More information

RF TEST REPORT. ZTE Corporation SRQ-VFD510 ZTE LTE/WCDMA/GSM GPRS RXC RF07

RF TEST REPORT. ZTE Corporation SRQ-VFD510 ZTE LTE/WCDMA/GSM GPRS RXC RF07 RF TEST REPORT Applicant FCC ID Brand Product ZTE Corporation SRQ-VFD510 ZTE LTE/WCDMA/GSM GPRS Model VFD 511 Multi-Mode Digital Mobile Phone Report No. RXC1703-0087RF07 Issue Date May 24,2017 TA Technology

More information

Rules for Classification and Construction Additional Rules and Guidelines

Rules for Classification and Construction Additional Rules and Guidelines VI Rules for Classification and Construction Additional Rules and Guidelines 7 Guidelines for the Performance of Type Approvals 7 Test Requirements for Statical Converters with Semi-Conductors Edition

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 SONY GLOBAL MANUFACTURING & OPERATIONS CORPORATION EMC/RF TEST LABORATORY - MAIN LAB 8-4 Shiomi Kisarazu-shi Chiba-ken, 292-0834, Japan Mr. Koichi.Hiyaoka Phone:

More information

Operation and use. Functions and characteristics

Operation and use. Functions and characteristics Operation and use Function Vigirex relays measure the earth-leakage current in an electrical installation via their associated toroids. Vigirex relays may be used for: b residual-current protection (RH10,

More information

Instructions for the fan motor control system with integrated wiring terminals SILVER C

Instructions for the fan motor control system with integrated wiring terminals SILVER C Instructions for the fan motor control system with integrated wiring terminals SILVER C 1. General The motor control system is used for controlling the type EC, 0.41-10 kw fan motors in the SILVER C units.

More information

CE EMC Test Report EN :2015 EN :2017. Folder with powerbank ZKS E. Lieber Ouyang (Engineer) Lahm Peng (Manager)

CE EMC Test Report EN :2015 EN :2017. Folder with powerbank ZKS E. Lieber Ouyang (Engineer) Lahm Peng (Manager) CE EMC Test Report Test Standard(s): Applicant: Product Name: EN 55032 :2015 EN 55035 :2017 Goya Importacionesy Distribuciones SL B50154293 Folder with powerbank Model: 606090 Report No.: ZKS180800212E

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 7240-27 First edition 2009-04-01 Fire detection and alarm systems Part 27: Point-type fire detectors using a scattered-light, transmitted-light or ionization smoke sensor, an

More information

Technical Note. Noise emission from Dehumidifier Type C35E-3.3 and Type C35E-5.6. TC Project no.: T Page 1 of 10.

Technical Note. Noise emission from Dehumidifier Type C35E-3.3 and Type C35E-5.6. TC Project no.: T Page 1 of 10. Technical Note Noise emission from Dehumidifier Type C35E-3.3 and Type C35E-5.6 Performed for COTES A/S TC-100902 Project no.: T211658 Page 1 of 10 15 January 2016 DELTA Venlighedsvej 4 2970 Hørsholm Denmark

More information

Indicators for Rudder Angle, Rate of Turn, Propeller Shaft Revolution and Propeller Pitch

Indicators for Rudder Angle, Rate of Turn, Propeller Shaft Revolution and Propeller Pitch STANDARD FOR CERTIFICATION No. 2.9 TYPE APPROVAL PROGRAMME NO. 844.40 - MED A1/4.20-4.21-4.22-4.9 Indicators for Rudder Angle, Rate of Turn, Propeller Shaft Revolution and Propeller Pitch FEBRUARY 2012

More information

EMC Emissions in the Machine Industry

EMC Emissions in the Machine Industry EMC Emissions in the Machine Industry Technical lecture by Herbert Blum 09.02.11 1 Programme > > Applicable Standard EN55011:2009 > Practical Examples 09.02.11 2 European Directives >The basic requirements

