1 Upper Smith Creek Comprehensive Development Plan (File: CDP 14-01) TERMS OF REFERENCE Development Services Division District of West Kelowna July 2014

2 1.0 INTRODUCTION Smith Creek CDP Terms of Reference (File: CDP-14-01) Page 2 The owners of two large, rural properties in the Smith Creek neighbourhood have requested that the District of West Kelowna prepare Terms of Reference for the development of a Comprehensive Development Plan (see Figure #1 [ The Plan Area ]). A Comprehensive Development Plan (CDP) provides a link between the Official Community Plan (OCP) and specific land development applications. Where an OCP is too broad to determine appropriate land use designations in areas where detailed investigation is required, and where a single development application is too narrow a focus to address broader issues, a CDP provides the necessary framework. The creation of such a plan enables land owners to work with the District to conduct the necessary investigations to examine development potential and determine how that development would best meet District objectives such as environmental protection, community resources, land use, servicing, access and transportation, form and character and parks. The following terms of reference guide the preparation of the CDP, which will outline the development areas, infrastructure, environmentally sensitive lands, land uses, design guidelines, phasing of development, servicing, and magnitude of costs projected within the planning area. Plan Area The Upper Smith Creek area is located north of Westbank Centre on the lower slopes of Carrot Mountain. The plan area is situated upslope from agricultural lands and adjacent to provincial crown forest and forms an extension of the existing Smith Creek neighbourhood. The total Smith Creek Comprehensive Development Area encompasses hectares and is comprised of three large, rurally zoned properties. The configuration of the parcels in relation to existing roads and servicing requires that the properties are planned comprehensively. Northerly expansion of the existing Smith Creek neighbourhood to the CD Area presents challenges given the topography, environmental features (Smith Creek) and significant aesthetic value of the site. 1.1 Authority Figure 1: Plan Area The authority which enables the District to consider a CDP is outlined in the District s OCP Bylaw No (see OCP Sections 3.1, and ). CDP s may be undertaken where a single applicant, group or adjoining land owners work collaboratively to prepare a consolidated plan for a specific area.

3 Page 3 Comprehensive Development Plans are non-statutory documents that must be endorsed by Council to become valid, and only specific OCP-related policy changes and Land Use Designation changes will be brought forward as an OCP amendment. 1.2 Framework The CDP shall establish a coherent framework for implementing OCP policies, guiding future development, and ensuring all documentation and supplemental information is consistent within the plan. Furthermore, a CDP shall adhere to the spirit and purpose of the OCP, the Zoning Bylaw and District master plans and policies related to development as a whole. While the District is currently undertaking a review of the Zoning Bylaw, the CDP will reflect the zones of the day when the CDP is brought forward to Council for consideration. Unlike Area Plans which are prepared by the municipality, CDP s may be undertaken where a single applicant, group or adjoining land owners work collaboratively to prepare a consolidated plan for a specific area. Protech Consultants 2012 has been commissioned by Progressive Construction Ltd., and BC. Ltd., to oversee the preparation of the CDP for the two properties. The costs to undertake the works outlined in this TOR will be borne by the applicant. 1.3 Content Appendix A of this TOR outlines the mandatory content required for the development of the CDP, including: I) Context & Inventory; II) Assessment and III) The Final Concept. In addition to mandatory content, the CDP should include the following: The location of future development nodes, land uses, constraints to development, the conditions under which development may occur. An estimate of the order of magnitude of costs associated with on-site and off-site infrastructure, identification of who pays, and a scheduling of services in association with phases of development. A comprehensive analysis of development nodes based on geotechnical and environmental constraints in the plan area. The general location of arterial, collector and local roads and the points of access to existing roads and adjacent lands. An understanding of the potential impacts of future land uses on adjacent crown lands and the inclusion of appropriate buffers and setbacks. Management of visual quality from key vantages in the community and protection of visually prominent hillsides and ridgelines. Identification and protection of Environmentally Sensitive Areas (ESA) and that the interface between development and the ESA areas are clearly defined. Provide potential development opportunities which are responsive to the District s CD Policies (Section 1.4 of this TOR). Ensure that new development provides benefits to the existing community and minimizes unacceptable impacts to both the community and the environment. Ensure the Plan promotes the establishment of on-site pedestrian and non-motorized forms of transport. Encourage energy efficiency in building and transportation planning and promote sustainable site design treatments and a balance with the natural environment.

4 Page 4 Support the DWK s long term requirements to accommodate the necessary infrastructure and servicing in a manner that minimize future costs to the taxpayer Recommendations for Official Community Plan and Development Permit Area designations and other recommended bylaw or regulatory amendments that will guide the servicing and development of the neighbourhood. 1.4 Policy Overview The District s Official Community Plan specifies that the CDP s shall be developed with community input and that future development of the subject area may be considered at DWK s discretion based on the following policies: 1. Development of the Upper Smith Creek area should be in strict accordance with the hillside development standards to develop the lands in a safe manner while minimizing visual impacts to the surrounding community. 2. Development proposals must include safe emergency access/egress. 3. Potential development must address potential servicing requirements including the location of water storage, connectivity and access considerations. 4. Development proposals should protect and enhance the historic flume trail located within the area. 5. Network road connections to adjacent neighbouring parcels must be secured. 6. Future management of and access to Crown Land should be addressed. 7. Should zoning amendments be contemplated for the CD Area, density transfer and bonusing concepts may be explored where it is in the DWK s interest to achieve community goals through such aspects as the protection of environmentally sensitive areas and the provision of community amenities. 2.0 COMPREHENSIVE DEVELOPMENT PLAN APPLICATION, CIRCULATION, AND PROCESS The development of a complete CDP containing all the requirements outlined in Appendix A will be divided into three phases. Each phase will involve review and coordination with District staff and other stakeholders, public engagement and additional technical review. The intent of this multi-phased approach is to identify and address any issues raised during the initial stages of CDP development so that the issues are resolved prior to the submission of a completed CDP. At a minimum, the applicant must provide (at their cost) at least two opportunities for consultation with the general public, at a location approved by District staff, over and above the statutory Public Hearing requirement for the future OCP amendments. The multi-phase approach will be completed as follows: Phase 1 Context and Inventory This initial phase of CDP development occurs after the terms of reference are approved by Council. The objective of this phase is to gather the baseline information for the land(s) and to identify the opportunities and constraints of potential development. The requirements outlined in Appendix A Context and Inventory must be addressed during this phase. This information will be provided to District staff and other stakeholders as appropriate.

