Advisory Design Panel Minutes

Size: px
Start display at page:

Download "Advisory Design Panel Minutes"

Transcription

1 Present: Chair L. Mickelson Panel Members: N. Baldwin W. Francl D. Lee S. Vincent S. Lyon J. Makepeace Cpl. M. Searle Guest Panelists: James Cheng Regrets Jim Hancock Regrets Advisory Design Panel Minutes Guests: Ralph Laser, Cotter Architects Bonnie Cotter, Cotter Architects Taichi Azegami, Cotter Architects Sarah Atkinson, SCDC Aubrey Kelly, SCDC Peter van der Meulen, ZGF Architects Mark van der Zalm, VDZ+Associates Rob Whetter, Cotter Architects Michael Heeney, Bing Thom Architects Lisa Potopsingh, Bing Thom Architects Nick Sully, Shape Architecture Derek Lee, PWL Maciej Dembek, Barnett Dembek Architects Inc. Meredith Mitchell, M2 Landscape Architecture City Centre Library, Room University Drive Surrey, B.C. THURS, MAY 17, 2012 Time: 4:10 PM Staff Present: T. Ainscough, City Architect - Planning & Development H. Bello, Senior Planner - Planning & Development M. Rondeau, Senior Planner - Planning & Development G. Gahr, Acting Current Planning Manager North, Planning & Development H. Kamitakahara, Planning Technician, Planning & Development A. RECEIPT OF MINUTES / NOTES It was Panel meeting of May 3, 2012 be received. Moved by S. Vincent Seconded by L. Mickelson That the minutes of the Advisory Design Carried B. RESUBMISSIONS 1. 4:15 PM File No.: New or Resubmit: Resubmit Last Submission Date: March 22, 2012 (workshop) Description: Mixed use high rise with hotel/conference, retail, office, residential 47 storeys Address: & City Parkway & portion of Avenue, City Centre Developer: Century Group & Surrey City Development Corporation (SCDC) Architect: Patrick Cotter, Cotter Architects Landscape Architect: Mark van der Zalm, van der Zalm & Associates Planner: Gary Gahr Urban Design Planner: Mary Beth Rondeau h:\adp\minutes\2012\min adp docx Page 1

2 The City Architect explained that the previous submission was a workshop and therefore no resolution was made. It was also noted that a response to the recommendations will be presented by the applicant and the ADP is asked to comment on the applicant s response and make a formal resolution. The City Architect provided a summary of the main recommendations from the March 22 workshop: Simplify the podium to respond better to the City Hall and Library Incorporate the free standing stair from the garage in the building. Maximize the active uses at ground and the upper levels of the podium facing the plaza. Develop a more graduated approach to the shear wall openings. Delete the handles at the top of the tower. Revise landscaping to maximize the green edge and active uses facing the plaza The Project Architect presented an overview of the site plan, building plans, elevations, cross sections, and streetscapes and highlighted the following: The purpose of the presentation is to respond to the comments that were received at the workshop on March 22, The Project Architect explained the massing changes, the refining of the design of the shear wall, and the glazing system design. A significant change has been made to the footprint of the building, which has had an effect on the landscaping. The podium has been extended out, to provide a better relationship between the building and Market Street. The larger podium provides for a much more urban feel and reinforces the pedestrian sidewalk at the base of the building. More information was provided on the shear wall design. A sample illustrating the thickness of the shear wall was provided. On the east elevation, work has been done to develop a language of a continuous balcony expression. The west elevation is the cleanest of the planes. On the west elevation, the primary move was to pick up on the language of the three buildings on the plaza (Library, City Hall, Phase 3). At the pedestrian scale, these three buildings frame the public space in a hierarchical way. The design of the subject building picks up on the patterns of the other buildings and relates to them. The revised proposal allows for more animation of the plaza by creating social spaces at the podium level that are completely transparent to the plaza. Instead of being tucked away the lounge area, cafe, and hotel reception have been brought out into the centre of the space and will animate the plaza. The Sustainability Architect reviewed the sustainability plans and highlighted the following: The larger energy picture is being developed by looking at ways to build capacity and reduce energy use. The project uses a ground source heat exchange system. There have been discussions with Fortis BC about the possibility of a cogeneration turbine. h:\adp\minutes\2012\min adp docx Page 2

3 Other strategies are also being considered such as wind turbines on the roof, which have the potential to harness wind power. The focus is also on creating a higher performance building envelope. The building uses glass which has 50% light transmittance. This allows for the capitalization of views but also for solar screening. The colouration of the glass is also important; it has an effect on the appearance of the building during the day. The glass that has been chosen is a neutral colour, is lightly reflective, and complements the natural environment. The amount of glass on the building is also being balanced with the use of overhang elements, such as decks and balconies, which create shade. Within the building, the focus is on isolating the outside temperature from the inside and protecting the thermal mass of the shell, addressing heat gain using trickle ventilation. The Landscape Architect reviewed the landscape plans and highlighted the following: At the Workshop, ADP members commented that it was important for the green walls to add some interest along the side of the building. There was strong support for developing a green wall along the side of the building that is visible from the SkyTrain in order to provide visual interest as people enter the City Centre from the SkyTrain. There was also discussion about the upper floor balconies with reference to liveability, and support for greater landscaping and urban forestry at the base plane. The increased building envelope/podium has had an impact on the amount of landscaping that can be provided at the base plane. There is still a significant amount of landscaping at grade, but now there is more landscaping within the building. There is a significant space between the building and the SkyTrain guideway which allows for the penetration of light; the strategy is to capture storm water, bring it down through the green wall system, and filter it into the bioswale below the guideway. The idea is to make this an expanded public thoroughfare. The SkyTrain pillars could also be cladded with a green wall system; the vision is for this area to be a pleasant place to walk while also serving as a functional part of the storm water strategy. The green wall system uses varying sizes of the guitar pick shape that picks up on the shear wall shapes. The expression is playful and useful as it can capture storm water. The amenity spaces were discussed, including the guideway banquet meeting rooms with balcony opportunities, the health club, the children s amenity space and the skydeck. In response to questions the following information was provided by the Project Design Team: The cogeneration turbine would be a natural gas turbine that would generate electricity and provide an opportunity to capture heat waste. Strategies are being discussed with local energy providers. The cogeneration turbine would supplement the geothermal; the geothermal allows for the efficient extraction of heating and cooling and cogeneration h:\adp\minutes\2012\min adp docx Page 3

4 is a supplemental program to assist in meeting the emerging goals of the region. All of the retail space is at street level because it is anticipated that the neighbourhood cannot yet support second floor retail. A highly urban environment is anticipated but is not here yet, and some reasonable accommodations have been made considering the neighbourhood context. There has been a lot of discussion around the way the building is glazed. There is a good strategy for self-shading and high-performance glass, but at the podium level, the space warrants a different glazing treatment to allow for more public and active uses. Much more attention is being paid to the glass pattern at the first 40 feet of the building. A Structural Engineer has reviewed the 20 foot cantilever at the south, and no problems engineering this are anticipated. The underground parkade is accessed from the City Hall parking entrance. There is an agreement for shared use of public parking. The Development Application involves rezoning and a Development Permit, which run concurrently. The glazing system uses a new product and is being developed with Allen Windows. The project would be the first to use this front-glazed window wall system, which moves the glazing out to the front face of the frame, similar to curtain wall. The midday sun will hit the amenity deck and this is anticipated to be a usable space even though it will be in the shade for a lot of the day. The fitness centre and swimming pool at the amenity level will be accessible to residents and hotel guests. ADVISORY DESIGN PANEL STATEMENT OF REVIEW Mixed use high rise with hotel/conference, retail, office, residential 47 storeys & City Parkway & portion of Avenue, City Centre File No It was Moved by Stu Lyon Seconded by Nigel Baldwin That the Advisory Design Panel (ADP) recommends that the applicant address the following recommendations and revise and resubmit to the Advisory Design Panel. Note: the intent of this resolution was to request an update to the ADP on the response to the recommendations; the Panel generally supported the revisions that were made. Carried STATEMENT OF REVIEW COMMENTS Context and Site Plan Consider outdoor programmed space on the edge of the plaza. On the west side of the base there could be outdoor tables to restaurant and coffee bar. The ground plane is very simple and sterile and there could be a bit more happening there. h:\adp\minutes\2012\min adp docx Page 4

