Watermark WestQuay Southampton

Size: px
Start display at page:

Download "Watermark WestQuay Southampton"

Transcription

1 Watermark WestQuay Southampton environmental Statement Non-Technical Summary February 2013 Coordinated by Barton Willmore LLP for

2 Environmental Statement Non-Technical Summary Issue/Revision Draft Final Date 22/02/ /02/3013 Prepared by Project Team Project Team Checked by Barton Willmore Barton Willmore Project Reference 19314/A5/EIA/NTS Barton Willmore 7 Soho Square, London, W1D 3QD Tel: Our Ref: 19314/A5/ES NTS FINAL Date: February 2013 COPYRIGHT The contents of this document must not be copied or reproduced in whole or in part without the written consent of Barton Willmore LLP. All Barton Willmore stationery is produced using recycled or FSC paper and vegetable oil based inks.

3 1.0 INTRODUCTION 1.1 Hammerson UK Properties Plc (the Applicant ) is seeking outline planning permission to provide a mixed use development including Class D2 leisure uses (including a cinema), Class A1-A5 retail uses, Class C1 hotel use, Class C3 residential use, and Class B1(a) office use along with car parking, access, highways, landscaping and public open space (collectively referred to hereafter as the Proposed Development ). 1.2 The Proposed Development will be located in Southampton on land between Harbour Parade and Portland Terrace to the south of the existing WestQuay Shopping Centre (WQSC) (the Application Site ). The location and extent of the Application Site is shown on Figures 1.1 and 1.2. The Application Site is situated within the administrative areas of Southampton City Council (SCC). 1.3 This report provides a non-technical summary (NTS) of the Environmental Statement (ES) prepared to accompany the planning application. The ES presents the findings of an Environmental Impact Assessment 1 (EIA) undertaken in support of the planning application. 1.4 The full findings of the ES are presented in a comprehensive set of documents that can be viewed at Southampton City Council, Civic Centre, One Guildhall Square, Southampton, SO14 7FP. Additional copies of the NTS (no charge), ES ( 70 plus postage) and the Technical Appendices ( 180 plus postage) are available from Paul Newton, Barton Willmore LLP, 7 Soho Square, London, W1D 3QB. The complete ES can also be obtained on CD for 20 (plus postage) from the same address. The Application Site 1.5 The Application Site, 4.27 hectares (ha) in area and shown on Figures 1.1 and 1.2, is bordered: to the west by Harbour Parade; to the south by the Quays Swimming and Diving Complex (QSDC); to the east by the historic and nationally important Town Walls; and to the north and partly incorporated into the Application Site, WQSC. The Application Site is located on land which was originally reclaimed from the River Test during the industrial expansion of Southampton in the late 19 th and early 20 th centuries. The Application Site was formerly occupied by warehouses belonging to the Pirelli Cable Works. The Pirelli Works closed in 1990 and the main part of the Application Site was virtually empty in June The majority of the Application Site is presently vacant and consists predominantly of large areas of hardstanding. It also includes the existing external terrace and part of WQSC and its car park (including the existing footbridge link); part of the QSDC car park; a portion of the 1 Prepared in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations /A5/NTS February 2013

4 Western Esplanade road and footpath; an area of car parking off Castle Way and Albion Place above the Town Walls; and a portion of Portland Terrace and Bargate Street including the pedestrian subway. In recent years, part of the Application Site has been used once a year by the organisers of the Southampton Boat Show and for informal parking. 1.7 The Application Site is easily accessed by pedestrians from both Harbour Parade and Western Esplanade with wide footways located along either side of both carriageways. Public transport to the Application Site is available via the bus stop interchange on Portland Terrace. Bus stops are also positioned on Castle Way to the east. Southampton Central Train Station is located approximately 850m to the north of the Application Site. The roads surrounding the Application Site provide good access to the wider highway network. 1.8 There are no landscape or ecological designations within the Application Site. However the Application Site contains a section of the medieval Town Walls which are designated as a Scheduled Monument 2 and a Grade I Listed 3 Building. In addition, Western Esplanade, and the access ramps and steps to the existing WQSC, as well as the car parks within the northeast area of the Application Site, are within the Old Town West Conservation Area 4 (OTWCA). 1.9 Given the nature of previous land uses, including the Pirelli Cable Works, it is anticipated that there could be some localised contamination sources present on the Application Site. An electricity sub-station adjacent to the western boundary also represents a potential source of polychlorinated biphenyls (PCBs) contamination. In addition, the Application Site was subject to heavy bomb damage during World War II and as a result, it is considered there could be a risk from unexploded bombs The majority of the Application Site is located in an area at low risk of flooding, with the exception of the far north-west corner which is at medium risk. The River Test is located approximately 400m to the south of the Application Site and the River Itchen approximately 1.3km to the east. In addition the Application Site is underlain by secondary aquifers. 2 A Scheduled Monument is a building included in the Schedule of Monuments compiled under Section 1 of the Ancient Monuments, and Archaeological Area Act Scheduled Monuments have statutory protection under this Act (Section 2). 3 Grade I buildings are considered to be of exceptional historical and/or architectural interest and are sometimes internationally important 4 A Conservation Area is an area of special environmental or historical importance that is protected from changes by law /A5/NTS February 2013

5 2.0 EIA METHODOLOGY Assessment Methodology 2.1 EIA is a systematic procedure that uses best practicable techniques and available sources of information to determine the potential environmental effects (beneficial, adverse, negligible, temporary, permanent, direct, indirect, cumulative and interactive) of a development. This enables the importance of predicted effects to be considered by a local planning authority (in this case SCC) before a decision is made about the planning application. The prediction of such effects for the Proposed Development was made in relation to both the construction activities and the operational phase of the Proposed Development i.e. when complete and occupied. 2.2 Within the ES the significance of an environmental effect has been identified. The significance reflects the relationship between: The sensitivity, importance or value of the affected resource or 'receptor' (such as people or wildlife); and The actual change taking place to the environment (i.e. the 'magnitude' or severity of an effect). 2.3 The three levels of significance defined are: Major an effect which, on its own, could have an influence on the decision making process; Moderate an effect which, on its own, could have some influence on decision making, particularly when combined with other similar effects; or Minor an effect which, on its own, is likely to have a minor influence on decision making but when combined with other effects could have greater influence. 2.4 Table 1 shows the relationship between the value of the receptor and the magnitude of an effect used to determine the significance of an effect /A5/NTS February 2013

6 Table 1: Significance Matrix Sensitivity/Value of Magnitude of Effect Receptor High Medium Low High (England, UK, International) Medium (County, Regional) Low (Local, District) Major Major/ Moderate Moderate Major/ Moderate Moderate Moderate/ Minor Moderate Moderate/ Minor Minor 2.5 Effects are also described as: Adverse i.e. detrimental or negative effects to an environmental resource or receptor; or Beneficial i.e. advantageous or positive effect to an environmental resource or receptor. 2.6 Where an effect is considered to be not significant or have no influence, irrespective of other effects, it is classified as negligible. Cumulative Effects 2.7 Within EIA, the cumulative effects of a development in conjunction with other consented but not yet built development in the area are considered. Cumulative effects are generally considered to arise from the combination of effects from the Proposed Development and from other proposed or permitted schemes in the vicinity. The following cumulative schemes are considered in the ES and are shown on Figure 2.1: Northern Above Bar (Former Tyrell & Green Store) Redevelopment (07/01686/FUL): Demolition of the existing building and erection of new buildings ranging in height from 9-storeys to 18-storeys to provide new arts facilities, a new commercial unit (Class A1/A3) and 282 flats (46 studios, 106x1 bedroom, 126x2 bedroom and 4x3 bedroom flats) with associated parking and formation of a new street between Guildhall Square and East/Andrews Park; Car Park next to Saxon Gate, Back of the Walls, Bargate (07/00755/FUL and 11/00339/Time): Redevelopment of the site including the erection of 5 and 6 storey buildings to provide 178 student housing flats with associated parking and 36 separate public car parking spaces with vehicular access from Canal Walk; Former C and A Building Above Bar Street, 1 West Marlands Road and 1-5 Gibbs Road Southampton, SO14 7FQ (08/00474/FUL); Redevelopment of the site including erection of a 6 storey building with basement parking to provide offices (Use Class B1 7,365 square metres floorspace) with retail, restaurant/cafes (Use Classes A1/A3) and a one stop shop customer service centre on the ground floor with vehicular 19314/A5/NTS February 2013

