APPENDIX E ARCHAEOLOGICAL INVESTIGATION

Size: px
Start display at page:

Download "APPENDIX E ARCHAEOLOGICAL INVESTIGATION"

Transcription

1 Municipal Class Environmental Assessment Study Burlington / Oakville Interconnecting Water Main Zone 3 Environmental Study Report APPENDIX E APPENDIX E ARCHAEOLOGICAL INVESTIGATION R.V. Anderson Associates Limited RVA / October 2010

2 Ministry of Tourism and Culture Ministère du Tourisme et de la Culture Culture Programs Unit Unité des programmes culturels Programs and Services Branch Direction des programmes et des services 400 University Avenue, 4 th floor 400, avenue University, 4 e étage Toronto, ON, M7A 2R9 Toronto, ON, M7A 2R9 Telephone: Téléphone: Facsimile: Télécopieur: Norbert.Stanchly@ontario.ca Norbert.Stanchly@ontario.ca April 9, 2010 Kim Slocki Archeoworks Inc Yonge Street Suite #1029 Newmarket, Ontario L3X 1X4 RE: Review and Acceptance into the Provincial Register of Reports: Archaeological Assessment Report Entitled, Stage 1 Archaeological Assessment (AA) for: Proposed Zone 3 Burlington/Oakville Interconnection Watermain, Class EA, City of Burlington, Regional Municipality of Halton, Ontario, Report Dated May, 2009, Report Received November 25, 2009, MCL Project Information Form Number P , MCL RIMS Number 24WT032 Dear Ms. Slocki: This office has reviewed the above-mentioned report, which has been submitted to this Ministry as a condition of licensing in accordance with Part VI of the Ontario Heritage Act, R.S.O. 1990, c This review is to ensure that the licensed professional consultant archaeologist has met the terms and conditions of their archaeological licence, that archaeological sites have been identified and documented according to the 1993 technical guidelines set by the Ministry and that the archaeological fieldwork and report recommendations ensure the conservation, protection and preservation of the cultural heritage of Ontario. As the result of our review, this Ministry accepts the above titled report into the Provincial register of archaeological reports. The report indicates that portions of the subject property have archaeological potential and, consequently, should be subject to a Stage 2 archaeological assessment. This Ministry concurs with this recommendation. I trust this information is of assistance. Should you require any further information regarding this matter, please feel free to contact me.

3 Sincerely, Norbert Stanchly Archaeology Review Officer cc. Archaeological Licensing Office R.V. Anderson Associates Limited

4 Stage 1 Archaeological Assessment (AA) for: Proposed Zone 3 Burlington/ Oakville Interconnection Watermain Class EA City of Burlington Regional Municipality of Halton Ontario Project #: 008-A Licencee/#: Kim Slocki/P029 CIF#: P Revised May 2009 Presented to: R.V. Anderson Associates Limited 2001 Sheppard Avenue East, Suite #400 Toronto, ON M2J 4Z8 T: F: Prepared by: Archeoworks Inc Yonge Street, Suite #1029 Newmarket, ON L3X 1X4 Tel.: Fax:

5 Executive Summary Due to predicted population growth in the Region of Halton over the next 25 years, the South Halton Water and Wastewater Master Plan Update recommended that two watermains be constructed across Bronte Creek to interconnect Zones 1 and 3 in City of Burlington and the Town of Oakville. These watermains are required since there is a surplus of water treatment capacity in the City Burlington and a shortfall in water treatment capacity in the Town of Oakville. The proposed watermains will allow the Region to operate the water distribution systems in the City of Burlington and the Town of Oakville as one system. To identify a preferred alignment for the mitigation of the Zone 3 interconnecting watermain in the City of Burlington, the Region of Halton has retained R.V. Anderson Associates Limited, to undertake a Class Environmental Assessment. Currently, two alternative alignments for Zone 3 have been proposed: Alternatives 1 and 2; the two proposed watermain alternatives are hereafter referred to collectively as the study area. Alternative 1 extends along Dundas Street from the existing watermain approximately 30 metres west of Appleby Line to Tremaine Road; and north along Appleby Line from Dundas Street for approximately 140 metres, where it will connect to the existing watermain on the west side of Appleby Line. Alternative 1 is proposed to be installed along the eastern and northern road right-of-way (ROW) along Appleby Line and for most of Dundas Street, with the exception of the Bronte Creek valley. In order to reduce environmental impact to the Bronte Creek valley at the Dundas Street Bridge, R.V. Anderson Associates Ltd., has proposed to hang the watermain on the existing bridge piers via the construction of a utility bridge. Alternative 2 extends along Tremaine Road from Dundas Street to the Highway 407 ETR; and along the Highway 407 ETR from Tremaine Road to approximately 250 metres east of Appleby Line where it will connect to the existing watermain approximately 85 metres southeast of the Highway 407 ETR. Alternative 2 is proposed to be installed along the western and southern road ROW along Tremaine Road and for most of Highway 407 ETR, respectively. The remainder of Alternative 2 is proposed to be installed within the fallow fields southeast and east of Highway 407 ETR and Appleby Lane, respectively. In order to help facilitate this study, conducted in accordance with the Class Environmental Assessment, Archeoworks Inc. has been retained to conduct a Stage 1 archaeological assessment of the Alternatives, with an emphases on Alternative 1, to illustrate areas of high archaeological potential and to address the specific features contributing to the classification of high archaeological potential zones within these limits. Consultation of the Ontario Heritage Properties Database has confirmed the absence of any designated heritage properties within close proximity to the overall study area limits. Background research has determined that 27 archaeological sites have been found within a 500-meter radius of the overall study area limits, indicating the potential for locating additional sites within this region. Furthermore, the study area is bisected by Bronte Creek and tributaries of both Bronte Creek and Sheldon Creek. As such, we find high potential for the location and recovery of Aboriginal archaeological resources within the boundaries of the study area. A review of the study area within the 1877 Illustrated Historical Atlas of Halton County indicates that numerous historical farm houses, a mill/ manufactory, a blacksmith shop, the Hamilton and North Western Railway system and Stage 1 AA of Proposed Zone 3 Burlington/ Oakville Interconnecting Watermain Class EA i

6 the Tansley Pioneer Cemetery were formerly located within the limits of Alternative 1. This substantial background research has been done to support the Regional Municipality of Halton s Archaeological Master Plan potential mapping, which indicates that significant portions of the study area fall within high archaeological potential zones for the location and recovery of both Aboriginal and Euro-Canadian archaeological resources, due to the close proximity of primary water sources, numerous historical features, and previously identified archaeological sites. Therefore, the background research also supports high archaeological potential for locating historical remains within undisturbed portions of Alternative 1. Background research of Alternative 2 supports low historical potential as it is only bisected by the historical Hamilton and North Western Railway system. The Stage 1 field review revealed that Alternatives 1 and 2 are located primarily within a rural locale; encompassing moderate residential, commercial and industrial land-uses, roadways, the 407 ETR Highway, CN Railway, agricultural, fallow and grassed fields, Bronte Creek and its associated valleylands. The majority of Alternatives 1 and 2 are to be installed within disturbed, existing road right-of-ways and, as such, archaeological concerns are not warranted for these segments of the study area. However, as construction for both alternatives has been proposed within undisturbed fallow and grassed fields, specifically the southeast corner of Highway 407 and Appleby Line and the northeast corner of Appleby Line and Dundas Street, and due to the established high archaeological potential for the recovery of Aboriginal and Euro-Canadian remains within these alignments, a Stage 2 archaeological field assessment should be undertaken, if to be disturbed by construction activities. Furthermore, should lands immediately adjacent to Tansley Pioneer Cemetery be impacted by construction, a Stage 2 archaeological field assessment, followed by further Stage 3 investigations of this site should be undertaken to ensure that no archaeological remains, including grave shafts, are located within the study corridor limits. Stage 1 AA of Proposed Zone 3 Burlington/ Oakville Interconnecting Watermain Class EA ii

7 Project Personnel: Project/Field Director: Kim Slocki Field Review Archaeologist: Nimal R Nithiyanantham Kim Slocki Report Preparation: Nimal R Nithiyanantham Graphics: Nimal R Nithiyanantham Stage 1 AA of Proposed Zone 3 Burlington/ Oakville Interconnecting Watermain Class EA iii

8 Contents Executive Summary Project Personnel Contents i-ii iii iv Introduction Archaeological Significance Registered Archaeological Sites Physiographic Description and Aboriginal Potential 4-5,8 4. Historical Context and Potential 6-7,9 5. Field Review Conclusions and Recommendations Bibliography 14 Tables: Table 1: Sites within 500 metres of the Study Area 3 Table 2: History of Occupation in Southern Ontario 4 Table 3: Historic Structures within 100 metres of Proposed Alternatives 7 Figures: Figure 1: Map Identifying Location of Zone 3 Burlington/ Oakville Interconnecting Watermain Alternatives 2 Figure 2: Archaeological Potential Zones* within the Study Area 8 Figure 3: Historic Structures within Close Proximity* to the Proposed Watermain Alternatives 9 Appendix: Plates Stage 1 AA of Proposed Zone 3 Burlington/ Oakville Interconnecting Watermain Class EA iv

9 Introduction Through the Places to Grow Act, the Regional Municipality of Halton has been mandated by the Province to accommodate for significant population growth over the next 25 years. Therefore, it was recommended within the South Halton Water and Wastewater Master Plan Update Class EA that two watermains be constructed across Bronte Creek to interconnect Zones 1 and 3 in the City of Burlington and Town of Oakville. These watermains are required since there is a surplus of water treatment capacity in Burlington and a shortfall in water treatment capacity in Oakville. The proposed watermains will allow the Region to operate the water distribution systems in the City Burlington and the Town of Oakville as one system. To identify a preferred alignment for the mitigation of the Zone 3 interconnecting watermain in the City of Burlington, The Region of Halton has retained R.V. Anderson Associates Limited, to undertake a Class Environmental Assessment. Currently, two alternative alignments for Zone 3 have been proposed: Alternatives 1 and 2; the two proposed watermain alternatives are hereafter referred to collectively as the study area (see Figure 1). To facilitate this study, conducted in accordance with the Class Environment Assessment, Archeoworks Inc. was retained by R.V. Anderson Associates Ltd., to conduct a Stage 1 archaeological assessment of the study area. Alternative 1 extends along Dundas Street from the existing watermain approximately 30 metres west of Appleby Line to Tremaine Road; and north along Appleby Line from Dundas Street for approximately 140 metres, where it will connect to the existing watermain. Alternative 1 is proposed to be installed along the eastern and northern road right-of-way (ROW) along Appleby Line and for most of Dundas Street, with the exception of the Bronte Creek valley. In order to reduce environmental impact to the Bronte Creek valley at the Dundas Street Bridge, R.V. Anderson Associates Ltd., has proposed to hang the watermain on the existing bridge piers via the construction of a utility bridge. Alternative 2 extends along Tremaine Road from Dundas Street to the Highway 407 ETR; and along the Highway 407 ETR from Tremaine Road to approximately 250 metres east of Appleby Line where it will connect to the existing watermain approximately 85 metres southeast of the Highway 407 ETR. Alternative 2 is proposed to be installed along western and southern road ROW along Tremaine Road and for most of Highway 407 ETR, respectively. The remainder of Alternative 2 is proposed to be installed through fallow fields southeast and east of Highway 407 ETR, respectively. The purpose of this document is to determine what archaeological impacts might occur during construction of the proposed watermain alternatives, with an emphasis on Alternative 1 and, thus, archaeological potential was identified by conducting background research and undertaking a non-intrusive field review of the study area limits. The Stage 1 research, reported herein, was conducted under the project direction of Ms. Kim Slocki, in accordance with the Ontario Heritage Act (1990) under an archaeological consulting licence (P029) issued to Kim Slocki. Stage 1 AA of Proposed Zone 3 Burlington/ Oakville Interconnecting Watermain Class EA 1