More information

IACS RESOLUTION CHANGES (GMO ) BEKİR SITKI TÜRKMEN

IACS RESOLUTION CHANGES (GMO ) BEKİR SITKI TÜRKMEN IACS RESOLUTION CHANGES (GMO - 10-12- 2015) BEKİR SITKI TÜRKMEN Resolution Changes January & July 2016 (UR, UI, PR, REC) 3+ 1 1 + 0 0 + 7-10 1 + 5 Total UR Changes = 9 (Jan 2016) + (28 10) (July 2016)

More information

Compliance Engineering Ireland Ltd

Compliance Engineering Ireland Ltd Clonross, Dunshaughlin, Co. Meath Testing Laboratory Registration number: 088T is accredited by the Irish National Board (INAB) to undertake testing as detailed in the Schedule bearing the Registration

More information

ISO INTERNATIONAL STANDARD. Fire detection and alarm systems Part 20: Aspirating smoke detectors

ISO INTERNATIONAL STANDARD. Fire detection and alarm systems Part 20: Aspirating smoke detectors INTERNATIONAL STANDARD ISO 7240-20 First edition 2010-05-15 Fire detection and alarm systems Part 20: Aspirating smoke detectors Systèmes de détection et d'alarme d'incendie Partie 20: Détecteurs de fumée

More information

DNVGL-CP-0407 Edition February 2016

DNVGL-CP-0407 Edition February 2016 CLASS PROGRAMME Type approval DNVGL-CP-0407 Edition February 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

SIMPLIFIED VOYAGE DATA RECORDER (S-VDR)

SIMPLIFIED VOYAGE DATA RECORDER (S-VDR) STANDARD FOR CERTIFICATION No. 2.9 SIMPLIFIED VOYAGE DATA RECORDER (S-VDR) APRIL 2009 Veritasveien 1, NO-1322 Høvik, Norway Tel.: +47 67 57 99 00 Fax: +47 67 57 99 11 FOREWORD (DNV) is an autonomous and

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK Unit 8 Contact: Mrs G Baker Woodfieldside Business Park Tel: +44 (0)1495 229219 Pontllanfraith Fax: +44 (0)1495 228331 Blackwood E-Mail: ginnie.baker@kiwa.co.uk

More information

CERTIFICATE OF ACCREDITATION

CERTIFICATE OF ACCREDITATION CERTIFICATE OF ACCREDITATION ANSI-ASQ National Accreditation Board 500 Montgomery Street, Suite 625, Alexandria, VA 22314, 877-344-3044 This is to certify that Washington Laboratories, Ltd. 7560 Lindbergh

More information

CERTIFICATE of QUALITY TEST

CERTIFICATE of QUALITY TEST Testing laboratory for climatic, mechanical and corrosive environmental stress CERTIFICATE of QUALITY TEST Test report - No. 10142 / 13 Client ADDI-DATA GmbH Airpark Business Center Airport Boulevard B210

More information

Technical Note. Noise emission from Dehumidifier Type C65E TC Project no.: I Page 1 of July 2016

Technical Note. Noise emission from Dehumidifier Type C65E TC Project no.: I Page 1 of July 2016 Technical Note Noise emission from Dehumidifier Type C65E-11.1 Performed for COTES A/S Project no.: I101033 Page 1 of 10 01 July 2016 DELTA Venlighedsvej 4 2970 Hørsholm Denmark Tel. +45 72 19 40 00 Fax

More information

Product Test report. Security Systems TO WHOM IT MAY CONCERN. Bosch Security Systems Torenallee 49 Eindhoven 5617 BA The Netherlands AT18-Q1616

Product Test report. Security Systems TO WHOM IT MAY CONCERN. Bosch Security Systems Torenallee 49 Eindhoven 5617 BA The Netherlands AT18-Q1616 TO WHOM IT MAY CONCERN Product Test report Bosch Security Systems Torenallee 49 Eindhoven 5617 BA The Netherlands AT18-Q1616 Product name: BOSCH FLEXIDOME IP indoor 4000 HD/IR BOSCH FLEXIDOME IP indoor

