1 Picture Report for Maersk Jabal Vessel Name: Maersk Jabal Customer: Maersk line Ship Mgnt. Location: Keppel shipyard & Anchorage Date: 26 Mar 2016 to 06 April 2016 Jobs Description: To check and service on the following systems -15ppm monitor calibration -Fire alarm system condition check -Cargo Hold Bilge Alarm System - Fuel Oil Flowmeters to service calibrate - To install new Fuel oil Leakage Alarm System REPORTS: We attended the vessel at Keppel shipyard, discussed with the attending supt and started the paperworks with the shipyard. Since there was only few days left before the vessel sail. We had to start work the following day itself. Page 1 of 16

2 AA) 15 ppm Calibration Make: Georim Engineering co. ltd Model: GBA-155 Serial no: GBA Herewith below is the picture of the 15ppm unit installed on board the vessel. The unit had been 15ppm monitor Analysing unit The unit has been successfully tested the 000ppm with clean water and tested the 15ppm alarm using the test tube provided from the maker itself. Page 2 of 16

3 When testing the 15 ppm alarm to second engineer and also ch engineer, we also tested the 3 way valve and found satisfactory. The system is now calibrated and tested to satisfactory and now ready for operation. BB) Fire Alarm System Make: Autronica Auto- Safe Model: Version: As requested by supt. for us to check the complete fire alarm system and submit condition and recommendation report. Therefore, our guys start to check and test the complete system. Herewith below the type of fire alarm panel installed on board. The system consist of total 4 loops and 124 sensors and call points. Page 3 of 16

4 Picture above indicating the main fire alarm control panel. Picture beside indicating manual call point type. Page 4 of 16

5 Picture indicating the type of smoke sensor used for the system We tested and simulated all 4 loops, fire alarm, disable/enable function and found all working properly. Loop 1 we tested total 52 no s sensors and call point. Found all sensors and some call points working good except for the following manual call points A62, poop deck corridor (manual call point) A63, poop deck emergency d/g room (manual call point) A70, poop deck corridor (manual call point) A81, main deck CO2 room (manual call point) A82, main deck changing room (manual call point) Loop 2 we tested total 50 no s sensor and call point, found the following below faulty and need replacement. B03, casing deck (manual call point) B06, poop deck E/R entrance (manual call point) B09, E/R 2 nd deck, M/E stairway (manual call point) Page 5 of 16

6 B16, E/R 2 nd deck, S/G room entrance (manual call point) B24, E/R 2 nd deck, spare M/E cylinder (smoke detector) B43, E/R 3 rd deck floor, M/E stairway stbd (manual call point) B63, E/R floor, stairway stbd (manual call point) B67, E/R floor, emergency exit (manual call point) Loop 3 we tested total 09 sensors and call points. The following found faulty and require replacement. C11, B/S bow thruster room (manual call point) Loop 4 we tested total 13 no s sensors and call points and found all working in good condition. In order to get the system complete operational, we will require to renew all the faulty items and must be addressed by maker before delivering to the vessel. Remark: We were unable to test the following 09 no s sensors due to time constrain and also located very high. There was no access. Had inform supt regarding this. B04, B05, D05, D06 and D07 Located above M/E D08, D09, D10 and D11 Located above no 1, 2 and 3 generator CC) Cargo Bilge Alarm System Attended the vessel and check and test the cargo hold bilge level alarm system as requested by supt. Total there are 6 cargo hold. Cargo hold 2 to 6 consist of 2 no s bilge sensor each and cargo hold no 1 only consist of 1 bilge sensor. There is also 2 no s bilge sensor located at bow thruster room. So total there are 13 no s bilge level sensor in the system. Picture below indicating the monitor of the system. Page 6 of 16

7 All bilge sensor alarm is indicated on the computer monitor in engine control room as in picture above. We tested all the 13 no s bilge sensor and found as follows -In bow thruster room, tested both the fwd and aft bilge sensor and found satisfactory. -Cargo hold no.1 to no.6, total 11 no s all found in very bad condition. Now working. Informed the supt. and requested all the following 11 no s bilge sensor must be renewed in order to get the system up and running. NOTE: The system was then tested and simulated from the IS barrier to confirm that the loop was working satisfactory and only sensor require renewal. Page 7 of 16

8 Picture above indication the condition of most of the cargo hold bilge level sensors. ADDITIONAL JOB TO RENEW ALL BILGE LEVEL SENSORS AFTER CONFIRMATION BY SUPT. As requested and confirmed by attending supt. To renew all the faulty cargo hold bilge alarm sensors. We proceed with the order and upon receiving the new bilge alarm sensors, we carried out the renewal job accordingly at anchorage. Page 8 of 16

9 Since the bilge level sensors was in very bad condition, we had to knock out all the bolt, drill and re-tap the bolt thread. Renew the bolts and also gaskets. Finally we manage to renew all the faulty cargo hold bilge level sensor accordingly and connect and secure the cables properly. Supt had ordered total of 13 no s bilge level sensors. Total 11 no s had been renewed for cargo hold and 2 no s to supply as ship spare. As picture beside indicating all the faulty sensors was replaced and brought on top the deck. All was found in poor condition. Page 9 of 16

10 Finally the cargo hold bilge level alarm system was tested after renewal and found in satisfactory condition. Ch engineer and second engineer was satisfied with the system. DD) Fuel Oil Flow Meters As requested by supt to remove and bring out the fuel oil flow meters for shore calibration on URGENT basis. Therefore the following flow meters were remove and brought back to shore. The removed pipes was blanked with flanges as requested and for safety reason. - M/E Fuel Oil Flow Meter 01 unit Make: NITTO Serial no: G/E Fuel Oil Flow Meter 01 unit Make: NITTO Serial no: CONTOIL Flow Meter 01 unit Serial no: Picture below indicating the removal of flow meters locate inside purifier room Page 10 of 16

11 The 3 no s flow meters was calibrated and obtained meter factor accordingly. Finally the flow meters was delivered on board and installed. After running for 1 day during vessel shifting to anchorage, second engineer complained that the G/E fuel oil flow meter was not working. Therefore, when we attended the vessel at anchorage, we opened up dismantled the counter assembly to investigate the fault. The counter assembly was removed from the flow meter to investigate on the fault complained. We then dismantle the magnetic gear shaft and found it was jammed due to some small particle found stuck inside. So we dismantle the complete piece, serviced and assemble back to original. Then installed back and tested to satisfactory. Ch engineer and 2 nd engineer was satisfied. Finally all the flow meters was tested and found in satisfactory and ready for operation. Page 11 of 16