10 Figure 1: Map Identifying Location of Zone 3 Burlington/ Oakville Interconnecting Watermain Alternatives (Source: R.V. Andersons Associates Ltd.) 1) Archaeological Significance To establish the archaeological significance of the Zone 3 study area, and specifically the proposed alternatives, Archeoworks Inc. conducted a comprehensive review of registered archaeological sites and designated heritage properties within close proximity to these alternatives. Furthermore, a review of the physiography of the study area and its correlation to locating Aboriginal remains as well as consultation of the Illustrated Historical Atlases of the County of Halton was undertaken. The results of this background research are documented below. Consultation of the records for listed heritage properties within the Ontario Ministry of Culture s database confirmed the absence of any designated heritage properties within close proximity of the proposed alternatives in the study area (Ontario Heritage Properties Database). Specifically regarding the archaeology of the City of Burlington, the Master Plan of Archaeological Resources for the Regional Municipality of Halton was consulted (ASI 1998). The Master Plan mapping for the Region of Halton was developed based on a number of variables: prehistoric site locations, water locations, distribution of soils, examination of the 19 th century mapping, consideration of the basic historical themes that have been most influential in the Regions development, and the location of currently developed areas. Based on these variables the archaeological Stage 1 AA of Proposed Zone 3 Burlington/ Oakville Interconnecting Watermain Class EA 2

11 potential of the Regional Municipality of Halton was established. As such, based on this mapping, significant portions of the study area are considered to be within a high archaeological potential zone. 2) Registered Archaeological Sites In order that an inventory of archaeological resources could be compiled for the study area, the site record forms for registered sites housed at the Ministry of Culture (MCL) were consulted. Each site is registered according to the Borden System, which is an archaeological numbering system used throughout Canada to track archaeological sites and the artifacts that come from them. The specific study area under review is located within Borden Block AiGw and according to the Ministry of Culture site registry files, a total of 27 sites have been registered within 500 metres of its limits. These sites are listed below in Table 1. Table 1: Sites within 500 metres of the Study Area Borden # Name Cultural Affiliation Type AiGw Euro-Canadian, Acermeric Aboriginal Findspot AiGw Aceramic Aboriginal Findspot AiGw-399 McCarthy II Archaic, early Findspot AiGw-400 McCarthy III Archaic, late Findspot AiGw-65 North Tremaine Woodland Findspot AiGw-98 Scattered Finds Undetermined Aboriginal Findspot AiGw-98.1 Scattered Finds - - AiGw Aceramic Aboriginal Findspot AiGw Archaic, Laurentian Findspot AiGw Aceramic Aboriginal Findspot AiGw Aceramic Aboriginal Findspot AiGw Aceramic Aboriginal Findspot AiGw Aceramic Aboriginal Findspot AiGw Aceramic Aboriginal Findspot AiGw Aceramic Aboriginal Chipping station AiGw Aceramic Aboriginal Aceramic Aboriginal AiGw Undetermined Aboriginal Findspot AiGw Undetermined Aboriginal Findspot AiGw Undetermined Aboriginal Findspot AiGw Archaic, middle; Brewerton Findspot AiGw Undetermined Aboriginal Scatter AiGw Archaic, early and late Scatter AiGw AiGw-35 Dumbo Undetermined Undetermined AiGw-386 Tremaine Archaic, late Findspot AiGw-39 Tremaine Road Archaic Undetermined AiGw-398 McCarthy I Undetermined Aboriginal Campsite Having noted the presence of these sites in relation to the study area, it might be useful to place them in the proper context by reviewing the cultural history of occupation in Southern Ontario provided in Table 2 below. Stage 1 AA of Proposed Zone 3 Burlington/ Oakville Interconnecting Watermain Class EA 3

12 Table 2: History of Occupation in Southern Ontario Period Archaeological Culture Date Range Attributes PALEO-INDIAN Early Gainey, Barnes, Crowfield 11,000-10,400 BP Small nomadic hunter-gatherer bands. Fluted projectile points Late Holcombe, Hi-Lo, Lanceolate 10,400-9,500 BP Small nomadic hunter-gatherer bands. Lanceolate projectile points ARCHAIC Early Side-notched, corner notched, bifurcatebase 9,500 8,000 BP Small nomadic hunter-gatherer bands; first notched and stemmed points, and ground stone celts. Middle Otter Creek, Brewerton 8,000 4,500 BP Small territorial hunter-gatherer bands; wider variety of ground stone tools; first copper tools; bone tools Late WOODLAND Narrow, Broad and Small Points Normanskill, Lamoka, Genesee, Adder Orchard etc. 4,500 2,800 BP More numerous territorial huntergatherer bands; increasing use of exotic materials and artistic items for grave offerings; regional trade networks Early Meadowood, Middlesex 2,800 2,000 BP Introduction of pottery, burial ceremonialism; panregional trade networks Middle Point Peninsula 2,000 1,200 BP Cultural and ideological influences from Ohio Valley complex societies; incipient horticulture Late Algonquian, Iroquoian 1, BP Transition to larger settlements and agriculture Algonquian, Iroquoian BP Establishment of large palisaded villages (Iroquoian) Algonquian, Iroquoian BP Tribal differentiation and warfare (Iroquoian) HISTORIC Early Huron, Odawa, Algonquin AD Tribal displacements Late Six Nations Iroquois, Ojibway, Algonquin AD s Migrations and resettlement Euro-Canadian AD present European immigrant settlements 3) Physiographic Description and Aboriginal Potential An investigation of the physiography of the study area was conducted by reviewing The Physiography of Southern Ontario (3 rd Edition), a volume published by the Ministry of Natural Resources and authored by L.J. Chapman and D.F. Putnam. This investigation is conducted to aid the researcher in developing an argument for archaeological potential based on the environmental conditions of the study area. Environmental factors such as close proximity to water, soil type, and nature of the terrain, for example, can be used as predictors to determine where human occupation may have occurred in the past. Stage 1 AA of Proposed Zone 3 Burlington/ Oakville Interconnecting Watermain Class EA 4

13 The majority of the study area is situated within the South Slope physiographic region of southern Ontario with the southern peripheries of the study area bounding the edge of the Iroquois Plain physiographic region. The South Slope extends from the Niagara Escarpment to the Trent River it covers approximately 940 square miles. The western portion of the South Slope of the Oak Ridges Moraine lies north of the Peel Plain, but the Trafalgar Moraine and adjacent till plain to the south of the Peel Plain is also included. The South Slope lies across the limestones of the Verulam and Lindsay Formations, the grey shales of the Georgian Bay Formation, and the reddish shales of the Queenston Formation, and contains a variety of soils, some of which have proved to be excellent through more than a century of agricultural use (Chapman & Putnam, 1984). Lying behind the lakeshore areas of first settlement in Upper Canada, the South Slope was colonized by the second wave composed largely of British immigrants after the close of the Napoleonic wars (Chapman & Putnam, 1984). The Iroquois Plain physiographic region is comprised of lacustrine deposits along the western end of Lake Ontario that were created by glacial Lake Iroquois. The plain extends from the Niagara River to the Trent River, a length of 300 kilometres, varying from a few hundred metres to thirteen kilometres in width. Across Peel and Halton, the Iroquois Plain has a very constant pattern with the old shoreline marked by bluffs or gravel bars. The land is generally level and the coarse sandy soil is often poorly drained. The soils of the general study area consist of clay loams derived from the underlying Ordovician red shale of the Queenston Formation (Chapman & Putnam, 1984). Prior to 1930, until 1940, the Iroquois plan was a general farming area, with a tendency for horticulture and growth of canning crops. Since the Second World War, the remaining farms have become larger while much of the land has been put to urban uses (Chapman & Putnam, 1984). In terms of archaeological potential, potable water is arguably the single most important resource necessary for any extended human occupation or settlement. As water sources have remained relatively stable in southern Ontario since post-glacial times, proximity to water can be regarded as a useful index for the evaluation of archaeological site potential. Indeed, distance from water has been one of the most commonly used variables for predictive modeling of site location. In fact, the Ministry of Tourism, Culture and Recreation (now the Ministry of Culture) primer on archaeology, land use planning and development in Ontario stipulates that undisturbed lands within 300 metres of a primary water source, and undisturbed lands within 200 metres of a secondary water source, are considered to be of high archaeological potential (1997: pp.12-13). Therefore, with Bronte Creek and numerous tributaries of the Bronte Creek and Sheldon Creek bisecting the study area, we find high potential for the location and recovery of Aboriginal archaeological resources within 300 metres of these water sources in undisturbed locations (see Figure 2). Stage 1 AA of Proposed Zone 3 Burlington/ Oakville Interconnecting Watermain Class EA 5

14 4) Historical Context and Potential To assess the study area s potential for the recovery of historic remains, several documents are reviewed in order to gain an understanding of the land-use history. These specifically include the Illustrated Historical Atlases for the Counties of Ontario. A review of the 1877 Illustrated Historical Atlas of the County of Halton has indicated that the study area is located within Concession 1 North of Dundas Street (NDS), Lots 1 through 6; and Concession 1 South of Dundas Street (SDS), Lot 6, in the former Township of Nelson (now the City of Burlington); in the former County of Halton (now the Regional Municipality of Halton see Figure 3). Both watermain alternatives are bisected by the historic Hamilton and North Western Railway system, which was constructed in Besides being bisected by the abovementioned historical feature Alternative 2 does not run in close proximity to any other historical structures and/ or features. This is likely due to the fact that a segment of Alternative 2 is being installed along the road right-of-way of the 407 ETR Highway, which was constructed through former agricultural fields of Concession 1 NDS, Lot 5 and not along an historic roadway. Patterns of historic land-use were such that the majority of the historic structures are predominantly located adjacent to the roadways and that villages were located at the intersections of these roadways. As such, based on this data, there is low potential for locating historical remains within the boundaries of Alternative 2 (see Figure 2). Alternative 1, which is proposed to be installed along Dundas Street and a small segment of Appleby Line runs in close proximity to 17 historical farm houses, a blacksmith shop, a mill/ manufactury and the Tansley Pioneer Cemetery (see Table 3). The cemetery was formerly located on the north side of Dundas Street just west of Tremaine Road (Burloak Drive Regional Road 3) within Concesssion 1 NDS, Lot 4. The cemetery was completely filled with burials; however, prior to its closing only a very few monuments remained which dated from While many of the graves originally had monuments, several did not as the deceased were transients or local residents who could not afford them. Many of the monuments have disappeared over time due to vandalism, deterioration and livestock roaming through the cemetery from adjacent pasture land. Other monuments were removed by those who either owned or looked after the land. The graves at the front of the cemetery were disturbed by the widening of Dundas Street to make it a highway and the laying of telephone and natural gas lines. Other graves were disturbed when a fence was erected down the middle of the cemetery. Sometime around 1978 the cemetery was closed and the remains of the deceased and monuments were removed to Greenwood Cemetery in Burlington (Halton-Peel Branch Ontario Genealogical Society 1993). Following the cemetery s closure, this property was occupied by a Sunoco gas station up until Based on the Region s data for contaminated sites, underground tanks were installed in Furthermore, a Phase 1 ESA was conducted by DML Environmental Services Limited in 2008 and the report indicates that the site was further disturbed by Terrapex Environmental Limited for the excavation of petroleum hydrocarbon impacted soil (DML 2008). As such, the site of the former Tansley Cemetery has been disturbed Stage 1 AA of Proposed Zone 3 Burlington/ Oakville Interconnecting Watermain Class EA 6

