COMPREHENSIVE DEVELOPMENT AT ADANAC PARK ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

Size: px
Start display at page:

Download "COMPREHENSIVE DEVELOPMENT AT ADANAC PARK ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY"

Transcription

1 COMPREHENSIVE DEVELOPMENT AT ADANAC PARK ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY October 2007

2 INTRODUCTION AND PROJECT BACKGROUND A planning application to develop a site at Adanac Park is being submitted jointly by The Trustees of the Barker Mill Estate (TBME) and the Ordnance Survey to Test Valley Borough Council (TVBC). The application site comprises some 31.7 hectares of land at Nursling which are located to the north of Brownhill Way at the southern part of the Test Valley Borough Council administrative area in South Hampshire. Figure NTS1 shows the general location of the site. The overall layout of the proposed development will be in accordance with the parameters which are shown on the General Layout Parameter Plan, a copy of which is supplied at Figure NTS4. References to Plot numbers in this NTS are intended to reflect the plots as numbered on the General Layout Parameter Plan. The development proposed is a business park for large space users, comprising a number of large prestige buildings for use within Use Class B1 on five spacious and well-landscaped plots. The planning application is hybrid in form. Whilst it is generally an outline application, it submits specific details for approval as part of the permission sought for an initial phase of development comprising the site access arrangements and a large Head Office building on Plot 4 (Figure NTS5 refers). The detailed component of the planning application relates to some 10.8 hectares and the outline component relates to the balance of 20.9 hectares of the application site. The Applicants intend that the detailed planning permission should permit (1) the main access into the site (by means of a new roundabout at the proposed entrance into the site from Brownhill Way) and a main spine road through the site from that new roundabout up to the point where it crosses the northern boundary of Plot 4 and (2) the proposed Ordnance Survey Head Office building and ancillary nursery cycle store and waste storage areas to be located on Plot 4 and (3) The wildlife corridor north of Plot 4 and the landscaped areas between the Ordnance Survey building and the M271 and adjacent to the boundary with Yewtree Farm house. The Ordnance Survey Head Office on Plot 4 will enable the relocation of some 1,000 of the existing 1,140 employees currently employed at the existing Ordnance Survey premises at Maybush. The Applicants seek outline planning permission for the remainder of the application site and (as part of the application) they will provide information in the form of parameters and principles which indicate how that part of the site is likely to be developed. These parameters and principles will be tied into the outline planning permission by a planning condition. The condition will require the approval of reserved matters (and other matters for which subsequent approval is required in relation to this development) to be in accordance with these parameters and principles, unless the Council approves any deviation or variation and which will not permit any deviation or variation unless it is unlikely to have any significant adverse environmental effect. The specified parameters and principles in relation to the development covered by the proposed outline planning permission also comprise the information that is required under Article 3(3) - (5) of the Town and Country Planning (General Development Procedure) Order 1995, as amended with effect from 10th May EIA is a process for drawing together, in a systematic way, information about a proposed development and expert analysis and assessment of its likely environmental effects. It also involves subjecting the project (and the supporting Environmental Statement) to appropriate consultation with statutory consultees and the wider public. The detailed information about the project and its likely significant environmental effects must be presented in an Environmental Statement (ES) and this Non-Technical Summary forms part of the ES. This enables the predicted effects, and the possibilities for mitigating them, to be properly considered by the decision-making body, which in this case is TVBC, taking account of other environmental information contained in representations submitted to it by the public, and by other interested organisations, before the planning application is determined. The information to be provided in the ES is specified by regulation 2(1) and Schedule 4 of the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 1999 as amended (the EIA Regulations). This Non-Technical Summary provides a synopsis of the information contained in and findings and conclusions of the ES.

3 THE SITE AND SURROUNDING AREA Current Land Use The application site is fairly low lying, ranging in height from 5 metres Above Ordnance Datum (AOD) at its southern margin, to 15 metres (AOD) to the north. The southern and central areas of the application site were worked for sand and gravel extraction until 1989, after which the area of extraction was backfilled with inert waste and restored to agricultural land. The application site, which includes Adanac Farmhouse and its associated outbuildings, is currently grazed by horses and cattle. The current occupants have an assured shorthold tenancy and will vacate prior to commencement of construction; there is no agricultural tenancy or holding. Figure NTS1 Location Map Site Location Adanac Park lies some 6.5km to the north west of Southampton city centre and 4km south of Romsey. Although very close to the administrative boundary and urban edge of Southampton, the application site is wholly within Test Valley Borough. The application site is bounded to the south by Brownhill Way, a major arterial route linking Junction 1 of the M271 with suburban Southampton (from which the main access into the proposed development will be taken). To the west the application site is flanked by the M271 motorway, beyond which lie the large storage and 1

4 distribution facilities of the Nursling Estate, and to the north by Nursling Street, a no-through road serving a primary school, housing estates, business and industrial uses, and by the Bridgers House and Bridgers Farm House industrial units. A small planted area and utilities easement (for a 30 inch steel pumped water main) along the north eastern boundary separates the application site from 1980s residential development at Wilks Close. Mature woodland at Home Covert forms nearly two thirds of the eastern site boundary, with the Hillyfield housing estate directly abutting the remaining eastern margin. Bargain Farm lies on the south east site boundary. Designated sites There are a number of statutory sites designated for their nature conservation importance within 2km of the application site. These are the River Test and the Lower Test Valley Sites of Special Scientific Interest (SSSI), the Solent Maritime Candidate Special Area of Conservation (csac) and the Solent and Southampton water Ramsar Site and Special Protection Area (SPA). The New Forest National Park lies approximately 71/2 kilometres to the west of the application site. The location of these areas are all shown in relation to the application site on Figure NTS3. Figure NTS2 Major Designations Two Sites of Importance for Nature Conservation (SINC) abut the application site; Home Covert SINC lies immediately adjacent to the eastern edge of the site and part of the Nursling Street SINC directly abuts the northernmost boundary of the site. The location of these areas is shown in relation to the application site on Figure NTS4. 2

5 Figure NTS3 Local Designations There are no Listed Buildings within the application site boundary. Yewtree Farm, a Grade II Listed farmhouse of 17th century origin, is surrounded by but excluded from the application site boundary. Bargain Farm, located approximately 500m to the south east of the application site, is also Grade II Listed. The application site forms part of the setting of both Listed Buildings and the need to safeguard the setting has influenced the preparation of the hybrid application proposals. PLANNING POLICY The application site is allocated under Policy STV 03 of the Adopted Test Valley Borough Local Plan (2006) (TVBLP) for high quality office, research and manufacturing development set in its own extensively landscaped grounds. Policies STV 03.2, STV 03.3 and STV 03.4 (Adopted Test Valley Borough Local Plan, 2006) also require that 40% of the total site area should comprise soft landscaping, and prescribe several on and off site transport measures that must be undertaken. A number of other Plan policies are also relevant to the way in which the proposed development fits into the local landscape. For example, the site lies immediately adjacent to the western boundary of the Nursling and Southampton Local Gap, designated by TVBC to maintain separation of the urban areas of Nursling and Southampton. Development will only be permitted here that will not diminish the gap physically or visually. Similarly, although Home Covert woodland is not located within the application site, Plan policy requires any development to be designed to have minimum impact on the setting of the woodland, unless the reasons for development clearly outweigh the substantive nature conservation value of the site. 3

