PROPOSED MINOR ZONING BY-LAW AMENDMENT

Size: px
Start display at page:

Download "PROPOSED MINOR ZONING BY-LAW AMENDMENT"

Transcription

1 PLANNING RATIONALE 929 RICHMOND ROAD/108 WOODROFFE AVENUE OTTAWA, ONTARIO PROPOSED MINOR ZONING BY-LAW AMENDMENT WESTBORO POINT DEVELOPMENTS INC. JANUARY 2012

2

3 1. INTRODUCTION PROJECT BACKGROUND AND PRECONSULTATION P ROP ERTY ANALYS IS Location Site Conditions and Use Community Context Transportation Context PROPOSED DEVELOPMENT SUPPORTING STUDIES Phase 1 and 2 Environmental Site Assessment (ESA) Servicing Options and Stormwater Management Transportation Shadow Impact Study Geotechnical Noise Tree Conservation PLANNING POLICY AND REGULATORY ANALYS IS Provincial Policy Statement City of Ottawa Official Plan Richmond Road/Westboro Community Design Plan Urban Design Guidelines along Traditional Mainstreets Urban Design Guidelines for High-Rise Housing Transit Oriented Design (TOD) Guidelines Urban Design and Review City of Ottawa Comprehensive Zoning By-law MINOR ZONING BY-LAW AMENDMENT Minor Zoning By-Law Amendment Rationale CONCLUSION Page i

4

5 1. INTRODUCTION The owner (applicant) proposes a minor amendment to the City of Ottawa Zoning By-law in order to permit the development of a 14-storey, 85-unit mixed-use building at the northwest corner of Richmond Road and Woodroffe Avenue in the Woodroffe North neighbourhood of Ottawa. The 0.25 hectare project site is owned by Westboro Point Developments Inc. A revised site plan will also be submitted as part of the overall development application. The project site is currently comprised of two parcels, one of which contains a neighbourhood convenience store with second storey apartments, and the other an abandoned single-family residence. Proposed redevelopment on the project site would comprise 85 residential units, varying from one-bedroom to two-bedroom plus den units, associated amenity space, and 239 square metres of ground-floor commercial space. Underground parking for 78 vehicles would be provided. The proposed design of the building reflects varying heights ranging from eight storeys nearest the existing residential neighbourhood behind the project site to 14 storeys at the Richmond Road frontage. In the City of Ottawa Official Plan, the project site is designated General Urban Area and is located on a portion of Richmond Road designated Traditional Mainstreet. The project site is regulated by the City of Ottawa Zoning By-law The subject lands are currently zoned TM H (25) Traditional Mainstreet, Height Maximum 25 metres. This Planning Rationale is submitted in support of the application for a Minor Zoning By-law Amendment to permit the proposed development. 2. PROJECT BACKGROUND AND PRECONSULTATION Development options for the project site were first considered in late 2007, and included a concept for a seven-storey mixed-use building consisting of ground-floor retail and 40 residential units above. Pre-consultation with City staff held in January 2008, determined that the proposed development concept complied with all standards and provisions of the existing zoning at the time and could proceed directly to Site Plan Control. City staff required a number of additional studies be prepared in support of the application for Site Plan Control, including: Phase 1 and 2 Environmental Site Assessment (including Record of Site Condition); Site Servicing Brief; Geotechnical Investigation Study; Noise Impact Assessment Study; Transportation Brief; Shadow Impact Assessment; and Tree Conservation Report. These studies were completed and the application for Site Plan Control submitted to the City on March 31, In June of 2008, the City of Ottawa adopted a new Comprehensive Zoning By-law ( ). The By-law had the effect of rezoning the project site from CG4 General Commercial Subzone 4 [435] F2.0 H (24.7), to TM (H25) Traditional Mainstreet, Height Maximum 25 metres. This did not affect the proposed development since the new zoning was tailored to reflect the application for Site Plan Control already in process for the project site. The City issued the draft Delegated Authority Report for review in January 2009, and a final site plan was submitted at that time; however, soon after submittal of the final plans, the applicant began to contemplate changes to the original development proposal. In the time that followed, the proposed development was revised to better reflect current market conditions and increased costs associated with acquiring the corner parcel and redeveloping a site in close proximity to the City s West Nepean Collector sanitary line and high-pressure watermain, both of which run along the rear of the property. The revised development concept reflects a 14-storey mixed-use building. 929 Richmond Road/108 Woodroffe Avenue Page 1

6 The revised development concept was discussed with the Woodroffe North Community Association executive in September 2011, and presented at the Association s Annual General Meeting in October, Pre-consultation with City staff in October, 2011, determined that a Minor Variance or Minor Zoning By-law Amendment would be required to proceed with the revised development concept. It also determined that all of the studies completed in support of the initial Site Plan Control application with the exception of the geotechnical investigation and environmental site assessments would have to be updated as part of any re-submission. In the interest of maintaining the strong working relationship between the Community Association and the development team, and of eliminating the perception by neighbours that approval by means of minor variance would limit opportunities for community input, it was determined that approval of the revised development concept would be sought by my means of application for Minor Zoning Bylaw Amendment. This Planning Rationale report is provided in support of said application. 3. PROPERTY ANALYSIS 3.1 Location The project site is located on two parcels of land at the northwest corner of Richmond Road and Woodroffe Avenue in the Woodroffe North neighbourhood of Ottawa (Figures 1 and 2). The total site area is approximately 2,357 square metres. The project site has frontage on both Richmond Road and Woodroffe Avenue, both of which are classified as Arterial roads in the 2008 City of Ottawa Transportation Master Plan (TMP). The project site located approximately seven kilometres west of downtown Ottawa, and is approximately 350 metres south of the Ottawa River. Overall, the project site is accessible to all areas of the City through the existing major road network, quality multi-route transit access, and multi-use pathways located nearby. Figure 1 Project Site Location (Source: Bing Maps). 929 Richmond Road/108 Woodroffe Avenue Page 2

7 Figure 2 Project Site Location with Aerial (Source: Bing Maps). 3.2 Site Conditions and Use The property at 929 Richmond Road includes a two-storey building containing apartments over a neighbourhood convenience store (Pronto Mart). The property at 108 Woodroffe Avenue contains an abandoned single-family residence. Photo 1: Facing north towards existing convenience store. Photo 2: Facing west from Woodroffe Avenue towards subject site. 3.3 Community Context A wide array of land uses and building types are located in the vicinity of the project site including: Mid-rise and high-rise buildings to the east and west along Richmond Road; A range of shops, restaurants, automotive, and personal services in small single-storey retail plazas or standalone parcels along Richmond Road; and Single-detached dwellings reflecting a range of ages and architectural styles primarily to the north (Woodroffe North neighbourhood) and south (Woodpark neighbourhood). 929 Richmond Road/108 Woodroffe Avenue Page 3

8 The area also offers a number of parks, several churches of differing denominations, and the Ottawa River Parkway which provides multi-purpose pathways along the Ottawa River. A multi-use pathway also runs along the Byron Avenue linear park (Byron Tramway Park) directly across Richmond Road from the project site providing east-west connectivity through the surrounding neighbourhoods. Figure 3 illustrates the land uses and associated built forms in the immediate vicinity of the project site. Figure 3 Project Site Surrounding Uses (Source: Bing Maps). North To the north of the project site is the Woodroffe North neighbourhood. This neighbourhood is characterized by a mix of mainly two-storey single-family dwellings varying in age, condition, and architectural style. Woodroffe Walk, a roughly eight-metre wide City-owned right-of-way, separates the project site from the adjacent dwellings. Further north from the subject site is the National Capital Commission (NCC) greenspace associated with the Ottawa River Parkway which runs along the south shoreline of the Ottawa River from Lincoln Fields in the west to LeBreton Flats in the east. South To the south of the project site across Richmond Road is the Hulse, Playfair, and McGarry Funeral Home (west of Woodroffe), Our Lady of Fatima Catholic Church and Elementary School (east of Woodroffe), and the residential neighbourhood of Woodpark. Buildings to the south of the project site are generally one- and two-storey residential dwellings. East To the east of the project site across Woodroffe Avenue is a vacant former Kentucky Fried Chicken (KFC) restaurant and the Lulu Plaza, a single-storey commercial plaza that includes numerous restaurants and service uses. Further east along Richmond Road is a mix of low-rise commercial and office buildings and two high-rise residential buildings. These high-rise buildings include the Lord Richmond at 851 Richmond Road (11 storeys) and the recently-completed Continental at 747 Richmond Road (16 storeys). West Immediately adjacent the project site is a nine storey mid-rise apartment building at 945 Richmond Road with personal service uses at street level. Further west along the Richmond Road is a mix of auto-oriented commercial uses including Ottawa Honda, Tops Car Wash, and Tim Horton s and 929 Richmond Road/108 Woodroffe Avenue Page 4

9 several high-rise residential buildings, the most prominent being Park Place at 1025 Richmond Road (28 storeys). From a land use perspective, the proposed development is compatible with existing uses in the area. With respect to built form, the proposed building fits the context of existing mid-rise and highrise buildings along Richmond Road. In addition, the design and positioning of the building on the site will establish the project as a substantial gateway to the neighbourhood and represent a significant aesthetic improvement over existing uses. The proposed development is located on a Traditional Main Street (Richmond Road) in a developing/ redeveloping area of Ottawa. Over time, it is anticipated that redevelopment and increases in density will occur along Richmond Road resulting in changes to the built form and character of the corridor that will be compatible with the proposed development. Buffering of the residential neighbourhoods to the north will be provided via incremental building heights, angular plane setbacks, property setbacks, and aesthetic treatments. Photo 3: Nine-storey building at 945 Richmond Road Photo 4: Lulu Plaza east of subject site Photo 5: Our Lady of Fatima Catholic Church Photo 6: Facing west towards subject site along Richmond Road. 929 Richmond Road/108 Woodroffe Avenue Page 5

10 Photo 7: Ottawa Honda and 945 Richmond Road Photo 8: Facing north along Woodroffe Avenue from subject site Photo 9: Woodroffe Walk Photo 10: The Continental Photo 11: Park Place 3.4 Transportation Context The project site fronts onto both Richmond Road (south) and Woodroffe Avenue (east). Both streets are classified as Arterial roads in the City of Ottawa Official Plan. Arterial roads are designed to function as major public and infrastructure corridors. Additionally, the Official Plan designates Richmond Road as a Traditional Mainstreet. Traditional Mainstreets are defined as having developed prior to 1945, and offer significant opportunities for intensification through more compact forms of development, mix of uses, and pedestrian-friendly environs. Two OC Transpo bus routes Route 2 and Route 87 provide frequent service to/from the project site. Route 2 (Bayshore/Downtown) provides service at (peak) to 30 minute (off-peak) intervals throughout the day, while Route 87 (South Keys/Baseline) provides frequent service at (peak) and 30 minute (off-peak) intervals throughout the day. To the north of the project site, the Ottawa River Parkway provides multi-purpose pathways along the Ottawa River, and into the downtown core. A multi-use pathway also runs along the Byron Avenue linear park (Byron Tramway Park) directly south across Richmond Road from the subject site, providing east-west connectivity through the surrounding neighbourhoods. 929 Richmond Road/108 Woodroffe Avenue Page 6