12 EE) Installation of New Fuel Oil Leakage Alarm system As discuss with supt. on board the vessel, we are requested to design, supply and install a new fuel oil leakage alarm system on the existing fuel oil leakage line located in the engine room platform. So we discussed, sketch a drawing and agreed by supt that we will design according to drawing. Upon confirmation, we start the fabrication of new oil tank with one inlet on top, one outlet return line, one testing oil inlet on top of the tank and a horizontal float installed to the tank. Picture below indicating the newly fabricated oil tank. Testing with oil inlet Oil leakage inlet Outlet return line We also installed a valve on the inlet line to oil tank and outlet return line as requested by ch engineer. So as requested by supt. we start to remove the main fuel oil leakage pipe which was about 350mm diameter, and transport to the engine room workshop where the hot works can take place. See picture below Page 12 of 16

13 After dismantling the big pipe and lifting it down, we transported the pipe to the engine room workshop. There, the ship crew assisted us in the hot works. We cut the socket out and welded a 2 inch pipe elbow pipe with a flange connection. Page 13 of 16

14 After hot works completed, we transport back the big pipe to its original location and fit in place so that we can start to fabricate the 2 inch pipe from the flange connection to the new oil tank. Newly fabricated 2 inch pipe new oil tank After all pipe fabrication, we installed the magnetic float switch and connected the cable which we had run from engine control room console to the engine room bottom platform at the newly oil tank. Magnetic float switch Page 14 of 16

15 We also fabricated a new alarm panel with two alarm points (one as spare). The alarm panel was installed on top of the engine room console as agreed by ch engineer and supt. See picture below. Newly fabricated alarm panel with two alarm points We also run cable from the new alarm panel in engine control room to the outside of engine control room where we had installed an external audio/visual upon request. See picture below Page 15 of 16

16 Finally upon completion, we tested the complete system with the presence of ch engineer and second engineer by actually filling the new oil tank with oil. The alarm activated accordingly and they also checked on the audio/visual alarm locate outside engine control room. The sound was loud enough and can be heard clearly in engine room. The system is found satisfactory and accepted by ch engineer. REMARK: ALL MATERIALS USED ARE REFLECTED IN SERVICE REPORT ACCORDINGLY End of Report Page 16 of 16

ARM 10.2 MAINTENANCE OF CRITICAL SYSTEMS

ARM 10.2 MAINTENANCE OF CRITICAL SYSTEMS 1. Purpose The purpose of this procedure is to set forth the identity and procedures associated with the critical systems and equipment to ensure their reliability on R/V Armstrong. 2. References a. Condition

More information

Automations Controls Experts

Automations Controls Experts ACE Instrumentation Automations Controls Experts ABOUT US ACE Instrumentation is renowned as one of the best marine automation company in Singapore. Our offices are located conveniently near shipyards

More information

IMO DEVELOPMENT OF MODEL PROCEDURE FOR EXECUTING SHIPBOARD EMERGENCY MEASURES. Fire-fighting drills. Submitted by the Republic of Korea

IMO DEVELOPMENT OF MODEL PROCEDURE FOR EXECUTING SHIPBOARD EMERGENCY MEASURES. Fire-fighting drills. Submitted by the Republic of Korea INTERNATIONAL MARITIME ORGANIZATION E IMO SUB-COMMITTEE ON STANDARDS OF TRAINING AND WATCHKEEPING 41st session Agenda item 12 STW 41/12/1 9 October 2009 Original: ENGLISH DEVELOPMENT OF MODEL PROCEDURE

More information

Notice No. 7. Rules and Regulations for the Classification of Ships, July Issue date: March Working together for a safer world

Notice No. 7. Rules and Regulations for the Classification of Ships, July Issue date: March Working together for a safer world Notice No. 7 Rules and Regulations for the Classification of Ships, July 2014 The status of this Rule set is amended as shown and is now to be read in conjunction with this and prior Notices. Any corrigenda

More information

MSC Guidelines for General Emergency Alarm & Public Address Systems

MSC Guidelines for General Emergency Alarm & Public Address Systems S. T. Brady, CDR, Chief of Engineering Division Purpose: This document outlines a basic method for submitting general emergency alarm and public address system drawings. References: a) 46 CFR 113.25 General

More information

Re: New manufacture of the inductosyn panel (internal parts) made by MHI and the after-sale service correspondence

Re: New manufacture of the inductosyn panel (internal parts) made by MHI and the after-sale service correspondence Sample of submit document at 1998 1/5 Re: New manufacture of the inductosyn panel (internal parts) made by MHI and the after-sale service correspondence 1. Outline We have gratefully supplied a large number

More information

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY 8619 Westwood Center Drive Suite 300 Vienna, Virginia 22182, USA Tel: +1 703 790 3434 Fax: +1 703 790 5655 Email: safety@liscr.com Web: www.liscr.com

More information

2012 International Fire Code Errata (Portions of text and tables not shown are unaffected by the errata)

2012 International Fire Code Errata (Portions of text and tables not shown are unaffected by the errata) 1 st PRINTING (8-30-12) CHAPTER 2 - DEFINITIONS [B] CARE SUITE. A group of treatment rooms, care recipient sleeping rooms and their associated support rooms or spaces and circulation space within Group

More information

Report from the Division for Investigation of Maritime Accidents

Report from the Division for Investigation of Maritime Accidents Report from the Division for Investigation of Maritime Accidents Engine room fire MAERSK MASTER Factual information MAERSK MASTER, OXEI2, IMO No. 8409379 is an anchor handling supply tug of 3949 BT. The

More information

VANUATU GENERAL CONDITION SURVEY REPORT

VANUATU GENERAL CONDITION SURVEY REPORT NAME OF VESSEL: PREVIOUS NAMES: CURRENT PORT OF REGISTRY: CURRENT OWNER: OPERATOR/ MANAGER: TYPE OF VESSEL: YEAR & PLACE OF CONSTRUCTION: ITC 69/REGULATORY GRT: ITC 69/REGULATORY NRT: DEADWEIGHT TONNAGE:

More information

Fact Sheet TANK CONTENT AND DRAUGHT MEASURING SYSTEM Issue Date

Fact Sheet TANK CONTENT AND DRAUGHT MEASURING SYSTEM Issue Date SYSTEM OVERVIEW The Hoppe Marine Tank Content and Draught Measuring System with electric pressure type sensors type HCG (Hoppe electric pressure type TCDM system) is the state of the art solution for continuous

More information

VANUATU GENERAL CONDITION SURVEY REPORT

VANUATU GENERAL CONDITION SURVEY REPORT NAME OF VESSEL: PREVIOUS NAMES: CURRENT PORT OF REGISTRY: CURRENT OWNER: OPERATOR/ MANAGER: TYPE OF VESSEL: YEAR & PLACE OF CONSTRUCTION: ITC 69/REGULATORY GRT: ITC 69/REGULATORY NRT: DEADWEIGHT TONNAGE:

More information

Nirmal Chandra Sinha. Supposed to complete(dd/ MM/YYYY) Comments after Physical Inspection

Nirmal Chandra Sinha. Supposed to complete(dd/ MM/YYYY) Comments after Physical Inspection Factory Name Address Fire Safety Follow up INTIMATE APPARELS LTD Karnaphuli EPZ, Plot no. 91-93, rth Patenga Date 05/20/2014 Date Report Received 11-August/15 Date of 1 st Follow-up 08-vember/15 Date of

More information

Service Instructions. for the MELAG Autoclaves. MELAtronic 23. Technische Änderungen vorbehalten

Service Instructions. for the MELAG Autoclaves. MELAtronic 23. Technische Änderungen vorbehalten Service Instructions for the MELAG Autoclaves MELAtronic 23 Technische Änderungen vorbehalten Functional reliability and retention of value of the unit depend on: - The proper preparation of the objects

More information

Contents. Commissioning 6 Operation 6 Routine Preventative Maintenance 6 Fault Finding 7 Spares Parts 8 Technical Support 9

Contents. Commissioning 6 Operation 6 Routine Preventative Maintenance 6 Fault Finding 7 Spares Parts 8 Technical Support 9 Contents Product Description 2 Approvals 2 Warranty 2 Warnings 2 Technical Specification 3 Installation 4 Location 4 Plumbing Connection 4 Electrical connection 5 Commissioning 6 Operation 6 Routine Preventative

More information

Survey of electrical equipment installed in hazardous areas on tankers

Survey of electrical equipment installed in hazardous areas on tankers (June 2015) Survey of electrical equipment installed in hazardous areas on tankers 1. Application The recommendations in this document apply for survey of electrical installation in hazardous areas on

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 1 GENERAL

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 1 GENERAL Annex 2, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 1 GENERAL Section 1 Application 1 The following new sentence is added to the end of paragraph 1.2:

More information

PAT E N T System 88. COMPLIES WITH Singapore Standard : SS CP10 : 2005 British Standard : BS EN54-2 : 1998 BS EN54-4 : 1998 REV.00

PAT E N T System 88. COMPLIES WITH Singapore Standard : SS CP10 : 2005 British Standard : BS EN54-2 : 1998 BS EN54-4 : 1998 REV.00 PAT E N T System 88 COMPLIES WITH Singapore Standard : SS CP10 : 2005 British Standard : BS EN54-2 : 1998 BS EN54-4 : 1998 REV.00 Pg 1 of 12 CONTENTS 1. GENERAL 1.1 Introduction 2 1.2 System Description

More information

RESOLUTION MSC.98(73) (adopted on 5 December 2000) ADOPTION OF THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS

RESOLUTION MSC.98(73) (adopted on 5 December 2000) ADOPTION OF THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS RESOLUTION MSC.98(73) THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on the International Maritime Organization concerning the functions of the Committee, NOTING the revision

More information

Part 4 Systems and components Chapter 5 Control and Monitoring Systems

Part 4 Systems and components Chapter 5 Control and Monitoring Systems RULES FOR CLASSIFICATION Inland navigation vessels Edition December 2015 Part 4 Systems and components Chapter 5 The content of this service document is the subject of intellectual property rights reserved

More information

Fokker 50 - Fire Protection

Fokker 50 - Fire Protection ENGINE General The engines are each equipped with a fire detection and a fire extinguishing system. The systems are controlled from the ENGINE FIRE panel, which is located at the overhead panel. Fire and

More information

DELIVER AS PROMISED A COMMITMENT TO CALIBRATION SERVICES ALL BRANDS & MAKERS PRESSURE / TEMPERATURE GAUGES & CALIBRATORS ULLAGE TAPES

DELIVER AS PROMISED A COMMITMENT TO CALIBRATION SERVICES ALL BRANDS & MAKERS PRESSURE / TEMPERATURE GAUGES & CALIBRATORS ULLAGE TAPES A COMMITMENT TO DELIVER AS PROMISED AMS - Atlas Marine Services, renowned in the marine industry for our impeccable service and capabilities. We were established to serve the ever evolving marine industry

More information

UEE30811 Q-Tracker Work Tasks

UEE30811 Q-Tracker Work Tasks UEE30811 Q-Tracker Work Tasks UEENEEC020B Participate in electrical work and competency development activities Q-Tracker requirements: 40 hours of practical training. 1. Comply with electrical industry/enterprise

More information

INSTALLATION & MAINTENANCE of FIRE ALARM SYSTEMS

INSTALLATION & MAINTENANCE of FIRE ALARM SYSTEMS INSTALLATION & MAINTENANCE of FIRE ALARM SYSTEMS COURSE 470: 2 DAYS: Max 8 Candidates Modern fire alarm systems require careful, validated installation and maintenance to ensure that false alarms are infrequent

More information

ClassNK Technical Information No. TEC-0453 Attachment (1) to ClassNK Technical Information No. TEC-0453 Guidance on SOLAS Chapter II-2 as amended in 2

ClassNK Technical Information No. TEC-0453 Attachment (1) to ClassNK Technical Information No. TEC-0453 Guidance on SOLAS Chapter II-2 as amended in 2 Subject: Guidance on SOLAS chapter II-2 as amended in 2000 Technical Information No. TEC-0453 To whom it may concern Date 22 April 2002 As stated in ClassNK Technical Information No. 406, SOLAS as amended

More information

ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual.

ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual. 1 MHG Heating Ltd ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual. Unit 4 Epsom Downs Metro Centre, Waterfield, Tadworth, Surrey, KT20 5LR Telephone 08456 448802 Fax 08456 448803

More information

4S-DHW Group project 2017/18. Research Meeting, Loughborough March 9 th 2018

4S-DHW Group project 2017/18. Research Meeting, Loughborough March 9 th 2018 4S-DHW Group project 2017/18 Research Meeting, Loughborough March 9 th 2018 Cold fill, either tank or mains pressure 10m long in practice, can we use < 15mm diameter? Heat pump modelled by electric heater

More information

Technical Manual Manual Técnico

Technical Manual Manual Técnico Technical Manual Manual Técnico TECHNICAL SERVICE MANUAL SCL - SC MODELS: SCL 400 - SC 400 SCL 600 - SC 600 SCL 1T - SC 1TN SCL 2T - SC 2TN SCL 3T - SC 3TN SCL 5T - SC 5TN SCL 10T - SC 10TN SCL 15T - SC

More information

Installation and Operation Manual

Installation and Operation Manual [Please read this installation & operation manual before install and use this Installation and Operation Manual Address: 8-701,Dongfangming Industry Zone, Dabao Road., Baoan, Shenzhen, China-518101 Page

More information

2.1 Create & Agree Demobilisation Plan Maintenance Procedure

2.1 Create & Agree Demobilisation Plan Maintenance Procedure 2.1 Create & Agree Demobilisation Plan Maintenance Procedure MARINE LAYUP SERVICES PTY LTD WWW.MARINELAYUP.COM 16 Raffles Quay, #33-02 Hong Leong Building Singapore 048581 Phone: +65 3159 1835 Email: info@marinelayupservices.com

More information

TECHNICAL SERVICE MANUAL SCALA - SC

TECHNICAL SERVICE MANUAL SCALA - SC TECHNICAL SERVICE MANUAL SCALA - SC MODELS: SCALA 400 - SC 400 SCALA 600 - SC 600 SCALA 1T - SC 1TN SCALA 2T - SC 2TN SCALA 3T - SC 3TN SCALA 5T - SC 5TN SCALA 10T - SC 10TN SCALA 15T - SC 15TN TABLE OF

More information

QD6310. Fixed Gas Detector Operation Manual

QD6310. Fixed Gas Detector Operation Manual QD6310 Fixed Gas Detector Operation Manual Safety Information Before using the device, please first carefully read and follow the following information to operate the device: Please don't use the defective

More information

Building Name: Our Lady of Sorrows Date: July 10, 2013

Building Name: Our Lady of Sorrows Date: July 10, 2013 1 E1. FIRE ALARM SYSTEM ANNUAL TEST AND INSPECTION REPORT (Reference: 5.1.2) Building Name: Our Lady of Sorrows Date: July 10, 2013 Address 19 Mohns Avenue Petawawa, ON System Manufacturer: Siemens Model

More information

Service manual. Type: TD25. Contents

Service manual. Type: TD25. Contents Service manual Type: TD25 Contents Introduction...3 Type overview...4 Programme...5 Indication of programme sequence...5 Options and settings...6 Variant settings...8 Test programme...9 Troubleshooting...11

More information

FIELD RE-ASSEMBLY FOR FORM 3 AND FORM 7 SHIPMENT MODEL YD CHILLERS - MOD A AND B WITH GRAPHIC CONTROL CENTER AND ELECTRO-MECHANICAL STARTER

FIELD RE-ASSEMBLY FOR FORM 3 AND FORM 7 SHIPMENT MODEL YD CHILLERS - MOD A AND B WITH GRAPHIC CONTROL CENTER AND ELECTRO-MECHANICAL STARTER CENTRIFUGAL LIQUID CHILLERS INSTALLATION INSTRUCTIONS Supersedes: 160.69-NM3 (912) Form 160.69-NM3 (715) FIELD RE-ASSEMBLY FOR FORM 3 AND FORM 7 SHIPMENT MODEL YD CHILLERS - MOD A AND B WITH GRAPHIC CONTROL

More information

INTERNAL INSPECTION REPORT

INTERNAL INSPECTION REPORT Page 1 Content Page Inspected areas overview 3 ISM 5 ISPS 7 Bridge 8 Accommodations 9 Deck 10 Engine room 12 Summery 15 Photos 16 - Page 2 Inspected Areas: A B C ISM ISPS Bridge 1 Ship s Certificates 2

More information

FIRE RISK ASSESSMENT

FIRE RISK ASSESSMENT FIRE RISK ASSESSMENT Fire Precautions (Workplace) Regulations Before beginning the risk assessment, check to see if your workplace has a Fire Certificate. If the workplace does have a Fire Certificate,

More information

Warranty Policy Shortlist Warranty does not cover :- Correcting faults caused by incorrect installation of a product. Where an engineer cannot gain ac

Warranty Policy Shortlist Warranty does not cover :- Correcting faults caused by incorrect installation of a product. Where an engineer cannot gain ac E350/40 and E350/41 WET HEAT BAINS MARIE E350/42 and E350/43 DRY HEAT BAINS MARIE INSTALLATION and SERVICING INSTRUCTIONS IMPORTANT The installer must ensure that the installation of the appliance is in

More information

2012 International Building Code Errata (Portions of text and tables not shown are unaffected by the errata)

2012 International Building Code Errata (Portions of text and tables not shown are unaffected by the errata) [F]TABLE 903.2.11.6 ADDITIONAL REQUIRED SUPPRESSION SYSTEMS SECTION SUBJECT 402.10 402.5 Covered and open mall buildings (Portions of table not show remain unchanged) 2012 International Building Code SEVENTH

More information

IN THE MARINE INDUSTRY

IN THE MARINE INDUSTRY H E A T E X C H A N G E R S BULLETIN NO. TIS-108A PRIME SURFACE HEAT EXCHANGERS PLATE & FRAME HEAT EXCHANGERS ALL-WELDED PLATE HEAT EXCHANGERS IN THE MARINE INDUSTRY THE heat transfer people H E A T E