5 Present the landscape plan for the entire civic plaza to show the project in context. Form and Character The proposed building is now supportable. Notable improvements are the resolution of the base which now has a more rectilinear form which does a better job of framing the plaza. The height of the podium also has a stronger relationship to the library. The overall tower massing is elegantly composed. Internally, the entry process at grade is better resolved, and the detailed design of the hotel has evolved nicely. The open volume in the lobby mezzanine which is now at a 40 foot height is an improvement. The expansion of the building facade to Market Street is appropriate it creates a nice vaulted interior space. Good improvement to the amenity deck. Shear wall improve the gradation; will relate better to the punched window openings in the Library and the City Hall. Consider a shear wall punch pattern that works well for the rooms within. Look at it from the point of view of what s inside the building what would make the rooms outstanding? Also try for more variety and a 1 storey module. The design needs to be more random and varied in its progression. Shear wall pattern one panel member recommended guitar pick patterning should be read as inflected pairs rather than single repeated pattern as currently shown: more consistent with eastern style of patterning. The west facade needs more work, for example solar shading, variety, presence, etc. To work the facades must be curtain wall or something very like it. The western residential facade is too repetitive. Consider using the east elevation as a precedent for expression on the west side emphasis on the three floor banding. The three floor skip bands may not be necessary and may be revisited. Consider introducing Juliet balconies on the west facing hotel to allow/encourage better interaction with the public square. Consider more clarity to the hotel pre-function space. The main entrance to the building accommodates the residential tower, the office function, and the hotel. The main entrance should face the plaza directly. Many of the hotel rooms appear to be too small to function and furnish. Take into consideration the marketability of the hotel rooms. Podium extension to the west should facilitate more outdoor space at second level. A good example of this is the restaurant at the Shangri La facing onto Alberni Street. Given the scale of the development and civic plaza, a multitiered/multilevel outdoor interface is critical to successfully achieve an active edge condition. Vertically semitransparent glazing doesn t create a friendly edge to the plaza. Consider greenery on the second/third levels this is the most desirable outdoor edge to the plaza and should be celebrated as a strong indoor/outdoor space on 2 or 3 levels. h:\adp\minutes\2012\min adp docx Page 5

6 Outdoor terraces including swimming pool, outdoor fitness and amenity patio really could be opened up to visually engage with the plaza. Right now the curtain wall glazing appears flat almost like a shield to the plaza. Bring forth the human scale activity and articulation to the first 4 levels. This is a massive west facade and a massive plaza deserves a rich, articulated edge. The shoulder of the podium covers the pool and reduces its comfort level, as it reduces penetration to the deck space. The south edge of the tower should have the same solar shading as the hotel. Landscaping Like the foil between the vertical guitar pick expression on the upper terraces. Like the whimsical/playful expression of the play area and inaccessible roof space. The simplicity of the landscape approach has the potential to be carried forward on future development. The strong grid of trees is a pattern that can be easily repeated to create a consistent green canopied edge to the plaza. Consider a more contiguous bosque of trees to strengthen the green canopy frame. The plaza is inherently hard and requires green relief. It is very important to see that the plaza expression up to the building edge of this and future developments have a consistent set of elements (e.g., bollards, paving, tree grates, etc.). It is important for the ground plane of this and future developments to read as one consistent precinct. Caution on the green wall expression hard to maintain. Combining the storm water runoff and irrigation system needs to be well thought out to ensure that it will work all year round. The ground plane needs to be drawn in conjunction with the landscaping. How is the inside/outside relationship being encouraged? CPTED Focus on making the plaza as vibrant and active as possible. Don t just focus attention on the street; there should be a lot of activity occurring at ground level on the plaza; encourage active uses at ground and at the podium floors to create eyes on the plaza. Look creatively to make the space at the ground level as active as possible. Take advantage of the natural warmth of that side of the plaza that will draw people to spaces at the ground floor of this project. Accessibility Ensure that there are power doors to entrances. Ensure accessible washrooms in the hotel and public spaces. Elevator button panels should be placed on the side to provide access to all floors. Also provide voice commands for visually impaired. Provide emergency call buttons in elevator lobbies. Provide disabled parking spaces close to the elevator lobbies (625 = 13 spaces). It is preferred that the disabled parking spaces are not on lowest parking level. h:\adp\minutes\2012\min adp docx Page 6

7 Amenities should be barrier free and managed programs should be made to consider disabled residents and hotel guests. Ensure that at least 5% of the units are disabled accessible (hotel and residential). Sustainability Well thought out and ambitious environmental approach. Good points in the design include the geothermal, heat recovery ventilation, high and low trickle ventilation (however, this would be better if the glazing percentage was reduced), guitar pick shading, green walls and green roof, and operable windows. Study wind turbines and roof to confirm that they will work. They are not likely to work in practice. Good storm water strategy in the LRT strip. There is too much glass, and difficult/complex approaches are being proposed to try and balance high heat gain and cooling in order to counter the effects of the glazing. Consider reducing the amount of glass. Horizontal shading from balconies has minimal benefit on the east and west sides. On the west side it is difficult to achieve comfortable conditions with so much glass. Cogeneration is not really part of the project, it could be done/added anywhere not necessarily on this site as cogeneration needs a use for waste heat 12 months of the year and this building doesn t have a large heating load in the summer. No space available for appreciable solar panels to be practical. The Urban Design Planner provided the following comments in response to questions from the panel: The design treatment on the plaza will be carried through the entire plaza; there will be a consistent treatment on all sides. The Project Architect made the following comments on the Statement of Review: The coffee shop opens out onto the sidewalk and thought has been put into spill-out spaces around the building. An energy modelling program is currently being undertaken and the Project Team will continue to model and deal with that. h:\adp\minutes\2012\min adp docx Page 7

8 C. NEW SUBMISSIONS 2. 6:00 PM File No.: New or Resubmit: New Last Submission Date: -- Description: Residential apartment building Address: NE corner 104 Avenue and University Drive Developer: Hermann Noessler, Bosa Properties Architect: Patrick Cotter Landscape Architect: Mark VanderZalm Planner: Gary Gahr Urban Design Planner: Mary Beth Rondeau The Urban Design Planner presented an overview of the proposed project and highlighted the following: The height of the towers is set by the neighbourhood context. To the north of the site is another block of towers and then 4 to 6 storey buildings. To the west is the BC Parkway, which is a separated bike and walking path. The buildings will use District Energy system. Comments from the panel are requested on the following: o podium - this is a location close to City Hall so the question of the podium height is important; 4 to 6 storeys was recommended. o tower expression - the two towers look the same; the panel is asked to comment on whether or not the tower expression/vocabulary is distinctive enough. o size of the floor plate - 7,700 Sq. ft. proposed; 6,500 sq. ft. recommended. The Project Architect presented an overview of the site plan, building plans, elevations, cross sections, and streetscapes and highlighted the following: This is a mixed-use project immediately north of the New City Hall. There are currently six existing lots which will be consolidated as part of the Rezoning and Development Permit application. The project includes retail commercial at the corner and townhouse units at grade, at the north end. The Mayflower Cooperative development and four-storey condominium buildings exist to the east, and there is undeveloped land encumbered by the SkyTrain guideway to the northeast. The proposed design takes into consideration the existing neighbourhood context. A central private road will connect with the finer grain street network. The outdoor amenity space is split up. There is a courtyard at the north end, and a rooftop amenity space at the south end, which is accessed from the third floor of the tower. The project provides for a strong pedestrian connection to the City s pedestrian network. A private street will be established with strong northsouth access and mews that would connect to a central pedestrian spine. h:\adp\minutes\2012\min adp docx Page 8

9 A 26 storey tower and a 32 storey tower are proposed. The height increases toward the City Centre. Both towers are proposed to be accessed from the north. At-grade indoor amenity space and townhouses face east, and the indoor amenity space opens up to outdoor amenity space. The form and character of the buildings is quite contemporary, and reflects what s happening across the street in the City Centre. A main feature is the lighter-coloured framework highlighted with a darker tone, and concrete bands on every second floor. The upper floors are stepped which allows for increased slenderness and an emphasis on the height of the tower. The Landscape Architect reviewed the landscape plans and highlighted the following: The landscaping is functional and aesthetically pleasing. There are outdoor amenity spaces throughout the site. The internal street is detailed as if it were a public street. There are no street trees lining the east - west corridor. The idea is to create infiltration zones and move the street trees back. The townhouse podium provides for a nice interface and separation of private and public space. There are rooftop patio opportunities for the townhouses, which provides for street level animation. The storm water is being celebrated with a water feature. This adds an element of whimsy to the project. The idea with the storm water management is to take water off of the rooftop through planted spaces and across the greenway into a bioswale. The bioswales add a higher level of texture, reduce noise, and act as filters to capture sediment and provide for a first flush before the water enters the City system. Art will be integrated into the development as well, and the vision is to celebrate the infrastructure through the public art. In response to questions the following information was provided by the Project Architect: There is an ongoing dialogue between the project team and City staff regarding the siting of the commercial buildings, in order to provide for prominence and exposure to the street. The intention is for the project to use the City of Surrey district energy system but the details of this are still being determined. There is no resolution yet on the cross-section for the sidewalk, boulevard and multi-use path. In response to questions the following information was provided by the Urban Design Planner. There are no future plans being considered for the Mayflower Cooperative site as it will likely be there long-term. h:\adp\minutes\2012\min adp docx Page 9

