LIVING AROUND TE TĀTUA A RIUKIUTA

Size: px
Start display at page:

Download "LIVING AROUND TE TĀTUA A RIUKIUTA"

Transcription

1 01 Fig 01 Panoramic view looking west showing Three Kings Road (later Mount Eden Road, foreground) part of Three Kings mountains (J Richardson, 1920), Sir George Grey Special Collections, Auckl Libraries, ID /4231 LIVING AROUND TE TĀTUA A RIUKIUTA Lscape rehabilitation urban redevelopment of Three Kings Richard Reid from Richard Reid & Associates Citymakers outlines two different approaches for lscape rehabilitation urban redevelopment of Three Kings Quarry, Auckl. 1 Our involvement with this project began in May 2015 when we were engaged by two community groups to assess a proposed plan change by Fletcher Residential for redevelopment of Three Kings Quarry. Our expertise was sought by South Epsom Planning Group Three Kings United Group who were aware of our local work on Puketapapa Mt Roskill Volcano Basin Reserve Roundabout in Wellington. Te Tātua a Riukiuta City Plan Three Kings Quarry is situated within Three Kings suburb of Auckl. Both quarry suburb took ir name from Three Kings Volcano which is an outsting natural feature of area. The volcano is considered geologically scientifically valuable for its original mix of five, not three scoria cones, numerous scoria mounds a lava lake nested inside a one kilometre diameter tuff ring. The whole feature was called by Maori Te Tātua a Riukiuta, belt of Riukiuta (Fig 01). The local area is strongly defined by Te Tātua a Riukiuta, including historic arrangement of streets. As early as 1860, a city plan showed Mt Eden Road aligned on centre of Te Tātua a Riukiuta Maungawhau, creating a gr lscape urban axis between two volcanoes. No two or volcanoes were embedded in city plan in this way (Fig 02). On same plan, four boundary roads formed a near-perfect square frame around Te Tātua a Riukiuta, with alignment of Mt Eden Road incorporated into symmetrical structure. A square frame is an unusual typology in Auckl s early ongoing city planning. It demonstrated that a high level planning order was overlaid on volcanic complex which accommodated its distinctive size features. The scale of this order is usually seen in planning of imperial cities such as Beijing which are planned to align a divine organisation of human settlement with an auspicious natural lscape, typically

2 Fig 02 Map of Eden County (c.1900), Sir George Grey Special Collections, Auckl Libraries, ID 7-A14275 (Te Tātua a Riukiuta Maungawhau highlighted by RRA) Fig 03 Te Tātua a Riukiuta tuff ring encircles Three Kings Quarry, Reserve Suburb: Town Centre (foreground), Three Kings Reserve (south west of quarry), Big King Reserve (north-west of quarry) Mt Eden Road (to north). Photo: Fig 04 Panorama view showing Three Kings Quarry (foreground), Big King (middle background), Te Tātua a Riukiuta tuff ring (right background), Three Kings Reserve adjoining quarry (left foreground background), Three Kings Town Centre (out-of-view to left) (RRA, 2015) mountains. These cities also have a rich suburb is subtle has largely gone been replaced by scale, shape depth hierarchy of spatial definition from ir unnoticed. The city remains poorly informed of Three Kings Quarry. centre outwards which is articulated by a as to value of early city plans series of nested structures (buildings inside recognition of what y originally related to courtyards inside compounds inside city provided for. regulatory In 2011 Environment Court granted The streets inside square frame authorities have enabled quarrying of Te Winstone Aggregates, a division of Fletcher, also reflect this. Beginning in 1890 s, Tātua a Riukiuta at expense of its right to clean-fill 15.1 hectare quarry. street system pushed inside frame physical integrity, lscape prominence The Court s consent conditions set out a bifurcated around scoria cones. complementary relationship with process by which final fill levels could The streets on western side took ir city plan. The volcano has been divided rehabilitate 25-40m deep hole line from circular structure radial along significantly integrate site with Big King, Three arrangement of volcano s features, compromised as a result (Fig 03). Four of Kings Reserve, adjacent properties fitting between or around cones, scoria cones have been quarried away, surrounding streets. Engineering drawings crusted lip of lava lake walls leaving only Big King, second highest, as referenced of tuff ring. Even plots of l for state most visible recognisable remnant. quarry filled close to adjoining ground housing in s were uniquely Te Tātua a Riukiuta now chiefly refers to levels which also remedied worst effects proportioned to maintain legibility of this one remaining cone (Fig 04). While from quarrying. Winstone Aggregates volcano. circularity of tuff ring is still imprinted on two community groups supported suburb, centrality of volcano has Court s decision. walls). The order evident in planning of Since property late lines 1800 s, Fletcher s plans for Three Kings Quarry by Court showed 2

3 Fig 05a Fletcher PC372 Masterplan 17H1 (May 2015) Fig 05b Masterplan 17H1 Proposed lform viewed from north-east (3D model by RRA) In late 2014, Fletcher Residential applied to rezone quarry for residential of suburb in partnership with mana quarry by itself was too restrictive for traffic whenua, (including distribution, too constraining for recreational major lowners two Fletcher), local community or open space too remote from Three private plan changes for public feedback. stakeholders called Three Kings Plan Kings Town Centre surrounding open Both finished fill levels of quarry which was based upon a presumption space network. At same time, Fletcher metres below street level, principally quarry would be filled to street level. development. Fletcher submitted to shorten lead-in time for construction Private Plan Change 373 (PC373) Auckl Council considered Three Kings Reserve was compromised of dwellings. The significant change in final sought rezoning of quarry. PC372 by fill level conflicted with expectations included poor of local community Puketapapa Kings Reserve adjacent to quarry. Council supported Fletcher s application Local Board (PLB). PLB had prepared a Fletcher chose to progress PC372 (Fig. 05a) for a public l exchange because it thirty year strategic guide for development after determining that development of considered an integrated comprehensive 3 rezoning 6.5ha of Three past quarrying connectivity, suffered amenity from safety.

4 Fig 06a RRA Development Plan Fig 06b RRA Development Plan Proposed lform viewed from north-east (3D model by RRA) development could maximise residential majority of submitters opposed both Each application needed to be assessed intensification increase recreational open plan change l exchange. PLB against different legislation: plan change space adjacent to emergent Three Kings considered PC372 failed to involve in relation to Operative Auckl City Town Centre. These were cited as two key Local Board; meet long term planning District Plan, l exchange chiefly objectives of The Auckl Plan, Council s objectives Plan under Reserves Act precinct long-term, overarching spatial plan to ensure including rehabilitation of lscape; rezoning as part of a special statutory Auckl grows in a way that will meet provide process for Unitary Plan. opportunities challenges of future. consider alternative options. for approved, with only one design change Opposition to Plan Change 372 PC372 to become a special precinct in from l exchange decision which Proposed Auckl Unitary Plan furr required removal of 15 terrace houses complicated process. from north-western area of Three Kings A PLB, two community groups a of l third Three equity; application by Kings adequately All three applications were subsequently Fletcher 4

