1 A16 Ecology: Application 2 - LBHF Addendum to the Environmental Statement Volume I January 2012

2 Introduction A16.1 This Chapter of the Addendum to the June 2011 Environmental Statement (ES) (hereafter referred to as the ES Addendum ) considers the amendments that have been made to the Earls Court Development Proposals in the context of ecology. Consideration is given to the changes that have been made to the outline elements of the Earls Court Development Proposals, in addition to the submission of details in relation to scale, layout and appearance of development plots WV01, WV02 and WV05 and their subsequent potential affect on the likely impacts to ecology defined within the June 2011 ES (Volume I). A16.2 In addition, as appropriate, additional environmental information and clarifications are provided within this ES Addendum Chapter as a result of consultation responses received to date on this technical aspect of the ES. A16.3 This Chapter of the Addendum has been prepared by URS Infrastructure & Environment UK Limited, who has used professional judgment in determining whether the alterations to the Earls Court Development Proposals will result in any changes to the residual impacts of the Earls Court Development Proposals on ecology as identified within the June 2011 ES (Volume I). Summary of the Conclusions of the June 2011 Environmental Statement A16.4 Chapter 16: Ecology of the June 2011 ES (Volume I) considers the potential impact of the Earls Court Development Proposals (Development Option (Site Wide)) on ecology. Development Option (Site Wide) results in the redevelopment of the entire Earls Court Site. A16.5 Chapter 16: Ecology of the June 2011 ES (Volume I) summarises the relevant legislative and planning policy context (as of June 2011); describes the baseline conditions currently existing across the Earls Court Site and in the immediate vicinity; the potential impacts arising from the Earls Court Development Proposals; and presents the required mitigation measures necessary to remove or reduce significant adverse ecological impacts. A16.6 The assessment presented within Chapter 16: Ecology of the June 2011 ES (Volume I) has been undertaken in accordance with the standards specified by the Institute for Ecology and Environmental Management (IEEM) (Ref. A16-1). A16.7 The Earls Court Site does not fall within any ecological statutory site designations. There are two non-statutory designated sites within the Earls Court Site (The West London and District Line and the West London Line South of Earls Court) which are Sites of Borough Importance for Nature Conservation (SBINC). West Brompton Cemetery is also a SBINC but is located circa 50m to the southeast of the Earls Court Site. A16.8 Receptors present, or potentially present, on the Earls Court Site that may be impacted by the Earls Court Development Proposals are; the existing green corridor, neutral grassland, other habitats present (e.g. parkland / scattered trees, introduced scrub and amenity grassland) bats, black redstart, breeding birds, reptiles, invertebrates and other mammals e.g. fox. June 2011 Summary of Residual Impacts to Ecology A16.9 Chapter 16: Ecology of the June 2011 ES (Volume I) concludes that with the implementation of a landscape and mitigation strategy, the potential adverse impacts of demolition, construction and through the completion and operation of the Earls Court Development Proposals on ecological receptors on-site will be reduced to residual impacts of between negligible and minor beneficial significance. Features that have been incorporated into the landscaping strategy will also mitigate for the loss of habitats within the West London and District Line and West London Line South of Earls Court SBINC. June 2011 Cumulative Impact Assessment A16.10 In addition to the assessment of the Earls Court Development Proposals alone, Chapter 16: Ecology of the June 2011 ES (Volume I) considers the potential for cumulative impacts. The following Cumulative Impact Assessment Scenarios are considered: SCENARIO 1: The Earls Court Development Proposals with other Cumulative Schemes; and SCENARIO 2: The Earls Court Development Proposals PLUS the Seagrave Road Development Proposals PLUS other Cumulative Schemes. A16.11 Each of these scenarios is discussed in more detail below. SCENARIO 1: The Earls Court Development Proposals PLUS Cumulative Schemes A16.12 The Earls Court Development Proposals in combination with the other cumulative schemes will result in an overall greening of the local area, as well as enhancement to the ecology at the Earls Court Site itself. The Earls Court Development Proposals in conjunction with the other cumulative schemes would contribute towards beneficial cumulative impacts on the local ecology. SCENARIO 2: The Earls Court Development Proposals PLUS Seagrave Road Development Proposals PLUS other Cumulative Schemes A16.13 The Seagrave Road Development Proposals will include a level of biodiversity enhancements (Ref. A16-2). The Earls Court Development Proposals in addition to other cumulative schemes within 1km of the Earls Court Site and the emerging Seagrave Road Development Proposals will therefore result in an overall greening of the local area. Both the Earls Court and Seagrave Road Development Proposals and the other cumulative schemes would contribute towards beneficial cumulative impacts on the local ecology. Further Information and Clarifications as a Result of Consultation A16.14 The following sections of this Chapter of the ES Addendum either provide further environmental information or present clarifications on the information presented within Chapter 16: Ecology of the June 2011 ES (Volume I) as a result of consultation on the ES. The full consultation comments and the Applicant s responses can be found within the Addendum to ES Volume III: Appendix B. The distinction between the provision of further environmental information or clarifications is made in the following sections of this Chapter. Clarification on the Basis of the Impact Assessment & Testing of the Maximum and Minimum Parameters A16.15 The ecological impact assessment undertaken of the June 2011 Earls Court Development Proposals was based on the proposed landscaping strategy for the Earls Court Site. Whilst indirectly the landscape strategy is dependent on the parameters (in terms of the amount of open space created by the Development Proposals), the principles of the landscaping strategy in terms of ecological mitigation measures and enhancements are independent of the parameters and the amount of development proposed. A16.16 The landscape strategy has been amended to incorporate details of layout, scale and appearance for buildings proposed within development plots WV01, WV02 and WV05; however the key principles of the landscaping strategy have not changed. A16.17 The key principles of the landscaping strategy that are relevant to the ecological impact assessment are as follows: No net loss of trees; Creation of wet woodland within the Lost River Gardens of 2200m2 and made up of species including alder and ash; Creation of native multispecies hedges; Provision of vertical greenery on buildings where practicable; A16-1