11 4. PROPOSED DEVELOPMENT Westboro Point Developments Inc. proposes to construct a new 14-storey mixed-use building on the project site. The proposed development would include 85 dwelling units, 239 square metres of street-level commercial spaces for retail or service uses, and two levels of underground parking for 78 vehicles. The building is designed and located on the project site so as to address the oblique angle of the intersection while providing a building face and unique public realm on both Richmond Road and Woodroffe Avenue. This approach also has the effect of angling the bulk of the building away from the Woodroffe North neighbourhood. In addition, incremental height increases from eight storeys at the rear property line to 14 storeys at Richmond Road moves building height away from the Woodroffe North neighbourhood with the resulting angular planes providing continued solar access. The entrance lobby is located in the centre of the building frontage facing the intersection and separates the street-level residential units from the commercial spaces. Two street-level townhouses are located on the Woodroffe Avenue side of the entrance lobby and include access from the street as a means of continuing the street-oriented residential character of Woodroffe Avenue to the north. Two street-level commercial spaces are located on the Richmond Road side of the entrance lobby as a means of addressing this Traditional Mainstreet corridor. The rear of the building includes three ground floor townhouses and a communal amenity area, all of which include a raised garden area. In addition to the raised gardens, the remaining area behind the building is landscaped with trees, shrubs, and grasses and distinguished from the surrounding properties by a 1.5-metre high opaque wall with a 0.5-metre high planted screen above. Vehicular access to two levels of underground parking for 78 vehicles would be provided via a ramp located at the northern edge of the project site. Service access would be provided via a loading zone located at the western edge of the project site. Both points of access have been located to maximize the distance from the intersection of Richmond Road and Woodroffe Avenue. Four public on-street parking stalls are proposed on Woodroffe Avenue in front of the development to increase access to the street-level commercial spaces and contribute to the Traditional Mainstreet character sought by the City and residents of the area. Exhibit 1 Project Rendering - Front Elevation 929 Richmond Road/108 Woodroffe Avenue Page 7

12 Exhibit 2 Rear Elevation Exhibit 3 South Elevation(Richmond Road) 929 Richmond Road/108 Woodroffe Avenue Page 8

13 Exhibit 4 North Elevation (Woodroffe Avenue) 5. SUPPORTING STUDIES 5.1 Phase 1 and 2 Environmental Site Assessment (ESA) T. Harris Environmental Management conducted a Phase 1 ESA on the project site in early 2008 to determine the presence of any potential environmental hazards associated with the property. The following provides a summary of the report: Neither Ontario Ministry of Environment (MOE) records of outstanding orders nor other legal undertakings against the property including non-compliance issues for the site were found; No spills were recorded within 0.25 kilometres of the site; Two former gasoline service stations with underground storage tanks were once located one block east of the subject site on Richmond Road between Woodroffe Avenue and Lockhart Avenue. Due to the close proximity of the two former gasoline stations, it was recommended that a limited Phase 2 ESA be conducted, and; Asbestos, lead, silica, and mercury were all found in the existing structures on site. It was recommended that an asbestos survey be conducted on the existing structures. Paterson Group conducted a Phase 2 ESA on the project site as recommended in the Phase 1 ESA. The report found limited existence of low-level hydrocarbon contamination in the soil on a small portion of the site. Since redevelopment will result in the complete removal of all soil on the site, it is expected that remediation of this occurrence will result. Soil removed during excavation of the site will be re-tested and any found to be contaminated will be disposed of at a registered landfill facility. 5.2 Servicing Options and Stormwater Management IBI Group prepared a servicing options analysis, including stormwater management, and plan for the proposed development. The following provides a summary of the report: The proposed site plan can be serviced by extending existing municipal services; Services accessible to the site include storm sewer, sanitary sewer, water service, gas, Bell and Rogers, and overhead hydro; 929 Richmond Road/108 Woodroffe Avenue Page 9

14 A new 150mm diameter water service is proposed that connects to the existing 400mm water line on Woodroffe Avenue. It will enter the building on the north side; A new 150mm diameter wastewater service is proposed that connects to the 225mm sanitary sewer line on Woodroffe Avenue. It will enter the building near the basement parking ramp on the north side of the building; A new 250mm diameter service connection is proposed to be connected to the existing 300mm storm sewer located in Woodroffe Avenue; Overland flow routes will be provided in the grading and roadway design to permit emergency overflow drainage from the site; Any excess runoff up to the 100-year event is to be stored on-site in an underground cistern in order to not surcharge the storm sewer system; Adherence to the Sediment and Erosion Control plan during construction will minimize harmful impacts on surface water, and; All necessary public utilities such as hydro, gas, bell and cable are available for the site. 5.3 Transportation A Transportation Brief was prepared by IBI Group to analyze the transportation and traffic impact of the proposed use. The following provides a summary of the report: The proposed development conforms to the City of Ottawa s Transportation Demand Management (TDM) principles by providing ease of access to non-motorized modes of travel, including multiple bus stops, bicycle facilities, and pedestrian amenities; It is estimated that the proposed development will generate a total of 62 veh/h, 54 veh/h and 67 veh/h during the weekday morning, weekday afternoon and Saturday peak hours, respectively. However, as the on-site underground parking will be primarily for residents, the traffic entering/exiting the site is only expected to be 48 vehicles per hour (veh/h), 40 veh/h and 49 veh/h during the weekday morning, weekday afternoon and Saturday peak hours, respectively; The Richmond Road/Woodroffe Avenue intersection is presently operating at an acceptable Level of Service (LOS A ) during the weekday morning and Saturday peak hours, but is operating above threshold capacity (LOS F ) during the weekday afternoon peak hour. Some improvement to the operation condition can be attained through signal timing improvements, but the intersection will continue to operate close to threshold levels; The location of the proposed site access within the property limits was chosen to provide the least impact to the adjacent road network. Analysis of the Site Access has demonstrated that the traffic generated by the proposed development will have a negligible effect on through-traffic and that the unsignalized Site Access intersection will function very well in terms of level of service; During peak periods of traffic, queues on the southbound approach to the Richmond Road/ Woodroffe Avenue intersection will extend beyond the location of the proposed access driveway. At these times, traffic in the queue on Woodroffe Avenue will have the right-ofway over traffic exiting the site at all times except in the case of emergency response vehicles. However, it is expected that during these times, stopped traffic in the queue will allow traffic attempting to exit the site to either cross or enter the queue by creating gaps where possible. This scenario is considered common practice on similar site arrangements at congested intersections. Additionally, since the peak hour traffic volumes generated by the development are relatively small due to the limitations of available on-site parking for residents and availability of on-street parking for commercial users, the interactions between site generated traffic and the Woodroffe Avenue traffic queue will be infrequent and should not pose a significant impact to traffic operations at the intersection or along this section of Woodroffe Avenue; and The site access driveway to the proposed development conforms to the City of Ottawa Private Approach By-Law. 929 Richmond Road/108 Woodroffe Avenue Page 10

15 5.4 Shadow Impact Study A shadow impact study was prepared by PLP Architecture, the architectural designer of the proposed development, to determine if it would result in significant shadow impacts on surrounding properties. A 3-D digital model of the proposed development was used to determine the projected shadow at various times of day at various times of year. The model assumes that a minimum of four hours of daylight are required throughout the growing season to allow for healthy plant life. Public spaces parks, walking trails, and sidewalks do not have the same minimum requirement. The model also assumed that on cool days, sunlight is generally appreciated, as is shade on very hot days. The shadow impact study demonstrates that the proposed development will not inhibit solar access to the backyards of neighbouring residential properties in the spring, summer, and fall. In the winter, there will be some restriction of solar access in the morning hours; however, in the afternoon hours, neighbouring residential properties will have solar access to utilize passive solar gain. Overall there will not be a significant shadow impact on nearby residential properties as a result of the proposed development. It is worth noting that the careful siting and design of the proposed development which is taller than the original development approved for the project site results in no more shadow impact on surrounding properties. 5.5 Geotechnical A geotechnical investigation was conducted by Paterson Group for the proposed development to determine subsoil and groundwater conditions on the site as well as to prepare geotechnical recommendations to the site design. The following provides a summary of the report: From a geotechnical perspective, the subject site is considered suitable for the proposed development; Bedrock removal will be required to complete underground parking levels. Bedrock excavation could conducted using hoe ramming for small quantities and line drilling or controlled blasting for large quantities; Stabilization of bedrock will be required in areas where the proposed foundation extends below the existing foundation levels. 5.6 Noise A noise impact assessment was conducted by Integral DX Engineering to determine the environmental noise impacting the proposed development, particularly from Richmond Road and Woodroffe Avenue, both of which are arterial roadways. The assessment predicted indoor and outdoor noise levels and compared these levels to City of Ottawa guidelines and requirements. The assessment found that special noise control measures are required, including central air conditioning of residential units, and notices-on-title regarding noise issued to purchasers. 5.7 Tree Conservation A tree inventory and conservation report was conducted by IFS Associates for the proposed development site to determine impacts to the trees on site from the development. The following provides a summary of the report: No endangered or other significant trees were found to be present on-site; None of the existing trees on-site were found to be retainable, as the proposed building, parking accesses, and underground construction leave little room to retain trees. However, it is anticipated that trees located on adjacent properties can be retained with appropriate preservation measures as outlined by the City of Ottawa. 929 Richmond Road/108 Woodroffe Avenue Page 11

16 6. PLANNING POLICY AND REGULATORY ANALYSIS This section of the report considers the proposed development in light of the Provincial Policy Statement (PPS), the City of Ottawa Official Plan, the Richmond Road/Westboro Community Design Plan (CDP), design guidelines for Traditional Mainstreets and High-Rise Buildings, and the City of Ottawa Zoning By-law The proposed development of the project site requires a Minor Zoning By-law Amendment. 6.1 Provincial Policy Statement Section 3 of the Planning Act requires that municipal planning decisions be consistent with the Provincial Policy Statement (PPS). The PPS provides direction on matters of provincial interest related to land use planning and development. The PPS encourages efficient, cost-effective development and patterns of land use which stimulate economic growth and protect the environment and public health. It also encourages land use patterns that accommodate an appropriate range and mix of residential uses in a manner that supports infill, intensification of development, and discourages the expansion of urban boundaries. The proposed development is consistent with the intent of the PPS in that it: Represents an efficient form of development and land use pattern while accommodating an appropriate range of residential uses for this site that contribute to meeting long-term needs of the City (Section 1.1.1a); Assists in accommodating an appropriate range and mix of residential uses to meet longterm needs (Section b); Avoids development and land use patterns which may cause environmental or public health and safety concerns (Section 1.1.1c); Promotes cost-effective development standards to minimize land consumption and servicing costs [Section 1.1.1e); Efficiently uses infrastructure and public service facilities which are planned or available (Section a); Constitutes an opportunity for intensification and redevelopment as outlined in Section ; Is located to take maximum advantage of existing and planned transportation improvements by locating at the intersection of two arterial roads (Section ); Provides a land use pattern, density and mix of uses that minimize the length and number of vehicle trips and supports the development of viable choices and plans for public transit and other alternative transportation modes (Section ); Accounts for protected future right-of-ways on Woodroffe Avenue and Richmond Road (Section ); Promotes compact form to fit into a structure of nodes and corridors (Section 1.8.1a); Does not conflict with identified resources such as agricultural lands, aggregate areas, or areas with an inherent environmental sensitivity (Section 2.1), and; Does not adversely impact public health and safety (Section 3.1). A major policy focus in the PPS is related to the concentration of growth in Settlement Areas, including the promotion of opportunities for intensification and redevelopment where they can be accommodated. The PPS defines intensification as development of a property, site, or area at a higher density than current exists through: Redevelopment, including the reuse of brownfield sites; The development of vacant and/or underutilized lots within previously developed areas; Infill development; and The expansion or conversion of existing buildings (Section 6.0). 929 Richmond Road/108 Woodroffe Avenue Page 12

