1 HS2 Environment Protecting the environment

2 Approach to mitigation EIA Regulations require an ES to include a description of the measures envisaged in order to avoid, reduce and, if possible, remedy significant adverse effects. Such measures are generally described in the ES as mitigation measures.

3 HS2 mitigation hierarchy The approach to mitigation adopted for HS2 has a hierarchy, whereby priority is given to avoiding or preventing effects Avoid Reduce Abate Repair Compensate Designing the proposed scheme so that a feature causing effects is avoided (e.g. through changing alignment) Designing the proposed scheme so that a feature causing effects is reduced (e.g. design changes to reduce visual effect) Abating, either at the railway (e.g. noise barrier) or at receptor (e.g. screening a property) Restoring or reinstating a feature after effects have occurred (e.g. to address temporary construction effects) Compensation for loss or damage (e.g. Planting new woodland elsewhere, or compensation for loss of amenity)

4 Approach to mitigation The mitigation approach is driven by the HS2 Sustainability Policy: We will strive to limit the negative impacts through design, mitigation and by challenging industry standards, and we will look for environmental enhancements and benefits. Further, the EMRs will impose a general requirement on the Nominated Undertaker (NU) to use reasonable endeavours to adopt measures to reduce the adverse effects reported in the ES (as long as this does not add unreasonable cost or delay to construction and operation).

5 HS2 is an integrated design Environmental design is a consideration throughout design, not an add-on at the end of the process. Troika+LCR

6 Over two million trees to be planted for habitat creation and screening. Planting will reflect local landscapes, including broad-leaved woodland, shrubs and hedgerow. c. 1,000 ha of landscaping/screening areas will be created (not including areas for ecological mitigation and public realm surrounding the stations) c. 520 ha of habitat of principal importance will be created for ecological mitigation, including: - lowland mixed deciduous woodland (c. 280 ha) - lowland meadows (c. 165 ha)

7 Balancing ponds and flood compensation measures will be integrated into the landscape to alleviate flooding and also provide opportunities for biodiversity New hedgerow and woodland creation will be undertaken to bolster and help connect existing habitats within the landscape as part of the compensation measures. The linking of new hedgerows and habitats to culverts, viaducts and over-bridges will help to funnel wildlife across or under the route to help provide habitat continuity both along and across the railway. The provision of green bridges will provide multifunctional crossing points Habitat planting and reinstatement will be undertaken in accordance with the principles of mitigation.

8 HS2 design approach Integrated - noise mitigation Visual screening Landscape integration Return to agriculture Minimise Rail Land Protecting environmental/ heritage features

9 Option 1. Do minimum (1:4 return slope) Option 2. Grading out (1:8, restoration to agriculture) Option 3. Grading out (full restoration to agriculture) Option 4. Maximum use to limit off-site haulage

10

11

12 HS1: Woodland soil translocation Eurostar Meadows Green Tunnel at Mersham

13 HS1 - Woodland soil translocation

14 HS1 - Habitat creation

15

16

17

18

19 Brentbat FlickR HS1 - Reducing maintenance improving biodiversity value

20 Thank you

21 HS2 Environment Protecting the Environment and Communities through a Code of Construction Practice

22 Aims Brief history Outline what is typically included in CoCP Describe purpose of document Give examples of typical control measures 22

23 Brief history Draft to be prepared based on Phase One document. Builds on direct experience from other major programmes such as HS1, Crossrail, Thames Tideway, London Approach developed through engagement with statutory bodies and local authorities. 23

24 Purpose of document Document relates to the route-wide principles governing construction. Contains strategic control measures and the standards that will be implemented as a minimum throughout the project. Local measures will be applied through a range of local underpinning plans. 24

25 General requirements of CoCP CoCP sets out our required standards for construction. Underpinned by Local Environmental Management Plans and local authority agreements. Supports the Environmental Statement. Implemented through construction contracts. 25

26 Keeping communities informed The CoCP is a key part of community relations during construction: a stakeholder liaison approach which seeks to include all parts of local communities; information for communities in advance of works; HS2 website to provide up-to-date information; and 24 -hour helpline / contact. 26

27 General requirements of CoCP To reduce the likelihood of incident or nuisance Typical measures include: Considerate Constructor practice good site management practice core working hours noise and air quality controls pollution incident control measures small claims procedure contractor qualifications and experience 27