5 Fig 07a Fletcher PC372 Masterplan 17H1 Proposed Zoning (west-east cross-section) Fig 07b RRA Development Plan Proposed Zoning (west-east cross-section) Reserve. The two community groups appealed to Environment High Courts on plan change Unitary Plan decisions, with Government of time joining legal proceedings in support of Fletcher. Richard Reid was engaged eir by community groups or PLB to provide lscape urban design evidence through three processes. At same time, Richard Reid & Associates (RRA) was commissioned by PLB to develop an alternative Masterplan aligned with Three Kings Plan for public consultation. Reid was accompanied in Environment Court by Jan McCredie, one of Australasia s foremost urban designers, who also peer reviewed RRA Development Plan. In short, Environment Court preferred Reid McCredie s evidence on PC372 s poor connectivity integration with surrounding neighbourhood in an interim decision required Fletcher to review thirteen key aspects of its Masterplan. The Court s findings countered Unitary Plan decision which sought no changes to Masterplan. 1 Fletcher community groups chose to settle legal impasse out-of-court in June 2017, outcome of which will be discussed in Conclusion. Reid McCredie s evidence Reid s alternative proposal are now focus of this paper. Critique of Fletcher Masterplans 2 Reid McCredie s evidence stated: 1. Fletcher s decision to set quarry s final fill level metres below Mt Eden Road fundamentally compromised development s ability to integrate with Big King, Three Kings Reserve, Town Centre surrounding streets, as well as provide easy access a walkable neighbourhood. 2. Fletcher s Masterplan required significant excavation of existing quarry walls Three Kings Reserve (c.680,000 tonnes) in order to make access to quarry floor viable enable apartment buildings to be built around its edges (Fig 05b). 3. Fletcher Council argued lower fill level would expose more of Big King to view yet proposed zoning enabled whole norrn half of quarry to be filled with up-to-five-storey buildings which would block se potential views (Fig 07a). 4. The Masterplan treated Big King as a background feature retained quarry access road s severe cut into its eastern face. Prominent volcanic features left from past quarrying of or scoria cones were proposed to be removed, concealed or significantly modified. 5. The location amount of open space did not contribute to enhancement of Big King or future-proof Council s significant recreational open space needs for wider area (Fig 08a,c). 6. The existing open space was re-oriented in an east-west direction, swinging focus away from Big King its lscape extension to south (Fig 04, 05a). 7. Fletcher argued its residential re-zoning of south-western area of Three Kings Reserve was to improve passive surveillance public safety, yet little evidence of social problems was presented to warrant this privatisation of public space. 8. The Masterplan arranged ten 9-10 storey apartment buildings around 5

6 eastern sourn sides of quarry, despite relevant District Plan residential zoning enabling 4 storeys. Fletcher used 15-17m lower fill level to hide bottom 5-6 storeys from Mt Eden Road, exposing full height of buildings to Big King. In total length, apartment buildings stretched over 750metres around site, creating a monumental wall competing with Big King in scale visual dominance. 9. Yet apartment buildings location against quarry walls significantly reduced ir potential housing yield. A typical cross-section showed apartments on only one side of seven of building s ten storeys, with carparking sharing six of floors. This is an extremely inefficient typology a prime reason for Fletcher needing public l to increase yield of 1200 dwellings it cited in Environment Court. The above-ground car parking also added substantially to bulk cost of buildings. 10. An excessive amount of l, 4.59 ha, was dedicated to roading due to circuitous routes down into quarry an inefficient street pattern (Fig 09a,b). 11. The convoluted street pattern was reflected in shape of many buildings. Their irregular curvature would create a high number of bespoke building elements, inefficient use of materials wasted space. These inefficiencies furr reduced potential housing yield. 12. The convoluted street pattern termination of streets by buildings increased inward focus perceived density of development rar than visually connecting people with Big King or green open spaces. 13. Few street pedestrian access points into 21.6 hectares site were provided. These were distant from one anor abrupt level changes reinforced depth of final fill level its separation from surrounding street network. 14. The lower fill level, limited entry points, circuitous roading wall-effect of apartment buildings isolated development from Town Centre neighbourhood, effectively creating a gated community within. 15. No alternative plan was developed by Fletcher or investigated by Auckl Council which sought to combine residential intensification with a higher fill level large recreational open space adjacent to Big King. Yet public l exchange with Fletcher placed an onus on Auckl Council to consider this approach, espcially when l exchange was deemed inequitable by PLB local community. Alternative Concept Masterplan by RRA Richard Reid submitted an alternative Concept Masterplan as part of his assessment of PC372 in May The RRA Concept Masterplan applied a methodology Environment Court had proposed to Winstone Aggregates in 2011 for investigating how quarry could integrate with its surrounds. This required analysis of a much wider context than PC372 provided, which in turn enabled different insights into how an integrated comprehensive development could be achieved. The RRA Concept Masterplan had three main points of difference from Fletcher s Masterplan. Firstly, it designated a significant area of open space alongside Big King to provide an appropriate curtilage spatial setting for Big King, which also futureproofed recreational needs (Fig 07b, 08b,10). Secondly, it connected western eastern sides of Three Kings suburb toger for first time by joining ir separate street systems (Fig 09b,c). This could principally be achieved by re-routing Smallfield Ave through three Housing New Zeal properties a Council Parks Depot site to link up with Grahame Breed Drive. The subsequent extension of western side s radial street pattern through Town Centre Fletcher s property would fulfil ultimate goal of Three Kings Plan to Develop a sense of local character identity around presence of Te Tātua a Riukiuta. Thirdly, RRA Concept Masterplan re-visioned development potential of privately-owned Town Centre adjacent Housing NZ l to maximise business street activities, residential intensification urban porosity (Fig 09c). The fundamental features of RRA Concept Masterplan aligned with key objectives of PLB s Three Kings Plan. It also brought or major lowners into frame who may wish to redevelop ir properties. RRA Development Plan Puketapapa Local Board (PLB) engaged RRA to develop Concept Masterplan in two stages between June 2015 May The first stage translated it into graphic language used by Three Kings Plan correlated its outcomes with Plan s five key moves. The second stage required Masterplan to be developed to a detailed level in which fill levels, open space areas housing yields could be measured. In summary, RRA Development Plan (Fig 06a,b): 1. Established that higher fill levels were needed to integrate quarry with Big King, Three Kings Reserve surrounding neighbourhood as well as to remedy past abuses from quarrying. The higher fill level significantly enhanced Big King without needing to modify cone itself. 2. Raised ground level of Three Kings Reserve between Town Centre quarry by 8 metres in conjunction with raising fill level of quarry. This significantly reduced 17 metre level difference transformed weakest part of reserve into critical join between all areas. 3. Shaped clean-fill to give impression it had been carved into an existing lform. Reference points were depressed sports fields around Pukekaroro in Pukekawa Auckl Domain raised earth-shaped stadium beside Mt Kronos at Olympia in ancient Greece. 4. Planned development to fit within remnant volcanic lscape, not quarry. The Fyvie Ave, Barrister Ave Grahame Breed Drive bluffs were used as markers to frame open space define location for buildings. 5. Extended neighbourhood street grid pattern over Fletcher s l Town Centre with a street block size linked to a conventional apartment building 6