6 PROJECT DESCRIPTION The proposed development comprises a business park for large space users in accordance with Policy STV 03 of the TVBLP, including a number of large prestige buildings for uses within Use Class B1, on some 31.7 hectares of land at Nursling. This planning application seeks detailed planning permission for a new site access from Brownhill Way by means of a new roundabout on Brownhill Way and a spine road leading from the new roundabout to the northern boundary of Plot 4 along a route which is shown on the General Layout Parameter Plan (see Figure NTS4). This spine road will provide access to the other plots within the proposed development except Plot 5. Plot 5 will be accessed directly from an arm off the new roundabout and this will also serve the existing Holiday Inn Express Hotel. Figure NTS4 General Layout Parameter Plan 4

7 The new roundabout onto Brownhill Way and the new spine road extending to the northern boundary of Plot 4 is shown on Drawing No. APP/002/GA/07E. This drawing confirms that a shared dedicated cyclist and pedestrian route will run adjacent to the spine road from Brownhill Way with a pedestrian/cycle link to Yewtree Lane. A secondary emergency access will be constructed onto Nursling Street on the northern boundary of the application site, and into Yewtree Lane at the eastern boundary. The landscape drawings submitted for detailed approval include the landscape schemes for the Main Roundabout (Drawing APP/002/1829/101), the land adjacent to Yewtree Farm (Drawing APP/002/1829/102) and wildlife corridor north of Plot 4 (APP/003/1829/103). A full list of the application drawings is set out at Appendix NTS1. The site plan at Figure NTS5 shows coloured purple that part of the site for which the application seeks detailed permission and hatched green that part of the site for which outline planning permission is sought. 5

8 Figure NTS5 Application Site Plots 1, 2, 3 & 5 - Scheme parameters and principles This part of the application site is intended to provide the following development in general accordance with the principles and parameters shown on the following Parameter Plans: General Layout Parameter Plan - drawing number PAR/01 Outline Landscape and Ecology Parameter Plan - drawing number PAR/02 Access Arrangements Parameter Plan - drawing number PAR/03 Surface Water Strategy Parameter Plan - drawing number PAR/04 Utilities and Services Parameter Plan - drawing number PAR/05 Site Protection Parameter Plan drawing number PAR/05 The table at Appendix NTS2 sets out the maximum and minimum floorspace for each plot and the approximate dimensions of the buildings within each plot (by reference to their length, width and maximum and minimum height). The approximate footprint of the buildings is shown on the General Layout Parameter Plan (see Figure NTS4) along with a line showing the zone of building flexibility that has been assumed in carrying out this environmental assessment. The conclusions and analysis in this ES would be unlikely to change provided the buildings on these plots were designed to be within the relevant parameters and principles specified and also within the relevant limits of flexibility or deviation. Marketing of the business park will target a small number of large users seeking to establish a major operation with secure boundaries and a clear corporate identity. The accommodation will comprise a number of large prestige buildings, for use within Use Class B1, set in spacious and well-landscaped grounds: 40% of the total site area will comprise soft landscaping (excluding car parks, buildings and other hard and semi-hard areas). A sustainable urban drainage strategy (SuDS) will ensure that surface water run-off from the proposed development is maintained at the same rate as the un-developed site. A Sustainable Energy Strategy will ensure that at least 10% of the application site s carbon dioxide (CO2) emissions are offset by generation of renewable energy on site. 6 These parameters and principles will be tied into the planning permission by way of a planning condition which will require the reserved matters (and other matters requiring subsequent approval under the planning

9 permission sought) to be in general conformity with the parameters and principles, unless TVBC otherwise approves and on the basis that no approval will be given under such conditions if and to the extent that any variations or modifications are likely to have significant environmental effects. Plot 4: The Proposed Ordnance Survey Head Office The Ordnance Survey requirement for a prestigious new Head Office building provides the opportunity to create a first phase for the strategic Adanac Park development on Plot 4. That is why the application is seeking detailed approval for development on that plot. Detailed planning permission is sought for the following development on Plot 4: Construction of a new three-storey Ordnance Survey Head Office B1 office building to accommodate approximately 1000 employees, with a gross external ground floor area of 6,833 m2 Construction of a small single storey children s nursery building with secure external play areas Construction of a cycle store for a minimum of 143 cycles, combined with an enclosed store for recyclable refuse Construction of a sub-station which will be linked by a wall to the cycle store to form an enclosure for refuse skips, Provision of 556 car parking spaces for staff and visitors to the Head Office Building and Children s Nursery Provision of all utilities and services for Plot 4 Construction of a ground coupling heat exchange system to provide 10% on-site renewable energy generation, the details of which will be fixed during the final detailed design phase Installation of a sustainable urban drainage system, (drawing number PAR/04 refers) Landscape works, comprising not less than 40% soft landscape, that set the Ordnance Survey Head Office within a setting appropriate to the adjacent woodland and neighbouring residential areas Construction of an access road up to the northern boundary of Plot 4. This will include a new roundabout on Brownhill Way and site access road to another roundabout adjacent to Plot 4, and a spine road running through the application site in a north-south direction along the western site boundary Construction of a shared dedicated cycle and pedestrian route adjacent to the spine road. The drawings submitted for detailed approval in respect of the development of Plot 4 are listed at Appendix NTS1. IMPACT ASSESSMENT A scoping opinion was received from TVBC on 11 May 2006 in response to a report by The Landmark Practice, scoping the main likely significant impacts. It was agreed that the following assessments would be undertaken to inform the Environmental Statement: Landscape and Visual Ecology Water Quality and Resources Transportation and Access Ground Conditions, Minerals and Contamination Archaeology and Built Heritage Noise and Vibration Air Quality Lighting Socio-Economic Impacts 7