15 significantly since its closure and relocation of remains to Greenwood Cemetery (see Plate 1). Of outstanding concern, however, is that unmarked graves may not have been identified for the 1978 relocation. As such, impacts to potential graves will need to be mitigated if to be disturbed by construction. Regarding the remainder of Alternative 1, since the patterns of historic land-use were such that the majority of the historic structures are predominantly located adjacent to the roadways and that villages were located at the intersections of these roadways, which is illustrated in Figure 3, we find high potential for locating historical remains within the boundaries of Alternative 1 (see Figure 2). Table 3: Historic Structures within 100 metres of Proposed Alternatives Alternative Township Concession Lot Occupant/Owner Type of Property Alternative 1 Nelson 1 SDS 1 Edmund Doran Farm house Alternative 1 Nelson 1 SDS 3 Mill Property Mill/ Manufactory Alternative 1 Nelson 1 SDS 3 Miles O Riely Two farm houses Alternative 1 Nelson 1 SDS 4 J. Bunton Two farm houses Alternative 1 Nelson 1 SDS 4 J. Galagar Two farm houses Alternative 1 Nelson 1 SDS 4 Charles Harrison Three farm houses Alternative 1 Nelson 1 SDS 6 Charles Harrison Two farm houses Blacksmith shop Alternative 1 Nelson 1 NDS 1 John Alexander Farm house Alternative 1 Nelson 1 NDS 2 Thomas Page Farm house Alternative 1 Nelson 1 NDS 4 Reverend A Nellis Farm house Tansley Pioneer Cemetery Alternative 1 Nelson 1 NDS 5 Neil Johnson Farm house Alternative 1 Nelson 1 NDS 6 James Campbell Two farm houses Stage 1 AA of Proposed Zone 3 Burlington/ Oakville Interconnecting Watermain Class EA 7

16 Figure 2: High Archaeological Potential Zones* within the Study Area *High Archaeological Potential Zones are defined as lands within 300 metres of a primary water source, within 200 metres of a secondary water source and within close proximity (ie: 100 metres or less) to a former or existing 18 th or 19 th century feature, structure and/or historic village Stage 1 AA of Proposed Zone 3 Burlington/ Oakville Interconnecting Watermain Class EA 8

17 Figure 3: Historic Structures within Close Proximity* to the Proposed Watermain Alternatives *Close Proximity is defined as lands within 100 meter or less to a former or existing 18 th or 19 th century structure/featur e and/or historic village. Stage 1 AA of Proposed Zone 3 Burlington/ Oakville Interconnecting Watermain Class EA 9

18 5) Field Review A non-intrusive field review of the study area was conducted on December 12 th, The purpose of the field review was to identify and describe high potential areas requiring additional archaeological research and low potential areas not warranting further archaeological concern. Alternative 1 is located within the rural locale of the City of Burlington, encompassing moderate residential, commercial and industrial land-uses, roadways, railways, agricultural, fallow and grassed fields, Bronte Creek and its associated valleylands (see Plate 2). Stage 2 archaeological assessment of Appleby Line from north of Taywood Drive to the 407 ETR Highway and along Dundas Street from the intersection of Appleby Line and Dundas easterly approximately 370 metres was assessed to free from archaeological remains by Archeoworks Inc. in October of 2008 (see Plate 3). The specifics of this archaeological assessment is outlined in the Stage 2 Archaeological Assessment of Proposed Improvements of Appleby Line (RR20) and the Intersection at Dundas Street (RR5), Class EA, City of Burlington, Halton Region, Ontario (Archeoworks Inc., 2008). To reduce environmental and archaeological impact to Bronte Creek valley where it bisects Dundas Street, RVA has proposed hanging the watermain on abandoned bridge piers adjacent to the existing Dundas Street bridge (see Plates 4). However, as the engineering designs have not been finalized, further archaeological review of this section of Alternative 1 should be undertaken once the detailed design is complete, to determine if any Stage 2 archaeological investigations are warranted. Furthermore, should construction occur within the Bronte Creek Provincial Park, guidelines for cultural and heritage studies set forth by Ontario Parks are required to be followed. While the majority of the remainder of this alternative is to be installed within disturbed, existing road right-of-ways (ROW), archaeological concerns remain outstanding for the fallow and grassed area extending from approximately 370 metres east of Appleby Line and Dundas Street to 5223 Dundas Street (see Plates 5). Additionally, should construction activities extend beyond the current ROW limits into undisturbed areas, Stage 2 archaeological investigations may be warranted, specifically if impacts are to occur to lands within close proximity to historic structures and features or to undisturbed lands falling within the high potential zones illustrated on Figure 2. Finally, should construction impact lands immediately adjacent to the Tansley Pioneer Cemetery, impacts to potential graves will need to be mitigated; these mitigations involving the mechanical removal of topsoil to locate any unmarked graves (grave shafts) following the length of the cemetery limits. The Registrar of Cemeteries should also be notified of the proposed work and consulted to confirm the investigation strategy. Alternative 2 is located with the rural locale of the City of Burlington, encompassing a single residential unit, the Tremaine roadway, the 407 ETR Highway, agricultural and fallow fields, Bronte Creek and its associated valleylands. All of Alternative 2 along Tremaine Road and the majority of its installation along the 407ETR Highway is to occur within disturbed existing road ROW; as such, further archaeological concerns are Stage 1 AA of Proposed Zone 3 Burlington/ Oakville Interconnecting Watermain Class EA 10

19 not warranted for this portion Alternative 2 (see Plate 6). However, should construction activities extend beyond the ROW limits into undisturbed areas, Stage 2 archaeological investigations may be warranted, specifically if impacts are to occur to lands within the established high potential zones (see Figure 2). Archaeological concerns are still outstanding for the remainder of Alternative 2 that extends approximately 85 metres from the 407 ETR Highway ROW south-easterly into undisturbed fallow fields within Lot 5, Concession 1 NDS, where Alternative 2 connects to the existing and proposed watermains (see Figure 2). Stage 1 AA of Proposed Zone 3 Burlington/ Oakville Interconnecting Watermain Class EA 11

20 6) Conclusions and Recommendations The Stage 1 archaeological assessment of the proposed Zone 3 Burlington/ Oakville Interconnecting Watermain, in the City of Burlington, Regional Municipality of Halton, has indicated that, based on historical documentation, the visual documentation of suitable topography and proximity of water sources, there is high potential for the recovery of sub-surface Aboriginal and Euro-Canadian, historic remains within the limits of the proposed study area. Therefore, the established high potential for the recovery of Aboriginal and Euro-Canadian, historic remains within the study area warrants further Stage 2 archaeological assessments in all undisturbed areas of both alternatives if they are to be impacted by construction activities. In light of these results, the following recommendations are presented: 1. Due to the assessed undisturbed condition of specified sections within Alternatives 1 and 2; along with the established high potential for the recovery of Aboriginal and/or Euro-Canadian remains within these alignments, once the preferred route has been selected, a Stage 2 archaeological field assessment of the identified undisturbed areas within this route should be undertaken prior to any construction activities, to minimize impacts to heritage resources. Should significant archaeological resources be encountered, additional background research or fieldwork may be required by the Ministry of Culture. 2. Should construction activities impact those lands immediately adjacent to the Tansley Pioneer Cemetery, a Stage 2 archaeological field assessment followed by detailed Stage 3 investigations, will be necessary. This would entail the use a smooth-bucket backhoe or Gradall to strip topsoil following the length of the cemetery frontage where ever construction is to occur. Once the topsoil has been removed, if it has been determined no grave shafts fall within the limits of construction, the topsoil would subsequently be returned and all excavated ditches filled in. Should grave shafts be encountered, local police, The Ministry of Culture and the Registrar of Cemeteries must be contacted immediately for further instruction. 3. This report is filed with the Ministry of Culture in compliance with Section 65 (1) of the Ontario Heritage Act. The ministry reviews reports to ensure that the licensee has met the terms and conditions of the licence and archaeological resources have been identified and documented according to the standards and guidelines set by the ministry, ensuring the conservation, protection and preservation of the heritage of Ontario. It is recommended that development not proceed before receiving confirmation that the Ministry of Culture has entered the report into the provincial register of reports. 4. Should previously unknown or unassessed deeply buried archaeological resources be uncovered during development, they may be a new archaeological site and therefore subject to Section 48 (1) of the Ontario Heritage Act. The proponent or person discovering the archaeological resources must cease alteration of the site immediately and engage a licensed archaeologist to carry out archaeological fieldwork, in compliance with Section 48 (1) of the Ontario Stage 1 AA of Proposed Zone 3 Burlington/ Oakville Interconnecting Watermain Class EA 12

21 Heritage Act. The office of the Heritage Operations Unit, Ministry of Culture ( ) should be contacted immediately. 5. Any person discovering human remains must immediately notify the office of the Heritage Operations Unit, Ministry of Culture ( ), the police or coroner, and the Registrar of Cemeteries, Cemeteries Regulation Unit, Ministry of Government Services ( ). Under Section 6 of Regulation 881 of the Ontario Heritage Act, Archeoworks Inc. will, keep in safekeeping all objects of archaeological significance that are found and all field records that are made. Stage 1 AA of Proposed Zone 3 Burlington/ Oakville Interconnecting Watermain Class EA 13

22 7) Bibliography Archaeological Services Inc Archaeological Master Plan for the Regional Municipality of Halton. Report on File at Archaeological Services Inc., Toronto. Archeoworks Inc Stage 2 Archaeological Assessment of Proposed Improvements of Appleby Line (RR20) and the Intersection at Dundas Street (RR5), Class EA, City of Burlington, Halton Region, Ontario, Newmarket. Chapman, L. J. and Putnam, D. F The Physiography of Southern Ontario; Ontario Geological Survey, Special Volume 2. Government of Ontario: Toronto. DML Environmental Services Limited 2008 Phase I Environmental Site Assessment of 5223 Dundas Street, Burlington, Ontario, Niagara Falls. Halton-Peel Branch Ontario Genealogical Society 1993 Nelson Township No. 10 Tansley Pioneer Cemetery. Streetsville Ontario Ministry of Citizenship, Culture and Recreation (now the Ministry of Culture) 1997(revised 1998) An Educational Primer and Comprehensive Guide for Nonspecialists. Archaeology, Land Use Planning & Development in Ontario. Toronto. Ontario Ministry of Culture 2006 Final Draft: Standards and Guidelines for Consulting Archaeologists. _final.htm Walker and Miles (publishers), 1877 Illustrated Historical Atlas of the County of Halton, Ontario Toronto: Walker & Miles. Websites: Ontario Heritage Properties Database Stage 1 AA of Proposed Zone 3 Burlington/ Oakville Interconnecting Watermain Class EA 14

23 Appendix: Plates Plate 1: Looking north at location of the former Tansley Pioneer Cemetery, entirely graded and covered in gravel. Plate 2: Looking northeast along Dundas Street at gravel and ditched disturbance along existing road ROW. Plate 3: Looking northeast at test-pit survey at five metre intervals from Stage 2 survey in October Stage 1 AA of Proposed Zone 3 Burlington/ Oakville Interconnecting Watermain Class EA 15

24 Plate 4: Looking northeast along Dundas Street at existing bridge pier. Plate 5: Looking northeast along Dundas Street at potentially undisturbed grassed frontage at 5223 Dundas Street. Plate 6: Looking northwest along Tremaine Road at existing road ROW. Stage 1 AA of Proposed Zone 3 Burlington/ Oakville Interconnecting Watermain Class EA 16

25 Ministry of Tourism and Culture Ministère du Tourisme et de la Culture Culture Programs Unit Unité des programmes culturels Programs and Services Branch Direction des programmes et des services 400 University Avenue, 4 th floor 400, avenue University, 4 e étage Toronto, ON, M7A 2R9 Toronto, ON, M7A 2R9 Telephone: Téléphone: Facsimile: Télécopieur: Norbert.Stanchly@ontario.ca Norbert.Stanchly@ontario.ca April 9, 2010 Kim Slocki Archeoworks Inc Yonge Street Suite #1029 Newmarket, Ontario L3X 1X4 RE: Review and Acceptance into the Provincial Register of Reports: Archaeological Assessment Report Entitled, Stage 2 Archaeological Assessment (AA) of: Proposed Zone 3 Burlington/Oakville Interconnection Watermain, Class EA, City of Burlington, Regional Municipality of Halton, Ontario, Report Dated May, 2009, Report Received November 25, 2009, MCL Project Information Form Number P , MCL RIMS Number 24WT032 Dear Ms. Slocki: This office has reviewed the above-mentioned report, which has been submitted to this Ministry as a condition of licensing in accordance with Part VI of the Ontario Heritage Act, R.S.O. 1990, c This review is to ensure that the licensed professional consultant archaeologist has met the terms and conditions of their archaeological licence, that archaeological sites have been identified and documented according to the 1993 technical guidelines set by the Ministry and that the archaeological fieldwork and report recommendations ensure the conservation, protection and preservation of the cultural heritage of Ontario. As the result of our review, this Ministry accepts the above titled report into the Provincial register of archaeological reports. No archaeological sites were documented. It is recommended that there are no further concerns for alterations to archaeological sites for the area that has undergone archaeological assessment. This Ministry concurs with this recommendation. Given the above, this Ministry is satisfied that concerns for archaeological sites have been met for the area of this development project as depicted by Figures 2.1 and 2.2 of the above titled report. Should you require further information, please do not hesitate to contact me.

