1 Page 1 1. INTRODUCTION AND BACKGROUND 1.1 THE PROJECT VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN TERMS OF REFERENCE The Town of Caledon (Town) is a large, predominantly rural municipality with a number of small villages and hamlets. Many of these historic settlement areas developed around early 19 th century mill sites on the Credit River and Humber River, which bisect the Town. One such mill site was Bolton, situated on the Humber River in the southeast corner of the Town. Now the largest settlement area in Caledon, Bolton represents the evolution of an early mill village into a major urban entity. The historic commercial and residential core of Bolton is now being examined by the Town of Caledon for possible Heritage Conservation District designation in accordance with the Ontario Heritage Act. The Town is issuing this Request for Proposals to solicit statements of qualifications and pricing from heritage planning consultants capable of conducting a Heritage Conservation District Study Brief History of Bolton George Bolton and his uncle, James Bolton, established a dam and grist mill on the Humber River in the early 1820s. The small hamlet that grew up around the mill was first known as Bolton Mills. Growth was strong through the mid-19 th century and the village was incorporated in 1872, at which time it had a population of 750. The spatial development of the village is still clearly reflected today, determined by the course of the Humber River as it runs through the steep sided river valley and the proximity of the surveyed concession and sideroad (now Queen and King streets) to the original mill site. The village was surveyed in sections between the late 1840s and late 1870s. The hills to the north and south of the village limited its expansion and contributed to the irregular form of its streets. Bolton s early commercial and industrial areas grew up in close proximity to the original mills, with the former eventually concentrating around the intersection of King Street and Queen Street. The residential areas of Bolton developed outward from this node, initially to the southeast and later the west. Queen Street and King Street have evolved into regionally significant north/south and east/west routes respectively. Lots within the village core still largely reflect their historic size and form, with irregular parcels indicating properties that predate the formal surveys. Original wood structures were largely replaced by brick in the 1850s-80s. Most of the remaining historic fabric of Bolton dates between 1850 and While most evidence of the original industries have disappeared, the late 19 th and early 20 th century residential fabric remains largely intact and enough of the late 19 th century commercial core survives to maintain the sense of the historic village.
2 Page 2 With suburban type expansion occurring on the hills to the north and south, and commercial expansion to the south along Queen Street, downtown Bolton remains an important area of historic character for local shopping, entertainment and residential use Heritage Conservation Districts Context and Process Heritage conservation districts recognize the collective heritage value of areas and neighbourhoods that have common threads such as construction timeframes, architectural features and styles, neighbourhood design and development. Through designation under Part V of the Ontario Heritage Act (Act), municipalities can identify and preserve areas and neighbourhoods with unique heritage character. This is done by creating a heritage district plan which provides guidelines for managing future development and alteration of existing heritage structures. While heritage conservation districts are recognized as a conservation strategy in the Town of Caledon s Official Plan, to date the Town has only focused on the designation of individual properties under Part IV of the Act. As a result, a number of buildings in Bolton already have some level of protection under the Act through Part IV designation. However, there has been growing recognition of, and interest in the cultural heritage value of downtown Bolton as a whole and recognition that a heritage conservation district, or districts (the commercial core as distinct from adjacent residential neighborhoods), would be beneficial to guide alteration of existing buildings and new development. In 2008, Caledon completed a town-wide Built Heritage Resources Inventory of pre-1946 structures and a Cultural Heritage Landscapes Inventory. Both studies identified Bolton s historic core as warranting further protection. Recently, the Bolton Business Improvement Area expressed interest in heritage conservation district designation as a means of protecting the remnant historic core of the village and guiding redevelopment. In view of this local interest, and the timing of two new planning studies which may affect future development and redevelopment within the village core, Caledon Council approved funding for the Bolton Heritage Conservation District Study within its 2013 budget. The two related and concurrent planning studies are the Town of Caledon Intensification Strategy and the Bolton Special Policy Area Review, the purposes of which are summarized below: Bolton Special Policy Area Study (SPA) The Bolton Special Policy Area (SPA) is found within the Humber River Watershed. The purpose of the Bolton Special Policy Area Study is to review and update the existing policies and flood plain boundaries of the Special Policy Area based on the Ministry of Natural Resources Technical Guide and updated technical data provided by the Toronto Region Conservation Authority.
3 Page 3 This review will enable the Town of Caledon to determine which lands should be included or excluded from the Bolton SPA, and to revise its Flood Risk Assessment criteria. The Town has retained a consulting team to conduct this review and establish a Planning Justification for those lands that will be included or excluded from the Bolton SPA. Intensification Strategy The Intensification Strategy will identify potential areas and sites for future development, redevelopment and infill within the delineated built up areas of Caledon, including Bolton, to guide the Town in meeting future intensification targets as prescribed by the Region of Peel Official Plan. The Strategy will contain design guidelines to demonstrate how such development will look in the Town of Caledon, and provide a means to monitor and measure intensification as it occurs in Caledon. The Town is in the process of retaining a consultant for this study. It should be noted that the Town does not yet have a Heritage Permit process in place. Development of a Heritage Permit process will be a necessary adjunct to the establishment of a heritage conservation district in Bolton. 2. TERMS OF REFERENCE / SCOPE OF WORK 2.1 PROJECT PURPOSE Heritage Conservation District Study The purpose of the project is to pursue the designation of a heritage conservation district, or possibly districts, in downtown Bolton in accordance with the Ontario Heritage Act. The consultant selected for this project will work with Town staff, Heritage Caledon, the Bolton Business Improvement Area (BIA), area residents and the public to examine the identified study area as per the Ministry of Culture s Heritage Conservation District Guidelines, the Ontario Heritage Act, and the guidelines contained within this document to deliver a Heritage Conservation District Study for Council s consideration. Heritage Conservation District Plan and Guidelines (Future Phase) Should the findings of the Heritage Conservation District Study determine that the Study Area warrants designation as one or more heritage conservation districts, preparation of the subsequent Heritage Conservation District Plan(s) and Guidelines will constitute a separate project, subject to Council and budget approval. 2.2 STUDY AREA The study area for the Bolton Heritage Conservation District Study is illustrated in Figure 1. The irregular study area boundary encompasses Bolton s commercial core and historic residential neighbourhoods adjacent to King Street and Queen Street, former industrial areas along the Humber River corridor, and historic cemeteries on the north hill of the Humber River valley.