5 Page 5 Once the site context information has been gathered, the applicant is required to meet with staff to review the findings and to obtain direction to proceed to the next phase of CDP preparation. Adequate time must be allocated at this stage to permit staff to review and consider the findings of the work completed. The District will provide the reproduction and circulation of drafts for interest groups and public discussion. The consultant must provide software compatible or photocopy compatible originals or material and drafts throughout the process. Public Information Meeting #1 Once the Plan Context has been developed and direction provided by staff, the Applicant shall hold a Public Information Meeting. The objective of this engagement effort is to gather the input of local residents and land owners regarding the potential impact of any proposed development, as well as any other outstanding opportunities or constraints for development. The applicant is also encouraged to provide conceptual plans at this meeting and work with the public to address their concerns and issues early in the approval process. All materials for public display and public questionnaires must be pre-approved by the District to ensure that all relevant information is presented and topics are well documented and a record of consultation will be provided to the District. Phase 2 - Assessment The second phase of CDP development will use the information gathered from the public and stakeholder engagement from Phase 1 to inform the further development of the CDP. Those requirements outlined in Appendix A Assessment and Final Concept must be provided during this phase, including any and all technical studies outlined in Section 2.2 of this TOR. The result will be a complete first draft of the CDP. This draft will be provided to District staff and other stakeholders as appropriate. Adequate time must be allocated at this stage to permit staff to comprehensively review and consider the findings of the work completed. Public Information Meeting #2 Using the draft CDP, the applicant shall hold, at their expense, a second Public Information Meeting. The objective of this meeting is to gather the input of local area residents and land owners regarding the potential impact of the development, as proposed. The applicant is strongly encouraged to work with the public to address their concerns and issues prior to proceeding to Council. The District will provide the reproduction and circulation of drafts for interest groups and public discussion. The consultant must provide software compatible or photocopy compatible originals or material and drafts throughout the process. Phase 3 Final Concept (Complete Application) Formal submission of the CDP document to the Development Service Division, in accordance with the District s Development Application Procedure Bylaw No.0131 (Schedule 3 PART B) and Appendix C, will provide all content specified for the CDP application prior to the application being deemed complete and ready for circulation.

6 Page 6 This final concept will be referred by District staff and review agencies will be asked to provide comments in response to a formal application within 4 weeks. The Development Services Division will monitor the status of agency responses, advise the applicant accordingly, and call meetings as necessary to deal with any outstanding technical issues of file complexities. During circulation of the draft plan, the CDP document may be further modified, updated or amended. Any changes to the document shall conform to the context requirements identified under these Terms of Reference and be completed prior to finalization of the CDP document and presentation to Council. All necessary technical studies shall be completed and summarized along with consultation(s) held with affected stakeholders and the general public prior to finalization of the CDP document and Development Services formal report to Council. 2.1 Roles and Responsibilities The DWK and the consultant are expected to develop a project management scenario that involves a close working relationship, including being mutually aware of all major decisions or issues, and the mutual coordination of project meetings and timelines. Specific responsibilities are outlined as follows: District of West Kelowna District staff is committed to providing exceptional customer servicing by being responsible, accountable, and professional. Staff is expected to review submissions in a timely and efficient manner, and provide pertinent information and communications in a clear and concise manner. Review of submissions will be in accordance with the District s Development Application Procedures Bylaw No (Schedule 3 Part B). Consultant Team The consultant team is expected to work collectively as a design team, with each member being aware of the constraints, opportunities and options identified through the various disciplines represented on the consulting team. The consultant team is also expected to provide complete, comprehensive submissions in a timely manner. The consultant team will be responsible for advertising and room rental costs associated with the public information distribution and meetings, and will collect all written public feedback that will then be forwarded to the District Planning staff. The team is expected to apply best planning principles consistently to all properties with the plan area. The study team must have a team leader with proven expertise in site design and community planning processes. There must be a demonstrated ability to incorporate local community and government agency participation and objectives. In order to conduct the planning process and to incorporate appropriate information into the Plan, the study team must include: A coordinating professional that is experienced in public planning process within British Columbia, multi-stakeholder interests and professional codes of conduct; A professional architect with experience in the development of design concepts and general guidelines;

7 Page 7 A professional engineer with experience in: o servicing and infrastructure o geotechnical engineering o transportation planning/traffic impact analysis; A professional biologist experienced in environmental site assessments, site planning and creating environmental criteria/recommendations for development; A professional forester with forest fire hazard assessment and abatement expertise; A professional archaeologist with experience in identification and protection of archaeological sites and material in B.C.; and A professional landscape architect with experience in visual quality assessment and analysis and local plant material. The lead consultant is responsible for reporting to the ownership group and providing copies of any technical reports and the CDP document or summary thereof (i.e. executive summary, land use concept map, population and land use statistics) to each registered owner within the Plan Area upon required. 2.2 Technical Reporting It is understood that a number of technical studies were submitted as part of the previous CDP application made in These studies included: Smith Creek Neighbourhood Plan: Preliminary Report of Groundwater and Surface Water Hydrology, prepared by Summit Environmental Consultants Ltd., dated August 2008; Wildfire Hazard Assessment for Smith Creek, prepared by Mosaic Forest Management Ltd., dated September 4 th, 2006; Smith Creek: Neighbourhood Plan Environmental Assessment, prepared by Makonis Consulting Ltd., dated September 2008; Geotechnical Hazard Assessment: Smith Creek Neighbourhood Plan, prepared by Calibre Geotechnical Engineering Ltd., dated January 22, 2007; and Archaeological Impact Assessment: Proposed Smith Creek Residential Subdivision, prepared by I.R. Wilson Consultants Ltd., dated August In recognition of the significant work put into these plans and that much of the technical information contained within the plan may remain valid, the District is prepared to accept amended technical studies or an addendum letter provided that: References to Regional District of the Central Okanagan and the Ministry of Transportation are replaced with the District of West Kelowna (where applicable); The studies are prepared and submitted in accordance with the District s Terms of Reference for Technical Reports (where applicable and attached for reference); The studies reflect the recent (July 2014) Smith Creek Wildfire event; and The studies reference and are reflective of latest District of West Kelowna Master Plans as adopted by Council, including: Official Community Plan; Master Transportation Plan; Water Master Plan; Recreation Trails Master Plan; Agricultural Plan; Stormwater Plan; and

8 Parks and Recreation Master Plan. Smith Creek CDP Terms of Reference (File: CDP-14-01) Page 8 In addition to the above noted technical reports, the following specific reports must be provided and shall be in accordance with the District s Terms of Reference for Technical Reports (where applicable) and relevant DWK Master Plans; Traffic assessment and conclusions as prepared by a professional engineer experienced in traffic analysis registered in the Province of British Columbia. In addition to the technical modeling and report, the information should be summarized in a way that facilitates public understanding (i.e., the meaning of level of service, additional diagrams, etc.) Stormwater Management/Drainage Plan to identify and mitigate impacts to downstream basins that may be affected by the land use concept. Functional Servicing Report, prepared by a professional engineer. A detailed overview of servicing consideration can be found in Appendix B. Visual Impact Assessment, prepared by a professional landscape architect.