26 Sincerely, Norbert Stanchly Archaeology Review Officer cc. Archaeological Licensing Office R.V. Anderson Associates Limited

27 Stage 2 Archaeological Assessment (AA) of: Proposed Zone 3 Burlington/ Oakville Interconnection Watermain Class EA City of Burlington Regional Municipality of Halton Ontario Project #: 008-A Licencee/#: Kim Slocki/P029 PIF#: P July 2009 Presented to: R.V. Anderson Associates Limited 2001 Sheppard Avenue East, Suite #400 Toronto, ON M2J 4Z8 T: F: Prepared by: Archeoworks Inc Yonge Street, Suite #1029 Newmarket, ON L3X 1X4 Tel.: Fax:

28 Executive Summary Through the Places to Grow Act, the Regional Municipality of Halton has been mandated by the Province to accommodate for significant population growth over the next 25 years. Therefore, it was recommended within the South Halton Water and Wastewater Master Plan Update Class EA that two watermains be constructed across Bronte Creek to interconnect Zones 1 and 3 in the City of Burlington and Town of Oakville. These watermains are required since there is a surplus of water treatment capacity in Burlington and a shortfall in water treatment capacity in Oakville. The proposed watermains will allow the Region to operate the water distribution systems in the City Burlington and the Town of Oakville as one system. To identify a preferred alignment for the mitigation of the Zone 3 interconnecting watermain in the City of Burlington, The Region of Halton has retained R.V. Anderson Associates Limited (RVA), to undertake a Class Environmental Assessment. To facilitate this study, conducted in accordance with the Class Environment Assessment, Archeoworks Inc. was initially retained by RVA, of Toronto, Ontario, in 2009 to conduct a Stage 1 archaeological assessment of the proposed watermain alternatives. Two alternative alignments for Zone 3 were initially proposed. In 2009, Archeoworks Inc. was further retained to conduct the Stage 2 archaeological assessment of the preferred watermain alignment within Zone 3, identified as Alternative 1 and which extends along Dundas Street from Tremaine Road to Appleby Line. A Stage 2 assessment was required due to the establishment of potential for the recovery of archaeological remains in our Stage 1 report. The pre-survey research, outlined in the Stage 1 Archaeological Assessment for Proposed Zone 3, Burlington/Oakville, Interconnection Watermain, Class EA, City of Burlington, Regional Municipality of Halton, Ontario (Archeoworks Inc., 2009), identified potential for locating historic Euro-Canadian remains within undisturbed portions of the Zone 3 study area based on the former presence of numerous historical farm houses, a mill/manufactory, a blacksmith shop, the Hamilton and North Western Railway system and the Tansley Pioneer Cemetery within the limits of Alternative 1. Furthermore, study corridor transects Bronte Creek and tributaries of Bronte Creek and Sheldon Creek, which supports the potential for the recovery of Aboriginal remains. In addition, the Regional Municipality of Halton s Archaeological Master Plan potential mapping indicates that significant portions of the study area fall within high archaeological potential zones for the location and recovery of both Aboriginal and Euro-Canadian archaeological resources. A total of 27 archaeological sites had been encountered within a two-kilometre radius of the study corridor which also helps establish the potential for the discovery of additional archaeological remains in the immediate area. During the Stage 2 archaeological assessment of Alternative 1, significant disturbances, including grading, ditching and filling activities associated with the existing roadways and surrounding construction activities related to adjacent development activities were encountered; these disturbances encompassing the majority of the study corridor and not subject to field assessment. Furthermore, a segment of the study corridor, at the Stage 2 AA of Proposed Zone 3 Watermain Interconnection, Burlington, RM of Halton i

29 intersection of Appleby Line and Dundas Street was previously subjected to a Stage 2 survey as recorded in Stage 2 Archaeological Assessment of Proposed Improvements of Appleby Line (RR20) and the Intersection at Dundas Street (RR5), Class EA, City of Burlington, Halton Region, Ontario (Archeoworks Inc., 2008). During this assessment no archaeological remains were encountered and, thus, this part of the study corridor is now considered free from further archaeological concern. Finally, to reduce environmental and archaeological impacts to the Bronte Creek valley where it bisects Dundas Street, as discussed within the Stage 1 Archaeological Assessment for Proposed Zone 3, Burlington/Oakville, Interconnection Watermain, Class EA, City of Burlington, Regional Municipality of Halton, Ontario (Archeoworks Inc., 2009), RVA has proposed hanging the watermain on abandoned bridge piers adjacent to the existing Dundas Street bridge, from approximately STA to just west of STA 13+00; as such, archaeological testing was not required with this segment of the study corridor and, thus, was not conducted. The surrounding area predominantly consists of commercial and residential developments except for woodlots near Bronte Creek north and south of Dundas Street, farmland on the south side of Dundas Street extending past Tremaine Road and north of Dundas Street near Tremaine Road. Test-pits were, nevertheless, excavated in order to determine the condition of the soil and to confirm disturbances associated with the adjacent roadways. Despite the detailed archaeological assessment, no archaeological remains were encountered while undertaking the Stage 2 assessment and, thus, and the entire study corridor is now considered free from further archaeological concern. Stage 2 AA of Proposed Zone 3 Watermain Interconnection, Burlington, RM of Halton ii

30 Project Personnel: Project/Field Director: Kim Slocki Field Archaeologists: Rob Dmytruk Nimal R Nithiyanantham Kelly Pike Jessica Lytle Report Preparation: Brad Gibson Nimal R Nithiyanantham Graphics: Brad Gibson Stage 2 AA of Proposed Zone 3 Watermain Interconnection, Burlington, RM of Halton iii

31 Contents Executive Summary Project Personnel Contents i ii-iii iv Introduction Stage 1 Summary 3 2. Stage 2 Field Assessment Conclusions & Recommendations 7 4. Bibliography 8 Figures: Figure 1: 1:50,000 Map Identifying Location of Study Corridor 2 Figure 2.1: Stage 2 Assessment 5 Figure 2.2: Stage 2 Assessment 6 Appendix: Plates Stage 2 AA of Proposed Zone 3 Watermain Interconnection, Burlington, RM of Halton iv

32 Introduction Through the Places to Grow Act, the Regional Municipality of Halton has been mandated by the Province to accommodate for significant population growth over the next 25 years. Therefore, it was recommended within the South Halton Water and Wastewater Master Plan Update Class EA that two watermains be constructed across Bronte Creek to interconnect Zones 1 and 3 in the City of Burlington and Town of Oakville. These watermains are required since there is a surplus of water treatment capacity in Burlington and a shortfall in water treatment capacity in Oakville. The proposed watermains will allow the Region to operate the water distribution systems in the City Burlington and the Town of Oakville as one system. To identify a preferred alignment for the mitigation of the Zone 3 interconnecting watermain in the City of Burlington, The Region of Halton has retained R.V. Anderson Associates Limited, to undertake a Class Environmental Assessment. To facilitate this study, conducted in accordance with the Class Environment Assessment, Archeoworks Inc. was initially retained by R.V. Anderson Associates Ltd., of Toronto, Ontario, in 2009 to conduct a Stage 1 archaeological assessment of the proposed watermain alternatives. Two alternative alignments for Zone 3 were initially proposed. In 2009, Archeoworks Inc. was further retained to conduct the Stage 2 archaeological assessment of the preferred watermain alignment within Zone 3, identified as Alternative 1 and which extends along Dundas Street from Tremaine Road to Appleby Line (see Figure 1). A Stage 2 assessment was required due to the establishment of potential for the recovery of archaeological remains in our Stage 1 report. The Stage 2 survey, reported herein, was conducted under the project and field direction of Ms. Kim Slocki on June 2 nd, Permission to enter this study area in order to conduct archaeological field activities, including the recovery of artifacts, was granted on April 15 th, This study was conducted in accordance with the Ontario Heritage Act (1990) under an archaeological consulting licence (P029) issued to Kim Slocki. Stage 2 AA of Proposed Zone 3 Watermain Interconnection, Burlington, RM of Halton 1

33 Figure 1: Map Identifying Location of Zone 3 Burlington/ Oakville Interconnecting Watermain Alternatives (Source: R.V. Andersons Associates Ltd.) Stage 2 AA of Proposed Zone 3 Watermain Interconnection, Burlington, RM of Halton 2

34 2) Stage 1 Summary The pre-survey research, outlined in the Stage 1 Archaeological Assessment for Proposed Zone 3, Burlington/Oakville, Interconnection Watermain, Class EA, City of Burlington, Regional Municipality of Halton, Ontario (Archeoworks Inc., 2009), indicated that according to the visual documentation of suitable topography, the close proximity of 27 known archaeological sites, historical documentation and the immediate proximity of several tributaries, additional significant sub-surface prehistoric Aboriginal and 19 th century Aboriginal and Euro-Canadian sites may be discovered at any undisturbed location within the proposed watermain Alternates 1 and 2. Specifically regarding Alternative 1, identified archaeological potential was based on the fact that the study corridor transects Bronte Creek and tributaries of Bronte Creek and Sheldon Creek. Furthermore, a review of the study corridor within the 1877 Illustrated Historical Atlas of Halton County indicated that numerous historical farm houses, a mill/ manufactory, a blacksmith shop, the Hamilton and North Western Railway system and the Tansley Pioneer Cemetery were formerly located within it limits. This substantial background research supports the Regional Municipality of Halton s Archaeological Master Plan potential mapping, which indicates that significant portions of the study corridor fall within high archaeological potential zones for the location and recovery of both Aboriginal and Euro-Canadian archaeological resources, due to the close proximity of primary water sources, numerous historical features, and previously identified archaeological sites. Due to the established high archaeological potential for the recovery of Aboriginal and Euro- Canadian remains within Alignment 1, it was recommended that a Stage 2 archaeological assessment, following the Final Draft: Standards and Guidelines for Consulting Archaeologists (2006), published by the Ministry of Culture, be undertaken in all undisturbed locations. The results of our Stage 2 survey are listed below. 2) Stage 2 Field Assessment The Stage 2 archaeological assessment illustrated in Figures 2.1 and 2.2 was undertaken to identify and describe any existing archaeological resources within the study corridor boundaries. The weather during the Stage 2 investigations was overcast with temperatures averaging 14.5ºC. Significant disturbances, including grading, ditching and filling activities associated with the existing roadways and surrounding construction activities related to adjacent development, were encountered; these disturbances encompassing the majority of the study corridor (see Figures 2.1 and 2.2, Plates 1-18). The surrounding area predominantly consists of commercial and residential developments except for woodlots near Bronte Creek north and south of Dundas Street, farmland on the south side of Dundas Street extending past Tremaine Road and north of Dundas Street near Tremaine Road. Test pits were, nevertheless, excavated in order to determine the condition of the soil and confirmed disturbances associated with the adjacent roadways. Due to the low archaeological potential classification of these areas, systematic survey was abandoned in all identified disturbed locations. Stage 2 AA of Proposed Zone 3 Watermain Interconnection, Burlington, RM of Halton 3