More information

Zijlmans Eagle 1200 Classic (2002)

Zijlmans Eagle 1200 Classic (2002) Zijlmans Eagle 1200 Classic (2002) Property: 64.707.2469 EYN Price: 149.000 Length: 12,00 m; Width: 3,85 m; Draft: 1,10 m; Headroom: 1,90 m; Engine brand: Vetus Deutz DTA43; Total engine power: 128 hp;

More information

IACS RESOLUTION CHANGES (GMO ) BEKİR SITKI TÜRKMEN

IACS RESOLUTION CHANGES (GMO ) BEKİR SITKI TÜRKMEN IACS RESOLUTION CHANGES (GMO - 10-12- 2015) BEKİR SITKI TÜRKMEN Resolution Changes January & July 2016 (UR, UI, PR, REC) 3+ 1 1 + 0 0 + 7-10 1 + 5 Total UR Changes = 9 (Jan 2016) + (28 10) (July 2016)

More information

Commissioning Pack. Heating and Hot Water Heat Pumps. IMPORTANT DOCUMENTS To Be Kept At All Times. With Equipment. Accredited Ecodan Installer:

Commissioning Pack. Heating and Hot Water Heat Pumps. IMPORTANT DOCUMENTS To Be Kept At All Times. With Equipment. Accredited Ecodan Installer: Accredited Ecodan Installer: Telephone: Email: Address: Commissioning Pack Heating and Hot Water Heat Pumps IMPORTANT DOCUMENTS To Be Kept At All Times With Equipment IMPORTANT This Sheet Must Be Kept

More information

GS100M Gas Detector. Technical Specification

GS100M Gas Detector. Technical Specification GS00M Detector Application Duomo is recognised within the Gas industry for providing a comprehensive range of low cost, high reliability gas detection for many applications. We have installed and commissioned

More information

Swan Song. Engine Rooms

Swan Song. Engine Rooms Engine Rooms The two main engines are Yanmar 6LYA STP rated at 350hp at 3300 rpm. They are continuously rated at 290hp at 3100 rpm and she will cruise at 24 knots at this speed. Maintenance is as per the

More information

Logbook. Precept EN Fire Detection/Alarm Panel. & Precept EN Repeater

Logbook. Precept EN Fire Detection/Alarm Panel. & Precept EN Repeater APPROVED BY: JBJ Precept EN Fire Detection/Alarm Panel & Precept EN Repeater Logbook PAGE 1 of 19 List of Contents 1. FIRE ALARM SYSTEM MAINTENANCE... 3 2. USER RESPONSIBILITIES... 3 2.1. RESPONSIBLE PERSON...

More information

This label warns for risk of electrical shock when failing to observe.

This label warns for risk of electrical shock when failing to observe. MANUAL horizontal centrifugal pumps MB series ic drive SB series mechanical seal 1. Introduction 2. Safety precautions 3. Receipt 4. Installation / Operation and Maintenance 4.1 Installation 4.2 Operation

More information

UCL PRINCIPAL CONTRACTOR SITE FIRE SAFETY RISK REVIEW & MITIGATION MEASURES

UCL PRINCIPAL CONTRACTOR SITE FIRE SAFETY RISK REVIEW & MITIGATION MEASURES Mandatory Fire Safety Instruction UCL PRINCIPAL CONTRACTOR SITE FIRE SAFETY RISK REVIEW & MITIGATION MEASURES Principal Contractor fire safety considerations in shared occupancy project or refurbishments

More information

Installation & Service Instructions for Jackson & Church Flexaire Packaged Furnaces SDF-125 thru SDF-400 Gas Firing

Installation & Service Instructions for Jackson & Church Flexaire Packaged Furnaces SDF-125 thru SDF-400 Gas Firing Installation & Service Instructions for Jackson & Church Flexaire Packaged Furnaces SDF-125 thru SDF-400 Gas Firing Important: To protect the unit and avoid damage to the heat exchanger, the blower speed

More information

SUBMERSIBLE WATER PUMP. Model Nos. CSE1 - CSE1A - CSE2 - CSE2A CSD3- -CSD3A CSV1A - CSV2 - CSV2A - CSW1A OPERATING & MAINTENANCE INSTRUCTIONS

SUBMERSIBLE WATER PUMP. Model Nos. CSE1 - CSE1A - CSE2 - CSE2A CSD3- -CSD3A CSV1A - CSV2 - CSV2A - CSW1A OPERATING & MAINTENANCE INSTRUCTIONS 1117 SUBMERSIBLE WATER PUMP Model Nos. CSE1 - CSE1A - CSE2 - CSE2A CSD3- -CSD3A CSV1A - CSV2 - CSV2A - CSW1A OPERATING & MAINTENANCE INSTRUCTIONS GUARANTEE This product is guaranteed against faults in

More information

PART-A, ANNUAL MAINTENANCE CONTRACT FOR PLANT 1 PACKAGE AIR CONDITIONER UNITS. SOR No Description of Services Qty UOM

PART-A, ANNUAL MAINTENANCE CONTRACT FOR PLANT 1 PACKAGE AIR CONDITIONER UNITS. SOR No Description of Services Qty UOM 1 PACKAGE AIR CONDITIONER UNITS 1.1 Monthly PM of Flame Proof for Analyzer House Air Conditioner Units at various locations.job includes but not limited to attending all complaints & rectifying the problems,

More information

Air cooler C 28-1/6. Tools : (The construction varies depending on extracting tool)

Air cooler C 28-1/6. Tools : (The construction varies depending on extracting tool) Air cooler 6606 1. Structure Horizontal-type Remark): There are 2 types of air cooler that are equipped with and without feed water heater. 6 Tools : (The construction varies depending on extracting tool)

More information

ENGINEERING STANDARD FOR FIRE STATIONS ORIGINAL EDITION NOV. 1993

ENGINEERING STANDARD FOR FIRE STATIONS ORIGINAL EDITION NOV. 1993 ENGINEERING STANDARD FOR FIRE STATIONS ORIGINAL EDITION NOV. 1993 This standard specification is reviewed and updated by the relevant technical committee on May 2000. The approved modifications are included

More information

User s Information Guide R2A

User s Information Guide R2A Pi HSC505 Home Security Controller User s Information Guide R2A Page 1 of 15 of its development program. 1This document and product are copyrighted and all rights are reserved. Introduction Convention

More information

Stena Clyde. Engine Room Fire 20 th October 2007

Stena Clyde. Engine Room Fire 20 th October 2007 Engine Room Fire 20 th October 2007 Sequence of Events: Refer to previous presentations to HSE Managers 19:56 Alarm raised 19:58 Muster & enter area 20:37 Identify fire call Ariki for assistance 20:13

More information

Based on NFPA 1001: Standard for Fire Fighter Professional Qualifications, 2013 Edition.