9 Appendix A: Mandatory Content of the Plan Smith Creek CDP Terms of Reference (File: CDP-14-01) Page 9 I. Context & Inventory The CDP will include an examination of the following site opportunities and constraints within or adjacent to the Plan area including: Land Use Existing land use, zoning and development permit area designations both within the plan area and on adjacent lands; Existing buildings and structures; Anticipated future land uses on adjacent lands; Biophysical Resources and Topography Hydrological and/or hydro-geological conditions including, but not limited to, infiltration, interception, groundwater and overland flows, as well as hydrologic processes including erosion. Geotechnical conditions including, but not limited to, soil composition, profile, and terrain stability; Slope analysis (less than 10%, 10% to 20%, 20% to 30% and over 30%), high points, low points and viewpoints. Note, slope analysis in development nodes and collector road corridors will require detailed mapping. Landscape and visually significant features (nature of feature, significance and magnitude) including view corridors and shadows, visual envelope, prominent features and landscape character; Natural and developments hazards such as wildfire, flood, instability, etc. Site Attributes Development nodes and alternative land use attributes of each proposed node. Wildlife and Fish Habitat Existing sensitive terrestrial and aquatic ecology including, but not limited to, biological diversity, flora and fauna, habitat size, habitat and wildlife corridors, complexity fragmentation or isolation. Special Features Existing archeological, historical (i.e. flume trail) and cultural features Contaminated areas Management of special features Transportation (including roads, cycling and pedestrian routes)/utility Corridors Existing conditions and corridors, future networks and standards (i.e., NFPA) Capacity and constraints of existing transportation routes Optional points of access to provincial highways, collector roads and appropriate points of access to adjacent lands. Existing utility corridors, registered rights-of-way and easements. Services/Facilities (see Appendix B) Water supply and sewage trunk mains and treatment (type, location, capacity)

10 Page 10 Schools, health, emergency services (type, location, capacity) Recreation services and parks in the vicinity of the plan area Proposed phasing of on and offsite services, expansions and improvements Opportunities for future servicing connections for adjacent lands. II. Assessment The Plan should include a detailed assessment of the opportunities, requirements and limitations within the Plan area based upon: The information gathered as part of the inventory outlined in Context and Inventory; Input from the public, Council, Council Committees, District staff and other agencies; Input from the other sources such as existing reports, policies and legislation; and Input from the consultant team. III. Final Concept The final plan must include statements regarding all of the following: An overview of the proposed development in the form of a site plan and accompanying text. The final site proposal should reference and include: o The proposed land use mix including type, location, density, and any other key development parameters, o A Phasing Plan, o An outline of how to manage remnants lands, o Development conceptual layout, o Road, pedestrian and cycling network, o Parkland, open space, trails, o Infrastructure and Servicing, o Reference and analysis of how the proposal is consistent with the following District Master Planning Documents including (but not limited to) : Official Community Plan; Master Transportation Plan; Water Master Plan; Recreation Trails Master Plan (draft); Agricultural Plan; Stormwater Plan; and Parks and Recreation Master Plan. Rationale and justification for all key development decisions and areas where the plan deviates from the above noted District Master Plans. An overview of how the plan respects the adjacent Crown Land rural land uses; A summary of the public consultation and a discussion of the responsiveness of the plan to that public input. An Urban Design Reference including general priorities for form and character Development Permit consideration. Outline the nature and extent of all anticipated impacts as determined through the plan process and the measures required to prevent, reduce, or mitigate those impacts.

11 Page 11 Appendix B: Engineering Considerations With relation to the entire study area, the Plan shall investigate options and associated costs respecting the following: 1. Water supply A. Source of Supply B. Capacity Requirements (Domestic and Fireflow) C. Major Infrastructure requirements, including: i. Water intakes ii. Treatment Facilities iii. Reservoirs iv. Pump Stations v. Supply Mains vi. Hydrant Locations 2. Sewage Collection and Disposal A. Method of Treatment B. Location of Treatment Facilities C. Treatment Capacity D. Major Infrastructure Requirements, including; i. Treatment Facilities ii. Lift Stations iii. Trunk Mains 3. Stormwater Management (Stormwater Management Plan) A. Define catchment areas and major flow paths B. Document natural flow paths, streams/watercourses C. Proposed Stormwater Outlets D. Major Infrastructure Requirements i. Trunk pipe systems ii. Hydraulic Controls 4. Roads (Traffic Impact Assessment) A. Arterial and Collector Road Networks B. Major infrastructure Requirements i. Arterial road network ii. Collector road network iii. Major structures (e.g. Grade separations, stream/river crossings) iv. Major intersections 5. Other A. Power Supply (BC Hydro) B. Natural Gas (Fortis) C. Television/Internet (Telus/Shaw)

12 Page 12 Appendix C: Deliverables Formal application and submission of the CDP document, and all related submissions, to the Development Services Division for review and circulation shall include: Four (4) copies of the complete submission on 8 ½ by 11 paper; Two (2) full sized sets of professionally stamped drawings (24 by 36 ), one (1) reduction suitable for photocopying (11 by 17 ) and PDF versions of all digitally produced drawings. An electronic copy of the formal submission document text (in Microsoft Word file format), and mapping (both PDF file format and GIS - ESRI shapefiles) on one (1) compact disk; All required maps formally submitted must include an appropriate title, plan boundaries, north arrow, graphic scale, legend, date (or revision dates as applicable), known street names and qualifications as required. All mapping must be reproducible in black in white or colour format; Land Ownership map and table containing legal addresses and a list of registered and assessed owners; A copy of all legal titles for the lands within the plan area, valid within the last 90 days, and copies of all registered covenants, easements, legal notations and statutory right-of-ways, including respective reference plans as applicable; Any additional technical figures and illustrations as necessary in support of the plan document; All required statistical summaries; All required technical studies (as outlined in Section 2.2 and associated Appendices of this TOR) and/or additional reports. These shall (be)submitted in PDF electronic format on one (1) compact disk, and four (4) bound copies on 8 ½ by 11 paper; Electronic copies of all all public meeting materials including presentation, posters and exit surveys shall be provided on compact disk, and All original slides, drawings and photos are to be surrendered upon completion of the project. Note: all documents and technical reports are to be submitted directly to the Development Services Division, who will then forward these to the affected District departments and/or agencies as applicable. Please ensure the application number is referenced in the cover letter. H:\DEVELOPMENT SERVICES\PLANNING\6520 Community Planning - Individual Areas\30 CDP Applications\2014\CDP 14-01\TOR\Smith Creek CDP TOR V1.docx

A Guide to Open Space Design Development in Halifax Regional Municipality

A Guide to Open Space Design Development in Halifax Regional Municipality A uide to Open Space Design Development in Halifax Regional Municipality May 2007 1 Introduction Pursuant to Section 3.5 of the Regional Municipal Planning Strategy (RMPS), subdivision of land may proceed

More information

TABLE OF CONTENTS 1.0 INTRODUCTION GENERAL OBJECTIVES LAND USE DESIGNATIONS, OBJECTIVES AND POLICIES 4

TABLE OF CONTENTS 1.0 INTRODUCTION GENERAL OBJECTIVES LAND USE DESIGNATIONS, OBJECTIVES AND POLICIES 4 Schedule I- Redstone Golf Course Resort Area Sector Plan 1 TABLE OF CONTENTS 1.0 INTRODUCTION 3 2.0 GENERAL OBJECTIVES 3 3.0 LAND USE DESIGNATIONS, OBJECTIVES AND POLICIES 4 4.0 TRANSPORTATION AND ROAD