35 A segment of the study corridor, at the intersection of Appleby Line and Dundas Street extending northeast toward the Dundas Street Bridge over Bronte Creek was previously subjected to a Stage 2 survey as recorded in Stage 2 Archaeological Assessment of Proposed Improvements of Appleby Line (RR20) and the Intersection at Dundas Street (RR5), Class EA, City of Burlington, Halton Region, Ontario (Archeoworks Inc., 2008). While disturbances consisted of grading, ditching, and filling activities, a test pit survey was conducted in areas near the intersection. Despite these efforts, no archaeological remains were encountered while undertaking the Stage 2 assessment of Appleby Line and Dundas Street and, thus, this part of the study corridor is now considered free from further archaeological concern. Moreover, to reduce environmental and archaeological impacts to the Bronte Creek valley where it bisects Dundas Street, as discussed within the Stage 1 Archaeological Assessment for Proposed Zone 3, Burlington/Oakville, Interconnection Watermain, Class EA, City of Burlington, Regional Municipality of Halton, Ontario (Archeoworks Inc., 2009), RVA has proposed hanging the watermain on abandoned bridge piers adjacent to the existing Dundas Street bridge, from approximately STA to just west of STA 13+00; as such, archaeological testing was not required with this segment of the study corridor and, thus, was not conducted (see Figure 2.2). A shovel test-pit form of survey, complying with the Final Draft: Standards and Guidelines for Consulting Archaeologists (2006), published by the Ministry of Culture, was conducted adjacent to and within the Bronte Creek woodlot on the south side of Dundas Street from just east of STA to approximately STA and from just east of STA to approximately STA 13+50, and on the north side of Dundas Street from just east of STA to approximately STA on the south and north sides of Dundas Street, so as to evaluate the archaeological significance of the lands (see Figures 2.1 and 2.2, Plates 10 and 12). Despite careful scrutiny, no archaeological remains were encountered. The remainder of the study corridor assessed to be undisturbed consisted of grassed margins adjacent to the roadways. These areas were subjected to a shovel test-pit form of survey, complying with the Final Draft: Standards and Guidelines for Consulting Archaeologists (2006), published by the Ministry of Culture (see Figures 2.1 and 2.2, Plates 5, 9, 10-11, 13 & 17). Shovel test-pit surveys are defined as excavating 30x30cm units at set intervals of five metres on a grid pattern in areas requiring this form of assessment. In total, approximately 300 test-pits were excavated to sterile subsoil depths of centimetres and the topsoil was screened through sixmillimetre mesh in order to facilitate the recovery of artifacts. All test-pits were backfilled. No archaeological remains were encountered while undertaking the Stage 2 assessment and, thus, and the entire study corridor is now considered free from further archaeological concern. Stage 2 AA of Proposed Zone 3 Watermain Interconnection, Burlington, RM of Halton 4

36 Figure 2.1: Stage 2 Archaeological Assessment Stage 2 AA of Proposed Zone 3 Watermain Interconnection, Burlington, RM of Halton 5

37 Figure 2.2: Stage 2 Archaeological Assessment Stage 2 AA of Proposed Zone 3 Watermain Interconnection, Burlington, RM of Halton 6

38 3) Conclusions & Recommendations During the Stage 2 archaeological assessment of preferred watermain alignment Alternative 1, within Zone 3, which extends along Dundas Street from Tremaine Road to Appleby Line, in the City of Burlington, Regional Municipality of Halton, no archaeological remains were encountered. As a result, it is recommended that: 1. The subject lands, as illustrated in Figures 2.1 and 2.2, be considered free from archaeological concern. 2. This report is filed with the Minister of Culture in compliance with Section 65 (1) of the Ontario Heritage Act. The ministry reviews reports to ensure that the licensee has met the terms and conditions of the licence and archaeological resources have been identified and documented according to the standards and guidelines set by the ministry, ensuring the conservation, protection and preservation of the heritage of Ontario. It is recommended that development not proceed before receiving confirmation that the Ministry of Culture has entered the report into the provincial register of reports. 3. Should previously unknown or unassessed deeply buried archaeological resources be uncovered during development, they may be a new archaeological site and therefore subject to Section 48 (1) of the Ontario Heritage Act. The proponent or person discovering the archaeological resources must cease alteration of the site immediately and engage a licensed archaeologist to carry out archaeological fieldwork, in compliance with Section 48 (1) of the Ontario Heritage Act. The office of the Heritage Operations Unit, Ministry of Culture ( ) should be contacted immediately. 4. Any person discovering human remains must immediately notify the office of the Heritage Operations Unit, Ministry of Culture ( ), the police or coroner, and the Registrar of Cemeteries, Cemeteries Regulation Unit, Ministry of Government Services ( ). Under Section 6 of Regulation 881 of the Ontario Heritage Act, Archeoworks Inc. will, keep in safekeeping all objects of archaeological significance that are found and all field records that are made. Stage 2 AA of Proposed Zone 3 Watermain Interconnection, Burlington, RM of Halton 7

39 4) Bibliography Archeoworks Inc Stage 1 Archaeological Assessment for Proposed Zone 3, Burlington/Oakville, Interconnection Watermain, Class EA, City of Burlington, Regional Municipality of Halton, Ontario. Newmarket. Ontario Ministry of Citizenship, Culture and Recreation (now the Ministry of Culture) 1997(revised 1998) Conserving a Future for our Past: Archaeology, Land Use Planning & Development in Ontario. An Educational Primer and Comprehensive Guide for Non-Specialists. Cultural Programs Branch, Archaeology & Heritage Planning Unit. Toronto. Ontario Ministry of Culture 2006 Final Draft: Standards and Guidelines for Consulting Archaeologists. Stage 2 AA of Proposed Zone 3 Watermain Interconnection, Burlington, RM of Halton 8

40 Appendix A: Plates Stage 2 AA of Proposed Zone 3 Watermain Interconnection, Burlington, RM of Halton 9

41 Plate 1: Looking at soil conditions in the southwestern corner of the study corridor. Plate 2: 887 Looking northeast at gravel disturbances and slope associated with the bridge. Plate 3: 891 Looking south at sloped area at the southern part of the study corridor. Stage 2 AA of Proposed Zone 3 Watermain Interconnection, Burlington, RM of Halton 10

42 Plate 4: Manhole access in the southern part of the study corridor with test-pitting in the background. Plate 5: Looking northeast at test pit survey at 5 metre intervals. Plate 6: Photo of the soil being excavated from test pits. Stage 2 AA of Proposed Zone 3 Watermain Interconnection, Burlington, RM of Halton 11

43 Plate 7: Looking northeast and disturbances caused by slope and ditch. Plate 8: Looking southwest at ditches and gravel shoulder, to the left is testable soil. Plate 9: Looking northeast at test pit survey at 5 metre intervals. Stage 2 AA of Proposed Zone 3 Watermain Interconnection, Burlington, RM of Halton 12

44 Plate 10: Looking northeast at test pit survey at 5 metre intervals. Plate 11: Looking southwest at test pit survey at 5 metre intervals in the west side of Dundas Street. Plate 12: Looking southwest at ditch and test pit area to the right of the ditch. Stage 2 AA of Proposed Zone 3 Watermain Interconnection, Burlington, RM of Halton 13

45 Plate 13: Looking northwest at test pit area in the west side of Dundas Street. Plate 14: Looking northeast at disturbances caused by ditching and a gravel shoulder. Plate 15: Looking southeast along study corridor. Stage 2 AA of Proposed Zone 3 Watermain Interconnection, Burlington, RM of Halton 14

46 Plate 16: Looking northeast along study corridor. Plate 17: Looking north at test pit survey at 5 metre intervals conducted beyond roadside ditch. Plate 18: Looking northeast towards Tremaine Road at the end of the study corridor. Stage 2 AA of Proposed Zone 3 Watermain Interconnection, Burlington, RM of Halton 15

ARCHEOWORKS INC. Project Number: Licence/CIF#: P June 2006

ARCHEOWORKS INC. Project Number: Licence/CIF#: P June 2006 ARCHEOWORKS INC. ADDENDUM to CIF# P029-088: Stage 2 Archaeological Assessment of Two parcels within Proposed Green Ginger Developments Subdivision: A) Fallow Field/Wooded Parcel (16.3-acres) & B) Holdout

More information

STAGE 1 2 ARCHAEOLOGICAL ASSESSMENT OF YONGE STREET SUBWAY EXTENSION, LOTS 37-41, CONCESSION EYS, TOWNSHIP OF MARKHAM, CITY OF TORONTO, YORK COUNTY

STAGE 1 2 ARCHAEOLOGICAL ASSESSMENT OF YONGE STREET SUBWAY EXTENSION, LOTS 37-41, CONCESSION EYS, TOWNSHIP OF MARKHAM, CITY OF TORONTO, YORK COUNTY STAGE 1 2 ARCHAEOLOGICAL ASSESSMENT OF YONGE STREET SUBWAY EXTENSION, LOTS 37-41, CONCESSION EYS, TOWNSHIP OF MARKHAM, CITY OF TORONTO, YORK COUNTY Original License Report Submitted to: Ecoplans Limited

More information

STAGE 1 ARCHAEOLOGICAL ASSESSMENT OF RATHBURN ROAD, FROM DUKE OF YORK BOULEVARD TO SHIPP DRIVE, CITY OF MISSISSAUGA. Submitted to:

STAGE 1 ARCHAEOLOGICAL ASSESSMENT OF RATHBURN ROAD, FROM DUKE OF YORK BOULEVARD TO SHIPP DRIVE, CITY OF MISSISSAUGA. Submitted to: STAGE 1 ARCHAEOLOGICAL ASSESSMENT OF RATHBURN ROAD, FROM DUKE OF YORK BOULEVARD TO SHIPP DRIVE, CITY OF MISSISSAUGA Submitted to: McCormick Rankin Corporation 2655 North Sheridan Way, Suite 280 Mississauga,

More information

ARCHEOWORKS INC. EXECUTIVE SUMMARY

ARCHEOWORKS INC. EXECUTIVE SUMMARY Archeoworks Inc. i ARCHEOWORKS INC. Stage 1 Archaeological Assessment for the: Trafalgar Road (Regional Road 3) Improvements Class EA Study From Cornwall Road to Highway 407 Town of Oakville Regional Municipality

More information

Revised License Report

Revised License Report STAGE 1 2 ARCHAEOLOGICAL ASSESSMENT OF THE EGLINTON CROSSTOWN LIGHT RAIL TRANSIT CORRIDOR, EGLINTON AVENUE FROM JANE STREET TO BRICKNELL STREET, CONCESSION 5, LOT 11, CONCESSION 6, LOT 41, YORK TOWNSHIP,

More information

Original License Report. Submitted to: New Horizon Development Inc. 69 John Street South, Suite 304 Hamilton, Ontario L8N 2B9 Phone (905)

Original License Report. Submitted to: New Horizon Development Inc. 69 John Street South, Suite 304 Hamilton, Ontario L8N 2B9 Phone (905) STAGE 1 ARCHAEOLOGICAL ASSESSMENT OF 2480-2496 OLD BRONTE ROAD, PART OF LOT 31, CONCESSION 1 SOUTH OF DUNDAS STREET, GEOGRAPHIC TOWNSHIP OF TRAFALGAR, TOWN OF OAKVILLE, REGIONAL MUNICPALITY OF HALTON Original

More information

Environmental Assessment for a New Landfill Footprint at the West Carleton Environmental Centre

Environmental Assessment for a New Landfill Footprint at the West Carleton Environmental Centre Waste Management of Canada Corporation Environmental Assessment for a New Landfill Footprint at the West Carleton Environmental Centre ARCHEOLOGY DETAILED IMPACT ASSESSMENT Prepared by: Archeoworks Inc.