4 Page 4 A final boundary(ies) associated with the heritage conservation district(s) for Bolton may be smaller in size and have a different configuration. There are 160 properties within the Study Area identified on Caledon s Built Heritage Resources Inventory. Of these, 10 are designated under section 29 of the Ontario Heritage Act, and 18 others are considered to be of high significance. The locations of these properties are illustrated on Figure PROJECT GOAL AND OBJECTIVES The overall goal of the Bolton Heritage Conservation District Study is to assess the heritage characteristics of the historic core of the village of Bolton and determine if the area merits designation as a heritage conservation district(s) pursuant to the Ontario Heritage Act, Provincial guidelines and Section 2 of this document. The objectives for the Bolton Heritage Conservation District Study are to: vi. vii. viii. ix. Assess the study area for historical, design and contextual value and identify contributing heritage resources within the area. Review the historical and current land use planning and heritage policies, regulations and guidelines applicable to Bolton s historic core. Review the merits of a heritage conservation district(s) and appropriateness of alternative tools for conserving cultural heritage within the study area. Review the need for and make recommendations on the suitability and timing for the use of an interim control by-law for the study area. x. Undertake meaningful and extensive public and stakeholder outreach, engagement and consultation. 2.4 PUBLIC CONSULTATION AND COMMUNICATIONS The Bolton Heritage Conservation District Study will require interaction with key stakeholders through a public engagement process to describe/explain the Heritage Conservation District concept and process, determine community expectations and support, obtain public input on issues and feedback on the proposed district boundary. The Proponent should detail the approach to public engagement and communications in terms of stakeholder consultation, public outreach, methods of engagement, obtaining input and conveying information in order to develop consensus. Consideration should be given to the variety and creativity of the methods used and how this program will meet the requirements of the Ontario Heritage Act. Key stakeholders may include but are not limited to: Owners of commercial and residential properties in the study area
5 Page 5 Business, community and residents associations Heritage Caledon (municipal advisory committee) Elected officials and Town staff from key departments A project Steering Committee will be established, comprised of the Town s Heritage Resource Officer, members of Heritage Caledon, a representative from the Bolton BIA, and other Town staff as resources to the committee. The consultant selected for the project will be required to collaborate with the consultants from the Bolton Special Policy Area and the Intensification Strategy projects. 2.5 PROJECT STAGES The Town envisions two main stages to the Bolton Heritage Conservation District Study, with reporting, public engagement and communication accompanying each stage: Stage 1: Background and Issues Identification Stage 2: Heritage Conservation District Study 2.6 PROJECT TASKS The following are minimum project requirements. If the Proponent considers additional tasks and deliverables as being appropriate, please submit as part of the project proposal and include costs in the total price of your Fee Proposal. i. To conduct research, review and analysis as required to complete the project ii. iii. iv. To collaborate with staff on public engagement and communications activities To provide written content to support public engagement and communications To develop meeting agendas, workshop workbooks, presentation slides and meeting summary reports and other materials as appropriate v. To attend and facilitate meetings as required and scheduled vi. vii. viii. To provide all materials required for meetings to the Project Manager for final review at least 5 business days in advance of the meeting To make presentations at public meetings of Council To deliver draft and final reports for review in a timely fashion 2.7 PROJECT DELIVERABLES Background and Issues Identification Report The purpose of the Background and Issues Identification Report is to outline the study and consultation process, identify early findings regarding public issues and concerns. The general report content is as follows: Description of Study Area
6 Page 6 Stakeholder identification Process outline Issues and challenges Links/relationships to other initiatives Heritage Conservation District Study Report The purpose of the Heritage Conservation District Study is to identify the heritage resources and characteristics that define the historic core of Bolton and determine if the area merits the establishment of a Heritage Conservation District(s). The general report content is as follows, to be illustrated by graphics and visuals: Historic background of area, including examination and discussion of the following: o Historic development of the commercial core and residential neighbourhoods o Evolution of the built environment o Significant historic view planes, streetscapes, and landscape features o Economic and cultural conditions that have affected the development and character of the area Documentation of individual heritage resources (built and natural) within the Study Area o The sample Built Heritage Resources Inventory Record Form shown in Figure 3 illustrates the existing base level of information for identified built heritage resources within the Study Area. o Additional information is available for Part IV designated heritage properties within the Study Area. Identification of area or areas meriting consideration as a heritage conservation district, and other tools for conserving cultural heritage in the Study Area Both reports must be submitted as five (5) bound copies, one (1) unbound copy, one (1) digital copy in MS Word format, and one (1) master copy in Adobe Acrobat PDF format. Prospective Proponents are encouraged to identify any other products or services, not listed above, which would help to achieve the purpose and objectives of this project. 