1 NORTH KENSINGTON GATE SOUTH ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY September 2016 Our Ref: Q60157

2 Contents 1 INTRODUCTION EIA METHODOLOGY SITE DESCRIPTION AND SETTING ALTERNATIVES DESCRIPTION OF THE DEVELOPMENT TRANSPORT NOISE AND VIBRATION AIR QUALITY LAND QUALITY WATER RESOURCES AND FLOOD RISK ARCHAEOLOGY ECOLOGY WIND SOCIO-ECONOMICS HERITAGE, TOWNSCAPE AND VISUAL EFFECTS CUMULATIVE EFFECTS SUMMARY OF MITIGATION MEASURES & RESIDUAL EFFECTS REFERENCES ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 1

3 1 INTRODUCTION This Non-Technical Summary (NTS) presents a summary of the findings of an Environmental Impact Assessment (EIA) that has been undertaken on behalf of Aurora Developments Ltd. (the Applicant ) to accompany a detailed planning application for redevelopment of North Kensington Gate South ( the Site ), otherwise known as A Scrubs Lane, London, NW10. The Site is located within the boundary of the Old Oak and Park Royal Development Corporation (OPDC) who are the local planning authority, as shown in Figure 1. Figure 1: Site Location N The redevelopment proposals include demolition of the existing buildings and erection of one tall building, with a tower component reaching a maximum height of 22 storeys, alongside an eight-storey and sixstorey block and providing up to 20,329 square metres (m 2 ) Gross External Area (GEA) of residential-led floorspace (the Development ), 33 car parking spaces, cycle parking, amenity space and landscaping. Figure 2 shows a view of the Development from Mitre Bridge to the south of the Site. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 2

4 Figure 2: A view of the Development from Mitre Bridge (to the South of the Site) The full EIA report, known as an Environmental Statement (ES) assesses the effects of the proposed Development and accompanies a detailed planning application submitted to the Old Oak and Park Royal Development Corporation (OPDC). The ES has been prepared in line with the legal requirements of the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended) 1,2. The purpose of the ES is to inform decision making by presenting the likely significant effects that the Development may have on the environment and how they will be avoided or reduced. The EIA has been informed by the production of a number of technical studies which accompany the ES and the planning application. The survey work and studies undertaken have been carried out by a ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 3

5 professional team led by Quod. The ES comprises three volumes, in addition to this Non-Technical Summary: Volume 1: Main document provides the full text of the ES along with figures. Volume 2: Heritage, Townscape and Visual Impact Assessment (including a Heritage Statement). Volume 3: Appendices contains technical surveys, reports and supporting documents to Volume 1. The ES and all supporting material can be viewed in entirety at the offices of OPDC. Electronic copies of the planning application and ES are available view on the Council s website. Copies of the ES can also be purchased from Quod. Please reception@quod.com for further details or contact ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 4

6 2 EIA METHODOLOGY The purpose of the EIA is to identify how people and the environment could be affected by the Development and to provide measures (often referred to as mitigation ) that would avoid, minimise or offset any negative effects. An EIA Scoping Study was undertaken to establish the scope of the EIA and identify the issues which needed detailed consideration in the ES. This study proposed that the following topics were scoped out of the EIA: Daylight, Sunlight and Overshadowing; Solar Glare; and Waste. An EIA Scoping Report (see Appendix 3.1 of ES Volume 3), which set out the proposed scope and content of the ES, was provided to OPDC on 15 th March 2016 together with a request for a scoping opinion on the issues to be covered in the EIA process. A scoping opinion was received on the 26 th April 2016 which provided the OPDC s comments on the proposed approach. This is provided in Appendix 3.2 of ES Volume 3 along with the project team s responses. Further consultation has occurred with other statutory consults since then, mostly in respect of clarifications on design changes and confirmation of assessment methodologies, and the key correspondence is provided in Appendix 3.3 of Volume 3. The ES considers the likely effect of the Development on its neighbours, local environment, local and regional economy, as well as the wider area. The environmental effects of the Development are predicted in relation to sensitive receptors, including human beings, built resources and natural resources. The sensitive receptors considered in the ES include local residents and businesses, the adjacent Grand Union Canal, nearby built heritage assets, road users, wildlife, construction workers and future occupiers of the Site. Each topic assessment attaches a level of significance to the identified effects, i.e. either major, moderate, minor or negligible. Short and long-term (temporary and permanent), direct and indirect effects have been assessed. The following terminology has been used to express the nature of the effect: adverse, negligible or beneficial. Residual effects are defined as those that remain after mitigation measures have been implemented. The significance of these has been identified using best practice and published standards. Where no suitable guidance exists, professional judgment has been applied by the technical specialists. The EIA Regulations require that cumulative effects are also considered in the ES. A full description of the cumulative effects of the Development is provided in Section 16 of this NTS. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 5

7 3 SITE DESCRIPTION AND SETTING The Site is located in north-west London, to the east of Scrubs Lane (see Figure 3). The Site s planning application boundary covers an area of 0.38 hectares (ha). Figure 3: Site Boundary and Context N Waste Management Site St. Mary s Cemetery Cargiant Waste Management Site Tyre Depot The existing Site comprises eight storage / industrial units, five of which front onto Scrubs Lane within a single building and three of which are located at the rear of the Site, adjacent to the cemetery. These are all two-storey buildings, primarily used for light industrial activities, such as car repair and maintenance on the ground floor with storage and office use above. Access and egress for the Site occurs at various points along the Scrubs Lane frontage. Figure 4 shows a view of the existing Site from the north west. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 6

8 Figure 4: View of the Existing Site from the North West Table 1 provides a summary of the land uses in the vicinity of the Site. Table 1: Land Uses in Proximity to Site Location Adjacent/Bordering Site Within 100m of Site Boundary Greater than 100m from Site boundary North Commercial premises Commercial premises West Coast main line London Overground and Underground railway lines Residential estates East St. Mary s Cemetery Canadian War Memorial St. Mary s Cemetery Kensal Green Cemetery Residential estates South A commercial tyre outlet (UK Tyre Exporter Ltd.) Grand Union Canal (Paddington Branch) Distribution and storage depots Wormwood Scrubs ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 7

9 West Scrubs Lane Waste management sites (Capital Waste Services Ltd. located at 104 Scrubs Lane and O Donovan (Waste Disposal) Ltd. located at 108 Scrubs Lane) Great Western main line and West London Line railways London and North Western railway line Cargiant depot (proposed for residential-led redevelopment and included within the cumulative assessment of effects (see Section 16 of this NTS)) As shown in Figure 5, the Site is not subject to any heritage designations. The Site abuts the St. Mary s Conservation Area with the Grand Union Canal Conservation Area also located in close proximity to the south of the Site. Figure 5: Heritage Assets and Conservation Areas N In addition to the proposed Development, a residential-led development is proposed to the north of the Site at 93-97A to Scrubs Lane, referred to as North Kensington Gate North. These proposals have been developed by the same architectural practice as the Development and have been designed to complement each other, but are being submitted by a different Applicant (Delta Holdings Ltd). The ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 8

10 proposals for North Kensington Gate North and the Development are not linked by any financial, design or planning mechanism and can both be delivered entirely independently from each other. For this reason, the proposals for North Kensington Gate North are not considered to form part of the North Kensington Gate South EIA Development and an EIA Screening Opinion was obtained from OPDC on this basis (Ref: 16/0016/SCROPDC). The North Kensington Gate North scheme has been included within the cumulative assessment of effects, as described further in Section 12 of this NTS. It is proposed that the Old Oak and Park Royal Opportunity Areas will deliver a minimum of 25,500 new homes and 65,000 jobs to make a major contribution to London s growth. New infrastructure is proposed to support this growth, with a new High Speed 2 (HS2) and Crossrail interchange and London Overground railway stations due to be constructed in the area. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 9