More information

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary TABLE OF CONTENTS Page Executive Summary 1.0 INTRODUCTION...1-1 1.1 Purpose of the Undertaking...1-1 1.2 Study Area Description...1-1 1.3 Description of the Undertaking...1-1 1.4 Rationale for the Undertaking...1-2

More information

Development Permit Application Form. Property Owner Information as Registered on Legal Title Property Owner Name: Phone:

Development Permit Application Form. Property Owner Information as Registered on Legal Title Property Owner Name: Phone: Development Application Requirements 1 1926 Tsawwassen Drive Tel: 604-943-2112 Tsawwassen, BC V4M 4G2 www.tsawwassenfirstnation.com Canada Development Permit Application Form Name of Applicant: Address:

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016 Item 11, Report No. 38, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan on November 15, 2016. Regional Councillor Di Biase declared an interest

More information

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT PUBLIC INFORMATION CENTRE Vaughan Metropolitan Centre (VMC) Black Creek Renewal Wednesday, May 10, 2017 6:00 p.m. to 8:00 p.m. Add photo Project Management, Environmental Assessment, Stormwater Management

More information

OP Council Resolution June 16, Planning and Development Services

OP Council Resolution June 16, Planning and Development Services OP-08-01 Council Resolution June 16, 2008 Planning and Development Services Kingsgate Landing Outline Plan Table of Contents 1.0 Introduction 1 1.1 Purpose of Plan 1 1.2 Plan Area Location 1 1.3 Ownership

More information

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

1.0 Purpose of a Secondary Plan for the Masonville Transit Village Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: John M. Fleming Managing Director, Planning and City Planner Subject: Masonville Transit Village

More information

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN Page 1 1. INTRODUCTION AND BACKGROUND 1.1 THE PROJECT VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN TERMS OF REFERENCE The Town of Caledon (Town) is a large, predominantly rural municipality with

More information

SECTION E. Realizing the Plan

SECTION E. Realizing the Plan SECTION E Realizing the Plan 60 DESIGN REGINA - OFFICIAL COMMUNITY PLAN SECTION E Realizing the Plan Design Regina has been an ambitious plan-making exercise, with a high level of community, stakeholder,

More information

TOWN OF BRUDERHEIM Report to the capital region board

TOWN OF BRUDERHEIM Report to the capital region board TOWN OF BRUDERHEIM Report to the capital region board Introduction to the Town of Bruderheim Municipal Development Plan amendment and Relation to the CRB Evaluation Criteria 02 march 2017 1 Introduction

More information

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY 1. Introduction WORK PROGRAM The Town of Caledon is a large, local municipality located in the Greater Toronto

More information

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED 9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO. 631 - BOCA EAST INVESTMENTS LIMITED The Planning and Economic Development Committee recommends the adoption of the recommendations contained in the following

More information

I. STAFF POLICY RECOMMENDATIONS. The following RMP policy strategies are proposed by staff in support of a Scenic Resource Protection Program:

I. STAFF POLICY RECOMMENDATIONS. The following RMP policy strategies are proposed by staff in support of a Scenic Resource Protection Program: Policy Consideration: Scenic Resource Protection Program Status: For Consideration by the Highlands Council at September 14, 2006 Work session Date: September 12, 2006 I. STAFF POLICY RECOMMENDATIONS The

More information

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose: Page 1 of Report PB-23-18 SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building Report Number: PB-23-18 Wards Affected: 2 File Numbers:

More information

AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON

AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON Subject: Boyne Survey Secondary Plan and Related Official Plan Amendments The following text and schedules constitute Amendment No. 30 to the

More information

Attachment 1 TOWN OF NEW TECUMSETH. Manual for the Preparation of an Urban Design Report

Attachment 1 TOWN OF NEW TECUMSETH. Manual for the Preparation of an Urban Design Report Attachment 1 TOWN OF NEW TECUMSETH Manual for the Preparation of an Urban Design Report July 2010 TABLE OF CONTENTS Background, Policy Framework and the Preparation of Urban Design Reports 1. Introduction

More information

~!VAUGHAN NOV Z November 21, Mr. Denis Kelly, Regional Clerk The Regional Municipality of York Yonge Street Newmarket, ON L3Y 6Z1

~!VAUGHAN NOV Z November 21, Mr. Denis Kelly, Regional Clerk The Regional Municipality of York Yonge Street Newmarket, ON L3Y 6Z1 ~!VAUGHAN NOV Z 5 2016 November 21, 2016 Mr. Denis Kelly, Regional Clerk The Regional Municipality of York 17250 Yonge Street Newmarket, ON L3Y 6Z1 Dear Mr. Kelly: RE: NEW KIRBY GO STATION IN BLOCK 27

More information

6 Growth Management Challenges and Opportunities

6 Growth Management Challenges and Opportunities 6 Growth Management Challenges and Opportunities The Town has established a goal of attaining a 50% participation rate with respect to employment opportunities versus residential population. The Town s

More information

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Welcome. Walk Around. Talk to Us. Write Down Your Comments Welcome This is an information meeting introducing the applications for proposed redevelopment of the Yorkdale Shopping Centre site at 3401 Dufferin Street and 1 Yorkdale Road over the next 20+ years,

More information

Master Environmental Servicing Plan & Secondary Plan

Master Environmental Servicing Plan & Secondary Plan East Side Lands Stage 2 1 Master Environmental Servicing Plan & Secondary Plan Public Information Centre #1 June 16, 2016 Welcome! Today s Agenda Please sign in at the front desk. 5:30 pm 6:30 pm: Open

More information

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting Page 1 of Report PB-76-17 SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO TO: FROM: Planning and Development Committee - Public Meeting Planning and Building

More information

Applicant Name Phone / Fax / Address City State Zip Code . Property Owner Phone / Fax / Address City State Zip Code

Applicant Name Phone / Fax / Address City State Zip Code  . Property Owner Phone / Fax / Address City State Zip Code Master Development Plan Application Community Development Department City of Redmond 411 SW 9 th Street Redmond, Oregon 97756 541-923-7721 541-548-0706 FAX Master Development Plan Fee $38,862.52 File Number

More information

Chapter 4 - Preparation of Stormwater Site Plans

Chapter 4 - Preparation of Stormwater Site Plans Chapter 4 - Preparation of Stormwater Site Plans The Stormwater Site Plan is the comprehensive report containing all of the technical information and analysis necessary for the City to evaluate a proposed

More information

ONTARIO MUNICIPAL BOARD

ONTARIO MUNICIPAL BOARD PL 120483 ONTARIO MUNICIPAL BOARD Applicant/Appellant: 2124123 Ontario Limited Subject: OPA, Rezoning and Draft Plan of Subdivision Municipal Address: 3940 Highway 7 East Municipality: City of Markham

More information

Ashbridges Bay Erosion and Sediment Control Project

Ashbridges Bay Erosion and Sediment Control Project Ashbridges Bay Erosion and Sediment Control Project Project Brief Overview Toronto and Region Conservation Authority, in partnership with the City of Toronto, intends to carry out remedial erosion control