10 ADVISORY DESIGN PANEL STATEMENT OF REVIEW Residential apartment building NE corner 104 Avenue and University Drive File No It was Moved by Stu Lyon Seconded by John Makepeace That the Advisory Design Panel (ADP) recommends that the applicant address the following recommendations and revise and resubmit to the Advisory Design Panel. Carried STATEMENT OF REVIEW COMMENTS Context and Site Plan The project should respond better to its City Centre / University Drive context. Vehicle Circulation Consider moving the north tower entrance ramp out of the courtyard and into the east edge of the property. There should be a direct route to the entrance of the north tower from the interior of the site. Consider a single parking entrance that would allow for a more pleasant entrance from the courtyard. Move the entrance ramp to the north tower so that an identifying courtyard can be provided in that location (at south tower). Reconfigure the loading area behind the tower (south) so that it works. Widen the doors which provide access to the bike rooms. Pedestrian Circulation Provide clear access from internal road to the north tower entrance. The proposed entries to the towers are poor. The entrances should provide for a clear indication of where you want people to enter. Form and Character Too much of an extruded floor plan in the towers. Base tower massing is okay but there is no organizing concept for the elevations. The commercial buildings should be clearly defined and the building that is further setback should be brought forward. Provide a more consistent and continuous commercial edge on the street; consider a more commercial facade and delete the piers. The blank wall on east commercial building should be softened; it is quite stark. Within the context the 2 to 3 level podium works. It creates a comfortable street front that reduces a strong urban feel. A bigger, continuous podium is needed to respond to the City Centre buildings immediately south of the site. h:\adp\minutes\2012\min adp docx Page 10

11 Residential building entries need to be more defined The buildings are heavily articulated with repetitive and continuous balcony iterations. There should be a stronger thesis for the composition of the facade, and something that is a bit more textured. The size of towers and podium height, including the floor plate, is okay especially at the bottom, but there is a concern with the length of the extrusion; consider relocating some of the tower density to a 6 or 8 storey podium over the commercial space. The same tower expression for both towers works okay, given that future development potential on neighbouring sites will create variety in the area. Concern regarding the pure symmetry of the towers. Consider a bigger gesture for the west facade. A 6,500 sq. ft. plate size is better than a 7,700 sq. ft. plate size but with architectural development a 7,700 sq. ft. plate size can work. A lot of development on massing and articulation is needed to make these towers sing. Landscaping The landscape architect is commended on the project s storm water strategies and the desire to manage storm run-off on on-slab conditions. Panel members liked the storm water features. Like the function of art celebrating storm water. There should be a larger, more usable, destination green area at grade. Knowing that street trees on grade are not feasible given the shallow slab depth, look for opportunities to introduce feature trees alongside the internalized east-west street. If not a raised planter, then berming in some areas could be considered. This may help to frame views and provide a pedestrian scale canopy. Think about the interface between the multi-use trail and the sidewalk, and how to broaden those areas. Consider combining the paths at the southwest. Give the corners some animation. Investigate opportunities to use landscaping features to draw people through and around the detached Commercial Retail Units and through the mews. Ensure that the storm water management system can handle the high volume of water anticipated. The landscaping has many interesting functions and programming which provides some interest and something for people of all ages. Consider a rooftop community amenity space on the south tower. Provide more landscaped space in the courtyard and finer grained design development. CPTED Provide a high quality streetscape including way finding and providing eyes on the street. Ensure that after-hours lighting is provided. h:\adp\minutes\2012\min adp docx Page 11

12 Accessibility Ensure that the call button panel is placed on its side to allow access to all floors. Amenities should be wheelchair accessible with accessible washrooms. The entry and underground parking call buttons should be accessible. There should be emergency call buttons in elevator lobbies. All patios and rooftop amenities should be barrier free. Paving should be level and wheelchair accessible. Provide power doors to retail/commercial spaces. At least 5% of the units should be disabled accessible. Sustainability Good approaches for rainwater collection and runoff strategies. Would like to see less glass. Less than 40% glazing is a good approach. It is positive that the project will be required to be on the District Energy System for energy efficiency. 3. 7:00 PM File No.: New or Resubmit: New - workshop Last Submission Date: -- Description: Proposed Guildford aquatic centre with 50 metre pool & leisure pool Address: Street and Avenue Developer: Scott Groves, City of Surrey Civic Facilities Architect: Landscape Architect: Planner: Urban Design Planner: BTA and Shape Architects Derek Lee, PWL Landscape Architects Pat Lau Mary Beth Rondeau The Project Architect presented an overview of the site plan, building plans, elevations, cross sections, and streetscapes and highlighted the following: The context of the Guildford Aquatic Centre was explained. The site is located along two major arteries 152 Street and 104 Avenue, and is a gateway into Guildford and Surrey in general. 104 Avenue is a future rapid transit corridor. In the general area there is a mall with an abundance of surface parking, low-rise residential buildings, two hotels (the Sandman and Sheraton), gas stations, and office commercial buildings. There is an existing library and recreation centre on the subject site, along with surface parking. The site slopes from south to north, about 6 metres across the site. There is a treed area at the northeast corner of the site, and a storm water pond condition close to 152 Street. There is a Jim Pattison digital sign at the corner of 152 Street and 105 Avenue, and an existing skate park close to 105 Avenue and the existing Recreation Centre entrance. The site consists of two properties which would be consolidated into one as part of the application. The site is bordered by Lincoln Drive to the north. h:\adp\minutes\2012\min adp docx Page 12

13 At first, a four-storey parking structure was being considered on the site at the north west, but this was problematic. The existing library views would be disturbed by such a parking structure, as well as the low-rise residential development to the north of the site. As a result, the additional parking has been located at the northeast corner of the site. This would allow for a more efficient layout, design and construction efficiencies, and costeffectiveness. The grading of the site poses a challenge. The design bridges the existing and proposed buildings with a new reception and control area. One of the problems with the existing building is that the control area is placed in a corridor, so people have difficulty figuring out where they need to go. This problem would be rectified with the new reception and control area as proposed. Different orientations were considered for the pool. The pool is sunken down in order to provide a more sensitive reaction to the grades along 152 Street. The parking and building are tied together with the use of landscaping as a feature. The landscaping will act to bring people across the site. The idea is to look toward the future in determining the location for teh entrances to the addition. The existing condition is a suburban environment where everything on the site is internal. The entrances are internal and not off of the main street. The new building will have an entrance off of 152 Street to offer a civic gateway and address the future more urban condition that may be set up with commercial activity along 152 Street. 304 parking stalls are required, based on shared usage and good pedestrian connections to the parking lots and the main entrances as well as the use of the Guildford Town Centre parking lot. The vehicular circulation will create an opportunity to go in several directions once you enter the site. There will be a ramp along the east side which will take vehicles to the lower level. The ramp will act as a buffer to the parking from 152 Street. For pedestrian circulation, there is an existing sidewalk around the perimeter of the site, and connections will be added to the sidewalk as well as to new crosswalks and pedestrian paths. There may be some potential conflicts between the vehicle and pedestrian circulation which will be dealt with. CPTED considerations have been taken into account. There will be landscape lighting as well as a light splaying out from the building. Glazing will be provided in stairwells to open them up, and there will be passive surveillance at the pool deck level. The design has a natural organic fluidity. The vision for the project is as a magic box, with recessed punched windows which filter out toward the south and north. The existing building is notorious for energy consumption so we have selectively placed glazing and the skylight washes the walls creating a dynamic interior space as time passes. The building is designed as a contemporary reinterpretation of a Roman or Turkish bath. h:\adp\minutes\2012\min adp docx Page 13

14 The Landscape Architect reviewed the landscape plans and highlighted the following: One of the key things driving the project is storm water management. There is a large existing storm water detention pond on the site. With the introduction of additional parking and an increased building footprint, the storm water management strategy is very important. The conventional method would be to create a concrete vault to store the water. The intent of the storm water management strategy is to satisfy the storm water requirements and introduce a whole system of habitat to the site, while also being more efficient on budgeting. The area surrounding the aquatic centre is low and the idea is to create a seamless transition between the inside and outside of the aquatic centre with the landscaping and water features. The contours create interesting transitions and add artistic and architectural expression. The storm water pond wraps around and expresses the contours. Pedestrian flows are also important. As you move through the site you enter a waterscape moving across into a civic-scale plaza. To address the existing conditions, about 40% of the skate park will be lost, so there is a need to work with the City to extend the skate park around the facade of the building. There is potential for a treed buffer to soften views of the parking lot from 152 Street, given that the parking lot is 1 metre below the street. Opportunities are being considered to use trees to act as a foil to the character of the building. In response to questions the following information was provided by the Project Architect and Landscape Architect: A heat recovery system is being considered, which would use and reuse humidification load. Solar panels are also being considered. The storm water management pond will have a 2-tier system. The lower tier is much drier than the upper tier. The lower tier is essentially overflow, and there will be much more permanent planting and water at this level. The upper tier is more aquatic. The soil is clay so the need for a clay liner is being reviewed; it may not be necessary. With the storm water, the focus is on detaining water and not groundwater filtration. The idea is to retain the water and create a blue plate around the perimeter of the building. The focus is on slowing the peak flows of water, but not eliminating them. The natural soil is clay, so there is very little groundwater filtration naturally. The below grade glazing is intentional; there are issues of glare with the swimming pool and implications of solar gain. In the evening, the light of the magic box will spill out, so the glow of the interior will register on the large facade at different times of the day. h:\adp\minutes\2012\min adp docx Page 14

