1 SOUTHEAST RECREATIONAL FACILITY REPLACEMENT 75 WEST DAYTON STREET MADISON, WI 575 DFD CONTRACT NUMBER: LT PLAN COMMISSION FEBRUARY 6, 07 INDEX TITLE NARRATIVE LOCATION MAP CONTEXT PLAN CONTEXT PHOTOS SITE CONCEPT PLAN SITE PLAN GRADING PLAN EROSION CONTROL PLAN / DETAILS STORMWATER PLAN / DETAILS UTILITY PLANS LANDSCAPE PLAN BUILDING ELEVATIONS FLOOR PLANS VIGNETTES / ILLUSTRATIONS

2 NARRATIVE Project Description - ation spaces and include a new shared division 50-meter competition pool and a separate diving well. This competition pool is intended to be the new home site of the UW-Madison Swimming and Diving program and will be designed - Current Zoning Anticipated Schedule UW-Madison Design Review Board # Madison Development Assistance Team city staff review Notify Alder Wood (District #8) in writing Joint Southeast Campus Area Committee-Informational UW-Madison Design Review Board # UDC Informational Meeting Submit Plan Commission application Joint Southeast Campus Area Committee-Recommendation UDC Initial/Final Meeting Plan Commission Approval Meeting Start Construction Substantial Completion Occupancy May 7, 06 July 7, 06 July, 06 July 8, 06 October 8, 06 December 7, 06 January, 07 January 5, 07 February 6, 07 October 07 January 00 Completed Completed Completed Completed Completed Completed