3 Extensive green roofs will be implemented on all roofs larger than 100m 2 that are either flat or gently sloped, making up at least 75% of the roof space of these roofs. Semi extensive green roofs such as brown roofs and sedum will be implemented on all smaller roofs; Creation of amenity grassland, species rich grassland and wildflower meadows; Creation of a minimum area of 450m 2 of neutral grassland; Provision of boxes for birds and bats; Incorporation of deadwood into the landscaping at both ground and roof level for stag beetles, hedgehog and reptiles; Creation of freshwater habitats (ponds and bird basins); and Creation of linear habitats for example the Lost River Gardens (of circa 20,000m 2 ). A16.18 The only change to the principles behind the landscaping strategy proposed by the revised Earls Court Development Proposals that is relevant to ecology is the area of extensive green roofs that will be implemented. Within the June 2011 ES it was stated that all roofs larger than 100m 2 that are either flat or gently sloped will have extensive green roofs, making up at least 75% of the roof space on these roofs (equivalent to a total of 15,800m 2 of roof space). This area has been amended as part of the revised Planning Applications; the extensive green roofs will now make up a total of 16,000m 2 of roof space of those that are either flat or gently sloped and are larger than 100m 2. This equates to 15 % of the illustrative master plan building footprint, whereas the previous extensive green roof space equated to 14% of the illustrative master plan building footprint. A16.19 It is considered that the ecological impact assessment based on the key principles of the proposed landscaping strategy, both in relation to the June 2011 Earls Court Development Proposals and as considered in this ES Addendum for the revised Earls Court Development Proposals presents a robust assessment of the likely impacts to ecology. Irrespective of the parameters, the key principles behind the landscape strategy remain applicable to the revised Earls Court Development Proposals. Further Assessment of Impacts Pre Mitigation A16.20 Table A16-1 below presents the pre-mitigation ecological impact assessment. Further Assessment of Residual Impacts (Post Mitigation) A16.21 Table A16-2 summarises the residual impacts of the Earls Court Development Proposals which have been revised to take into account of comments received from consultees. Specifically, the revised impact assessment accounts for the ecological enhancements associated with the landscaping strategy on completion and occupation of the Earls Court Development Proposals rather than both throughout the deconstruction, demolition and construction phases and on completion and occupation. The assessment of residual impacts takes into account the new habitats created through the landscaping strategy that will mitigate for some of the habitats lost to the development and provide new habitats for species which currently use the site and which may be displaced when their habitats are removed. It is acknowledged that the new habitats will not be fully instated or of value to animals until the operational phase of the development and therefore will not mitigate for impacts incurred in the site preparation, deconstruction, demolition and construction phase. Table A16-1 Ecology Impact Assessment (Pre Mitigation) January 2012 Ecological Receptor West London and District Line West London Line south of Earls Court West Brompton Cemetery Green corridor Neutral grassland Other habitats present Bats Black redstart Common breeding birds Reptiles Invertebrate assemblage Stag beetle Other mammals Nature of Impact Site Preparation, Deconstruction / Demolition & Construction Impact (Pre Mitigation) Completed & Occupied Development Impact (Pre Mitigation) Minor beneficial Overshadowing Overshadowing Minor adverse Minor adverse A16-2

4 Table A16-2 Ecology Residual Impact Assessment (Post Mitigation) January 2012 Ecological Receptor Nature of Impact Mitigation *Site Preparation, Deconstruction / Demolition & Construction Residual Impact **Completed & Occupied Development Residual Impact West London and District Line West London Line South of Table Earls A16-2 Habitat Residual Creation Ecology Impact Assessment (Post Mitigation) January 2012 Court Overshadowing None Required West Brompton Cemetery Green corridor Neutral grassland Other habitats present Bats Black redstart Other Breeding birds Reptiles Invertebrate assemblage Stag beetle Other Mammals Overshadowing None Required Check mature trees and buildings with bat potential prior to removal* Landscaping Strategy and bat boxes** Sensitive lighting of adjacent habitats** Site will not be left dormant for over two weeks during the nesting season, or the site will be checked for the presence of black redstarts*. Vegetation and building clearance undertaken outside the bird-breeding season or under watching brief*. Vegetation removed slowly and potential hibernacula dismantled by hand*. Bi-annual monitoring** Removal of dead wood sensitively* Removing burrows sensitively and covering excavations at night/providing planked escape routes for trapped wildlife. Liquids stored securely*.. Further Assessment of Cumulative Impacts on Ecology Combined Effects of Individual Impacts (Type 1) A16.22 A review of the combined effects of individual impacts on identified sensitive receptors has been undertaken. A16.23 An exercise which tabulates the residual impacts stated in the June 2011 ES (Volume I) against relevant receptors has been completed, and the potential for impact interactions and so combined cumulative effects has been identified. A16.24 This is presented within Chapter A18: Cumulative Impact Assessment of this ES Addendum. Cumulative Impacts with Other Schemes (Type 2) A16.25 Further information is provided below in the January 2012 review of the cumulative impact assessment. Review of Planning Policy Context A16.26 Chapter 16: Ecology of the June 2011 ES (Volume I) summarises the relevant legislative and planning policy context (as of June 2011). Consideration is given to national and regional planning policy; and local planning policy of relevance to the London Borough of Hammersmith and Fulham (LBHF). In addition, the Chapter considers the local policy context of the Royal Borough Kensington and Chelsea (RKBC) with respect to ecology. Whilst Application 2 is for LBHF determination, the Earls Court Site straddles the borough boundary of the LBHF and the RBKC. National Planning Policy A16.27 The review of the national planning policy context (as presented in the June 2011 ES) remains valid and so applicable to the revised Planning Applications for the Earls Court Development Proposals. In July 2011, a draft of the National Planning Policy Framework (Ref. A16-3) (NPPF) was issued for consultation. Page 46 of the draft NPPF concerns the Natural Environment. The Government s objective is that planning should help to deliver a healthy natural environment for the benefit of everyone and safe places which promote wellbeing. A16.28 The draft National Planning Policy Framework states that to achieve this objective, the planning system should aim to conserve and enhance the natural and local environment by: protecting valued landscapes; minimising impacts on biodiversity and providing net gains in biodiversity, where possible; and preventing both new and existing development from contributing to or being put at unacceptable risk from, or being adversely affected by unacceptable levels of land, air, water or noise pollution or land instability. A16.29 The draft NPPF states that planning policies should: take account of the need to plan for biodiversity at a landscape-scale across local authority boundaries identify and map components of the local ecological networks, including: international, national and local sites of importance for biodiversity, and areas identified by local partnerships for habitat restoration or creation promote the preservation, restoration and re-creation of priority habitats, ecological networks and the recovery of priority species populations, linked to national and local targets13; and identify suitable indicators for monitoring biodiversity in the plan; and aim to prevent harm to geological conservation interests. A16.30 The draft NPPF confirms that opportunities to incorporate biodiversity in and around developments should be encouraged. Regional Planning Policy A16.31 In July 2011, The London Plan: Spatial Development Strategy for Greater London was adopted (Ref. A16-4). This endorses the protection of land of strategic importance for biodiversity and stresses the requirement for development proposals to include new or enhanced natural habitats, or design and landscaping that promotes biodiversity, the greening of the built environment and associated provision for its management. There are no major changes in the A16-3