17 The proposed project provides significant potential for infill development of two underutilized lots in a highly-developed area of Ottawa and represents the kind of opportunity for intensification promoted by the PPS. Conclusion Overall, the proposed development is consistent with the policies of the PPS. The project provides an intensification opportunity of existing underutilized lots within a built-up and well-serviced area of the City. 6.2 City of Ottawa Official Plan Section 2.2 (Managing Growth) Section 2 of the City of Ottawa Official Plan outlines the strategic policy direction for future growth in the City. Section (Managing Growth within the Urban Area) notes that opportunities for residential intensification exist and will be supported within the General Urban Area. Section provides a definition of residential intensification as development that results in a net increase in residential units and includes: Redevelopment (the creation of new units, uses or lots on previously developed land in existing communities), including the redevelopment of Brownfield sites; The development of vacant or underutilized lots within previously developed areas, being defined as adjacent areas that were developed four or more years prior to new intensification; Infill development; The conversion or expansion of existing industrial, commercial and institutional buildings for residential use, and; The conversion or expansion of existing residential buildings to create new residential units or accommodation, including secondary dwelling units and rooming houses. The proposed project would redevelop two previously underutilized commercial and residential parcels within the urban area into 85 residential units and 239 square metres of commercial uses. As a result, the proposed development meets four of the five intensification definitions noted in Section Section of the Official Plan states that major intensification will be directed toward designated Mainstreets. The project site is located on a designated Traditional Mainstreet (Richmond Road). Sections through of the Official Plan go on to outline intensification targets and minimum densities for specific areas in the city. Section notes that the target for overall residential intensification in the timeframe is 38-percent of total development in the city. Section b notes that the City will establish minimum residential targets on Traditional Mainstreets; however, no residential targets for the Traditional Mainstreet section of Richmond Road have been established at this time. Section 2.5 (Building Liveable Communities) Section (Urban Design and Compatibility) sets out design and compatibility objective, principles, and policies applicable to intensification and infill development within the urban area. The guidance provided in Section assists in mitigating differences in built form and function to achieve compatibility within a community; however, Section does acknowledge that allowing for some flexibility and variation that complements the character of existing communities is central to successful intensification. Development applications are evaluated in the context of meeting guidelines in Section The proposed development meets the design and compatibility objectives set forth in Section in the following manner: 929 Richmond Road/108 Woodroffe Avenue Page 13

18 Promotes quality consistent with a major metropolis, and a prime business and tourist destination; Encourages a continuity of street frontages; Minimizes the exposure of inhabitants to noise levels that could adversely impact their health and well-being; Integrates public transit with existing and new development; Creates places and spaces that are visible and safe and can be confidently used at all hours of the day and at night where it is appropriate to do so; Integrates new development to complement and enliven the surroundings. Achieves a more compact urban form over time; Protects the City s natural heritage system and take an ecosystem approach to design that supports natural functions, such as natural drainage, groundwater recharge and discharge, and wildlife habitat; Orients development to maximize opportunities for passive solar gain, natural ventilation, and use energy efficient development forms and building measures; Maximizes opportunities for sustainable transportation modes (walking, cycling, transit facilities and connections), and; Reduces hard surfaces and maximize landscaping and site permeability on site. Section 3.6 (Urban Designations) The project site is designated General Urban Area in the Official Plan and is also located on a designated Traditional Mainstreet (Richmond Road) (see Figure 4). Figure 4 City of Ottawa Official Plan: Designated General Urban Area The General Urban Area designation, outlined in Section of the Official Plan, permits a wide variety of uses, including all types and densities of residential development, as well as employment, retail, institutional, leisure, cultural, greenspace, entertainment, and institutional uses (Section ). Section provides policy on proposals for residential intensification through infill or redevelopment in the General Urban Area, noting that the City will: 929 Richmond Road/108 Woodroffe Avenue Page 14

19 Recognize the importance of new development relating to existing community character so that it enhances and builds upon desirable established patterns and built form; Apply the policies of Section and Section 4.11 of the Official Plan; Consider its contribution to the maintenance and achievement of a balance of housing types and tenures to provide a full range of housing for a variety of demographic profiles throughout the General Urban Area, and; Assess ground-oriented multiple housing forms, such as duplex, triplex and fourplex, as one means of intensifying within established low-rise residential communities. Section notes that the City will encourage a variety of small, locally-oriented convenience and service uses that complement adjacent residential uses, and are of a size and scale consistent with the needs of the nearby residential areas. Such uses are to be: Compatible and complement surrounding land uses, and can be developed in accordance with Section and Section 4.11; Conveniently located with respect to concentrations of residential development and provide direct access for pedestrians and cyclists from adjacent residential areas; Permitted to cluster with other community-oriented uses, such as parks, pedestrian linkages, community centres or leisure facilities, in order to facilitate interaction among residents and contribute to a sense of community; Situated to take advantage of pedestrian and cycling patterns, and; Of a size and scale that will not result in the attraction of large volumes of vehicular traffic from outside the immediate area. The proposed development contains 239 square metres of ground-floor commercial area fronting Richmond Road. Surrounding uses include other small-scale retail and service uses that serve the community. Direct access to the commercial areas is provided via sidewalk connections to adjacent neighbourhoods as well as other uses along the Richmond Road Traditional Mainstreet corridor. Cycling access to retail on site is provided via connections to the Byron Avenue Tramway multi-use path as well as multi-use pathways along the Ottawa River Parkway to the north. The Traditional Mainstreet designation, outlined in Section of the Official Plan, identifies streets that offer significant intensification through compact development, mixed uses, and pedestrian-friendly environments. A broad range of uses are allowed on Mainstreets, including residential, retail and service commercial uses, office, and institutional uses. Richmond Road, in the area of the proposed development, is designated a Traditional Mainstreet. Section notes that redevelopment and infill are encouraged on Traditional Mainstreets, with general support for four-to-six storey building heights, although consideration for height increases is provided. The proposed development achieves multiple criteria for building height increases listed in Section , including: Proposing a building height that conforms with prevailing building heights along Richmond Road, while providing a transition to low-rise neighbourhoods to the north through urban design measures such as massing, incremental changes in building height, and architectural treatments; Creating a community focus at a gateway for the Woodroffe North neighbourhood by locating on the corner of two arterial roads (Richmond Road and Woodroffe Avenue) currently served by multiple transit routes, and; Meeting provisions of Section and Section 4.11 that determine if additional height is appropriate. Refer to the related discussion below on Section 5.2 of the Official Plan regarding the provision of community benefit in exchange for additional height and density. 929 Richmond Road/108 Woodroffe Avenue Page 15

20 Section 4.11 (Urban Design and Compatibility) Section 4.11 provides objectives, criteria, and policies that can be used to evaluate compatibility for intensive development projects within the city. Specifically, where zoning by-laws are required to change the permitted use of the land, height, or density, compatibility of the proposed development must be assessed as it relates to the criteria and policies. Criteria used to evaluate compatibility include both built form and operational characteristics. Development applications are evaluated in the context of meeting policies and criteria in Section The proposed development meets the compatibility objectives set forth in Section 4.11 in the following manner: Traffic (Section a) The project site is located at the intersection of two arterial roadways Richmond Road and Woodroffe Avenue and is also served by multiple transit routes and bicycle/pedestrian connections. A Transportation Brief completed for the project documented that the traffic generated by the proposed development would not negatively affect the existing road network. Vehicular Access (Section b) The proposed development has been designed with two access points one for service deliveries from Richmond Road and the main access for residents and visitors from Woodroffe Avenue. The majority of traffic entering the project site will be routed into an underground parking facility, thus mitigating noise, glare, and loss of privacy on neighbouring uses. Parking Requirements (Section c) The proposed development includes 78 parking spaces for residents and visitors of the building. Four on-street parking stalls are also proposed for Woodroffe Avenue in front of the building. Additionally, nearby on-street parking on Byron Avenue and excellent transit connectivity at the project site will provide further options for parking and access to the site. Sufficient bicycle parking and storage is also provided. Refer to Section 5.3 of this report for more information. Outdoor Amenity Areas (Section d) The neighbouring uses do not contain amenity areas; however, the siting and design of the proposed development, as well as landscape planting and screening, will provide protection from any potential undesirable impacts. Loading Areas, Service Areas, and Outdoor Storage (Section e) The proposed service and loading area is located at the western extent of the property adjacent the windowless east side of the mid-rise apartment building located next door at 945 Richmond Road. Landscape planting and screening will be used to limit any potential undesirable impacts. Lighting (Section f) Lighting for the proposed development will be designed and installed to the City s standards. As such, no impacts on neighbouring properties from lighting are anticipated. Noise and Air Quality (Section g) The proposed development will not cause any adverse noise or air quality impacts on neighbouring properties. Refer to Section 5.6 of this report for more information. Sunlight (Section h) A solar shadow study was completed for the proposed development. The results of the study determined that no adverse impacts are anticipated from the proposed development on neighbouring properties. Refer to Section 5.4 of this report for more information. Microclimate (Section i) Study of microclimatic (wind, drifting, temperature) effects of the proposed development was not required nor completed; however, no adverse microclimatic effects on neighbouring properties are anticipated due to the relatively modest scale of the project. Supporting Neighbourhood Services (Section j) The proposed development is situated in a location close to many neighbourhood facilities and amenities. The project site is within short distance to multi-use pathways along Byron Avenue and the Ottawa River Parkway, and is one block from the multi-facility Woodroffe Park. In addition, numerous retail, service, religious, and 929 Richmond Road/108 Woodroffe Avenue Page 16

21 educational amenities are located along Richmond Road, most of which within walking distance of the project site. Sections through provide guidance on building profile as it relates to urban design and compatibility. Section notes that high-rise buildings defined as buildings higher than ten storeys will be considered on Traditional Mainstreets, provided that one of the following conditions listed in Section is met: Within areas characterized by high-rise buildings that have direct access to an arterial road, or; Within 600 metres of a rapid transit station or; Where a community design plan, secondary plan, or other similar Council-approved planning document identifies locations suitable for the creation of a community focus on a strategic corner lot, or at a gateway location or on a terminating site to strategic view, or a site that frames important open spaces, or at a location where there are significant opportunities to support transit at a transit stop or station by providing a pedestrian and transit-oriented mix of uses and activities, or; Within areas identified for high-rise buildings where these building profiles are already permitted in the Zoning By-law approved by Council, or; Within areas where a built form transition as described in Section is appropriate. The proposed development is located on a gateway corner lot with direct access on two arterial roadways (Richmond Road and Woodroffe Avenue) and the potential for creating a focal point in the community. The proposed development is also located on a section of Richmond Road that includes multiple high-rise buildings of between 11 and 28 storeys. Furthermore, the proposed development also meets a variety of the built form transitions outlined in Section Although not highlighted specifically in the Richmond Road/Westboro Community Design Plan, the project site represents a gateway location at the intersection of two arterial roads and four neighbourhoods within the western urban built-up area of Ottawa. Two high-frequency transit routes also service the site (OC Transpo Routes 2 and 87). Section outlines architectural and urban design considerations that the City will evaluate for new high-rise building proposals. Considerations include: How the scale, massing and height of the proposed development relates to adjoining buildings and the existing and planned context for the surrounding area in which it is located; How the proposal enhances existing or creates new views, vistas and landmarks; The effect on the skyline of the design of the top of the building; The quality of architecture and urban design, particularly as expressed in Council-approved design guidelines, and; How the proposal enhances the public realm, including contribution to and interaction with its surroundings at street level. Section outlines taller building transitions used as integration tools with surrounding land uses. Measures to accomplish transitions include: Incremental changes in building height; Massing; Character; Architectural design; and Building setbacks. The proposed development was reviewed by the City s Urban Design Review Panel on December 1, 2011, to determine compatibility with Sections 4.11 of the Official Plan. Transitions to adjacent existing development will be accomplished by massing the building to the front of the property along Richmond Road, orienting the building toward both arterial streets and away from the residential area at the back of the property, and designing incremental changes in building height from eight 929 Richmond Road/108 Woodroffe Avenue Page 17