Based on NFPA 1001: Standard for Fire Fighter Professional Qualifications, 2013 Edition. Based on NFPA 1001: Standard for Fire Fighter Professional Qualifications, 2013 Edition. Revised 02/10/2017 Alabama Fire College Firefighter II Instructional JPR Verification Sheet Full Name: Fire Department:

More information

TX7130. Conventional Reflective Beam Detector Installation and Operation Manual. TANDA UK Technology Copyright 2015, All right reserved.

TX7130. Conventional Reflective Beam Detector Installation and Operation Manual. TANDA UK Technology Copyright 2015, All right reserved. TX7130 Conventional Reflective Beam Detector Installation and Operation Manual Technology Copyright 2015, All right reserved. Product Safety To prevent severe injury and loss of life or property, read

More information

10yr O2NE & Safe-Ox. User Manual

10yr O2NE & Safe-Ox. User Manual Analox Ltd. 15 Ellerbeck Court, Stokesley Business Park North Yorkshire, TS9 5PT, UK T: +44 (0)1642 711400 F: +44 (0)1642 713900 W: www.analox.net E: info@analox.net This support line is closed on UK public

More information

IMO INTERPRETATIONS OF FIRE PROTECTION-RELATED PROVISIONS OF THE HSC CODE

IMO INTERPRETATIONS OF FIRE PROTECTION-RELATED PROVISIONS OF THE HSC CODE INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 0171-735 7611 Fax: 0171-587 3210 Telex: 23588 IMOLDN G Ref. T4/4.01 IMO E MSC/Circ.911 4 June 1999 INTERPRETATIONS OF FIRE

More information

Riva F40 Cube. Multi-Fuel Free Standing Stove. Installation Instructions. Models: RVF40C. For use in Great Britain and Eire IMPORTANT

Riva F40 Cube. Multi-Fuel Free Standing Stove. Installation Instructions. Models: RVF40C. For use in Great Britain and Eire IMPORTANT Riva F40 Cube Multi-Fuel Free Standing Stove Installation Instructions Models: RVF40C For use in Great Britain and Eire This product is suitable for use in the stated countries. To install the product

More information

RD:30 Specification No. TI/SPC/PSI/AUTOTR/0090 For 50U5/150 MVA, 220/132 kv Auto Transformer

RD:30 Specification No. TI/SPC/PSI/AUTOTR/0090 For 50U5/150 MVA, 220/132 kv Auto Transformer RD:30 Specification No. TI/SPC/PSI/AUTOTR/0090 For 50U5/150 MVA, 220/132 kv Auto Transformer Annexure-4 TECHNICAL SPECIFICATIONS FOR NITROGEN INJECTION FIRE PREVENTION AND EXTINGUISHING SYSTEM FOR OIL

More information

Maintenance of Fire Systems

Maintenance of Fire Systems Maintenance of Fire Systems Duty Holder Facilities Manager Responsible Person By John Briggs All Fire Facilities, equipment, systems and devices are required by law to be subject to a suitable system of

More information

SECTION ELECTRIC WATER HEATERS

SECTION ELECTRIC WATER HEATERS SECTION 22 36 01 ELECTRIC PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Certification and Class reports Item Common deficiencies Check items Finding Corrective Action Statutory / mandatory certificates

Certification and Class reports Item Common deficiencies Check items Finding Corrective Action Statutory / mandatory certificates Note: This checklist is based on PSC deficiencies noted on ships in year 2016 do not cover the whole requirements of Conventions or Regulations. Certification Class reports Statutory / matory certificates

More information

LGCNCOE Study Guide: Fixed Gas Detection

LGCNCOE Study Guide: Fixed Gas Detection LGCNCOE Study Guide: Fixed Gas Detection References Regulatory International Gas Carrier Code (IGC) regulation 13.6 Gas Carrier Code (GC) regulation 13.6 Existing Gas Carrier Code regulation 13.6 46 CFR

More information

1 ESMA, Inc. P. O. BOX 734 * SOUTH HOLLAND, IL * (800) * FAX (708)

1 ESMA, Inc. P. O. BOX 734 * SOUTH HOLLAND, IL * (800) * FAX (708) 1 2 Instructions for Ultrasonic Washer E789 (U.L. Approved) 1. INTRODUCTION The E789 Automatic Ultrasonic Washer automatically performs a cleaning cycle, the major steps of which are: Ultrasonic cleaning

More information

OHM N PREPARATIONS & SUPPORT FOR A WATERTUBE BOILER Fax: P.O. Box 96. Russell, IL

OHM N PREPARATIONS & SUPPORT FOR A WATERTUBE BOILER Fax: P.O. Box 96. Russell, IL D E S C A L I N G OHM N S E R V I C E S PREPARATIONS & SUPPORT FOR A WATERTUBE BOILER 1-800-228-6462 Fax: 1-847-838-2226 P.O. Box 96. Russell, IL 60075 WWW.OHMANDESCALING.COM 1 OHMAN CIRCULATION DIAGRAM

More information

RESOLUTION MSC.292(87) (adopted on 21 May 2010) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS

RESOLUTION MSC.292(87) (adopted on 21 May 2010) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS RESOLUTION MSC.292(87) THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on the International Maritime Organization concerning the functions of the Committee, NOTING resolution MSC.98(73)