5 adopted London Plan to the Biodiversity and Access to Nature or Trees and Woodlands policies referred to within the June 2011 ES which will affect the revised Planning Applications for the Earls Court Development Proposals. A16.32 In November 2011, the LBHF, the RBKC and the GLA issued a revised draft of the Earl s Court and West Kensington Opportunity Area Supplementary Planning Document (Ref. A16-5). Key Principle ENV18 and ENV 19 of the revised draft SPD requires development to protect and enhance ecology and biodiversity with no net loss of species or habitat and requires major planning applications to be accompanied by an Ecological Impact Assessment, including an ecological enhancement strategy. It is acknowledged that an ecological management plan will also be required through any Section 106 agreement. A16.33 The revised draft has been prepared having regard to the LBHF and RBKC Ecological Aspirations Report, 2010 (Ref. A16-6). As reported within the June 2011 ES, the Ecological Aspirations Report outlines specific aspirations for the Earls Court and West Kensington Opportunity Area. It states that the two core requirements relating to the development site are to audit and monitor the ecological status of habitats and species and to protect and enhance the biodiversity resource, by improving the quality of the local environment through the protection of important wildlife sites, the creation and enhancement of habitats, and the incorporation of green infrastructure through innovative design. A16.34 All the other regional planning policy documents considered within Chapter 16: Ecology of the June 2011 ES (Volume I), specifically, the Mayor s Biodiversity Strategy, 2002 (Ref. A16-7) and the London Biodiversity Action Plan, 2004 (Ref. A16-8) remain applicable to the revised Planning Applications for the Earls Court Development Proposals. Local Planning Policy A16.35 Since June 2011, the LBHF has adopted their Core Strategy. The LBHF Core Strategy (Ref. A16-9) was adopted on the 19th October Strategic Objective 15 of the Core Strategy states that the borough will seek to Protect and enhance the borough s open green spaces and create new parks and open spaces where there is major regeneration, promote biodiversity and protect private gardens. A16.36 All the other local planning policy documents considered within Chapter 16: Ecology of the June 2011 ES (Volume I), specifically the LBHF Parks and Open Spaces Strategy, (Ref. A16-10), the LBHF Biodiversity Action Plan, (Ref. A16-11), the RBKC Core Strategy, 2010 (Ref. A16-12) and the RBKC Biodiversity Action Plan, 2010, (Ref. A16-13) remain applicable to the revised Planning Applications for the Earls Court Development Proposals. Review of the Baseline Conditions A16.37 The ecology baseline surveys were conducted in 2009, 2010 and Ecology survey data is generally regarded to be valid for up to two years and it is therefore considered that the baseline information presented in Chapter 16: Ecology of the June 2011 ES (Volume I) remains valid. Within the June 2011 submission it was stated that clearance works on site associated within the Northern Access Road area were underway, and due to be completed in September These clearance works are now complete; they were completed in September 2011 as indicated within the June 2011 submission. With the exception of this update, the baseline conditions of the Earls Court Site have not changed. A16.38 The Institute for Ecology and Environmental Management (IEEM) EcIA guidelines set out the methodology for evaluating habitats and species and these have not been updated since The evaluation of ecological receptors presented within the June 2011 ES (Volume 1) remains valid and applicable to the revised Earls Court Development Proposals. Review of the Impact of the Design Changes A16.39 The design changes and amendments to the Planning Applications are described fully in Chapter 4: The Design Changes. A16.40 The landscape strategy has been amended to incorporate details of layout, scale and appearance for buildings proposed within development plots WV01, WV02 and WV05; however the key principles of the landscaping strategy have not changed. The only change to the principles behind the landscaping strategy proposed by the revised Earls Court Development Proposals that is relevant to ecology is the area of extensive green roofs that will be implemented. Within the June 2011 ES it was stated that all roofs larger than 100m 2 that are either flat or gently sloped will have extensive green roofs, making up at least 75% of the roof space on the flat or gently sloped roofs (equivalent to a total of 15,800m 2 of roof space). This area has been amended as part of these revised Planning Applications; the extensive green roofs will now make up a total of 16,000m 2 of roof space of those that are either flat or gently sloped and are larger than 100m 2. This equates to 15 % of the revised illustrative master plan building footprint, whereas the previous extensive green roof space equated to 14% of the illustrative master plan building footprint. A16.41 This will result in slight increase in green roof space than that proposed as part of the June 2011 ES, and will still result in the minor beneficial impacts proposed in Table A16-2 above. January 2012 Potential Impacts & Mitigation Measures A16.42 In light of the changes made to the outline elements of the Planning Applications, in addition to the submission of details in relation to scale, appearance and layout of development plot WV01, WV02 and WV05, the proposed mitigation strategy remains unchanged from that presented within the June 2011 ES (Volume I) and therefore remains applicable to the revised Earls Court Development Proposals. January 2012 Residual Impact Assessment A16.43 The residual impacts of the revised Earls Court Development Proposals to ecology range from minor adverse to negligible through the site preparation, deconstruction, demolition and construction period. Once the Earls Court Development Proposals are complete and operational, residual impacts range from negligible to minor beneficial significance. This is as presented above in Table A16-2 Ecology Residual Impact Assessment January A16.44 It is acknowledged that the ecological mitigation and landscaping strategy do not go into specifics in relation to bat and bird boxes, green roofs and external lighting. It is considered that the details of these elements of the ecological mitigation and landscaping strategy can be agreed at the reserved matters stage of planning, with the required details to be secured through an appropriately worded planning condition. Review of the Cumulative Impact Assessment SCENARIO 1: The Earls Court Development Proposals with Cumulative Schemes A16.45 A review of the Cumulative Schemes that were considered within the June 2011 Cumulative Impact Assessment has been undertaken. The following amendment and two additional schemes are acknowledged: Amendment: Hammersmith Embankment residential led scheme 2011/00407/COMB, resolution to grant 23 September 2011; Additional cumulative scheme: Fulham Wharf, 51 Townmead Road, SW6 2SY 2010/02481/FUL resolution to grant 5 July 2011; and Additional cumulative scheme: Westfield mixed use retail and residential led extension to the existing Westfield London shopping centre 2011/02940/OUT submitted for planning. A16.46 Table A16-3 outlines the predicted cumulative impacts on ecological receptors identified in Table A16-1 with respect to each Cumulative Scheme, including the amended scheme and additional schemes as outlined above, where the information required is available. Where sufficient information was not available this is also stated. Ecological receptors that could be subject to cumulative impacts with respect to each Cumulative Scheme are identified. A16.47 The other Cumulative Schemes include features beneficial to wildlife such as tree planting and other soft landscaping. Ten of the schemes include proposals for green or brown roofs which provide opportunities for black redstart, other birds and invertebrates. Furthermore, five of the schemes propose to incorporate bat boxes which will add additional bat roosting habitats to those supplied by the Earls Court Development Proposals. A16.48 It should be noted that ecological enhancement details for three of the Cumulative Schemes were not available and so these schemes are not included in the assessment of cumulative impacts, as shown in Table A16-3 below. The A16-4