More information

TERMS OF REFERENCE FOR THE PREPARATION AND AMENDMENT OF RESIDENTIAL AREA STRUCTURE PLANS

TERMS OF REFERENCE FOR THE PREPARATION AND AMENDMENT OF RESIDENTIAL AREA STRUCTURE PLANS Attachment 3 TERMS OF REFERENCE FOR THE PREPARATION AND AMENDMENT OF RESIDENTIAL AREA STRUCTURE PLANS Prepared by: Planning and Development Department Version 5 (2010) TABLE OF CONTENTS 1 INTRODUCTION

More information

Slope Stability Management Framework

Slope Stability Management Framework Slope Stability Management Framework For the assessment, evaluation, prioritization and mitigation of slope stability concerns. 2013/06/19 The Slope Stability Management Framework provides guidance to

More information

Rapid Transit Implementation Working Group September 14, 2017

Rapid Transit Implementation Working Group September 14, 2017 Rapid Transit Implementation Working Group September 14, 2017 BACKGROUND Council approved the Rapid Transit Master Plan and Updated Business Case on July 25, 2017. Approval of the RTMP confirmed the BRT

More information

SECTION 7A: WHAKARONGO RESIDENTIAL AREA

SECTION 7A: WHAKARONGO RESIDENTIAL AREA SECTION 7A: WHAKARONGO RESIDENTIAL AREA CONTENTS 7A.1 Introduction 1 7A.2 Resource Management Issues 1 7A.3 Objectives and Policies 1 7A.4 Methods 4 7A.5 Residential Zone 4 7A.5.1 Rules: Controlled Activities

More information

EXECUTIVE SUMMARY. Introduction

EXECUTIVE SUMMARY. Introduction Introduction EXECUTIVE SUMMARY The Urban Service Area Fort McMurray (hereafter referred to as the Urban Service Area) is currently experiencing a variety of development pressures. Unprecedented population

More information

Simon Fraser University Official Community Plan

Simon Fraser University Official Community Plan Simon Fraser University Official Community Plan 1.0 Introduction Adopted 1996 September 9, Amended April 15, 2002 1.1 The Role of the S.F.U. Official Community Plan 1.1.1 The Simon Fraser University Official

More information

City of Surrey PLANNING & DEVELOPMENT REPORT. OCP Amendment of a portion from Suburban to Urban

City of Surrey PLANNING & DEVELOPMENT REPORT. OCP Amendment of a portion from Suburban to Urban City of Surrey PLANNING & DEVELOPMENT REPORT File: 7911-0119-00 Planning Report Date: November 7, 2011 PROPOSAL: OCP Amendment of a portion from Suburban to Urban Rezoning from RA to RH and RF in order

More information

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC 2018 November 15 Page 1 of 10 EXECUTIVE SUMMARY This land use amendment application was submitted by Rick Balbi Architect on 2017 August 31 on behalf of Sable Developments Ltd, and with authorization from

More information

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved. COMMITTEE OF THE WHOLE AUGUST 18, 2003 THORNHILL CENTRE STREET STUDY PLANNING FILE: 15.92 Recommendation The Commissioner of Planning recommends: THAT the attached Terms of Reference for the Thornhill

More information

11.4 Highway 400 North Employment Lands Secondary Plan APPROVED BY THE ONTARIO MUNICIPAL BOARD ON NOVEMBER 21, 2011

11.4 Highway 400 North Employment Lands Secondary Plan APPROVED BY THE ONTARIO MUNICIPAL BOARD ON NOVEMBER 21, 2011 11.4 Highway 400 North Employment Lands Secondary Plan APPROVED BY THE ONTARIO MUNICIPAL BOARD ON NOVEMBER 21, 2011 11.4.1 General 11.4.1.1. as approved by the Ontario Municipal Board on November 21, 2011,

More information

DRAFT SCOPE FOR THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HUDSON HIGHLANDS RESERVE TOWN OF PHILIPSTOWN, NEW YORK June 5, 2018

DRAFT SCOPE FOR THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HUDSON HIGHLANDS RESERVE TOWN OF PHILIPSTOWN, NEW YORK June 5, 2018 DRAFT SCOPE FOR THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HUDSON HIGHLANDS RESERVE TOWN OF PHILIPSTOWN, NEW YORK June 5, 2018 Project Name: Project Location SEQRA Classification of Project: Lead Agency:

More information

Complete Neighbourhood Guidelines Review Tool

Complete Neighbourhood Guidelines Review Tool Complete Neighbourhood Guidelines Review Tool Prepared By: City of Regina Planning Department October 2014 Page 1 of 14 Community Development Review Checklist for Secondary Plans and Concept Plans The

More information

Rezoning. Rezone from C-4 and RA to RF-9C and RF-12C to allow subdivision into approximately 47 small single family lots in East Clayton.

Rezoning. Rezone from C-4 and RA to RF-9C and RF-12C to allow subdivision into approximately 47 small single family lots in East Clayton. City of Surrey PLANNING & DEVELOPMENT REPORT File: 7903-0275-00 Rezoning Proposal: Rezone from C-4 and RA to RF-9C and RF-12C to allow subdivision into approximately 47 small single family lots in East

More information

Southwest Fleetwood Enclave

Southwest Fleetwood Enclave Southwest Fleetwood Enclave Development Concept Plan Southwest Fleetwood Enclave 1 st Land Owners Meeting April 30 th, 2012 Presentation Overview Why the Plan? ; Overview & Purpose of Study; Constraints

More information

TO: Mayor & Council DATE: April 12, The Planning and Development Department and the Engineering Department recommend that Council:

TO: Mayor & Council DATE: April 12, The Planning and Development Department and the Engineering Department recommend that Council: CORPORATE REPORT NO: R080 COUNCIL DATE: April 12, 2010 REGULAR COUNCIL TO: Mayor & Council DATE: April 12, 2010 FROM: SUBJECT: General Manager, Planning and Development General Manager, Engineering Neighbourhood

More information

MAYFIELD WEST SECONDARY PLAN PHASE 2

MAYFIELD WEST SECONDARY PLAN PHASE 2 MAYFIELD WEST SECONDARY PLAN PHASE 2 Public Open House #3 February 25, 2010 Draft Preferred Land Use Scenario TOWN OF CALEDON PLANNING & DEVELOPMENT DEPARTMENT Open House Agenda TOWN OF CALEDON 1. Welcome

More information

Liftlock Secondary Plan and Proposed Draft Plan of Subdivision 15T Public Open House. June 21, /21/ City of Peterborough 1

Liftlock Secondary Plan and Proposed Draft Plan of Subdivision 15T Public Open House. June 21, /21/ City of Peterborough 1 Liftlock Secondary Plan and Proposed Draft Plan of Subdivision 15T-17501 Public Open House June 21, 2017 6/21/2017 1 City of Peterborough 1 Tonight s Goal To foster constructive conversation regarding