7 a Existing b RRA Development Plan c Fletcher Masterplan 18H1 Fig 08 Open Space Analysis (Big King with contours; public reserves in green) typology (Fig 06a, 09c). 6. Provided free-sting mediumdensity housing of mainly five storeys height, with carparking in basements to reduce fill needed. 7. Integrated all components of Three Kings suburb by building upon underlying structure of volcanic lscape historic city plan. Comparison of outcomes The RRA Development Plan provided: Up to 1200 dwellings, same yield Fletcher nominated for PC372. However, RRA s dwellings covered only half of Fletcher s property only one third of plan change area. The RRA yield also excluded residential redevelopment of Town Centre adjacent HNZ properties Over 1,000m² of private communal space for each apartment building against none provided by PC372 Nearly double amount of public open space compared to PC372 Three additional playing fields versus Fletcher s one Under half road area of PC372 Seven traffic dispersal points to surrounding streets compared to PC372 s three (Fig 09) 3 Pedestrian pathways which followed existing desire lines avoided conflict with traffic. These outcomes demonstrate that RRA Development Plan s compact urban form is much more efficient productive than PC372. It achieves a similar number of dwellings without needing public l for housing or creating adverse effects on environment neighbourhood. It also resolves planning problems that dissuaded Fletcher from developing only its l (see page 3). The higher fill levels for quarry lower reserve establish a continuous ground surface, making for a more accessible, liveable cohesive suburb (Fig 06b, 10). The amount of time required to fill to RRA Development Plan s levels, based upon a realistic filling rate, would take one year ten months longer than Masterplan Fletcher gained resource consent for in November 2015, according to community groups civil engineer Garry Law (55 months vs 33 4 months). Yet RRA Development Plan s levels are still well below those originally agreed by Fletcher for rehabilitation of quarry in Mr Law also considered re was no difficulty in servicing RRA Development Plan for stormwater wastewater, an analysis confirmed by Fletcher. In contrast, Fletcher s need to furr excavate quarry Three Kings Reserve was a cost associated with preparation of area for residential development, not rehabilitation. The lower fill level also required use of new sports fields for retention of surface flooding during 100 year storm events, a potential loss of public amenity considering uncertain frequency of se wear events. Environment Court recommendations Although Environment Court preferred Reid McCredie s evidence on PC372 s poor connectivity integration with surrounding neighbourhood, it recommended an approach different from those proposed or tested by conflicting parties. The Court supported southwestern area of Three Kings Reserve two volcanic bluffs being protected from residential development. This reduced Fletcher s yield by 58 dwellings. It also directed an 8m higher ground level for reserve l below Town Centre a 4m higher level for new sports fields, as specified in RRA Plan. However, Court also supported Fletcher s lower fill level in norrn half of quarry ir arrangement of streets buildings. The Court s directive left a substantial part of development within a deep hole in ground. The Court appeared to prioritise 7

8 a Fletcher Masterplan 17H1 b Existing c RRA Development Plan Fig 09 Street Network connection of sourn part of development with Town Centre rar than achieving integration across whole area, a holistic outcome which both 2011 clean-fill decision PLB s Three Kings Plan had focused on. In this respect, Court s view that PC372 fitted with key objectives of PLB s Three Kings Plan sat uncomfortably with PLB s public rejection of PC372 for not taking account of substantial aspects of its plan, including a failure to integrate development with wider local area. The Masterplan s use of a large-scale, l-hungry suburban typology was also antisis of fine-grained, inter-connected street grid plan favoured in Three Kings Plan. The RRA Development Plan had adopted this pattern because it was a logical extension of neighbouring street network would facilitate easy pedestrian movement to Town Centre, community facilities, public transport open space. Conclusion Negotiations between Fletcher community groups post-court continued to weaken this compromised arrangement furr reduced housing yield by c. anor 110 dwellings. Precious areas of volcanic lscape, like Grahame Breed Drive volcanic bluff, have been unnecessarily sacrificed for inconsequential housing opportunities. 5 In Reid McCredie s opinion, intrinsic problems associated with Fletcher s fill levels street network will not be able to be remedied over time. Nor will new plan respect or enhance Big King. Most of issues raised in Reid McCredie s critique of PC372 remain. Judged against principles of Three Kings Plan priorities of The Auckl Plan, a quality compact environment will not be achieved. The development does not maximise efficient use of existing l for urban development; provide greater preservation of natural environmental qualities through a reduced urban footprint; reinforce enhance local character, identity heritage; significantly increase or enhance local amenities; enable good accessibility. This lack of understing of good urban outcomes seems reflective of whole process. The result is poor fails to capitalise on opportunity to build an examplar urban development that ensures lscape rehabilitation residential intensification. The housing yield in RRA Development Plan now appears substantially greater than revised Fletcher Masterplan. The differential of c.170 dwellings is unlikely to change given that increases in height levels along Mt Eden Road agreed by Court could equally be applied to RRA Plan. Although RRA Plan specifies a higher fill level at norrn end of quarry, re cannot be too much time difference between filling to this level versus new levels proposed by Court as well as time Fletcher needs for furr regulatory processes. This apparently will involve a new plan change anor public l exchange to help increase Fletcher s housing yield. Redevelopment of exchanged site, Council Parks Depot area, would permanently block Reid s proposed unification of local street network around Big King, a more equitable social environmental outcome. Jan McCredie concluded in her evidence: Urban areas require more than intensification. An urban city is not a suburban city with bigger buildings. The public domain is critically important great care needs to be taken as to how streets built fabric are organised relative to lform when people are located close toger, are less car dependent using public transport. Urban is a different model has to be considered in long term framework of a city how a city changes. The approach must be holistic. 8