15 ADVISORY DESIGN PANEL STATEMENT OF REVIEW Proposed Guildford aquatic centre with 50 metre pool & leisure pool Street and Avenue File No It was Moved by Walter Francl Seconded by Stephen Vincent That the Advisory Design Panel (ADP) accept the workshop into the minutes. Carried STATEMENT OF REVIEW COMMENTS Context Be careful about steep drops on the southeast corner from grade. Consider how to integrate or avoid guard rails. Pedestrian Circulation Include stairs straight up to the entrance on the east wall. Form and Character There was a minor concern regarding the internal quality of the stair at the lower entry. It seems very internal for what could be quite a major entry or arrival point. The other entrances are natural and generous. Unclear how the glazed entry bridge roof meets the existing east building wall. Resolve how it attaches to the existing building. How can the roof be expressed as a source of storm water? Landscaping The landscaping was well received by the panel. There was support for the dynamic nature of the curvilinear path and the 152 St. entry. Consider a sunny green outdoor bank to sit out on after using the pool. Include an art element with the storm water. Consider what the storm water pond will look like in all seasons. Consider using some small bubbles/aeration to allow for recirculation and to avoid stagnant water, West Nile virus. Carefully consider the stone wall material and make sure that the right size module is used. CPTED There is a CPTED challenge with the east elevation and the trench. The lower level concealed space is not supported. Think about landscaping and programming to determine how best to handle this. Skate parks are best at street level so that there is surveillance. Some users advise the existing skate park is the least attractive skateboarding facility in the City. If 40% of the skate park will be lost, or if it s being relocated, the design issues need to be addressed. If not the users will use the pedestrian ramps at 152 St. and the parkade; this will create conflict with other users. h:\adp\minutes\2012\min adp docx Page 15

16 Support the north entry. Consider where large groups can gather at the entries to the building, e.g., swim teams. Use CCTV where appropriate. Accessibility The wheelchair accessibility for the project was described very well. The entrance off of 152 Street will have accessibility challenges because of the grade change at that location. Provide accessible parking and washrooms. Ensure ramps and walkways are to code. Include power doors. Ensure that the pool decks and aquatic areas are wheelchair accessible. Ensure that the change rooms, washrooms, etc. are accessible. Sustainability The daylighting of pools should be an essential quality of the space. Consider rooftop treatments including green roofs. A suitable budget should be put toward mechanical, ventilation and plumbing systems to reduce annual energy consumption. Anything that will improve efficiency of the mechanical systems and reduce maintenance would be appropriate. 4. 8:10 PM File No.: General DP Detail DP (Phase 2) New or Resubmit: New Last Submission Date: -- Description: Hotel/Conference Centre General DP for site and Detail DP for Phase 2 Retail / Office Address: A Street, Douglas Developer: Hardy Bains Architect: Maciej Dembek, Barnett Dembek Architects Inc. Landscape Architect: Meredith Mitchell, M2 Landscape Architecture Planner: Keith Broersma Urban Design Planner: Hernan Bello The Urban Design Planner presented an overview of the proposed project and highlighted the following: The site context was explained. There is an existing building on the site which is under construction at the northeast corner. The Douglas Neighbourhood Context Plan area exists to the west of the site, the border crossing is to the south, and there is a townhouse development immediately west of the site. The same colour scheme will be used for the project as is being used on the building under construction at the northeast corner of the site. h:\adp\minutes\2012\min adp docx Page 16

17 There is an approved DP for the site, and the general site plan for the area has been determined. 176 Street is a major road that goes to the border. Most of the time cars and trucks are lined up for the border on 176 Street in front of the site. A landscape buffer is required to smooth the transition between the site and the townhouse development to the west. Staff also asked for linkages for future pedestrian activity for residents in the townhouse units and the adjacent Douglas neighbourhood. The Project Architect presented an overview of the site plan, building plans, elevations, cross sections, and streetscapes and highlighted the following: There is a pre-existing Development Permit for the site, and the site plan has been expanded to accommodate the parking for the proposed site programming. The detailed Development Permit being presented is for the building at the corner of 4 Avenue and 176 Street. The remaining building on the site, for which comments on the general Development Permit are sought, includes a 2-storey portion with a conference centre on the second floor and retail on the first floor, and a 4- storey portion for a hotel (Best Western Premiere). An indoor waterslide development is proposed at the south end of the building. Access to the hotel and conference centre is on the east side of the building. The conference centre consists of a large hall that is divisible into four smaller units. There is a roof deck on the east side and another on the north side off of the hall. There is a large service corridor that connects to a kitchen on the ground floor on the west side of the building. The water park was originally envisioned as for hotel patrons only, but it may be expanded so that the public can access it as well. The waterslide entry is at the southwest corner. Sidewalks connect through the site and pick up points of contact with the building. The hotel is defined with a ledge stone base and three storeys out of fibre cement board and supporting a large overhanging roof. For the corner building, a lot more details have been provided because the applicant has applied for a detailed Development Permit for this building. The building will include three commercial retail units on the ground floor, and office space on the upper floor with a rooftop terrace covered with a colonnade. The corner building (Phase 2) is at the northeast corner of the site, and announces the site as you drive down 176 Street (Highway 15). A lot of permeable paving is proposed as part of the overall development. The developer has made some attempts to address sustainability issues within the constraints of a limited budget. A high efficiency air conditioning system (heat pumps) is proposed, and fresh air will be ducted into interior spaces. In addition, low water faucets will be used. The Landscape Architect reviewed the landscape plans for the detailed Development Permit for Phase 2 and highlighted the following: h:\adp\minutes\2012\min adp docx Page 17

18 The same character of plant material, heights, colours, etc. as in Phase 1 are being used on the street frontage in order to make sure that there is good connectivity between the phases. Permeable pavers and rain gardens are used to encourage more natural drainage. A mix of plant materials are used along the highway (176 Street), where the trucks park while waiting to cross the border. The intent is to add interest and variety along the highway frontage. The idea is to create an interesting and colourful corner at 4 Avenue and 176 Street with the landscaping. In response to questions the following information was provided by the Project Architect: The entries to the hotel and conference centre are on the east side of the buildings in response to concerns expressed from neighbouring residents to the west of the site. The intent is that the landscape treatment along 176 Street would be carried though the entire length of the site, that large feature trees would be spotlighted, and that the remaining landscaping would be varied in order to create a more natural feel instead of just street trees. ADVISORY DESIGN PANEL STATEMENT OF REVIEW Hotel/Conference Centre General DP for site and Detail DP for Phase 2 Retail/Office A Street, Douglas File No General DP; Detail DP (Phase 2) General DP for site It was Moved by Walter Francl Seconded by John Makepeace That the Advisory Design Panel (ADP) recommends that the applicant address the following recommendations and revise and resubmit to the Advisory Design Panel. Carried Detailed DP for Phase 2 It was Moved by Nigel Baldwin Seconded by Stu Lyon That the Advisory Design Panel (ADP) recommends that the applicant address the following recommendations and revise and resubmit to the Advisory Design Panel Carried STATEMENT OF REVIEW COMMENTS General DP Vehicle Circulation This is an auto-dominated project. h:\adp\minutes\2012\min adp docx Page 18

19 Consider reducing the parking areas and increasing the landscape area, e.g., delete 20 parking spaces and convert to landscape space at the entry to the hotel/conference; locate the building around the green space. Consider a c-shaped driveway with a distinctive pattern of paving that comes around the end of the building. There are strong concerns about traffic congestion in the area. Provide drop-off parking spaces at the front entries. Pedestrian Circulation Consider an entrance that spans the whole building permitting an entrance on 175A Street, so that people can enter from both sides of the building, instead of having to walk around the building to get to the entrance. Form and Character Combine the hotel and convention centre entrance into 1. The two uses benefit from synergies between the two even if they are operated by separate operators. Consider a porte-cochere to break up the building and make it more permeable. The project is inward focused. Opportunities for more animation around the building should be considered, such as a purpose-built plaza or larger open area. Landscaping Provide more locations for outdoor seating, nodes for congregation and adequate outdoor space for cafe/interactive zones by increasing the sidewalk width along the commercial retail unit entrances. Depending on the type of retail, the sidewalks are somewhat shallow; it is recommended that the applicant find an opportunity for flex space. There is a lot of asphalt paving and the landscaping tends to be primarily in left-over spaces, with the exception of the rain gardens at the northeast corner. The water park needs more outdoor space outside of the front door. The proposed permeable paving is positive and is encouraged. Explore how it could be handled/combined with the bioswales. There should be a landscaping frame around the building instead of having parking right to the building all the way around the perimeter. Accessibility Include a minimum of 6 handicapped parking spaces. At least 5% of the hotel units should be disabled accessible. Include power doors at entrances. Washrooms in the conference centre and commercial areas should be wheelchair accessible. Sidewalks should be a minimum of 6 feet in width. Sustainability Should have less on grade parking. Consider underground parking or multi-level parking. h:\adp\minutes\2012\min adp docx Page 19