6 schemes not included are Warwick Road; 90 Bagley s Lane; and G-Gate, Olympia, Corner of Lyons Walk and Hammersmith Road. A16.49 The residual impact on the habitats present as a result of the Earls Court Development Proposals is minor beneficial, with the Cumulative Schemes contributing further to the greening of the local area, through tree planting and other features. However, the cumulative impact on the habitats is considered to remain minor beneficial. A16.50 The residual impacts on bats, black redstart and the invertebrate assemblage as a result of the Earls Court Development Proposals are negligible (Table A16-1). Considering the inclusion of appropriate features within a number of the Cumulative Schemes (Table A16-3) that will individually provide a beneficial impacts with respect to these ecological receptors, it is considered that the cumulative impact on these receptors is minor beneficial. This conclusion has been drawn on the assumption that no significant residual impacts are expected on these receptors from the Warwick Road; 90 Bagley s Lane; and G-Gate, Olympia, Corner of Lyons Walk and Hammersmith Road Cumulative Schemes; in these cases, insufficient information is available to determine what the residual impacts of these cumulative developments will be. SCENARIO 2: The Earls Court Development Proposals PLUS the Seagrave Road Development Proposals PLUS other Cumulative Schemes. A16.51 A revised planning application has been submitted in relation to the Seagrave Road Development Proposals. This scheme includes areas of brown and green roofs, the planting of wet woodland, trees, grassland and hedges. It also proposes the incorporation of a number of bat and bird boxes. All of these features will provide additional habitats to those proposed by the Earls Court Development Proposals and other Cumulative Schemes. It is expected that invertebrates, bats and birds (including black redstarts) in particular will benefit from these enhancements. A16.52 The cumulative impact assessment of the Earls Court Development Proposals, plus the Seagrave Road Development Proposals plus the other Cumulative Schemes (including the amendment to the scheme on Hammersmith Embankment and the additional scheme at Fulham Wharf, as noted above) has been revised, to account for the additional details provided within Table A16-3. A16.53 To summarise, the cumulative impact on the habitats present, bats, black redstart, other breeding birds, and invertebrate assemblage in conjunction with the Cumulative Schemes and Seagrave Road Development Proposals remains as being of minor beneficial significance. Conclusions A16.54 The design changes made to the outline elements of the Planning Applications in addition to the submission of details in relation to scale, appearance and layout of development plots WV01, WV02 and WV05 have no material impact on the significance of the impacts to ecology and so the resultant mitigation strategy and overall conclusions presented within Chapter 16: Ecology of the June 2011 ES. The conclusions of the June 2011 ES therefore remain applicable to the revised Earls Court Development Proposals. Table A16-3 Ecology & Biodiversity Details used in the Cumulative Impact Assessment Cumulative Scheme Relevant Ecological Receptor Cumulative Impact Assessment Westfield mixed use retail and residential led extension to the existing Westfield London shopping centre Fulham Wharf, 51 Townmead Road Habitats present, breeding birds and bats. Habitats present, bats, black redstart and other breeding birds No potential adverse impacts. Landscaping will include amenity grassland, ornamental shrubs, ground cover and hedgerows, Green and brown roofs will be installed as well as bird and bat boxes. Vegetated open space will be provided, as well as an ecology platform/garden (the jetty). Brown roofs and bat and bird boxes are also proposed Warwick Road Potential impacts and landscaping unknown. Ibis Hotel, 47 Lillie Road Habitats present and other breeding birds Tree planting and proposed gardens will contribute towards a beneficial impact. 72 Farm Lane, London Habitats present Amenity space and green roofs will contribute towards a beneficial impact. 90 Bagley s Lane Potential impacts and landscaping unknown. Holiday Inn Express, 295 North End Road Olympia Exhibition Centre, Hammersmith Road Odeon Cinema, Kensington High Street Charles House, 375 Kensington High Street and the Radnor Arms, 247 Warwick Road G-Gate, Olympia, Corner of Lyons Walk and Hammersmith Road Telephone Exchange, Warwick Road The Commonwealth Institute, Kensington High Street Car Park adjacent to Hammersmith & City Line Station Extension of the Chelsea Harbour Design Centre, Chelsea Harbour Hammersmith Palais Hammersmith Embankment Imperial Wharf, Townmead Road including land bounded by Imperial Road, Fulham Gasworks and Railway Line and Imperial Wharf J2 Land adjacent to south side of Chelsea Creek Habitats present and other breeding birds Habitats present Other breeding birds and bats Habitats present, other breeding birds and invertebrate assemblage Black redstart and invertebrate assemblage Habitats present, black redstart, other breeding birds, bats and invertebrate assemblage Black redstart, invertebrate assemblage and other breeding birds 100 West Cromwell Road Former TA Site Homebase, 195 Warwick Road Earls Court Link Road Habitats present, other breeding birds and bats Green roof and green screen will be provided, but unclear as to whether this provides mitigation or an ecological enhancement. Some soft landscaping will be provided, but unclear as to whether this provides mitigation or an ecological enhancement. Tree planting and new landscape planting within the private apartment area and in the gardens for the townhouses will contribute towards a beneficial impact. Street tree planting and a linear park will mitigate impacts as a result of the development only. Potential impacts and landscaping unknown. Planting of tree, shrubs and understory will contribute towards a beneficial impact. An area of approximately 3,000m 2 will be planted with a woodland structure, comprising herb, shrub and tree layers. Bird boxes and roosting habitat for bats, comprising bat boxes, bat bricks and/or bat houses are also proposed. These features will contribute towards a beneficial impact. The planting of trees and provision of green roofs will contribute towards a beneficial impact. Pockets of planting and greenery will be introduced; however it is unclear as to whether these features provide mitigation or an ecological enhancement. Brown roofing is proposed, which will contribute towards a beneficial impact. Brown roofs proposed, as well as bird boxes for black redstart. Bird boxes will be installed for other bird species, as well as bat boxes. Moderate beneficial impact predicted with respect birds and bats, contributing to a beneficial impact. Minor beneficial impact predicted with respect to habitats and invertebrates. Parkland corridor, with a range of habitat types, extension of the Former British Gas Pond Grade 1 Site of Borough Importance for Nature Conservation and green roofs will contribute towards a beneficial impact. A series of tree lined terraces and reed beds are proposed. However, it is unclear as to whether these features provide mitigation or an ecological enhancement. Planting of native trees, inclusion of bird and bat boxes as well as green roofing will mitigate potential impacts as a result of the development. New public linear park and green roof, but unclear whether this provides mitigation or an ecological enhancement. Native tree planting and proposed buildings will incorporate bat roosting habitat, which will contribute towards a beneficial impact. Removal of vegetation within part of the SBINC, resulting in a minor adverse impact on West London and District Line SBINC and the green corridor. However, this will not affect the significance of the residual impact on this receptor as a result of the Earls Court Development Proposals A16-5