10 LANDSCAPE & VISUAL The application site lies within a transitional zone between the predominately rural landscape of the southern Test Valley and the urban edge of Southampton. The proposed development incorporates 40% soft landscaping and the buildings, although of a large scale, are well spaced throughout the site and in keeping with the local landscape character. Although the landform of the application site will be modified by development, the final topography will remain in character with the surrounding area. The proposed development respects the settings of Home Covert woodland, and the Grade II listed buildings of Yewtree and Bargain Farm. Key landscape features will be retained, protected and enhanced, including an oak tree protected by a Tree Protection Order. New landscape features will be created by substantial woodland and parkland planting and by using drainage features to create wildlife corridors through the developed site. The boundary with the M271 will be reinforced with woodland planting to protect and enhance the setting of the application site and Yewtree Farm. The quality of both planting and built form will be high and in keeping with the prestigious nature of the proposed development. The application site is visually well contained. Views of the site are very local, and mainly from a few properties along Nursling Road, at Hillyfields and Brownhill Way. Because of their height and proximity to residential areas and the motorway, the buildings at the south of the site will be the most prominent within the developed site. These are, however, intended to be prestigious gateway buildings. The proposed development will not cause any major negative landscape and visual effects. Following establishment of the proposed planting, any residual landscape and visual impacts will be of moderate negative significance only, and will be compensated for by landscape enhancement incorporated within the development scheme. ECOLOGY Ecological assessment of the application site and its surroundings to inform this EIA identified a range of habitats used by a variety of wildlife species including bats, birds, reptiles and amphibians. Proximity of the site to nearby designated sites, particularly Home Covert woodland SINC and a section of hedgerow along Nursling Street SINC, adds to the intrinsic ecological value of the site. Careful integration of ecological safeguards within the application scheme means that most of the potential negative effects of construction of the proposed development are addressed, for example by retaining and enhancing key habitat areas and creating extensive areas of new habitat and wildlife corridors. Where development impacts are unavoidable, mitigation is provided by creating alternative roosting and nesting opportunities for bats and birds and new habitat for reptiles. A comprehensive Construction Environmental Management Plan, which will be prepared and approved in accordance with parameters and principles outlined in the Ecology Chapter of the ES, will include methods to safeguard ecology during development of the detailed application scheme, and subsequently of each development plot within the outline consent as detailed schemes are sought. The Plan will secure protection from potential construction impacts of accidental damage, pollution of habitats, and disturbance to wildlife. Once the site is fully developed, disturbance to wildlife will be minimised, for example by use of controlled lighting and restriction of access to wildlife areas. An Ecological and Landscape Management Plan will be prepared for the application site to maintain and enhance the existing and new habitats within the developed site for nature conservation. 8 Although a small number of hedgerows and trees will be lost to development, subject to full implementation of the proposed mitigation strategy, the overall effect of the proposed development will be long term enhancement of the ecological diversity of the site and local area.

11 WATER QUALITY AND RESOURCES The assessment considered potential development impacts, including contamination of water resources, alteration of the drainage regime and flood risk, and increase in demand for water and foul sewerage. The application site is not at risk from tidal, fluvial, groundwater or sewer flooding, neither will the proposed development displace any tidal or fluvial flood plain storage. Surface and sub-surface drainage from the application site currently drains through a network of small streams and ditches and feeds into the River Test. The groundwater below the application site is believed to be connected to the River Test, which supports ecologically important habitats that are sensitive to changes in the quality and quantity of the water discharged. Implementation of the proposed sustainable drainage system (SuDS) and associated mitigation measures will prevent increases in the amount of surface water run-off from the developed site. The proposed SuDS will also ensure that there will be no deterioration in water quality or alteration to the drainage regime that could affect important and sensitive water resources and ecological receptors, during either the construction or operational phase. Water efficiency measures will be implemented to reduce the volume of water required by the operational development and therefore minimise the amount of wastewater that is produced. Following appropriate mitigation, including increasing the capacity of the local foul sewerage network, the proposed development will not result in any significant residual or cumulative impacts on water demand and foul sewerage infrastructure. TRANSPORTATION AND ACCESS The existing highway network is highly vehicle dominated and the majority of the local junctions are under pressure and will become over capacity within the time frame of this development. There are very limited pedestrian, cycle and public transport services and facilities, and consequently use of these modes in the area is very low. There is an existing accident history related to speed and congestion, principally focussed on the M271, although there are issues at other points on the network. The proposed development will significantly increase the demand for pedestrian, cycle and public transport movements in the area. Pedestrian and cycle movement will be focussed on Nursling Street, Redbridge Lane and from Lower Brownhill Road and Mansel Park Road across Brownhill Way. The proposed development will also introduce a significant level of vehicular activity in peak periods, with the main impacts being on the M271 from the M27 and Redbridge roundabout, but also on the Brownhill Way roundabout and Lordshill roundabout. The scheme proposals and mitigation measures provide a package of works and services that will mitigate the impact of the development (the mitigation measures are detailed in Appendix NTS3). Generally the impacts are either positive or neutral, notwithstanding the additional trips generated by the development. The pedestrian and cycle facilities will increase permeability of the area and encourage movement not only to Adanac Park, but also to the existing Nursling Estate. The bus services will provide a high standard of accessibility to the site, across the whole of Southampton, and will assist in supporting the commercial viability of services by providing demand in the minor directions in peak periods. The highway capacity improvements will ensure that traffic conditions are generally no worse than would be experienced in the future without the development, with the exception of Redbridge roundabout where due to topographical constraints a negative impact is predicted in terms of highway capacity. The improvements will not only benefit traffic movement, which is predicted to become congested at all junctions other than Test Lane, but also provide significant improvement to highway safety for vulnerable road users such as pedestrians and cyclists which will in turn encourage the use of Public Transport. A further benefit will be the improvement in environmental conditions in the Hillyfields residential area as a result of the closure of the Redbridge Lane through route. 9

12 GROUND CONDITIONS, MINERALS AND CONTAMINATION The southern part of the application site was worked for sand and gravel extraction until The resulting void was backfilled under controlled conditions with inert material. Site investigations to inform this Environmental Impact Assessment have concluded that, as a consequence of the inert nature of the backfill material, no leachate is being generated from fill material and no significant ground contamination exists. Slightly elevated concentrations of carbon dioxide and methane have been recorded in the made ground within Plot 4. The site investigations have recommended that, to overcome any ground instability, development in plots previously subject to landfill activity should be on piled foundations. This assessment concludes that the proposed development poses low risk of causing contamination from the worked and filled area of the site. With respect to winning of minerals, a site investigation in 2001 proved that remaining sand and gravel reserves are insignificant in terms of quantity, quality and economic viability. Safeguarding of the site for future extraction is not justified and the proposed development will not, therefore, impact on the supply of minerals. ARCHAEOLOGY AND BUILT HERITAGE There are no Scheduled Monuments or Listed Buildings within the application site. Yewtree Farm Grade II Listed farmhouse is enclosed by the site, but lies outside the application area, while Bargain Farm, another Grade II Listed farmhouse, is located nearby. These Grade II Listed farmhouses are of medium importance. Known archaeological features within the application site comprise features and finds, historic hedgerows and lanes, undated earthworks and Adanac Farmhouse, all of low archaeological importance. Although all archaeological remains have been lost from areas of the site that were subject to mineral extraction, other un-worked areas have high potential to contain unidentified buried archaeological remains of at least low importance. NOISE AND VIBRATION The proposed development will cause negligible negative impact on the earthworks, the historic lanes, the settings of the Listed Farmhouses and historic hedgerows. Mitigation is provided through the site Landscape Strategy, which will retain the majority of the historic hedgerows and reduce the visual impact of the proposed development on the setting of the Farmhouses. The demolition of Adanac Farmhouse will have a minor negative impact, mitigated by an external photographic record of the Farmhouse prior to its demolition. Archaeological field evaluation in the nonextracted areas of the application site will be undertaken prior to construction to discern any unidentified archaeological remains. Following the evaluation, an appropriate programme of archaeological work will be implemented with the prior approval of TVBC. Despite preservation of individual elements, the loss of the setting of the historic farming landscape of one of the few surviving parcels of land south of the M27 motorway and east of the River Test will create a negative impact. This loss will be of negligible significance as long as any buried archaeological remains are preserved by record. Current noise levels around the application site are significant, due to existing road traffic on the M27 to the north and M271 to the west of the site. The distances between these sources and potentially sensitive receptors are relatively large, so wind direction can markedly affect noise levels on any particular day, or time of day. 10 There is no significant existing source of vibration at potentially sensitive locations around the perimeter of the application site. Vibration during construction will not be significant.