11 4 ALTERNATIVES No alternative sites have been considered by the Applicant for the Development since the Site is allocated for housing delivery between 2017 and 2021 within the OPDC Draft Local Plan. If the Site were not developed and it were to remain in its current use, the delivery of 170 new homes, including affordable housing, and new commercial space would not be realised which would be contrary to planning policy. There would also be a loss of opportunity to improve the visual setting of the Site and address potential ground contamination issues. The proposed Development layout has remained relatively unchanged through the design evolution, with the main building being located in the centre of the Site and the tower component remaining at the southern end of the Site. This layout provides an entrance point to the Old Oak Area and is designed to enhance the southern entry point onto Scrubs Lane. Landscaping is proposed along the eastern boundary of the Site to provide a buffer to the adjacent St Mary s Conservation Area and Canadian War Memorial. Key constraints for the Site include: Townscape, visual and heritage issues due to the nearby conservation areas and heritage assets (and associated views); Noise and vibration conditions associated with local traffic, industrial uses and nearby railway lines; and An existing easement (right to access the Site) at the northern boundary of the Site. The Grand Union Canal to the south and adjacent St. Mary s Catholic Cemetery offer connections for pedestrians and cycle routes east to central London. In the opposite direction Hythe Road offers pedestrian and cycling routes to Willesden Junction and the proposed Old Oak Interchange and New Hythe Road Station. The Development also offers the opportunity to improve the amenity and public realm of Scrubs Lane and the setting of adjacent cemetery and Canadian War Memorial. The Site runs north-south and sits at a natural high point creating the opportunity for panoramic views and morning to evening sunlight. The Interactive Map for OPDC 3 shows the indicative masterplan and massing for future development along Scrubs Lane. On the Site, it shows a tall building of circa 50 metres (m) announcing the new development at Mitre Bridge with lower buildings at 8-10 stories. Further north, blocks are shown stepping down to create a 4-5 storeys lining to the street opposite the proposed conservation area. The ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 10

12 initial scheme for the Development used the OPDC aspiration massing as a starting point from which the design evolved. Evolution of the design has primarily centred around the heights and massing of the building to accord with the setting of the nearby heritage assets and sensitive views from the local area. Initial design proposals incorporated 290 new residential units in a two tower building reaching a maximum height of 28 storeys. Figure 6 shows the initial design with a two tower building (August 2015). Through a number of stages of consultation with OPDC, Old Oak Common and Park Royal Place Review Group (OPRG) and other statutory bodies, the height and massing of the building was reduced to one building with a 22-storey tower component providing 170 new residential units. Figure 7 and Figure 8 shows the design evolution of the massing of the Development. Figure 6: Initial design incorporating a two tower building (August 2015) ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 11

13 Figure 7: December 2015 Scheme Figure 8: May 2016 Scheme The architectural character of the Development is influenced by the character and materials of the neighbouring cemeteries and local heritage assets. The materials used within the Development are intended to weave together references from the adjacent cemeteries and industrial buildings. Over the course of design development, the frame of the building became more pronounced in order to create a stronger relationship with the materials used within the nearby Canadian War Memorial, the Anglican Chapel and the rest of the cemetery. The facades were developed to reflect the cemetery s material palette and the industrial heritage of the area to improve the visual setting of the Development. A basement, extending beyond the footprint of the building above, has been incorporated into the design of the Development. Different options of ramped access to the basement were considered with the most suitable location found to be located at the foot of the tower since it was found to be the least disruptive for the landscape and public realm. The proposals for the ramp were further refined in May 2015, when ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 12

14 a single lane ramp was included in the design. This was found to help to reduce the amount of inactive frontage at the public space in front of the tower. The design was developed through regular pre-application meetings with OPDC, London Borough of Hammersmith and Fulham (LBHF), Oak Common and Park Royal Place Review Group as well as relevant specialist consultants, local stakeholders and the local community. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 13

15 5 DESCRIPTION OF THE DEVELOPMENT The full planning application proposes the comprehensive redevelopment of the Site as a mixed-use, residential led development. The key elements of the Development comprise: Demolition of existing buildings; Erection of one building including a ground floor mezzanine level, with a tower component reaching a maximum height of 22 storeys, alongside an eight-storey and six-storey block; 170 new residential units (C3 Use) (60 x one bed units (35%), 78 x two bed units (46%) and 32 x 3 bed units (195), with 600m 2 Gross Internal Area (GIA) flexible ground floor commercial (A1/A2/A3/B1(a) Use) and amenity associated car parking, amenity space, landscaping and infrastructure works on the ground floor; Parking for 33 cars (including 9 disabled spaces and one Car Club space) and 308 cycle spaces; and Public realm improvements, including private and communal open space. A selection of application drawings upon which the EIA is based, is included within Appendix 1.1 of ES Volume 3. The Development comprises approximately 20,329 square metres (m 2 ) Gross External Area (GEA) (19,020m 2 (GIA)) over 22 storeys. The Development principally consists of one building comprising one tall tower of 22 storeys with two lower-tiered components (eight and six storeys) and improvements to the surrounding public realm. The Development seeks to respect the setting of the nearby Canadian War Memorial by increasing the open space around the memorial and planting a hedge with a low wall and fencing to form a more natural backdrop than the existing situation which currently comprises a brick wall. Flexibility is being sought on the exact mix of commercial floorspace to directly engage with the public realm and create a coherent built form and active frontage on Scrubs Lane. Commercial uses will be located on the ground floor. The Development will incorporate a basement below the Site reserved for car parking, utilities and plant. This will be accessed via a ramp located at the foot of the tallest building from Scrubs Lane. The basement will reach a maximum depth of 4.6m below fixed floor level and will extend under the footprint of the proposed building and a large portion of the proposed communal amenity space to the east of the Site. Figures 9 and 10 show the proposed massing and ground floor layout of the Development. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 14

16 Figure 9: Proposed Massing of the Development (West (Scrubs Lane) Elevation) Source: Allies and Morrison Architects ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 15

17 Figure 10: Proposed Ground Floor Layout Source: Allies and Morrison Architects, A SCRUBS LANE ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 16

18 The Development will provide quality landscaping both within the public realm on Scrubs Lane and the private communal spaces located at ground level and on the roof terraces. Figure 11 shows the proposed amenity space, including proposed playspace. Figure 11: The Proposed Amenity Space Masterplan Figure 12: An Artist s Sketch of the Proposed Public Realm situated along Scrubs Lane, A SCRUBS LANE ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 17

19 The easement (access) route along the northern extent of the Site will be paved in a high quality material and gated. A gate will be installed to allow light and views through the Development. A key aspect of the communal garden in the north-eastern part of the Development is its relationship with the Canadian War Memorial. The existing boundary wall will be set back from the edge of the Site to provide space to comfortably walk around the memorial. The private terraces on level six and eight have been designed to provide private amenity space where residents can relax and enjoy outdoor space. Both terraces will provide seating and open areas, including lawned areas, planting and trees with a light canopy. Within the level six terrace, a play area will be provided with seating. The level eight terrace will provide a barbecue and dining area. Approximately 185m 2 of green roofs (with plantings of smaller sedums and grasses) will be provided on level 22 and level nine. The green roofs will offer potential wildlife habitat and reduce rainwater runoff. In total, 2,287m 2 of communal amenity space will be delivered by the Development. This will come forward through the private communal garden and the two roof terraces on the sixth and eighth storey. Approximately 1,610m 2 private amenity space will be provided within balconies associated with the residential units. Waste and recycling storage has been designed in-line with LBHF s requirements as they will be the local authority collecting the waste. Bin stores for the residential development are located in the basement. Surface water from the Development will be discharged to the combined sewer via an attenuation tank. This attenuation tank will reduce the rate that surface water enters the sewer from the existing situation, therefore helping to reduce surface water flood risk. A standalone Energy and Sustainability Statement is submitted with this planning application in line with planning policy. The Development is proposing to achieve BREEAM Excellent status. An on-site Combined Heat and Power (CHP) engine will be installed within an Energy Centre which will be located in the basement. The Development will have the ability to connect to the planned Old Oak Common low carbon district heat network at the Site boundary. Mechanical ventilation and heat recovery (MVHR) systems will provide summer cooling and filtering of the air entering the apartments. This is a low energy ventilation solution that can reuse heat that will have otherwise have been lost. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 18

20 There is adequate utility infrastructure in the local area to connect to the Development, including water supply and sewer capacity. Connections for gas and electricity will be made and a sub-station will be located on the ground floor of the Development, with a standby generator located in the basement. Construction It is anticipated that the Development would be fully built-out over an approximate two year period. Commencement of demolition and construction works on-site is expected in early 2017 and the year 2019 is assumed as the full year of completion and occupation, although this may be subject to change. A Construction Management Plan (CMP) would be prepared prior to the commencement of demolition and construction works on-site and adhered to during all works to manage and minimise construction effects. An outline CMP is provided as part of the ES. The CMP provides management procedures and protocols to outline how the project will avoid, minimise or mitigate effects on the environment and surrounding area during the demolition and construction phases. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 19