9 Fig 10 RRA Development Plan New lform viewed from Town Centre Re-development of Auckl or any city undergoing change should not be by a site by site approach. All avenues should be kept open so best outcome can be developed. The RRA design does precisely this. It enables possibility over time for an integrated outcome that celebrates Maunga creates a cohesive, urban, memorable place. Endnotes 1. Our design was commissioned by Puketapapa Local Board submitted to Environment Court on behalf of two community groups to highlight key outcomes neccessary for successful intensification of area: integration of final quarry lform residential development with volcanic lscape, Town Centre, open space network neighbourhood; provision of more open space to enhance Tātua a Riukiuta recreational activities; revitalisation of Town Centre. 2. Fletcher produced at least four iterations of masterplan for assessment after Masterplan 15-H1 was submitted with PC372 in November Masterplan 17-H1, re-presented by RRA here, was submitted by Fletcher for plan change hearing in May The yield is calculated using an average floor space area for apartments which can vary depending upon mix of apartment sizes wanted. A range of yields was calculated by Jan McCredie, an expert urban designer from Sydney, based upon different average floor space areas. The methodology used is stard practice in NSW for assessing development capacity of building envelopes. It is derived from tested assumptions over many projects delivers a high level of accuracy. 4. Mr Law s evidence to Environment Court estimated commented upon respective fill volume, rate time differences between Fletcher, RRA 2011 (EC214) proposals. 5. The author s involvement with this project lasted from May 2015 until completion of an Environment Court hearing in May He has had no furr involvement with project or parties concerned including ir negotiation of a final settlement in June The author Richard Reid is an architect, lscape architect, urban designer transport planner with thirty years professional experience. Richard has worked with nationally internationally recognised design practices in Sydney (Neville Gruzman) London (Sir Colin St John Wilson). Richard is director of Richard Reid & Associates Citymakers, a multi-disciplinary design practice based in Auckl. Over past twenty years, practice has focused on large-scale infrastructure projects ir integration with local communities sensitive urban/natural environments. All drawings in this article were prepared for RRA by Richard Reid Carlos Charlton except Fig 5a 6a by Richard Reid Yiqiu Hong. Drawings of Fletcher s Masterplans were prepared by RRA using information published by Fletcher Residential. The RRA Development Plan RRA drawings are protected by copyright. RRA Ltd May All rights reserved. ISBN: (PDF) ISBN: (Softcover) 9

Three Kings Precinct. Plan Change 11 to Auckland Unitary Plan Operative in Part Section 32 Report

Three Kings Precinct. Plan Change 11 to Auckland Unitary Plan Operative in Part Section 32 Report Three Kings Precinct Plan Change 11 to Auckland Unitary Plan Operative in Part Section 32 Report Updated 12 February 2018 2 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY... 4 2.0 CONTEXT AND HISTORY OF THE THREE

More information

THREE KINGS RENEWAL DESCRIPTION OF URBAN DESIGN / ARCHITECTURAL ELEMENTS AND PROCESS. prepared by dko Architecture

THREE KINGS RENEWAL DESCRIPTION OF URBAN DESIGN / ARCHITECTURAL ELEMENTS AND PROCESS. prepared by dko Architecture THREE KINGS RENEWAL DESCRIPTION OF URBAN DESIGN / ARCHITECTURAL ELEMENTS AND PROCESS prepared by dko Architecture THESE PLANS OUTLINE THE VISION OF FLETCHER RESIDENTIAL LTD AND ARE NOT ENDORSED BY AUCKLAND

More information

I615. Westgate Precinct

I615. Westgate Precinct I615. Westgate Precinct I615.1. Precinct Description The Westgate Precinct is located approximately 18km west of the Auckland city centre. There are seven Sub-precincts in the Westgate Precinct: Sub-precinct

More information

Appendix 1 Structure plan guidelines

Appendix 1 Structure plan guidelines Appendix 1 Structure plan guidelines This appendix forms part of the regional policy statement [rps]. 1.1. Introduction Structure plans are an important method for establishing the pattern of land use

More information

I539. Smales 2 Precinct

I539. Smales 2 Precinct I539. Smales 2 Precinct I539.1. Precinct Description The Smales 2 Precinct applies to a 4.8 hectare block of land located on the southern side of Northcote Road and fronting Lake Pupuke, Takapuna. The

More information

Scottish Natural Heritage. Better places for people and nature

Scottish Natural Heritage. Better places for people and nature Scottish Natural Heritage Better places for people and nature Contents Summary... 3 SNH approach... 5 Place-making in policy and practice... 6 Developing the contribution of the natural heritage to place-making...

More information

THREE KINGS RENEWAL MASTER PLAN REPORT H-1

THREE KINGS RENEWAL MASTER PLAN REPORT H-1 THREE KINGS RENEWAL MASTER PLAN REPORT 02.09.2014 15H-1 THESE PLANS OUTLINE THE VISION OF FLETCHER RESIDENTIAL LTD AND ARE NOT ENDORSED BY AUCKLAND COUNCIL 1.0 EXECUTIVE SUMMARY 4.0 analysis 6.0 Master

More information

Urban Design Guidelines

Urban Design Guidelines Urban Design Guidelines These Urban Design Guidelines comprise the Key Design Objectives below, the Roads Design Guidelines overleaf and Neighbourhood Framework Plans. Together with Section 3: Urban Design

More information

building with nature - a new benchmark for green infrastructure

building with nature - a new benchmark for green infrastructure building with nature - a new benchmark for green infrastructure Danielle Sinnett, Gemma Jerome, Sarah Burgess, Nick Smith and Roger Mortlock outline the aims, development and proposed operation of Building

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

I333 Three Kings Precinct

I333 Three Kings Precinct I333. Three Kings I333.1. Precinct description The Three Kings Precinct provides for the development of a vibrant, sustainable urban village on the former quarries and the adjacent land at Three Kings.

More information

Official Plan Review: Draft Built Form Policies

Official Plan Review: Draft Built Form Policies PG.30.1 REPORT FOR ACTION Official Plan Review: Draft Built Form Policies Date: May 15, 2018 To: Planning and Growth Management Committee From: Chief Planner and Executive Director, City Planning Division

More information

Plan Modification to Chapter B2 of the Auckland Unitary Plan(AUP) Operative in part (15 November 2016)

Plan Modification to Chapter B2 of the Auckland Unitary Plan(AUP) Operative in part (15 November 2016) UNITARY PLAN UPDATE REQUEST MEMORANDUM TO FROM Phill Reid Linley Wilkinson DATE 25 September 2018 SUBJECT Plan Modification to Chapter B2 of the Auckland Unitary Plan(AUP) Operative in part (15 November

More information

Draft Western District Plan

Draft Western District Plan Powered by TCPDF (www.tcpdf.org) Draft Western District Plan Submission_id: 31440 Date of Lodgment: 15 Dec 2017 Origin of Submission: Online Organisation name: Goodman Property Services Australia Pty Ltd

More information

THREE KINGS RENEWAL MASTER PLAN REPORT. Final H-2

THREE KINGS RENEWAL MASTER PLAN REPORT. Final H-2 THREE KINGS RENEWAL MASTER PLAN REPORT Final 01.08.2014 15H-2 1.0 EXECUTIVE SUMMARY 4.0 analysis 6.0 Master plan Study Area Master plan Objectives Background and Purpose Master plan Structure Process Principles

More information

INCREMENTAL CHANGE AREA REVIEW March 2015 Page 1

INCREMENTAL CHANGE AREA REVIEW March 2015 Page 1 INCREMENTAL CHANGE AREA REVIEW March 2015 Page 1 Table of Contents Introduction... 3 Background to Review... 3 Comparison of the Schedules to the General Residential Zone... 7 Methodology... 7 Policy Context...