22 storeys at the back of the property to 14 storeys at the front of the property on Richmond Road. Refer to Section 6.7 of this report for more information regarding the specific comments of the Urban Design Review Panel and how certain elements of the building design were revised to address these comments. Section 5.2 (Implementation Mechanisms, by Authority under the Planning Act) As noted in the discussion of Section of the Official Plan above, the City will consider increases in height or density on Traditional Mainstreets. Such consideration is guided by Section of the Official Plan which states that increases in height and density above levels permitted in the zoning by-law will conform with Section 37 of the Planning Act regarding the provision of community benefit. Conclusion The proposed development meets the general intent and objectives of the Official Plan in the following manner: It fits the definition of intensification under Section ; It conforms to the design objectives and principles set out in Section 2.5.1: Compatibility and Community Design; It conforms with applicable policies set out in Section 3.6.1: General Urban Area, and 3.6.3: Traditional Mainstreets; It meets multiple criteria for height increases on Traditional Mainstreets, as listed in Section ; and, It responds to the compatibility criteria established in Section 4.11: Compatibility. 6.3 Richmond Road/Westboro Community Design Plan The Richmond Road/Westboro Community Design Plan (2007) was prepared to guide the longterm design and development of the area. The Plan locates the project site in Sector 2 (Woodroffe North area) and is identified as an infill/intensification site with a building height of three to four storeys. However, the existing TM - Traditional Mainstreet zoning of the project site permits a building height of 25m (seven storeys). The Plan provides policy guidance for future land use, streetscape, and building design. The Guiding Principles of the Plan include: Retaining all public greenspace; increase greenspace where possible; Increasing recreational facilities; Ensuring the area develops in such a way as to ensure that it is pedestrian- and cyclistfriendly; and; Preserving the scale and character of existing neighbourhoods and ensure compatibility of new development. Section 4.2 (Overlying Objectives and Principles) of the Plan outlines principles for intensification and infill within the Plan area. The proposed development meets the principles in Section 4.2 in the following manner: It provides appropriate setbacks and transitions in building height, including a design that includes incremental height changes varying from eight storeys closest to residential areas to 14 storeys closest to other taller structures on Richmond Road; It conforms to multiple applicable Richmond Road/Westboro design guidelines for the Woodroffe North neighbourhood found in Section 8.4 of the CDP (see discussion below); It conform to the standards for increased densification and building height as set out in Section 8.7 of the CDP (see discussion below); It respects a transition in building scale and density and compatibility of land use from Richmond to the Ottawa River Parkway in a north-south direction and along Richmond between different sectors in an east-west direction, and; 929 Richmond Road/108 Woodroffe Avenue Page 18

23 It creates a breaks in the street wall from neighbouring properties and is aligned to front both Richmond Road and Woodroffe Avenue, creating an inviting presence and pedestrianfriendly environment. Section 6.11 (Development Potential) of the Plan provides a comparison between existing zoning and proposed build-out based on the CDP for each planning sector. The Woodroffe North area, in which the project site is located, had an existing zoning potential of 560 new residential units and a CDP proposed potential of 548 residential units. It should be noted that the zoning for the project site changed since the CDP was adopted. Since the adoption of the CDP, one major development in Woodroffe North the Continental at Richmond Road and Cleary Avenue has been completed. The Continental project contains approximately 100 units, leaving an additional 460 new residential units available for development in Woodroffe North according to the CDP build-out potential. The proposed development consists of 85 units, representing only about 15 percent of the total new buildout in Woodroffe North. Figure 5 Richmond Road/Westboro CDP: Woodroffe North Sector Section 8.4 of the Plan provides specific built form, open space, landscape, and parking guidelines for the section of Richmond Road from Golden Avenue west to the Ottawa Parkway. According to the Plan, the overall intent of the guidelines in this planning area is to foster the evolution of the existing mixed traditional/arterial mainstreet type of development toward a more compact, mixeduse, pedestrian- oriented form, including buildings located close to the street. As the project site is located on this section of Richmond Road, the proposed development must address these guidelines. Applicable guidelines include: Design new development to be compatible with adjacent neighbourhoods, in accordance with the infill guidelines applicable to each planning sector; Ensure adequate sunlight for sidewalks by building within a 45 degree angular plane measured from the opposite sidewalk curb and setting back the upper floors of buildings above the third storey from the lot frontage; Use periodic breaks in the street wall or minor variations in building setback and alignment to add interest to the streetscape, and to provide space for activities adjacent to the sidewalk in order to avoid creating a continuous wall effect on the street; Orient the front façade of the building to the public street and locate its front doors to be visible from the street; 929 Richmond Road/108 Woodroffe Avenue Page 19

24 Set the building back from the property line where necessary to accommodate a wider sidewalk; Avoid blank side walls, especially if they are visible from the street, a parking lot or from a public plaza. If applicable, continue the same level of architectural treatment around the sides of the building; Maximize the number of residential units with windows on two sides; Preserve the views to the Ottawa River Parkway open space corridor from north-south streets south of Richmond Road; Design buildings to accommodate signage; use signs to accentuate architectural features, not to hide them; Provide sufficient open space around residential buildings to ensure the provision of sufficient sunlight to habitable areas; Ensure existing dwellings to the north of Richmond retain adequate sunlight and privacy and minimize overlook; Where appropriate, new buildings should relate to the existing built form of adjacent properties to help create a coherent streetscape in each planning sector; Create a north-south and east-west transition in the scale and massing of buildings. Connect pedestrian walkways to the street and to adjacent properties to facilitate circulation between properties; Provide a minimum three-metre landscape area, which may include a solid wall or fence in addition to planting, at the edges of sites adjacent to residential or institutional properties; and Preserve open spaces in the streetscape to provide for the creation of green streets and pedestrian links toward the Ottawa River. The design of the proposed development achieves the vast majority of these guidelines to achieve a compact, mixed-use and pedestrian-oriented streetscape. Due to the size and orientation of the project site, certain guidelines cannot be achieved, including: stepping back of upper floors from the street frontage; and, providing a three-metre landscape area at the edges of the site adjacent to residential properties. However, the existing built conditions surrounding the project site, coupled with careful siting and design of the proposed building, will ensure that any potential adverse impacts are minimized. Section 8.5 of the Plan provides direction to ensure that new development will be compatible with existing features, building scale, and adjacent neighbourhoods. Applicable guidelines for the Woodroffe North area include: Encourage the conversion/redevelopment of existing automobile-oriented uses fronting on Richmond Road to more pedestrian-friendly, mainstreet uses; Design buildings rich in architectural detail that respect the rhythm and pattern of existing or planned buildings on the street through the alignment of such elements as windows, front doors, cornice lines, fascias, etc.; Ensure the spacing and massing of new buildings with respect to other existing or planned adjacent buildings is particularly sensitive to the general guidelines to provide sufficient light and privacy for residential and institutional uses to the rear and to minimize overlook; Create a transition in building height where new development is to be higher than the existing adjacent residential area, with a minimum height of two storeys; Avoid major alterations to the lot grade and ensure that rear yards are properly landscaped, complementing the existing buffer strip at the rear of lots fronting Richmond Road; and For new infill development on Richmond between Aylen and Pooler Avenues, recognize that the existence of a low-rise residential area to the north at a lower elevation will affect the siting and footprint of buildings. Portions of a development closer to Richmond can use the full width of the lot to create a strong edge to the street. However, development at the rear of the lot will need to be particularly sensitive to the general guidelines to provide sufficient light and privacy for residential uses to the rear and to minimize overlook. 929 Richmond Road/108 Woodroffe Avenue Page 20

25 The design of the proposed development achieves the vast majority of these guidelines to achieve compatibility with existing features, building scale, and the adjacent neighbourhood. Due to the size and orientation of the project site, the guideline pertaining to the creation of a transition in building height from the adjacent residential area beginning above two storeys cannot be achieved. However, careful siting and design of the proposed building ensures that only a narrow portion of the lowest segment of the building abuts the rear yard, and then only at an angle. Combined with the proposed rear yard setback and the eight-metre wide Woodroffe Walk that abuts the rear yard in this location, a significant shadow impact on nearby residential properties as a result of the proposed development is not expected (refer to Section 5.4 of this report). Section 8.7 of the Plan notes that developments proposing levels of intensification above the Plan policies in this case proposing a taller building should be evaluated vis a vis the following applicable standards: The building should safeguard exposure to sunlight along the sidewalk; The building should not have significant negative effects on surrounding properties and residential neighbourhoods regarding shadowing and visual impact; and The applicant must address the planning strategy and the urban design guidelines, including infill guidelines in Section 8.5 of the CDP, and undertake a transportation impact study. Careful siting and design of the proposed building provides exposure to sunlight along sidewalks, and based on the results of the shadow impact study (refer to Section 5.4 of this report), does not create negative visual or shadowing effects on neighbouring properties. As noted in the discussion above, the proposed development achieves the vast majority of the guidelines set out in Section 8.5 of the Plan with respect to compatibility. Finally, a transportation impact study was undertaken to analyze the effect of the project on the neighbouring road network. The study found that the traffic generated by the proposed development would not negatively affect the existing road network (refer to Section 5.5 of this report). Conclusion The proposed development meets the general intent and objectives of the Richmond Road/ Westboro Community Design Plan in the following manner: It meets intensification principles as outlined in Section 4.2 of the Plan; It falls within the build-out goals in the Woodroffe North area, as outlined in Section 6.11 of the Plan, providing approximately 15 percent of the proposed units for the Sector; It meets the specific built form, open space, landscaping, and parking guidelines for the Woodroffe North area in Section 8.4 of the Plan; It meets the guidelines established for infill development as outlined in Section 8.5; and It conforms to the applicable standards for increasing height and density on intensification sites, as outlined in Section 8.7 of the Plan. 6.4 Urban Design Guidelines along Traditional Mainstreets The City of Ottawa s Guidelines for Development along Traditional Mainstreets provide urban design guidance at the planning application stage to assess, promote, and achieve appropriate development for proposed developments on Traditional Mainstreets. The proposed development supports several of the Traditional Mainstreet guidelines. In particular it would: Align with the existing built form along Richmond Road (Guideline 1); Provide a minimum 2-metre wide concrete sidewalk to match the approved streetscape provisions in the Richmond Road/Westboro CDP (Guideline 3); Provide a quality building design that is rich in architectural detail and respects the rhythm and pattern of the existing or planned, buildings on the street, through the alignment of elements such as windows and front doors (Guideline 8); 929 Richmond Road/108 Woodroffe Avenue Page 21