21 6 TRANSPORT The Site is situated on the eastern side of Scrubs Lane approximately 75m to the south of the junction with Hythe Road and 25m north of the Mitre Bridge. Traffic count surveys were completed on Scrubs Lane which, along with analysis of published datasets, helped establish the existing traffic conditions on the local road network in the vicinity of the Site. An assessment was then undertaken to understand the potential effects of the Development on driver delays, pedestrian delays, severance (e.g. crossing roads), pedestrian amenity and accidents and safety in line with published standards. During construction, the Development would lead to a maximum of 45 Heavy Goods Vehicle (HGV) trips (one-way) per day to the Site over the 27 month construction period. This is an increase of approximately 15-16% on Hythe Road for approximately 10 weeks during the construction period and less than 10% on road links beyond Hythe Road. These are low numbers in traffic terms and, as such, this is considered to be a minor adverse effect. Measures to manage traffic disruption during construction would be carried out by the construction contractor, such as setting traffic routes to and from the Site, scheduling deliveries to avoid vehicles queuing for access onto the Site and cleaning of Site routes to reduce mud being transferred onto public highways. These measures would be implemented as part of the Construction Logistics Plan (CLP) (see Appendix 6.3 of ES Volume 3). To understand the effects of the Development once it is fully occupied traffic modelling has been undertaken for 2019 and This enables the assessment to account of the future year of opening with and without the significant proposed changes in local public transport infrastructure as a result of the wider regeneration of the local area, including the Crossrail, HS2 and new London Overground station schemes. Modelling indicates that there would be a reduction in the number of vehicles visiting the Site once completed and occupied due to the Development having a relatively low number of car parking spaces (only 33). There would also be a negligible increase in public transport and pedestrian movements. In 2026, when the proposed large-scale infrastructure developments are open to the public, the commuting patterns are likely to see a shift to the use of rail services since the new railway stations will be within easy walking distance. This would lead to associated reductions in bus use, walking and a lower demand for travel by car. These predicted effects are all considered to be negligible. A Travel Plan and Framework Delivery and Servicing Plan have been produced to ensure that any transport related effects of the Development are mitigated and managed. Both documents are appended to the ES. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 20

22 With the implementation of these plans, the Development is considered to result in negligible effects for: severance; driver delay; pedestrian delay and amenity; fear and intimidation; accidents and road safety; dust and dirt; and sustainable transport networks. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 21

23 7 NOISE AND VIBRATION Baseline noise monitoring in July 2015 provided data on the baseline noise environment, which was noted to be typical of a busy urban centre that was dominated by road traffic, particularly from HGV movements on Scrubs Lane (A219). Noise from nearby railway lines and industrial uses also contributes to the background noise environment. The sensitivity of all existing and future sensitive receptors is considered to be medium, with the adjacent Canadian War Memorial classified as a low sensitivity when not in use. Construction noise effects were calculated using worst-case assumptions about the location of plant. Along with sub-structure works at St. Mary s Roman Catholic Chapel, construction noise will also have a major adverse effect at the Canadian War Memorial. There will be moderate adverse construction noise effects on residential dwellings along Scrubs Lane and at Cumberland House during all works and on nearby canal boats during the demolition, sub-structure and superstructure works. However, mitigation in the form of site hoarding, regular maintenance of plant, restricted hours of work and traffic routing will ensure that noise emissions from the Site comply with appropriate British noise limit criteria. Nonetheless, even with the inclusion of these measures, construction noise effects are likely to remain significant at the Canadian War Memorial, although with a relatively short construction period these works are only temporary. Demolition and construction works will also be ceased during ceremonies at the memorial. Vibration levels have been set for construction of the Development and would be managed through the CMP. As such, the effects on nearby receptors will be negligible. Due to relatively small number of proposed parking spaces and the relatively high volume of traffic already using Scrubs Lane, traffic noise from the Completed Development on existing sensitive is not considered to be significant. The suitability of the Development for its future use is considered to be appropriate with glazing and ventilation measures which will serve to reduce noise to acceptable levels. Nearby industrial sources include the operation of a scrap yard by Capital Waste Services Ltd. and the operation of a waste transfer station by O Donovan Waste Disposal. These sources, including associated lorry movements, will have notable adverse noise effects, especially on the lower floors of the Development. As such, mitigation measures such as solid balustrades have been incorporated into the design, especially for relevant balconies and external amenity areas. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 22

24 Detailed specifications and locations of commercial fixed-plant items have not been provided at this stage. However, based on existing levels of background noise at the nearest sensitive receptors, noise limits will be set in accordance with the guidance advocated within relevant British Standards. Hence, the noise from commercial fixed plant will be negligible on existing and future sensitive receptors. Residential units will be designed to ensure that internal noise levels resulting from external noise exposure will comply with internal noise level standards, so as to provide acceptable conditions for resting in living rooms/dining areas during the day, and for resting and sleeping in bedrooms at night. Commercial units will be well insulated and designed to provide acceptable conditions for work requiring concentration. Accordingly, with appropriate acoustic design, the effect of noise of the completed Development has been predicted to be negligible. The Development provides public realm and external amenity space for residents and each dwelling will have an outdoor balcony space. Roof terraces are also proposed on the sixth and eighth floors. Noise calculations show that these spaces would meet the relevant guidance level for external amenity space. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 23

25 8 AIR QUALITY The Site is located in an Air Quality Management Area; the entire borough is designated for high levels of nitrogen dioxide (NO 2) and fine particulate matter (both PM 10 and PM 2.5). As such, an air quality assessment was carried out to determine the likely effects of the Development. Traffic flow data for 2015 was analysed using a computer model which calculates and predicts the likely changes in local air quality. The model predicted air quality concentrations for 2016 and 2019 to assess the potential effects of the Development during demolition and construction and once complete and occupied. This also incorporated the potential effects of emissions from the proposed CHP and boilers on nearby existing and proposed residential dwellings and the nearby Kensal Green Crematorium. In addition, an odour assessment was carried out to examine the likely influence of odours on the Site for future residents in relation to three nearby waste transfer stations approximately 15m and 800m to the west of the Site. No discern able odour was identified in on the Site and no significant effects were identified. Therefore, there would be no loss of amenity to residents living in the Development in respect of odour. During demolition and construction works, dust would likely be generated by activities at the Site. The amount of dust generation is influenced by the type of activity taking place and is therefore usually temporary. Industry standard measures would be implemented by contractors on the Site to minimise the risk of dust causing a potential nuisance for local residents. These measures would form part of the CMP (see Appendix 5.1 of ES Volume 3 for the outline CMP) and would likely include damping-down exposed surfaces, covering construction materials and stockpiles, sheeting material-laden vehicles leaving the Site, and regular monitoring of the Site. With these measures in place, it is expected that there will be a negligible effect on nearby sensitive receptors during the demolition and construction phase. Exhaust emissions from construction plant would not be significant. As described in Section 6 of this NTS, construction traffic is not anticipated to significantly add to local traffic flows (a maximum of 45 Heavy Goods Vehicle movements per day). Computer modelling of air quality effects from road traffic associated with the completed and occupied Development showed that the additional traffic flows would result in a negligible effect on the concentrations of NO 2 and particulate matter at the existing receptors tested. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 24

26 The Development has also been designed to have a minimal effect on air quality as it provides only 33 car parking spaces, 308 cycle spaces and walking will be encouraged. As part of the ventilation strategy, the building will be fitted with a particulates and nitrogen oxides filter to provide residents with clean air. An Air Quality Neutral Assessment was carried out for the Development in relation to emissions associated with the building and traffic. This demonstrated that the Development was below the respective benchmarks and achieved air quality neutral standards. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 25