2.8 BACKGROUND INFORMATION / RESOURCES The following resources will be available to the successful Proponent for use in this study: i. Town of Caledon Official Plan (cultural heritage policies) ii Town of Caledon Cultural Heritage Landscapes Inventory, Section 11: Bolton s Historic Core iii Town of Caledon Built Heritage Resources Inventory Report and Record Forms for properties within the Study Area
7 Page 7 iv Town of Caledon Heritage Register v. Research reports for Part IV designations vi. vii. viii. Bolton Community Improvement Plan Town of Caledon Industrial/Commercial Design Guidelines GIS mapping of the Study Area 2.9 PROJECT SCHEDULE The Heritage Conservation District Study project shall be completed within a maximum of twelve (12) months beginning from the date of awarding of the contract. A shorter time frame for completion of the project is preferred by the Town. The Proponent shall provide a detailed project work plan and schedule showing the tasks and activities to be undertaken in order to meet the project requirements within the maximum 12 month timeframe, including approximate timing of key internal and stakeholder meetings. The schedule shall be updated regularly whenever required to show project progress and shall be submitted to the Town s Project Manager. The Proponent shall keep Town staff informed on the project s status on a bi-weekly basis. Any reasonable steps that will advance the completion of the project will be considered PROJECT MANAGEMENT The Heritage Resource Officer will act as the Town s Project Manager. The successful Proponent shall appoint one person as Consultant Project Manager who is required to participate in all phases of this Study, and shall have expertise and ability in the following areas: Cultural heritage planning experience, specifically including experience with Heritage Conservation District Studies and Plans Experience with cultural heritage landscape planning, including urban design, landscape architecture and open space concepts Effective project management, community engagement and workshop facilitation skills Excellent communication skills with proven ability to work with Council, landowners, stakeholders, Town staff and other consultants who may be involved at various phases of this study The Consultant Project Manager shall: a. Report to the Town s Project Manager b. Keep the Town s Project Manager informed of progress on a regular basis c. Provide the Town s Project Manager with copies of all correspondence d. Consult with the Town s Project Manager on potentially significant or controversial issues, options considered and solutions adopted
8 Page 8 e. Consult with the Town s Project Manager prior to deviations from standards, specifications and procedures f. Consult with the Town s Project Manager prior to any significant schedule changes g. Lead meetings with stakeholders and others as required 3. BUDGET The budget for the Heritage Conservation District Study is $80,000.00, HST included.
CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM
CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY 1. Introduction WORK PROGRAM The Town of Caledon is a large, local municipality located in the Greater Toronto
More informationGarden District Heritage Conservation District Study
Garden District Heritage Conservation District Study Community Consultation Meeting September 24 th, 2013 What is a Heritage Conservation District? A defined area of heritage significance and character
More informationChapter 6 cultural heritage
6 Cultural Heritage 6.1 Protecting Vaughan s Cultural Heritage 165 6.1.1 Protecting Vaughan s Cultural Heritage 165 6.1.2 Maintaining a Heritage Inventory 166 6.1.3 Promoting Vaughan s Cultural Heritage
More informationChair and Members of the Planning, Public Works and Transportation Committee. Tara Buonpensiero, Senior Planner Policy, MCIP, RPP
REPORT TO: REPORT FROM: Chair and Members of the Planning, Public Works and Transportation Committee Tara Buonpensiero, Senior Planner Policy, MCIP, RPP DATE: April 9, 2018 REPORT NO.: RE: PLS-2018-0027
More informationTOWN OF AURORA HERITAGE IMPACT ASSESSMENTS AND CONSERVATION PLANS GUIDE
PLANNING AND DEVELOPMENT SERVICES Development Planning Division Heritage Planning Section Phone: 905-727-3123 ext. 4226 Fax: 905-726-4736 Email: planning@aurora.ca Town of Aurora 100 John West Way, Box
More informationSCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference
Scarborough Subway Extension Final Terms of Reference 1 1.0 Introduction and Background 1.1 Introduction Toronto City Council recently confirmed support for an extension of the Bloor-Danforth Subway from
More information1.0 Purpose of a Secondary Plan for the Masonville Transit Village
Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: John M. Fleming Managing Director, Planning and City Planner Subject: Masonville Transit Village
More informationGarden District Heritage Conservation District Study
Garden District Heritage Conservation District Study Community Consultation Meeting Ryerson International Living & Learning Centre 7:30 9:00 pm April 29 th, 2014 Presentation Overview Presentation of project