28 Other topics included The CoCP covers all environmental topics discussed in the Environmental Statement, for example: Agriculture and soils; Air quality; Cultural heritage; Ecology; Landscape, townscape and visual impact; Noise and vibration; and Traffic and transport. 28

29 Example of a CoCP control Air quality Document sets out the high-level objective Lists measures that can be implemented (where appropriate) to reduce impacts for construction activities: Mechanical plant Transportation/handling of materials Demolition/excavation, etc Ongoing monitoring and compliance 29

30 Summary The CoCP covers the key principles of construction at a route-wide level. It will be underpinned by Local Environmental Management Plans and agreements with local authorities which will set the requirements for specific construction sites and activities. It will be a contractual requirement for our supply chain. 30

31 Thank you

32 HS2 Consultations Involving communities and stakeholders in shaping HS2

33 Why consult? Improve the scheme Legal and moral obligation Engagement will carry on throughout the project; consultations have to comply with legal framework 33

34 Story so far Eleven national public consultations (nine for Phase One, two for Phase Two) Over 150,000 responses Over 150 consultation events attended by over 50,000 people. 34

35 What we consult on Four broad topic areas: Policy Route Safeguarding Environmental 35

36 Who is targeted in our publicity? People and businesses (typically up to 1km away) Local communities e.g. action groups, community groups and local representative groups Organisations e.g. local authorities and environmental groups Elected representatives We welcome responses from everyone. 36

37 Information is shared in a number of ways Website Document order line Libraries and local venues Public events Helpdesk Newspaper and online advertising Mail-outs We are always looking to improve, and welcome your feedback. 37

38 Responding to consultations Dedicated response channels Online (usually) Hardcopy by freepost Dedicated channels reduce the risks of missing responses. 38

39 What happens to responses Logged and Analysed Independent response analysis report Consider responses Publish reports and results Evidence-based, not a vote. 39

40 What difference does it make? Quite a lot, actually! For example, on Phase One: Chiltern tunnel moved/extended to avoid aquifer; route moved away from Edgcote House, the nearby Roman villa and the battlefield; retaining wall to reduce impacts on Cubbington Woods; and discretionary property schemes. 40

41 We welcome your input in consultations Respond to HS2 Ltd consultations Help us improve accessibility 41

42 Thank you

43 Next Steps Phase Two announcement at the end of 2014 Local Authority data survey Summer 2014 Safeguarding 43

44 Thank you If you have any further questions, please contact the Stations and Route Engagement Team Route-wide - philippa.garden@hs2.org.uk Western leg - james.wynne@hs2.org.uk Eastern leg - victoria.wallace@hs2.org.uk 44

45 Thank you

E16: MAINTENANCE OF LANDSCAPED AREAS

E16: MAINTENANCE OF LANDSCAPED AREAS HIGH SPEED TWO INFORMATION PAPER E16: MAINTENANCE OF LANDSCAPED AREAS This paper outlines the proposed approach to the maintenance of landscaped areas created for HS2 Phase One. It will be of particular

More information

HS2 Hybrid Bill Petitioning. Summary of SMBC Asks 23/09/13. Background

HS2 Hybrid Bill Petitioning. Summary of SMBC Asks 23/09/13. Background Summary of SMBC Asks 23/09/13 Background The Council has a developed a significant number of asks and propositions for consideration by HS2 Ltd and Government throughout further development of the HS2

More information

High Speed Rail (London- West Midlands)

High Speed Rail (London- West Midlands) High Speed Rail (London- West Midlands) Draft Environmental Minimum Requirements Annex 3: Draft Heritage Memorandum November 2013 ESA 4.4 High Speed Rail (London- West Midlands) Draft Environmental Minimum

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

Welcome to the Public Consultation Exhibition

Welcome to the Public Consultation Exhibition Welcome to the Public Consultation Exhibition Today is your opportunity to: Speak to the team Learn more about the project Leave feedback on the plans The Secretary of State for Transport has recognised

More information

Euston Community Forum. 11 June Maria Fidelis School

Euston Community Forum. 11 June Maria Fidelis School Euston Community Forum 11 June 2013- Maria Fidelis School Item Topic Lead Duration Introductions Welcome and introductions/apologies Chair 6.00pm - Minutes of the meeting on 18 th April 6.15pm Format of