7 access from Above Bar Street following the demolition of the existing buildings; St Andrews Road, Ambulance Station, Central Health Clinic East Park Terrace & Adjoining Highways Southampton (06/01457/FUL and 08/00635/VC): Demolition of the existing buildings. Redevelopment of the site to provide four buildings: a 21-storey hotel (Class C1); an 11-storey apart-hotel (Class C1) which includes 4 flats (Class C3); a 14-storey block of 219 flats (Class C3); and a 12 storey office building (Class B1) of 8,996 square metres gross floorspace; with associated environmental improvements, parking and servicing involving alterations to the highways in St Andrews Road; and Admirals Quay, Ocean Way, Southampton (11/01555/FUL): Redevelopment of the site involving the erection of three buildings of 9-storeys, 16 storeys and 26 storeys to provide 299 flats (37 x 1 bedroom, 225 x 2 bedrooms and 37 x 3 bedroom) and 2764 square metres of commercial floorspace, comprising retail (Class A1 and/or cafes/restaurants (Class A3) and/or drinking establishments (Class A4) with associated storage and parking. Determining the Content of the ES 2.8 Scoping' 5 involves focusing the study (and hence the ES) of environmental issues of potential significance. The scope (content) of the ES was established by the project team at the start of the EIA process. A request for a Scoping Opinion was originally sent to SCC on the 13 th November The topics set out in the scoping report comprised: Socio Economics; Transport and Access; Ecology; Landscape and Visual (including consideration of Arboriculture); Daylight, Sunlight and Overshadowing; Noise and Vibration; Air Quality; Water Resources and Flood Risk; Ground Conditions; Wind Microclimate; Archaeology; Built Heritage; and Waste. 5 A Scoping Opinion is a written statement of the local authority s opinion as to the information to be provided in the ES, in accordance with the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations /A5/NTS February 2013

8 2.9 SCC adopted a Scoping Opinion on 25 th January 2013 which generally agreed with the scope of the topics set out above. Consultation Process 2.10 As part of the design of the Proposed Development consultation has been undertaken with the local community and key stakeholders including: SCC, Environment Agency, Natural England; English Heritage; Southern Water; and BAA. The Applicant also held a public exhibition in December 2012 at WQSC. The public exhibition provided an opportunity to inform local residents and these organisations of the progress with the Proposed Development and allow the local residents to feed back their comments on the proposals. Involvement with the local community will continue throughout the planning process and into the construction phase of the Proposed Development. 3.0 ALTERNATIVES 3.1 The EIA Regulations 6 require that an applicant provides an outline of the main alternatives considered. The Applicant has considered a number of alternative designs for the Proposed Development following identification of the constraints and opportunities on the Application Site. The layout and design of the Proposed Development has been informed by: the considerations and constraints within the Application Site; the key design principles necessary to ensure the vision for the Proposed Development is achieved; and feedback from the public exhibition. 4.0 THE PROPOSED DEVELOPMENT 4.1 The description of the Proposed Development is set out below: "Mixed-use development including alterations to the WestQuay Shopping Centre comprising Leisure uses including a Cinema (Use Class D2), Retail (Use Classes A1, A2, A3, A4 and A5), Hotel (Use Class C1), Residential (Use Class C3), Office (Use Class B1(a)), public open space, with associated car parking, access, highway, landscaping and other works". 4.2 Development parameters have been established for the entire Application Site 7. These set out details of the limits, necessary to define and fix those aspects of the Proposed Development capable of having significant environmental effects, as defined in the EIA 6 The Town and Country Planning (Environmental Impact Assessment) Regulations Parameter plans are a series of drawings that set the types of land use, the heights of the future buildings, main points of access, and landscaping proposals. They do not show individual buildings, roads, or planning but set out where the key parts of a development will be located on a site /A5/NTS February 2013

9 Regulations. These limits or development parameters are shown on Figures 4.1 to 4.10 and described below. Built Form 4.3 The Proposed Development has been divided into four Development Zones (DZ1-DZ4) for the purposes of identifying distinct development areas within the Proposed Development, which have different building envelopes, uses, areas and heights. The footprint of each building and type of development including maximum and minimum lines of deviation are illustrated on Figures 4.4 to 4.8. The extent of each DZ is identified on Figure 4.1 and the main land use elements are set out in Table 4.1. Table 4.1: Land Use Elements of the Proposed Development Design Zone Land Use Floor Space (DZ) Maximum Minimum DZ1 Retail-Restaurant 15,000 4,000 (A1-A5) Leisure (including 15,000 6,000 cinema) (D2) DZ2 Retail Kiosks (A1-A5) 1,000 0 DZ3 Retail-Restaurant 2,500 0 (A1-A5) Office (B1(a)) 10,000 0 Hotel (C1) 28,000 0 Residential (C3) 28,000 0 (Units) (360) (0) Leisure (D2) 2,500 0 DZ4 Retail-Restaurant 1,000 0 (A1-A5) Residential (C3) 20,000 11,000 (units) (260) (140) Leisure (D2) 2,000 0 Car Parking Spaces The Proposed Development will be delivered in two phases. DZ1 and parts of DZ2 will come forward as part of Phase One of the Proposed Development. DZ3, DZ4 and the remaining areas of DZ2 will come forward as part of Phase Two. The Proposed Development elements are described in detail below under each DZ of the Application Site. Phase One DZ1 4.5 DZ1 is positioned in the northern portion of the Application Site abutting WQSC (see Figure 4.1) with the Town Walls to the east (at a minimum distance of 20m). DZ1 includes a main building with retail, leisure, cafe and restaurant uses along with a cinema. DZ1 will contain the proposed service yard access to the Proposed Development (from Harbour Parade) and 19314/A5/NTS February 2013

10 pedestrian access to the multi-storey car park via a new link footbridge. The building is designed with flexibility to respond to operator demand. 4.6 The cinema element is the main leisure anchor of the Proposed Development and represents a key visual landmark due to its design and position opposite the Plaza and Town Walls. Commercial units, designed to primarily include restaurants, cafes and bars will be provided on various levels facing towards the pedestrian ramps and Western Esplanade. A large retail unit (Class A1) will be provided at ground floor level fronting onto Harbour Parade. It is envisaged that this will be occupied by a Supermarket or national multiple retailer. 4.7 Service access to the building is provided from a dedicated route off Harbour Parade, with all servicing to individual units to be undertaken internally from the internal core connecting to the service yard. 4.8 DZ1 includes a number of open spaces including an area on promenade level towards the Plaza and an area of public realm on the southern edge linking the Plaza to Harbour Parade. Terraced areas will also be created at the upper levels associated with the cinema. DZ2 (Phase One element) 4.9 DZ2 will deliver substantial areas of public realm. This includes the main Plaza and the Esplanade alongside the Town Walls to the east, the Pocket-Park to the north of the QSDC and the landscaped public realm above the Town Walls off Albion Place adjacent to Catchcold Tower. DZ2 will also provide up to 1,000 sqm GIA for retail kiosks proposed to be used on temporary and/or permanent basis The main Plaza and the Esplanade positioned on the north-eastern part of the Applicaiton Site will come forward as part of Phase One. They represent a key component of the Proposed Development as it is a significant area of public open space and will form a new pedestrian link between Bargate Street and Western Esplanade. This will significantly enhance pedestrian linkage between the City Centre and the waterfront to the south. DZ2 as a whole also contains accessible pedestrian linkage between the Plaza and the QSDC and the access road to the car park from Harbour Parade. Vehicles access will only be occasional in order to cater primarily for the staging of event and to allow access for emergency vehicles. The proposed access is shown on Figure The configuration and extent of the Plaza has been designed in order to relate sensitively to the setting of the Town Walls. The area varies in width (east-west) from a minimum of 20m at its narrowest point to 42m between the main leisure/cinema building and commercial units and the Town Walls (ensuring a significant buffer and appropriate setting to the Town Walls) /A5/NTS February 2013