13 The new buildings will benefit most of the noise sensitive locations surrounding the application site by screening residential areas from existing noise from the M271 motorway. At other points, where the development may cause a net increase in noise, this will be of minor significance and the change so gradual as not to be noticeable. One minor exception might occur from the infrequent sound of a car alarm in car parks at the northern end of the application site, where the closest houses at Bridgers Cottages (see Figure NTS1) may experience noise for short periods. If those car parks are to be used at night the closest spaces will be provided with a screen fence to provide effective mitigation for such events. Mitigation is proposed for control of construction noise, initially at the Plot 4 and associated works, and later for the balance of the site. The recommended noise limits are achievable even for the worst case situations and at all locations. Indeed, noise levels during the majority of the construction works will be significantly below those limits. Overall, the effect of the proposed development of the local noise environment will be benign. AIR QUALITY Air quality close to the application site is generally good, and baseline pollution concentrations around the application site are expected to meet national and local air quality objectives. In contrast, and further from the application site, Southampton City Council has declared Air Quality Management Areas at Redbridge and at the junction of Romsey Road and Tebourba Way (see map Figure NTS1). These areas have been declared on the basis of predicted future exceedences of the annual mean objective for nitrogen dioxide. Increased emissions of dust and particulate matter may occur during construction of Adanac Park, with the greatest potential for dust nuisance to occur within 200 metres of construction activities. A Construction Environmental Management Plan is proposed (in the Environmental Action Plan Chapter of the Adanac Park ES), which will include delivery of mitigation measures to secure reduction of these emissions to an acceptable level. Once operational the scheme will give rise to small increases in emissions of nitrogen dioxide and particulate matter, but no exceedence of the air quality objectives laid down by the Government are predicted. The impact of the proposed development once operational will be of negligible negative significance. LIGHTING The application site lies within a typically dark area of low district brightness. The application site itself is currently unlit and the main local light sources are associated with the M27/M271 junction, street lighting in neighbouring residential areas, the urban fringes of Southampton and, most prominently, the Nursling Estate. Site development will require temporary construction lighting, principally to light the contractor s compound and site access roads. The construction lighting will managed as part of a Construction Environmental Management Plan to mitigate any impacts on surrounding sensitive receptors, for example by use of directionally controlled, well located, modern light fittings, in accordance with current best practice standards and TVBC requirements. Once operational, the proposed development will introduce new artificial light sources to a currently unlit area, resulting in changes to the current local baseline lighting conditions that may affect surrounding residential and ecological receptors. In order to mitigate such impacts, lighting will be designed to current best practice standards and will provide the minimum level of illumination to ensure a safe and secure night time environment, whilst ensuring that the necessary design measures are incorporated into the lighting specification to minimise any impacts to surrounding sensitive receptors. New landscape planting will provide further screening of installed light sources from adjacent receptors. The buffer zone adjacent to Home Covert, filter planting and wildlife corridors will remain unlit to provide natural areas across the application site, that are unaffected by artificial light sources and safeguard night time biodiversity. SOCIO-ECONOMIC IMPACT The socio-economic assessment has addressed the impacts of the proposed development during both the construction and operational phases. The assessment has shown that there will be significant benefits in terms of job creation and support for the local economy. It is estimated that upon final completion, between 2,757 and 4,545 jobs will be created, with an estimated further 827 to 1,363 indirect job opportunities created through demand for ancillary services such as food and drink outlets, hotels, property maintenance and business support functions. 11

14 SUMMARY OF THE IMPACTS OF THE PROPOSED DEVELOPMENT Appendix NTS4 provides a simplified summary of the impacts that were assessed by the EIA. The table gives a description of the potential significant impacts (divided into impact assessment areas, e.g. landscape and visual, ecology etc). For each impact a prediction is made of the predicted significance of the impact prior to application of mitigating measures and then a prediction is made for the residual significance of the impact once the mitigation that is proposed in the ES is applied. CUMULATIVE IMPACTS There is the potential for the proposed development at Adanac Park to have cumulative impacts as a result of the combination of activities associated with the proposed development with those of other development projects. The local developments that have been considered to have potential cumulative implications with the proposed development are as follows: The redevelopment of the current Ordnance Survey offices at Romsey Road for light industrial use (Class B1c), research and development (Class B1b), and ancillary offices The proposed Park and Ride scheme adjacent to the M271; and The proposed light industrial uses within class B1 at Test Lane South The Combined Heat and Power Generation plant at Redbridge Lane Development of the sites in proximity to the application site (Park and Ride, CHP and Test Lane) will increase urbanisation of the locality to such an extent that the landscape around Junction 1 is more likely to be perceived as urban rather than rural. The proposed development would contribute to this change but, given the current level of urbanisation in the area, this impact is considered to be following a recognised and planned trend rather than causing a new effect. The cumulative transport impacts of the proposed development are not anticipated to require mitigation measures additional to those proposed within the Adanac Park Environmental Statement (described at Appendix NTS3), with the exception of the proposed Park and Ride facility to the South of Brownhill Way. This will require additional highway capacity measures to be introduced at both the M271 Junction 1 and the application site access roundabout on Brownhill Way The cumulative impact of the proposed development will also contribute to the loss of the archaeological resource within this particular part of the Lower Test Valley. On completion of the proposed development, only limited areas within and adjacent to the application site will remain undeveloped and therefore contain in-situ deposits representative of the archaeology of this area. The arrangement of farmhouse and field system within the application site represents one of the last surviving elements of that landscape south of and originally part of the historic settlement of Nursling. The proposed development will therefore contribute to a cumulative impact on the surviving historic farming landscape. No further cumulative impacts are anticipated. CONCLUSIONS Allocation of the application site by the Test Valley Borough Local Plan, for development of high quality office, research and/or manufacturing development, provides a presumption in favour of development, subject to delivery of high quality environmental and infrastructure investment in accordance with Plan policy. In the long-term, the key positive environmental effects of the proposed development include the provision of off-site highway infrastructure works and traffic management measures to improve vehicle, cycle and pedestrian safety, particularly at Brownhill Way, Romsey Road and Nursling Street, and significant ecological enhancement. The development will safeguard existing habitats and species, create substantial new habitats and establish long term habitat management. The proposed development will generate a significant change in the landscape, from open field to developed site. Although this ES has found that this change may be negative for some recipients in the short term, the effect will be ameliorated as the proposed site landscape works mature. 12 Subject to full implementation of mitigation measures summarised in this NTS, negative impacts of the proposed development are capable of being overcome or satisfactorily addressed by mitigation (Appendix NTS4) gives a summary of the residual impacts of the proposed development). The overall judgement of this Environmental Impact Assessment is that adverse impacts of the application scheme are outweighed by environmental and economic benefits that will be generated by delivery of the proposed development.