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

HS2 Interchange Station Design

HS2 Interchange Station Design Working on behalf of HS2 Interchange Station Design October 2018 www.hs2.org.uk 1 Interchange Station, Solihull Introduction In February 2018, HS2 Ltd appointed Arup to take forward the design of Interchange

More information

BRE Strategic Ecological Framework LI Technical Information Note 03/2016

BRE Strategic Ecological Framework LI Technical Information Note 03/2016 BRE Strategic Ecological Framework Technical Information Note 03/2016 September 2016 Contents 1. Introduction 2. Aims of BRE s Strategic Ecological Framework 3. How SEF is different from previous approaches

More information

Looking Forward. Tuesday 22 nd April 2018

Looking Forward. Tuesday 22 nd April 2018 Looking Forward Tuesday 22 nd April 2018 Vernon Loo Community Engagement Manager Area Central Online HS2 has partnered with Commonplace to provide a locally focused website. This is currently being updated

More information

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents Interim Advice Note 76 / 06 VOLUME 11 SECTION 1: ENVIRONMENTAL ASSESSMENT INTRODUCTION PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT Contents 1. Introduction and Application 2. Aims and Objectives

More information

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts Chapter 4 Route Window C12: Mile End Park and Eleanor Street Shafts 48 Crossrail Amendment of Provisions 4 Route Window C12: Mile End Park and Eleanor Street Shafts Location plan of Mile End Park and Eleanor

More information

Thank you for coming. We want to hear your views on proposed improvements to the A1 between junction 65 (Birtley) and junction 67 (Coal House).

Thank you for coming. We want to hear your views on proposed improvements to the A1 between junction 65 (Birtley) and junction 67 (Coal House). Welcome Thank you for coming. We want to hear your views on proposed improvements to the between junction 65 (Birtley) and junction 67 (Coal House). This is your opportunity to provide comments on our

More information

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics

More information

Infrastructure and the environment

Infrastructure and the environment INFRASTRUCTURE MATTERS Infrastructure and the environment December 2016 In this edition: Infrastructure and the environment: maximising environmental benefits Ancient woodland: a case study Image: Helix

More information

Welcome to this public consultation event for the proposed South Western Relief Road. Thank you for taking the time to come along.

Welcome to this public consultation event for the proposed South Western Relief Road. Thank you for taking the time to come along. WELCOME Welcome to this public consultation event for the proposed South Western Relief Road. Thank you for taking the time to come along. The South Western Relief Road (SWRR) route is proposed in Stratford-on-Avon

More information

Great Easton Neighbourhood Plan Statement of Basic Conditions

Great Easton Neighbourhood Plan Statement of Basic Conditions Great Easton Neighbourhood Plan 2017-2031 Statement of Basic Conditions OCTOBER 2016 GREAT EASTON PARISH COUNCIL Contents 1.0 Introduction....Page 2 2.0 Summary of Submission Documents and Supporting Evidence..

More information

The Place Solar Farm

The Place Solar Farm The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1

More information

Wylfa Newydd Project Site Preparation and Clearance

Wylfa Newydd Project Site Preparation and Clearance ENERGY WORKING FOR BRITAIN Wylfa Newydd Project 11. HNP SITE PREP & CLEAR APP (CIR) A4 PORTRAIT + SPINE (ENG)_V1.indd 1 18/05/2018 Contents 1.....1 1.1 Introduction..1 1.2 Proposed development......2 1.3

More information

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

INTRODUCTION. Welcome to the third round of information events on the emerging Yorkshire Energy Park proposals. THE CONSULTANT TEAM WHERE IS THE SITE?