11 4.12 There will be active frontages onto the Plaza and Esplanade from DZ1, DZ3 and DZ4. The Plaza has been designed to cater for a number of different uses and events including outdoor dining, outdoor events and leisure associated with the use of the Proposed Development and the City Centre. The majority of the area will be hardscaped. Phase Two DZ DZ3 is positioned in the central portion of the Application Site fronting the Town Walls to the east and residential tower (DZ4) immediately to the west. DZ1 is to the north and DZ2 is to the south and east as shown in Figure DZ3 will contain a variety of uses including hotel, restaurant, retail, office and residential uses. It will also contain replacement and other additional car parking and associated service yards. It has been designed with flexibility to incorporate or omit the various uses at the detailed design stage (dependent on user demand). This element will comprise separate building blocks around a unifying area of public realm. The servicing of the buildings will via Harbour Parade roundabout access road or Western Esplanade DZ3 includes two levels of car parking providing between spaces. The ground level car park will replicate the spaces lost from the SCC owned car park adjacent to the QSDC which will be removed as part of the Proposed Development. The second level is provided for the occupants of the residential tower located in DZ4. The car park will be accessed from the existing access road linked to the Harbour Parade roundabout. DZ DZ4 is positioned on the south-western corner of the Proposed Development fronting the QSDC to the south and Harbour Parade immediately to the west. DZ1 is to the north and DZ3 to the east DZ4 contains the residential tower building which is intended to become a key visual landmark for the Proposed Development and Southampton City Centre. The building has been positioned in the least sensitive part of the Application Site away from the Town Walls and has been orientated to maximise views to the waterfront The tower building will provide residential uses as well as some commercial floorspace which will include leisure and/or retail uses. There will be between 140 to 260 residential units with a range of studios, 1, 2 and 3 bedroom units /A5/NTS February 2013

12 4.19 There is no dedicated parking within DZ4. Car parking for residents will be provided in the second level of the DZ3 car park. There will be a direct internal link between this area and the building for residents. Service access to the building is provided from a dedicated route off Harbour Parade. The building is proposed to be set back from the street edge which will allow the provision of an area of open space along Harbour Parade on its western edge. DZ2 (Phase Two element) 4.20 The Phase Two elements of DZ2 include the Pocket-Park to the north of the QSDC and the landscaped public realm above the Town Walls off Albion Place adjacent to Catchcold Tower The Pocket-Park represents a dedicated area of open space consisting of hard surfacing and green landscaping and is positioned on the southern part of the Application Site immediately to the south of DZ3. The configuration and extent of the Park has been designed in order to integrate the disabled access ramp to the QSDC into the primary circulation route of the Proposed Development and provide enhanced green space within the Proposed Development The landscaped public realm above the Town Walls Albion Gardens will be designed to accentuate the Town Walls and Catchcold Tower. Albion Garden will be designed based on the quilt pattern of the historic garden which was formerly located here The elevated location of Albion Garden at the level of the Old Town will allow for views across the Plaza below. Building Heights 4.24 The maximum and minimum building heights within each DZ are illustrated on Figure 4.9. Table 4.2 breaks down the maximum heights by DZ. Table 4.2: Maximum Heights by DZ DZ Maximum Heights AOD (m) DZ DZ2 N/A DZ3 +36 DZ4 +95 Notes: 1. AOD is defined as Above Ordnance Datum 2. Heights of buildings to be measured from the level of the ground floor slab to the apex of the roof (not including plant). 3. The DZs referred to are identified on Figure 4.9 Building Heights 19314/A5/NTS February 2013

13 Access 4.25 The locations of the access points into the Proposed Development are shown on Figure The majority of vehicles will access the Application Site from Harbour Parade and the A33 West Quay Road/Town Quay corridor. Car parking will be available in existing surface level and multi-storey car parks with high level pedestrian bridge links Public transport to the Application Site will be available via the bus stop interchange on Portland Terrace. Bus stops are also positioned on Castle Way to the east. Construction Programme 4.27 Construction will commence in 2013/2014 with Phase One (subject to gaining planning permission) which is expected to be completed by Phase Two will be brought forward in response to active market demand, but is anticipated to be completed by Figure 4.11 shows the anticipated phasing for the Proposed Development A Construction Environmental Management Plan (CEMP) will be prepared for the Proposed Development that will provide the methods of managing environmental issues for all involved with the construction activities It is anticipated that SCC will wish to regulate the hours of work on the Application Site. It is anticipated that these will be 08:00 to 18:00 Monday to Friday and 08:00 to 13:00 on Saturdays. All work outside these hours will be subject to prior agreement, and/or reasonable notice, by SCC, who may impose certain restrictions. Night time working will be with the agreement of SCC and restricted to exceptional circumstances. 5.0 SOCIO ECONOMICS 5.1 The ES includes an assessment of the effects of the Proposed Development on socio economics in proximity to the Application Site during construction and operation. 5.2 During construction of Phase One it is anticipated that approximately 600 full, part-time and temporary jobs will be generated by the construction of the Proposed Development. These will be supplemented with further indirect employment that may be generated due to requirements for building materials, plan, plant maintenance etc. during the build period. Local services such as restaurants, cafes, shops, petrol stations etc are also likely to experience a temporary boost through the provision of meals, refreshments and fuel to the workforce. This will result in temporary effects of moderate beneficial significance /A5/NTS February 2013

14 5.3 During operation of Phase One it is anticipated that a maximum of 500 full and part time jobs will be created. The increased job creation and consequently income will lead to wider spinoff benefits for local shops, businesses and services primarily in Southampton. This will result in a long-term effect of major beneficial significance. 5.4 Phase One will provide space for retail and restaurants catering largely for retailers and restaurant/leisure operators not present in the City Centre and WQSC which will complement the existing offer and ensure only positive effects on the trading conditions and health of wider parts of the City Centre. The effects will be long-term and of moderate beneficial significance. 5.5 Phase One also represents a significant opportunity to promote accessibility and enhance social inclusion in the area around the Application Site and City Centre. The Proposed Development will be accessible and inclusive to all elements of the population who will be able to access the completed retail and leisure facilities; use and enjoy areas of new public open space; appreciate the City s heritage assets through enhanced access to the Town Walls; and improve pedestrian accessibility between the City Centre and Waterfront. 5.6 The mix of uses within the Proposed Development including shopfronts which will be active during day and night time hours. This will offer a significantly enhanced degree of natural surveillance which is currently lacking in the area around the Application Site. This will result in a long-term effect of moderate beneficial significance. 5.7 During operation of Phase One and construction of Phase Two there will be further 600 job opportunities associated with the construction activities while the benefits associated with the operation of Phase One will also continue. 5.8 During the Completed Development in addition to the effects described above for the operation of Phase One there will be long term effects of moderate beneficial significance associated with the provision of residential units in the form of a range of studio, 1, 2 and 3 bedroom units providing accommodation for up to 937 people by completion and contributing to housing needs established by planning policy. The provision of the hotel will create a long-term effect of minor beneficial significance. There will also be the creation of an additional 883 jobs associated with the increase in retail and office accommodation providing a moderate beneficial effects 5.9 However with the increase in population there will be additional school aged children generated by the residential components of the Proposed Development leading to a long /A5/NTS February 2013