More information

Three Kings Private Plan Change Request 15-H1

Three Kings Private Plan Change Request 15-H1 Three Kings Private Plan Change Request 15-H1 31 August 2014 TABLE OF CONTENTS 1.0 INTRODUCTION... 4 2.0 OVERVIEW... 5 3.0 LAND SUBJECT TO THIS PRIVATE PLAN CHANGE REQUEST... 8 4.0 CURRENT USE... 11 5.0

More information

Tāhuhu whakaruruhau ā-taone The sheltering ridge pole

Tāhuhu whakaruruhau ā-taone The sheltering ridge pole B2. Tāhuhu whakaruruhau ā-taone - Urban growth and form B2.1. Issues Tāhuhu whakaruruhau ā-taone The sheltering ridge pole Auckland s growing population increases demand for housing, employment, business,

More information

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC 2018 November 15 Page 1 of 10 EXECUTIVE SUMMARY This land use amendment application was submitted by Rick Balbi Architect on 2017 August 31 on behalf of Sable Developments Ltd, and with authorization from

More information

2A District-wide Policies

2A District-wide Policies 2A Introduction This Chapter contains policies which are relevant to subdivision, use and development activities occurring across all zones and areas of the District. The policies in this Chapter implement

More information

Urban Growth Management in Seven New World cities: Aligning visions and quality neighbourhood outcomes

Urban Growth Management in Seven New World cities: Aligning visions and quality neighbourhood outcomes Urban Growth Management in Seven New World cities: Aligning visions and quality neighbourhood outcomes New Zealand Centre for Sustainable Cities 14 August 2013 Errol Haarhoff & Lee Beattie School of Architecture

More information

Three Kings Private Plan Change Request 15-H2

Three Kings Private Plan Change Request 15-H2 Three Kings Private Plan Change Request 15-H2 31 August 2014 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 OVERVIEW 4 3.0 LAND SUBJECT TO THIS PRIVATE PLAN CHANGE REQUEST... 6 4.0 CURRENT USE 8 5.0 FLETCHER

More information

Draft Eastern District Plan

Draft Eastern District Plan Draft Eastern District Plan Submission_id: 31238 Date of Lodgment: 13 Dec 2017 Origin of Submission: Online Organisation name: Turrulla Gardens Pty Ltd C/- Mecone Organisation type: Industry First name:

More information

SECTION ONE North East Industrial Zone Design Guide Palmerston North City Council June 2004

SECTION ONE North East Industrial Zone Design Guide Palmerston North City Council June 2004 SECTION ONE North East Industrial Zone Design Guide Palmerston North City Council June 2004 young heart easy living 1 Preface Industrial areas are a very important component of the economic well-being

More information

DAREBIN PLANNING SCHEME AMENDMENT C137

DAREBIN PLANNING SCHEME AMENDMENT C137 Who is the planning authority? Planning and Environment Act 1987 DAREBIN PLANNING SCHEME AMENDMENT C137 EXPLANATORY REPORT This amendment has been prepared by the Darebin City Council, who is the planning

More information

Three Kings Residential Design Guide

Three Kings Residential Design Guide Three Kings Residential Design Guide Contents A. Background and Purpose... 2 B. Context Te Tātua a Riukiuta / Three Kings... 2 C. Three Kings Renewal Project Vision... 3 D. Three Kings Renewal Project

More information

Northern Territory Compact Urban Growth Policy

Northern Territory Compact Urban Growth Policy Northern Territory Compact Urban Growth Policy A Reference Policy Document to clause 2.7 (Reference to Policy) of the NT Planning Scheme May 2015 Table of Contents 1 Policy Setting... 3 1.1 Context for

More information

Hearing Topic: 058 Public Open Space. Primary Evidence: from Andrea Broughton

Hearing Topic: 058 Public Open Space. Primary Evidence: from Andrea Broughton Submitter: Andrea & Alex Broughton Submission Number: 5650-1 Hearing Topic: 058 Public Open Space Primary Evidence: from Andrea Broughton Date: 10 June 2015 1. Introduction My name is Andrea Broughton

More information

RURAL ZONE - POLICY. Rural Zone Policy. Issue: Rural Environment. Ruapehu District Plan Page 1 of 8

RURAL ZONE - POLICY. Rural Zone Policy. Issue: Rural Environment. Ruapehu District Plan Page 1 of 8 Rural Zone Policy RU2 RURAL ZONE - POLICY RU2.1 Introduction The natural resources of the rural environment in the Ruapehu District provide the basis for the existing and potential character, intensity

More information

Built Form and Massing

Built Form and Massing Initial Urban Design Assessment Former Gasworks Site, 111 Queens Parade and 433 Smith Street, Fitzroy North Prepared for Protect Fitzroy North Incorporated by David Pryor, Place Design Studio 6 April 2018

More information

01 the vision NEW LYNN IS WAITING FOR THE GREAT LEAP FORWARD

01 the vision NEW LYNN IS WAITING FOR THE GREAT LEAP FORWARD [A] FRAMEWORK 01 the vision 02 the framework 03 urban design principles 04 c o n t e x t 05 issues a n d o p p o r t u n i t i e s 06 creating a t.o.d. 07 key recommendations 08 seven strategic areas of

More information

ONTARIO MUNICIPAL BOARD

ONTARIO MUNICIPAL BOARD PL 120483 ONTARIO MUNICIPAL BOARD Applicant/Appellant: 2124123 Ontario Limited Subject: OPA, Rezoning and Draft Plan of Subdivision Municipal Address: 3940 Highway 7 East Municipality: City of Markham

More information

Auckland City Operative District Plan (Isthmus 1999) Private Plan Change: Three Kings Precinct PA372

Auckland City Operative District Plan (Isthmus 1999) Private Plan Change: Three Kings Precinct PA372 Auckland City Operative District Plan (Isthmus 1999) Private Plan Change: Three Kings Precinct Under Part 2 of Schedule 1 of the Resource Management Act 1991 PA372 1 2 3 Part C: Insert the following in

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

Part F: Three Kings Residential Design Guide

Part F: Three Kings Residential Design Guide Part F: Three Kings Residential Design Guide Contents A. Background and Purpose 2 B. Context Te Tātua a Riukiuta / Three Kings 2 C. Three Kings Renewal Project Vision 3 D. Three Kings Renewal Project Components

More information

AUCKLAND DESIGN OFFICE. Terms of Reference: Auckland Urban Design Panel 2017

AUCKLAND DESIGN OFFICE. Terms of Reference: Auckland Urban Design Panel 2017 AUCKLAND DESIGN OFFICE Terms of Reference: Auckland Urban Design Panel 2017 Auckland Design Office 3 Contents 4 Introduction Benefits of the Panel 6 Terms of Reference The Purpose of the Auckland Urban

More information

Exhibition of Oran Park and Turner Road Precincts

Exhibition of Oran Park and Turner Road Precincts 22 June 2007 Growth Centres Commission Mr. Angus Dawson PO Box 1457 PARRAMATTA NSW 2124 Dear Sir Exhibition of Oran Park and Turner Road Precincts UDIA NSW commends the Growth Centres Commission (GCC)

More information

GREENBANK DEVELOPMENT MASTERPLAN

GREENBANK DEVELOPMENT MASTERPLAN DEVELOPMENT MASTERPLAN POTENTIAL TRAIN STATION COMMUNITY CENTRE Greenbank will be a connected masterplanned community providing easy access to local and surrounding amenity. Affordable quality homes, green