More information

STAGE 1 ARCHAEOLOGICAL ASSESSMENT OF THE MISSISSAUGA BRT (EAST), CITY OF MISSISSAUGA. Submitted to:

STAGE 1 ARCHAEOLOGICAL ASSESSMENT OF THE MISSISSAUGA BRT (EAST), CITY OF MISSISSAUGA. Submitted to: STAGE 1 ARCHAEOLOGICAL ASSESSMENT OF THE MISSISSAUGA BRT (EAST), CITY OF MISSISSAUGA Submitted to: Ecoplans Limited 2655 North Sheridan Way, Suite 280 Mississauga, Ontario L5K 2P8 Telephone (905) 823-4988

More information

Appendix E Study Area Archaeological Assessment

Appendix E Study Area Archaeological Assessment Appendix E Study Area Archaeological Assessment ARCHEOWORKS INC. Stage 1 Archaeological Assessment (AA): Proposed Zone 5 Sub-Transmission Main Preliminary Alternatives City of Brampton Regional Municipality

More information

APPENDIX 'D' Archaeological Investigation

APPENDIX 'D' Archaeological Investigation City of Peterborough Lansdowne Street West Our File: 6552 ENVIRONMENTAL STUDY REPORT ADDENDUM APPENDIX 'D' Archaeological Investigation March 2008 Lansdowne Street West Widening / Reconstruction Class

More information

Appendix I. Stage 2 Archaeological Assessment Report

Appendix I. Stage 2 Archaeological Assessment Report Appendix I Stage 2 Archaeological Assessment Report Stage 2 Archaeological Assessment for: Region of Waterloo Rapid Transit Project Regional Municipality of Waterloo Ontario Transit Project Assessment

More information

Detritus Consulting Ltd.

Detritus Consulting Ltd. Archaeological Assessment (Stages 1, 2) Plan 55, Part Lot 18 RP 17R2952, Parts 1, 2, 3 and 4, Geographical Township of West Grey, Formerly Part of Lot 1 and 2, Concession 2, Historical Township of Bentick,

More information

Ministère du Tourisme, de la Culture et du Sport

Ministère du Tourisme, de la Culture et du Sport APPENDIX B Page 1 of 1 Ministry of Tourism, Culture and Sport Culture Programs Unit Programs and Services Branch Culture Division 401 Bay Street, Suite 1700 Toronto ON M7A 0A7 ArchaeologyReports@ontario.ca

More information

ASI ORIGINAL REPORT. Prepared for: Golden Arch Tech Investment Corporation 1092 Argyle Drive Oakville, ON L6J 1A7 T

ASI ORIGINAL REPORT. Prepared for: Golden Arch Tech Investment Corporation 1092 Argyle Drive Oakville, ON L6J 1A7 T STAGE 1 ARCHAEOLOGICAL ASSESSMENT OF 2418 KHALSA GATE PART OF LOT 31, CONCESSION 1, SOUTH OF DUNDAS STREET GEOGRAPHIC TOWNSHIP OF TRAFALGAR, COUNTY OF HALTON NOW IN THE TOWN OF OAKVILLE, REGIONAL MUNICIPALITY

More information

Environmental Assessment for a New Landfill Footprint at the West Carleton Environmental Centre

Environmental Assessment for a New Landfill Footprint at the West Carleton Environmental Centre Waste Management of Canada Corporation Environmental Assessment for a New Landfill Footprint at the West Carleton Environmental Centre ARCHAEOLOGY EXISTING CONDITIONS REPORT Prepared by: Archaeological

More information

Submitted to. Armel Corporation Suite Spectrum Way, Mississauga, Ontario L4W 5N5 Telephone: Facsimile:

Submitted to. Armel Corporation Suite Spectrum Way, Mississauga, Ontario L4W 5N5 Telephone: Facsimile: The 2006 Stage 1-2 Archaeological Assessment of the Proposed Elmira West Development, Lot 6, Concession 1, B Division, Guelph Township, City of Guelph, Wellington County, Ontario Submitted to Armel Corporation

More information

Submitted: July 23, 2009

Submitted: July 23, 2009 Stage I and II Archaeological Assessment Jock River Estates Phase 2 PML Project No. 0801-01 Client: 773804 Ontario Inc. Lot 21, Concession 2 Geographic Township of Goulbourn City of Ottawa Submitted: July

More information

APPENDIX F CULTURAL HERITAGE RESOURCE ASSESSMENT

APPENDIX F CULTURAL HERITAGE RESOURCE ASSESSMENT APPENDIX F CULTURAL HERITAGE RESOURCE ASSESSMENT TO Katherine Jim, MRC DATE February 28, 2013 (Revised March 6 2013, May 27 2013, June 24 2013) FROM Lindsay Popert, ASI ASI FILE 12EA-084 RE Dundas Street

More information

Cultural Heritage Resources

Cultural Heritage Resources Cultural Heritage Resources An Information Bulletin for Projects Subject to Ontario Regulation 359/09 - Renewable Energy Approvals Ministry of Tourism, Culture and Sport 2011 (updated August 2013) Disclaimer:

More information

McKay Road Interchange and Salem / Lockhart Crossing

McKay Road Interchange and Salem / Lockhart Crossing McKay Road Interchange and Salem / Lockhart Crossing The McKay Road Interchange Class EA has two components: 1. A new MacKay Road Interchange at Highway 400; and 2. A new bridge crossing of Highway 400

More information

TOWN OF AURORA HERITAGE IMPACT ASSESSMENTS AND CONSERVATION PLANS GUIDE

TOWN OF AURORA HERITAGE IMPACT ASSESSMENTS AND CONSERVATION PLANS GUIDE PLANNING AND DEVELOPMENT SERVICES Development Planning Division Heritage Planning Section Phone: 905-727-3123 ext. 4226 Fax: 905-726-4736 Email: planning@aurora.ca Town of Aurora 100 John West Way, Box

More information

APPENDIX H. Stage 1 Archaeological Assessment

APPENDIX H. Stage 1 Archaeological Assessment APPENDIX H Stage 1 Archaeological Assessment THE STAGE 1 ARCHAEOLOGICAL ASSESSMENT FOR THE MUNICIPAL CLASS EA FOR HARVIE ROAD/BIG BAY POINT ROAD/HIGHWAY 400, CITY OF BARRIE, SIMCOE COUNTY Prepared for

More information

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN Page 1 1. INTRODUCTION AND BACKGROUND 1.1 THE PROJECT VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN TERMS OF REFERENCE The Town of Caledon (Town) is a large, predominantly rural municipality with

More information

CULTURAL HERITAGE ASSESSMENT REPORT CULTURAL HERITAGE LANDSCAPE & BUILT HERITAGE FEATURES

CULTURAL HERITAGE ASSESSMENT REPORT CULTURAL HERITAGE LANDSCAPE & BUILT HERITAGE FEATURES CULTURAL HERITAGE ASSESSMENT REPORT CULTURAL HERITAGE LANDSCAPE & BUILT HERITAGE FEATURES DUNTROON QUARRY EXPANSION LOT 25 AND PART LOT 26, CONCESSION 12 & PART LOT 25, CONCESSION 12 CLEARVIEW TOWNSHIP

More information

Ministère du Tourisme, de la Culture et du Sport

Ministère du Tourisme, de la Culture et du Sport Page 1 of 1 Ministry of Tourism, Culture and Sport Archaeology Programs Unit Programs and Services Branch Culture Division 401 Bay Street, Suite 1700 Toronto ON M7A 0A7 Archaeology@ontario.ca Ministère

More information

Station Street/Haig Road Extension Environmental Assessment (EA)Study. Welcome

Station Street/Haig Road Extension Environmental Assessment (EA)Study. Welcome Station Street/Haig Road Extension Environmental Assessment (EA)Study Welcome Welcome to this Public Information Centre (PIC) meeting. Please record your attendance and obtain a comment sheet at the registration

More information

Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment

Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment APPENDIX G ARCHAEOLOGICAL ASSESSMENT REPORT Spadina Subway Extension Downsview Station to Steeles Avenue Environmental

More information

Chapter 6 cultural heritage

Chapter 6 cultural heritage 6 Cultural Heritage 6.1 Protecting Vaughan s Cultural Heritage 165 6.1.1 Protecting Vaughan s Cultural Heritage 165 6.1.2 Maintaining a Heritage Inventory 166 6.1.3 Promoting Vaughan s Cultural Heritage

More information

Stage 1 Archaeological Assessment (Background Study and Property Inspection)

Stage 1 Archaeological Assessment (Background Study and Property Inspection) ORIGINAL Stage 1 Archaeological Assessment (Background Study and Property Inspection) Tremaine Road to Highway 407 Class Environmental Assessment Study, Town of Milton, Regional Municipality of Halton,

More information

Appendix C. Archaeological Assessment Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

Appendix C. Archaeological Assessment Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix C Archaeological Assessment Report TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD ARCHEOWORKS INC. Stage 1 Archaeological

More information

Appendix D. Cultural Heritage Assessment Report

Appendix D. Cultural Heritage Assessment Report Appendix D Cultural Heritage Assessment Report EXISTING CONDITION REPORT CULTURAL HERITAGE LANDSCAPES & BUILT HERITAGE RESOURCES & CLASS EA STUDY AND PRELIMINARY DESIGN MAVIS ROAD FROM COURTNEYPARK DRIVE

More information

5: Cross Avenue Bridge, Sixteen Mile Creek Rail Bridge

5: Cross Avenue Bridge, Sixteen Mile Creek Rail Bridge 1. Description of Property Municipal Address Name (if applicable) Legal Description Location of Property Ownership Access Current Use Existing Designation General Description Priority Level 5: Cross Avenue

More information

MILTON HEIGHTS COMMUNITY January 2006 Revised February 2015 Revised November 2015

MILTON HEIGHTS COMMUNITY January 2006 Revised February 2015 Revised November 2015 REVISED DRAFT MILTON HEIGHTS COMMUNITY January 2006 Revised February 2015 Revised November 2015 Urban Design Guidelines Milton Heights Landowners Group This page has been intentionally left blank. Contents

More information

AN ARCHAEOLOGICAL SURVEY FOR THE RICHARDS, TEXAS FARM-TO-MARKET ROAD 149 FIBER OPTIC CABLE PROJECT IN MONTGOMERY COUNTY, TEXAS

AN ARCHAEOLOGICAL SURVEY FOR THE RICHARDS, TEXAS FARM-TO-MARKET ROAD 149 FIBER OPTIC CABLE PROJECT IN MONTGOMERY COUNTY, TEXAS AN ARCHAEOLOGICAL SURVEY FOR THE RICHARDS, TEXAS FARM-TO-MARKET ROAD 149 FIBER OPTIC CABLE PROJECT IN MONTGOMERY COUNTY, TEXAS Antiquities Permit 6097 By William E. Moore Brazos Valley Research Associates

More information

Burloak Drive Grade Separation

Burloak Drive Grade Separation Burloak Drive Grade Separation Transit Project Assessment Process Public Meeting #1 March 30, 2017 GO Lakeshore West Service Plan Weekday Rush Hour 15-minute, two-way service between Aldershot* and Union

More information

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report Page 1 of 18 ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville Environmental Screening Report July 2011 Page 2 of 18 Table of Contents 1.0 INTRODUCTION

More information

Baby Point Heritage Conservation District Study. Kick-off Community Meeting March 27, 2017 Humbercrest United Church

Baby Point Heritage Conservation District Study. Kick-off Community Meeting March 27, 2017 Humbercrest United Church Baby Point Heritage Conservation District Study Kick-off Community Meeting March 27, 2017 Humbercrest United Church Agenda 7:00 Welcome 7:10 HCD Study Overview and Process 8:00 Interactive Discussion /

More information

Garden District Heritage Conservation District Study

Garden District Heritage Conservation District Study Garden District Heritage Conservation District Study Community Consultation Meeting September 24 th, 2013 What is a Heritage Conservation District? A defined area of heritage significance and character