15 term effect of minor adverse significance on education facilities. There will also be a longterm effect of minor adverse significance on health facilities associated with the rise in population The Proposed Development in combination with the cumulative development schemes discussed above will result in cumulative effects of: major beneficial significance in terms of employment and job creation; moderate beneficial significance in terms of population, housing, retail, hotel, leisure and office; negligible significance in terms of leisure provision, community and recreation facilities and minor adverse significance in terms of education and health facilities. 6.0 TRANSPORT AND ACCESS 6.1 The ES includes an assessment of the transport effects of the Proposed Development. The Application Site is well located in terms of accessibility by public transport, walking and cycling, which is in accordance with the general aims of National Planning Policy Guidance and is close to other amenities and services which will enable one trip to support multiple purposes. 6.2 Construction traffic effects resulting from HGVs and other vehicles associated with construction accessing the Application Site will be mitigated by appropriate planning and management resulting in negligible effects. 6.3 During operation of Phases One and Two, walking and cycling trips in the local area are expected to increase as a result of the Proposed Development. New routes and connections, improved public realm and cycle parking facilities will be provided to support the use of these modes. The residual effect of the overall development on walking is considered to be moderate beneficial and on cycling it is considered to be negligible. Use of these modes will also be supported by travel planning measures at the Proposed Development. 6.4 The Proposed Development is located in the city centre close to numerous and frequent public transport services. It is considered that the existing public transport services have adequate capacity to accommodate the increase in passenger demand and that the overall residual effect of the Proposed Development on public transport is negligible. 6.5 The Proposed Development will increase traffic on the local highway network. Most of the Proposed Development traffic is expected to use the A33 West Quay Road / Town Quay corridor to access the Application Site. The effect of the traffic increase would be mitigated by optimising the traffic signal timings on the A33 corridor near the Application Site to take 19314/A5/NTS February 2013

16 account of the change in traffic demand arising from the Proposed Development. Travel planning at the Application Site will help mitigate the effects of the Proposed Development on the local transport network and to support use of non-car travel modes. This will result in negligible effects to the highway network apart from at one junction (Eastern Harbour Parade/West Quay Road junction) which will experience a long term moderate adverse effect. 6.6 The Proposed Development proposes a restrained level of car parking for its new land uses and will facilitate the use of existing under-utilised parking capacity, particularly in the West Quay Multi-Storey car park. The proposed parking and servicing provision is considered suitable for the size of development proposed resulting in a negligible effect. 6.7 It was agreed with SCC that due to a combination of factors including the distance from the Application Site and minimal parking provision, that consideration of cumulative effects was not necessary for transport assessment purposes. 6.8 The development proposals accord with the relevant national, regional and local transportation policies. 7.0 ECOLOGY AND NATURE CONSERVATION 7.1 The Application Site is currently of limited ecological interest with amenity grassland and areas of hard standing on the Application Site having no ecological interest and no potential to support protected species. However, trees and ornamental planting provide some opportunities for common bird and invertebrate species. Castle Bailey Wall is considered to have low bat roosting potential, as a precautionary measure only. 7.2 The Proposed Development abides by the principles laid out in national, regional and local planning policies. 7.3 There is the potential for some minor adverse effects upon ecological receptors during construction of Phase One and Phase Two, although the majority of effects are negligible. Similarly, there is the potential for some minor beneficial ecological effects to arise as a result of the Completed Development. The ecological value of the Application Site could be enhanced as a result of the Completed Development with the provision of ecological enhancement measures such as the provision of suitable nesting opportunities for birds, roosting opportunities for bats and foraging habitat for invertebrates, birds and bats. 7.4 There would be no significant adverse effects upon designated sites as a result of the Proposed Development or any adverse effects in combination with other consented schemes considered as part of the cumulative assessment /A5/NTS February 2013

17 8.0 LANDSCAPE AND VISUAL 8.1 The ES has included an assessment of the effect of the Proposed Development on the landscape and views to and from the Application Site for the construction and Completed Development phases. To inform the assessment, an appraisal of the current townscape and visual amenity of the Assessment Site and its surroundings was undertaken. 8.2 Some temporary major adverse effects are expected during construction. The main receptors identified experiencing these effects are the character area around the walls (CA11) and views from the Catchcold and Arundel Towers. The effects are considered to be major adverse due to the proximity to the Application Site, the sensitive nature of the receptors and the magnitude of change to the views. 8.3 Whilst inevitably losing some views of the Town Walls, and some views of the waterfront from Arundel Tower, the Completed Development will generally have minor beneficial effects for the majority of views and character areas. The maximum and minimum parameters have been assessed. In some close range views, the Proposed Development close to the minimum parameters would benefit the views. Conversely, from some longer distance views, the Proposed Development could benefit from achieving closer to the maximum height parameters in order to create a new iconic landmark for Southampton. 8.4 Small numbers of properties on Forest View will experience moderate to major adverse effects during operation of Phase One and the operation of the Completed Development. These properties are located at the top of the Town Walls with clear views towards the Application Site and out towards the waterfront. These views will be limited particularly by the maximum parameters of Phase Two. Views from the top of the Town Walls will also experience major to moderate adverse effects during the operation of the Completed Development for the maximum parameters. 8.5 The mitigation measures inherent with the Design Principles of the Proposed Development will minimise the adverse effects on the sensitive Town Walls and adjacent Conservation Areas: Old Town West Conservation Area and Old Town North Conservation Area. The Proposed Development will contribute vitality and a 'sense of place' to what is currently a fragmented character area, west of the City Centre. 8.6 There are no foreseeable cumulative effects associated with the Application Site in relation to other development schemes in the area /A5/NTS February 2013

18 9.0 DAYLIGHT, SUNLIGHT, OVERSHADOWING AND SOLAR GLARE 9.1 The ES has included an assessment of the effect of the Proposed Development on daylight, sunlight, overshadowing and solar glare for the construction and operation phases. 9.2 The effect of construction of the Proposed Development on daylight, sunlight and overshadowing is considered to be negligible. 9.3 The effect of the operational maximum parameter Proposed Development on residential amenity at the properties on Forest View is considered to range from major adverse to negligible. However, this effect is likely to be reduced when the massing and articulation of the buildings are considered at the detailed design stage. 9.4 The assessment has shown that the Completed Development will have a negligible effect on new and adjacent amenity areas in terms of overshadowing. In terms of solar glare, the technical analysis shows that for the majority of the year there would be negligible effect. However, the nature of the Proposed Development does mean that reflected solar glare would be unavoidable at certain times of the day assuming that there are clear skies at these times to allow the sun to reflect off the building façades. However, at worst this would be a highly localised minor adverse effect lasting only a short period of time. The effects from daytime solar glare are not considered to be detrimental to the safe movement around the roads and pavements surrounding the Proposed Development. 9.5 Due to the distance of the cumulative schemes from the Proposed Development, there will be no cumulative effects when considering the effects of daylight, sunlight, overshadowing and solar glare NOISE AND VIBRATION 10.1 The ES has included an assessment of the effect of the Proposed Development on noise and vibration for the construction and operation phases During the construction of Phases One and Two the implementation of suitable control measures through the CEMP the effects resulting from construction noise and vibration would be temporary and of minor to moderate adverse significance depending on the location of the Noise Sensitive Receptors (NSRs) in relation to the construction activities The Application Site is suitable for residential amenity provided measures including use of appropriate window glazing and ventilation are implemented. In addition should private 19314/A5/NTS February 2013