20 A good approach is needed for an energy efficient heating and cooling system for the hotel and conference centre. Consider geothermal or a similar system. This would be a good location for geothermal because heat is needed for the pool. STATEMENT OF REVIEW COMMENTS Detailed DP Phase 2 Vehicle Circulation Relocate the garbage/recycling enclosure to permit better views into the dead-end parking aisle. The drive-through is at odds with the desire to create a strong corner entry to the site. Form and Character Introduce some glazing into the north and east walls. Consider making the whole building 2-storeys all the way through, and especially at the corner. Landscaping Generally, the landscaping is consistent and appropriate. The varied landscape expression along the eastern edge is supported, but it is recommended that there is some degree of rhythm with the tree species. A native/natural expression is supported, and some higher understory planting to screen opposing headlights is recommended. Use evergreen trees along 176 Street so that the landscaping screens opposing headlights in all seasons. While encouraged elsewhere, the permeable paving in the drive-through area is discouraged because this area is more susceptible to oil dripping and other pollutants, which puts extra demand on the bioswale. Accessibility Include power doors at entrances. Washrooms should be wheelchair accessible. Sidewalks should be a minimum of 6 feet in width. D. NEXT MEETING The next Advisory Design Panel is scheduled for Thursday, May 31, E. ADJOURNMENT The Advisory Design Panel meeting adjourned at 9:00 pm Jane Sullivan, City Clerk Leroy Mickelson, Chairperson, Advisory Design Panel h:\adp\minutes\2012\min adp docx Page 20

Advisory Design Panel Minutes

Advisory Design Panel Minutes Advisory Design Panel Minutes 2E - Community Room B City Hall 13450-104 Avenue Surrey, B.C. THURSDAY, JUNE 7, 2018 Time: 4:00 p.m. Present: Chair - L. Mickelson Panel Members: J. Leger K. Johnston M. Enns

More information

Advisory Design Panel Minutes

Advisory Design Panel Minutes Present: Chair - L Mickelson D. Newby M. Ehman M. Vance T. Coady K. Johnston S. Forrest M. Younger Advisory Design Panel Minutes Guests: C. Kay, Townline S. Jedreicich, Townline C. Mackintosh, GBL Architects

More information

Advisory Design Panel Minutes

Advisory Design Panel Minutes Chair: S. Lyon Panel Members: CPL. M. Searle K. Newbert L. Mickelson M. Ehman R. Myers M. Mortensen Advisory Design Panel Minutes Guests: C. Hogan, Focus Architecture Inc. A. Good, DMG Landscape Architects

More information

Advisory Design Panel Minutes

Advisory Design Panel Minutes Advisory Design Panel Minutes 2E - Community Room B City Hall 13450-104 Avenue Surrey, B.C. THURSDAY, FEBRUARY 28, 2019 Time: 4:09 p.m. Present: Panel Members: L. Mickelson, Chair A. Callison G. Borowski

More information

City of Surrey. Advisory Design Panel Minutes

City of Surrey. Advisory Design Panel Minutes City of Surrey Advisory Design Panel Minutes Parks Boardroom #1 City Hall 14245-56 Avenue Surrey, B.C. THURSDAY, FEBRUARY 5, 2009 Time: 4:07 p.m. Present: Chair - P. Cotter Panel Members: W. Francl A.

More information

WINDSOR GLEN DESIGN GUIDELINES

WINDSOR GLEN DESIGN GUIDELINES WINDSOR GLEN DESIGN GUIDELINES Adopted by Council, 2006 WINDSOR GLEN REDEVELOPMENT DESIGN GUIDELINES August 2006 1.0 Master Plan Organization For this area of the Coquitlam Town Centre, a mix of high,

More information

HIGHLAND VILLAGE GREEN URBAN DESIGN PRINCIPLES/GUIDELINES

HIGHLAND VILLAGE GREEN URBAN DESIGN PRINCIPLES/GUIDELINES URBAN DESIGN GUIDING PRINCIPLES/GUIDELINES CONTEXT/CHARACTER The City of Calgary s Municipal Development Plan (MDP), Transit-Oriented Development (TOD) Policy Guidelines and Main Street/Corridor policy

More information

Site Planning. 1.0 Site Context. 2.0 Pedestrian Circulation Systems. Pag e 2-23

Site Planning. 1.0 Site Context. 2.0 Pedestrian Circulation Systems. Pag e 2-23 The following photographs from throughout the country illustrate key urban design principles. Photographs are provided to illustrate the overall urban design concepts described in Chapter 1 of the Downtown

More information

Westwind Developments Ltd. PIONEER LANDS AREA STRUCTURE PLAN - PROPOSED AMENDMENT

Westwind Developments Ltd. PIONEER LANDS AREA STRUCTURE PLAN - PROPOSED AMENDMENT FEBRUARY 2013 TABLE OF CONTENTS 1.0 BACKGROUND... 1 1.1 Amendment... 1 2.0 LOCATION & CONTEXT... 2 2.1 Land Ownership... 2 3.0 POLICY CONTEXT... 3 3.1 Municipal Development Plan... 3 3.2 Capital Region

More information

Highland Village Green Design Guidelines

Highland Village Green Design Guidelines Highland Village Green Design Guidelines Publishing Information Title Highland Village Green Design Guidelins Author The City of Calgary Status DRAFT - Proposed document subject to changes Additional Copies

More information

Urban Design Guidelines Townhouse and Apartment Built Form

Urban Design Guidelines Townhouse and Apartment Built Form Urban Design Guidelines Townhouse and Apartment Built Form Town of Wasaga Beach Table of Contents 1. Introduction 1.1. Purpose 1.2. Urban Design Principles 1.3. Application of Guidelines 2. Site Design,

More information

Figure 3-1: Public Realm Plan

Figure 3-1: Public Realm Plan 3 Public Realm Figure 3-1: Public Realm Plan 3.1 Public Realm Concept The public realm concept for the Little Mountain site integrates a clear and accessible movement network with public spaces for social

More information

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 DESIGN BRIEF CONTENTS PART A 1.0 INTRODUCTION 2.0 DESCRIPTION & ANALYSIS OF SITE CONTEXT 3.0 DESIGN CONSTRAINTS AND OPPORTUNITIES

More information

SQUAMISH 2010 AND BEYOND COMMUNITY VISION

SQUAMISH 2010 AND BEYOND COMMUNITY VISION Our plan has been imagined and created to be both pragmatic and visionary. At the core of the strategy is a consideration of the highway s role and its impact on the community. First and foremost in creating

More information

Policies and Code Intent Sections Related to Town Center

Policies and Code Intent Sections Related to Town Center Policies and Code Intent Sections Related to Town Center The Town Center Vision is scattered throughout the Comprehensive Plan, development code and the 1994 Town Center Plan. What follows are sections

More information

Clairtrell Area Context Plan

Clairtrell Area Context Plan Clairtrell Area Context Plan March 2005 Urban Development Services City Planning Contents 1. Introduction... 4 2. Development Structure... 6 2.1 Streets... 7 2.1.1 Sheppard Avenue and Bayview Avenue...

More information

AIRPORT BUSINESS PARK

AIRPORT BUSINESS PARK PIER MAC PETROLEUM INSTALLATION LTD. AIRPORT BUSINESS PARK DEVELOPMENT APPLICATIONS March 2003 4.1 Airport Business Park Development Permit Area 4.1.1 Justification/Design Concept The design concept envisioned

More information

FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project

FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project DEVELOPER: SIGNATURE PROPERTIES ARCHITECT: HKIT ARCHITECTS April 23, 2010 TABLE OF CONTENTS 3 Vision 4 Description of Site 5 Guiding Concepts 6

More information

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership Workshop 3 City of Burlington Waterfront Hotel Planning Study September 14, 2017 The Planning Partnership The Waterfront Hotel Planning Study 01 The Brant & Lakeshore Planning Study will establish a Strategic

More information

Regency Developments. Urban Design Brief. Holyrood DC2 Rezoning

Regency Developments. Urban Design Brief. Holyrood DC2 Rezoning Regency Developments Urban Design Brief Holyrood DC2 Rezoning Stantec Consulting Ltd. 7-31-2017 1. Overview Regency Developments intends to rezone the lands located at 8510 and 8511 93 Avenue, within the

More information

SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN

SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN DD/MM/YY Proposed C120 SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY Shown on the planning scheme map as DDO12. GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN 1.0 Design objectives DD/MM/YY Proposed

More information

East Bayshore Road Neighbourhood

East Bayshore Road Neighbourhood East Bayshore Road Neighbourhood Northridge Property Management Urban Design Brief 3195 East Bayshore Road City of Owen Sound January 2016 East Bayshore Road Neighbourhood Northridge Property Management

More information

Advisory Design Panel Minutes

Advisory Design Panel Minutes Advisory Design Panel Minutes Parks Boardroom #1 City Hall 14245-56 Avenue Surrey, B.C. THURSDAY, JULY 19, 2012 Time: 4:00 PM Present: Chair - L. Mickelson Panel Members: N. Baldwin D. Lee S. Lyon J. Makepeace

More information

THE CORPORATION OF THE DISTRICT OF WEST VANCOUVER DESIGN REVIEW COMMITTEE MEETING MINUTES MUNICIPAL HALL COUNCIL CHAMBER THURSDAY, JULY 19, 2018

THE CORPORATION OF THE DISTRICT OF WEST VANCOUVER DESIGN REVIEW COMMITTEE MEETING MINUTES MUNICIPAL HALL COUNCIL CHAMBER THURSDAY, JULY 19, 2018 THE CORPORATION OF THE DISTRICT OF WEST VANCOUVER DESIGN REVIEW COMMITTEE MEETING MINUTES MUNICIPAL HALL COUNCIL CHAMBER THURSDAY, JULY 19, 2018 Members Present: Voting Members: Shelley Craig (Chair);