15 APPENDIX NTS1: LIST OF APPLICATION DRAWINGS AND PLANS 13

16 APPENDIX NTS2: GENERAL LAYOUT PARAMETER PLAN DIMENSIONS TABLE 14 (A) (B/C) (D) Based on an average taken across the site from the site survey analysis. Minimum/Maximum building heights for Plots 1a and 1b is based on a reduced scale floor to ceiling height of (3.2m) that better relates in design terms to the northern end of the site, service constraints and the scale of existing offices on Nursling Street. Figures relate to building eaves/shoulders only. Min/Max building heights for Plots 2, 3, 5 relies on a greater scale floor to ceiling height (of 4.0m) typical of larger headquarters buildings. Figures relate to building eaves/shoulders only. Width Minimum relates to buildings shown on General Layout Parameter Plan.

17 (E) Width Maximum relates to the extent of development frontage to Nursling Street and an alternative layout based on a single building for plot 1a rather than the group of smaller buildings shown on the General Layout Parameter Plan. (F) Length Minimum relates to buildings shown on General Layout Parameter Plan. (G) Length Maximum relates to a reasonable standard for office developments of this scale and location within the site (refer to B/C above). (H) Width Maximum of 115metres is based on an alternative layout to the General Layout Parameter Plan that sees a larger single building sited on the western side of the Park Spine rather than the collection of smaller buildings currently shown. (I) Length Minimum relates to buildings shown on General Layout Parameter Plan. (J) Length Maximum relates to point (H) above and an alternative layout that develops a single larger building in keeping with the design on plots 2, 3 and 5 in terms of building typology. (K) The range of storey heights indicated is based on the approach developed for Plot 4 and the use of a series of office fingers that step down in height at the back of the building. (L) Width Minimum for Plots 2,3 and 5 is based on a 5 metre reduction in the main building frontage shown on the General Layout Parameter Plan that provides flexibility but maintains the original design intent and principles. (M) Width Maximum for Plots 2,3 and 5 is based on a 5 metre increase in the length of the main building frontage shown on the General Layout Parameter Plan that provides flexibility but maintains the original design intent and principles. (N) Length Minimum for Plots 2 and 3 and is based on a 5 metre reduction to each of the fingers shown on the General Layout Parameter Plan. Plot 5 is based on a 5 metre reduction on the length of the buildings shown on the General Layout Parameter Plan. (O) Length Minimum for Plots 2 and 3 and is based on a 5 metre reduction to each of the fingers shown on the General Layout Parameter Plan. Plot 5 is based on a 5 metre reduction on the length of the buildings shown on the General Layout Parameter Plan. Plot 4 is included for reference purposes. (A) PEDESTRIAN NETWORK Footway link on Frogmore Lane APPENDIX NTS3: HIGHWAY MITIGATION MEASURES Pedestrian controlled crossing facilities of Brownhill Way at Frogmore Lane Pedestrian crossing off Brownhill Way west of the new site access roundabout Signal controlled crossing of Brownhill Way, east of new site access roundabout Footway link from Brownhill Way to Lower Brownhill Road Signal controlled crossings of M271 Junction 1 Pedestrian crossing island on Romsey Road at Bakers Drove Pedestrian link between Brownhill Way and Nursling Street (B) CYCLE NETWORK Signal controlled cycle crossing facilities of Brownhill Way at Frogmore Lane Cycle crossing of Brownhill Way west of the new site access roundabout Signal controlled crossing of Brownhill Way east of the new site access roundabout Cycleway link from Brownhill Way to Lower Brownhill Road Signal controlled crossing of M271 Junction 1 Cycleway link between Brownhill Way and Nursling Street (C) PUBLIC TRANSPORT Extension of existing service 8 into the development during peak periods (D) HIGHWAY IMPROVEMENTS New site access roundabout on to Brownhill Way Dualling of Brownhill Way to M271 M27 Junction 3 capacity enhancements consisting of improvements to 3 arms and provision of signals on the M271(N) entry M271 Junction 1 to become a signal controlled roundabout including widening of the circulatory carriageway and the M271(N) slip road entry to the junction Signal controlled layouts at the Brownhill Way junctions with Frogmore Lane and Lower Brownhill Way Widen Romsey Road north and Brownhill Way entries to the Lordshill roundabout and widen the circulatory carriageway on the north side of the roundabout Ghost island right turn facilities to be provided at Bakers Drove and Redbridge Lane staggered T junction with Romsey Road (E) CLOSURE OF REDBRIDGE LANE Redbridge Lane will be stopped up between Brownhill Way and the spine road and converted to pedestrian & cycle use only, east of the spine road northwards to Hillyfields A traffic calming scheme following the closure of Redbridge Lane would include the closure of Jerretts Lane to reduce existing problems associated with rat running traffic 15

18 APPENDIX NTS4: SUMMARY OF THE IMPACTS THAT WERE ASSESSED BY THE EIA The following table gives a simplified summary of the impacts that were assessed by the EIA. The table gives a description of the potential significant impacts (divided into impact assessment areas, e.g. landscape and visual, ecology etc). For each impact a prediction is made of the predicted significance of the impact prior to application of mitigating measures and then a prediction is made for the residual significance of the impact once the mitigation that is proposed in the ES is applied. Table 1: Summary of Impacts 16

19 17

20 18

21 19

22 20

23

24 Hope Chapel House Hope Chapel Hill Hotwells Bristol BS8 4ND Tel: Fax:

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433 LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY March 2017 Our Ref: Q70433 Contents 1 INTRODUCTION AND SITE DESCRIPTION... 1 2 EIA METHODOLOGY... 5 3 ALTERNATIVES... 6 4 DESCRIPTION

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Land Securities plc is applying to Maidstone Borough Council

More information

Barvills Solar Farm Environmental Statement Non-Technical Summary

Barvills Solar Farm Environmental Statement Non-Technical Summary Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development

More information

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP LAND AT WEST YELLAND Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP May 2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft FINAL Date

More information

Meridian Water Phase 1 Application

Meridian Water Phase 1 Application Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed

More information

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD Land at Environmental Statement: Non-Technical Summary Introduction Brook Street Properties is applying to Cornwall Council for outline planning permission

More information

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June

More information

South Whitehaven, Cumbria EIA

South Whitehaven, Cumbria EIA South Whitehaven, Cumbria EIA Environmental Statement - Non Technical Summary June 2013 in association with 1. Introduction Story Homes is applying to Copeland Borough Council (CBC) for a new residential

More information

The Place Solar Farm

The Place Solar Farm The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1

More information

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts Chapter 4 Route Window C12: Mile End Park and Eleanor Street Shafts 48 Crossrail Amendment of Provisions 4 Route Window C12: Mile End Park and Eleanor Street Shafts Location plan of Mile End Park and Eleanor

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

Sustainability Statement. Whitby Business Park Area Action Plan

Sustainability Statement. Whitby Business Park Area Action Plan Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan

More information

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 1 April 2015 AUTHOR/S: Planning and New Communities Director Application Number: Parish(es): Proposal: Site address: Applicant(s): Recommendation:

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

SPG 1. * the northern and western sections which are open fields used for pasture and grazing;

SPG 1. * the northern and western sections which are open fields used for pasture and grazing; SPG 1 1.0 INTRODUCTION This development brief is based on the allocation of the Priors Hall site for employment and countryside recreational purposes in the Corby Borough Local Plan. The brief is intended

More information

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433 LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2017 Our Ref: Q70433 Contents 1 INTRODUCTION... 2 2 SITE DESCRIPTION... 5 3 EIA METHODOLOGY...