26 Ensure sufficient light and privacy for residential and institutional properties to the rear by ensuring that the development is compatible and sensitive with adjacent uses with regard to maximizing light and minimizing overlook (Guideline 9); Use clear windows and doors to make the pedestrian level façade of walls facing the street highly transparent and locate active pedestrian-oriented uses at-grade (Guideline 11); Locate a mixed-use development by concentrating height and mass at nodes and gateways (Guideline 14); Highlight a corner site where two public streets intersect with special treatment such as a corner entrance. It would also continue the same level of architectural detailing around both sides of the building (Guideline 16); Provide pedestrian weather protection (Guideline 17); Locate the front doors to face the mainstreet and be directly accessible from the public sidewalk (Guideline 19); Construct the pedestrian walkways of materials such as concrete or unit pavers that are easily maintained for safety (Guideline 20); Provide enclosures or screening for all utility equipment within buildings (Guideline 38); Design lighting so that there is no glare or light spilling onto surrounding uses (Guideline 40), and; Provide lighting that is appropriate to the street character and mainstreet ground-floor use, with a focus on pedestrian areas (Guideline 41). 6.5 Urban Design Guidelines for High-Rise Housing The City of Ottawa s Urban Design Guidelines for High Rise Housing are intended to encourage and achieve appropriate high-rise development. High-rise buildings are defined by the City of Ottawa as any building that is ten storeys or more. The Urban Design Guidelines for High Rise Housing deal with seven elements of design, including: context; built form; pedestrian and public realm; open space; amenities; environmental considerations; site circulation and parking; and services and utilities. The proposed development supports several of the High-Rise Housing guidelines. In particular it would: Integrate into the context and address compatibility with the planned context through the transitions in building height, and through the design qualities and character (Guideline 1a); Provide direct links to public transit, sidewalks and streets (Guideline 1b); Create a landmark building that is distinctive in form, is located at a prominent intersection, and is designed and will be built with richness and quality in materials and detail (Guideline 2a); Step-down at 45 degree angles to lessen the impact on adjacent areas (Guideline 4); Feature innovative design and site treatments on a community gateway (Guideline 7); Be oriented to minimize shadowing on adjacent sites (Guideline 11); Create a building form that responds to function, site characteristics, context, and mix of uses (Guideline 12); Support human-scaled streetscapes through the design and uses of the lower portion of the building (Guideline 13); Use clear windows and doors to make the pedestrian level façade highly transparent and accessible (Guideline 14); Include retail uses and active uses along the street façade to enhance the building s relationship to the public realm (Guideline 16); Include at an-grade pedestrian entrance which is directly accessible, clear, and prominent with a direct link to the sidewalk (Guideline 17); Feature an architecturally detailed façade, using various types of materials and treatments, with no blank or featureless sides (Guideline 18); Be designed with a compact floor plate to maximize views and light for the interior spaces, creates narrow shadows, and allow opportunities for sky views (Guideline 21); Feature a distinctive and well-designed roofline (Guideline 23); 929 Richmond Road/108 Woodroffe Avenue Page 22

27 Provide barrier-free and universal access to the building by pedestrians (Guideline 30); Provide views from the apartments to the streets and open space allowing visual surveillance and neighbourliness (Guideline 31); Protect pedestrians from inclement weather by using canopies on the ground level (Guideline 32); Coordinate and integrate existing transit stops into the site (Guideline 34); Provide required outdoor amenity space through use of balconies and private outdoor space (Guideline 41); Provide amenities at the building entrance, including benches, bike racks, bus stops, and lobby seating (Guideline 51); Provide a 2-metre wide entrance from the main doors to the sidewalk (Guideline 52); Include underground parking and locate the garage entry in such a way as to not to detract from the streetscape (Guidelines 56 and 58); Provide bicycle parking (Guideline 59); Integrate the strategic location of building infrastructure away from public areas (Guideline 61 and 62); Locate utility, garbage, and other service areas away from public view (Guidelines 63, 64, and 65), and; Locate and conceal exhaust and other service intakes/outputs to avoid impacts on sidewalks, outdoor spaces, and adjacent development (Guideline 67). 6.6 Transit Oriented Design (TOD) Guidelines The Western Light Rail Transit Corridor Planning and Environmental Assessment currently underway identifies Richmond Road in the vicinity of the proposed development as a potential light rail transit corridor. Based on this possible future, the proposed development should be designed to consider the City s TOD guidelines. The intent of the TOD guidelines is to provide an urban design standard for assessing, promoting, and achieving appropriate TOD within the City of Ottawa. TOD is defined as a mix of moderate-tohigh density transit-supportive land uses located within an easy walk of a rapid transit stop or station that is oriented and designed to facilitate transit use. The TOD guidelines are to be applied for all development within a 600-metre walking distance of a rapid transit stop or station. Should rapid transit be provided along the Richmond Road corridor, the proposed development would support several of the TOD guidelines. In particular it would: Provide transit-supportive land uses (residential apartments) within 600m walking distance of a rapid transit station or stop (Guideline 1); Locate high density uses as close as possible to transit (Guideline 8); Include architectural variety at grade to provide visual interest to pedestrians and highlight the building entrance (Guideline 14); Use clear windows and doors to make the pedestrian level façade of walls facing the street highly transparent in order to provide ease of entrance, visual interest, and increased security through informal viewing (Guideline 15); Feature a ground floor designed to be appealing to pedestrians, particularly through its architectural treatment (Guideline 28), and; Provide underground parking (Guideline 39). 929 Richmond Road/108 Woodroffe Avenue Page 23

28 6.7 Urban Design and Review The proposed development was presented to the City s Urban Design Review Panel on December 1, The Panel serves in an independent advisory role to enhance the City s architectural and urban design goals and objectives. The Panel supported the proposed development and provided the following comments in regard to the design: The proposed building responds wonderfully to the site; The scale of the building is appropriate for the site; The proposed building will provide a positive addition to this stretch of Richmond Road and will assist in creating a more Traditional Mainstreet atmosphere; The design successfully addresses the odd-shaped corner site; Explore architectural devices, such as glass projections or different materials to make the retail element distinct; Examine more closely how retail projects beyond the face of the adjacent apartment building to the west; Investigate options for how the mechanical penthouse is integrated into the design; Street trees should be planted along both Woodroffe Avenue and Richmond Road; Surface treatments need to be a priority along the Woodroffe Avenue side; There is an especially awkward, angular relationship with the adjacent nine storey building to the west that should be revisited and addressed; Consider a green wall or some other treatment here that would soften or mediate the relationship between the proposed development and the residential to the north; There is a nice stepping-down to the neighbourhood on the eastern edge; Explore and illustrate further how the rear of the building will be handled, and; Explore the public street edges further. In some places they appear too tight to the curb and in others awkwardly vacant. In response to the comments from the Urban Design Review Panel, the project architect has made several revisions to the development concept, including the following: The ground-floor on the western edge of the building has been realigned to better fit the angular relationship to the nine-storey building to the west. This change also allows the ground-floor retail on that edge of the building to project a better frontage onto Richmond Road; A mechanical penthouse has been added to rooftop to indicate a potential height profile and impact on the skyline; however, the size of the mechanical penthouse has yet to be finalized with the intent of making it as small as possible by locating some equipment in the basement of the building; Street trees have been added to the frontage along Richmond Road and four on-street parking stalls have been added in the large vacant area between the proposed building and Woodroffe Avenue; Surface parking has been removed from the rear of the building and located underground, and; A proposed 1.5-metre wall and 0.5-metre screen on top is proposed for the north and west property boundary. The fence will be finished in materials similar to the proposed building and will include planting as appropriate. Refer to the revised renderings of the proposed development submitted in conjunction with this report. 929 Richmond Road/108 Woodroffe Avenue Page 24

29 6.8 City of Ottawa Comprehensive Zoning By-law The project site is zoned TM H(25) Traditional Mainstreet, Height Maximum 25m (see Figure 6). The purpose of the Traditional Mainstreet Zone is to accommodate a broad range of uses, promote compact, mixed-use pedestrian-oriented development, and impose development standards that ensure street continuity, scale, character, and compatibility with surrounding uses. Figure 6 City of Ottawa Zoning By-law : Site zoned Traditional Mainstreet (TM). Both the high rise residential and ground floor commercial uses are permitted in the TM Zone. However, the proposed development includes ground floor residential uses along the Woodroffe Avenue frontage, but not along the Traditional Mainstreet frontage of Richmond Road. The TM Zone prohibits ground floor residential uses within a depth of six metres of the front wall of a building abutting the street. Table 1 below compares the applicable zoning provisions with the standards required by the proposed development. The proposed development complies with the overall intent of the zone and numerous applicable zoning provisions; however, a Minor Zoning By-law Amendment is required to revise some provisions in response to the proposed plans. The Minor Zoning By-law Amendment is outlined below in Section 7 of this report. 929 Richmond Road/108 Woodroffe Avenue Page 25

178 Carruthers Properties Inc.

178 Carruthers Properties Inc. 178 Carruthers Properties Inc. Planning Rationale for 178 Carruthers Avenue Site Plan Control Application June 2014 Table of Contents 1.0 Introduction 2.0 Overview of Subject Property 3.0 Current Zoning

More information

Commercial Development Proposal Tenth Line Road. Planning Rationale Report. Minto Developments Inc.

Commercial Development Proposal Tenth Line Road. Planning Rationale Report. Minto Developments Inc. Commercial Development Proposal 2168 Tenth Line Road Report September 2015 Prepared for Minto Developments Inc. Paquette Planning Associates Ltd. 56 Hutchison Avenue Ottawa, Ontario K1Y 4A3 PH: 613-722-7217

More information

CONTENTS 8.0 LAND USE 8.1 GENERAL LAND USE 8.2 RESIDENTIAL 8.3 MIXED USE 8.4 COMMERCIAL 8.5 EMPLOYMENT LANDS

CONTENTS 8.0 LAND USE 8.1 GENERAL LAND USE 8.2 RESIDENTIAL 8.3 MIXED USE 8.4 COMMERCIAL 8.5 EMPLOYMENT LANDS 8-2 Land Use 8.0 LAND USE CONTENTS 8.1 GENERAL LAND USE 8.1.1 Uses provided for in all Land Use Designations 8.1.2 Uses prohibited in Hazardous Lands, Hazardous Sites and Special Policy Areas 8.1.3 Uses

More information

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 DESIGN BRIEF CONTENTS PART A 1.0 INTRODUCTION 2.0 DESCRIPTION & ANALYSIS OF SITE CONTEXT 3.0 DESIGN CONSTRAINTS AND OPPORTUNITIES

More information

URBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville

URBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville URBAN DESIGN BRIEF 2136&2148 Trafalgar Road Town of Oakville Prepared By: METROPOLITAN CONSULTING INC For 2500674 Ontario Inc November 2016 TABLE OF CONTENTS Page No. 1.0 Introduction/Description of Subject

More information

ONTARIO MUNICIPAL BOARD

ONTARIO MUNICIPAL BOARD PL 120483 ONTARIO MUNICIPAL BOARD Applicant/Appellant: 2124123 Ontario Limited Subject: OPA, Rezoning and Draft Plan of Subdivision Municipal Address: 3940 Highway 7 East Municipality: City of Markham

More information

The West Vaughan Employment Area Secondary Plan Policies

The West Vaughan Employment Area Secondary Plan Policies Part 2: The West Vaughan Employment Area Secondary Plan Policies 2.1 General Policies It is the policy of Council: 2.1.1. That the West Vaughan Employment Area (the WVEA), identified on Schedule 1, will

More information

PLANNING RATIONALE 3843 INNES ROAD, ORLEANS 78 UNITS CONDOMINIUM PROJECT MELKART DEVELOPMENTS Inc.