More information

WEST LOOP DESIGN GUIDELINES CHECKLIST

WEST LOOP DESIGN GUIDELINES CHECKLIST WEST LOOP DESIGN GUIDELINES CHECKLIST Section 1.0 General Strategies 1.1 DESIGN EXCELLENCE: ENCOURAGE HIGH QUALITY AND INNOVATIVE DESIGN OF NEW BUILDINGS WITHIN THE WEST LOOP WITHOUT BEING PRESCRIPTIVE

More information

Landscape Site Plan BLOCK D BLOCK A BLOCK C BLOCK B DEC 2009 L A N E W AY ARBUTUS 2 MEWS ARBUTUS STREET YEW STREET EXTENSION LEGEND

Landscape Site Plan BLOCK D BLOCK A BLOCK C BLOCK B DEC 2009 L A N E W AY ARBUTUS 2 MEWS ARBUTUS STREET YEW STREET EXTENSION LEGEND Landscape Site Plan Green Edges Arbutus Mews Public Square Urban Garden Courts Green Roofs City Homes Private Patios Private Roof Terraces Urban Agriculture Plots BLOCK D BLOCK C YEW STREET EXTENSION L

More information

DEVELOPMENT DESIGN GUIDELINES

DEVELOPMENT DESIGN GUIDELINES DEVELOPMENT DESIGN GUIDELINES Approved by Surrey City Council January 26, 2004 Campbell Heights Business Park - Development Design Guidelines TABLE OF CONTENTS 1.0 DEVELOPMENT CONCEPT... 1 2.0 DESIGN OBJECTIVES...

More information

THE CORPORATION OF THE CITY OF NORTH VANCOUVER

THE CORPORATION OF THE CITY OF NORTH VANCOUVER THE CORPORATION OF THE CITY OF NORTH VANCOUVER Meeting of the Held at City Hall, 141 West 14th Street, North Vancouver, B.C. in Conference Room A on Wednesday, July 20,2005 M I N U T E S Present: Staff:

More information

Advisory Design Panel Minutes

Advisory Design Panel Minutes Advisory Design Panel Minutes Park's Meeting Room #1 City Hall 14245-56 Avenue Surrey, B.C. THURSDAY, FEBRUARY 4, 2010 Time: 4:00 PM Chair: L. Mickelson Panel Members: Cpl. M. Searle M. Ehman M. Mortensen

More information

Advisory Design Panel Minutes

Advisory Design Panel Minutes Advisory Design Panel Minutes 2E - Community Room B City Hall 13450-104 Avenue Surrey, B.C. THURSDAY, JANUARY 26, 2017 Time: 4:03 pm Present: Chair Leroy Michelson M. Enns M. Lesack D. Nelson A. Scott

More information

Bel-Air Lexus Automobile Service Station

Bel-Air Lexus Automobile Service Station Bel-Air Lexus Automobile Service Station Design Brief 443-447 McArthur Avenue Ottawa April 30, 2015 14-1299-MCA Site Details Application: Site Plan Control Legal Description and Municipal Addresses: 443

More information

Cit of Kitchener Ur 6 an Design Manual PARTA. Desi n for _--::

Cit of Kitchener Ur 6 an Design Manual PARTA. Desi n for _--:: Cit of Kitchener Ur 6 an Design Manual Date PARTA Year ) Desi n for k Nodes Corridors _--:: Section Page 01 of 12 2 INTRODUCTION Purpose & Application Nodes and Corridors have been identified as key intensification

More information

MULTIFAMILY RESIDENTIAL DESIGN PRINCIPLES Site Plan and Design Review Principles Checklist

MULTIFAMILY RESIDENTIAL DESIGN PRINCIPLES Site Plan and Design Review Principles Checklist MULTIFAMILY RESIDENTIAL DESIGN PRINCIPLES Site Plan and Design Review Principles Checklist Applicant s Name: Project Address: Phone: Email: Applicant shall fill out the design guidelines checklist for

More information

Buildings may be set back to create small plazas provided that these setbacks do not substantially disrupt the street wall s continuity.

Buildings may be set back to create small plazas provided that these setbacks do not substantially disrupt the street wall s continuity. 6-22 Community Design Street Walls and Street-front Setbacks The siting of buildings will play a critical role in establishing the character and sense of place for the District. Siting buildings at the

More information

NEW WESTMINSTER DESIGN PANEL Tuesday, June 27, :00p.m. Council Chamber

NEW WESTMINSTER DESIGN PANEL Tuesday, June 27, :00p.m. Council Chamber NEW WESTMINSTER DESIGN PANEL Tuesday, 3:00p.m. Council Chamber MINUTES MEMBERS PRESENT: Chris Block Maranatha Coulas Meredith Mitchell David Roppel Craig West REGRETS: Maria Fish Rodney Maas GUESTS: Ross

More information

NEW WESTMINSTER DESIGN PANEL

NEW WESTMINSTER DESIGN PANEL NEW WESTMINSTER DESIGN PANEL Tuesday, 3:00p.m. Committee Room No. 2 MINUTES MEMBERS PRESENT: Ken Falk Jay Hiscox Keith Ross Steve Wong REGRETS: Cheryl Fu Doug Hamming Tom Morton GUESTS: Scott Gordon Rebecca

More information

Revitalization Guidelines for Corridors, Villages and Town Centres

Revitalization Guidelines for Corridors, Villages and Town Centres Revitalization Guidelines for Corridors, Villages and Town Centres July 2017 Updated May, 2018 Publishing Information Title: Prepared by: Revitalization Guidelines for Corridors, Villages and Town Centres

More information

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas 111111 PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction The ION rapid transit system will link Waterloo, Kitchener and Cambridge through a central transit corridor (CTC). There are a number

More information

Commercial Development Permit Area

Commercial Development Permit Area City of Kamloops KAMPLAN Commercial Development Permit Area PURPOSE The purpose of this Development Permit Area (DPA) is to establish objectives and provide guidelines for the form and character of commercial

More information

City of Vaughan Urban Design Guidelines for Infill Development in Established Low-Rise Residential Neighbourhoods

City of Vaughan Urban Design Guidelines for Infill Development in Established Low-Rise Residential Neighbourhoods City of Vaughan Urban Design Guidelines for Infill Development in Established Low-Rise Residential Neighbourhoods DRAFT - September 2016 Contents 1. Introduction 1 2. Policy Context 3 3. Characteristics

More information

DESIGN GUIDELINES CITY OF OTTAWA

DESIGN GUIDELINES CITY OF OTTAWA DESIGN GUIDELINES CITY OF OTTAWA DECEMBER 17, 2015 BASED ON THE ISLES: DOMTAR LANDS REDEVELOPMENT MASTER PLAN DATED APRIL 22, 2014 AND PREPARED BY PERKINS+WILL ZIBI DESIGN GUIDELINES Prepared by FOTENN

More information

Advisory Design Panel Minutes

Advisory Design Panel Minutes Present: L. Mickelson - Chair C. Taylor T. Wolf D. Newby N. Baldwin S. Vincent (1 st item only) M. Young S. Forrest Absent: G. McGarva J. Makepeace E. Mashig B. Wakelin T. Bunting B. McGinn T. Coady M.

More information

599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report

599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report Date: March 7, 2017 To: From: Wards: Reference Number: Scarborough Community

More information

5.1 Site Plan Guidelines

5.1 Site Plan Guidelines 5. Community Core Guidelines Development of the Community Core will take place by plan of subdivision and site plan approval. It will occur in a phased manner that will reflect the timing of residential

More information

1354 CARLING AVENUE FORMAL RESUBMISSION HOLLOWAY LODGING

1354 CARLING AVENUE FORMAL RESUBMISSION HOLLOWAY LODGING 1354 CARLING AVENUE FORMAL RESUBMISSION HOLLOWAY LODGING DECEMBER, 2017 THE SITE 1354 CARLING AVENUE The subject property is at a key gateway to the Carlington Neighbourhood, and when combined with future

More information

Advisory Design Panel Minutes

Advisory Design Panel Minutes Advisory Design Panel Minutes Parks Boardroom #1 City Hall 14245-56 Avenue Surrey, B.C. THURSDAY, SEPTEMBER 2, 2010 Time: 4:15 p.m. Chair: L. Mickelson Panel Members: K. Newbert M. Ehman R. Myers S. Lyon

More information

Tel: (705) Fax: (705)

Tel: (705) Fax: (705) 521 and 525 Essa Road City of Barrie Tel: (705) 812-3281 Fax: (705) 812-3438 Email: INFO@IPSCONSULTINGINC.com 1 5 0 D U N L O P S T R E E T E A S T, S U I T E 2 0 1, B A R R I E O N T A R I O L 4 M 1 B

More information

Sierra Springs Regional Commercial Master Site Plan Airdrie, Alberta Hopewell Development Corporation Project No May 26, 2010

Sierra Springs Regional Commercial Master Site Plan Airdrie, Alberta Hopewell Development Corporation Project No May 26, 2010 Sierra Springs Regional Commercial Master Site Plan Airdrie, Alberta Hopewell Development Corporation Project No. 205-077 May 26, 2010 TABLE OF CONTENTS Purpose... 2 Master Site Plan Guidelines... 3 Overall