INTRODUCTION. Welcome to the third round of information events on the emerging Yorkshire Energy Park proposals. THE CONSULTANT TEAM WHERE IS THE SITE? 1 INTRODUCTION Welcome to the third round of information events on the emerging Yorkshire Energy Park proposals. This is the third round of information events that we have undertaken on the project, following

More information

In Title Your Area 5: Amersham to Great Missenden

In Title Your Area 5: Amersham to Great Missenden LOCAL AREA In Title Your Area 5: Amersham to Great Missenden Find out here about: what is proposed between Amersham and Great Missenden; what this means for people living between Amersham and Great Missenden;

More information

PLANNING FOR THE SUPPLY OF BUILDING AND ROOFING STONE The Planning Officers Society 2008

PLANNING FOR THE SUPPLY OF BUILDING AND ROOFING STONE The Planning Officers Society 2008 PLANNING FOR THE SUPPLY OF BUILDING AND ROOFING STONE The Planning Officers Society 2008 Extraction of minerals, including building and roofing stone, from the land requires planning permission under the

More information

Wildlife and Planning Guidance: Neighbourhood Plans

Wildlife and Planning Guidance: Neighbourhood Plans Wildlife and Planning Guidance: Neighbourhood Plans This Leaflet is one of a series of 4 Wildlife and Planning Guidance Leaflets and is intended to provide useful information to assist you to campaign

More information

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

WELCOME. Land North of STEVENAGE.   We would like to thank you for attending our public exhibition today. WELCOME We would like to thank you for attending our public exhibition today. The purpose of this event is to share our proposals and hear your thoughts on our ideas. Members of the project team are on

More information

Environmental Memorandum

Environmental Memorandum Environmental Memorandum Annex 3 to the EMR CR/HB/E/0001 Custodian REVISION HISTORY 7.0 22/07/08 BG CLRL RP Final Version 6.0 12/05/08 BG CLRL RP Consultation draft 5.0 02/11/07 BG CLRL

More information

Canal & River Trust response to the Consultation on the Working Draft Environmental Impact Assessment Report

Canal & River Trust response to the Consultation on the Working Draft Environmental Impact Assessment Report High Speed Two Phase 2a: West Midlands to Crewe Response to Working Draft Environmental Impact Assessment Report Please find below the response of the Canal & River Trust. The Trust is the guardian of

More information

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2

More information

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2 11.1 OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11.2 POLICIES RELEVANT TO ALL WORKSITES IN ISLINGTON... 3 11.3 FARRINGDON

More information

Route Window Environmental Topic Summary of Significant Residual Impacts

Route Window Environmental Topic Summary of Significant Residual Impacts Table 1.3: Summary of Eliminated Significant Residual Impacts Route Window Environmental Topic Summary of Significant Residual Impacts C6 and C7: Farringdon Station and Liverpool Street Station Townscape

More information

Land at Rampton Road. Cottenham

Land at Rampton Road. Cottenham Land at Rampton Road Cottenham Introduction TEP is preparing an outline planning application for 54 dwellings on 6.9 hectares of land adjacent to Rampton Road, Cottenham on behalf of the owners Cambridgeshire

More information

Policy DM19: Development and Nature Conservation

Policy DM19: Development and Nature Conservation Avonmouth Wetland Habitat Project October 2010 and December 2011 (the Cresswell study). Policy Links Bristol Local Plan Core Strategy Lead Policy BCS4: Avonmouth and Bristol Port BCS9: Green Infrastructure

More information

Cotswolds AONB Landscape Strategy and Guidelines. June 2016

Cotswolds AONB Landscape Strategy and Guidelines. June 2016 Cotswolds AONB Landscape Strategy and Guidelines June 2016 Cotswolds AONB Landscape Strategy and Guidelines Introduction The evolution of the landscape of the Cotswolds AONB is a result of the interaction

More information

In Title Your Area 10: Lower Boddington to Southam & Offchurch

In Title Your Area 10: Lower Boddington to Southam & Offchurch LOCAL AREA In Title Your Area 10: Lower Boddington to Southam & Offchurch Find out here about: what is proposed between Lower Boddington and Southam & Offchurch; what this means for people living between

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.

More information

Enclosures Appendix 1: Draft Golders Green Station Planning Brief. Summary

Enclosures Appendix 1: Draft Golders Green Station Planning Brief. Summary Policy and Resources Committee 23 February 2017 Title Report of Wards Status Urgent Key Golders Green Station Draft Planning Brief Cath Shaw Commissioning Director - Growth & Development Interim Deputy

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

Frequently Asked Questions

Frequently Asked Questions 1. Where is Aylesbury Woodlands? Frequently Asked Questions Aylesbury Woodlands lies to the east of Aylesbury. It is bounded to the south by the A41. To the north is the Aylesbury Arm of the Grand Union