More information

DESIGN REVIEW PANEL TERMS OF REFERENCE AND PROTOCOL

DESIGN REVIEW PANEL TERMS OF REFERENCE AND PROTOCOL DESIGN REVIEW PANEL TERMS OF REFERENCE AND PROTOCOL 1.0 Purpose of the City of Vaughan Design Review Panel 1.1 The City of Vaughan Design Review Panel ( Panel ) is strictly an advisory body and makes recommendations

More information

City of Surrey PLANNING & DEVELOPMENT REPORT File:

City of Surrey PLANNING & DEVELOPMENT REPORT File: City of Surrey PLANNING & DEVELOPMENT REPORT File: 7916-0362-00 Planning Report Date: July 10, 2017 PROPOSAL: Development Permit Development Variance Permit to allow a truck/trailer staging area and to

More information

CITY CLERK. Parkland Acquisition Strategic Directions Report (All Wards)

CITY CLERK. Parkland Acquisition Strategic Directions Report (All Wards) CITY CLERK Clause embodied in Report No. 10 of the, as adopted by the Council of the City of Toronto at its meeting held on November 6, 7 and 8, 2001. 10 Parkland Acquisition Strategic Directions Report

More information

Town of Cobourg Heritage Master Plan. Statutory Public Meeting

Town of Cobourg Heritage Master Plan. Statutory Public Meeting Town of Cobourg Heritage Master Plan Statutory Public Meeting April 25 th 2016 Presentation Overview 1. Introduction 2. Project background and schedule overview 3. Review of strategic direction content

More information

LAND USE AMENDMENT CORNERSTONE (WARD 3) 60 STREET NE AND COUNTRY HILLS BOULEVARD NE MAP 26NE BYLAW 22D2017

LAND USE AMENDMENT CORNERSTONE (WARD 3) 60 STREET NE AND COUNTRY HILLS BOULEVARD NE MAP 26NE BYLAW 22D2017 Page 1 of 14 EXECUTIVE SUMMARY This Land Use Amendment application covers an area of 43.76 hectares ± (108.14 acres ±) located in northeast Calgary, bound by Country Hills Boulevard NE to the south and

More information

SECTION 2.4 URBAN DEVELOPMENT AND STRATEGIC URBAN DIRECTIONS

SECTION 2.4 URBAN DEVELOPMENT AND STRATEGIC URBAN DIRECTIONS SECTION 2.4 URBAN DEVELOPMENT AND STRATEGIC URBAN DIRECTIONS 2.4.1 INTRODUCTION In 1993/94 the Hastings District Council completed the Hastings Urban Development Strategy. The purpose of this study was:

More information

CHAPTER 12 IMPLEMENTATION

CHAPTER 12 IMPLEMENTATION CHAPTER 12 IMPLEMENTATION The 2010 Town of Denton Comprehensive Plan is intended to capture a vision of the future of Denton. As such, it provides a basis for a wide variety of public and private actions

More information

CHUGIAK-EAGLE RIVER SITE-SPECIFIC LAND USE PLAN

CHUGIAK-EAGLE RIVER SITE-SPECIFIC LAND USE PLAN CHUGIAK-EAGLE RIVER SITE-SPECIFIC LAND USE PLAN JUNE 2010 Final Prepared for The Heritage Land Bank, Municipality of Anchorage by Agnew: :Beck Consulting www.agnewbeck.com 907.222.5424 Chugiak-Eagle River

More information

BYLAW C A Bylaw of Rocky View County to amend Land Use Bylaw C

BYLAW C A Bylaw of Rocky View County to amend Land Use Bylaw C BYLAW C-7720-2017 A Bylaw of Rocky View County to amend Land Use Bylaw C-4841-97. The Council of Rocky View County enacts as follows: PART 1 TITLE This Bylaw shall be known as Bylaw C-7720-2017. PART 2

More information

GRAYSTONE ESTATES CONCEPTUAL SCHEME

GRAYSTONE ESTATES CONCEPTUAL SCHEME GRAYSTONE ESTATES CONCEPTUAL SCHEME Bylaw C-5438-2001, Adopted November 6, 2001 MUNICIPAL DISTRICT OF ROCKY VIEW NO. 44 Department of Planning and Development TABLE OF CONTENTS 1.0 INTRODUCTION 5 1.1 Conceptual

More information

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: December 16, 2013 Action Required: Adoption of Resolution Presenter: Staff Contacts: Title: James E. Tolbert, AICP, Director of NDS James

More information

Leduc Industrial Outline Plan SE W4

Leduc Industrial Outline Plan SE W4 Leduc Industrial Outline Plan SE 1-50-25-W4 Within the North Leduc Industrial ASP Prepared for: Leduc Energy Park Ltd. Prepared by: Stantec Consulting Ltd. File No. 1161 104655 V5 Table of Contents 1.0

More information

Executive Summary.. 1. Introduction

Executive Summary.. 1. Introduction Executive Summary.. 1. Introduction 1.1. Park and Open Space Development... 1 1.2. Park and Open Space Designations and Zones.... 2 1.3. Types of Parks... 2 1.4. Types of Open Spaces... 3 1.5. Who Should

More information

Rowntree Mill Road Zoning and Plan of Subdivision Applications Final Report

Rowntree Mill Road Zoning and Plan of Subdivision Applications Final Report STAFF REPORT ACTION REQUIRED 148-156 Rowntree Mill Road Zoning and Plan of Subdivision Applications Final Report Date: March 13, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 July 27, 2009 TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Plan Area Location & Context... 1 1.2 Ownership

More information

OFFICIAL COMMUNITY PLANS (OCPs) AND ZONING BYLAWS (ZBs): PLANNING FOR THE FUTURE

OFFICIAL COMMUNITY PLANS (OCPs) AND ZONING BYLAWS (ZBs): PLANNING FOR THE FUTURE OFFICIAL COMMUNITY PLANS (OCPs) AND ZONING BYLAWS (ZBs): PLANNING FOR THE FUTURE Official Community Plan Workshop January 20, 2016 Frontier, SK SARM Community Planning Services SARM the voice of rural

More information

DEVELOPMENT PERMIT SENSITIVE ECOSYSTEMS

DEVELOPMENT PERMIT SENSITIVE ECOSYSTEMS DEVELOPMENT PERMIT SENSITIVE ECOSYSTEMS What is the Sensitive Ecosystem Development Permit Area (SEDPA)? Surrey s SEDPA is made up of two distinct classifications of the natural environment: Streamside

More information

GREENBANK DEVELOPMENT MASTERPLAN

GREENBANK DEVELOPMENT MASTERPLAN DEVELOPMENT MASTERPLAN POTENTIAL TRAIN STATION COMMUNITY CENTRE Greenbank will be a connected masterplanned community providing easy access to local and surrounding amenity. Affordable quality homes, green

More information

Highlands Region Stormwater Management Program Guidance

Highlands Region Stormwater Management Program Guidance DRAFT Highlands Region Stormwater Management Program Guidance Release Date: January 2016 Abstract This guidance document provides an overview of the Highlands Stormwater Management Program. It is intended