7 References A16-1 IEEM 2006; Guidelines for Ecological Impact Assessment. A16-2 URS Scott Wilson on behalf of EC Properties limited, November 2011; Seagrave Road Environmental Statement Addendum Volume I. A16-3 Communities and Local Government, July 2011; Draft National Planning Policy Framework, July A16-4 GLA, 2011; The London Plan Spatial Development Strategy for Greater London, July A16-5 Greater London Authority / LBHF / RBKC, November 2011; Revised Draft Earls Court and West Kensington Opportunity Area Supplementary Planning Document. A16-6 LBHF and RBKC, (2010); Earls Court and West Kensington Opportunity Area - Ecological Aspirations. A16-7 GLA (2002); Connecting with London s Nature: The Mayor s Biodiversity Strategy. A16-8 London Biodiversity Partnership, (2004); London Biodiversity Action Plan. GLA, London. A16-9 London Borough of Hammersmith & Fulham, 2011; Core Strategy A16-10 LBHF, (2003); Parks and Open Spaces Strategy Technical Document. A16-11 LBHF, (2004); Biodiversity Action Plan A16-12 Royal Borough of Kensington and Chelsea, 2010; Core Strategy A16-13 RBKC, (2010); Local Biodiversity Action Plan 2010/11 to 2014/15. A16-6

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

Planning Area Committee 25 June 2018 Addendum to Officers Report RESTRICTION OF PERMITTED DEVELOPMENT RIGHTS - EXTENSIONS

Planning Area Committee 25 June 2018 Addendum to Officers Report RESTRICTION OF PERMITTED DEVELOPMENT RIGHTS - EXTENSIONS Planning Area Committee 25 June 2018 Addendum to Officers Report 17/8150/RMA West Hendon Regeneration Area (Phase 6) Pages 11 54 The conditions section shall be changed as follows: RESTRICTION OF PERMITTED

More information

ECOLOGICAL ADVICE SERVICE

ECOLOGICAL ADVICE SERVICE ECOLOGICAL ADVICE SERVICE TO: FROM: Guy Wilson Marie Thibault DATE: 11 th August 2016 SUBJECT: CA/16/01502/FUL / Land adjoining Goose Farm, Canterbury Thank you for requesting advice on this application

More information

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY NON-TECHNICAL SUMMARY THE HIDE, BISHOP AUCKLAND PROPOSED ECO CHALET DEVELOPMENT NON-TECHNICAL SUMMARY 1 Introduction 1.1.1 This non-technical summary for the (ES) prepared in relation to the proposed eco-chalet

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

E16: MAINTENANCE OF LANDSCAPED AREAS

E16: MAINTENANCE OF LANDSCAPED AREAS HIGH SPEED TWO INFORMATION PAPER E16: MAINTENANCE OF LANDSCAPED AREAS This paper outlines the proposed approach to the maintenance of landscaped areas created for HS2 Phase One. It will be of particular

More information

Watford Local Plan Part 2 Publication Stage Environmental Report. Appendix 3: Consultation Comments

Watford Local Plan Part 2 Publication Stage Environmental Report. Appendix 3: Consultation Comments Watford Local Plan Part 2 Publication Stage Environmental Report Appendix 3: Consultation Comments August 2016 Appendix 3 - Responses to Consultation of the Local Plan Part 2 As required by the SEA Directive,

More information

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Greenbank Partnerships Ltd October 2012 Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Environmental Statement - Non Technical

More information

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation REPRESENTATIONS... Plumpton Parish Council Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation Representations submitted on behalf of: Cala Homes (South

More information

17A. Wind Microclimate

17A. Wind Microclimate 17A. Wind Microclimate 17A.1 Introduction 17A.1.1 17A.1.2 17A.1.3 17A.1.4 This Chapter, which has been prepared by Waterman and BMT, provides further information with regard to the potential wind microclimate

More information

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2

More information

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics

More information

Reference: 16/1447/FUL Received: 7th March 2016 Accepted: 7th March 2016 Ward: East Finchley Expiry 2nd May 2016

Reference: 16/1447/FUL Received: 7th March 2016 Accepted: 7th March 2016 Ward: East Finchley Expiry 2nd May 2016 Location 374B Long Lane London N2 8JX Reference: 16/1447/FUL Received: 7th March 2016 Accepted: 7th March 2016 Ward: East Finchley Expiry 2nd May 2016 Applicant: Ms Katrin Hirsig Proposal: Single storey

More information

London Road, Derker. Non Technical Summary. Introduction

London Road, Derker. Non Technical Summary. Introduction London Road, Derker Non Technical Summary Introduction The Oldham Rochdale Housing Market Pathfinder was set up to tackle longstanding problems of poor quality housing and to provide the framework for

More information

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts Chapter 4 Route Window C12: Mile End Park and Eleanor Street Shafts 48 Crossrail Amendment of Provisions 4 Route Window C12: Mile End Park and Eleanor Street Shafts Location plan of Mile End Park and Eleanor

More information

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433 LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY March 2017 Our Ref: Q70433 Contents 1 INTRODUCTION AND SITE DESCRIPTION... 1 2 EIA METHODOLOGY... 5 3 ALTERNATIVES... 6 4 DESCRIPTION

More information

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP LAND AT WEST YELLAND Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP May 2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft FINAL Date

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

Garages To Rear Of The Willows 1025 High Road London N20 0QE

Garages To Rear Of The Willows 1025 High Road London N20 0QE Location Garages To Rear Of The Willows 1025 High Road London N20 0QE Reference: 15/03944/FUL Received: 25th June 2015 Accepted: 2nd July 2015 Ward: Totteridge Expiry 27th August 2015 Applicant: Mr Alex

More information

Barvills Solar Farm Environmental Statement Non-Technical Summary

Barvills Solar Farm Environmental Statement Non-Technical Summary Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

Sustainability Statement. Whitby Business Park Area Action Plan

Sustainability Statement. Whitby Business Park Area Action Plan Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan

More information

Proposed Residential Development at Church Stile Farm in Cradley, Herefordshire. Hazel Dormouse Surveys

Proposed Residential Development at Church Stile Farm in Cradley, Herefordshire. Hazel Dormouse Surveys Proposed Residential Development at Church Stile Farm in Cradley, Herefordshire A report to: Terra Strategic BSL Strategic Ltd. 2 The Courtyard 707 Warwick Road Solihull B91 3DA By: Udall-Martin Associates

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities)

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities) SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 12 January 2011 AUTHOR/S: Executive Director (Operational Services) Corporate Manager (Planning and New Communities) Notes: S/1848/10

More information

Policy DM19: Development and Nature Conservation

Policy DM19: Development and Nature Conservation Avonmouth Wetland Habitat Project October 2010 and December 2011 (the Cresswell study). Policy Links Bristol Local Plan Core Strategy Lead Policy BCS4: Avonmouth and Bristol Port BCS9: Green Infrastructure

More information

Moat Lane Regeneration Project Environmental Statement

Moat Lane Regeneration Project Environmental Statement AECOM Environment Towcester Regeneration Ltd. October 2012 Moat Lane Regeneration Project Environmental Statement Non-Technical Summary Prepared by:... Checked by:... Sophie Collins Scott Wilson Environmental

More information

REFERENCE: B/03745/12 Received: 02 October 2012 Accepted: 05 October 2012 WARD(S): Totteridge Expiry: 30 November 2012.