19 residential balconies orientated towards Harbour Parade form part of the Proposed Development, solid balustrades and recessed balconies would act to reduce noise levels thereby safeguarding the residential amenity for future residents The potential noise effects from the Proposed Development uses can be suitably controlled through the use of planning conditions which prescribe noise limits for fixed mechanical plant together with suitable operational controls. Further to this, noise effects can be mitigated through appropriate building design and suitable operational controls to safeguard the residential amenity for existing off site NSRs and future proposed on-site NSRs Due to the distance of the cumulative schemes from the Proposed Development and the implementation of appropriate mitigation measures such as those discussed above, there will be no cumulative effects when considering the effects of noise and vibration AIR QUALITY 11.1 The ES has included an assessment of the effect of the Proposed Development on air quality for the construction and operation phases. The Application Site is outside of any Air Quality Management Area During construction of Phase One and Two, following the implementation of appropriate environmental management controls through the CEMP, the likely residual temporary effects of construction-related dust would be minor adverse at the closest properties between 10m and 100m of the Application Site boundary and negligible at all other sensitive receptors. The temporary residual effects of emissions and dust from construction vehicles entering and leaving the Application Site would be minor adverse to moderate adverse During operation of Phase One and Two the likely residual effects at receptors surrounding the Application Site are predicted to result in negligible to minor adverse effects on local concentration of Nitrogen dioxide and particulate matter (PM 10 and PM 2.5 ) taking into account the operation of the potential Energy Centre In terms of cumulative effects, the combined construction traffic of all cumulative schemes may cause cumulative local air quality effects in the worse case scenario whereby the other development schemes are constructed at the same time as Phase One or Phase Two. In contrast there will be no significant cumulative operational effects associated with either Phases One or Two. 8 An Air Quality Management Area is a defined area by virtue of Section 82(3) of the Environment Act 1995, where it appears that the air quality objectives prescribed under the UK Air Quality Strategy will not be achieved. In these areas, a Local Authority must designate Air Quality Management Areas, within which an Action Plan can be proposed to secure improvements in air quality so that prescribed air quality objectives can be achieved /A5/NTS February 2013

20 12.0 WATER RESOURCES AND FLOOD RISK 12.1 The ES has included an assessment of the effect of the Proposed Development on water resources and flood risk for the construction and operation phases The Application Site is located between the River Test and the River Itchen which form a confluence to the southeast of the Application Site. The River Test is located approximately 450m south of the Application Site and the River Itchen approximately 1.3 km to the east; these combined rivers flow in a south easterly direction into the English Channel. A number of statutory designated nature conservation sites lie within 2km of the Application Site The geological deposits underlying the Application Site are classified as a minor aquifer, there are high groundwater levels on-site and groundwater flows to the southwest towards the River Test. The Proposed Development should have a negligible effect on localised groundwater flows and levels during both the construction and operational phases of the Proposed Development Appropriate mitigation measures will be employed during the construction phases of the Proposed Development, primarily through the implementation of the CEMP, to safeguard surrounding surface waters and groundwater from any adverse effects associated with construction activities. These measures will result in temporary negligible effects It is envisaged that the Proposed Development will discharge to Southern Water s existing drainage network and sewerage infrastructure. Should new foul and surface water drainage be required in order to accommodate the Proposed Development this will be undertaken in consultation with Southern Water. The drainage strategy envisages a reduction in surface water run-off from the Application Site due to the use of large landscaped areas for storage, in order to limit the discharge rate into the public sewer, which should have a beneficial effect in respect of surface water discharge to the sewer compared with the existing situation. These measures will result in long-term negligible effects 12.6 The Proposed Development will lie within areas at low flood risk (Flood Zone 1) with the exception of the far north-west corner which lies within an area at medium risk of flooding (Flood Zone 2). All Phase One land uses are assumed to have a 60-year lifespan so would not be at risk of tidal flooding throughout their lifetime. However, Phase Two, which includes residential development, is assumed to have 100-year lifespan so buildings in DZ3 and DZ4 would be at risk of tidal flooding towards the end of their lifetime (after 2070) based on current climate change predictions. As such, consideration should be given to 19314/A5/NTS February 2013

21 appropriate flood resilience and management measures for the Phase Two development area at detailed design stage. These measures will result in long-term negligible effects There are no foreseeable cumulative effects associated with the Application Site in relation to other development schemes in the area GROUND CONDITIONS 13.1 The ES has included an assessment of the effect of the Proposed Development on ground conditions for the construction and operation phases. The potential for ground contamination to be present at the Application Site has been identified as part of the assessment. Any such contamination could be localised or widespread Subject to the implementation of the recommended mitigation measures including site investigations and remediation prior to construction, the residual effects of the Proposed Development should largely be negligible, with one minor adverse effect identified in relation to ground contamination during construction of the Proposed Development The Application Site is considered suitable for the Proposed Development. It is anticipated that on completion of the Proposed Development the National Planning Policy Framework requirement that the Application Site would no longer be able to be captured under the Environment Act Part IIA regime 9, will be met Given that ground conditions are specific and local to the Application Site, the Proposed Development would not give rise to adverse effects that would interact with any of the agreed cumulative schemes, either during the Proposed Development s construction or following its completion. Therefore, it is considered that the Proposed Development would not give rise to any significant cumulative effects WIND MICROCLIMATE 14.1 The ES has included an assessment of the effect of the Proposed Development on wind microclimate for the construction and operation phases Current wind conditions for the existing open Application Site are expected to be suitable for leisure walking on both the upper pedestrian level on the east side of the Application Site 9 Specific UK legislation on contaminated land is principally contained within Part IIA of the Environmental Protection Act (EPA) The legislation endorses the principle of a suitable for use approach to contaminated land, where remedial action is only required if there are unacceptable risks to human health or the environment, taking into account the use of the land and its environmental setting /A5/NTS February 2013

22 (above the Town Wall) and the lower pedestrian level on the west end of the Application Site. The meteorological data indicates that prevailing winds are from the south-west with a secondary peak from the north-east It is considered there will be negligible effects on the wind microclimate during the construction of Phase One and Phase Two of the Proposed Development The assessment has shown that the windier parts of the Completed Development are expected: at the west facing building corners; along the thoroughfare between Phase One and Two; and Between Phase Two and QSDC The wind microclimate at the majority of entrances to the Proposed Development is suitable for the intended use. Therefore the effects would be negligible significance during operation As there are no cumulative developments within a 500m radius of the Application Site there are considered to be no cumulative effects during the construction or operation of the Proposed Development ARCHAEOLOGY 15.1 The ES has included an assessment of the effect of the Proposed Development on archaeology for the construction and operation phases The main part of the Application Site lies west of the medieval walled town on land reclaimed from the River Test foreshore in the twentieth century. However, in early prehistory the river level was much lower than it is today. Evidence for Palaeolithic and Mesolithic activity (pre c BC) in bands of peat within the alluvial deposits below modern levelling has been found in the foreshore zone. It is also possible that the remains of ancient vessels abandoned on the foreshore in almost any period of the past may survive near to or on the surface of the alluvium The principal effect of the Proposed Development on archaeological remains west of the walled town will be as a result of piling within the footprint of DZ4 within Phase Two. Mitigation will take place in accordance with the provisions of government policy as set out in the National Planning Policy Framework, regional and local planning policies. In advance of 19314/A5/NTS February 2013

23 construction, mitigation will include an archaeological evaluation to a specification agreed with the Planning Archaeologist at SCC. Should any significant remains be found, a further programme of appropriate mitigation will be put in place to allow recording and recovery. The effects will be permanent negligible significance Localised groundworks on the part of the Application Site within the town walls is likely to have some effect on archaeological remains, largely of the medieval period, which were identified in a 2009 site evaluation. The effects will be of permanent negligible significance It is expected that archaeological investigation will take place at all the cumulative schemes in order to mitigate the potential effects of development such that the archaeological resource will be preserved by record. It is considered that there will be negligible cumulative effects on archaeological remains from development of the Proposed Development and the cumulative schemes BUILT HERITAGE 16.1 The ES has included an assessment of the effect of the Proposed Development on built heritage for the construction and operation phases Following the adoption of the CEMP during the construction phases which details appropriate piling and remediation techniques, imposition of protective zone, and use of site hoardings during demolition and construction works, residual effects on the setting of Scheduled Monuments and listed buildings within the study area will be minor adverse to negligible. The minor effects will be experienced by the Town Walls and the associated designated structures, and the settings of the Old Town West Conservation Area and Old Town North Conservation Area The mitigation measures inherent within the Design Principles of the Proposed Development will minimise the adverse effects on the sensitive Town Walls and adjacent Conservation Areas, via design, materials, building placement, and the creation of visual permeability. Connectivity between the Proposed Development and the Town Walls and the Old Town Conservation Areas will be strengthened through defining and reinforcing important view corridors to historic assets including the Town Walls In addition, the increased activity along Western Esplanade will encourage greater visitor numbers to appreciate the resource. The new pedestrian routes and the creation of views within and through the Completed Development, along with the improvements to pedestrian access and linkages and resulting increase in activity, will represent a minor beneficial effect, 19314/A5/NTS February 2013