PLANNING RATIONALE 3843 INNES ROAD, ORLEANS 78 UNITS CONDOMINIUM PROJECT MELKART DEVELOPMENTS Inc. 78 UNITS CONDOMINIUM PROJECT MELKART DEVELOPMENTS Inc. 2 PLANNING RATIONALE 78 UNITS CONDOMINIUM PROJECT Proposed at 3843 Innes Road Orleans, Ontario Report Prepared for: Melkart Developments Inc. 3497

More information

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN ELMVALE ACRES SHOPPING CENTRE MASTER PLAN Contents 1.0 INTRODUCTION... 2 2.0 LOCATION... 2 3.0 EXISTING CONTEXT... 2 4.0 VISION & GUIDING PRINCIPLES... 2 5.0 LAND USE AND BUILT FORM... 4 5.1 St. Laurent

More information

December 16, Gary Sealey Kanata Beaverbrook Community Association Inc. 2 Beaverbrook Road Ottawa ON K2K 1L1. Dear Mr. Sealey

December 16, Gary Sealey Kanata Beaverbrook Community Association Inc. 2 Beaverbrook Road Ottawa ON K2K 1L1. Dear Mr. Sealey December 16, 2013 Gary Sealey Kanata Beaverbrook Community Association Inc. 2 Beaverbrook Road Ottawa ON K2K 1L1 Dear Mr. Sealey Re: Letter of Opinion - Update 1131 Teron Road Application # D02-02-12-0041

More information

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014 [PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue May 23, 2014 Contents 1.0 Introduction... 2 2.0 Site Context... 2 2.1 Adjacent Uses... 2 Figure 1: Site

More information

776 and 784 St. Laurent Boulevard City of Ottawa

776 and 784 St. Laurent Boulevard City of Ottawa Engineering Land / Site Development Municipal Infrastructure Environmental / Water Resources Traffic / Transportation Structural Recreational 776 and 784 St. Laurent Boulevard City of Ottawa Planning Rationale

More information

TABLE OF CONTENTS 1.0 INTRODUCTION... 3

TABLE OF CONTENTS 1.0 INTRODUCTION... 3 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 1.1. BACKGROUND... 3 1.2. THE PROPOSAL... 5 2.0 EXISTING POLICY FRAMEWORK... 5 2.1. PROVINCIAL POLICY STATEMENT (PPS)... 5 2.2. CITY OF LONDON OFFICIAL PLAN (OP)...

More information

PORT WHITBY COMMUNITY

PORT WHITBY COMMUNITY PORT WHITBY COMMUNITY SECONDARY PLAN UPDATE COMMUNITY IMPROVEMENT PLAN URBAN DESIGN GUIDELINES September 2015 DRAFT PROPOSED AMENDMENT NUMBER # to the Whitby Official Plan PURPOSE: The intent of this Amendment

More information

K. SMART ASSOCIATES LIMITED

K. SMART ASSOCIATES LIMITED Planning Justification Report Zoning By-Law Amendment 185 King Street North Waterloo, Ontario April 7th, 2017 Project Reference Number 16-245 K. SMART ASSOCIATES LIMITED CONSULTING ENGINEERS AND PLANNERS

More information

Re: 1110 Fisher Avenue Proposed Residential Development Revised Proposal File D PLANNING RATIONALE ADDENDUM

Re: 1110 Fisher Avenue Proposed Residential Development Revised Proposal File D PLANNING RATIONALE ADDENDUM October 23, 2014 Prestige Design & Construction 50 Camelot Drive Ottawa, ON K2G 5X8 Attention: Mr. Enzo DiChiara Dear Mr. DiChiara Re: 1110 Fisher Avenue Proposed Residential Development Revised Proposal

More information

Greystone Village Main Street. Terraces at Greystone. City of Ottawa. Planning Rationale

Greystone Village Main Street. Terraces at Greystone. City of Ottawa. Planning Rationale Greystone Village - 175 Main Street Terraces at Greystone City of Ottawa Planning Rationale Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 August / 7 / 2015 Novatech

More information

1296 Kennedy Road - Zoning Amendment Application - Preliminary Report

1296 Kennedy Road - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 1296 Kennedy Road - Zoning Amendment Application - Preliminary Report Date: January 15, 2016 To: From: Wards: Reference Number: Scarborough Community Council Acting Director,

More information

*** DRAFT 2 FOR PUBLIC REVIEW ***

*** DRAFT 2 FOR PUBLIC REVIEW *** 6.7 The area is generally bounded by the Red Hill Valley Parkway to the west, Lake Avenue to the east, the Queen Elizabeth Way (QEW) to the north, and by the properties just south of Queenston Road to

More information

Planning Rationale Fernbank Road, Ottawa. Major Zoning By-law Amendment and Site Plan Control Application Ontario Inc.

Planning Rationale Fernbank Road, Ottawa. Major Zoning By-law Amendment and Site Plan Control Application Ontario Inc. Planning Rationale Major Zoning By-law Amendment and Site Plan Control Application 5264 Fernbank Road, Ottawa 1872089 Ontario Inc. March 2014 Planning Rationale Major Zoning By-law Amendment and Site Plan

More information

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Welcome. Walk Around. Talk to Us. Write Down Your Comments Welcome This is an information meeting introducing the applications for proposed redevelopment of the Yorkdale Shopping Centre site at 3401 Dufferin Street and 1 Yorkdale Road over the next 20+ years,

More information

URBAN DESIGN BRIEF. Saginaw Subdivision 124 SAGINAW PARKWAY, CAMBRIDGE OCTOBER 2015 OUR FILE 1422A

URBAN DESIGN BRIEF. Saginaw Subdivision 124 SAGINAW PARKWAY, CAMBRIDGE OCTOBER 2015 OUR FILE 1422A URBAN DESIGN BRIEF Saginaw Subdivision 124 SAGINAW PARKWAY, CAMBRIDGE OCTOBER 2015 OUR FILE 1422A Contents 1.0 INTRODUCTION AND SITE DESCRIPTION... 1 2.0 MUNICIPAL DESIGN DIRECTION... 7 3.0 MASTER CONCEPT

More information

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas 111111 PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction The ION rapid transit system will link Waterloo, Kitchener and Cambridge through a central transit corridor (CTC). There are a number

More information

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN Official Plan Amendment XX to the Official Plan for the City of Ottawa 1 INDEX THE STATEMENT OF COMPONENTS PART A THE PREAMBLE PAGE Purpose...

More information

141 GEORGE STREET PLANNING RATIONALE

141 GEORGE STREET PLANNING RATIONALE 141 GEORGE STREET PLANNING RATIONALE MINOR ZONING BY-LAW AMENDMENT NOVEMBER 2, 2016 PLANNING RATIONALE 223 McLeod Street Ottawa, ON K2P 0Z8 613.730.5709 fotenn.com INTRODUCTION FOTENN Consultants is acting

More information

Bloor St. W. Rezoning - Preliminary Report

Bloor St. W. Rezoning - Preliminary Report STAFF REPORT ACTION REQUIRED 1638-1644 Bloor St. W. Rezoning - Preliminary Report Date: April 1, 2008 To: From: Wards: Reference Number: Toronto and East York Community Council Acting Director, Community

More information

2136 & 2148 Trafalgar Road Town of Oakville Region of Halton

2136 & 2148 Trafalgar Road Town of Oakville Region of Halton PLANNING JUSTIFICATION REPORT 2136 & 2148 Trafalgar Road Town of Oakville Region of Halton Zoning By-Law Amendment Application 2500674 Ontario Inc. November 2016 Table of Contents Page 1.0 Location/Summary

More information

Regency Developments. Urban Design Brief. Holyrood DC2 Rezoning

Regency Developments. Urban Design Brief. Holyrood DC2 Rezoning Regency Developments Urban Design Brief Holyrood DC2 Rezoning Stantec Consulting Ltd. 7-31-2017 1. Overview Regency Developments intends to rezone the lands located at 8510 and 8511 93 Avenue, within the

More information

10 COPE DRIVE. May 08, 2018 Planning Rationale and Design Brief. Site Plan Control

10 COPE DRIVE. May 08, 2018 Planning Rationale and Design Brief. Site Plan Control 10 COPE DRIVE May 08, 2018 Planning Rationale and Design Brief Site Plan Control Prepared for: Taggart Realty Management 225 Metcalfe Street, Suite 708 Ottawa, ON K2P 1P9 taggart.ca Prepared by: Fotenn

More information

599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report

599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report Date: March 7, 2017 To: From: Wards: Reference Number: Scarborough Community

More information

175 RICHMOND ROAD ZONING BY-LAW AMENDMENT PLANNING RATIONALE

175 RICHMOND ROAD ZONING BY-LAW AMENDMENT PLANNING RATIONALE 175 RICHMOND ROAD ZONING BY-LAW AMENDMENT PLANNING RATIONALE Prepared for: Prepared by: OCTOBER 2011 175 RICHMOND ROAD ZONING BY-LAW AMENDMENT PLANNING RATIONALE Prepared for: Claridge Homes 2001-210 Gladstone

More information

Urban Design Brief December 23, 2015 Southside Construction Group Official Plan & Zoning By-Law Amendment

Urban Design Brief December 23, 2015 Southside Construction Group Official Plan & Zoning By-Law Amendment Urban Design Brief Proposed Official Plan & Zoning By-Law Amendment 3244, 3263 and 3274 Wonderland Road South Southside Group December 23, 2015 TABLE OF CONTENTS Page No. INTRODUCTION... 1 SECTION 1 LAND

More information

and services The protection and conservation of environmentally significant and sensitive natural heritage features and functions.

and services The protection and conservation of environmentally significant and sensitive natural heritage features and functions. 6. Land Use 6.0 Preamble A healthy and livable city is one in which people can enjoy a vibrant economy and a sustainable healthy environment in safe, caring and diverse neighbourhoods. In order to ensure

More information

Clairtrell Area Context Plan

Clairtrell Area Context Plan Clairtrell Area Context Plan March 2005 Urban Development Services City Planning Contents 1. Introduction... 4 2. Development Structure... 6 2.1 Streets... 7 2.1.1 Sheppard Avenue and Bayview Avenue...

More information

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 The Planning and Economic Development Committee recommends the adoption of the recommendations contained

More information

PLANNING RATIONALE. for. Site Plan Application

PLANNING RATIONALE. for. Site Plan Application PLANNING RATIONALE for Site Plan Application 2781, 2791, and 2797 Baseline Road And 2704, 2706, and 2734 Draper Avenue Prepared by: Lloyd Phillips & Associates Ltd. File: 0811 Planning Rationale Page 1

More information

DRAFT Northeast Quadrant of Kipling Avenue and Highway 7 DRAFT AUGUST 29, Goals Land Use. The goals of this Plan are to:

DRAFT Northeast Quadrant of Kipling Avenue and Highway 7 DRAFT AUGUST 29, Goals Land Use. The goals of this Plan are to: AUGUST 29, 2017 12.15 Northeast Quadrant of Kipling Avenue and Highway 7 12.15.1 Goals 12.15.2 Land Use The goals of this Plan are to: 12.15.2.1 General Provisions: a) Ensure the development of a compact

More information

KANATA CENTRUM 255 KANATA AVENUE OFFICIAL PLAN AMENDMENT ZONING BY-LAW AMENDMENT

KANATA CENTRUM 255 KANATA AVENUE OFFICIAL PLAN AMENDMENT ZONING BY-LAW AMENDMENT KANATA CENTRUM 255 KANATA AVENUE OFFICIAL PLAN AMENDMENT ZONING BY-LAW AMENDMENT JUNE 2015 PREPARED BY: FOTENN Consultants Inc. 223 Mcleod Street Ottawa, ON K2P OZ8 (613) 730-5709 PREPARED FOR: Kanata

More information

770 BRONSON AVENUE. Zoning By-law Amendment and Site Plan Control

770 BRONSON AVENUE. Zoning By-law Amendment and Site Plan Control 770 BRONSON AVENUE Zoning By-law Amendment and Site Plan Control Revised Planning Rationale + Design Brief August 2016 REVISED PLANNING RATIONALE 223 McLeod Street Ottawa, ON K2P 0Z8 613.730.5709 fotenn.com

More information

École Secondaire 2405 et 2419 chemin Mer Bleue Road. Planning Rationale Report. May 2018

École Secondaire 2405 et 2419 chemin Mer Bleue Road. Planning Rationale Report. May 2018 École Secondaire 2405 et 2419 chemin Mer Bleue Road Report Prepared for Conseil des écoles publiques de l'est de l'ontario Prepared by Paquette Planning Associates Ltd. 56 Hutchison Avenue Ottawa, Ontario

More information

QUEEN-RIVER SECONDARY PLAN

QUEEN-RIVER SECONDARY PLAN 34 QUEEN-RIVER SECONDARY PLAN 34. QUEEN RIVER SECONDARY PLAN 1. INTRODUCTION The Queen-River area is approximately 6.4 hectares and is located at the eastern edge of the Downtown as shown on Map 34-1.