REFERENCE: B/03745/12 Received: 02 October 2012 Accepted: 05 October 2012 WARD(S): Totteridge Expiry: 30 November 2012. LOCATION: 15A Pyecombe Corner, London, N12 7AJ REFERENCE: B/03745/12 Received: 02 October 2012 Accepted: 05 October 2012 WARD(S): Totteridge Expiry: 30 November 2012 Final Revisions: APPLICANT: PROPOSAL:

More information

ECOLOGY DUE DILIGENCE REPORT

ECOLOGY DUE DILIGENCE REPORT ECOLOGY DUE DILIGENCE REPORT Saunderton Data Centre GP Limited, Haw Lane, Saunderton November 2010 Our Ref: JSL1776-R-003 RPS Lakesbury House Hiltingbury Road Chandlers Ford Hampshire SO53 5SS Tel: 0238

More information

STATEMENT OF COMMON GROUND (CD/H01) LAND ADJ A385 TOTNES ROAD COLLATON ST MARY APPEAL REFERENCE: APP/X1165/A/14/

STATEMENT OF COMMON GROUND (CD/H01) LAND ADJ A385 TOTNES ROAD COLLATON ST MARY APPEAL REFERENCE: APP/X1165/A/14/ STATEMENT OF COMMON GROUND (CD/H01) LAND ADJ A385 TOTNES ROAD COLLATON ST MARY APPEAL REFERENCE: APP/X1165/A/14/2214154 APPEAL BY TAYLOR WIMPEY (EXETER) LIMITED LOCAL PLANNING AUTHORITY TORBAY COUNCIL

More information

49 Broughton Avenue London N3 3EN

49 Broughton Avenue London N3 3EN Location 49 Broughton Avenue London N3 3EN Reference: 17/3448/RCU Received: 30th May 2017 Accepted: 1st June 2017 Ward: Finchley Church End Expiry 27th July 2017 Applicant: Mr P Atwal Proposal: Erection

More information

2014/0590 Reg Date 26/06/2014 Chobham

2014/0590 Reg Date 26/06/2014 Chobham 2014/0590 Reg Date 26/06/2014 Chobham LOCATION: PROPOSAL: TYPE: APPLICANT: OFFICER: ASCOT PARK POLO CLUB, WESTCROFT PARK FARM, WINDLESHAM ROAD, CHOBHAM, WOKING, GU24 8SN Erection of a two storey detached

More information

Non-Technical Summary

Non-Technical Summary Introduction The Brent Cross Cricklewood regeneration scheme is located in northwest London and comprises 151 hectares (ha) of land within the London Borough of Barnet (LBB) (the Site ). In July 2014,

More information

Former North Works, Lickey Road, Longbridge, Birmingham

Former North Works, Lickey Road, Longbridge, Birmingham Committee Date: 14/11/2013 Application Number: 2013/06431/PA Accepted: 27/08/2013 Application Type: Full Planning Target Date: 26/11/2013 Ward: Longbridge Former North Works, Lickey Road, Longbridge, Birmingham

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

NON TECHNICAL SUMMARY

NON TECHNICAL SUMMARY NON TECHNICAL SUMMARY INTRODUCTION NTS.1 CEMEX UK Properties Limited is applying for planning permission to South Cambridgeshire District Council (SCDC) for the redevelopment of the former CEMEX cement

More information

Land at Whiteditch Lane, Newport, Essex

Land at Whiteditch Lane, Newport, Essex Land at Whiteditch Lane, Newport, Essex Ecology Report Produced for Sworders Agricultural By March 2013 Document Control: Version Date Version Details Prepared by Checked by Approved by 0.1 01.03.2013

More information

Kier Infrastructure and Overseas Limited Greenburn Surface Mine, Dalgig Farm Site

Kier Infrastructure and Overseas Limited Greenburn Surface Mine, Dalgig Farm Site Kier Infrastructure and Overseas Limited Greenburn Surface Mine, Dalgig Farm Site Planning application pursuant to s.42 Town and Country Planning (Scotland) Act 1997 to amend the restoration scheme Volume

More information

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback

More information

Derry City and Strabane District Council Planning Committee Report

Derry City and Strabane District Council Planning Committee Report Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 23 rd March 2016 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: LA11/2015/0395/F Residential Development

More information

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Land Securities plc is applying to Maidstone Borough Council

More information

Habitat Regulations Assessment (HRA) Screening Determination. May 2017

Habitat Regulations Assessment (HRA) Screening Determination. May 2017 Cholsey Parish Council Cholsey Neighbourhood Plan Habitat Regulations Assessment (HRA) Screening Determination May 2017 Cholsey Neighbourhood Plan Page! 1 of! 10 SASR - HRA v1.1 Page Left Intentionally

More information

UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest)

UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest) UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest) PROPOSAL: LOCATION: APPLICANT: Amendments to the design of a scheme for a 49.99MW battery

More information

HRA PLANNING Chartered Town Planning and Environmental Consultants

HRA PLANNING Chartered Town Planning and Environmental Consultants HRA PLANNING Chartered Town Planning and Environmental Consultants Screening Statement for the Purposes of Determining the need for Appropriate Assessment Proposed development of 74 no. residential units

More information

Birmingham University, Pritchatts Road, Adjacent to Gisbert Kapp Building, Edgbaston, Birmingham, B15

Birmingham University, Pritchatts Road, Adjacent to Gisbert Kapp Building, Edgbaston, Birmingham, B15 Committee Date: 07/03/2013 Application Number: 2013/00181/PA Accepted: 10/01/2013 Application Type: Reserved Matters Target Date: 11/04/2013 Development Ward: Edgbaston Birmingham University, Pritchatts

More information

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

1 The development hereby permitted shall be carried out in accordance with the following approved plans: Location The Avenue Tennis Club The Avenue London N3 2LE Reference: 16/6509/FUL Received: 10th October 2016 Accepted: 10th October 2016 Ward: Finchley Church End Expiry 5th December 2016 Applicant: Mrs

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 1 April 2015 AUTHOR/S: Planning and New Communities Director Application Number: Parish(es): Proposal: Site address: Applicant(s): Recommendation:

More information

Kibworth Harcourt. Introduction. Introduction

Kibworth Harcourt. Introduction. Introduction Introduction Introduction Welcome to this public exhibition on the proposals for the delivery of new homes on land at The Kibworths. The purpose of today s exhibition is to give you the opportunity to

More information

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

WELCOME. Land North of STEVENAGE.   We would like to thank you for attending our public exhibition today. WELCOME We would like to thank you for attending our public exhibition today. The purpose of this event is to share our proposals and hear your thoughts on our ideas. Members of the project team are on

More information

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DECEMBER 2014 CRANBROOK EXPANSION AREAS ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY Submitted in support of Outline Planning

More information

Welcome to our public exhibition

Welcome to our public exhibition About our development Welcome to our public exhibition This public exhibition gives you the opportunity to view and comment on our proposals to create a new residential development on land adjacent to

More information

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 1 st February 2017 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: Full Planning application Amended