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2

More information

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

Barvills Solar Farm Environmental Statement Non-Technical Summary

Barvills Solar Farm Environmental Statement Non-Technical Summary Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development

More information

17A. Wind Microclimate

17A. Wind Microclimate 17A. Wind Microclimate 17A.1 Introduction 17A.1.1 17A.1.2 17A.1.3 17A.1.4 This Chapter, which has been prepared by Waterman and BMT, provides further information with regard to the potential wind microclimate

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

Meridian Water Phase 1 Application

Meridian Water Phase 1 Application Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed

More information

The Place Solar Farm

The Place Solar Farm The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1

More information

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Land Securities plc is applying to Maidstone Borough Council

More information

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Greenbank Partnerships Ltd October 2012 Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Environmental Statement - Non Technical

More information

London Road, Derker. Non Technical Summary. Introduction

London Road, Derker. Non Technical Summary. Introduction London Road, Derker Non Technical Summary Introduction The Oldham Rochdale Housing Market Pathfinder was set up to tackle longstanding problems of poor quality housing and to provide the framework for

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

NON - TECHNICAL SUMMARY

NON - TECHNICAL SUMMARY WATERMAN ENERGY, ENVIRONMENT & DESIGN LTD 60 ludgate hill / 30 old bailey environmental STATEMENT NON - TECHNICAL SUMMARY REV. 01 january 2011 Non-Technical Summary 60 Ludgate Hill / 30 Old Bailey 1. Introduction

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 in association with 1. Introduction Peel Holdings is applying to Nottingham City Council (NCC) for Outline planning

More information

Land to the rear of the Police Station, High Street, Heathfield

Land to the rear of the Police Station, High Street, Heathfield Land to the rear of the Police Station, High Street, Heathfield Environmental Statement March 2013 Land to the rear of the Police Station, High Street, Heathfield Environmental Statement Non-Technical

More information

Sustainability Statement. Whitby Business Park Area Action Plan

Sustainability Statement. Whitby Business Park Area Action Plan Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan

More information

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433 LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY March 2017 Our Ref: Q70433 Contents 1 INTRODUCTION AND SITE DESCRIPTION... 1 2 EIA METHODOLOGY... 5 3 ALTERNATIVES... 6 4 DESCRIPTION

More information

South Whitehaven, Cumbria EIA

South Whitehaven, Cumbria EIA South Whitehaven, Cumbria EIA Environmental Statement - Non Technical Summary June 2013 in association with 1. Introduction Story Homes is applying to Copeland Borough Council (CBC) for a new residential

More information

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

185 Park Street ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

185 Park Street ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction DV4 Properties Park Street Co. Ltd (hereafter referred to as the Applicant ) is seeking to obtain full planning permission for the redevelopment of 185 Park Street, situated on land bounded

More information

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd Drakelow Park ES 5 Environmental Statement Volume 5: Non Technical Summary Lead Author Waterman Energy, Environment and Design Ltd April 2009 Environmental Statement Volume 5: Non-Technical Summary DRAKELOW

More information

Land at Hunters Moon, Chippenham. Environmental Statement Non-Technical Summary

Land at Hunters Moon, Chippenham. Environmental Statement Non-Technical Summary Environmental Statement Non-Technical Summary Issue/Revision Draft Final Date January 2013 April 2013 Prepared by Project Team Project Team Checked by Marian Cameron Andrew Malcomson Andrew Malcomson Project

More information

Former North Works, Lickey Road, Longbridge, Birmingham

Former North Works, Lickey Road, Longbridge, Birmingham Committee Date: 14/11/2013 Application Number: 2013/06431/PA Accepted: 27/08/2013 Application Type: Full Planning Target Date: 26/11/2013 Ward: Longbridge Former North Works, Lickey Road, Longbridge, Birmingham

More information

Armourers Court, Woolwich

Armourers Court, Woolwich Armourers Court, Woolwich Environmental Statement, Non-Technical Summary December 2013 DESIGN PACKAGE C158 WOOLWICH STATION East End Over Site Development (Armourers Court, Arsenal Way, Woolwich) Environmental

More information

1 INTRODUCTION 1.1 INTRODUCTION

1 INTRODUCTION 1.1 INTRODUCTION 1 INTRODUCTION 1.1 INTRODUCTION RREEF (UK) Ltd in partnership with Sheffield City Council (SCC) is applying for planning permission for the construction of: a new indoor city centre market hall and indoor

More information

I615. Westgate Precinct

I615. Westgate Precinct I615. Westgate Precinct I615.1. Precinct Description The Westgate Precinct is located approximately 18km west of the Auckland city centre. There are seven Sub-precincts in the Westgate Precinct: Sub-precinct

More information

intu Bromley Planning Summary Bringing more to Bromley February 2014

intu Bromley Planning Summary Bringing more to Bromley February 2014 intu Bromley Planning Summary February 2014 Bringing more to Bromley Contents Introduction 1 Description of the Proposals 2 Economic Benefits 4 Planning Policy 6 Cinema and Catering Assessment 7 Design

More information

The Haymarket 189 Morrison Street, Edinburgh. Environmental Statement. Volume 1 Non Technical Summary

The Haymarket 189 Morrison Street, Edinburgh. Environmental Statement. Volume 1 Non Technical Summary The Haymarket 189 Morrison Street, Edinburgh Environmental Statement Volume 1 Non Technical Summary 16 August 2010 Tiger Haymarket Limited Partnership Non Technical Summary Contents 1 Introduction 1 2

More information

Land North of Hall Road, Rochford. Rochford District Council. Planning Application Index. Prepared on behalf of Bellway Homes Ltd

Land North of Hall Road, Rochford. Rochford District Council. Planning Application Index. Prepared on behalf of Bellway Homes Ltd Land North of Hall Road, Rochford Rochford District Council Planning Application Index Prepared on behalf of Bellway Homes Ltd April 2010 Land North of Hall Road, Rochford Rochford District Council Scope

More information

Date: TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2011: REGULATION 13 SCOPING OPINION

Date: TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2011: REGULATION 13 SCOPING OPINION PLANNING & BUILDING CONTROL Tracy Harvey Head of Planning & Building Control Rob Wells Savills Innovation Court 121 Edmund Street Birmingham B3 2HJ Our Ref: 5/16/3441 E-mail: Date: planning@stalbans.gov.uk

More information

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08 DESIGN MANUAL FOR ROADS AND BRIDGES volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08 glossary of terms Used in DMRB Volume 11, Sections 1 and 2 SUMMARY This

More information

Former RAF Sealand Site EIA

Former RAF Sealand Site EIA Praxis (Holdings) Ltd. Former RAF Sealand Site EIA Environmental Statement - Non Technical Summary February 2012 in association with P a g e 1 1. Introduction Praxis (Holdings) Ltd. is applying to Flintshire

More information

Proposed World-Class Hotel at Former Royal High School, Regent Road, Edinburgh

Proposed World-Class Hotel at Former Royal High School, Regent Road, Edinburgh Duddingston House Properties and Urbanist Hotels Proposed World-Class Hotel at Former Royal High School, Regent Road, Edinburgh Environmental Statement Non-Technical Summary 3rd September 2015 www.oldroyalhighschool.com

More information

NON-TECHNICAL SUMMARY. October 2017 CLARENDON GAS WORKS WOOD GREEN

NON-TECHNICAL SUMMARY. October 2017 CLARENDON GAS WORKS WOOD GREEN NON-TECHNICAL SUMMARY October 2017 CLARENDON GAS WORKS WOOD GREEN CLARENDON GAS WORKS, HARINGEY ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY October 2017 Our Ref: Q70251 Contents 1 INTRODUCTION... 2 2