More information

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan Notes: This document is provided for information purposes

More information

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd.

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd. PART A: PREAMBLE 1.0 PURPOSE The purpose of this Secondary Plan is to provide a development framework for intensification of the Yonge/ Steeles corridor including the north side of Steeles Avenue West

More information

1071 King Street West Zoning Amendment Application - Preliminary Report

1071 King Street West Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 1071 King Street West Zoning Amendment Application - Preliminary Report Date: August 9, 2012 To: From: Wards: Reference Number: Toronto and East York Community Council Director,

More information

PLANNING RATIONALE FOR THE PROPOSED RIVERSIDE SOUTH ELEMENTARY SCHOOL 715 BRIAN GOOD AVENUE, OTTAWA, ON

PLANNING RATIONALE FOR THE PROPOSED RIVERSIDE SOUTH ELEMENTARY SCHOOL 715 BRIAN GOOD AVENUE, OTTAWA, ON PLANNING RATIONALE FOR THE PROPOSED RIVERSIDE SOUTH ELEMENTARY SCHOOL 715 BRIAN GOOD AVENUE, OTTAWA, ON Conseil des écoles publiques de l'est de l'ontario (CEPEO) French Public School Board TABLE OF CONTENTS

More information

POLICY AMENDMENT AND LAND USE AMENDMENT KILLARNEY/GLENGARRY (WARD 8) NW CORNER OF RICHMOND ROAD AND 33 STREET SW BYLAWS 1P2015 AND 7D2015

POLICY AMENDMENT AND LAND USE AMENDMENT KILLARNEY/GLENGARRY (WARD 8) NW CORNER OF RICHMOND ROAD AND 33 STREET SW BYLAWS 1P2015 AND 7D2015 Page 1 of 13 EXECUTIVE SUMMARY This application seeks to redesignate an RC-2 (Residential Contextual One/Two Dwelling) parcel to MC-Gd72 (Multi-Residential Contextual Grade-Oriented) to allow for multi-residential

More information

URBAN DESIGN BRIEF Gordon Street City of Guelph. Prepared on behalf of Ontario Inc. March 25, Project No. 1507

URBAN DESIGN BRIEF Gordon Street City of Guelph. Prepared on behalf of Ontario Inc. March 25, Project No. 1507 URBAN DESIGN BRIEF 1131 Gordon Street City of Guelph Prepared on behalf of 1876698 Ontario Inc. March 25, 2016 Project No. 1507 423 Woolwich Street, Suite 201, Guelph, Ontario, N1H 3X3 Phone (519) 836-7526

More information

MOMENTUM. Design Brief. Site Plan Control and Minor Variance Applications. 59 Russell Avenue

MOMENTUM. Design Brief. Site Plan Control and Minor Variance Applications. 59 Russell Avenue MOMENTUM PLANNING AND COMMUNICATIONS Design Brief Site Plan Control and Minor Variance Applications 59 Russell Avenue December 2014 Revised February 2015 Prepared by: Dennis Jacobs MCIP, RPP Index 1. Introduction

More information

Bank Street Secondary Plan

Bank Street Secondary Plan 1.1 Introduction The is a guide to the long term design and development of the portion of Bank Street between Riverside Drive and Ledbury Park, and provides direction on land use, built form, design, parking,

More information

A Growing Community Rural Settlement Areas

A Growing Community Rural Settlement Areas Town of Huntsville Official Plan Review - POLICY BACKGROUND PAPER A Growing Community Rural Settlement Areas BACKGROUND: In addition to the fully municipally-serviced Urban Settlement Area and the Hidden

More information

Official Plan Review: Draft Built Form Policies

Official Plan Review: Draft Built Form Policies PG.30.1 REPORT FOR ACTION Official Plan Review: Draft Built Form Policies Date: May 15, 2018 To: Planning and Growth Management Committee From: Chief Planner and Executive Director, City Planning Division

More information

646 Kingston Road - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

646 Kingston Road - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report STAFF REPORT ACTION REQUIRED 646 Kingston Road - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report Date: December 8, 2014 To: From: Wards: Reference Number: Toronto and East

More information

URBAN DESIGN BRIEF New Street Burlington, ON

URBAN DESIGN BRIEF New Street Burlington, ON 3225-3237 New Street Burlington, ON MARCH 2017 Prepared for: Royal Living Development Group Inc. Prepared by: adesso design inc. 218 Locke Street South, 2nd Floor Hamilton, ON L8P 4B4 t. 905.526.8876 3225-3237

More information

Design Brief and Planning Rationale. for Site Plan Control Application. Harmony Subdivision, Stage 1, Block 104

Design Brief and Planning Rationale. for Site Plan Control Application. Harmony Subdivision, Stage 1, Block 104 Design Brief and Planning Rationale for Site Plan Control Application Harmony Subdivision, Stage 1, Block 104 4025 Strandherd Drive, Minto Communities Inc. Prepared By: NOVATECH Suite 200, 240 Michael

More information

The Corporation of the TOWN OF MILTON

The Corporation of the TOWN OF MILTON Report to: From: Chair & Members of the Administration & Planning Standing Committee W.F. Mann, Director of Planning and Development Date: April 16, 2012 PD 022-12 (Z19/11) Subject: Technical Report Proposed

More information

SCHEDULE 'A' TO BY-LAW as Amended by AMENDMENT NO. 90 TO THE WHITBY OFFICIAL PLAN

SCHEDULE 'A' TO BY-LAW as Amended by AMENDMENT NO. 90 TO THE WHITBY OFFICIAL PLAN SCHEDULE 'A' TO BY-LAW 6413-10 as Amended by 6553-11 AMENDMENT NO. 90 TO THE WHITBY OFFICIAL PLAN SECTION A: GROWTH PLAN CONFORMITY PURPOSE: LOCATION: BASIS: The purpose of this Amendment is to: conform

More information

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018 Page 1 of 19 EXECUTIVE SUMMARY This application proposes redesignating two parcels in the community of Silver Springs from Special Purpose Future Urban Development (S-FUD) District and undesignated road

More information

6 PORT SYDNEY SETTLEMENT AREA

6 PORT SYDNEY SETTLEMENT AREA Section 6 Port Sydney Page 61 6 PORT SYDNEY SETTLEMENT AREA 6.1 Basis and Principles Village of Port Sydney Waterfront Community Existing Services 6.1.1 Port Sydney is an historic settlement that has developed

More information

MOMENTUM. Design Brief for 1161 Heron Road. Site Plan Control

MOMENTUM. Design Brief for 1161 Heron Road. Site Plan Control MOMENTUM PLANNING AND COMMUNICATIONS Design Brief for 1161 Heron Road July 2016 Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 Prepared by: Dennis

More information

burlington mobility hubs study Downtown Burlington Mobility Hub

burlington mobility hubs study Downtown Burlington Mobility Hub burlington mobility hubs study Downtown Burlington Mobility Hub Draft Precinct Plan Workbook PIC #3, September 7, 2017 downtown mobility hub objectives City staff and their consultants are proposing an

More information

280 Manse Road - Official Plan Amendment, Zoning Amendment, Draft Plan of Subdivision Applications - Preliminary Report

280 Manse Road - Official Plan Amendment, Zoning Amendment, Draft Plan of Subdivision Applications - Preliminary Report STAFF REPORT ACTION REQUIRED 280 Manse Road - Official Plan Amendment, Zoning Amendment, Draft Plan of Subdivision Applications - Preliminary Report Date: March 11, 2014 To: From: Wards: Reference Number:

More information

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC 2018 November 15 Page 1 of 10 EXECUTIVE SUMMARY This land use amendment application was submitted by Rick Balbi Architect on 2017 August 31 on behalf of Sable Developments Ltd, and with authorization from

More information

ADMINISTRATION RECOMMENDATION(S) 2018 January 25. That Calgary Planning Commission recommend APPROVAL of the proposed Land Use Amendment.

ADMINISTRATION RECOMMENDATION(S) 2018 January 25. That Calgary Planning Commission recommend APPROVAL of the proposed Land Use Amendment. Page 1 of 9 EXECUTIVE SUMMARY This land use amendment proposes to redesignate a parcel from DC Direct Control District to Multi-Residential Contextual Grade-Oriented (M-CG) District to allow for multi-residential

More information

Urban Design Guidelines Townhouse and Apartment Built Form

Urban Design Guidelines Townhouse and Apartment Built Form Urban Design Guidelines Townhouse and Apartment Built Form Town of Wasaga Beach Table of Contents 1. Introduction 1.1. Purpose 1.2. Urban Design Principles 1.3. Application of Guidelines 2. Site Design,

More information

BASIC SITE PLAN AND DESIGN PRINCIPLES FOR REDEVELOPMENT OF 114 RICHMOND ROAD

BASIC SITE PLAN AND DESIGN PRINCIPLES FOR REDEVELOPMENT OF 114 RICHMOND ROAD BASIC SITE PLAN AND DESIGN PRINCIPLES FOR REDEVELOPMENT OF 114 RICHMOND ROAD Department of Planning and Growth Management City of Ottawa August 2009 1. Site Locations and Description The property is located

More information

Uptown Rideau Street Secondary Plan [Amendment #166, January 12, 2016]

Uptown Rideau Street Secondary Plan [Amendment #166, January 12, 2016] [Amendment #166, January 12, 2016] The policies of this Secondary Plan are in effect, save and except for the property at 560 Rideau Street, for which there remains a site specific appeal to this Secondary

More information

Queen Street West - Zoning Amendment Application - Preliminary Report

Queen Street West - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 944-952 Queen Street West - Zoning Amendment Application - Preliminary Report Date: February 6, 2013 To: From: Wards: Reference Number: Toronto and East York Community Council

More information

Westwind Developments Ltd. PIONEER LANDS AREA STRUCTURE PLAN - PROPOSED AMENDMENT

Westwind Developments Ltd. PIONEER LANDS AREA STRUCTURE PLAN - PROPOSED AMENDMENT FEBRUARY 2013 TABLE OF CONTENTS 1.0 BACKGROUND... 1 1.1 Amendment... 1 2.0 LOCATION & CONTEXT... 2 2.1 Land Ownership... 2 3.0 POLICY CONTEXT... 3 3.1 Municipal Development Plan... 3 3.2 Capital Region

More information

Additional Studies: Site Context

Additional Studies: Site Context February 16, 2011 Mr. Simon Deiaco Planner II Planning and Growth Management Department City of Ottawa 110 Laurier Avenue West Ottawa, Ontario K1P 1J1 RE: Dymon Management Ltd. Zoning By-law Amendment