More information

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN ELMVALE ACRES SHOPPING CENTRE MASTER PLAN Contents 1.0 INTRODUCTION... 2 2.0 LOCATION... 2 3.0 EXISTING CONTEXT... 2 4.0 VISION & GUIDING PRINCIPLES... 2 5.0 LAND USE AND BUILT FORM... 4 5.1 St. Laurent

More information

Mixed Use Centres Development Permit Guidelines

Mixed Use Centres Development Permit Guidelines 1 Mixed Use Centres Development Permit Guidelines Area Commercial or Mixed Use development occurring in City Centre, Urban Centre, Neighbourhood Centre, or Institutional Complex land use designations is

More information

Landscape and Streetscape Design 2.5

Landscape and Streetscape Design 2.5 Landscape and Streetscape Design 2.5 2.5.1 Goals 2.5.2 Planting 2.5.3 Sidewalks and Pavement 2.5.4 Furnishings 2.5.5 Walls 2.5.6 Lighting 2.5.7 Stormwater 2.5.8 Street Cross Sections 2.5 LANDSCAPE AND

More information

Design Guidelines - 1 -

Design Guidelines - 1 - Design Guidelines REAR YARDS Rear yard decks and porches, attached to a garden or garage suite, should be permitted provided minimum rear yard setbacks, separation distances, and necessary site access

More information

Urban Design Brief December 23, 2015 Southside Construction Group Official Plan & Zoning By-Law Amendment

Urban Design Brief December 23, 2015 Southside Construction Group Official Plan & Zoning By-Law Amendment Urban Design Brief Proposed Official Plan & Zoning By-Law Amendment 3244, 3263 and 3274 Wonderland Road South Southside Group December 23, 2015 TABLE OF CONTENTS Page No. INTRODUCTION... 1 SECTION 1 LAND

More information

4.9 Mendocino Avenue Corridor Plan Design Guidelines

4.9 Mendocino Avenue Corridor Plan Design Guidelines 4.9 Mendocino Avenue Corridor Plan Design Guidelines The Mendocino Avenue Corridor Plan addresses the area between College Avenue and Steele Lane. Mendocino Avenue is a busy arterial that runs parallel

More information

DRAFT Northeast Quadrant of Kipling Avenue and Highway 7 DRAFT AUGUST 29, Goals Land Use. The goals of this Plan are to:

DRAFT Northeast Quadrant of Kipling Avenue and Highway 7 DRAFT AUGUST 29, Goals Land Use. The goals of this Plan are to: AUGUST 29, 2017 12.15 Northeast Quadrant of Kipling Avenue and Highway 7 12.15.1 Goals 12.15.2 Land Use The goals of this Plan are to: 12.15.2.1 General Provisions: a) Ensure the development of a compact

More information

City of Surrey. Advisory Design Panel Minutes

City of Surrey. Advisory Design Panel Minutes City of Surrey Advisory Design Panel Minutes Executive Boardroom City Hall 14245-56 Avenue Surrey, B.C. THURSDAY, JANUARY 25, 2007 Time: 3:30 p.m. Present: Chair L. Mickelson Panel Members: R. Knill G.

More information

URBAN DESIGN PEER REVIEW PANEL MINUTES

URBAN DESIGN PEER REVIEW PANEL MINUTES MINUTES 2016-03-15 PRESENT: UDPRP Members Adrian Dyer Studiodyer, Architect Jason McIntyre Cornerstone Architecture, Architect John Nicholson Nicholson Sheffield Architects Inc., Architect Jordan Kemp

More information

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM PUBLIC RIGHT-OF-WAY This section provides design guidelines for improvements in the public right-of-way. The public right-of-way refers to streets, sidewalks, non-vehicular thoroughfares, parks and greenways

More information

GUIDELINES REPLACEMENT HOUSING GUIDELINES LOCATION INTRODUCTION URBAN DESIGN GUIDELINES

GUIDELINES REPLACEMENT HOUSING GUIDELINES LOCATION INTRODUCTION URBAN DESIGN GUIDELINES Replacement housing in the former City of North York will be consistent with the following urban design guidelines. They provide a framework for residential re-development in the former City of North York

More information

New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario

New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario URBAN DESIGN BRIEF New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario TABLE OF CONTENTS: 1.0 Executive Summary 2.0 Creating Vibrant and Sustainable Urban Places: Excerpts from

More information

ELK GROVE TOWN CENTER DESIGN GUIDELINES

ELK GROVE TOWN CENTER DESIGN GUIDELINES ......... ELK GROVE TOWN CENTER DESIGN GUIDELINES LAGUNA RIDGE SPECIFIC PLAN... June 2008 ............ DESIGN GUIDELINES Table of Contents Contents Section A: Town Center Overview...1 A.1. Purpose and

More information

(DC1) Direct Development Control Provision DC1 Area 4

(DC1) Direct Development Control Provision DC1 Area 4 . General Purpose (DC) Direct Development Control Provision DC Area 4 The purpose of this Provision is to provide for an area of commercial office employment and residential development in support of the

More information

LOW DENSITY RESIDENTIAL

LOW DENSITY RESIDENTIAL LOW DENSITY RESIDENTIAL Corner lots with coach houses to increase diversity, provide unity to the streetscape and increase eyes on the street. Garages and ancillary units accessed via rear lanes. Parking

More information

Smart Growth Development Checklist

Smart Growth Development Checklist 2004 Smart Growth Development Checklist Smart Growth Development Checklist Corporation of the City of New Westminster Guide and manage growth in a manner which is consistent with the principles of sustainable

More information

Urban Design Manual 2.0 DRIVE-THROUGH FACILITIES. Background. Urban Design Challenges

Urban Design Manual 2.0 DRIVE-THROUGH FACILITIES. Background. Urban Design Challenges 222221 2.0 DRIVE-THROUGH FACILITIES Background In recent years, drive-through facilities have grown significantly in popularity with drive-through restaurants, in particular, being established on numerous

More information

Urban Design Brief Fanshawe Park Road. Competition Toyota

Urban Design Brief Fanshawe Park Road. Competition Toyota Urban Design Brief 1300 Fanshawe Park Road Competition Toyota May 2, 2014 TABLE OF CONTENTS Page No. INTRODUCTION... 1 SECTION 1 LAND USE PLANNING CONTEXT... 1 1.1 The Subject Lands... 1 1.2 The Proposal...

More information

VEHICULAR AND PEDESTRIAN CIRCULATION

VEHICULAR AND PEDESTRIAN CIRCULATION This perspective sketch communicates the intended character and quality of a proposed streetscape design. Locate benches near a major intersection where people tend to gather. Seating and lighting provide

More information

Design Guidelines for Multi-Family Residential Development

Design Guidelines for Multi-Family Residential Development Design Guidelines for Multi-Family Residential Development Development Services 972-466-3225 cityofcarrollton.com September 2012 Table of Contents Purpose... 1 Design Objectives... 2 Building Design Guidelines...

More information

Gateway commercial MIXED USE MASTER SITE PLAN. CITILAND AIrDRIE GATEWAY VENTURE INC. airdrie GATEWAY COMMERCE CENTRE. airdrie, ALBERTA FEBRUARY 2012

Gateway commercial MIXED USE MASTER SITE PLAN. CITILAND AIrDRIE GATEWAY VENTURE INC. airdrie GATEWAY COMMERCE CENTRE. airdrie, ALBERTA FEBRUARY 2012 Gateway commercial MIXED USE MASTER SITE PLAN 1914 CENTRE STREET NORTH CALGARY, AB CANADA T2E 2S8 T. 403.264.7177 F. 403.264-7175 WWW.CITILAND.CA CITILAND AIrDRIE GATEWAY VENTURE INC. airdrie GATEWAY COMMERCE

More information

4.0 Design Guidelines For The Village Centre. South fields Community Architectural Design Guidelines Town of Caledon

4.0 Design Guidelines For The Village Centre. South fields Community Architectural Design Guidelines Town of Caledon 4.0 Design Guidelines For The Village Centre 4.0 Design Guidelines for the Village Centre The Village Centre is the focal point of the entire South Fields Community and is designed as a traditional commercial

More information

Planning Board Briefing

Planning Board Briefing Planning Board Briefing Why Now? The Sector Plan Implementation Chapter States: Before Stage 1 begins, the following must occur: Approval of the Sectional Map Amendment. Approval of the Greater Lyttonsville

More information

MEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North.

MEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North. MEMORANDUM Date: August 28, 2015 Our File: 1010-20-15-062 To: Design Review Committee From: Lisa Berg, Senior Community Planner Re: Amendment to Development Permit for Park Royal North This memo deals

More information

Walnut Creek Transit Village Design Guidelines. Part Three III - 25

Walnut Creek Transit Village Design Guidelines. Part Three III - 25 C. General Design Criteria Part Three DRAFT 0/6/ III - 5 Frontage Types Frontage is a semi-public transition zone at the ground level where public and private realms meet. An understanding of various frontage

More information

Form & Character Development Permit Areas

Form & Character Development Permit Areas Form & Character 1.1. Overview 1.1.1. AREAS Lands designated as Downtown Smithers, Multi-family Residential, and Highway 16 Commercial and identified on Schedule: C. 1.1.2. PURPOSE The Form and Character

More information

4 Semi-Private & Private Open Spaces

4 Semi-Private & Private Open Spaces 4 Semi-Private & Private Open Spaces 4.1 Semi-private Open Space 4.1.1 Common Courtyards The common courtyards for each complex will be designed and programmed for the typical owners living there. They

More information

Reflect the context of New Westminster and unique characteristics such as history, views and topography.