More information

Accumulated Battery JULY The electronic pdf version of this document found through is the officially binding version

Accumulated Battery JULY The electronic pdf version of this document found through   is the officially binding version p pproval roramms for U rcos orasato Mutual coto (M)No. 2.9 STANDARD FOR CERTIFICATION Approval Programmes Type Approval Programmes for EU recognised organisation Mutual Recognition (MR) No. MR-E008 Accumulated

More information

Draft ES V1.1.1 ( )

Draft ES V1.1.1 ( ) Standard Transmission and Multiplexing (TM); Passive optical components; Fibre optic mechanical splices for single-mode optical fibre communications systems; Common requirements and conformance testing

More information

Environment Test Report

Environment Test Report Environment Test Report Product Name: Product Model: Product Type: Power System TP48200A TP48200A-H15A3 TP48200A-H15A5 TP48200A-D15A1 Report Number: SYBH(H) 346052012 Reliability Laboratory of Huawei Technologies

More information

Circuit Breakers JANUARY The electronic pdf version of this document found through is the officially binding version

Circuit Breakers JANUARY The electronic pdf version of this document found through   is the officially binding version STANDARD FOR CERTIFICATION No. 2.9 Approval Programmes Type Approval Programmes for EU recognised organisation Mutual Recognition (MR) No. MR-E001 Circuit Breakers JANUARY 2013 The electronic pdf version

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60533 Second edition 1999-11 Electrical and electronic installations in ships Electromagnetic compatibility Installations électriques et électroniques à bord des navires Compatibilité

More information

Australian Standard. Fire detection and alarm systems. Part 6: Carbon monoxide fire detectors using electro-chemical cells

Australian Standard. Fire detection and alarm systems. Part 6: Carbon monoxide fire detectors using electro-chemical cells AS 7240.6 2006 ISO 7240-6:2004 AS 7240.6 2006 Australian Standard Fire detection and alarm systems Part 6: Carbon monoxide fire detectors using electro-chemical cells This Australian Standard was prepared

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Crewe Road North Contact: Mr C Marshall Crewe Toll Tel: +44 (0)131 343 4242 Edinburgh Fax: +44 (0)131 343 5420 EH5 2XS E-Mail: chris.marshall@leonardocompany.com

More information

EVC-P CONVENTIONAL PHOTOELECTRIC SMOKE DETECTOR. instruction manual. evolution EVC-P Conventional Photoelectric Smoke Detector

EVC-P CONVENTIONAL PHOTOELECTRIC SMOKE DETECTOR. instruction manual. evolution EVC-P Conventional Photoelectric Smoke Detector EVC-P CONVENTIONAL PHOTOELECTRIC SMOKE DETECTOR instruction manual Ref No: NISM/EVC-P/03 Date: Jan 2010 Issue: 3 Quality System Certificate No. 041 Assessed to BS EN ISO 9001:2000 NITTAN (UK) LTD. Hipley

More information

RE-PR3-E-27 3-Phase Panel Mount 27kW

RE-PR3-E-27 3-Phase Panel Mount 27kW Page 1 of 6 RE-PR3-E-27 3-Phase Panel Mount 27kW Features: Benefits: 0-10Vdc, 0-5Vdc, 4-20mA or manual via potentiometer control input Over temperature protection with auto reset Enclosed panel mounting

More information

Evolution Product Range

Evolution Product Range Evolution Product Range World Leading Fire Detection Products from the NITTAN group Analogue Products Smoke / Heat / Flame Sensors CN-P Optical Smoke Detector CN-PH Optical Smoke and Heat Detector Optical

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 CENTRE TESTING INTERNATIONAL GROUP CO., LTD. 1 Building C, Hongwei Industrial Park Block 70, Bao'an District Shenzhen, Guangdong, People s Republic of China