27 9 LAND QUALITY The assessment has been informed by a desk-based study which included a review of historical maps, previous ground investigation and contamination risks on the Site. The assessment has focussed on how construction of the Development would affect human health and natural resources. The Site is currently occupied by a number of commercial/industrial businesses including workshops, a hand car wash and vehicle repair businesses. Historical land uses on the Site include (but are not limited to): foundries, coach works and vehicle repair depot. Information provided by LBHF indicates that a petrol filling station was present on the Site in the 1950s. Surrounding historical land uses have included: a wharf, railway land, a building depot, a rubber depot and a scrap yard. These historical uses mean that contamination is likely to be present in the Made Ground and there is also a risk of pockets or buried ground gas. The geology of the Site comprises Made Ground (man-made material), underlain predominantly by clay. This overlies a chalk aquifer a layer of rock that can hold water and creates a barrier that prevents surface and shallow groundwater interacting with the aquifer. It is likely that the nearby canal has a hard lining so that it is separated and cannot mix with the local groundwater. Intrusive investigation will be carried out to inform the detailed design of the Development, the scope of which is currently under discussion with LBHF Environmental Quality Officers. During construction works, the primary risks to site users would be from any existing contamination sources or presence of ground gases on-site, i.e. within the Made Ground, which could be mobilised by demolition and construction activities. There is also a small risk associated with contamination from construction works through spills and leaks. Mitigation measures which would be implemented through further site investigation, appropriate remediation (if required) and adherence to the CMP (see Appendix 5.1 of ES Volume 3 for the outline CMP) would reduce potential land quality effects on all receptors from the Development to negligible. These measures would include such procedures as correct storage for site materials, dewatering procedures for basement excavation, use of personal protective equipment (PPE) and good working practices in accordance with current guidelines. The Development will remove approximately 7,500m 3 of material for basement excavation and will therefore remove significant quantities of potentially contaminated land. It is considered that the potential for activities undertaken on the Site once the Development is completed and occupied to affect land contamination are very limited. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 26

28 10 WATER RESOURCES AND FLOOD RISK The Site conditions in relation to water resources and flood risk have been established through records information, Environment Agency flood maps and information from the Canal & River Trust (a charity who look after the adjacent canal). A Flood Risk Assessment (see Appendix 10.1 of ES Volume 3) and Foul and Surface Water Drainage Strategy (see Appendix 10.2 of ES Volume 3) have been prepared to provide an assessment of the potential effects of the Development on the local water environment in line with European and National legislation. There are no rivers in the vicinity of the Site, however the Grand Union Canal is situated approximately 30m south of the Site. It is likely that the canal is puddle clay lined and therefore not connected to groundwater, although this cannot be confirmed. Beneath the Site lies a groundwater aquifer at depth (within the chalk). This is overlain by a deep layer of clay which prevents surface water and shallow groundwater entering the chalk aquifer. The Site lies within Flood Zone 1, which means it has a low risk of flooding from rivers, however surface water flooding hot spots are situated in the vicinity of the Site. This means that there is a potentially high risk of surface water flooding following heavy rainfall events on the Site, Scrubs Lane and adjacent premises as sewer capacity for excess sewer water is currently limited in the area. In the absence of appropriate design, this surface flood water could potentially enter the basement and ground floor levels of the building. There are no residential or other sensitive uses at basement levels. However, suitable mitigation would be provided through the use of Sustainable Drainage Systems (SuDS) such as green roofs and landscaping alongside a 90m 3 on-site attenuation tank as a storage provision for extreme volumes of excess surface water. In order to ensure that on and off-site surface water flooding does not occur further analysis will be undertaken during the detailed design stage. It is likely that more detailed surface water flood risk modelling will be required and this would provide guidance on the potential incorporation of additional design measures. Potential design options include raising the level of the ground floor level above the determined flood level and off-site improvements to the local infrastructure. During construction, there would be a risk of surface water pollution from general construction activity (e.g. from sediment run-off during excavation of the Site) to the adjacent canal, local sewers and adjacent sites. There is a small risk that sediment run-off could block sewers during the early phases of construction which may temporarily increase the flood risk on-site. A series of measures would therefore be put in ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 27

29 place as part of the CMP to protect the Site and surface water receptors from existing contamination, dust generation, spillages and sediment run-off from the Site. As such, these effects would be negligible. Construction activities will require water supply and foul drainage. The volumes of water required and foul sewage generated are likely to be small and to be over a short period when compared to the final development and are not considered to be significant, i.e. negligible. The construction of basements will require excavation below the water table and the use of foundation piles. The London Clay provides a barrier to the downward migration of contamination and because the piles will not penetrate the chalk, the protection provided will remain intact. However, basement excavation will reduce the thickness of the London Clay beneath the Site, reducing the protection it provides to groundwater at depth. Dewatering may be required during construction to control groundwater entering the excavation. However, only limited shallow groundwater is likely to be present. The effect on groundwater is therefore negligible. The Development is likely to result in a significant increase in water demand due to the change from industrial to residential use. The effect on water supply will be mitigated through water efficient fittings and equipment in each dwelling, as well as through an intelligent control system which will include a smart water meter and display in each home. Rainwater harvesting will be used to minimise water use on landscaped areas. Water efficiency measures would reduce water demand and consequently foul sewage flows. The residual effect on water supply would be minor adverse. Once complete, the Development would discharge both surface water and foul water into the sewer network at rates which are lower than the existing combined discharge rate. This would be achieved through the use of an underground attenuation tank and SuDS which would manage the rate at which surface water leaves the Site, reducing the flood risk. This reduction from the existing Site run-off rates will also reduce the risk of flooding elsewhere, which would represent a minor beneficial effect. There would also be an associated beneficial effect on emergency access. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 28

30 11 ARCHAEOLOGY A desk-based assessment of the archaeological records, historic maps and other sources as well as a site visit have informed the assessment of effects on buried heritage assets from the Development. A built heritage assessment is also submitted within this ES, and this aspect of assessment is discussed in Section 15 of this NTS. There are no recorded buried heritage assets on-site although a total of 17 buried heritage assets were identified within the 500m of the Site. The Site is not in an Archaeological Priority Area, although it is understood that the adjacent St. Mary s Cemetery is designated as an Archaeological Priority Area. The construction of existing and previous buildings on the Site is likely to have disturbed a vast majority of the Site. Buried archaeological remains that have survived are likely to be associated with industrial activities occurring in the area during the late nineteenth and early twentieth century and would be of local value and low heritage significance. The archaeological potential for the prehistoric, Roman, early- Medieval and Medieval periods has been assessed as low and for the post-medieval as low to medium. Subject to agreement with the Greater London Archaeology Advisory Service, further archaeological investigation would be carried out on the Site through a Written Scheme of Investigation or a project watching brief. It is assumed this would be a monitoring exercise, carried out post-determination and secured through a standard condition attached to the planning consent for the Site. This would ensure that should unexpected significant remains be encountered appropriate mitigation can be undertaken if required The residual effects of the demolition and construction of the Development is considered to be minor adverse. No effects are anticipated once the Development is complete, therefore no mitigation measures will be required. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 29

31 12 ECOLOGY The ecological conditions of the Site have been derived from the results of a desk study, field surveys, and relevant published information. There are no statutory nature conservation designations on or in close proximity to the Site. Wormwood Scrubs Local Nature Reserve (LNR) is the closest statutory site, located approximately 185m to the south of the Site. There are 13 non-statutory Sites of Importance for Nature Conservation (SINCs) within a 1km radius of the Site. The closest is St Mary s Cemetery Site of Importance for Nature Conservation SINC, adjacent to the east of the Site and designated for its native flora and habitats. The London Canals SINC is also located in close proximity to the Site, approximately 15m to the south of the Site. The location of all these sites in context of the Site is presented in Figure 13. Figure 13: Ecological Designations in Vicinity of the Site ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 30

32 Following established ecological impact assessment guidance methods, ecological resources and features (e.g. type of species habitat) have been given values based on a scale of geographic importance. For example, ecological features of low intrinsic value would be considered to be of importance at a site level, with resources of greater value progressing up the scale (local, district, county, regional, national and international) as the value increases. No high value species were recorded on-site, although three legally protected or otherwise notable species/species groups within the vicinity of the Site. Although no bat species were recorded within the boundary of the Site, other data sources indicate potential bat foraging activity in the area, both in the adjacent St Mary s Cemetery and along the canal. A sensitive lighting strategy has therefore been incorporated into the building design, limiting light spill from the eastern and southern façades of the building. Although no breeding birds were identified on-site, to ensure legal compliance, demolition and vegetation removal will be undertaken in such a way as to ensure no active nests, eggs or dependent young are damaged or destroyed. Provision of nest boxes on the proposed building has the potential to provide opportunities to nesting birds in the future although this in unlikely to provide a significant uplift to local populations. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 31