More information

MONOBLOCK GAS BURNERS INSTALLATION, OPERATING AND MAINTENANCE MANUAL

MONOBLOCK GAS BURNERS INSTALLATION, OPERATING AND MAINTENANCE MANUAL MONOBLOCK GAS BURNERS INSTALLATION, OPERATING AND MAINTENANCE MANUAL ONE-STAGE, TWO-STAGE AND MODULATING OPERATION ECO 1 ECO 2 ECO 30 ECO 45 www.ecostar.com.tr DEAR USER, ECOSTAR ECO 1, ECO 2, ECO 30,

More information

SMHA Hatch High temperature fan HT-fan Installation and Maintenance

SMHA Hatch High temperature fan HT-fan Installation and Maintenance High temperature fan HT-fan Installation and Maintenance 22.8.2012 Contents 1. Important information 2. Safety notes 3. Technical description 4. Transport 5. Mounting instructions 6. Commissioning 7. Maintenance

More information

FIRE SAFETY PLAN. Ceramics/Sculpture Building 47 Service Rd 1 S Winnipeg, MANITOBA. May / Prepared by: Chris Pancoe

FIRE SAFETY PLAN. Ceramics/Sculpture Building 47 Service Rd 1 S Winnipeg, MANITOBA. May / Prepared by: Chris Pancoe FIRE SAFETY PLAN Ceramics/Sculpture Building 47 Service Rd 1 S Winnipeg, MANITOBA May / 2017 Prepared by: Chris Pancoe TABLE OF CONTENTS Contents A. BUILDING AUDIT:... 3 BUILDING DESCRIPTION... 3 1. Level

More information

MODEL A5-2 SOLVENT & WATER RECOVERY SYSTEMS (EXPLOSION PROOF UNITS)

MODEL A5-2 SOLVENT & WATER RECOVERY SYSTEMS (EXPLOSION PROOF UNITS) MODEL A5-2 SOLVENT & WATER RECOVERY SYSTEMS (EXPLOSION PROOF UNITS) FOR PROPER AND SAFE USE OF THIS CHEMCHAMP EQUIPMENT, PLEASE FOLLOW THIS DOCUMENT AND LOCAL AUTHORITY. KEEP THIS DOCUMENT FOR FUTURE REFERENCE.

More information

A U TO S M O K E. Model AUTO SMOKE FIRE SHUT Flat Slats Fire Shut Rolling Doors

A U TO S M O K E. Model AUTO SMOKE FIRE SHUT Flat Slats Fire Shut Rolling Doors Model AUTO SMOKE Flat Slats Fire Shut Rolling Doors NOTE: For specifications, architects must choose from a variety of options. The standard choice will be shown first in plain text followed by the options

More information

SUBMERSIBLE WATER PUMPS

SUBMERSIBLE WATER PUMPS OPERATING & MAINTENANCE INSTRUCTIONS SUBMERSIBLE WATER PUMPS Model Nos. HIPPO-3 and 3A 6/97 Thank you for purchasing this CLARKE, HIPPO Submersible Pump. These highly efficient pumps are designed for pumping

More information

2013 DD DEFECT LIST. Total amount. No discount. Unit Rate SR. NO. DESCRIPTION

2013 DD DEFECT LIST. Total amount. No discount. Unit Rate SR. NO. DESCRIPTION SR. NO. DESCRIPTION 2013 DD DEFECT LIST 3.01 SHIP SIDE DIRECT SEA VALVES AND INTERMEDIATE VALVES SCOPE OF WORK a) Valves to be opened up, overhauled and surveyed by Classification Society Surveyor and

More information

Operating Guide. Termix Solar A+/B+ 1.0 Table of Contents. 1.0 Table of Contents

Operating Guide. Termix Solar A+/B+ 1.0 Table of Contents. 1.0 Table of Contents 1.0 Table of Contents 1.0 Table of Contents... 1........................................................................ 2 2.0 Functional description... 3 3.0 Safety notes... 4 3.1 Safety Notes general............................................

More information

MV THOMSON MAJESTY Engine-room fire South of Gorgona Island 21 October 2016

MV THOMSON MAJESTY Engine-room fire South of Gorgona Island 21 October 2016 Marine Safety Investigation Unit SIMPLIFIED SAFETY INVESTIGATION REPORT REPORT NO.: 22/2017 October 2017 The Merchant Shipping (Accident and Incident Safety Investigation) Regulations, 2011 prescribe that

More information

Introduction. Our team

Introduction. Our team Introduction Staadco Marine International Pte Ltd is a subsidiary of Staadco Agency Pte Ltd which established more than 30 years in the freight forwarding industry. Staadco Marine International Pte Ltd

More information

GENERAL SPECIFICATION ELECTRICAL

GENERAL SPECIFICATION ELECTRICAL GENERAL SPECIFICATION ELECTRICAL GS ELE 331 Tape trace heating 00 10/04 First issue Rev. Date Notes Contents 1. Scope...3 2. Reference documents...3 3. Environmental Conditions...4 4. Technical Requirements...5

More information

ADDITIONAL FIRE PROTECTION (F-AMC)

ADDITIONAL FIRE PROTECTION (F-AMC) RULES FOR CLASSIFICATION OF SHIPS NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 4 ADDITIONAL FIRE PROTECTION (F-AMC) JULY 2006 CONTENTS PAGE Sec. 1 General Requirements...

More information

SPECIFICATION MAZARIN 72 4 CABIN VERSION

SPECIFICATION MAZARIN 72 4 CABIN VERSION DECK Stainless steel anchor 50 kg with 55 m chain (13 mm) Electric windlass with two operating units Separate fender locker Stainless steel bow fitting 10 Stainless steel belaying cleats Deck hatches,

More information

1845 Tech Manual.qxd 23/11/05 1:20 pm Page 2 EXCELSIOR UNVENTED WATER HEATERS INSTALLATION MANUAL. Design for living

1845 Tech Manual.qxd 23/11/05 1:20 pm Page 2 EXCELSIOR UNVENTED WATER HEATERS INSTALLATION MANUAL. Design for living 1845 Tech Manual.qxd 23/11/05 1:20 pm Page 2 EXCELSIOR UNVENTED WATER HEATERS INSTALLATION MANUAL Design for living 1845 Tech Manual.qxd 23/11/05 1:21 pm Page 3 TECHNICAL DATA & INSTALLATION INSTRUCTIONS

More information

SERIES OWNER MANUAL DP1000(B) Please read this manual carefully prior to operating your Drinkpod. Retain for future reference.