More information

Bressa Developments Limited. Planning Justification Report. Revised Draft Plan of Subdivision and Zoning By-Law Amendment

Bressa Developments Limited. Planning Justification Report. Revised Draft Plan of Subdivision and Zoning By-Law Amendment Bressa Developments Limited Revised Draft Plan of Subdivision and Zoning By-Law Amendment Planning Justification Report Part of Lots 7 & 8 Concession 1, North of Dundas Street Town of Oakville September,

More information

Land adjacent to Dingle Dock, Front Street, East Garston

Land adjacent to Dingle Dock, Front Street, East Garston Land adjacent to Dingle Dock, Front Street, East Garston An Archaeological Watching Brief for Dr J Davies by Jo Pine Thames Valley Archaeological Services Site Code DEG99/82 January 2000 Summary Site name:

More information

1.0 PROJECT REPORT COVER PAGE

1.0 PROJECT REPORT COVER PAGE 1.0 PROJECT REPORT COVER PAGE LICENSEE INFORMATION: Contact Information: Licensee: Ontario Archaeology Licence: Michael B. Henry CD BA FRAI FRSA Marilyn E. Cornies BA CAHP Southwestern District Office

More information

ORIGINAL REPORT. Prepared for: Ontario Inc Hazelton Blvd. Burlington, ON L7P 4V3 T

ORIGINAL REPORT. Prepared for: Ontario Inc Hazelton Blvd. Burlington, ON L7P 4V3 T STAGE 1 ARCHAEOLOGICAL ASSESSMENT OF THE SOUTHWEST CORNER OF LOWER BASE LINE ROAD AND TRAFALGAR ROAD, PART OF LOT 12, CONCESSION 2 NORTH OF DUNDAS STREET, GEOGRAPHIC TOWNSHIP OF TRAFALGAR, HALTON COUNTY,

More information

THE REGIONAL MUNICIPALITY OF YORK BYLAW NO A bylaw to adopt Amendment No. 6 to the Official Plan for The Regional Municipality of York

THE REGIONAL MUNICIPALITY OF YORK BYLAW NO A bylaw to adopt Amendment No. 6 to the Official Plan for The Regional Municipality of York THE REGIONAL MUNICIPALITY OF YORK BILL NO. 13 BYLAW NO. 2014-13 A bylaw to adopt Amendment No. 6 to the Official Plan for The Regional Municipality of York WHEREAS the Planning Act, R.S.O. 1990, c.p.13,

More information

Archaeological Evaluation and Assessment of Land at Kent Cottage, 19 Chapel Street, Hythe, Kent

Archaeological Evaluation and Assessment of Land at Kent Cottage, 19 Chapel Street, Hythe, Kent Archaeological Evaluation and Assessment of Land at Kent Cottage, 19 Chapel Street, Hythe, Kent Planning Application Y13/0463/SH Date of Report: 29/04/2015 Report for Marc Carney SWAT. ARCHAEOLOGY Swale

More information

A. M. Archaeological Associates

A. M. Archaeological Associates THE STAGE 1 AND 2 ARCHAEOLOGICAL ASSESSMENT OF THE 393 DUNDAS STREET WEST PROPERTY, TOWN OF OAKVILLE (PART LOT 19, CONCESSION 1, GEO. TWP. TRAFALGAR NORTH, HALTON COUNTY) Prepared for Emil Toma, Distrikt

More information

Summary of Changes for the Comprehensive Draft Proposed Official Plan Amendment

Summary of Changes for the Comprehensive Draft Proposed Official Plan Amendment Summary of Changes for the Comprehensive Draft Proposed Official Plan Amendment Note: Due to the broad scope of the Official Plan Review, this list is not exhaustive of the extent of changes in the comprehensive

More information

L 2-1 HERITAGE REPORT: REASONS FOR HERITAGE DESIGNATION. Cheyne Family Cemetery. Main Street South

L 2-1 HERITAGE REPORT: REASONS FOR HERITAGE DESIGNATION. Cheyne Family Cemetery. Main Street South L 2-1 HERITAGE REPORT: REASONS FOR HERITAGE DESIGNATION Cheyne Family Cemetery Main Street South October 2013 L 2-2 PROFILE OF SUBJECT PROPERTY: Municipal Address Main Street South (Lot 14, Con 1, EHS)

More information

APPENDIX G. Historical Resources Overview Documentation

APPENDIX G. Historical Resources Overview Documentation APPENDIX G Historical Resources Overview Documentation Statement of Justification for Historical Resources Act Requirements for projects other than small-scale oil and gas This document contains sensitive

More information

AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON

AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON Subject: Boyne Survey Secondary Plan and Related Official Plan Amendments The following text and schedules constitute Amendment No. 30 to the

More information

Phase One Archaeological Investigation Results, James Madison Park Master Development Plan Project, City of Madison, Dane County, Wisconsin

Phase One Archaeological Investigation Results, James Madison Park Master Development Plan Project, City of Madison, Dane County, Wisconsin Phase One Archaeological Investigation Results, James Madison Park Master Development Plan Project, City of Madison, Dane County, Wisconsin Prepared for the City of Madison Parks Department 28 January

More information

Proposed Water Ski Wakeboard Cable Park (former Cedar Run Horse Park) Kevin Bechard Deputation to Committee of the Whole June 4, 2018

Proposed Water Ski Wakeboard Cable Park (former Cedar Run Horse Park) Kevin Bechard Deputation to Committee of the Whole June 4, 2018 Proposed Water Ski Wakeboard Cable Park (former Cedar Run Horse Park) Kevin Bechard Deputation to Committee of the Whole June 4, 2018 Development Proposal - Comprised of three separate cable systems ;

More information

MONITORING STRATEGY. CRM Lab Archaeological Services

MONITORING STRATEGY. CRM Lab Archaeological Services CRM Lab Archaeological Services MONITORING STRATEGY Archaeological Monitoring and Mitigation Strategy submitted to City Planning - for project 587-599 Yonge Street, 7 & 9 Gloucester Street, 4 Dundonald

More information

Municipal Obligations Archaeological Heritage Screening. Heritage Conservation Branch Ministry of Parks, Culture and Sport November 14, 2018

Municipal Obligations Archaeological Heritage Screening. Heritage Conservation Branch Ministry of Parks, Culture and Sport November 14, 2018 Municipal Obligations Archaeological Heritage Screening Heritage Conservation Branch Ministry of Parks, Culture and Sport November 14, 2018 Legislative Authority: The Heritage Property Act, 1980 Impact

More information

ARCHAEOLOGIX INC. 14 Oxford Street West, London ON N6H 1P9 ~ T: (519) F: (519) ~

ARCHAEOLOGIX INC. 14 Oxford Street West, London ON N6H 1P9 ~ T: (519) F: (519) ~ ARCHAEOLOGIX INC. 14 Oxford Street West, London ON N6H 1P9 ~ T: (519)642-7836 F: (519) 642-7733 ~ jimarch@rogers.com Archaeological Assessment (Stages 1, 2 & 3), Addendum Report Lowndes Holdings Corp.,

More information

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study Reconstruction of Regional Road 45 (Creek Road) Between Regional Road 27 (River Road) and Regional Road 63 (Canborough Road) in the Township of Wainfleet Municipal Class EA Study Public Information Centre

More information

24. ARCHAEOLOGY & BUILT HERITAGE

24. ARCHAEOLOGY & BUILT HERITAGE 24. ARCHAEOLOGY & BUILT HERITAGE Overview There are no known archaeological or built heritage sites within or adjacent to the Project designation boundaries. There is a history of both Māori and European

More information

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY 1. Introduction WORK PROGRAM The Town of Caledon is a large, local municipality located in the Greater Toronto

More information

WELCOME TO THE PUBLIC INFORMATION CENTRE. Please Sign In

WELCOME TO THE PUBLIC INFORMATION CENTRE. Please Sign In WELCOME TO THE PUBLIC INFORMATION CENTRE Replacement of Oxtongue Lake Narrows Bridge & Oxtongue River Bridge, Highway 60 (G.W.P. 93-89-00 & G.W.P. 5550-04-00) Class Environmental Assessment (Group B) Please

More information

Archaeological Monitoring of Land at 29 Royal Pier Road, Gravesend, Kent

Archaeological Monitoring of Land at 29 Royal Pier Road, Gravesend, Kent Archaeological Monitoring of Land at 29 Royal Pier Road, Gravesend, Kent Site Code ROY/WB/15 Report for Dr Maxted Date of report 06/10/2015 SWAT ARCHAEOLOGY Swale and Thames Archaeological Survey Company

More information

Ivol Buildings, Woodcote Road, South Stoke, Oxfordshire

Ivol Buildings, Woodcote Road, South Stoke, Oxfordshire Ivol Buildings, Woodcote Road, South Stoke, Oxfordshire An Archaeological Watching Brief For Christ Church, Oxford by Pamela Jenkins Thames Valley Archaeological Services Ltd Site Code IBSS 04/03 March

More information

THE CORPORATION OF THE TOWN OF OAKVILLE BY-LAW NUMBER

THE CORPORATION OF THE TOWN OF OAKVILLE BY-LAW NUMBER THE CORPORATION OF THE TOWN OF OAKVILLE BY-LAW NUMBER 20012-08530 A by-law to adopt an amendment to the Official Plan of the Oakville Planning Area (Official Plan Amendment 198) Land North of Dundas Street.

More information

Northbury Farm, Castle End Road, Ruscombe, Berkshire

Northbury Farm, Castle End Road, Ruscombe, Berkshire Northbury Farm, Castle End Road, Ruscombe, Berkshire An Archaeological Watching Brief For Sir Colin and Lady Southgate by Danielle Milbank Thames Valley Archaeological Services Ltd Site Code NFR 07/120

More information

Chapter 8: Cultural Heritage Assessment

Chapter 8: Cultural Heritage Assessment Chapter 8: Cultural Heritage Assessment Cultural Heritage Assessment 8. Cultural Heritage Assessment... 2 8.1 Introduction... 2 8.2 Baseline Assessment... 2 8.3 Results / Assessment Findings... 3 8.4 Mitigation...

More information

and The Ontario Ministry of Tourism, Culture and Sport

and The Ontario Ministry of Tourism, Culture and Sport Original Report on Archaeological Assessment (Stages 1 & 2) Northgate Land Corp. & Erbsville Kartway Lands Conservation Drive, Part of Lot 28, German Company Tract Geographic Township of Waterloo, City

More information

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network. Better Cycling Dedicated bike facilities will be constructed along BRT corridors where space is available. Nearby bike routes will also be upgraded to ensure a complete network is available for cyclists.