33 13 WIND The meteorological data for the Site indicates that prevailing winds are from the south-west throughout the year with secondary winds from the north-easterly direction, particularly during spring. The wind microclimate around the Site at ground level with existing surrounds during the windiest season would be generally acceptable for sitting, standing and leisure walking at various locations across the Site. However, the construction of the Development has been shown to significantly affect this wind microclimate. Conditions at thoroughfare locations accessing the Site are generally found to remain constant or deteriorate slightly. Thoroughfares through the Development experience significant negative effects at individual receptors, especially on the roadway at the northern end of the Site. However, the inclusion of design measures such as a 50% porous gate to the east and west of access route provide sufficient mitigation to reduce these increased wind effects to acceptable levels for intended use. Entrance locations will generally experience conditions suitable for the intended pedestrian use with isolated receptors on Scrubs Lane and the northern roadway requiring mitigation. This will be in the form of street trees and the inclusion of a 50% porous gate as described above which will provide minor beneficial effects. Ground level and terrace amenity spaces generally display a mixture of sitting and standing conditions during the summer season when these areas are expected to be used, with the exception of the southwestern corner of the terrace on Level 6. A screen or dense hedge/shrubs approximately 2m in height would mitigate these effects. Amenity space at the southern boundary of the Site is windier than would be suitable for amenity use. However, design measures such as inclusion of a solid screen (approximately 2m in height) have been developed to reduce wind speeds to suitable levels. Strong winds that exceed the wind speed thresholds of Beaufort Force 6 (B6) occur at multiple locations on the completed Development with cumulative schemes in-situ. There are also a number of locations that observe up to 3.5 hours of Beaufort Force 7 per year. Mitigation measures have been developed to reduce wind speeds and remove pedestrian safety concerns. This includes the use of screens and porous gates at ground floor level and landscaping, screens and the use of balustrades and glazed screens and canopies on terraces. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 32

34 With design measures in place strong winds are reduced to occasional B6 which are infrequent and not expected to cause nuisance to pedestrians on thoroughfare locations. All receptors are in amenity spaces not expected to be used frequently during the windiest season. As none of these hours are recorded during the summer season these winds are not anticipated to present an impact on pedestrian safety or cause a nuisance to occupants. Overall, wind conditions would be suitable for or calmer than required for the intended pedestrian use. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 33

35 14 SOCIO-ECONOMICS Baseline socio economic conditions have been established through the interpretation 2011 Census Data, Business Register and Employment Survey, Indices of Multiple Deprivation, Claimant Count Data and other available sources. The Site falls within a neighbourhood which is among the 20% most deprived areas in England. Existing land uses are primarily for light industrial activities including car repair and maintenance on the ground floor with offices and storage above. It is estimated that there could be approximately 40 Full Time Equivalent (FTE) jobs on-site. Unemployment levels are slightly higher than the regional average. Construction of the Development is estimated to generate approximately 70 permanent FTE construction jobs over the course of the project. However, with the demolition of existing commercial premises, there is also the potential for a loss of existing jobs on-site, although these businesses are likely to relocate locally. Therefore, the effect of construction employment is considered negligible at all spatial scales. The proposed new commercial floorspace would accommodate up to FTE jobs, which is a small decrease on the existing number but considered a negligible effect at all spatial scales. The construction of 170 new homes on a site that currently has no housing stock, represents 8.1% of the OPDC s draft local policy delivery target of 2,100 homes for the five years This would be a permanent moderate beneficial effect at the local, wider impact area (i.e. OPDC area) and district levels. The Development is projected to generate a population of approximately 300 people, of which 39 would be children. This would place additional demands on local amenities including primary healthcare, education facilities and playspace. This is predicted to be negligible at all spatial levels for all effects, except for primary education which is considered a minor adverse effect at the local and wider impact area levels. However, the Applicant would agree to pay Section 106 obligations and Community Infrastructure Levy towards the delivery of the OPDC s strategic objectives for healthcare and education provision as part of the planning consent. This would reduce this potential effect to negligible as the local provision for primary education increases. The Development is predicted to have moderate beneficial effects in respect of household spending and minor beneficial effects on crime and safety at the local level due to the improved physical environment. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 34

36 15 HERITAGE, TOWNSCAPE AND VISUAL EFFECTS The Site is not of high townscape or heritage value, currently comprises of storage and industrial buildings used for car repair and maintenance. As shown in Figure 5, the Site is situated adjacent to St Mary s Conservation Area (CA). The Grand Union Canal CA is located approximately 30m to the south of the Site and the Kensal Green (All Souls) Cemetery Grade I listed Registered Park and Garden is located 225m to the east of the Site. A proposed Conservation Area (Cumberland Park Factory Conservation Area) is located approximately 50m to the north of the Site. Demolition and construction works would have moderate to minor adverse impacts on Kensal Green (All Souls) Cemetery Registered Park and Garden, St Mary s CA and the Grand Union Canal CA. However, with a relatively short construction period of approximately two years these works would only be temporary and construction hoarding would limit these effects. There are no statutory listed buildings of special architectural or historic interest within the Site. However, there are a number of listed buildings within the surrounding area of the Site, with the closest being the Grade II listed Mortuary Chapel of Conde De Bayona Marques De Misa approximately 280m north-east of the Site. It is not considered that demolition and construction works will have significant effects on these assets. Once completed, the Development is considered to have a negligible effect on all listed buildings, with only moderate to minor adverse effects on St. Mary s CA and Kensal Green (All Souls) Cemetery Registered Park and Garden. Views from within the Site are largely restricted to short range by the surrounding built form to the north, east and west, with views from the south encompassing the Grand Union Canal that runs beyond the southern boundary of the Site. Representative views have been established at agreed viewpoints through consultation with the OPDC and Historic England in order to recognise and assess the likely effects of the Development on the identified visual receptors. Demolition and construction works would have a range of effects on these views ranging from minor to moderate adverse, with the ones closest to the Development having the most significant effect. Longerdistance views have more obstructions due to existing buildings and there tends to be a lesser degree of change of effect. Once completed, the Development is considered to have beneficial effects on all views from where visible due to the high architectural design and high-quality palette of materials which respond to elements of the existing and emerging local context of Old Oak Opportunity Area, as set out ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 35

37 in the OAPF. The Development will also introduce a high quality public realm along with public open space and create clear urban blocks with active frontages. ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 36

38 16 CUMULATIVE EFFECTS The EIA Regulations require consideration of cumulative effects which include: Potential effects from interactions of individual effects during the demolition and construction phase of the Development; and Effects which could arise from other schemes planned in the local area. There is the potential for effects to occur during the construction stage of the Development, to nearby receptors. Individual effects that have the potential to interact are largely related to noise from the construction works and the slightly increase in traffic flows due to construction traffic. When these effects are combined they could potentially create adverse (albeit temporary) combined effects on the identified receptors. This adverse cumulative effect from will occur throughout the demolition and construction programme, however the effect experienced by the receptors will vary as works progress around the Site. These effects would however be temporary over the period of construction and are typical for a project of this nature. The Applicant has committed to implementing a Construction Management Plan (CMP) and Construction Logistics Plan (CLP) which will manage and minimise effects where possible. The assessment has examined the potential for impacts to arise from overlapping construction periods with other schemes in the area. It has also examined the potential for impacts to arise in the long term from traffic generated by the different schemes and from the physical presence of other schemes. The list of schemes considered were agreed with the OPDC and are shown in Figure 14. The assessment concluded that there would be short term cumulative effects arising during the construction period of the following schemes in the vicinity, but that these would be controlled through measures such as CMPs and CLPs for each scheme: Old Oak Common Rail Depot; Land at Old Oak Common including, Hythe Road, The Grand Union Canal, Salter Street and Station Approach (Old Oak Park/Cargiant site); Land to East of Old Oak Common Lane, London; Woodlands, 80 Wood Lane, W12 0TT; and ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 37

39 Former Dairy Crest Site Land Beneath and Bounded by Westway and West London Railway Line and adjoining 58 Wood Lane, London, W12. For the completed Development, the assessment concluded that no adverse long term or permanent effects are anticipated to occur as a result of Development and the other schemes identified in the vicinity. The key points of the assessment are as follows: Cumulative schemes were included in the future assessment years of 2019 and 2026 and cumulative effects on road traffic would be negligible. New services proposed within the OAPF will be provided on at least three rail corridors; Crossrail, HS2, and London Overground which will be within walking distance of the Site, thereby reducing demand on the bus network. Cumulative schemes were included in the future year of 2026 modelled in the noise and air quality assessments and the Development would not give rise to significant cumulative effects. Should remediation of sites occur as part of the cumulative schemes due to identified contamination, this will add to the beneficial impact of improving land quality in the local area. All cumulative schemes would be required to reduce water consumption and improve how surface water drainage is discharged which would lead to a beneficial effect on local flood risk from surface water. No adverse cumulative effects have been identified in relation to archaeology as all schemes would implement appropriate mitigation in line with planning requirements. The cumulative schemes landscape proposals will result in an overall greening of the local area and wildlife habitat in line with planning policy therefore leading to beneficial effects on local ecology The cumulative effects of North Kensington Gate North scheme on wind microclimate has little discernible effect. Overall the cumulative schemes, along with the Development, would deliver new housing, new transport infrastructure and generate employment meeting local and regional government targets set for the area. Together, these would have a combined permanent major beneficial effect at a local and district level in terms of socio-economic receptors. The effect would be minor beneficial at a regional level. Planning conditions, on-site provision and off-site payments would ensure that any adverse effects are mitigated. The significance of the cumulative effects on the identified heritage assets will range from neutral / negligible with minor adverse effects on the St Mary s Conservation Area and minor to moderate ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 38