More informationSouth of Eastern Strategic Direction Status Update
STAFF REPORT ACTION REQUIRED South of Eastern Strategic Direction Status Update Date: July 10, 2014 To: From: Planning and Growth Management Committee Chief Planner and Executive Director, City Planning
More informationTOWN OF MIDLAND TERMS OF REFERENCE AND REQUEST FOR PROPOSALS
TOWN OF MIDLAND TERMS OF REFERENCE AND REQUEST FOR PROPOSALS UNIMIN WATERFRONT LANDS MASTER PLAN STUDY August 2012 Town of Midland 575 Dominion Avenue Midland, Ontario L4R 1R2 705-526-4275 TOWN OF MIDLAND
More informationBaby Point Heritage Conservation District Study. Kick-off Community Meeting March 27, 2017 Humbercrest United Church
Baby Point Heritage Conservation District Study Kick-off Community Meeting March 27, 2017 Humbercrest United Church Agenda 7:00 Welcome 7:10 HCD Study Overview and Process 8:00 Interactive Discussion /
More informationa) buildings, structures and artifacts of historical significance;
12.3.2. Definition Heritage Resources: There are two classes of heritage resources: monumental or landmark heritage that is considered to reflect exemplary architecture and style of a particular area or
More informationSustainable Growth. Sustainable Growth
2 Sustainable Growth Sustainable Growth SUSTAINABLE GROWTH 2.1 COMMUNITY VISION... 2-5 2.2 THE CITY SYSTEM... 2-7 2.2.1 AREAS... 2-7 2.2.2 CITY-WIDE SYSTEMS... 2-8 2.2.3 PROVINCIAL PLAN BOUNDARIES AND
More informationMayfield West Phase 2 Secondary Plan
Town of Caledon Mayfield West Phase 2 Secondary Plan Built Heritage Resources & Cultural Heritage Landscapes Assessment André Scheinman Heritage Preservation Consultant / ENVision The Hough Group Assignment
More informationTown of Cobourg Heritage Master Plan. Statutory Public Meeting
Town of Cobourg Heritage Master Plan Statutory Public Meeting April 25 th 2016 Presentation Overview 1. Introduction 2. Project background and schedule overview 3. Review of strategic direction content
More informationPRIORITIES COMMITTEE MEETING
PRIORITIES COMMITTEE MEETING Meeting Date: October 28, 2014 Agenda Item #: 11.1 Mature Neighbourhood Strategy Phase 2 Report Purpose To provide the Priorities Committee with a progress update on the Mature
More informationNEW REGIONAL OFFICIAL PLAN HIGH LEVEL PROCESS & FRAMEWORK
NEW REGIONAL OFFICIAL PLAN HIGH LEVEL PROCESS & FRAMEWORK Why A New Official Plan Originally the role of Regionally Planning and content of Regional Official Plan (1970s) primarily focused on protecting
More informationPlanning and Public Consultation Process for the Preparation of a General Land Use Plan for South Port Kells TERMS OF REFERENCE
APPENDIX "B" Planning and Public Consultation Process for the Preparation of a General Land Use Plan for South Port Kells TERMS OF REFERENCE PURPOSE South Port Kells is located in the northeastern quadrant
More informationPART 1. Background to the Study. Avenue Study. The Danforth
The Danforth 1.1/ Study Purpose & Key Municipal Goals 1.2/ The Local Advisory Committee 1.3/ The Project Team 1.4/ Study Process/Summary of Method 1.5/ Summary of Consultation 1.1 Study Purpose and Key
More informationRapid Transit Implementation Working Group September 14, 2017
Rapid Transit Implementation Working Group September 14, 2017 BACKGROUND Council approved the Rapid Transit Master Plan and Updated Business Case on July 25, 2017. Approval of the RTMP confirmed the BRT
More informationScope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan
Scope of Services River Oaks Boulevard (SH 183) Corridor Master Plan PROJECT AREA The project area consists of the River Oaks Boulevard (SH 183) corridor bounded by SH 199 at the northern end and the Trinity
More informationI. INTRODUCTION. Project Background and Study Area
I. INTRODUCTION Project Background and Study Area Freedom Parkway is a key east-west corridor connecting I-25 on the west to the Town of Kersey on the east, running approximately one to two miles south
More informationMAYFIELD WEST SECONDARY PLAN PHASE 2
MAYFIELD WEST SECONDARY PLAN PHASE 2 Public Open House #3 February 25, 2010 Draft Preferred Land Use Scenario TOWN OF CALEDON PLANNING & DEVELOPMENT DEPARTMENT Open House Agenda TOWN OF CALEDON 1. Welcome
More informationMAYFIELD WEST SECONDARY PLAN PHASE 2
MAYFIELD WEST SECONDARY PLAN PHASE 2 Council Information Workshop February 16, 2010 Draft Preferred Land Use Plan TOWN OF CALEDON PLANNING & DEVELOPMENT DEPARTMENT Workshop Agenda TOWN OF CALEDON 1. Welcome
More information6 PORT SYDNEY SETTLEMENT AREA
Section 6 Port Sydney Page 61 6 PORT SYDNEY SETTLEMENT AREA 6.1 Basis and Principles Village of Port Sydney Waterfront Community Existing Services 6.1.1 Port Sydney is an historic settlement that has developed
More informationSt. Lawrence Neighbourhood Focused Area - Official Plan Amendment Status Report
STAFF REPORT ACTION REQUIRED St. Lawrence Neighbourhood Focused Area - Official Plan Amendment Status Report Date: May 21, 2015 To: From: Wards: Reference Number: Toronto and East York Community Council
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016
Item 11, Report No. 38, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan on November 15, 2016. Regional Councillor Di Biase declared an interest
More informationREQUEST FOR PROPOSAL RFP PRESERVATION MASTER PLAN FOR THE ELAM MARTIN FARMSTEAD CITY OF WATERLOO RIM PARK TERMS OF REFERENCE
REQUEST FOR PROPOSAL RFP-01-28 PRESERVATION MASTER PLAN FOR THE ELAM MARTIN FARMSTEAD CITY OF WATERLOO RIM PARK TERMS OF REFERENCE The City of Waterloo is requesting proposals for the development of a
More informationATTACHMENT A. Town of Lebanon Village Center Study Proposal Cover Sheet (to be included with Proposal) Contract shall not exceed $48,500.