More information

Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD

Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD 1.0 Introduction: The relocation of the City Council stores and depot from Bolton Street creates an exciting opportunity for development

More information

SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN

SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN DD/MM/YY Proposed C120 SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY Shown on the planning scheme map as DDO12. GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN 1.0 Design objectives DD/MM/YY Proposed

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS

10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS SCHEME EVOLUTION STARBUCKS The proposed Starbucks Drive Thru alongside the proposed food store provides an appropriate mix of uses, suitable for this location. The proposed store is bespoke, designed specifically

More information

I539. Smales 2 Precinct

I539. Smales 2 Precinct I539. Smales 2 Precinct I539.1. Precinct Description The Smales 2 Precinct applies to a 4.8 hectare block of land located on the southern side of Northcote Road and fronting Lake Pupuke, Takapuna. The

More information

Land to the North of Main Road, Wybunbury

Land to the North of Main Road, Wybunbury Land to the North of Main Road, Wybunbury Environmental Statement Non-Technical Summary November 2014 Land to the North of Main Road, Wybunbury Environmental Statement Non-Technical Summary Prepared on

More information

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP LAND AT WEST YELLAND Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP May 2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft FINAL Date

More information

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts Chapter 4 Route Window C12: Mile End Park and Eleanor Street Shafts 48 Crossrail Amendment of Provisions 4 Route Window C12: Mile End Park and Eleanor Street Shafts Location plan of Mile End Park and Eleanor

More information

Moat Lane Regeneration Project Environmental Statement

Moat Lane Regeneration Project Environmental Statement AECOM Environment Towcester Regeneration Ltd. October 2012 Moat Lane Regeneration Project Environmental Statement Non-Technical Summary Prepared by:... Checked by:... Sophie Collins Scott Wilson Environmental

More information

1. Introduction. Site Boundary

1. Introduction. Site Boundary 1. Introduction Workspace Group Plc (hereafter referred to as the Applicant ) is seeking to obtain full planning permission for the redevelopment of (hereafter referred to as the Site ), situated to the

More information

13. London Bridge London Bridge Area Vision

13. London Bridge London Bridge Area Vision 13. 13.1. Area Vision 13.1.1. is: A globally significant central London business district which is home to international business headquarters; Internationally renowned for its prominent riverfront location

More information

5. Bankside and The Borough 5.1. Bankside and The Borough Area Vision

5. Bankside and The Borough 5.1. Bankside and The Borough Area Vision 5. 5.1. Area Vision 5.1.1. are: A globally significant central London business district which is home to international business headquarters; At the heart of the commercial and cultural life of the capital

More information

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion Mr Graham Clark Berrys Newchurch Farm Kinnersley Hereford HR3 6QQ BY EMAIL The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion SC/2017/0001

More information

AOTEA SUPERMARKET ZONE. Zone Introduction

AOTEA SUPERMARKET ZONE. Zone Introduction C18 AOTEA SUPERMARKET ZONE Zone Introduction C18.1 Objective This zone identifies a specific area in Aotea for a stand alone supermarket. The zone is site specific and has a range of objectives, policies

More information

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2 11.1 OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11.2 POLICIES RELEVANT TO ALL WORKSITES IN ISLINGTON... 3 11.3 FARRINGDON

More information

2. The application, which is a full plans application, is for a commercial development comprising B1, D1, D2 and A3 uses.

2. The application, which is a full plans application, is for a commercial development comprising B1, D1, D2 and A3 uses. Former Taff Vale Shopping Centre, Taff Street, Pontypridd, CF37 4TR PLANNING APPLICATION SUPPORTING STATEMENT May 2017 Ref.11431/1 INTRODUCTION AND APPLICATION CONTEXT 1. This planning application statement

More information

Ʊ ± ªº Œª ºª ø ª ª ± ª

Ʊ ± ªº Œª ºª ø ª ª ± ª Ʊ ± ªº Œª ºª ø ª ª ± ª ø º Õ± ± ± Œ±øºÙ Õ ß Æª ø檺 ±Æ ƪ ø檺 æß Æ± Ʊ ª ø ø fl ª ª ± ê ø Õ øæß ª ª æªæ Ó ÔÌ Non-Technical Summary Introduction A planning application has been submitted to the Vale

More information

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June

More information

Peckham Peckham Area Vision Map

Peckham Peckham Area Vision Map Area Vision Map PNAAP13 PNAAP8 Sumner Road Surrey Canal Walk Bird in Bush Park Key: NSP Site Allocations PNAAP Allocations Greenspace Low Line Cycle Network Primary Shopping Areas Square Surrey Canal Walk

More information

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433 LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2017 Our Ref: Q70433 Contents 1 INTRODUCTION... 2 2 SITE DESCRIPTION... 5 3 EIA METHODOLOGY...

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD Land at Environmental Statement: Non-Technical Summary Introduction Brook Street Properties is applying to Cornwall Council for outline planning permission

More information

BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY

BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY November 2014 Introduction 1.1 St George Central London (the Applicant ) is seeking to obtain planning

More information

16. Peckham Peckham Area Vision

16. Peckham Peckham Area Vision 16. 16.1. Area Vision 16.1.1. is: A lively town centre providing a range of daytime and night time activities on Rye Lane including a Library, a Leisure Centre and many independent retailers which specialise

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.

More information

3.1 The hybrid planning application proposes the following description of development:

3.1 The hybrid planning application proposes the following description of development: CHAPTER 3: PROPOSED DEVELOPMENT 3.1 The hybrid planning application proposes the following description of development: Hybrid (part-outline/part-full) planning application for a single composite development

More information

Crossharbour District Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

Crossharbour District Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction ASDA Stores Limited and Ashbourne Beech Property Limited (hereafter referred to as the Applicants ) are seeking to obtain planning permission for the redevelopment of the existing supermarket

More information

Longbridge East : Site Wide and Phase One Development

Longbridge East : Site Wide and Phase One Development Longbridge East : Site Wide and Phase One Development Non-Technical Summary of the August 2011 Introduction St Modwen Developments Ltd intend to submit a new outline planning application for Longbridge

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

CA//16/00504/FUL. Canterbury City Council Military Road Canterbury Kent CT1 1YW. Crown copyright and database rights 2016 Ordnance Survey

CA//16/00504/FUL. Canterbury City Council Military Road Canterbury Kent CT1 1YW. Crown copyright and database rights 2016 Ordnance Survey O Scale 1:1,250 Map Dated: 09/05/2016 CA//16/00504/FUL Crown copyright and database rights 2016 Ordnance Survey 100019614 Canterbury City Council Military Road Canterbury Kent CT1 1YW AGENDA ITEM NO 13

More information

Environmental Statement (Volume 1) Non Technical Summary

Environmental Statement (Volume 1) Non Technical Summary Environmental Statement (Volume 1) Non Technical Summary Prepared by: The Environment Partnership Haydock Point Environmental Statement (Volume 1): Non-Technical Summary March 2017 Contents 1. Introduction

More information

Principal Place ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

Principal Place ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction RT Group Property Investments Limited (the Applicant ) is seeking detailed planning permission for the redevelopment of 1.28 hectares of land off Norton Folgate to the north of Liverpool

More information

EVALUATION OF MASTER PLAN ALTERNATIVES

EVALUATION OF MASTER PLAN ALTERNATIVES 7 The Environmental Report is required to identify, describe and evaluate reasonable alternatives, taking into account the objectives and geographical scope of the Master Plan 2008. Three plan alternatives

More information

Manchester Town Hall Complex Transformation Programme

Manchester Town Hall Complex Transformation Programme Manchester Town Hall Complex Transformation Programme St Peter s Square Public Realm Scheme 49307969 Environmental Statement NON-TECHNICAL SUMMARY November 2012 Prepared for: Manchester City Council Rev

More information

17A. Wind Microclimate

17A. Wind Microclimate 17A. Wind Microclimate 17A.1 Introduction 17A.1.1 17A.1.2 This Chapter has been prepared by BMT and provides further information with regard to the potential wind microclimate impacts arising from the