More information

Welcome to our public exhibition

Welcome to our public exhibition About our development Welcome to our public exhibition This exhibition gives you the chance to view and comment on our proposals for a new residential development of 165 high-quality homes, along with

More information

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP LAND AT WEST YELLAND Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP May 2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft FINAL Date

More information

EIA process in Malaysia. Approaches and Strategies. Way Forward

EIA process in Malaysia. Approaches and Strategies. Way Forward PUBLIC PARTICIPATION APPROACHES AND STRATEGIES UNDER THE EIA PROCESS IN MALAYSIA By Norhayati Mohamad Yusof Principal Assistant Director Department of Environment Malaysia AECEN REGIONAL WORKSHOP Strengthening

More information

London Road, Derker. Non Technical Summary. Introduction

London Road, Derker. Non Technical Summary. Introduction London Road, Derker Non Technical Summary Introduction The Oldham Rochdale Housing Market Pathfinder was set up to tackle longstanding problems of poor quality housing and to provide the framework for

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager Perth and Kinross Council Development Management Committee 8 June 2016 5(3)(i) 16/259 Pre-Application Report by Development Quality Manager Residential development at St Martins Road, Land 120 metres West

More information

REFERENCE: 15/01661/FUL Registered: 16 March 2015 Expiry date: 25 October 2016

REFERENCE: 15/01661/FUL Registered: 16 March 2015 Expiry date: 25 October 2016 LOCATION: Land North Of Charcot Road, Colindale REFERENCE: 15/01661/FUL Registered: 16 March 2015 Expiry date: 25 October 2016 WARD: Colindale APPLICANT: PROPOSAL: Fairview New Homes (Colindale) Ltd Erection

More information

ENVIRONMENTAL ISSUES and TEN-T PROJECTS Key elements for a sustainable network development

ENVIRONMENTAL ISSUES and TEN-T PROJECTS Key elements for a sustainable network development ENVIRONMENTAL ISSUES and TEN-T PROJECTS Key elements for a sustainable network development TEN-T Project Management Workshop 2010 George Kremlis DG ENV B4, European Commission 13 January 2010 Environmental

More information

Planning Area Committee 25 June 2018 Addendum to Officers Report RESTRICTION OF PERMITTED DEVELOPMENT RIGHTS - EXTENSIONS

Planning Area Committee 25 June 2018 Addendum to Officers Report RESTRICTION OF PERMITTED DEVELOPMENT RIGHTS - EXTENSIONS Planning Area Committee 25 June 2018 Addendum to Officers Report 17/8150/RMA West Hendon Regeneration Area (Phase 6) Pages 11 54 The conditions section shall be changed as follows: RESTRICTION OF PERMITTED

More information

8.0 Design and Form of Development 43/

8.0 Design and Form of Development 43/ 42/ 8.0 Design and Form of Development 43/ Rothwells Farm, Golborne/ Development Statement Figure 7. Site Constraints Key 44/ Site Boundary 360 Bus Route/Stops Existing Trees Underground Water Pipe Sensitive

More information

Urban and Landscape Design Frameworks Highways and Network Operations Guideline

Urban and Landscape Design Frameworks Highways and Network Operations Guideline Urban and Landscape Design Frameworks Highways and Network Operations Guideline The following outlines the process to be followed through the planning, design and construction phases of a state highway

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

Linden Homes Proposals for land off Ringwood Road, Verwood

Linden Homes Proposals for land off Ringwood Road, Verwood Welcome Welcome to Linden Homes first public exhibition displaying proposals for new homes on land off Ringwood Road in Verwood. Award-winning house builder Linden Homes, part of the Galliford Try Group,

More information

HS2 EIA Scope and Methodology Consultation

HS2 EIA Scope and Methodology Consultation HS2 EIA Scope and Methodology Consultation Response from The Wildlife Trusts (England) May 2012 ENGLAND The Wildlife Trusts The Kiln, Waterside, Mather Road, Newark, NG24 1WT Registered Charity No. 207238

More information

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08 DESIGN MANUAL FOR ROADS AND BRIDGES volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08 glossary of terms Used in DMRB Volume 11, Sections 1 and 2 SUMMARY This

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

Crossrail. Supplementary Environmental Statement 2. Utilities Assessment Additional Information

Crossrail. Supplementary Environmental Statement 2. Utilities Assessment Additional Information Crossrail Supplementary Environmental Statement 2 Utilities Assessment Additional Information January 2006 S2 If you would like information about Crossrail in your language, please contact Crossrail supplying

More information

Thank you for sparing the time to visit our exhibition and to provide us with your feedback on our proposals displayed here today.