More information

APPENDIX 1: SCOPED ENVIRONMENTAL IMPACT STATEMENT (EIS) FORM

APPENDIX 1: SCOPED ENVIRONMENTAL IMPACT STATEMENT (EIS) FORM APPENDIX 1: SCOPED ENVIRONMENTAL IMPACT STATEMENT (EIS) FORM This form is intended for use by applicants (primarily private landowners) who need to conduct a Scoped EIS in support of minor development

More information

Site north of Hattersley Road West (east of Fields Farm Road), Hattersley

Site north of Hattersley Road West (east of Fields Farm Road), Hattersley Application Number 17/00982/REM Proposal Site Applicant Recommendation Reason for report Application for the approval of reserved matters (means of access, landscaping, layout, scale and appearance) relating

More information

Environmental Assessment (Scotland) Act 2005: Clackmannanshire Council Sustainability Strategy Scoping Request

Environmental Assessment (Scotland) Act 2005: Clackmannanshire Council Sustainability Strategy Scoping Request TAYSIDE & CLACKMANNANSHIRE Tel: 01738 458582(direct line) Fax: 01738 458616 e-mail addresses: denise.reed@snh.gov.uk Niall Urquhart Team Leader Sustainability Clackmannanshire Council Kilncraigs Greenside

More information

Garden Bridge Planning Application

Garden Bridge Planning Application Planning Application Additional Verified photomontages and assessment September 2014 Contents Page 1 Visual assessment 2 1.1 Introduction 2 1.2 Baseline 2 1.3 Potential effects and good environmental

More information

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016 Thornton Road, Pickering Environmental Statement Non-Technical Summary January 2016 EIA Quality This Environmental Statement, and the Environmental Impact Assessment (EIA) carried out to identify the significant

More information

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD Land at Environmental Statement: Non-Technical Summary Introduction Brook Street Properties is applying to Cornwall Council for outline planning permission

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.

More information

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 in association with 1. Introduction Peel Holdings is applying to Nottingham City Council (NCC) for Outline planning

More information

LILAC Housing: Site Management Plan

LILAC Housing: Site Management Plan LILAC Housing: Site Management Plan Prepared by: Joe Atkinson. Date: 30/10/2011 Version 1.0 Relevant Legislation & Policy Conservation Regulations 1994, 2007, 2009, 2010 Wildlife & Countryside Act 1981;

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents Interim Advice Note 76 / 06 VOLUME 11 SECTION 1: ENVIRONMENTAL ASSESSMENT INTRODUCTION PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT Contents 1. Introduction and Application 2. Aims and Objectives

More information

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary For Engine of the North April 2015 Contents Contents 3 1 Introduction 1 2 The Proposals 5 3 Alternative Options

More information

Land at Pirton Fields. South Churchdown, Innsworth Design and Access Statement Addendum

Land at Pirton Fields. South Churchdown, Innsworth Design and Access Statement Addendum Land at Pirton Fields South Churchdown, Innsworth Design and Access Statement Addendum February 2017 Revisions Revision Date Description Prepared Approved Document No. 15-45-CR02 - Land at Pirton Fields

More information

LONGDEN VILLAGE DEVELOPMENT STATEMENT

LONGDEN VILLAGE DEVELOPMENT STATEMENT LONGDEN VILLAGE DEVELOPMENT STATEMENT 2017-2027 1 Longden Development Statement 2017-2027 15/01/18 1. Background 1.1 Longden Village Longden village is a very rural and traditional community first mentioned

More information

Non-technical summary

Non-technical summary Non-technical summary Introduction NTS.1 is applying for outline planning permission for a residential development of up to 80 dwellings on land at Hambrook, on the northern fringe of Bristol. NTS.2 An

More information

Case Officer: Sarah Kay File No: CHE/14/00515/REM Tel. No: (01246) Plot No: 2/6132 Ctte Date: 15 th September 2014 ITEM 1

Case Officer: Sarah Kay File No: CHE/14/00515/REM Tel. No: (01246) Plot No: 2/6132 Ctte Date: 15 th September 2014 ITEM 1 Case Officer: Sarah Kay File No: CHE/14/00515/REM Tel. No: (01246) 345786 Plot No: 2/6132 Ctte Date: 15 th September 2014 ITEM 1 APPROVAL OF RESERVED MATTERS FROM APPLICATION CHE/12/00234/OUT (1) LAYOUT,

More information

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN BASIC CONDITIONS STATEMENT December 2018 CEF 4 Legal Requirements This statement has been produced by the NDP Working Group on behalf of Repton Parish Council

More information

Draft Hailey Neighbourhood Plan

Draft Hailey Neighbourhood Plan Persimmon Homes (Wessex) Draft Hailey Neighbourhood Plan Representations to West Oxfordshire District Council s Regulation 16 Consultation December 2018 2 Copyright 2018 Persimmon Homes Ltd. All rights

More information

South Whitehaven, Cumbria EIA

South Whitehaven, Cumbria EIA South Whitehaven, Cumbria EIA Environmental Statement - Non Technical Summary June 2013 in association with 1. Introduction Story Homes is applying to Copeland Borough Council (CBC) for a new residential

More information

5 Gratton Terrace London NW2 6QE. Reference: 17/5094/HSE Received: 4th August 2017 Accepted: 7th August 2017 Ward: Childs Hill Expiry 2nd October 2017

5 Gratton Terrace London NW2 6QE. Reference: 17/5094/HSE Received: 4th August 2017 Accepted: 7th August 2017 Ward: Childs Hill Expiry 2nd October 2017 Location 5 Gratton Terrace London NW2 6QE Reference: 17/5094/HSE Received: 4th August 2017 Accepted: 7th August 2017 Ward: Childs Hill Expiry 2nd October 2017 Applicant: WSD (Gratton) Ltd Proposal: The

More information

and Netherhall Road and Camp Farm EIA

and Netherhall Road and Camp Farm EIA and Netherhall Road and Camp Farm EIA Environmental Statement - Non Technical Summary December 2012 in association with 1. Introduction Story Homes applied to Allerdale Borough Council (ABC) in May 2011

More information

Former RAF Sealand Site EIA

Former RAF Sealand Site EIA Praxis (Holdings) Ltd. Former RAF Sealand Site EIA Environmental Statement - Non Technical Summary February 2012 in association with P a g e 1 1. Introduction Praxis (Holdings) Ltd. is applying to Flintshire

More information

Oxford Brookes University Biodiversity Action Plan (BAP) V2

Oxford Brookes University Biodiversity Action Plan (BAP) V2 Oxford Brookes University Biodiversity Action Plan (BAP) V2 Background Oxford Brookes University is based at three sites in Oxford: Headington, Wheatley and Harcourt Hill, and has a presence across numerous

More information

PANSHANGER QUARRY, Hertfordshire

PANSHANGER QUARRY, Hertfordshire PANSHANGER QUARRY, Hertfordshire Proposed enhanced restoration of Phases F & H Briefing Note 1 March 2015 INERT (INACTIVE) RESTORATION MATERIALS, CONTROLS AND OPERATIONS 1 Introduction This briefing note

More information

Statutory and Non-Statutory Designated Sites and Ecology

Statutory and Non-Statutory Designated Sites and Ecology Statutory and Non-Statutory Designated Sites and Ecology The National Planning Policy Framework considers the conservation and enhancement of the natural environment in chapter 11 paragraphs 109-119, where

More information

HS2 Environment. Protecting the environment

HS2 Environment. Protecting the environment HS2 Environment Protecting the environment Approach to mitigation EIA Regulations require an ES to include a description of the measures envisaged in order to avoid, reduce and, if possible, remedy significant

More information

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2 11.1 OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11.2 POLICIES RELEVANT TO ALL WORKSITES IN ISLINGTON... 3 11.3 FARRINGDON

More information

BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY

BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY November 2014 Introduction 1.1 St George Central London (the Applicant ) is seeking to obtain planning

More information

Peter Brett Associates LLP (PBA) act on behalf of db symmetry ltd in respect of the proposed symmetry park, Kettering development (the Site).