More information

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17 Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS A New Garden Neighbourhood Matford Barton 17 2.1. SUMMARY AND STATUS OF THE PROPOSALS 2.1.1. The parameter plans and associated wording in this chapter

More information

Chapter 5 Urban Design and Public Realm

Chapter 5 Urban Design and Public Realm 5.1 Introduction Public realm is all areas of the urban fabric to which the public have access. It is where physical interaction takes place between people. It therefore, includes buildings and their design,

More information

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

1.0 Purpose of a Secondary Plan for the Masonville Transit Village Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: John M. Fleming Managing Director, Planning and City Planner Subject: Masonville Transit Village

More information

St. Lawrence Neighbourhood Focused Area - Official Plan Amendment Status Report

St. Lawrence Neighbourhood Focused Area - Official Plan Amendment Status Report STAFF REPORT ACTION REQUIRED St. Lawrence Neighbourhood Focused Area - Official Plan Amendment Status Report Date: May 21, 2015 To: From: Wards: Reference Number: Toronto and East York Community Council

More information

2. Create streetlevel

2. Create streetlevel 2. Create streetlevel vibrancy 2.1 Ensure building entrances are visible Building entrances (including to upper floor activities) are to be visible, accessible, provide weather protection and contribute

More information

SUSTAINABLE MANAGEMENT

SUSTAINABLE MANAGEMENT . Sustainable Management.1 The Concept of Sustainable Management The concept of sustainable management recognises there are limits to the use of natural and physical resources and there is a need to balance

More information

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017 Strategic Environmental Assessment Screening Report Dublin Port Masterplan Review 2017 Table of Contents 1 Introduction... 1 2 Purpose of the Masterplan... 2 3 Task 1.1 Pre-Screening Check... 5 4 Task

More information

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback

More information

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY You will be aware that Scarborough borough council have adopted a new local plan that includes land at Church Cliff

More information

BEFORE THE CENTRAL OTAGO DISTRICT COUNCIL

BEFORE THE CENTRAL OTAGO DISTRICT COUNCIL BEFORE THE CENTRAL OTAGO DISTRICT COUNCIL IN THE MATTER OF Proposed Plan Change 12 to the Central Otago District Plan ON BEHALF OF Wooing Tree Holdings Limited Requestor EVIDENCE OF BENJAMIN ESPIE (LANDSCAPE

More information

AUCKLAND DESIGN OFFICE. Terms of Reference: Auckland Urban Design Panel

AUCKLAND DESIGN OFFICE. Terms of Reference: Auckland Urban Design Panel AUCKLAND DESIGN OFFICE Terms of Reference: Auckland Urban Design Panel Auckland Design Office 3 Contents 4 Introduction Benefits of the Panel 6 Terms of Reference The Purpose of the Auckland Urban Design

More information

REMARKABLES PARK ZONE

REMARKABLES PARK ZONE .10 Remarkables Park Zone.10.1 Resources, Activities and Values The Remarkables Park Area comprises approximately 150 hectares of perimeter urban land in the vicinity of Frankton and occupies a strategic

More information

THREE PARKS ZONE Three Parks Special Zone The process of applying for resource consents in the zone.

THREE PARKS ZONE Three Parks Special Zone The process of applying for resource consents in the zone. .25 Three Parks Special Zone The purpose of this zone is to provide for growth and to give effect to the Wanaka 2020 Community (2002) and the more recent Wanaka Structure (2007) and Wanaka Transport Strategy

More information

MVRC ARCHITECTURAL DESIGN STATEMENT

MVRC ARCHITECTURAL DESIGN STATEMENT 11251 MOONEE VALLEY RACING CLUB MAY 201 CONTENTS 0 Contents Introduction 1 Site Analysis a. Site Features b. Built form Interfaces c. Existing Streetscape d. Site Opportunities and Constraints 2 Masterplan

More information

The Proposed Auckland Unitary Plan (notified 30 September 2013)

The Proposed Auckland Unitary Plan (notified 30 September 2013) 3 Business zones Introduction There are 10 business zones in the Unitary Plan: City Centre Metropolitan Centre Town Centre Local Centre Neighbourhood Centre Mixed Use General Business Business Park Light

More information

2.0 Strategic Context 4

2.0 Strategic Context 4 2.0 Strategic Context 4 2.1 The Area Action Plan is a non-statutory plan, which forms a corporate policy document, expressing particular issues and areas of concern while also providing a vision for the

More information

H7 Open Space zones. (a) provide for the needs of the wider community as well as the needs of the community in which they are located;

H7 Open Space zones. (a) provide for the needs of the wider community as well as the needs of the community in which they are located; H7. Open Space zones H7.1. Background The majority of land zoned as open space is vested in the Council or is owned by the Crown. However some areas zoned open space are privately owned. While the open

More information

Urban Growth Boundaries

Urban Growth Boundaries Urban Growth Boundaries Discussion Document July 2008 Contents page Introduction... 3 What are urban growth boundaries?... 3 The need to manage growth... 3 Purpose of urban growth boundaries... 4 How will

More information

PHASE III: Reserved Matters Submission

PHASE III: Reserved Matters Submission Statement of Compliance with the outline approval for the proposed residential development of land at: BURGES LANE, WIVELISCOMBE PHASE III: Reserved Matters Submission Foreword Contents: This Statement

More information

BEFORE THE CHRISTCHURCH REPLACEMENT DISTRICT PLAN HEARINGS PANEL

BEFORE THE CHRISTCHURCH REPLACEMENT DISTRICT PLAN HEARINGS PANEL BEFORE THE CHRISTCHURCH REPLACEMENT DISTRICT PLAN HEARINGS PANEL IN THE MATTER of the Resource Management Act 1991 and the Canterbury Earthquake (Christchurch Replacement District Plan) Order 2014 AND

More information

D10. Outstanding Natural Features Overlay and Outstanding Natural Landscapes Overlay

D10. Outstanding Natural Features Overlay and Outstanding Natural Landscapes Overlay D10. Outstanding Natural Features Overlay and Outstanding Natural Landscapes Overlay D10.1. Background These provisions give effect to Policy 15(a) of the New Zealand Coastal Policy Statement 2010, and

More information

178 Carruthers Properties Inc.

178 Carruthers Properties Inc. 178 Carruthers Properties Inc. Planning Rationale for 178 Carruthers Avenue Site Plan Control Application June 2014 Table of Contents 1.0 Introduction 2.0 Overview of Subject Property 3.0 Current Zoning

More information

WELLINGTON HOSPITAL DESIGN GUIDE TABLE OF CONTENTS

WELLINGTON HOSPITAL DESIGN GUIDE TABLE OF CONTENTS WELLINGTON HOSPITAL DESIGN GUIDE TABLE OF CONTENTS 1.0 Introduction Page 2 The Place of Wellington Hospital 2 The Future of the Hospital 2 2.0 The Intention of the Design Guide 3 3.0 Analysis 4 General