Thank you for sparing the time to visit our exhibition and to provide us with your feedback on our proposals displayed here today. WELCOME Aerial image of the application site in context Thank you for sparing the time to visit our exhibition and to provide us with your feedback on our proposals displayed here today. Plymouth City

More information

Application Guide. Should you have any questions on the Outline Application please contact:

Application Guide. Should you have any questions on the Outline Application please contact: Application Guide Application Guide This guide describes the structure of the Outline Application, explains the different documents that have been submitted with it and identifies what will happen next.

More information

Barvills Solar Farm Environmental Statement Non-Technical Summary

Barvills Solar Farm Environmental Statement Non-Technical Summary Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development

More information

DESIGN AND MANAGEMENT OBJECTIVES PART 7 HA 92/01 SCHEME DEVELOPMENT, IMPLEMENTATION & MANAGEMENT SUMMARY

DESIGN AND MANAGEMENT OBJECTIVES PART 7 HA 92/01 SCHEME DEVELOPMENT, IMPLEMENTATION & MANAGEMENT SUMMARY DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 10 SECTION 0 ENVIRONMENTAL DESIGN AND MANAGEMENT ENVIRONMENTAL OBJECTIVES PART 7 HA 92/01 SCHEME DEVELOPMENT, IMPLEMENTATION & MANAGEMENT SUMMARY This Advice

More information

Plumstead Temporary Railway Sidings and Associated Permanent Works

Plumstead Temporary Railway Sidings and Associated Permanent Works Plumstead Temporary Railway Sidings and Associated Permanent Works Environmental Impact Assessment Non-Technical Summary Document Number: February 2013 Plan Design Enable Page 2 of 20 Contents Contents...

More information

The journey so far. The new masterplan for Dargavel Village

The journey so far. The new masterplan for Dargavel Village The journey so far Our vision for Dargavel Village began over ten years ago when the original masterplan for transforming the former Royal Ordnance Factory site into a thriving community was established.

More information

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford. Welcome Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of. We are at the early stages of designing our proposals and have a number

More information

7 Scoping and Introduction to the Assessments

7 Scoping and Introduction to the Assessments 7 Scoping and Introduction to the Assessments 7.1 Scope of the assessments 7.1.1 Rule 8 of the TWR makes provision for an applicant to request a scoping opinion from the SoS indicating the information

More information

Making Space for Nature A Leicester Case Study. Dr Helen O Brien Leicester City Council

Making Space for Nature A Leicester Case Study. Dr Helen O Brien Leicester City Council Making Space for Nature A Leicester Case Study Dr Helen O Brien Leicester City Council Helen.Obrien@Leicester.gov.uk Definitions Biodiversity (biological diversity) The variety of plant and animal life

More information

Wetland Design Manual. A1: Vision, core outcomes and aspirational outcomes

Wetland Design Manual. A1: Vision, core outcomes and aspirational outcomes Wetland Design Manual A1: Vision, core outcomes and aspirational outcomes Table of contents Introduction 5 Vision 6 Core outcomes 7 Effective pollutant removal and flow management... 7 Community safety...

More information

Slough International Freight Exchange Proposals, Colnbrook+

Slough International Freight Exchange Proposals, Colnbrook+ Welcome Welcome to this exhibition, which is being held in connection with our proposals for a new freight exchange facility on land to the north of the A4. Please take this opportunity to look at the

More information

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB INTRODUCTION This event is being hosted by the promoters of the proposed North Heybridge Garden Suburb who are working with Maldon District Council and other key stakeholders on the preparation of a comprehensive

More information

Watford Local Plan Part 2 Publication Stage Environmental Report. Appendix 3: Consultation Comments

Watford Local Plan Part 2 Publication Stage Environmental Report. Appendix 3: Consultation Comments Watford Local Plan Part 2 Publication Stage Environmental Report Appendix 3: Consultation Comments August 2016 Appendix 3 - Responses to Consultation of the Local Plan Part 2 As required by the SEA Directive,