More information

Snifter ATEX22 VERSION. User Manual. Distributor

Snifter ATEX22 VERSION. User Manual. Distributor Snifter ATEX22 VERSION User Manual Distributor Version 1.4 09/09/2009 Table of Contents 1. INTRODUCTION... 3 1.1. Safety... 3 1.2. Product overview... 4 1.3. How does it work?... 4 2. INSTALLATION... 5

More information

ETSI TS V1.2.1 ( )

ETSI TS V1.2.1 ( ) TS 101 263 V1.2.1 (2004-07) Technical Specification Transmission and Multiplexing (TM); Passive optical components; Fibre optic mechanical splices for single-mode optical fibre communications systems for

More information

Technical Note. Noise emission from Dehumidifier Type C22/CR100. TC Project no.: T Page 1 of January 2016

Technical Note. Noise emission from Dehumidifier Type C22/CR100. TC Project no.: T Page 1 of January 2016 Technical Note Noise emission from Dehumidifier Type C22/CR100 Performed for COTES A/S TC-100899 Project no.: T211658 Page 1 of 9 15 January 2016 DELTA Venlighedsvej 4 2970 Hørsholm Denmark Tel. +45 72

More information

Technical evaluation of the Ningbo Longmax Electronic Co., Ltd LM-201A battery operated carbon monoxide (CO) Detector Type B to EN :2010.

Technical evaluation of the Ningbo Longmax Electronic Co., Ltd LM-201A battery operated carbon monoxide (CO) Detector Type B to EN :2010. Technical evaluation of the Ningbo Longmax Electronic Co., Ltd LM-201A battery operated carbon monoxide (CO) Detector Type B to EN 50291-1:2010. Prepared for: LPCB Bucknalls Lane Garston Watford WD25 9XX

More information

Report to the Certificate

Report to the Certificate Report to the Certificate XEF 15 SIL 0039 rev.1 Monitoring System, TDSP Manufacturer: CEMB S.p.A. Via Risorgimento n.9 23826 Mandello del Lario (Lc) Italy Report No.: 22CEM-TECH-15-03 Revision 2.0 of January,

More information

LIGHTING TEF 9980 STATUS LIGHT, MAIN LIGHT & REPEATER LIGHT ZONE 1, ZONE 2 & SAFE AREA USER MANUAL

LIGHTING TEF 9980 STATUS LIGHT, MAIN LIGHT & REPEATER LIGHT ZONE 1, ZONE 2 & SAFE AREA USER MANUAL Subject to change without prior notice TUM7 REV. B.08.08 SAFETY INSTRUCTIONS The TEF 9980 status light may be installed in Zone, or safe area. The Equipment shall not be installed in Zone 0! HANDLE WITH

More information

NZQA unit standard version 2 Page 1 of 6. Perform installation and maintenance of telecommunications radio systems and services

NZQA unit standard version 2 Page 1 of 6. Perform installation and maintenance of telecommunications radio systems and services Page 1 of 6 Title Perform installation and maintenance of telecommunications radio systems and services Level 3 Credits 40 Purpose This unit standard covers basic skills for people engaged in installation

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 62052-21 First edition 2004-05 Electricity metering equipment (a.c.) General requirements, tests and test conditions Part 21: Tariff and load control equipment IEC 2004 Copyright

More information

/Mar/2014 Rev A

/Mar/2014 Rev A Qualification Test Report 501-93038 21/Mar/2014 Rev A MPOptimate FO Microcassette 12 fiber MPO-12xLC/PC 1. INTRODUCTION 1.1 Purpose Tests performed on MPOptimate FO Microcassette 12 fiber MPO-12xLC/PC,

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 LABORATOIRE D ESSAIS CEM INC. 1490-D Nobel Street Boucherville, Quebec, Canada J4B 5H3 Mr. Xavier Couste Phone: 450 868 0360 Email: Xavier.Couste@nts.com ELECTRICAL