More information

49 Broughton Avenue London N3 3EN

49 Broughton Avenue London N3 3EN Location 49 Broughton Avenue London N3 3EN Reference: 17/3448/RCU Received: 30th May 2017 Accepted: 1st June 2017 Ward: Finchley Church End Expiry 27th July 2017 Applicant: Mr P Atwal Proposal: Erection

More information

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 The Planning and Economic Development Committee recommends the adoption of the recommendations contained

More information

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN 5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN The Planning and Economic Development Committee recommends the following: 1. The communication from Brendan O Callaghan,

More information

LONDON BOROUGH OF WALTHAM FOREST

LONDON BOROUGH OF WALTHAM FOREST LONDON BOROUGH OF WALTHAM FOREST Committee/Date: Planning 5th December 2006 Application reference: Applicant: Location: Proposed development: Wards affected: Appendices: 2006/1330/OUT Mr Z Ahmed Nita Villa

More information

BLETCHLEY PARK AREA - DEVELOPMENT FRAMEWORK

BLETCHLEY PARK AREA - DEVELOPMENT FRAMEWORK ANNEX A To Item 9 REVISED TEXT: additions shown bold and underlined, deletions in (brackets and in italics). BLETCHLEY PARK AREA - DEVELOPMENT FRAMEWORK This framework sets out the key objectives and requirements

More information

B4. Te tiaki taonga tuku iho - Natural heritage

B4. Te tiaki taonga tuku iho - Natural heritage B4. Te tiaki taonga tuku iho - Natural heritage Tuia I runga, tuia i raro, tuia ki te waonui a Tiriwa Bind the life forces of heaven and earth to the great realm of Tiriwa B4.1. Issues Auckland s distinctive

More information

04Design. Methodology. Future of Jacksons Hill Identifying Potential Uses Building Typology and Adaptability Community Engagement

04Design. Methodology. Future of Jacksons Hill Identifying Potential Uses Building Typology and Adaptability Community Engagement Jacksons Hill Adaptive Re-Use Study 25 04Design Methodology Objectives Future of Jacksons Hill Identifying Potential Uses Building Typology and Adaptability Community Engagement Jacksons Hill Adaptive

More information

Case Officer: Sarah Kay File No: CHE/14/00515/REM Tel. No: (01246) Plot No: 2/6132 Ctte Date: 15 th September 2014 ITEM 1

Case Officer: Sarah Kay File No: CHE/14/00515/REM Tel. No: (01246) Plot No: 2/6132 Ctte Date: 15 th September 2014 ITEM 1 Case Officer: Sarah Kay File No: CHE/14/00515/REM Tel. No: (01246) 345786 Plot No: 2/6132 Ctte Date: 15 th September 2014 ITEM 1 APPROVAL OF RESERVED MATTERS FROM APPLICATION CHE/12/00234/OUT (1) LAYOUT,

More information

LAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017

LAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017 Page 1 of 10 EXECUTIVE SUMMARY This Land Use Amendment application seeks to redesignate a full downtown block (currently the YWCA site) from a Direct Control based on the CM-2 District (Land Use Bylaw

More information

Living in Albemarle County s Urban Places

Living in Albemarle County s Urban Places Living in Albemarle County s Urban Places ALBEMARLE COUNTY, VIRGINIA A Closer Look at Albemarle s Approach to Managing Growth and Creating Quality Urban Environments www.albemarle.org Page 2 Living in

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

King s College Proposed Private Plan Change 41 Golf Avenue, Otahuhu URBAN DESIGN ASSESSMENT

King s College Proposed Private Plan Change 41 Golf Avenue, Otahuhu URBAN DESIGN ASSESSMENT King s College Proposed Private Plan Change 41 Golf Avenue, Otahuhu URBAN DESIGN ASSESSMENT CONTENTS 1.0 EXCECUTIVE SUMMARY... 1 2.0 INTRODUCTION... 2 2.1 Purpose of document... 2 2.2 Report structure...

More information

Site Assessment Technical Document Appendix A: Glossary

Site Assessment Technical Document Appendix A: Glossary Central Bedfordshire Council www.centralbedfordshire.gov.uk Site Assessment Technical Document Appendix A: Glossary July 2017 1.1.11-1 - ii Appendix A: Glossary Term Agricultural Land Classification AONB

More information

AND STATEMENT OF EVIDENCE OF JOHN LONINK ON BEHALF OF CHRISTCHURCH CITY COUNCIL SPECIFIC PURPOSE (GOLF RESORT) ZONE

AND STATEMENT OF EVIDENCE OF JOHN LONINK ON BEHALF OF CHRISTCHURCH CITY COUNCIL SPECIFIC PURPOSE (GOLF RESORT) ZONE Page 1 of 13 BEFORE THE CHRISTCHURCH REPLACEMENT DISTRICT PLAN INDEPENDENT HEARINGS PANEL IN THE MATTER of the Resource Management Act 1991 and the Canterbury Earthquake (Christchurch Replacement District

More information

Great Easton Neighbourhood Plan Statement of Basic Conditions

Great Easton Neighbourhood Plan Statement of Basic Conditions Great Easton Neighbourhood Plan 2017-2031 Statement of Basic Conditions OCTOBER 2016 GREAT EASTON PARISH COUNCIL Contents 1.0 Introduction....Page 2 2.0 Summary of Submission Documents and Supporting Evidence..

More information

SECTION 2.4 URBAN DEVELOPMENT AND STRATEGIC URBAN DIRECTIONS

SECTION 2.4 URBAN DEVELOPMENT AND STRATEGIC URBAN DIRECTIONS SECTION 2.4 URBAN DEVELOPMENT AND STRATEGIC URBAN DIRECTIONS 2.4.1 INTRODUCTION In 1993/94 the Hastings District Council completed the Hastings Urban Development Strategy. The purpose of this study was:

More information

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN BASIC CONDITIONS STATEMENT December 2018 CEF 4 Legal Requirements This statement has been produced by the NDP Working Group on behalf of Repton Parish Council

More information

Dominion and Valley Road Mixed Use Development URBAN DESIGN / LANDSCAPE / VISUAL ASSESSMENT REPORT

Dominion and Valley Road Mixed Use Development URBAN DESIGN / LANDSCAPE / VISUAL ASSESSMENT REPORT Dominion and Valley Road Mixed Use Development URBAN DESIGN / LANDSCAPE / VISUAL ASSESSMENT REPORT Client Name: Project Name: Document Name: Document Status: Panuku Development Auckland Dominion and Valley

More information

Long Branch Neighbourhood Character Guidelines Final Report

Long Branch Neighbourhood Character Guidelines Final Report STAFF REPORT ACTION REQUIRED Long Branch Neighbourhood Character Guidelines Final Report Date: October 26, 2017 To: From: Wards: Reference Number: Etobicoke York Community Council Director, Community Planning,

More information

Planning Proposal Concurrent DA/LEP Amendment for Belmont North Pharmacy Amendment No. 24 to Lake Macquarie Local Environmental Plan (LMLEP) 2014