ATTACHMENT A Town of Lebanon Village Center Study Proposal Cover Sheet (to be included with Proposal) Contract shall not exceed $48,500. Price to complete the survey as described $ Price to be submitted
More informationURBAN DESIGN ACTION PLAN. Community Design and Environmental Services Committee April 20, 2009
URBAN DESIGN ACTION PLAN Community Design and Environmental Services Committee April 20, 2009 What is the Urban Design Action Plan? The Action Plan is a guiding document to address how design-thinking
More informationREQUEST FOR QUALIFICATIONS
REQUEST FOR QUALIFICATIONS VILLAGE OF HAMBURG COMPREHENSIVE ZONING/LAND USE REGULATIONS UPDATE Prepared By: Village of Hamburg 100 Main Street Hamburg, New York 14075 Village of Hamburg RFQ Page 1 of 10
More informationDowntown Streetscape Manual & Built Form Standards
City of Guelph Downtown Streetscape Manual & Built Form Standards July 2014 Prepared by Brook McIlroy Inc. in association with Unterman McPhail Associates and McCormick Rankin Inc. City of Guelph Downtown
More informationTO: Mayor & Council DATE: April 12, The Planning and Development Department and the Engineering Department recommend that Council:
CORPORATE REPORT NO: R080 COUNCIL DATE: April 12, 2010 REGULAR COUNCIL TO: Mayor & Council DATE: April 12, 2010 FROM: SUBJECT: General Manager, Planning and Development General Manager, Engineering Neighbourhood
More informationCOMMITTEE OF THE WHOLE SEPTEMBER 13, 2011
COMMITTEE OF THE WHOLE SEPTEMBER 13, 2011 VAUGHAN MILLS CENTRE SECONDARY PLAN STUDY APPROVAL OF TERMS OF REFERENCE DIRECTION TO ISSUE A REQUEST FOR PROPOSAL FOR CONSULTING SERVICES FILE 26.1 WARDS 3 &
More informationCookstown Heritage Conservation District Plan Heritage Workshop Public Open House September 10, 2013
Heritage Workshop Public Open House September 10, 2013 Funded by the Government of Ontario MMM Group Darryl Bird Project Manager, Senior Planner Shannon Baker Senior Landscape Architect, CAHP AREA Architects
More informationReport to: Development Services Committee Report Date: April 24, 2017
SUBJECT: Cornell Rouge National Urban Park Gateway - Report on Design Charrette and Next Steps PREPARED BY: Lilli Duoba, MES, MCIP, RPP, Manager, Natural Heritage (ext. 7925) REVIEWED BY: Marg Wouters,
More informationURBAN DESIGN POLICY DEVELOPMENT STEP 1: BACKGROUND RESEARCH
URBAN DESIGN POLICY DEVELOPMENT STEP 1: BACKGROUND RESEARCH Final Report August 2016 P2. A. OVERVIEW, METHODOLOGY & ENGAGEMENT The City of Toronto s Urban Design Policy Development Background Research
More informationSUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:
Page 1 of Report PB-23-18 SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building Report Number: PB-23-18 Wards Affected: 2 File Numbers:
More informationContact: Alex Taranu ( ) or Karl Walsh ( )
Date: 09 September 2005 File: Subject: P03.DUDS Downtown Urban Design Vision Study Report Contact: Alex Taranu (905 874 3454) or Karl Walsh (905 874 2331) OVERVIEW Staff has produced an Urban Design Vision
More informationRequest for Qualifications. Knowledge Park Pedestrian/Cyclist Connectivity Planning and Design
PUR872 I. Invitation Request for Qualifications Knowledge Park Pedestrian/Cyclist Connectivity Planning and Design The City of Rock Hill is requesting Statements of Qualifications from interested and qualified
More informationBeautification Advisory Committee Mission Statement and Goals & Objectives
Beautification Advisory Committee Mission Statement and Goals & Objectives 2011-2012 MISSION STATEMENT To advise the Marco Island City Council on beautifying the community s landscape in a way consistent
More informationFigure 1- Site Plan Concept
Figure 1- Site Plan Concept Parking will be provided underground on three levels at rate of 1.0 space/ unit; this rate includes all visitors parking. MMM Group has prepared a parking assessment (April,
More informationCultural Landscape Heritage Impact Statement Terms of Reference
Culture Division Community Services Department City of Mississauga 201City Centre Dr, Suite 202 MISSISSAUGA ON L5B 2T4 www.mississauga.ca Leading today for tomorrow Cultural Landscape Heritage Impact Statement
More informationKLEINBURG-NASHVILLE AREA HERITAGE CONSERVATION DISTRICT STUDY AND PLAN PURSUANT TO PART V OF THE ONTARIO HERITAGE ACT
COUNCIL JUNE 23, 2003 KLEINBURG-NASHVILLE AREA HERITAGE CONSERVATION DISTRICT STUDY AND PLAN PURSUANT TO PART V OF THE ONTARIO HERITAGE ACT Recommendation The Commissioner of Planning in consultation with
More informationNiagara Region Official Plan. Table of Contents
Niagara Region Official Plan Table of Contents This page has been intentionally left blank. Table of Contents ii Niagara Region Official Plan Niagara Region Official Plan - Table of Contents Chapter 1
More informationPurpose of Report...1. Planning Framework Provincial Policy Statement Draft PPS...2. Ontario Heritage Act...3