SERIES OWNER MANUAL DP1000(B) Please read this manual carefully prior to operating your Drinkpod. Retain for future reference. 1000 SERIES DP1000(B) OWNER MANUAL Please read this manual carefully prior to operating your Drinkpod. Retain for future reference. Safety caution & usage Temperature Please use the product in a dry place

More information

SEALED THERMAL STORE

SEALED THERMAL STORE ISSUE 3 0717 INSTALLATION AND USER GUIDE ENERGYMANAGER SEALED THERMAL STORE ADVANCE APPLIANCES LTD PLEASE RETAIN AND ENSURE SERVICE RECORDS ARE KEPT UP TO DATE. SCHEMATIC DIAGRAM OF ENERYMANAGER THERMAL

More information

Commercial Fan Heater

Commercial Fan Heater Commercial Fan Heater Installation and Operating Manual Catalogue Numbers: CH06CSiRX, CH06CPiRX, CH09iRX, CH12iRX, CH15iRX. INDEX Section General Information -----------------------------------------------------------

More information

1. GENERAL. In case of change of Class, foreseen Classification Society 20 Date of last Dry Docking

1. GENERAL. In case of change of Class, foreseen Classification Society 20 Date of last Dry Docking 1. GENERAL 1 Name of Ship 2 IMO No 3 Present Flag 4 Port of Registry 5 Call Sign 6 Type of Ship 7 Registered owner 8 Ship s Manager 9 GT/NT 10 Deadweight 11 Length 12 Breadth 13 Depth 14 Year of build

More information

Minima User Guide and Installation Manual

Minima User Guide and Installation Manual Minima User Guide and Installation Manual D r a c o D r u m M i n i m a U s e r G u i d e V e r. 1. 1 Page 1 Table of Contents Introduction... 3 Product Information... 4 Getting to know your DracoDrum

More information

SCOPE OF SUPPLY SUPPLY OF H2S ANALYZER

SCOPE OF SUPPLY SUPPLY OF H2S ANALYZER H2S Analyzer SCOPE OF SUPPLY SUPPLY OF H2S ANALYZER Scope of supply-h2s analyzer Page 1 of 9 SCOPE OF WORK 1.0 Introduction The Scope of work covers the following which includes Procurement of 3 H2S analyzers

More information

Fire Risk Assessment 2017

Fire Risk Assessment 2017 Fire Risk Assessment 2017 Westmorland House Windermere School Author Paul Brownless Date 11 April 2017 Revised Revised by 04/12/2017 Richard Hennah Reference FRA_WSWH_11042017 1 AUTHOR CLIENT Paul Brownless

More information

5 - Ventilation - Exterior Vents

5 - Ventilation - Exterior Vents 5 - Ventilation - Exterior Vents Solar Vent - Stainless Steel Solar Vent - Plastic Low profile, weatherproof, solar powered vent with stainless steel housing. Extracts up to 900 cubic feet of air per hour

More information

Installation, operating and servicing instructions

Installation, operating and servicing instructions English 57-115 - 144-1 - 259 Installation, operating and servicing instructions ITALIA EN 1 ITALIA English INDEX WARnINGS 3 Who should read these instructions 3 Symbols 3 Recommendations 3 Importants notes

More information

DMG 970. Gas Burner Safety Control. For 2-stage forced draught and combi oil/gas burners

DMG 970. Gas Burner Safety Control. For 2-stage forced draught and combi oil/gas burners certified Qualitysystem ISO 9001 / EN 29001 Reg. Nr. 10529 Gas Burner Safety Control A Honeywell Company For 2-stage forced draught and combi oil/gas burners Possible flame detectors: - Ionisation probe

More information

HEALTH AND SAFETY INDUCTION CHECKLIST

HEALTH AND SAFETY INDUCTION CHECKLIST LIST Listed below is a checklist of health & safety matters, some general and some applicable only to certain jobs. page 1 Section A Mandatory for all Staff 1. HEALTH, SAFETY & ENVIRONMENTAL (HSE) POLICIES

More information

ER MANUAL FOR YOUR BAUMATIC

ER MANUAL FOR YOUR BAUMATIC BW18BL 50 litre thermoelectric beverage centre BW28BL 70 litre thermoelectric beverage centre ER MANUAL FOR YOUR BAUMATIC BW18BL 50 litre thermoelectric beverage centre BW28BL 70 litre thermoelectric beverage

More information

FlowMark Model Mark-II-SC Installation Operation Manual. EPA Est.#: FL-1

FlowMark Model Mark-II-SC Installation Operation Manual. EPA Est.#: FL-1 flowmark FlowMark Model Mark-II-SC Installation Operation Manual EPA Est.#: 92852-FL-1 Record Information About Your System Date Purchased: Date Installed: Serial Number: Local Representative: For assistance

More information

CLe-series Dishwashers

CLe-series Dishwashers CLe-series Dishwashers Blower-dryer electric (CLe SERIES) ML-138211 ML-138212 ML-138213 ML-138214 electric (CLeR SERIES) ML-138325 ML-138326 ML-138327 ML-138328 STEAM (CLe SERIES) ML-138226 ML-138227 ML-138228

More information

Kelsow Work Instruction. Buffalo Venture FPSO Fire Protection Systems

Kelsow Work Instruction. Buffalo Venture FPSO Fire Protection Systems Kelsow Work Instruction Buffalo Venture FPSO Fire Protection Systems Table of Contents Abbreviations and Definitions....................................................... 2 Overview............................................................................

More information

Ver.GCIMY105V3Y12 MAJESTY 105

Ver.GCIMY105V3Y12 MAJESTY 105 Ver.GCIMY105V3Y12 MAJESTY 105 MAJESTY 105 Bow Seating Area Fly-bridge Main Saloon Dining Owner s En Suite Owner s Stateroom Owner s En Suite Owner s Office VIP Stateroom VIP Stateroom Twin Guest Stateroom

More information

Chapter 3 Cooling, heating and ventilation systems

Chapter 3 Cooling, heating and ventilation systems 3 1 Chapter 3 Cooling, heating and ventilation systems Contents Antifreeze mixture..............................see Chapter 1 Cooling fan assembly - testing, removal and refitting.............8 Cooling