Reflect the context of New Westminster and unique characteristics such as history, views and topography. .0 Design Guidelines 5 6 7 8 9 10 11 12 13 14 15 17 Objectives The City of New Westminster will ensure that new development supports a vibrant, pleasant, and people oriented downtown. The guidelines for

More information

Gas Stations ottawa.ca

Gas Stations ottawa.ca Urban Design Guidelines for Gas Stations ottawa.ca Ce document est disponible en français sur ottawa.ca. This document is available in French on ottawa.ca. Approved by City Council May 24, 2006 City of

More information

Proposed for Vic West Neighbourhood Plan. Design Guidelines for Intensive Residential Development - Townhouse and Attached Dwelling

Proposed for Vic West Neighbourhood Plan. Design Guidelines for Intensive Residential Development - Townhouse and Attached Dwelling Proposed for Vic West Neighbourhood Plan Design Guidelines for Intensive Residential Development - Townhouse and Attached Dwelling Design Guidelines for Intensive Residential Development - Townhouse and

More information

Advisory Design Panel Minutes

Advisory Design Panel Minutes Present: Chair - L. Mickelson Panel Members: N. Baldwin T. Wolf B. Shigetomi S. Vincent S. Lyon J. Makepeace Cpl. M. Searle Guests: Advisory Design Panel Minutes Clark Kavolinas, C. Kavolinas & Associates

More information

RESIDENTIAL GUIDELINES CHECKLIST

RESIDENTIAL GUIDELINES CHECKLIST RESIDENTIAL GUIDELINES CHECKLIST The following checklist was created to provide you with an easy way to ensure that your project complies with the Residential Design Guidelines. RESIDENTIAL DESIGN GUIDELINES

More information

appendix and street interface guidelines

appendix and street interface guidelines appendix five: building and street interface guidelines appendix 5 building and street interface guidelines BOULEVARDS Boulevards are generally characterized by higher levels of traffic movement at higher

More information

Community Design Plan

Community Design Plan Gardena General Plan 2006 Authority While the is not a required element of a General Plan, it is included because improving the community appearance and image is paramount to the overall quality of life

More information

DRAFT DRAFT DRAFT DRAFT

DRAFT DRAFT DRAFT DRAFT # 19 EXPAND GREEN AND OPEN SPACES AND COMMUNITY FACILITIES IN TANDEM WITH NEW DEVELOPMENT The role of Eglinton will change in the coming years, along with the intensity of activity and land uses. As more

More information

DRAFT DESIGN GUIDELINES

DRAFT DESIGN GUIDELINES IHZ Booklet #7 May 6, 2010 DRAFT DESIGN GUIDELINES CANTERBURY 7 Overview During the recent planning process for the Plan of Conservation and Development community character was identified as an important

More information

Design Guidelines April 12, 2016

Design Guidelines April 12, 2016 100 Braid Street 100 BRAID STREET Design Guidelines April 12, 2016 Previous Issues: April 01, 2016 March 11, 2016 March 07, 2016 2 Cover Image: conceptual rendering of proposed development Table of Contents

More information

MINUTES OF THE ADVISORY DESIGN PANEL MEETING HELD WEDNESDAY JULY 26, 2017 AT 12:00 P.M. 1. THE PANEL CALLED THE MEETING TO ORDER AT 12:10 P.M.

MINUTES OF THE ADVISORY DESIGN PANEL MEETING HELD WEDNESDAY JULY 26, 2017 AT 12:00 P.M. 1. THE PANEL CALLED THE MEETING TO ORDER AT 12:10 P.M. MINUTES OF THE ADVISORY DESIGN PANEL MEETING HELD WEDNESDAY JULY 26, 2017 AT 12:00 P.M. 1. THE PANEL CALLED THE MEETING TO ORDER AT 12:10 P.M. Panel Members Present: Staff Present: Elizabeth Balderston;

More information

CENTERS AND CORRIDORS

CENTERS AND CORRIDORS INITIAL DESIGN STANDARDS AND GUIDELINES for CENTERS AND CORRIDORS City of Spokane Planning Services Third Floor, City Hall 808 W. Spokane Falls Blvd. Spokane, WA 99201-3329 (509) 625-6300 www.spokaneplanning.org

More information

Courthouse Square Planning & Urban Design Study. Courthouse Square Working Group #13 October 15, 2014

Courthouse Square Planning & Urban Design Study. Courthouse Square Working Group #13 October 15, 2014 Courthouse Square Planning & Urban Design Study Courthouse Square Working Group #13 October 15, 2014 1 Courthouse Square Process Working Group Community Courthouse Square Advisory Groups & Civic Associations

More information

lot flankage Y street 16m 6m landscape strip for large site 3m landscape strip for small medium site

lot flankage Y street 16m 6m landscape strip for large site 3m landscape strip for small medium site Commercial General Commercial Objectives Create developments compatible with adjacent land uses in scale, function and character Define a consistent and attractive street edge with quality landscaping,

More information

South th E ast Communit ity Centre (SECC)

South th E ast Communit ity Centre (SECC) South East Community Centre (SECC) 1 New Park Design & Community Centre Update Thursday, February 8, 2018 Public Open House Thank you for attending this Open House! The town and the Consulting Team will

More information

City of Redlands Architectural Guidelines for Non-Residential Development

City of Redlands Architectural Guidelines for Non-Residential Development 14. Building articulation shall be included in the design of building, in order to create a formal entry statement. Avoid this Do this Page 11 15. Give special attention to creating pedestrian scale and

More information

T O W N O F A J A X URBAN DESIGN GUIDELINES FOR MOTOR VEHICLE GAS BARS / SERVICE CENTRES

T O W N O F A J A X URBAN DESIGN GUIDELINES FOR MOTOR VEHICLE GAS BARS / SERVICE CENTRES T O W N O F A J A X URBAN DESIGN GUIDELINES FOR MOTOR VEHICLE GAS BARS / SERVICE CENTRES June 2006 Table of Contents TABLE OF CONTENTS... 1 1.0 INTRODUCTION... 2 1.1 Purpose... 2 1.2 Organization of the...

More information

Lehigh Acres Land Development Regulations Community Planning Project

Lehigh Acres Land Development Regulations Community Planning Project Lehigh Acres Land Development Regulations Planning Effort Summary In July, 2010 Commissioner Frank Mann invited the Lehigh Acres community to start discussing how to achieve their recently adopted community

More information

4. INDUSTRIAL 53 CASTLE ROCK DESIGN

4. INDUSTRIAL 53 CASTLE ROCK DESIGN 4. INDUSTRIAL 53 CASTLE ROCK DESIGN CASTLE ROCK DESIGN 54 4. INDUSTRIAL Overview Well-designed and attractive industrial centers are the product of blending economic realities with both functional and

More information

Duplex Design Guidelines

Duplex Design Guidelines Duplex Design Guidelines Adopted by Council May 29, 2006 Prepared By: Table of Contents 1.0 Application and Intent 1 2.0 Areas of Application 2 3.0 Design Principles 3 4.0 Design Guidelines 4 4.1 Site

More information

Urban Design Brief to 1557 Gordon Street & 34 Lowes Road West

Urban Design Brief to 1557 Gordon Street & 34 Lowes Road West Urban Design Brief 1533 to 1557 Gordon Street & 34 Lowes Road West Reid s Heritage Homes Ltd. & 883928 Ontario Ltd. and RHH Property Management Ltd. City of Guelph Zoning By-law Amendment November 2017

More information

VILLAGE OF SKOKIE Design Guidelines for Mixed-Use Districts NX Neighborhood Mixed-Use TX Transit Mixed-Use CX Core Mixed-Use

VILLAGE OF SKOKIE Design Guidelines for Mixed-Use Districts NX Neighborhood Mixed-Use TX Transit Mixed-Use CX Core Mixed-Use VILLAGE OF SKOKIE Design Guidelines for Mixed-Use Districts NX Neighborhood Mixed-Use TX Transit Mixed-Use CX Core Mixed-Use TABLE OF CONTENTS CHAPTER 1 SITE DESIGN Purpose 1 CHAPTER 2 SITE DESIGN Streetscape

More information

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. Mixed-use and infill development should maintain or enhance

More information

The Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN

The Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN The Village SPECIFIC PLAN Chapter 3 3.1 INTRODUCTION 3.1.1 Purpose This Chapter describes the development regulations applicable to the Mixed-Use and Transit Center Planning Areas. These form-based regulations

More information

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014 [PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue May 23, 2014 Contents 1.0 Introduction... 2 2.0 Site Context... 2 2.1 Adjacent Uses... 2 Figure 1: Site

More information