More information

APPENDIX F: EXTERNAL APPROVALS

APPENDIX F: EXTERNAL APPROVALS 1.0 RESPONSIBILITIES When the City is constructing the Park or Open Space Development lands (OPTION I), after the subdivision construction process is completed by the Developer, Open Space Development

More information

Figure 1- Site Plan Concept

Figure 1- Site Plan Concept Figure 1- Site Plan Concept Parking will be provided underground on three levels at rate of 1.0 space/ unit; this rate includes all visitors parking. MMM Group has prepared a parking assessment (April,

More information

a) buildings, structures and artifacts of historical significance;

a) buildings, structures and artifacts of historical significance; 12.3.2. Definition Heritage Resources: There are two classes of heritage resources: monumental or landmark heritage that is considered to reflect exemplary architecture and style of a particular area or

More information

The Regional Municipality of Halton. Chair and Members of the Planning and Public Works Committee

The Regional Municipality of Halton. Chair and Members of the Planning and Public Works Committee The Regional Municipality of Halton Report To: From: Chair and Members of the Planning and Public Works Committee Art Zuidema, Commissioner, Legislative and Planning Services Date: October 4, 2017 Report

More information

McCormick Property Part Lot 12, Concession 2 EHS, Town of Caledon, Region of Peel For Blueland Farms Limited

McCormick Property Part Lot 12, Concession 2 EHS, Town of Caledon, Region of Peel For Blueland Farms Limited McCormick Property Part Lot 12, Concession 2 EHS, Town of Caledon, Region of Peel For Blueland Farms Limited BUILT HERITAGE AND CULTURAL HERITAGE LANDSCAPE ASSESSMENTS February 2013 TABLE OF CONTENTS 1.0

More information

Chitty Farmhouse Extension, Wall Lane, Silchester, Hampshire

Chitty Farmhouse Extension, Wall Lane, Silchester, Hampshire Chitty Farmhouse Extension, Wall Lane, Silchester, Hampshire An Archaeological Watching Brief For In Touch by Andrew Mundin Thames Valley Archaeological Services Ltd Site Code CFS 08/52 May 2008 Summary

More information

Draft ROPA 43 - HPBATS/GTA West Corridor Protection

Draft ROPA 43 - HPBATS/GTA West Corridor Protection Draft ROPA 4 - HPBATS/GTA West Corridor Protection Overview Purpose The purpose of Regional Official Plan Amendment (ROPA) No. 4 is to: Implement a corridor protection area to protect for the planned corridor

More information

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment Bostwick Road Municipal Class Environmental Assessment October 13, 2016 Welcome! Welcome to the first Public Information Centre for the Bostwick Road Municipal Class Environmental Assessment. Representatives

More information

Intention to Designate under Part IV, Section 29 of the Ontario Heritage Act 844 Don Mills Road and 1150 Eglinton Avenue East

Intention to Designate under Part IV, Section 29 of the Ontario Heritage Act 844 Don Mills Road and 1150 Eglinton Avenue East STAFF REPORT ACTION REQUIRED Intention to Designate under Part IV, Section 29 of the Ontario Heritage Act 844 Don Mills Road and 1150 Eglinton Avenue East Date: September 7, 2016 To: From: Toronto Preservation

More information

Dundas Street (Regional Road 5) Improvements Class Environmental Assessment Study

Dundas Street (Regional Road 5) Improvements Class Environmental Assessment Study REGION Dundas Street (Regional Road 5) Improvements Class Environmental Assessment Study Brant Street (Regional Road 18) to Bronte Road (Regional Road 25) ENVIRONMENTAL STUDY REPORT May 2015 DUNDAS STREET

More information

Meales Farm, Sulhamstead, West Berkshire

Meales Farm, Sulhamstead, West Berkshire Meales Farm, Sulhamstead, West Berkshire An Archaeological Watching Brief For Mr. Robert Astor by Steve Ford Thames Valley Archaeological Services Ltd Site Code CHH02/29 May 2002 Summary Site name: Meales

More information

2136 & 2148 Trafalgar Road Town of Oakville Region of Halton

2136 & 2148 Trafalgar Road Town of Oakville Region of Halton PLANNING JUSTIFICATION REPORT 2136 & 2148 Trafalgar Road Town of Oakville Region of Halton Zoning By-Law Amendment Application 2500674 Ontario Inc. November 2016 Table of Contents Page 1.0 Location/Summary

More information

Garage Site, Foots Cray High Street, Sidcup, Kent, London Borough of Bexley

Garage Site, Foots Cray High Street, Sidcup, Kent, London Borough of Bexley Garage Site, Foots Cray High Street, Sidcup, Kent, London Borough of Bexley An Archaeological Evaluation for Mizen Design Build by Andy Taylor Thames Valley Archaeological Services Ltd FOC 07 September

More information

TAKANINI STRUCTURE PLAN AREAS 6A & 6B: ARCHAEOLOGICAL ASSESSMENT

TAKANINI STRUCTURE PLAN AREAS 6A & 6B: ARCHAEOLOGICAL ASSESSMENT TAKANINI STRUCTURE PLAN AREAS 6A & 6B: ARCHAEOLOGICAL ASSESSMENT Report prepared for Hosken & Associates Ltd By Barry Baquie (MA) Rod Clough (PhD) April 2006 Clough & Associates Ltd heritage@clough.co.nz

More information

2.1.8 Cultural Resources Regulatory Setting. Affected Environment, Environmental

2.1.8 Cultural Resources Regulatory Setting. Affected Environment, Environmental REVISED DRAFT ENVIRONMENTAL IMPACT REPORT/ Affected Environment, Environmental 2.1.8 Cultural Resources This section evaluates the potential for historical and archaeological resources within the proposed

More information

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED 9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO. 631 - BOCA EAST INVESTMENTS LIMITED The Planning and Economic Development Committee recommends the adoption of the recommendations contained in the following

More information

THE CORPORATION OF THE TOWN OF OAKVILLE BY-LAW NUMBER

THE CORPORATION OF THE TOWN OF OAKVILLE BY-LAW NUMBER THE CORPORATION OF THE TOWN OF OAKVILLE BY-LAW NUMBER 2017-120 A by-law to adopt an amendment to the Livable Oakville Plan, Official Plan Amendment Number 20 (Downtown Oakville Growth Area) WHEREAS the

More information

BURNT BERRY POND COTTAGE DEVELOPMENT PLAN PHASE II ENVIRONMENTAL ASSESSMENT REGISTRATION

BURNT BERRY POND COTTAGE DEVELOPMENT PLAN PHASE II ENVIRONMENTAL ASSESSMENT REGISTRATION GOVERNMENT OF NEWFOUNDLAND AND LABRADOR Department of Environment and Conservation Lands Branch, Land Management Division BURNT BERRY POND COTTAGE DEVELOPMENT PLAN PHASE II ENVIRONMENTAL ASSESSMENT REGISTRATION

More information

BIG COOK S POND COTTAGE DEVELOPMENT PLAN ENVIRONMENTAL ASSESSMENT REGISTRATION

BIG COOK S POND COTTAGE DEVELOPMENT PLAN ENVIRONMENTAL ASSESSMENT REGISTRATION GOVERNMENT OF NEWFOUNDLAND AND LABRADOR Department of Environment and Conservation Lands Branch, Land Management Division BIG COOK S POND COTTAGE DEVELOPMENT PLAN ENVIRONMENTAL ASSESSMENT REGISTRATION

More information

5. CULTURAL ENVIRONMENT

5. CULTURAL ENVIRONMENT 5. CULTURAL ENVIRONMENT 5.1 CULTURAL HERITAGE BUILT HERITAGE AND CULTURAL LANDSCAPES 5.1.1 Background: Regulatory Framework This cultural heritage assessment considers cultural heritage resources pursuant

More information

1. Description of Property

1. Description of Property 1. Description of Property 39: 2483 Burnhamthorpe Rd. West, Schellenberg Stables Municipal Address 2483 Burnhamthorpe Rd. West ame (if applicable) Schellenberg Stables Legal Description PT LT 30, CO 2

More information

APPENDIX 9: Archaeological Assessment by Ken Phillips

APPENDIX 9: Archaeological Assessment by Ken Phillips APPENDIX 9: Archaeological Assessment by Ken Phillips ARCHAEOLOGICAL ASSESSMENT PROPOSED SERVICE STATION DEVELOPMENT BRUCE ROAD, PAPAMOA TAURANGA Prepared by KEN PHILLIPS (MA HONS) MARCH 2016 ARCHAEOLOGY

More information

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S. 67 HEARING LOCATION: ERICKSEN COMMUNITY CENTER 1401 11 TH AVENUE NORTH

More information

Final Initial Study. Chalice Unitarian Universalist Congregation Conditional Use Permit

Final Initial Study. Chalice Unitarian Universalist Congregation Conditional Use Permit 5 Final Initial Study Chalice Unitarian Universalist Congregation Conditional Use Permit Appendix B Chalice Unitarian Universalist Congregation Cultural Resources Memorandum TRC 9685 Research Drive Irvine,

More information

43: 2165 Dundas St. West, Smith-Carrique Barn and Shed

43: 2165 Dundas St. West, Smith-Carrique Barn and Shed 1. Description of Property Municipal Address Name (if applicable) Legal Description Location of Property Ownership Access Current Use Existing Designation General Description Priority Level 43: 2165 Dundas

More information

CULTURAL HERITAGE RESOURCES POLICIES

CULTURAL HERITAGE RESOURCES POLICIES New Official Plan CULTURAL HERITAGE RESOURCES POLICIES Date March 6, 2009 Distributed at: Livable Oakville Committee, March 9, 2009 Planning Services Department March 2009 1 1 Policy Discussion Paper:

More information

150 Eighth Street Zoning By-law Amendment Application Preliminary Report

150 Eighth Street Zoning By-law Amendment Application Preliminary Report REPORT FOR ACTION 150 Eighth Street Zoning By-law Amendment Application Preliminary Report Date: March 27, 2019 To: Etobicoke York Community Council From: Director, Community Planning, Etobicoke York District

More information

Purpose of Report...1. Planning Framework Provincial Policy Statement Draft PPS...2. Ontario Heritage Act...3

Purpose of Report...1. Planning Framework Provincial Policy Statement Draft PPS...2. Ontario Heritage Act...3 Cultural Heritage Policy Discussion Paper November 4 th, 2013 Table of Contents Purpose of Report...1 Planning Framework...1 2005 Provincial Policy Statement...1 2012 Draft PPS...2 Ontario Heritage Act...3

More information

Municipal Heritage Bridges Cultural, Heritage and Archaeological Resources Assessment Checklist Revised April 11, 2014

Municipal Heritage Bridges Cultural, Heritage and Archaeological Resources Assessment Checklist Revised April 11, 2014 Municipal Heritage Bridges Cultural, Heritage and Archaeological Assessment Checklist Revised April 11, 2014 This checklist was prepared in March 2013 by the Municipal Engineers Association to assist with

More information

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES 7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES The following list of social, economic, and environmental issues have been identified based on a preliminary inventory of resources in the project area, an

More information

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd.

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd. PART A: PREAMBLE 1.0 PURPOSE The purpose of this Secondary Plan is to provide a development framework for intensification of the Yonge/ Steeles corridor including the north side of Steeles Avenue West

More information

PennDOT. single spann lanes and 3- mayy need to be to accommodate. any bridge. addition to III. Date: CRP 07/27/2015 CRP.

PennDOT. single spann lanes and 3- mayy need to be to accommodate. any bridge. addition to III. Date: CRP 07/27/2015 CRP. (10/27/14) PennDOT Section 106 Field Assessments and Finding Combined Early tification/finding? Yes Concurrence required or requested: Yes MPMS: 51507 ER# (if consultation with PHMC required) ): County:

More information

Cultural Heritage Resource Assessment Built Heritage Resources and Cultural Heritage Landscapes. Existing Conditions Assessment of Impacts

Cultural Heritage Resource Assessment Built Heritage Resources and Cultural Heritage Landscapes. Existing Conditions Assessment of Impacts Cultural Heritage Resource Assessment Built Heritage Resources and Cultural Heritage Landscapes Existing Conditions Assessment of Impacts Midtown Oakville Transportation Network and Municipal Storm Water

More information

The MSII reports for the bridge indicate that the Annual Average Daily Traffic at the bridge is 100. The road can be considered a low volume road.

The MSII reports for the bridge indicate that the Annual Average Daily Traffic at the bridge is 100. The road can be considered a low volume road. Page 1 1 INTRODUCTION 1.1 Background The Bronk Road Bridge is located on Bronk Road about 0.2 km north of Thrasher Road and spans Parks Creek, a tributary of the Moira River. Bronk Road is the road allowance

More information

PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED DEVELOPMENT ERF 3 ROBERTSON WESTERN CAPE PROVINCE

PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED DEVELOPMENT ERF 3 ROBERTSON WESTERN CAPE PROVINCE PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED DEVELOPMENT ERF 3 ROBERTSON WESTERN CAPE PROVINCE Prepared for BOLAND ENVIRO Att: Mr Nik Wullschleger PO Box 250 Worcester 6849 Fax: (023) 347 0336 By

More information