More information

Appendix 1 Structure plan guidelines

Appendix 1 Structure plan guidelines Appendix 1 Structure plan guidelines This appendix forms part of the regional policy statement [rps]. 1.1. Introduction Structure plans are an important method for establishing the pattern of land use

More information

SCHEDULE THREE TO THE DEVELOPMENT PLAN OVERLAY EASTERN GOLF COURSE KEY REDEVELOPMENT SITE

SCHEDULE THREE TO THE DEVELOPMENT PLAN OVERLAY EASTERN GOLF COURSE KEY REDEVELOPMENT SITE DD/MM/YY SCHEDULE THREE TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO3 EASTERN GOLF COURSE KEY REDEVELOPMENT SITE 1.0 A permit may be granted before a development plan has been

More information

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number: Applicant: Contact Name: Phone Number: Email: Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Concept Plan Requirements: I. General Project Information 1. Address or parcel number

More information

11.4 Highway 400 North Employment Lands Secondary Plan

11.4 Highway 400 North Employment Lands Secondary Plan 11.4 Highway 400 North Employment Lands Secondary Plan APPROVED BY THE ONTARIO MUNICIPAL BOARD ON NOVEMBER 21, 2011 11.4.1 General 11.4.1.1. The following policies and Schedules A - I form Official Plan

More information

Report to: Development Services Committee Report Date: September 11, 2017

Report to: Development Services Committee Report Date: September 11, 2017 ~RKHAM Report to: Development Services Committee Report Date: September 11, 2017 SUBJECT: PREPARED BY: Conceptual Master Plan for the Future Urban Area - Community Structure Plan and Key Policy Direction

More information

Official Plan Review: Draft Built Form Policies

Official Plan Review: Draft Built Form Policies PG.30.1 REPORT FOR ACTION Official Plan Review: Draft Built Form Policies Date: May 15, 2018 To: Planning and Growth Management Committee From: Chief Planner and Executive Director, City Planning Division

More information

GATEWAY AREA STRUCTURE PLAN

GATEWAY AREA STRUCTURE PLAN CHESTERMERE GATEWAY AREA STRUCTURE PLAN COMMUNITY OPEN HOUSE SEPTEMBER 22 nd, 2015 PLAN AREA ± 512 hectares (± 1,265 acres) GATEWAY LOCATION UNDEVELOPED LANDS PRESENT AGRICULTURAL USE REGIONAL LAND USE

More information

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies Vision Statement Queen Creek s interconnected network of parks, trails, open spaces and recreation opportunities provide safe and diverse activities and programs that sustain its unique, small town, equestrian

More information

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 2010 Legislative Session. Council Members Dernoga and Olson

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 2010 Legislative Session. Council Members Dernoga and Olson DR- COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 00 Legislative Session Bill No. CB--00 Chapter No. Proposed and Presented by Introduced by Co-Sponsors The Chairman

More information

Local Growth Planning in North Central Green Line Communities

Local Growth Planning in North Central Green Line Communities 2018 April 30 Page 1 of 6 EXECUTIVE SUMMARY This report outlines a high-level scope for local growth planning for north central Green Line communities. The catalyst for this review is the significant investments

More information

TOURIST AREA DESIGN GUIDELINES

TOURIST AREA DESIGN GUIDELINES TOURIST AREA DESIGN GUIDELINES INTRODUCTION The purpose of the Tourist Area Design Guidelines is to provide a comprehensive reference manual to the urban design principles that will be used to evaluate

More information

ADMINISTRATIVE REPORT

ADMINISTRATIVE REPORT ADMINISTRATIVE REPORT TO: FROM: Board of Directors B. Newell, Chief Administrative Officer DATE: July 6, 2017 RE: Official Community Plan (OCP) Bylaw Amendment Electoral Area C Administrative Recommendation:

More information

Prepared for: Ontario Limited

Prepared for: Ontario Limited Application for Zoning By-law Amendment and Plan of Subdivision 1353 Scharfgate Drive Planning Rationale Report Prepared for: 1384341 Ontario Limited November 28, 2014 Revised August 18, 2015 Planning

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS REQUEST FOR QUALIFICATIONS VILLAGE OF HAMBURG COMPREHENSIVE ZONING/LAND USE REGULATIONS UPDATE Prepared By: Village of Hamburg 100 Main Street Hamburg, New York 14075 Village of Hamburg RFQ Page 1 of 10

More information

WESTMINSTER GLEN CONCEPTUAL SCHEME

WESTMINSTER GLEN CONCEPTUAL SCHEME WESTMINSTER GLEN CONCEPTUAL SCHEME Bylaw C-5379-2001, Adopted July 31, 2001 MUNICIPAL DISTRICT OF ROCKY VIEW NO. 44 Department of Planning and Development MUNICIPAL DISTRICT OF ROCKY VIEW NO. 44 BYLAW

More information

GEORGE DERBY COMMUNITY PLAN

GEORGE DERBY COMMUNITY PLAN Planning and Building Department GEORGE DERBY COMMUNITY PLAN The following Council Report constitutes the George Derby Community Plan as adopted by Council in 1989. TO: MUNICIPAL MANAGER 1989 OCTOBER 17

More information

POLICY AMENDMENT AND LAND USE AMENDMENT TUXEDO PARK (WARD 9) CENTRE STREET N AND 26 AVENUE NE BYLAWS 36P2017 AND 234D2017

POLICY AMENDMENT AND LAND USE AMENDMENT TUXEDO PARK (WARD 9) CENTRE STREET N AND 26 AVENUE NE BYLAWS 36P2017 AND 234D2017 Page 1 of 11 EXECUTIVE SUMMARY This application proposes to redesignate a single parcel of land in the Community of Tuxedo Park from Commercial Corridor 2 (C-COR2 f1h10) District to Mixed Use Active Frontage

More information

Planning Services Public Meeting Report

Planning Services Public Meeting Report Planning Services Public Meeting Report If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. Report To: Planning and

More information

COMMUNITY SUSTAINABILITY AND ENVIRONMENTAL MASTER PLAN IMPLEMENTATION UPDATE

COMMUNITY SUSTAINABILITY AND ENVIRONMENTAL MASTER PLAN IMPLEMENTATION UPDATE Attachment 1 COMMUNITY SUSTAINABILITY AND ENVIRONMENTAL MASTER PLAN IMPLEMENTATION UPDATE Priorities and Key Initiatives Committee May 2013 Page E-1 How we grow Goal 2: To ensure sustainable development

More information

The Corporation of the TOWN OF MILTON

The Corporation of the TOWN OF MILTON Report to: From: Chair & Members of the Administration & Planning Standing Committee W.F. Mann, Director of Planning and Development Date: April 16, 2012 PD 022-12 (Z19/11) Subject: Technical Report Proposed

More information

REQUEST FOR PROPOSAL RFP PRESERVATION MASTER PLAN FOR THE ELAM MARTIN FARMSTEAD CITY OF WATERLOO RIM PARK TERMS OF REFERENCE