More information

Welcome to our public exhibition

Welcome to our public exhibition About our development Welcome to our public exhibition This public exhibition gives you the opportunity to view and comment on our proposals to create a new residential development on land adjacent to

More information

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 Dear Resident This Special Edition of the Whiteley Voice which has been prepared in conjunction with the North Whiteley Consortium is to

More information

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal Option SWH1 Balanced Communities Option SWH1 1 To ensure the delivery of high quality sustainable communities where people want to live and work Will it ensure the phasing of infrastructure, including

More information

10. East Dulwich East Dulwich Area Vision

10. East Dulwich East Dulwich Area Vision 10. 10.1. Area Vision 10.1.1. is: A predominantly residential area characterised by mostly medium density housing, including many family homes. Many parts of have retained historic character and it includes

More information

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17 Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS A New Garden Neighbourhood Matford Barton 17 2.1. SUMMARY AND STATUS OF THE PROPOSALS 2.1.1. The parameter plans and associated wording in this chapter

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

Marshgate Business Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

Marshgate Business Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction Workspace 14 Limited (hereafter referred to as the Applicant ) has applied for full planning permission for the redevelopment of and 14 Marshgate Lane, situated on land bound by Marshgate

More information

PANSHANGER QUARRY, Hertfordshire

PANSHANGER QUARRY, Hertfordshire PANSHANGER QUARRY, Hertfordshire Proposed enhanced restoration of Phases F & H Briefing Note 1 March 2015 INERT (INACTIVE) RESTORATION MATERIALS, CONTROLS AND OPERATIONS 1 Introduction This briefing note

More information

Rotherhithe Rotherhithe Area Vision Map

Rotherhithe Rotherhithe Area Vision Map Area Vision Map CWAAP1 Improved pedestrian and cycle links to the wider area Improved link from town centre to River Thames and docks CWAAP2 Brunel Museum NSP79 CWAAP3 Proposed Thames Crossing Station

More information

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY SITE LOCATION The site of the existing AECC lies in an area of predominately residential and business use in Bridge of Don and extends approximately 50 acres.

More information

Kilnw Envir ood Vale onmental Statement Volume 3: Non Technical Summary July 2010

Kilnw Envir ood Vale onmental Statement Volume 3: Non Technical Summary July 2010 Kilnwood Vale Environmental Statement Volume 3: Non Technical Summary July 2010 Kilnwood Vale Environmental Impact Assessment Environmental Statement Volume 3 KILNWOOD VALE ENVIRONMENTAL STATEMENT NON-TECHNICAL

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. REPORT TO: Planning Committee 1 April 2015 Planning and New Communities Director SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 1 April 2015 AUTHOR/S: Planning and New Communities Director Application Number: Parish(es): Proposal: Site address: Applicant(s): Recommendation:

More information

London Borough of Lambeth. Lambeth Depots. Environmental Impact Assessment Environmental Statement: Non-Technical Summary.

London Borough of Lambeth. Lambeth Depots. Environmental Impact Assessment Environmental Statement: Non-Technical Summary. London Borough of Lambeth Lambeth Depots Environmental Impact Assessment Environmental Statement: Non-Technical Summary April 2009 This Non-Technical Summary (NTS) sets out the findings of an Environmental

More information

NORTH KENSINGTON GATE SOUTH ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. September 2016 Our Ref: Q60157

NORTH KENSINGTON GATE SOUTH ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. September 2016 Our Ref: Q60157 NORTH KENSINGTON GATE SOUTH ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY September 2016 Our Ref: Q60157 Contents 1 INTRODUCTION... 2 2 EIA METHODOLOGY... 5 3 SITE DESCRIPTION AND SETTING... 6 4 ALTERNATIVES...

More information

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017 Strategic Environmental Assessment Screening Report Dublin Port Masterplan Review 2017 Table of Contents 1 Introduction... 1 2 Purpose of the Masterplan... 2 3 Task 1.1 Pre-Screening Check... 5 4 Task

More information

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to Introduction WCC have indicated that in advance of the surveys and assessments being undertaken consultation should be undertaken with technical officers of both Warwickshire CC and Nuneaton and Bedworth

More information

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015 Wyvern Park Skipton Environmental Statement Non-technical Summary - April 2015 BWB Consulting Ltd Whitehall Waterfront 2 Riverside Way Leeds LS1 4EH Telephone: +44(0)113 233 8000 Copyright This Report

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY NON-TECHNICAL SUMMARY THE HIDE, BISHOP AUCKLAND PROPOSED ECO CHALET DEVELOPMENT NON-TECHNICAL SUMMARY 1 Introduction 1.1.1 This non-technical summary for the (ES) prepared in relation to the proposed eco-chalet

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities)

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities) SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 12 January 2011 AUTHOR/S: Executive Director (Operational Services) Corporate Manager (Planning and New Communities) Notes: S/1848/10

More information

Vision for East Cowes

Vision for East Cowes Vision for East Cowes A better East Cowes for now and the future The East Cowes Regeneration project is a major regeneration scheme on the Isle of Wight. It will create a vibrant community with a long-term

More information

The Proposed Auckland Unitary Plan (notified 30 September 2013)

The Proposed Auckland Unitary Plan (notified 30 September 2013) 3 Business zones Introduction There are 10 business zones in the Unitary Plan: City Centre Metropolitan Centre Town Centre Local Centre Neighbourhood Centre Mixed Use General Business Business Park Light

More information

Site Location Plan. Land on the North West of Epsom Road Waddon Croydon. 1 : A4 September The. Waddon. Waddon.

Site Location Plan. Land on the North West of Epsom Road Waddon Croydon. 1 : A4 September The. Waddon. Waddon. 138 140 44.3m MP 11.5 El Sub Sta EPSOM ROAD 13 Bank 1 to 5 154 Trough 19to21 1 to 5 156 The Waddon (PH) 23 FB Waddon Station 45.0m Posts 29to31 1 to 9 Stafford Court 39 37 Meridian Court 10 43 to 45 1

More information

here today Public exhibition

here today Public exhibition Public exhibition here today Find out more about Central England Co-operative and Hawkstone Vale Developments Ltd s redevelopment proposal to bring new retail and community facilities to Wilnecote. The

More information

Appendix 1 Structure plan guidelines

Appendix 1 Structure plan guidelines Appendix 1 Structure plan guidelines This appendix forms part of the regional policy statement [rps]. 1.1. Introduction Structure plans are an important method for establishing the pattern of land use

More information

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DECEMBER 2014 CRANBROOK EXPANSION AREAS ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY Submitted in support of Outline Planning

More information

Land at Weymouth Gateway Proposed hotel and pub / restaurant Non-technical summary. Premier Inns Ltd February 2011

Land at Weymouth Gateway Proposed hotel and pub / restaurant Non-technical summary. Premier Inns Ltd February 2011 February 2011 Introduction NTS.1 In April 2007, New Look Retailers Ltd submitted an outline planning application to Weymouth and Portland Borough Council to redevelop the Mount Pleasant Business Park

More information

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high

More information

North Somerset Council Local Development Framework

North Somerset Council Local Development Framework North Somerset Council Local Development Framework Sites and Policies Development Plan Document Evidence Paper Re-opening Portishead Railway Line and Options for the Location of Portishead Railway Station

More information

6 PORT SYDNEY SETTLEMENT AREA

6 PORT SYDNEY SETTLEMENT AREA Section 6 Port Sydney Page 61 6 PORT SYDNEY SETTLEMENT AREA 6.1 Basis and Principles Village of Port Sydney Waterfront Community Existing Services 6.1.1 Port Sydney is an historic settlement that has developed

More information

2.0 Strategic Context 4

2.0 Strategic Context 4 2.0 Strategic Context 4 2.1 The Area Action Plan is a non-statutory plan, which forms a corporate policy document, expressing particular issues and areas of concern while also providing a vision for the

More information