Cultural Heritage Policy Discussion Paper November 4 th, 2013 Table of Contents Purpose of Report...1 Planning Framework...1 2005 Provincial Policy Statement...1 2012 Draft PPS...2 Ontario Heritage Act...3
More informationCONCLUSION AND IMPLEMENTATION
Lisbon s Vision CONCLUSION AND IMPLEMENTATION 7 Lisbon residents clearly appreciate the character, amenities, and opportunities that define our community. This Plan of Conservation and Development identifies
More informationA Growing Community Rural Settlement Areas
Town of Huntsville Official Plan Review - POLICY BACKGROUND PAPER A Growing Community Rural Settlement Areas BACKGROUND: In addition to the fully municipally-serviced Urban Settlement Area and the Hidden
More information9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED
9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO. 631 - BOCA EAST INVESTMENTS LIMITED The Planning and Economic Development Committee recommends the adoption of the recommendations contained in the following
More information13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154
13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 The Planning and Economic Development Committee recommends the adoption of the recommendations contained
More informationThe Corporation of the Town of Milton
Report To: From: Council Barbara Koopmans, Commissioner, Planning and Development Date: May 7, 2018 Report No: Subject: Making it Possible Positioning the Town s Strategy for Growth and Economic Development
More informationSUBJECT: Revised proposed new official plan recommended for adoption
Page 1 of Report PB-04-18 SUBJECT: Revised proposed new official plan recommended for adoption TO: FROM: Planning and Development Committee Department of City Building Report Number: PB-04-18 Wards Affected:
More informationExecutive Summary. Parks and Recreation Plan. Executive Summary
Parks and Recreation Plan Executive Summary The Whitemarsh Township Parks and Recreation Plan sets forth a vision for how Whitemarsh Township can provide a premiere parks and recreation system reflective
More informationFeasibility Analysis for Expansion of the Provincial Greenbelt Plan Area into Mississauga
Feasibility Analysis for Expansion of the Provincial Greenbelt Plan Area into Mississauga November 8, 2013 Natural Heritage and Urban Forest Strategy: Draft Discussion Paper #3: Table of Contents 1.0 Introduction...
More informationPUBLIC ART CALL LIONS GATE COMMUNITY CENTRE. For Expressions of Interest Submission Deadline: March 18, 2018 Project Value: $85,000(inclusive)
LIONS GATE COMMUNITY CENTRE PUBLIC ART CALL For Expressions of Interest Submission Deadline: March 18, 2018 Project Value: $85,000(inclusive) LGCC EOI 1 LIONS GATE COMMUNITY CENTRE (LGCC) PUBLIC ART CALL
More informationDAVENPORT VILLAGE SECONDARY PLAN
27 DAVENPORT VILLAGE SECONDARY PLAN 27. DAVENPORT VILLAGE SECONDARY PLAN 1. VISION FOR THE DAVENPORT VILLAGE SECONDARY PLAN Davenport Village, municipally known as 830, 940, 980 and 1100 Lansdowne Avenue,
More informationTHAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.
COMMITTEE OF THE WHOLE AUGUST 18, 2003 THORNHILL CENTRE STREET STUDY PLANNING FILE: 15.92 Recommendation The Commissioner of Planning recommends: THAT the attached Terms of Reference for the Thornhill
More informationPart A. District Overview. Thornhill-Markham Heritage Conservation District Plan 1
Part A District Overview Thornhill-Markham Heritage Conservation District Plan 1 Thornhill-Markham Heritage Conservation District Plan 2 1.0 Introduction 1.1 The Heritage Conservation District Concept
More informationAMENDMENT NO.XX TO THE CLARINGTON OFFICIAL PLAN
AMENDMENT NO.XX TO THE CLARINGTON OFFICIAL PLAN PURPOSE: The purpose of this Amendment is to create a planning framework that will facilitate the development of a transit supportive, pedestrian friendly,
More informationSummary of Action Strategies
Strategic Action Plan 6 Summary of Action Strategies Action Strategy Categories: 1. Organization and Management 2. Implementation 3. Marketing and Promotion This chapter summarizes all of the action strategies
More informationPORT WHITBY COMMUNITY
PORT WHITBY COMMUNITY SECONDARY PLAN UPDATE COMMUNITY IMPROVEMENT PLAN URBAN DESIGN GUIDELINES September 2015 DRAFT PROPOSED AMENDMENT NUMBER # to the Whitby Official Plan PURPOSE: The intent of this Amendment
More informationPlan Overview. Manhattan Area 2035 Reflections and Progress. Chapter 1: Introduction. Background
Plan Overview The Manhattan Urban Area Comprehensive Plan (the Comprehensive Plan) is a joint planning initiative of the City of Manhattan, Pottawatomie County, and Riley County. The 2014 Comprehensive
More informationCity of Kingston Heritage Commemoration Program Guidelines: 7 May 2010
MHC-13-010 Exhibit B City of Kingston Heritage Commemoration Program Guidelines: 7 May 2010 These guidelines cover three separate types of city heritage commemoration: small markers on designated property.