40 adverse on the Kensal Green (All Souls) Cemetery Grade 1 listed Registered Park and Garden; on the townscape character areas they will range from moderate to minor beneficial; and, for the representative views substantial beneficial to no effects will remain. Figure 14: Location of Developments Considered in Cumulative Assessment ENVIRONMENTAL STATEMENT Non-Technical Summary I Page 39

Longbridge Town Centre Phase 2 Planning Application

Longbridge Town Centre Phase 2 Planning Application Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham

More information

Meridian Water Phase 1 Application

Meridian Water Phase 1 Application Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed

More information

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller

More information

NON-TECHNICAL SUMMARY. October 2017 CLARENDON GAS WORKS WOOD GREEN

NON-TECHNICAL SUMMARY. October 2017 CLARENDON GAS WORKS WOOD GREEN NON-TECHNICAL SUMMARY October 2017 CLARENDON GAS WORKS WOOD GREEN CLARENDON GAS WORKS, HARINGEY ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY October 2017 Our Ref: Q70251 Contents 1 INTRODUCTION... 2 2

More information

17A. Wind Microclimate

17A. Wind Microclimate 17A. Wind Microclimate 17A.1 Introduction 17A.1.1 17A.1.2 17A.1.3 17A.1.4 This Chapter, which has been prepared by Waterman and BMT, provides further information with regard to the potential wind microclimate

More information

London Road, Derker. Non Technical Summary. Introduction

London Road, Derker. Non Technical Summary. Introduction London Road, Derker Non Technical Summary Introduction The Oldham Rochdale Housing Market Pathfinder was set up to tackle longstanding problems of poor quality housing and to provide the framework for

More information

University Park, Worcester Non Technical Summary December 2011

University Park, Worcester Non Technical Summary December 2011 University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to

More information

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2

More information

South Whitehaven, Cumbria EIA

South Whitehaven, Cumbria EIA South Whitehaven, Cumbria EIA Environmental Statement - Non Technical Summary June 2013 in association with 1. Introduction Story Homes is applying to Copeland Borough Council (CBC) for a new residential

More information

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts Chapter 4 Route Window C12: Mile End Park and Eleanor Street Shafts 48 Crossrail Amendment of Provisions 4 Route Window C12: Mile End Park and Eleanor Street Shafts Location plan of Mile End Park and Eleanor

More information

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015

Wyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015 Wyvern Park Skipton Environmental Statement Non-technical Summary - April 2015 BWB Consulting Ltd Whitehall Waterfront 2 Riverside Way Leeds LS1 4EH Telephone: +44(0)113 233 8000 Copyright This Report

More information

Grantham Southern Quadrant Link Road Environmental Statement

Grantham Southern Quadrant Link Road Environmental Statement Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of

More information

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental

DEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics

More information

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433

LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433 LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2017 Our Ref: Q70433 Contents 1 INTRODUCTION... 2 2 SITE DESCRIPTION... 5 3 EIA METHODOLOGY...

More information

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433

LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433 LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY March 2017 Our Ref: Q70433 Contents 1 INTRODUCTION AND SITE DESCRIPTION... 1 2 EIA METHODOLOGY... 5 3 ALTERNATIVES... 6 4 DESCRIPTION

More information

Armourers Court, Woolwich

Armourers Court, Woolwich Armourers Court, Woolwich Environmental Statement, Non-Technical Summary December 2013 DESIGN PACKAGE C158 WOOLWICH STATION East End Over Site Development (Armourers Court, Arsenal Way, Woolwich) Environmental

More information

The Haymarket 189 Morrison Street, Edinburgh. Environmental Statement. Volume 1 Non Technical Summary

The Haymarket 189 Morrison Street, Edinburgh. Environmental Statement. Volume 1 Non Technical Summary The Haymarket 189 Morrison Street, Edinburgh Environmental Statement Volume 1 Non Technical Summary 16 August 2010 Tiger Haymarket Limited Partnership Non Technical Summary Contents 1 Introduction 1 2

More information

Date: TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2011: REGULATION 13 SCOPING OPINION

Date: TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2011: REGULATION 13 SCOPING OPINION PLANNING & BUILDING CONTROL Tracy Harvey Head of Planning & Building Control Rob Wells Savills Innovation Court 121 Edmund Street Birmingham B3 2HJ Our Ref: 5/16/3441 E-mail: Date: planning@stalbans.gov.uk

More information

BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY

BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY BEAUFORT PARK BUILDINGS D3 TO D8 PLANNING APPLICATION ENVIRONMENTAL STATEMENT NON- TECHNICAL SUMMARY November 2014 Introduction 1.1 St George Central London (the Applicant ) is seeking to obtain planning

More information

NON - TECHNICAL SUMMARY

NON - TECHNICAL SUMMARY WATERMAN ENERGY, ENVIRONMENT & DESIGN LTD 60 ludgate hill / 30 old bailey environmental STATEMENT NON - TECHNICAL SUMMARY REV. 01 january 2011 Non-Technical Summary 60 Ludgate Hill / 30 Old Bailey 1. Introduction

More information

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE

LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Land Securities plc is applying to Maidstone Borough Council

More information

The Place Solar Farm

The Place Solar Farm The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1

More information

Barvills Solar Farm Environmental Statement Non-Technical Summary

Barvills Solar Farm Environmental Statement Non-Technical Summary Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development

More information

185 Park Street ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

185 Park Street ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction DV4 Properties Park Street Co. Ltd (hereafter referred to as the Applicant ) is seeking to obtain full planning permission for the redevelopment of 185 Park Street, situated on land bounded

More information

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD

ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June

More information

Newcourt Masterplan. November Exeter Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework Newcourt Masterplan November 2010 Exeter Local Development Framework Background The Exeter Core Strategy Proposed Submission sets out the vision, objectives and strategy for the development of Exeter up

More information

Environmental Statement Non-Techncial Summary Anthology Hale Works xx.xx.xx Document title 1

Environmental Statement Non-Techncial Summary Anthology Hale Works xx.xx.xx Document title 1 Environmental Statement Non-Techncial Summary 28.06.2017 Anthology Hale Works xx.xx.xx Document title 1 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description...

More information

Plumstead Temporary Railway Sidings and Associated Permanent Works

Plumstead Temporary Railway Sidings and Associated Permanent Works Plumstead Temporary Railway Sidings and Associated Permanent Works Environmental Impact Assessment Non-Technical Summary Document Number: February 2013 Plan Design Enable Page 2 of 20 Contents Contents...

More information

Principal Place ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

Principal Place ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction RT Group Property Investments Limited (the Applicant ) is seeking detailed planning permission for the redevelopment of 1.28 hectares of land off Norton Folgate to the north of Liverpool

More information

Moat Lane Regeneration Project Environmental Statement

Moat Lane Regeneration Project Environmental Statement AECOM Environment Towcester Regeneration Ltd. October 2012 Moat Lane Regeneration Project Environmental Statement Non-Technical Summary Prepared by:... Checked by:... Sophie Collins Scott Wilson Environmental

More information

1 INTRODUCTION 1.1 INTRODUCTION

1 INTRODUCTION 1.1 INTRODUCTION 1 INTRODUCTION 1.1 INTRODUCTION RREEF (UK) Ltd in partnership with Sheffield City Council (SCC) is applying for planning permission for the construction of: a new indoor city centre market hall and indoor

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date: 22-05-2018 Applicant: Proposal: Site: Mr Gillett Change of use to the

More information

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Greenbank Partnerships Ltd October 2012 Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Environmental Statement - Non Technical

More information

Welcome to our public exhibition

Welcome to our public exhibition About Our Scheme Welcome to our public exhibition This exhibition gives you the chance to view and comment upon our emerging proposals for a new residential development of 68 new homes on the site of the

More information

Proposed World-Class Hotel at Former Royal High School, Regent Road, Edinburgh

Proposed World-Class Hotel at Former Royal High School, Regent Road, Edinburgh Duddingston House Properties and Urbanist Hotels Proposed World-Class Hotel at Former Royal High School, Regent Road, Edinburgh Environmental Statement Non-Technical Summary 3rd September 2015 www.oldroyalhighschool.com

More information

BREEDON NORTHERN LIMITED

BREEDON NORTHERN LIMITED Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...