REQUEST FOR PROPOSAL RFP PRESERVATION MASTER PLAN FOR THE ELAM MARTIN FARMSTEAD CITY OF WATERLOO RIM PARK TERMS OF REFERENCE REQUEST FOR PROPOSAL RFP-01-28 PRESERVATION MASTER PLAN FOR THE ELAM MARTIN FARMSTEAD CITY OF WATERLOO RIM PARK TERMS OF REFERENCE The City of Waterloo is requesting proposals for the development of a

More information

THREE-STEP DESIGN PROCESS FOR OPEN SPACE SUBDIVISIONS

THREE-STEP DESIGN PROCESS FOR OPEN SPACE SUBDIVISIONS 00216106.DOC NMA/RRK 1/30/14 THREE-STEP DESIGN PROCESS FOR OPEN SPACE SUBDIVISIONS Open space subdivisions, sometimes called cluster developments, maintain a significant portion of a development site in

More information

HURON COMMUNITY PLAN

HURON COMMUNITY PLAN CITY OF KITCHENER DEPARTMENT OF DEVELOPMENT AND TECHNICAL SERVICES PD 94/7 HURON COMMUNITY PLAN Recommended by Planning and Economic Development Committee: October 31, 1994 Adopted by Kitchener City Council:

More information

edmonton.ca/ribbonofgreen #ribbonofgreen

edmonton.ca/ribbonofgreen #ribbonofgreen WHAT IS THE RIBBON OF GREEN? The Ribbon of Green is Edmonton s entire river valley and ravine system. The Ribbon of Green (2018) Project will provide strategic guidance for the southwest and northeast

More information

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018 Page 1 of 19 EXECUTIVE SUMMARY This application proposes redesignating two parcels in the community of Silver Springs from Special Purpose Future Urban Development (S-FUD) District and undesignated road

More information

TOWN OF AURORA HERITAGE IMPACT ASSESSMENTS AND CONSERVATION PLANS GUIDE

TOWN OF AURORA HERITAGE IMPACT ASSESSMENTS AND CONSERVATION PLANS GUIDE PLANNING AND DEVELOPMENT SERVICES Development Planning Division Heritage Planning Section Phone: 905-727-3123 ext. 4226 Fax: 905-726-4736 Email: planning@aurora.ca Town of Aurora 100 John West Way, Box

More information

AMENDMENT NO. 38 TO THE CITY OF BARRIE OFFICIAL PLAN SALEM SECONDARY PLAN. June 2014

AMENDMENT NO. 38 TO THE CITY OF BARRIE OFFICIAL PLAN SALEM SECONDARY PLAN. June 2014 AMENDMENT NO. 38 TO THE CITY OF BARRIE OFFICIAL PLAN SALEM SECONDARY PLAN June 2014 AMENDMENT NO. 38 TO THE OFFICIAL PLAN OF THE BARRIE PLANNING AREA TABLE OF CONTENTS Page Introduction 1 Part A - The

More information

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST St. Mary s Soil Conservation District 26737 Radio Station Way, Suite B Leonardtown, MD 20650 Phone: 301-475-8402 ext. 3 Fax: 301-475-8391 www.stmarysscd.com St. Mary s County Government Department of Public

More information

SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 57/58 WEST BLOCK PLAN BLOCK PLAN FILE BL.57/58W.99 HUNTINGTON BUSINESS PARK LAND OWNERS

SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 57/58 WEST BLOCK PLAN BLOCK PLAN FILE BL.57/58W.99 HUNTINGTON BUSINESS PARK LAND OWNERS SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 57/58 WEST BLOCK PLAN BLOCK PLAN FILE BL.57/58W.99 HUNTINGTON BUSINESS PARK LAND OWNERS Recommendation The Commissioner of Planning recommends: THAT

More information

Study Process / Planning Policy Issues

Study Process / Planning Policy Issues Memorandum Date: March 13 th, 2009 To: From: Reference: Subject: Murray Thompson, URS Canada Tyler Drygas, Senior Environmental Planner, URS Canada Detroit River International Crossing Study Response to

More information

Elfrida Growth Area Study

Elfrida Growth Area Study Elfrida Growth Area Study Public Information Centre #2 December 6, 2017 6:00-8:30 pm PLANNING & ECONOMIC DEVELOPMENT DEPARTMENT Purpose of the Study The Elfrida Area has been identified as the preferred

More information

Goal 1 To establish and follow land use patterns for the long-range development of the campus.

Goal 1 To establish and follow land use patterns for the long-range development of the campus. ELEMENT 4 FUTURE LAND USE Goal 1 To establish and follow land use patterns for the long-range development of the campus. Objective 1A Correct existing incompatible campus land uses. Policy 1A-1 Reduce

More information

COLVER ROAD INDUSTRIAL CONCEPT PLAN

COLVER ROAD INDUSTRIAL CONCEPT PLAN COLVER ROAD INDUSTRIAL CONCEPT PLAN A CONCEPTUAL LAND USE AND TRANSPORTATION PLAN FOR TA-4 AN URBAN RESERVE AREA OF THE CITY TALENT City of Talent Adopted by City Council Resolution No., June, 2015 PART

More information

Planning for the Future Urban Area. in north Markham. Update. Development Services Committee. December 9, De Development Services Committee

Planning for the Future Urban Area. in north Markham. Update. Development Services Committee. December 9, De Development Services Committee Planning for the in north Markham 1 Update De December 9, 2014 Overview - Growth Management Strategy and new Official Plan 2014 Status - Official Plan 2014 and ROPA3 Update - Planning for the Future Urban

More information

Request for Decision. Recommendation. Presented: Monday, Jul 07, Report Date Friday, Jun 20, Type: Public Hearings

Request for Decision. Recommendation. Presented: Monday, Jul 07, Report Date Friday, Jun 20, Type: Public Hearings Presented To: Planning Committee Request for Decision Application for rezoning in order to permit a place of worship on a vacant lot zoned for C1, Local Commercial uses, Cam Street, Sudbury Sitiri Investments

More information

WASHINGTON COUNTY OREGON

WASHINGTON COUNTY OREGON WASHINGTON COUNTY OREGON LONG RANGE PLANNING DIVISION North Bethany Subarea Stream Corridors: Existing Regulations In Oregon, there is a distinct difference between the land use rules that apply in rural

More information

DAVENPORT VILLAGE SECONDARY PLAN

DAVENPORT VILLAGE SECONDARY PLAN 27 DAVENPORT VILLAGE SECONDARY PLAN 27. DAVENPORT VILLAGE SECONDARY PLAN 1. VISION FOR THE DAVENPORT VILLAGE SECONDARY PLAN Davenport Village, municipally known as 830, 940, 980 and 1100 Lansdowne Avenue,

More information

Infrastructure, Development and Enterprise Services. Natural Heritage Action Plan (NHAP) Project Initiation

Infrastructure, Development and Enterprise Services. Natural Heritage Action Plan (NHAP) Project Initiation Staff Report To Service Area Committee of the Whole Infrastructure, Development and Enterprise Services Date Monday, March 6, 2017 Subject Natural Heritage Action Plan (NHAP) Project Initiation Report

More information