More information

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 3 October 2012 AUTHOR/S: Planning and New Communities Director S/1723/12/OL CAXTON AND ELSWORTH OUTLINE APPLICATION FOR ERECTION OF RESTAURANT/TAKEAWAY

More information

Moat Lane Regeneration Project Environmental Statement

Moat Lane Regeneration Project Environmental Statement AECOM Environment Towcester Regeneration Ltd. October 2012 Moat Lane Regeneration Project Environmental Statement Non-Technical Summary Prepared by:... Checked by:... Sophie Collins Scott Wilson Environmental

More information

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs Welcome Welcome to our consultation on our proposals for new homes on land north east of Soham Road, Fordham. Members of the project team are available to answer any questions you have and listen to feedback.

More information

UTT/16/1466/DFO GREAT DUNMOW MAJOR

UTT/16/1466/DFO GREAT DUNMOW MAJOR UTT/16/1466/DFO GREAT DUNMOW MAJOR PROPOSAL: LOCATION: APPLICANT: AGENT: Reserved matters approval for the accesses to the site and principal roads within the site including spine road following outline

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition housing development A46 Wildmoor Alcester Road Canal Quarter A422 Town Centre housing development Warwickshire-based IM Properties, one of the UK s largest privately owned property

More information

Ʊ ± ªº Œª ºª ø ª ª ± ª

Ʊ ± ªº Œª ºª ø ª ª ± ª Ʊ ± ªº Œª ºª ø ª ª ± ª ø º Õ± ± ± Œ±øºÙ Õ ß Æª ø檺 ±Æ ƪ ø檺 æß Æ± Ʊ ª ø ø fl ª ª ± ê ø Õ øæß ª ª æªæ Ó ÔÌ Non-Technical Summary Introduction A planning application has been submitted to the Vale

More information

PANSHANGER QUARRY, Hertfordshire

PANSHANGER QUARRY, Hertfordshire PANSHANGER QUARRY, Hertfordshire Proposed enhanced restoration of Phases F & H Briefing Note 1 March 2015 INERT (INACTIVE) RESTORATION MATERIALS, CONTROLS AND OPERATIONS 1 Introduction This briefing note

More information

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to Introduction WCC have indicated that in advance of the surveys and assessments being undertaken consultation should be undertaken with technical officers of both Warwickshire CC and Nuneaton and Bedworth

More information

PLANNING COMMITTEE DATE: 07/09/2015 REPORT OF THE SENIOR MANAGER PLANNING AND ENVIRONMENT SERVICE CAERNARFON. Number: 4

PLANNING COMMITTEE DATE: 07/09/2015 REPORT OF THE SENIOR MANAGER PLANNING AND ENVIRONMENT SERVICE CAERNARFON. Number: 4 Number: 4 Application Number: C15/0034/37/LL Date Registered: 21/05/2015 Application Type: Full - Planning Community: Llanaelhaearn Ward: Llanaelhaearn Proposal: Location: Summary of the Recommendation:

More information

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd Drakelow Park ES 5 Environmental Statement Volume 5: Non Technical Summary Lead Author Waterman Energy, Environment and Design Ltd April 2009 Environmental Statement Volume 5: Non-Technical Summary DRAKELOW

More information

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2 11.1 OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11.2 POLICIES RELEVANT TO ALL WORKSITES IN ISLINGTON... 3 11.3 FARRINGDON

More information

Former RAF Sealand Site EIA

Former RAF Sealand Site EIA Praxis (Holdings) Ltd. Former RAF Sealand Site EIA Environmental Statement - Non Technical Summary February 2012 in association with P a g e 1 1. Introduction Praxis (Holdings) Ltd. is applying to Flintshire

More information

2014/0590 Reg Date 26/06/2014 Chobham

2014/0590 Reg Date 26/06/2014 Chobham 2014/0590 Reg Date 26/06/2014 Chobham LOCATION: PROPOSAL: TYPE: APPLICANT: OFFICER: ASCOT PARK POLO CLUB, WESTCROFT PARK FARM, WINDLESHAM ROAD, CHOBHAM, WOKING, GU24 8SN Erection of a two storey detached

More information

3.1 The hybrid planning application proposes the following description of development:

3.1 The hybrid planning application proposes the following description of development: CHAPTER 3: PROPOSED DEVELOPMENT 3.1 The hybrid planning application proposes the following description of development: Hybrid (part-outline/part-full) planning application for a single composite development

More information

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion Mr Graham Clark Berrys Newchurch Farm Kinnersley Hereford HR3 6QQ BY EMAIL The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion SC/2017/0001

More information

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015 Wyvern Park Skipton Environmental Statement Non-technical Summary - April 2015 BWB Consulting Ltd Whitehall Waterfront 2 Riverside Way Leeds LS1 4EH Telephone: +44(0)113 233 8000 Copyright This Report

More information

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal Option SWH1 Balanced Communities Option SWH1 1 To ensure the delivery of high quality sustainable communities where people want to live and work Will it ensure the phasing of infrastructure, including

More information

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17 Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS A New Garden Neighbourhood Matford Barton 17 2.1. SUMMARY AND STATUS OF THE PROPOSALS 2.1.1. The parameter plans and associated wording in this chapter

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire

Request for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire Request for a Scoping Opinion by Provectus Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire January 2012 Contents 1 Introduction & Background... 1 2 Site

More information

17A. Wind Microclimate

17A. Wind Microclimate 17A. Wind Microclimate 17A.1 Introduction 17A.1.1 17A.1.2 17A.1.3 17A.1.4 This Chapter, which has been prepared by Waterman and BMT, provides further information with regard to the potential wind microclimate

More information

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

WELCOME. Land North of STEVENAGE.   We would like to thank you for attending our public exhibition today. WELCOME We would like to thank you for attending our public exhibition today. The purpose of this event is to share our proposals and hear your thoughts on our ideas. Members of the project team are on

More information

LAND NORTH OF NETHERHOUSE COPSE, FLEET

LAND NORTH OF NETHERHOUSE COPSE, FLEET REPORT N O 70020067 LAND NORTH OF NETHERHOUSE COPSE, FLEET ENVIRONMENTAL STATEMENT VOLUME 3:NON-TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT PUBLIC JUNE 2016 LAND NORTH OF NETHERHOUSE COPSE, FLEET

More information

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd.

VALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd. VALLEY PARK, DIDCOT Non-Technical Summary December 2014 On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd. CONTENTS 1 Introduction... 2 2 The Proposed Development...