Peter Brett Associates LLP (PBA) act on behalf of db symmetry ltd in respect of the proposed symmetry park, Kettering development (the Site). Our ref: 30062 2 nd August 2017 Kettering Borough Council Planning Department Municipal Offices Bowling Green Rd Kettering NN15 7QX 61 Oxford Street Manchester M1 6EQ T: +44 (0)161 245 8900 E: manchester@peterbrett.com

More information

Ground Floor Flat 15 Redbourne Avenue London N3 2BP

Ground Floor Flat 15 Redbourne Avenue London N3 2BP Location Ground Floor Flat 15 Redbourne Avenue London N3 2BP Reference: 17/4160/FUL Received: 28th June 2017 Accepted: 29th June 2017 Ward: West Finchley Expiry 24th August 2017 Applicant: Proposal: Mr

More information

Reserved Matters application for a site that straddles the boundary between CBC and BBC

Reserved Matters application for a site that straddles the boundary between CBC and BBC BBC APPLICATION 15/02682/MAR NUMBER CBC APPLICATION CB/15/04294/RM NUMBER LOCATION Wixams Land at former storage depot, Bedford Road, Wilstead Bedfordshire PROPOSAL Reserved Matters Application for Strategic

More information

The Place Solar Farm

The Place Solar Farm The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1

More information

PHASE III: Reserved Matters Submission

PHASE III: Reserved Matters Submission Statement of Compliance with the outline approval for the proposed residential development of land at: BURGES LANE, WIVELISCOMBE PHASE III: Reserved Matters Submission Foreword Contents: This Statement

More information

REFERENCE: 15/01661/FUL Registered: 16 March 2015 Expiry date: 25 October 2016

REFERENCE: 15/01661/FUL Registered: 16 March 2015 Expiry date: 25 October 2016 LOCATION: Land North Of Charcot Road, Colindale REFERENCE: 15/01661/FUL Registered: 16 March 2015 Expiry date: 25 October 2016 WARD: Colindale APPLICANT: PROPOSAL: Fairview New Homes (Colindale) Ltd Erection

More information

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to Introduction WCC have indicated that in advance of the surveys and assessments being undertaken consultation should be undertaken with technical officers of both Warwickshire CC and Nuneaton and Bedworth

More information

My role and specialisms. Worked at spawforths for nearly 13 years. Worked on EIA projects for approx. 10 years and had co-ordinator role for approx.

My role and specialisms. Worked at spawforths for nearly 13 years. Worked on EIA projects for approx. 10 years and had co-ordinator role for approx. My role and specialisms. Worked at spawforths for nearly 13 years. Worked on EIA projects for approx. 10 years and had co-ordinator role for approx. 9 years. Lead EIA activities in the company. The majority

More information

3.1: The Masterplan Proposals

3.1: The Masterplan Proposals .: The Masterplan Proposals Retail School..0. The majority of the retail units are focused along the vibrant High Street and the existing North End Road and Lillie Road...0. There are also retail units

More information

WELCOME. ORPINGTON. Welcome to this exhibition of our proposals for the redevelopment of Bassetts Campus.

WELCOME.   ORPINGTON. Welcome to this exhibition of our proposals for the redevelopment of Bassetts Campus. WELCOME Welcome to this exhibition of our proposals for the redevelopment of Bassetts Campus. The site has been vacant since 2013 and in 2014 NHS Property Services previously brought forward plans for

More information

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site Welcome Welcome to this event to discuss the development of land adjacent to Braggs Farm Lane. is currently in the preliminary stages of designing proposals to sensitively develop this site with high-quality

More information

Land at Porch Farm, Kingsclere Ecology Briefing Paper, April 2016 C_EDP3343_01a

Land at Porch Farm, Kingsclere Ecology Briefing Paper, April 2016 C_EDP3343_01a C_EDP3343_01a Introduction 1.1 This Ecology Briefing Paper has been prepared by The Environmental Dimension Partnership Ltd (EDP) on behalf of Linden Homes. This briefing paper considers the ecological

More information

Planning Committee 04/02/2015 Schedule Item 6. Smith Farm Estate, Old Bridge Close, Northolt, UB5 6UA.

Planning Committee 04/02/2015 Schedule Item 6. Smith Farm Estate, Old Bridge Close, Northolt, UB5 6UA. Planning Committee 04/02/2015 Schedule Item 6 Ref: Address: Ward: Proposal: PP/2014/5145 Smith Farm Estate, Old Bridge Close, Northolt, UB5 6UA. Greenford Broadway Installation of sports pitch, reconstruction

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition housing development A46 Wildmoor Alcester Road Canal Quarter A422 Town Centre housing development Warwickshire-based IM Properties, one of the UK s largest privately owned property

More information

Review of the Environmental Statement for Brook Green, Braintree, Essex

Review of the Environmental Statement for Brook Green, Braintree, Essex Review of the Environmental Statement for Brook Green, Final Review Report Prepared by LUC in association with Cascade Consulting and Clewlow Consulting November 2017 Planning & EIA Design Landscape Planning

More information

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

1 The development hereby permitted shall be carried out in accordance with the following approved plans: Location 59 Greenway Close London N20 8ES Reference: 16/00011/HSE Received: 30th December 2015 Accepted: 7th January 2016 Ward: Totteridge Expiry 3rd March 2016 Applicant: Mr Ankit Shah Proposal: Part

More information

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08 DESIGN MANUAL FOR ROADS AND BRIDGES volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08 glossary of terms Used in DMRB Volume 11, Sections 1 and 2 SUMMARY This

More information

M7 Naas to Newbridge Bypass Upgrade Scheme. Landscape and Visual Impact Assessment Brief of Evidence

M7 Naas to Newbridge Bypass Upgrade Scheme. Landscape and Visual Impact Assessment Brief of Evidence M7 Naas to Newbridge Bypass Upgrade Scheme Landscape and Visual Impact Assessment Brief of Evidence Presented by Richard Butler, Cunnane Stratton Reynolds Landscape Architect: BL Arch (University of Pretoria,

More information