Planning Proposal Concurrent DA/LEP Amendment for Belmont North Pharmacy Amendment No. 24 to Lake Macquarie Local Environmental Plan (LMLEP) 2014 Planning Proposal Concurrent DA/LEP Amendment for Belmont North Pharmacy Amendment No. 24 to Lake Macquarie Local Environmental Plan (LMLEP) 2014 Local Government Area: Name of Draft LEP: Subject Land:

More information

Reference: 15/06961/RCU Received: 13th November 2015 Accepted: 17th November 2015 Ward: Coppetts Expiry 12th January 2016

Reference: 15/06961/RCU Received: 13th November 2015 Accepted: 17th November 2015 Ward: Coppetts Expiry 12th January 2016 Location 91 Manor Drive London N20 0XD Reference: 15/06961/RCU Received: 13th November 2015 Accepted: 17th November 2015 Ward: Coppetts Expiry 12th January 2016 Applicant: Mr Christos Papadopoulos Proposal:

More information

1. Assessment of Environmental Effects

1. Assessment of Environmental Effects 1. Assessment of Environmental Effects Table of Contents 1. Introduction and Overview 1 2. Statutory Assessment 3 3. Site Description 5 4. Proposal Description 7 5. Assessment of Effects on the Environment

More information

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager 4(4)(iii) 13/81 Erection of sports hall, associated changing facilities, offices

More information

D10. Outstanding Natural Features Overlay and Outstanding Natural Landscapes Overlay

D10. Outstanding Natural Features Overlay and Outstanding Natural Landscapes Overlay D10. Outstanding Natural Features Overlay and Outstanding Natural Landscapes Overlay D10.1. Background These provisions give effect to Policy 15(a) of the New Zealand Coastal Policy Statement 2010, and

More information

Wairaka Zoning and Precinct Section 32 evaluation for the Proposed Auckland Unitary Plan

Wairaka Zoning and Precinct Section 32 evaluation for the Proposed Auckland Unitary Plan Wairaka Zoning and Precinct Section 32 evaluation for the Proposed Auckland Unitary Plan 1.0 OVERVIEW AND PURPOSE This document provides an assessment of the proposed Wairaka Zoning and Precinct Provisions

More information

The Proposed Auckland Unitary Plan (notified 30 September 2013)

The Proposed Auckland Unitary Plan (notified 30 September 2013) 8 Special Purpose zones 8.1 Airport zone The Airport zone applies to the Kaipara Flats Airfield, North Shore Airfield, Auckland International Airport and Ardmore Airport. Auckland International Airport

More information

TO: Denver Planning Board FROM: Analiese Hock, Senior City Planner DATE: March 13, 2018 RE:

TO: Denver Planning Board FROM: Analiese Hock, Senior City Planner DATE: March 13, 2018 RE: Community Planning and Development Planning Services 201 W. Colfax Ave., Dept. 205 Denver, CO 80202 p: 720.865.2915 f: 720.865.3052 www.denvergov.org/cpd TO: Denver Planning Board FROM: Analiese Hock,

More information

I331. St John s Theological College Precinct

I331. St John s Theological College Precinct I331. St John s Theological College Precinct I331.1. Precinct Description The precinct contains the existing St John s Theological College which is a residential college for the Anglican Church in New

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

Former North Works, Lickey Road, Longbridge, Birmingham

Former North Works, Lickey Road, Longbridge, Birmingham Committee Date: 14/11/2013 Application Number: 2013/06431/PA Accepted: 27/08/2013 Application Type: Full Planning Target Date: 26/11/2013 Ward: Longbridge Former North Works, Lickey Road, Longbridge, Birmingham

More information

Northfield and Willowbrae Community Council

Northfield and Willowbrae Community Council Northfield and Willowbrae Community Council Head of Planning and Building Standards, Services for Communities, Waverley Court, 4 East Market Street, Edinburgh, EH8 8BG 30 Piershill Terrace, Edinburgh,

More information

Western City District What we heard

Western City District What we heard What we heard Vision to 2056 and Priorities Governance and implementation Infrastructure and funding The protection of the natural landscape including biodiversity and the Metropolitan Rural Area for food

More information

I Te Koti Taiao o Aotearoa Ōtautahi Rohe ENV-2018-CHC- Appellant. Queenstown Lakes District Council. Respondent

I Te Koti Taiao o Aotearoa Ōtautahi Rohe ENV-2018-CHC- Appellant. Queenstown Lakes District Council. Respondent In the Environment Court of New Zealand Christchurch Registry I Te Koti Taiao o Aotearoa Ōtautahi Rohe ENV-2018-CHC- Under In the matter of Between the Resource Management Act 1991 (RMA) An appeal under

More information

LEEDS SITE ALLOCATIONS PLAN MATTER 3 GREEN BELT KCS DEVELOPMENT AUGUST 2017

LEEDS SITE ALLOCATIONS PLAN MATTER 3 GREEN BELT KCS DEVELOPMENT AUGUST 2017 LEEDS SITE ALLOCATIONS PLAN MATTER 3 GREEN BELT KCS DEVELOPMENT AUGUST 2017 Smith Limited Suite 9C Joseph s Well Hanover Walk Leeds LS3 1AB T: 0113 2431919 F: 0113 2422198 E: planning@peacockandsmith.co.uk

More information

PART AOTEA PRECINCT

PART AOTEA PRECINCT CONTENTS... PAGE AOTEA PRECINCT...4 14.5.1 INTRODUCTION...4 14.5.2 RESOURCE MANAGEMENT ISSUES...4 14.5.3 RESOURCE MANAGEMENT OBJECTIVES AND POLICIES... 4 14.5.4 RESOURCE MANAGEMENT STRATEGY...5 14.5.5

More information

H10. Business Town Centre Zone

H10. Business Town Centre Zone H10. Business Town Centre Zone H10.1. Zone description The Business Town Centre Zone applies to suburban centres throughout Auckland, the satellite centres of Warkworth and Pukekohe, and the rural towns

More information

Bayview Avenue Official Plan Amendment, Zoning Amendment and Site Plan Control Applications Request for Direction Report

Bayview Avenue Official Plan Amendment, Zoning Amendment and Site Plan Control Applications Request for Direction Report STAFF REPORT ACTION REQUIRED 2425 2427 Bayview Avenue Official Plan Amendment, Zoning Amendment and Site Plan Control Applications Request for Direction Report Date: May 28, 2015 To: From: Wards: Reference

More information

AOTEA SUPERMARKET ZONE. Zone Introduction

AOTEA SUPERMARKET ZONE. Zone Introduction C18 AOTEA SUPERMARKET ZONE Zone Introduction C18.1 Objective This zone identifies a specific area in Aotea for a stand alone supermarket. The zone is site specific and has a range of objectives, policies

More information

Urban Design Expert Evidence Leanne Hodyl

Urban Design Expert Evidence Leanne Hodyl Fishermans Bend GC81 Panel Hearing Urban Design Expert Evidence Leanne Hodyl 14 March 2018 1 Fishermans Bend GC81 Panel Hearing - Urban Design Expert Evidence Leanne Hodyl Overview 1. Role of the Urban

More information