More information

CNBOP-PIB Standard Fire Protection

CNBOP-PIB Standard Fire Protection Centrum Naukowo Badawcze Ochrony Przeciwpożarowej im. Józefa Tuliszkowskiego Państwowy Instytut Badawczy CNBOP-PIB-BA-01E:2014 Revision 1, February 2014 CNBOP-PIB Standard Fire Protection Laboratory Tests

More information

Instructions for the fan motor control system, SILVER C

Instructions for the fan motor control system, SILVER C Instructions for the fan motor control system, SILVER C 1. General The motor control system is used for controlling the type EC, 0.41-10 kw fan motors in the SILVER C units. The motor control system is

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60938-1 QC 280000 Second edition 1999-10 Fixed inductors for electromagnetic interference suppression Part 1: Generic specification Inductances fixes d'antiparasitage Partie

More information

ISO INTERNATIONAL STANDARD. Fire detection and alarm systems Part 16: Sound system control and indicating equipment

ISO INTERNATIONAL STANDARD. Fire detection and alarm systems Part 16: Sound system control and indicating equipment INTERNATIONAL STANDARD ISO 7240-16 First edition 2007-07-01 Fire detection and alarm systems Part 16: Sound system control and indicating equipment Systèmes de détection et d'alarme d'incendie Partie 16:

More information

This document is a preview generated by EVS

This document is a preview generated by EVS TECHNICAL SPECIFICATION ISO/TS 7240-29 First edition 2017-06 Fire detection and alarm systems Part 29: Video fire detectors Systèmes de détection et d alarme d incendie Partie 29: Titre manque Reference

More information

Electromagnetic Locking Devices Performance Requirements

Electromagnetic Locking Devices Performance Requirements Technical Specification Electromagnetic Locking Devices Performance Requirements DHF TS 010:2016 Technical specification produced by dhf www.dhfonline.org.uk Contents Foreword 1. Scope 2 ANNEX A Bodies

More information

ANSI-ASQ National Accreditation Board/ACLASS

ANSI-ASQ National Accreditation Board/ACLASS ANSI-ASQ National Accreditation Board/ACLASS SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 Washington Laboratories, Ltd. 1, 2 7560 Lindbergh Drive, Gaithersburg, Maryland 20879 John Repella Phone: 301-216-1500

More information

Electromagnetic Compatibility of Alarm Systems

Electromagnetic Compatibility of Alarm Systems Electromagnetic Compatibility of Alarm Systems Jan VALOUCH Tomas Bata University in Zlin, Faculty of Applied Informatics, Nad Stráněmi 4511, 76005, Zlín, Czech Republic valouch@fai.utb.cz. Abstract. Alarm

More information

This document is a preview generated by EVS

This document is a preview generated by EVS EESTI STANDARD EVS-EN 54-18:2006 Fire detection and fire alarm systems - Part 18: Input/output devices Fire detection and fire alarm systems - Part 18: Input/output devices EESTI STANDARDIKESKUS EESTI

More information

***** 2. Rev.1 is to be uniformly implemented by IACS Members from 1 July 2004.

***** 2. Rev.1 is to be uniformly implemented by IACS Members from 1 July 2004. (Sept 2003) (Rev.1 May 2004) (Rev.2 Nov 2005) (Rev.3 Mar 2012) Hold, ballast and dry space water level detectors (Chapter II-1/25 and Chapter XII/12) and Performance Standards for Water Level Detectors

More information

Compliance Engineering Ireland Ltd

Compliance Engineering Ireland Ltd Clonross, Dunshaughlin, Co. Meath Testing Laboratory Registration number: 088T is accredited by the Irish National Board (INAB) to undertake testing as detailed in the Schedule bearing the Registration

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005. F2 LABS Peters Road Middlefield, OH Wendy Fuster Phone: Ext.

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005. F2 LABS Peters Road Middlefield, OH Wendy Fuster Phone: Ext. SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 F2 LABS 16740 Peters Road Middlefield, OH 44062 Wendy Fuster Phone: 301 253 4500 Ext. 101 ELECTRICAL (EMC) Valid To: November 30, 2019 Certificate Number: 0793.02

More information