More informationRequest for Proposals (RFP) Consultant Services for the Muckleshoot Placemaking and Landscape Visual Design Services; Campus/Village Planning Project
Request for Proposals (RFP) Consultant Services for the Muckleshoot Placemaking and Landscape Visual Design Services; Campus/Village Planning Project To assist the Muckleshoot Indian Tribe by: 1) Providing
More informationIntention to Designate under Part IV, Section 29 of the Ontario Heritage Act 844 Don Mills Road and 1150 Eglinton Avenue East
STAFF REPORT ACTION REQUIRED Intention to Designate under Part IV, Section 29 of the Ontario Heritage Act 844 Don Mills Road and 1150 Eglinton Avenue East Date: September 7, 2016 To: From: Toronto Preservation
More informationMASTER PLANNING: THE CRITICAL ROLE OF ELECTED LEADERS AND THE PLANNING COMMISSION Planning Michigan Conference
MASTER PLANNING: THE CRITICAL ROLE OF ELECTED LEADERS AND THE PLANNING COMMISSION 2018 Planning Michigan Conference Today s Presenters: Chris McLeod, AICP, Sterling Heights City Planner Gerald (Jerry)
More informationCITY CLERK. Parkland Acquisition Strategic Directions Report (All Wards)
CITY CLERK Clause embodied in Report No. 10 of the, as adopted by the Council of the City of Toronto at its meeting held on November 6, 7 and 8, 2001. 10 Parkland Acquisition Strategic Directions Report
More informationJohn M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference
Report to Planning and Environment Committee To: From: Subject: Chair and Members Planning & Environment Committee John M. Fleming Managing Director, Planning and City Planner Old East Village Dundas Street
More informationAgenda Item # Page # RECOMMENDATION
TO: FROM: SUBJECT: CHAIR AND MEMBERS - PLANNING AND ENVIRONMENT COMMITTEE MEETING ON Tuesday, December 10, 2013 not before 5:15 p.m. JOHN FLEMING MANAGING DIRECTOR, PLANNING AND CITY PLANNER BLACKFRIARS/PETERSVILLE
More information2 STATUTORY PUBLIC MEETING AND INFORMATION REPORT FOR PUBLIC MEETING ON AMENDMENT NO. 62 TO THE YORK REGION OFFICIAL PLAN
2 STATUTORY PUBLIC MEETING AND INFORMATION REPORT FOR PUBLIC MEETING ON AMENDMENT NO. 62 TO THE YORK REGION OFFICIAL PLAN Pursuant to Section 17(15) of the Planning Act, as amended, the Regional Planning
More informationPublic Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill. March 30, 2017
Public Open House Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill March 30, 2017 Open House Review of Project Purpose and Process Policy Refresher Highlights of
More informationCultural Heritage Landscape Heritage Impact Statement Terms of Reference
Community Services Department City of Mississauga 201City Centre Dr, Suite 900 MISSISSAUGA ON L5B 2T4 www.mississauga.ca Leading today for tomorrow Cultural Heritage Landscape Heritage Impact Statement
More informationSUBJECT: Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies
Page 1 of Report PB-81-17 SUBJECT: Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies TO: FROM: Committee of the Whole Planning and Building Department Report Number: PB-81-17
More informationPART 1. INTRODUCTION CITY OF WATERLOO URBAN DESIGN MANUAL
CITY OF WATERLOO URBAN DESIGN MANUAL PART 1. INTRODUCTION The City of Waterloo is committed to a high standard of urban design as established through the City s Official Plan policies, its urban design
More informationC h a p t e r 3 E V A L U A T I O N A N D D E S I G N A T I O N. Background
Part Two GOALS Part 2: Restoration work at Kingston (Historic Site 79-019-13) Upper Marlboro, 2009 C h a p t e r 3 E V A L U A T I O N A N D D E S I G N A T I O N Background The Inventory of Historic Resources
More information6: 2417 Fourth Line, Sixteen Hollow, Lion Valley Park
1. Description of Property 6: 2417 Fourth Line, Sixteen Hollow, Lion Valley Park Municipal Address 2417 Fourth Line ame (if applicable) Sixteen Hollow, Lion Valley Park Legal Description CO 1 SDS PT LOTS
More informationHEMSON C o n s u l t i n g L t d.
INVENTORY & ASSESSMENT OF INTENSIFICATION OPPORTUNITIES City of Brampton Discussion i Paper for Public Review C o n s u l t i n g L t d. November 2008 EXECUTIVE SUMMARY This report is one of the key background
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016
Item 5, Report No. 26, of the Committee of the Whole (Working Session), which was adopted without amendment by the Council of the City of Vaughan on June 7, 2016. 5 MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT
More informationNOTE: PLEASE REFER TO CITY PLAN FOR ADDITIONAL CITY-WIDE POLICIES WHICH APPLY TO THIS DISTRICT.