More information

1960 SCOTT STREET PLANNING RATIONALE

1960 SCOTT STREET PLANNING RATIONALE 1960 SCOTT STREET PLANNING RATIONALE SITE PLAN CONTROL APPLICATION AUGUST 2017 IN ASSOCIATION WITH: 1960 SCOTT STREET PLANNING RATIONALE SITE PLAN CONTROL APPLICATION AUGUST 2017 PREPARED FOR: KELLY RHODENIZER,

More information

Carleton University. Nicol Building New Sprott School of Business. Design Brief and Planning Rationale. Carleton University

Carleton University. Nicol Building New Sprott School of Business. Design Brief and Planning Rationale. Carleton University Carleton University Nicol Building New Sprott School of Business Design Brief and Planning Rationale Carleton University Design Team Proposal New Sprott School of Business Academic Building 2019 October

More information

2983 NAVAN ROAD ZONING BY-LAW AMENDMENT

2983 NAVAN ROAD ZONING BY-LAW AMENDMENT 2983 NAVAN ROAD ZONING BY-LAW AMENDMENT June 29, 2018 Planning Rationale Zoning By-law Amendment Prepared for: Taggart Realty Management 225 Metcalfe, Suite 708 Ottawa, ON, K2P 1P9 taggart.ca Prepared

More information

URBAN DESIGN BRIEF 181 Burloak Drive, Oakville

URBAN DESIGN BRIEF 181 Burloak Drive, Oakville URBAN DESIGN BRIEF 181 Burloak Drive, Oakville February 2017 Our File: 1730B 230-7050 WESTON ROAD / WOODBRIDGE / ONTARIO / L4L 8G7 / T: 905 761 5588/ F: 905 761 5589/WWW.MHBCPLAN.COM TABLE OF CONTENTS

More information

Urban Design Brief Fanshawe Park Road. Competition Toyota

Urban Design Brief Fanshawe Park Road. Competition Toyota Urban Design Brief 1300 Fanshawe Park Road Competition Toyota May 2, 2014 TABLE OF CONTENTS Page No. INTRODUCTION... 1 SECTION 1 LAND USE PLANNING CONTEXT... 1 1.1 The Subject Lands... 1 1.2 The Proposal...

More information

8 Oak Street - Official Plan and Zoning By-law Amendment Application - Preliminary Report

8 Oak Street - Official Plan and Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 8 Oak Street - Official Plan and Zoning By-law Amendment Application - Preliminary Report Date: March 17, 2014 To: From: Wards: Reference Number: Planning and Growth Management

More information

PLANNING RATIONALE APPLICATIONS FOR: MINOR ZONING BY-LAW AMENDMENT AND SITE PLAN CONTROL North River Road

PLANNING RATIONALE APPLICATIONS FOR: MINOR ZONING BY-LAW AMENDMENT AND SITE PLAN CONTROL North River Road PLANNING RATIONALE APPLICATIONS FOR: MINOR ZONING BY-LAW AMENDMENT AND SITE PLAN CONTROL 1111 North River Road Prepared by: Lloyd Phillips & Associates Ltd. File: 1306 August 2013 Table of Contents 1.

More information

Northern Territory Compact Urban Growth Policy

Northern Territory Compact Urban Growth Policy Northern Territory Compact Urban Growth Policy A Reference Policy Document to clause 2.7 (Reference to Policy) of the NT Planning Scheme May 2015 Table of Contents 1 Policy Setting... 3 1.1 Context for

More information

I615. Westgate Precinct

I615. Westgate Precinct I615. Westgate Precinct I615.1. Precinct Description The Westgate Precinct is located approximately 18km west of the Auckland city centre. There are seven Sub-precincts in the Westgate Precinct: Sub-precinct

More information

PLANNING JUSTIFICATION REPORT

PLANNING JUSTIFICATION REPORT PLANNING JUSTIFICATION REPORT 55 DELHI STREET CITY OF GUELPH PREPARED FOR: VESTERRA PROPERTY MANAGEMENT PREPARED BY: LABRECHE PATTERSON & ASSOCIATES INC. SCOTT PATTERSON, BA, CPT, MCIP, RPP PRINCIPAL,

More information

150 Eighth Street Zoning By-law Amendment Application Preliminary Report

150 Eighth Street Zoning By-law Amendment Application Preliminary Report REPORT FOR ACTION 150 Eighth Street Zoning By-law Amendment Application Preliminary Report Date: March 27, 2019 To: Etobicoke York Community Council From: Director, Community Planning, Etobicoke York District

More information

6.0 Land Use Policies for Rural Settlements. 6.1 Rural Settlement Strategy

6.0 Land Use Policies for Rural Settlements. 6.1 Rural Settlement Strategy 6.0 Land Use Policies for Rural Settlements 6.1 Rural Settlement Strategy INTRODUCTION AMENDMENT NO. 131 PURPOSE Designated rural settlements comprise Rural Clusters, Villages and Serviced Villages as

More information

Official Plan Review

Official Plan Review Official Plan Review Summary Report - The Built Environment August 2014 Part 1: Introduction Planning for a healthy, prosperous and sustainable community is an important goal for our municipality. From

More information

Complete Neighbourhood Guidelines Review Tool

Complete Neighbourhood Guidelines Review Tool Complete Neighbourhood Guidelines Review Tool Prepared By: City of Regina Planning Department October 2014 Page 1 of 14 Community Development Review Checklist for Secondary Plans and Concept Plans The

More information

Yonge Street Zoning Amendment Application - Preliminary Report

Yonge Street Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 341-355 Yonge Street Zoning Amendment Application - Preliminary Report Date: March 24, 2011 To: From: Wards: Reference Number: Toronto and East York Community Council Director,

More information

Bel-Air Lexus Automobile Service Station

Bel-Air Lexus Automobile Service Station Bel-Air Lexus Automobile Service Station Design Brief 443-447 McArthur Avenue Ottawa April 30, 2015 14-1299-MCA Site Details Application: Site Plan Control Legal Description and Municipal Addresses: 443

More information

Urban Design Brief. Watson Parkway North & Watson Road North Guelph, Ontario. Prepared by Coletara Development

Urban Design Brief. Watson Parkway North & Watson Road North Guelph, Ontario. Prepared by Coletara Development Urban Design Brief Watson Parkway North & Watson Road North Guelph, Ontario Prepared by Coletara Development December, 2013 Urban Design Brief, Coletara Development 1 Introduction This Urban Design Brief

More information

Planning Rationale in Support of an Application for Zoning By-law Amendment

Planning Rationale in Support of an Application for Zoning By-law Amendment Planning Rationale in Support of an Application for Zoning By-law Amendment 4845 Bank Street City of Ottawa Prepared by: Holzman Consultants Inc. Land Development Consultants March 16, 2015 TABLE OF CONTENTS

More information

Planning Rationale Report

Planning Rationale Report École secondaire catholique Paul-Desmarais Air Supported Dome Structure Zoning By-law Amendment Application Report Prepared for Conseil des écoles catholiques du Centre-Est Paquette Planning Associates

More information

Planning Rationale Zoning By-law Amendment Application October Centrepointe Drive - Ottawa, Ontario

Planning Rationale Zoning By-law Amendment Application October Centrepointe Drive - Ottawa, Ontario ZONING BYLAW AMENDMENT OCTOBER 2011 Table of Contents Table of Contents... i 1 Introduction... 1 1.1 Site Location... 1 1.2 Overview of Proposed Development... 1 2 Context... 6 2.1 Community Character...

More information

DAVENPORT VILLAGE SECONDARY PLAN

DAVENPORT VILLAGE SECONDARY PLAN 27 DAVENPORT VILLAGE SECONDARY PLAN 27. DAVENPORT VILLAGE SECONDARY PLAN 1. VISION FOR THE DAVENPORT VILLAGE SECONDARY PLAN Davenport Village, municipally known as 830, 940, 980 and 1100 Lansdowne Avenue,

More information

Trafalgar Road Corridor Planning Study Open House

Trafalgar Road Corridor Planning Study Open House Trafalgar Road Corridor Planning Study Open House June 24, 2013 6:30-8:30 p.m. Oakville & Trafalgar Rooms Overview The Livable Oakville Plan identifies the lands along Trafalgar Road, between the QEW and

More information

DRAFT PLAN OF SUBDIVISION PLANNING RATIONALE 5100 KANATA AVENUE CITY OF OTTAWA. Hawthorn Retirement Group MALONE GIVEN PARSONS LTD.

DRAFT PLAN OF SUBDIVISION PLANNING RATIONALE 5100 KANATA AVENUE CITY OF OTTAWA. Hawthorn Retirement Group MALONE GIVEN PARSONS LTD. DRAFT PLAN OF SUBDIVISION PLANNING RATIONALE 5100 KANATA AVENUE CITY OF OTTAWA Prepared By: MALONE GIVEN PARSONS LTD. Prepared For: Hawthorn Retirement Group July 2015 Draft Plan of Subdivision 5100 Kanata

More information

and Richmond Street West - Official Plan Amendment Application - Preliminary Report

and Richmond Street West - Official Plan Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 822-838 and 860-862 Richmond Street West - Official Plan Amendment Application - Preliminary Report Date: August 14, 2017 To: From: Wards: Reference Number: Toronto and East

More information

Sheppard Avenue East Zoning Amendment Application Refusal Report

Sheppard Avenue East Zoning Amendment Application Refusal Report STAFF REPORT ACTION REQUIRED 179-181 Sheppard Avenue East Zoning Amendment Application Refusal Report Date: January 4, 2017 To: From: Wards: Reference Number: North York Community Council Director, Community

More information

Urban Design Brief. 583, 585 and 589 OXFORD STREET EAST. Salt Clinic Canada Inc.

Urban Design Brief. 583, 585 and 589 OXFORD STREET EAST. Salt Clinic Canada Inc. Urban Design Brief 583, 585 and 589 OXFORD STREET EAST Salt Clinic Canada Inc. February 3, 2013 TABLE OF CONTENTS Page No. INTRODUCTION... 1 SECTION 1 LAND USE PLANNING CONCEPT... 1 1.1 The Subject Property...

More information

MEADOWGLEN DR. ORLEANS. Zoning By-Law Amendment Application November 2012

MEADOWGLEN DR. ORLEANS. Zoning By-Law Amendment Application November 2012 5911 MEADOWGLEN DR. ORLEANS Zoning By-Law Amendment Application November 2012 Prepared by: 223 McLeod Street Ottawa, ON K2P 0Z8 T: 613.730.5709 ext.238 F: 613.730.1136 Prepared for: 371A Richmond Road,

More information

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

1.0 Purpose of a Secondary Plan for the Masonville Transit Village Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: John M. Fleming Managing Director, Planning and City Planner Subject: Masonville Transit Village

More information

The lands identified as Residential Areas on Schedule A1, Urban Structure, represent the areas that provide for stable residential communities.

The lands identified as Residential Areas on Schedule A1, Urban Structure, represent the areas that provide for stable residential communities. Livable Oakville Part D: Land Use Designations and Policies 11. RESIDENTIAL 11.1 General The lands identified as Residential Areas on Schedule A1, Urban Structure, represent the areas that provide for

More information

SECTION ONE: INTRODUCTION. introduction

SECTION ONE: INTRODUCTION. introduction introduction 1 INTRODUCTION Since it was first established in 1843 as a trading post for the Hudson s Bay Company, Victoria has evolved into a Provincial capital city that is recognized across Canada and

More information

30 and 44 Zorra Street - Zoning By-law Amendment Application - Preliminary Report

30 and 44 Zorra Street - Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 30 and 44 Zorra Street - Zoning By-law Amendment Application - Preliminary Report Date: March 14, 2016 To: From: Wards: Reference Number: Etobicoke York Community Council Director,

More information