More information

Public Consultation. Land at Monks Farm, North Grove. Welcome

Public Consultation. Land at Monks Farm, North Grove. Welcome Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition housing development A46 Wildmoor Alcester Road Canal Quarter A422 Town Centre housing development Warwickshire-based IM Properties, one of the UK s largest privately owned property

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes

More information

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford. Welcome Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of. We are at the early stages of designing our proposals and have a number

More information

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013 in association with 1. Introduction Peel Holdings is applying to Nottingham City Council (NCC) for Outline planning

More information

97 Lea Bridge Road, Leyton, E10 7QL London Borough of Waltham Forest December 2015

97 Lea Bridge Road, Leyton, E10 7QL London Borough of Waltham Forest December 2015 97 Lea Bridge Road, Leyton, E10 7QL London Borough of Waltham Forest December 2015 Public Realm and Landscape Proposals LEA BRIDGE ROAD, WALTHAMSTOW Public Realm & Landscape Proposals BDP(90)RPT001 December

More information

London Borough of Lambeth. Lambeth Depots. Environmental Impact Assessment Environmental Statement: Non-Technical Summary.

London Borough of Lambeth. Lambeth Depots. Environmental Impact Assessment Environmental Statement: Non-Technical Summary. London Borough of Lambeth Lambeth Depots Environmental Impact Assessment Environmental Statement: Non-Technical Summary April 2009 This Non-Technical Summary (NTS) sets out the findings of an Environmental

More information

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP

LAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP LAND AT WEST YELLAND Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP May 2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft FINAL Date

More information

Welcome to our public exhibition

Welcome to our public exhibition About our development Welcome to our public exhibition This exhibition gives you the chance to view and comment on our proposals for a new residential development of 165 high-quality homes, along with

More information

HS2 Environment. Protecting the environment

HS2 Environment. Protecting the environment HS2 Environment Protecting the environment Approach to mitigation EIA Regulations require an ES to include a description of the measures envisaged in order to avoid, reduce and, if possible, remedy significant

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY NON-TECHNICAL SUMMARY THE HIDE, BISHOP AUCKLAND PROPOSED ECO CHALET DEVELOPMENT NON-TECHNICAL SUMMARY 1 Introduction 1.1.1 This non-technical summary for the (ES) prepared in relation to the proposed eco-chalet

More information

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal Option SWH1 Balanced Communities Option SWH1 1 To ensure the delivery of high quality sustainable communities where people want to live and work Will it ensure the phasing of infrastructure, including

More information

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to Introduction WCC have indicated that in advance of the surveys and assessments being undertaken consultation should be undertaken with technical officers of both Warwickshire CC and Nuneaton and Bedworth

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE CONTENTS Page 1. Introduction 3 2. Pre-application Discussions 4 3. The Consultation Process 5 4. Consultation Feedback 7 5. Responses to Consultation Feedback

More information

CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2)

CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2) CENTRAL CHELMSFORD DEVELOPMENT AGENCY: CITY PARK WEST (PHASE 2) Central Chelmsford Development Agency / Genesis 27/08/2014 Central Chelmsford Development Agency: Environmental Statement Quality Management

More information

I615. Westgate Precinct

I615. Westgate Precinct I615. Westgate Precinct I615.1. Precinct Description The Westgate Precinct is located approximately 18km west of the Auckland city centre. There are seven Sub-precincts in the Westgate Precinct: Sub-precinct

More information

Crossharbour District Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

Crossharbour District Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction ASDA Stores Limited and Ashbourne Beech Property Limited (hereafter referred to as the Applicants ) are seeking to obtain planning permission for the redevelopment of the existing supermarket

More information

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2 11.1 OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11.2 POLICIES RELEVANT TO ALL WORKSITES IN ISLINGTON... 3 11.3 FARRINGDON

More information

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion

The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion Mr Graham Clark Berrys Newchurch Farm Kinnersley Hereford HR3 6QQ BY EMAIL The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion SC/2017/0001

More information

1. Introduction. Site Boundary

1. Introduction. Site Boundary 1. Introduction Workspace Group Plc (hereafter referred to as the Applicant ) is seeking to obtain full planning permission for the redevelopment of (hereafter referred to as the Site ), situated to the

More information

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY SITE LOCATION The site of the existing AECC lies in an area of predominately residential and business use in Bridge of Don and extends approximately 50 acres.

More information

Non-Technical Summary

Non-Technical Summary The Wharves, Deptford Environmental Statement Non-Technical Summary Prepared for Lend Lease by Quod THE WHARVES DEPTFORD ES NON TECHNICAL SUMMARY PAGE 2 Contents Introduction... 3 The Site And Surroundings...

More information

Environmental Statement (Volume 1) Non Technical Summary

Environmental Statement (Volume 1) Non Technical Summary Environmental Statement (Volume 1) Non Technical Summary Prepared by: The Environment Partnership Haydock Point Environmental Statement (Volume 1): Non-Technical Summary March 2017 Contents 1. Introduction

More information

PANSHANGER QUARRY, Hertfordshire

PANSHANGER QUARRY, Hertfordshire PANSHANGER QUARRY, Hertfordshire Proposed enhanced restoration of Phases F & H Briefing Note 1 March 2015 INERT (INACTIVE) RESTORATION MATERIALS, CONTROLS AND OPERATIONS 1 Introduction This briefing note

More information

7 Scoping and Introduction to the Assessments

7 Scoping and Introduction to the Assessments 7 Scoping and Introduction to the Assessments 7.1 Scope of the assessments 7.1.1 Rule 8 of the TWR makes provision for an applicant to request a scoping opinion from the SoS indicating the information

More information

Sustainability Statement. Whitby Business Park Area Action Plan

Sustainability Statement. Whitby Business Park Area Action Plan Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan

More information

Welcome to the Public Consultation Exhibition

Welcome to the Public Consultation Exhibition Welcome to the Public Consultation Exhibition Today is your opportunity to: Speak to the team Learn more about the project Leave feedback on the plans The Secretary of State for Transport has recognised

More information

Battersea Park East Environmental Statement

Battersea Park East Environmental Statement Environmental Statement Non-Technical Summary July 2014 , Battersea, London July 2014 Waterman Energy, Environment & Design Limited Pickfords Wharf, Clink Street, London SE1 9DG, www.watermangroup.com

More information

I539. Smales 2 Precinct

I539. Smales 2 Precinct I539. Smales 2 Precinct I539.1. Precinct Description The Smales 2 Precinct applies to a 4.8 hectare block of land located on the southern side of Northcote Road and fronting Lake Pupuke, Takapuna. The

More information

Site Location Plan. Land on the North West of Epsom Road Waddon Croydon. 1 : A4 September The. Waddon. Waddon.