More information

Biodiversity Standard

Biodiversity Standard 14 Sustainability Service + This is a controlled document whilst viewed at https://universityofleeds.myeqms.com/login/login.aspx. Once downloaded or printed it becomes an uncontrolled copy. Please check

More information

London Overground (Barking Riverside Extension) Order Environmental Statement: Non-Technical Summary

London Overground (Barking Riverside Extension) Order Environmental Statement: Non-Technical Summary Transport and Works Act 1992 London Overground ( Riverside Extension) Order Environmental Statement: Non-Technical Summary March 2016 Cover image for illustrative purposes only Page 2 Contents 1.0 Introduction

More information

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to Introduction WCC have indicated that in advance of the surveys and assessments being undertaken consultation should be undertaken with technical officers of both Warwickshire CC and Nuneaton and Bedworth

More information

Planning Statement. Application for Development Consent. Thames Tideway Tunnel Thames Water Utilities Limited. Application Reference Number: WWO10001

Planning Statement. Application for Development Consent. Thames Tideway Tunnel Thames Water Utilities Limited. Application Reference Number: WWO10001 Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001 Planning Statement Doc Ref: 7.01 Appendix Z APFP Regulations 2009: Regulation

More information

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017 WILLIAM STREET STORM SEWER OUTFALL Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE March 23, 2017 ACCESSIBILITY Under the Accessibility Standards 2015 for Customer Service Regulation

More information

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback

More information

Kibworth Harcourt. Introduction. Introduction

Kibworth Harcourt. Introduction. Introduction Introduction Introduction Welcome to this public exhibition on the proposals for the delivery of new homes on land at The Kibworths. The purpose of today s exhibition is to give you the opportunity to

More information

Preferred route announcement M25 junction 10/A3 Wisley interchange Improvement scheme

Preferred route announcement M25 junction 10/A3 Wisley interchange Improvement scheme Preferred route announcement M25 junction 10/A3 Wisley interchange Improvement scheme Winter 2017 Introduction This section of the M25 is of nationally-strategic importance, as it provides vital access

More information

Location: The Wildlife Trust for Bedfordshire, Cambridgeshire and Northamptonshire, Lings House, Billing Lings, Northampton NN3 8BE

Location: The Wildlife Trust for Bedfordshire, Cambridgeshire and Northamptonshire, Lings House, Billing Lings, Northampton NN3 8BE Role Description Role Title: Volunteer Conservation Officer Location: The Wildlife Trust for Bedfordshire, Cambridgeshire and Northamptonshire, Lings House, Billing Lings, Northampton NN3 8BE Accountable

More information

Meridian Water Phase 1 Application

Meridian Water Phase 1 Application Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed

More information

Circular L8/08 2 September Water Services Investment and Rural Water Programmes Protection of Natural Heritage and National Monuments

Circular L8/08 2 September Water Services Investment and Rural Water Programmes Protection of Natural Heritage and National Monuments Circular L8/08 2 September 2008 Water Services Investment and Rural Water Programmes Protection of Natural Heritage and National Monuments 1. The purpose of this Circular is to provide local authorities

More information

Urban Green Space Management (Horticulture) FdSc Course outline

Urban Green Space Management (Horticulture) FdSc Course outline Urban Green Space Management (Horticulture) FdSc Course outline Module Outline Year 1 Module 1: Plant Development and Knowledge (20 credits) Develop applied knowledge and skills based on the principles

More information

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd Drakelow Park ES 5 Environmental Statement Volume 5: Non Technical Summary Lead Author Waterman Energy, Environment and Design Ltd April 2009 Environmental Statement Volume 5: Non-Technical Summary DRAKELOW

More information

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017 Strategic Environmental Assessment Screening Report Dublin Port Masterplan Review 2017 Table of Contents 1 Introduction... 1 2 Purpose of the Masterplan... 2 3 Task 1.1 Pre-Screening Check... 5 4 Task

More information

Wednesbury to Brierley Hill Extension

Wednesbury to Brierley Hill Extension 19 February 2019 Wednesbury to Brierley Hill Extension Evidence Given on Behalf of the Applicant: WMCA Civil Engineering Summary Proof of Evidence Ian Collins Transport and Works Act 1992 The Transport