NOTE: THE POLICIES IN THIS DOCUMENT ARE SPECIFIC TO THE SHERIDAN RESIDENTIAL PLANNING DISTRICT OF, AND MUST BE READ IN CONJUNCTION WITH ALL THE POLICIES OF CITY PLAN PLEASE REFER TO FOR ADDITIONAL CITY-WIDE
More informationDraft Urban Hamilton Official Plan. Amendment No. XX
1 of 75 The following text, together with: Draft Appendix A Appendix B Volume 1, Schedule E-1 Urban Land Use Designations Appendix C Volume 1, Appendix A Parks Classification Map Appendix D Volume 1, Appendix
More informationTown of Oakville Streetscape Strategy
Town of Oakville Streetscape Strategy Endorsed by PDC on February 10, 2014 (PD-011-14) Town of Oakville Streetscape Strategy [endorsed by PDC February 10, 2014] 0 Town of Oakville Streetscape Strategy
More informationREQUEST FOR PROPOSALS. Preparation of National Register of Historic Places. Nominations for the following:
REQUEST FOR PROPOSALS Preparation of National Register of Historic Places Nominations for the following: The Conner Swales Site, The Baumann Village Site, The Bird Point Heaven Village Site, The Wise Village
More informationCity of Toronto. Emery Village Transportation Master Plan
City of Toronto Emery Village Transportation Master Plan May 2009 Emery Village Transportation Master Plan Toronto, ON May 2009 Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel:
More informationCOBOURG Cobourg Heritage Advisory Committee. Alison Torrie Lapaire Planner I - Heritage
0 0 -e---s- THE CORPORATION OF THE TOWN OF COBOURG STAFF REPORT TO: COBOURG Cobourg Heritage Advisory Committee FROM: TITLE: Alison Torrie Lapaire Planner I - Heritage DATE OF MEETING: October 11,2017
More informationGUIDELINES FOR CULTURAL HERITAGE IMPACT ASSESSMENTS
GUIDELINES FOR CULTURAL HERITAGE IMPACT ASSESSMENTS Purpose A Cultural Heritage Impact Assessment (CHIA) is a study to identify and evaluate built heritage resources and cultural landscapes in a given
More informationA New Plan For The Calgary Region June calgary.ca call 3-1-1
A New Plan For The Calgary Region June 2009 calgary.ca call 3-1-1 Introduction Since January 2006, The City of Calgary has been actively participating with the member municipalities of the Calgary Regional
More informationCULTURAL HERITAGE RESOURCES POLICIES
New Official Plan CULTURAL HERITAGE RESOURCES POLICIES Date March 6, 2009 Distributed at: Livable Oakville Committee, March 9, 2009 Planning Services Department March 2009 1 1 Policy Discussion Paper:
More informationAuthorization to Study Potential Heritage Conservation Districts (HCD) under Part V of the Ontario Heritage Act
STAFF REPORT ACTION REQUIRED Authorization to Study Potential Heritage Conservation Districts (HCD) under Part V of the Ontario Heritage Act Date: August 16, 2012 To: From: Toronto and East York Community
More informationRequest for Expressions of Interest & Call for Qualifications Maplewood Townhomes 433 Seymour River Place
Interest & 433 Seymour River Place Open Competition to Artists July 2014 Interest & I. INTRODUCTION is seeking an artist or a team of artists to create artwork associated with the development of a new
More informationHistoric Yonge Street HCD Plan Community Consultation October 14, 2015
Historic Yonge Street HCD Plan Community Consultation October 14, 2015 Archaeological Services Inc. Philip Goldsmith Architect BRAY Heritage Historic Yonge Street HCD Plan Agenda: 6:30 Open House 7:30
More informationAlbion Hills Conservation Area Master Plan. Public Information Session
Albion Hills Conservation Area Master Plan Public Information Session 1 03.25.2014 Meeting Agenda 1. Project Introduction Property History Current Use Master Plan Process 2. Draft Vision Goals and Objectives
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 6, 2014
CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 6, 2014 Item 35, Report No. 18, of the Committee of the Whole, which was adopted, as amended, by the Council of the City of Vaughan on May 6,
More informationInfrastructure, Development and Enterprise Services. Natural Heritage Action Plan (NHAP) Project Initiation
Staff Report To Service Area Committee of the Whole Infrastructure, Development and Enterprise Services Date Monday, March 6, 2017 Subject Natural Heritage Action Plan (NHAP) Project Initiation Report
More informationCookstown Heritage Conservation District Study Public Consultation March 26, 2013
Public Consultation March 26, 2013 Funded by the Government of Ontario MMM Group Darryl Bird Project Manager, Senior Planner, CAHP Intern Shannon Baker Senior Landscape Architect, CAHP AREA Architects
More informationSummary of Changes for the Comprehensive Draft Proposed Official Plan Amendment
Summary of Changes for the Comprehensive Draft Proposed Official Plan Amendment Note: Due to the broad scope of the Official Plan Review, this list is not exhaustive of the extent of changes in the comprehensive
More informationLong Branch Neighbourhood Character Guidelines Final Report
STAFF REPORT ACTION REQUIRED Long Branch Neighbourhood Character Guidelines Final Report Date: October 26, 2017 To: From: Wards: Reference Number: Etobicoke York Community Council Director, Community Planning,
More informationAPPENDIX I Presentations
APPENDIX I Presentations Workshop Summary Report 11 Peel Region Official Plan Review May 5, 2010 Compatible Active Recreation Workshop July 29, 2010 Components of PROPR Sustainability Planning Tools/Updates
More informationSECTION E. Realizing the Plan
SECTION E Realizing the Plan 60 DESIGN REGINA - OFFICIAL COMMUNITY PLAN SECTION E Realizing the Plan Design Regina has been an ambitious plan-making exercise, with a high level of community, stakeholder,
More informationBENSON / HUNT TERTIARY PLAN
BENSON / HUNT TERTIARY PLAN TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 Purpose 2 1.2 How to Read This Plan 3 1.3 Tertiary Plan Context 3 1.4 Vision and Principles 5 1.5 Public Consultation 5 2.0 PLANNING CONTEXT
More informationCultural Heritage Resource Assessment Review Update of the Mayfield West Phase II Secondary Plan TOWN OF CALEDON, ONTARIO.
TOWN OF CALEDON, ONTARIO Prepared for: Town of Caledon 6311 Old Church Road Caledon, ON L7C IJ6 File: 17CH-030 May 2017 Archaeological & Providing Cultural Heritage Services 528 Bathurst Street Toronto,