Site Location Plan. Land on the North West of Epsom Road Waddon Croydon. 1 : A4 September The. Waddon. Waddon. 138 140 44.3m MP 11.5 El Sub Sta EPSOM ROAD 13 Bank 1 to 5 154 Trough 19to21 1 to 5 156 The Waddon (PH) 23 FB Waddon Station 45.0m Posts 29to31 1 to 9 Stafford Court 39 37 Meridian Court 10 43 to 45 1

More information

ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY

ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY HWK-DOC-INF-ESNTA-02 FEBRUARY 2017 REVISION HACKNEY WICK CENTRAL OUTLINE PLANNING APPLICATION Contents Introduction... 1 Application Site and Surroundings...2

More information

Ʊ ± ªº Œª ºª ø ª ª ± ª

Ʊ ± ªº Œª ºª ø ª ª ± ª Ʊ ± ªº Œª ºª ø ª ª ± ª ø º Õ± ± ± Œ±øºÙ Õ ß Æª ø檺 ±Æ ƪ ø檺 æß Æ± Ʊ ª ø ø fl ª ª ± ê ø Õ øæß ª ª æªæ Ó ÔÌ Non-Technical Summary Introduction A planning application has been submitted to the Vale

More information

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016) 1 DONINGTON S PLACE IN THE SPATIAL STRATEGY 1.1 Policy 2 of the South East Lincolnshire Local Plan 2011-2036 Draft for Public Consultation

More information

Kings Road Industrial Development, Immingham. Environmental Impact Assessment. Non Technical Summary

Kings Road Industrial Development, Immingham. Environmental Impact Assessment. Non Technical Summary Environmental Impact Assessment Non Technical Summary Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 December 2013 Page left intentionally blank INTRODUCTION

More information

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary

Land at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD Land at Environmental Statement: Non-Technical Summary Introduction Brook Street Properties is applying to Cornwall Council for outline planning permission

More information

DEVELOPMENT MANAGEMENT REPORT

DEVELOPMENT MANAGEMENT REPORT ITEM A08-1 DEVELOPMENT MANAGEMENT REPORT TO: BY: DATE: DEVELOPMENT: SITE: WARD: APPLICATION: APPLICANT: Development Management Committee Development Manager Proposed live/work unit in connection with existing

More information

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016

Thornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016 Thornton Road, Pickering Environmental Statement Non-Technical Summary January 2016 EIA Quality This Environmental Statement, and the Environmental Impact Assessment (EIA) carried out to identify the significant

More information

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs Welcome Welcome to our consultation on our proposals for new homes on land north east of Soham Road, Fordham. Members of the project team are available to answer any questions you have and listen to feedback.

More information

Former RAF Sealand Site EIA

Former RAF Sealand Site EIA Praxis (Holdings) Ltd. Former RAF Sealand Site EIA Environmental Statement - Non Technical Summary February 2012 in association with P a g e 1 1. Introduction Praxis (Holdings) Ltd. is applying to Flintshire

More information

GREENWICH PENINSULA CABLE CAR AREA MASTERPLAN ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. 24 December 2010

GREENWICH PENINSULA CABLE CAR AREA MASTERPLAN ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. 24 December 2010 GREENWICH PENINSULA CABLE CAR AREA MASTERPLAN ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY 24 December 2010 Our Ref: DT/JLL0509 Appeal Ref (optional): RPS 1 st Floor West Cottons Centre Cottons Lane London

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities)

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities) SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Planning Committee 12 January 2011 AUTHOR/S: Executive Director (Operational Services) Corporate Manager (Planning and New Communities) Notes: S/1848/10

More information

Ref: A073350/SM/sm Date: 13 September 2013

Ref: A073350/SM/sm Date: 13 September 2013 Ref: A073350/SM/sm Date: 13 September 2013 Ian Parkinson Development Control Team Leader Planning Portsmouth City Council Civic Offices Guildhall Square Portsmouth PO1 2AY Dear Ian LIGHT & GLEAVE VILLA

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Hybrid outline/detailed planning application comprising an outline planning application for 196 residential dwellings, landscaping, open space, estate roads and infrastructure, plus 4 permanent gypsy and

More information

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL

More information

Welcome to our public exhibition

Welcome to our public exhibition About our development Welcome to our public exhibition This public exhibition gives you the opportunity to view and comment on our proposals to create a new residential development on land adjacent to

More information

Peckham Peckham Area Vision Map

Peckham Peckham Area Vision Map Area Vision Map PNAAP13 PNAAP8 Sumner Road Surrey Canal Walk Bird in Bush Park Key: NSP Site Allocations PNAAP Allocations Greenspace Low Line Cycle Network Primary Shopping Areas Square Surrey Canal Walk

More information

Marshgate Business Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

Marshgate Business Centre ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction Workspace 14 Limited (hereafter referred to as the Applicant ) has applied for full planning permission for the redevelopment of and 14 Marshgate Lane, situated on land bound by Marshgate

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.

More information

DRAYTON GARDEN VILLAGE

DRAYTON GARDEN VILLAGE DRAYTON GARDEN VILLAGE Environmental Statement Non Technical Summary 1 DRAYTON GARDEN VILLAGE / ENVIRONMENTAL STATEMENT Contents > 01 Introduction > 02 Description of Site and Surroundings > 03 The Proposed

More information

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd

ES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd Drakelow Park ES 5 Environmental Statement Volume 5: Non Technical Summary Lead Author Waterman Energy, Environment and Design Ltd April 2009 Environmental Statement Volume 5: Non-Technical Summary DRAKELOW

More information

1 The development hereby permitted shall be carried out in accordance with the following approved plans:

1 The development hereby permitted shall be carried out in accordance with the following approved plans: Location 59 Greenway Close London N20 8ES Reference: 16/00011/HSE Received: 30th December 2015 Accepted: 7th January 2016 Ward: Totteridge Expiry 3rd March 2016 Applicant: Mr Ankit Shah Proposal: Part

More information

Hounsome Fields, Basingstoke Environmental Statement Non- Technical Summary. For Wates Developments Ltd and Pellipar Investments Ltd

Hounsome Fields, Basingstoke Environmental Statement Non- Technical Summary. For Wates Developments Ltd and Pellipar Investments Ltd Hounsome Fields, Basingstoke Environmental Statement Non- Technical Summary For Wates Developments Ltd and Pellipar Investments Ltd December 2015 Contents 1 Introduction 3 2 The Proposals 8 3 Environmental

More information

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high

More information

Welcome to our Public Consultation

Welcome to our Public Consultation About our development This exhibition gives you the chance to view and comment on our emerging plans for a proposed residential development located on land to the West of Alwyn Road, Rugby. Welcome to

More information

6. Bermondsey 6.1. Bermondsey Area Vision

6. Bermondsey 6.1. Bermondsey Area Vision 6. 6.1. Area Vision 6.1.1. is: An inner-london neighbourhood characterised by modest worker ho associated with the historic Rotherhithe docks and local manufacturing industries such as biscuits, jam, vinegar

More information

10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS

10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS SCHEME EVOLUTION STARBUCKS The proposed Starbucks Drive Thru alongside the proposed food store provides an appropriate mix of uses, suitable for this location. The proposed store is bespoke, designed specifically

More information

DESIGN & ACCESS STATEMENT

DESIGN & ACCESS STATEMENT DESIGN & ACCESS STATEMENT January 2016 Contents Introduction section 1 Section 1 - Introduction Section 2 - Assessment Section 3 - Involvement Section 4 - Evaluation Section 5 - Design Section 6 - Layout

More information

RECOMMENDATION APPROVE THE APPLICATION SUBJECT TO:

RECOMMENDATION APPROVE THE APPLICATION SUBJECT TO: LOCATION: Gateway House, 318-330 Regents Park Road, Finchley Church End, London, N3 REFERENCE: F/03933/13 Received: 03/09/2013 Accepted: 30/09/2013 WARD: Finchley Church End Expiry: 30/12/2013 APPLICANT:

More information

intu Bromley Planning Summary Bringing more to Bromley February 2014

intu Bromley Planning Summary Bringing more to Bromley February 2014 intu Bromley Planning Summary February 2014 Bringing more to Bromley Contents Introduction 1 Description of the Proposals 2 Economic Benefits 4 Planning Policy 6 Cinema and Catering Assessment 7 Design

More information

LAND WEST OF ST ANDREWS ROAD

LAND WEST OF ST ANDREWS ROAD LAND WEST OF ST ANDREWS ROAD ENVIRONMENTAL STATEMENT VOLUME 3 - NON-TECHNICAL SUMMARY Submitted by Nathaniel Lichfield & Partners on behalf of Redrow Homes Limited July 2014 Applicant: Consultant Team:

More information

5. Bankside and The Borough 5.1. Bankside and The Borough Area Vision

5. Bankside and The Borough 5.1. Bankside and The Borough Area Vision 5. 5.1. Area Vision 5.1.1. are: A globally significant central London business district which is home to international business headquarters; At the heart of the commercial and cultural life of the capital

More information

A16 Ecology: Application 2 - LBHF

A16 Ecology: Application 2 - LBHF A16 Ecology: Application 2 - LBHF Addendum to the Environmental Statement Volume I January 2012 Introduction A16.1 This Chapter of the Addendum to the June 2011 Environmental Statement (ES) (hereafter

More information

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DECEMBER 2014 CRANBROOK EXPANSION AREAS ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY Submitted in support of Outline Planning

More information