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Hybrid outline/detailed planning application comprising an outline planning application for 196 residential dwellings, landscaping, open space, estate roads and infrastructure, plus 4 permanent gypsy and

More information

Dunsbury Hill Farm. Environmental Statement - Non Technical Summary. Portsmouth City Council

Dunsbury Hill Farm. Environmental Statement - Non Technical Summary. Portsmouth City Council Dunsbury Hill Farm Environmental Statement - Non Technical Summary Portsmouth City Council March 2012 1 2 Environmental Statement: Non Technical Summary March 2012 3 4 Introduction A planning application

More information

SUBJECT TO ATTACHED SCHEDULE OF THIRTY SIX CONDITIONS

SUBJECT TO ATTACHED SCHEDULE OF THIRTY SIX CONDITIONS Stratton House 58/60 High West Street Dorchester Dorset DT1 1UZ Duchy of Cornwall Poundbury Farmhouse Poundbury Farm Way Poundbury Dorchester DT1 3RT Tel: (01305) 251010 Fax: (01305) 251481 Minicom: (01305)

More information

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 in association with 1. Introduction Peel Holdings is applying to Nottingham City Council (NCC) for Outline planning

More information

Test Valley Borough Council. Strategic Housing Land Availability Assessment (SHLAA)

Test Valley Borough Council. Strategic Housing Land Availability Assessment (SHLAA) Test Valley Borough Council Strategic Land Assessment (SHLAA) Appendix 2 Southern Test Valley Sites Where a Change in Policy is Required for Residential Development Final Version as at 1 st April 2014

More information

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DECEMBER 2014 CRANBROOK EXPANSION AREAS ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY Submitted in support of Outline Planning

More information

Derry City and Strabane District Council Planning Committee Report

Derry City and Strabane District Council Planning Committee Report Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 23 rd March 2016 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: LA11/2015/0395/F Residential Development

More information

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high

More information

Welcome. Land adjacent Sandy Lane WALTHAM CHASE THE PROPOSED SITE

Welcome. Land adjacent Sandy Lane WALTHAM CHASE THE PROPOSED SITE Land adjacent Sandy Lane WALTHAM CHASE Existing Linden Homes developments Welcome Welcome to Linden Homes Southern s ( Linden ) public exhibition about its proposals for a range of high-quality homes for

More information

Reserved Matters application for a site that straddles the boundary between CBC and BBC

Reserved Matters application for a site that straddles the boundary between CBC and BBC BBC APPLICATION 15/02682/MAR NUMBER CBC APPLICATION CB/15/04294/RM NUMBER LOCATION Wixams Land at former storage depot, Bedford Road, Wilstead Bedfordshire PROPOSAL Reserved Matters Application for Strategic

More information

MAIDSTONE MEDICAL CAMPUS LTD LAND AT NEWNHAM PARK, MAIDSTONE

MAIDSTONE MEDICAL CAMPUS LTD LAND AT NEWNHAM PARK, MAIDSTONE MAIDSTONE MEDICAL CAMPUS LTD LAND AT NEWNHAM PARK, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Maidstone Medical Campus Ltd is applying to Maidstone Borough Council for

More information

INTRODUCTION. Land south of Bishopswood Lane, Tadley

INTRODUCTION. Land south of Bishopswood Lane, Tadley 0 INTRODUCTION THE SITE Introduction Gladman Developments Ltd. has successfully invested in communities throughout the UK over the past 0 years, developing high quality and sustainable residential, commercial

More information

Kibworth Harcourt. Introduction. Introduction

Kibworth Harcourt. Introduction. Introduction Introduction Introduction Welcome to this public exhibition on the proposals for the delivery of new homes on land at The Kibworths. The purpose of today s exhibition is to give you the opportunity to

More information

Ward: Southbourne. Outline application with all matters reserved. Erection of 5 no. dwellings and associated works.

Ward: Southbourne. Outline application with all matters reserved. Erection of 5 no. dwellings and associated works. Parish: Southbourne Ward: Southbourne SB/16/00205/OUT Proposal Site Outline application with all matters reserved. Erection of 5 no. dwellings and associated works. Dunkirk South Lane Southbourne Emsworth

More information

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 1 st February 2017 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: Full Planning application Amended

More information

Land at Weymouth Gateway Proposed hotel and pub / restaurant Non-technical summary. Premier Inns Ltd February 2011

Land at Weymouth Gateway Proposed hotel and pub / restaurant Non-technical summary. Premier Inns Ltd February 2011 February 2011 Introduction NTS.1 In April 2007, New Look Retailers Ltd submitted an outline planning application to Weymouth and Portland Borough Council to redevelop the Mount Pleasant Business Park

More information

Land North of Hall Road, Rochford. Rochford District Council. Planning Application Index. Prepared on behalf of Bellway Homes Ltd

Land North of Hall Road, Rochford. Rochford District Council. Planning Application Index. Prepared on behalf of Bellway Homes Ltd Land North of Hall Road, Rochford Rochford District Council Planning Application Index Prepared on behalf of Bellway Homes Ltd April 2010 Land North of Hall Road, Rochford Rochford District Council Scope

More information

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) 1 DONINGTON S PLACE IN THE SPATIAL STRATEGY 1.1 Policy 2 of the South East Lincolnshire Local Plan 2011-2036 Draft for Public Consultation

More information

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION Application Site and Description of Development Proposed new quarry at Culham, Oxfordshire Land and Mineral

More information

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane Proposed Land Use: Total Site Area (Ha): Housing 1.85 Ha Description: It is understood that the owner has no plans to dispose of the site

More information

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016 Thornton Road, Pickering Environmental Statement Non-Technical Summary January 2016 EIA Quality This Environmental Statement, and the Environmental Impact Assessment (EIA) carried out to identify the significant

More information

Kings Road Industrial Development, Immingham. Environmental Impact Assessment. Non Technical Summary

Kings Road Industrial Development, Immingham. Environmental Impact Assessment. Non Technical Summary Environmental Impact Assessment Non Technical Summary Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 December 2013 Page left intentionally blank INTRODUCTION

More information

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics

More information

Date: TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2011: REGULATION 13 SCOPING OPINION

Date: TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2011: REGULATION 13 SCOPING OPINION PLANNING & BUILDING CONTROL Tracy Harvey Head of Planning & Building Control Rob Wells Savills Innovation Court 121 Edmund Street Birmingham B3 2HJ Our Ref: 5/16/3441 E-mail: Date: planning@stalbans.gov.uk

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.

More information

Land to the North of Main Road, Wybunbury

Land to the North of Main Road, Wybunbury Land to the North of Main Road, Wybunbury Environmental Statement Non-Technical Summary November 2014 Land to the North of Main Road, Wybunbury Environmental Statement Non-Technical Summary Prepared on

More information

Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY December 2016 Environmental Statement: Non-Technical Summary Stubbocks Walk, North Hertfordshire J S Bloor

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

Kilnw Envir ood Vale onmental Statement Volume 3: Non Technical Summary July 2010

Kilnw Envir ood Vale onmental Statement Volume 3: Non Technical Summary July 2010 Kilnwood Vale Environmental Statement Volume 3: Non Technical Summary July 2010 Kilnwood Vale Environmental Impact Assessment Environmental Statement Volume 3 KILNWOOD VALE ENVIRONMENTAL STATEMENT NON-TECHNICAL

More information

and Netherhall Road and Camp Farm EIA

and Netherhall Road and Camp Farm EIA and Netherhall Road and Camp Farm EIA Environmental Statement - Non Technical Summary December 2012 in association with 1. Introduction Story Homes applied to Allerdale Borough Council (ABC) in May 2011

More information

PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY APRIL 2010 INTRODUCTION This document is the Non-Technical Summary (NTS) of an Environmental Statement

More information

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017

South Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017 South Macclesfield Development Area Environmental Statement March 2017 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description... 2 2.0 The Proposals...