More information

SOUTH WOKINGHAM STRATEGIC DEVELOPMENT LOCATION PUBLIC CONSULTATION

SOUTH WOKINGHAM STRATEGIC DEVELOPMENT LOCATION PUBLIC CONSULTATION 01 WELCOME Croudace Homes, Gleeson Strategic Land, Kier Ventures, Lightwood Strategic and Miller Homes are delighted to welcome you to this public exhibition. Proposals for the site have been developing

More information

Wildlife and Planning Guidance: Local Plans

Wildlife and Planning Guidance: Local Plans Wildlife and Planning Guidance: Local Plans This Leaflet is one of a series of 4 Wildlife and Planning Guidance Leaflets and is intended to provide useful information to assist you to campaign effectively

More information

South Whitehaven, Cumbria EIA

South Whitehaven, Cumbria EIA South Whitehaven, Cumbria EIA Environmental Statement - Non Technical Summary June 2013 in association with 1. Introduction Story Homes is applying to Copeland Borough Council (CBC) for a new residential

More information

EVALUATION OF MASTER PLAN ALTERNATIVES

EVALUATION OF MASTER PLAN ALTERNATIVES 7 The Environmental Report is required to identify, describe and evaluate reasonable alternatives, taking into account the objectives and geographical scope of the Master Plan 2008. Three plan alternatives

More information

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June

More information

Chalk, Cherries and Chairs Central Chilterns Landscape Partnership Scheme LANDSCAPE PARTNERSHIP DEVELOPMENT OFFICER JOB INFORMATION PACK

Chalk, Cherries and Chairs Central Chilterns Landscape Partnership Scheme LANDSCAPE PARTNERSHIP DEVELOPMENT OFFICER JOB INFORMATION PACK Chalk, Cherries and Chairs Central Chilterns Landscape Partnership Scheme LANDSCAPE PARTNERSHIP DEVELOPMENT OFFICER JOB INFORMATION PACK How to apply Please complete our application form, together with

More information

Welcome to our Public Consultation

Welcome to our Public Consultation About our development This exhibition gives you the chance to view and comment on our emerging plans for a proposed residential development located on land to the West of Alwyn Road, Rugby. Welcome to

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017 South Macclesfield Development Area Environmental Statement March 2017 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description... 2 2.0 The Proposals...

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

Greening the Thameslink Route

Greening the Thameslink Route Greening the Thameslink Route Amelia Woodley Network Rail Thameslink Environment Manager 29-Sep-15 / 1 Thameslink Programme / 2 Our approach to sustainability Recruit, retain and grow People Diversity

More information

Rannoch 132 / 33 kv Substation Extension

Rannoch 132 / 33 kv Substation Extension Who we are Scottish and Southern Energy Power Distribution is part of the SSE plc group of companies. We own, maintain and invest in the networks in the north of Scotland the electricity transmission network

More information

Describing the Integrated Land Management Approach

Describing the Integrated Land Management Approach Describing the Integrated Land Management Approach ISBN No. 978-0-7785-8902-0 (Online Edition) Pub No. I/422 What is Integrated Land Management? Integrated land management (ILM) is the strategic, planned

More information

PANSHANGER QUARRY, Hertfordshire

PANSHANGER QUARRY, Hertfordshire PANSHANGER QUARRY, Hertfordshire Proposed enhanced restoration of Phases F & H Briefing Note 1 March 2015 INERT (INACTIVE) RESTORATION MATERIALS, CONTROLS AND OPERATIONS 1 Introduction This briefing note

More information

Neighbourhood Planning Local Green Spaces

Neighbourhood Planning Local Green Spaces Neighbourhood Planning Local Green Spaces Introduction... 2 1. Why green space is important... 4 2. Neighbourhood plans and green space... 6 3. Evidence... 8 Statutory designations... 9 Green space audit...

More information

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY SITE LOCATION The site of the existing AECC lies in an area of predominately residential and business use in Bridge of Don and extends approximately 50 acres.

More information

Former RAF Sealand Site EIA

Former RAF Sealand Site EIA Praxis (Holdings) Ltd. Former RAF Sealand Site EIA Environmental Statement - Non Technical Summary February 2012 in association with P a g e 1 1. Introduction Praxis (Holdings) Ltd. is applying to Flintshire

More information