More information

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North

South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary. For Engine of the North South Macclesfield Development Area, Phase 1 Environmental Statement Non- Technical Summary For Engine of the North April 2015 Contents Contents 3 1 Introduction 1 2 The Proposals 5 3 Alternative Options

More information

Ref: A073350/SM/sm Date: 13 September 2013

Ref: A073350/SM/sm Date: 13 September 2013 Ref: A073350/SM/sm Date: 13 September 2013 Ian Parkinson Development Control Team Leader Planning Portsmouth City Council Civic Offices Guildhall Square Portsmouth PO1 2AY Dear Ian LIGHT & GLEAVE VILLA

More information

I615. Westgate Precinct

I615. Westgate Precinct I615. Westgate Precinct I615.1. Precinct Description The Westgate Precinct is located approximately 18km west of the Auckland city centre. There are seven Sub-precincts in the Westgate Precinct: Sub-precinct

More information

Welcome to our Public Consultation

Welcome to our Public Consultation About our development This exhibition gives you the chance to view and comment on our emerging plans for a proposed residential development located on land to the West of Alwyn Road, Rugby. Welcome to

More information

Persimmon Homes Thames Valley Date received: 2 nd April week date(major): 2 nd July 2014 Ward: Nascot

Persimmon Homes Thames Valley Date received: 2 nd April week date(major): 2 nd July 2014 Ward: Nascot PART A Report of: DEVELOPMENT MANAGEMENT SECTION HEAD Date of Committee: 26 th June 2014 Site address: Rounton, 28, Nascot Wood Road Reference Number: 14/00497/REM Description of Development: Reserved

More information

St Austell Northern Expansion Non Technical Summary

St Austell Northern Expansion Non Technical Summary Wainhomes (Southwest) Holdings Ltd St Austell Northern Expansion Non Technical Summary November 2009 WSP Document Reference Footer Title Sustainability Appraisal St Austell Northern Expansion 0 QM Issue/revision

More information

Application Recommended for Approval Hapton with Park Ward

Application Recommended for Approval Hapton with Park Ward Application Recommended for Approval Hapton with Park Ward APP/2017/0036 Outline Planning Application Outline application for the construction of a new 3 bedroom dwelling (with all matters reserved for

More information

Non-Technical Summary

Non-Technical Summary Introduction The Brent Cross Cricklewood regeneration scheme is located in northwest London and comprises 151 hectares (ha) of land within the London Borough of Barnet (LBB) (the Site ). In July 2014,

More information

DEVELOPMENT MANAGEMENT REPORT

DEVELOPMENT MANAGEMENT REPORT ITEM A08-1 DEVELOPMENT MANAGEMENT REPORT TO: BY: DATE: DEVELOPMENT: SITE: WARD: APPLICATION: APPLICANT: Development Management Committee Development Manager Proposed live/work unit in connection with existing

More information

Environmental Statement (Volume 1) Non Technical Summary

Environmental Statement (Volume 1) Non Technical Summary Environmental Statement (Volume 1) Non Technical Summary Prepared by: The Environment Partnership Haydock Point Environmental Statement (Volume 1): Non-Technical Summary March 2017 Contents 1. Introduction

More information

SHIRLEY MOTORWAY SERVICE AREA

SHIRLEY MOTORWAY SERVICE AREA SHIRLEY MOTORWAY SERVICE AREA PROPOSED DEVELOPMENT OF A NEW MOTORWAY SERVICE AREA, WITH MEANS OF ACCESS, LANDSCAPING AND ASSOCIATED INFRASTRUCTURE ON LAND ADJACENT TO JUNCTION 4 OF THE M42 ENVIRONMENTAL

More information

Inert Recycling (UK) Ltd Boxgrove Quarry Restoration Environmental Statement

Inert Recycling (UK) Ltd Boxgrove Quarry Restoration Environmental Statement November 2013 Non-Technical Summary Empress House, 12 Empress Road, Lyndhurst, SO43 7AE Tel: 023 8028 3226 Email: waste.enquiries@wyg.com Introduction Background EIA is a process by which the environmental

More information

This document provides a summary of the ES findings in non-technical language.

This document provides a summary of the ES findings in non-technical language. Introduction MOTO Hospitality Limited (the Applicant ) is seeking full planning permission to redevelop the Kinross Motorway Service Area (the Site ) located at Turfhills, near Kinross, west of Junction

More information

WELCOME. Welcome and thank you for visiting today.

WELCOME.   Welcome and thank you for visiting today. WELCOME Welcome and thank you for visiting today. Bellway Homes Ltd (Yorkshire) are preparing a reserved matters planning application for a residential development of 293 homes at land North of Yew Tree

More information

A303 Stonehenge. Amesbury to Berwick Down Scheme Assessment Report Appendix D CSR and Policy Assessment. Volume 6

A303 Stonehenge. Amesbury to Berwick Down Scheme Assessment Report Appendix D CSR and Policy Assessment. Volume 6 A0 Stonehenge Amesbury to Berwick Down Scheme Assessment Report Appendix D CSR and Policy Assessment Volume 6 September 2017 Appendix D Client Scheme Requirements (CSRs) and Policy Assessment D.1 CSR Assessment

More information

Response by the Wiltshire Archaeological and Natural History Society

Response by the Wiltshire Archaeological and Natural History Society Highways England Consultation A303 Stonehenge Response by the Wiltshire Archaeological and Natural History Society Background About the Society Founded in 1853 to educate the public by promoting, fostering

More information

Longbridge East : Site Wide and Phase One Development

Longbridge East : Site Wide and Phase One Development Longbridge East : Site Wide and Phase One Development Non-Technical Summary of the August 2011 Introduction St Modwen Developments Ltd intend to submit a new outline planning application for Longbridge

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY NON-TECHNICAL SUMMARY THE HIDE, BISHOP AUCKLAND PROPOSED ECO CHALET DEVELOPMENT NON-TECHNICAL SUMMARY 1 Introduction 1.1.1 This non-technical summary for the (ES) prepared in relation to the proposed eco-chalet

More information

Test Valley Borough Council Southern Area Planning Committee 8 January 2019

Test Valley Borough Council Southern Area Planning Committee 8 January 2019 ITEM 11 APPLICATION NO. 18/02218/FULLS APPLICATION TYPE FULL APPLICATION - SOUTH REGISTERED 23.08.2018 APPLICANT Rugby Football Union SITE The Trojans Club, Stoneham Lane, Eastleigh, SO50 9HT, CHILWORTH

More information