3 LOCATION MAP N 0 500

4 CONTEXT PLAN N 0,000

5 CONTEXT PHOTOS EXISTING SERF

6 CONTEXT PHOTOS 5 6 6

7 SITE CONCEPT PLAN NEW BUS DROP-OFF MAIN ENTRY LEVEL PUBLIC EVENT ENTRY LEVEL BUILDING SERVICES LOADING DOCK N

8 SITE PLAN 8

9 GRADING PLAN 9

10 EROSION CONTROL PLAN 0

11 EROSION CONTROL DETAILS NYLON CORD SEAM SUPPORT NETTING FLOW FOLD " MAX. GEOTEXTILE FABRIC REINFORCED WITH SUPPORT NETTING RING GEOTEXTILE FABRIC FLOW FOLD " MAX. WIRE SUPPORT FENCE RING GEOTEXTILE FABRIC FLOW FOLD " MAX. WIRE SUPPORT FENCE Consultant: WOOD OR STEEL POSTS. LENGTH ' -6" MIN. '-0" MIN. DEPTH IN GROUND COMPANIES, LLC BACKFILL AND COMPACT TRENCH WITH EXCAVATED SOIL GEOTEXTILE FABRIC WITH ALTERNATE SUPPORT COMPONENTS SHEET FLOW DIRECTION ALTERNATE "A" BACKFILL AND COMPACT TRENCH WITH EXCAVATED SOIL GEOTEXTILE FABRIC ONLY SHEET FLOW DIRECTION ALTERNATE "B" GEOTEXTILE FABRIC FLOW DIRECTION TIEBACK BETWEEN FENCE POST AND ANCHOR SILT FENCE EXCESS FABRIC ANCHOR STAKE MIN. 8" LONG FLOW DIRECTION NOT FOR CONSTRUCTION NOTES TRENCH DETAIL SILT FENCE SCALE: NOT TO SCALE SILT FENCE TIE BACK. WHEN POSSIBLE THE SILT FENCE SHOULD BE CONSTRUCTED IN AN ARC OR HORSESHOE SHAPE WITH THE ENDS POINTING UPSLOPE TO MAXIMIZE BOTH STRENGTH AND EFFECTIVENESS. CROSS BRACE WITH "x" WOODEN FRAME OR EQUIVALENT AT TOP OF POSTS. MINIMUM GAGE WIRE REQUIRED. FOLD FABRIC " OVER THE WIRE AND STAPLE OR PLACE WIRE RINGS ON " C-C.. EXCAVATE A TRENCH A MINIMUM OF " WIDE & 6" DEEP TO BURY AND ANCHOR THE GEOTEXTILE FABRIC. FOLD MATERIAL TO FIT TRENCH AND BACKFILL & COMPACT TRENCH WITH EXCAVATED SOIL.. WIRE SUPPORT FENCE SHALL BE GAGE MINIMUM WOVEN WIRE WITH A MAXIMUM MESH SPACING OF 6". SECURE TOP OF GEOTEXTILE FABRIC TO TOP OF FENCE WITH STAPLES OR WIRE RINGS AT " C-C.. GEOTEXTILE FABRIC SHALL BE REINFORCED WITH AN INDUSTRIAL POLYPROPYLENE NETTING WITH A MAXIMUM MESH SPACING OF /" OR EQUAL. A HEAVY DUTY NYLON TOP SUPPORT CORD OR EQUIVALENT IS REQUIRED. 5. STEEL POSTS SHALL BE STUDDED "TEE" OR "U" TYPE WITH A MINIMUM WEIGHT OF.8 LBS/LINEAL FOOT (WITHOUT ANCHOR). FIN ANCHORS SUFFICIENT TO RESIST POST MOVEMENT ARE REQUIRED. WOOD POSTS SHALL BE A MINIMUM SIZE OF " DIA. OR /" x /8" EXCEPT WOOD POSTS FOR GEOTEXTILE FABRIC REINFORCED WITH NETTING SHALL BE A MINIMUM SIZE OF /8" x /8" OAK OR HICKORY. 6. ALTERNATES A & B ARE EQUAL AND EITHER MAY BE USED. 7. CONTRACTOR SHALL INSPECT SILT FENCE DAILY AND REPAIR OR REPLACE AS NEEDED. SEDIMENT SHALL BE REMOVED AND PROPERLY DISPOSED OF WHEN DEPOSITS REACH / THE HEIGHT OF THE FENCE. 8. CONTRACTOR SHALL NOT TRENCH SILT FENCE WITHIN THE CRITICAL ROOT RADIUS OF EXISTING TREES CRITICAL ROOT RADIUS (FEET) =.5 X DIAMETER OF TREE (INCHES). SILT FENCE WITHIN THE CRITICAL ROOT RADIUS SHALL INSTEAD BE PINNED DOWN WITH TIED FILTER BAGS FILLED WITH "-" ANGULAR STONE. 9. ADDITIONAL POST DEPTH OR TIE BACKS MAY BE REQUIRED IN UNSTABLE SOILS. NOTES:. CONTRACTOR SHALL INSPECT INLET PROTECTION DAILY AND REPAIR OR REPLACE AS NEEDED.. SEDIMENT SHALL BE REMOVED AND PROPERLY DISPOSED OF WHEN DEPOSITS REACH THE DESIGN DEPTH OF THE DEVICE OR WHEN THE DEVICE IS NO LONGER FUNCTIONING AS DESIGNED.. CONTRACTOR SHALL REMOVE GEOTEXTILE FILTER FABRIC COVERING INLETS UPON COMPLETION OF THE PROJECT. 0. ATTACH THE FABRIC TO THE POSTS WITH WIRE STAPLES OR WOODEN LATH AND NAILS. INLET PROTECTION SCALE: NOT TO SCALE State of Wisconsin Department of Administration Division of Facilities Development 60 W. DAYTON STREET, MADISON, WI 575 ADJUST FLARE DIMENSIONS TO MEET SITE CONSTRAINTS ADJUST FLARE DIMENSIONS TO MEET SITE CONSTRAINTS PAVED SURFACE " MIN. THICKNESS " CLEAR STONE LENGTH AS SHOWN ON PLANS NOTE: CONTRACTOR SHALL INSPECT PAD DAILY AND CLEAN OR REPLACE AS NEEDED TO PREVENT TRACKING. 0' MIN. WIDTH INSTALL WISDOT TYPE HR GEOTEXTILE FABRIC UNDER PAD Southeast Recreational Facility Replacement University of Wisconsin Madison, Wisconsin Revisions Sheet Title: No. Date: Description: NOTES:. TRACKING PAD TO BE INSTALLED PRIOR TO ANY TRAFFIC LEAVING THE SITE.. SURFACE WATERS MUST BE PREVENTED FROM PASSING THROUGH THE CONSTRUCTION ENTRANCE. FLOWS SHALL BE DIVERTED AWAY FROM THE CONSTRUCTION ENTRANCE OR CONVEYED UNDER AND AROUND THEM BY USE OF A CULVERT, DIVERSION BERM OR OTHER PRACTICES AS APPROVED BY THE DFD CONSTRUCTION REPRESENTATIVE.. CLEANING BY SCRAPING OR ADDING NEW STONE SHALL BE REQUIRED IF ENTRANCE BECOMES MORE THAN 50% COVERED BY TRACKED MUD. TRACKING PAD SCALE: NOT TO SCALE Graphic Scale DFD Number Set Type Date Issued Sheet Number LT XX /8/06

12 E. CAMPUS MALL E. LAKE STREET STORMWATER PLAN NEW 6' DIA. STORM MANHOLE (CLOSED LID) RIM = EX. 9"X5" E&W INV = 85.0 " S INV = L.F. OF NEW " DIA. PVC STORM 0.67% STP- NEW ' DIA. CATCH BASIN (OPEN GRATE) W/ CURB FRAME AND GRATE RIM = EX.5" NE INV = 85. 5" S INV = 85.0 W. DAYTON STREET Consultant: COMPANIES, LLC " STORM SEWER CONNECTION TO BUILDING INV = L.F. OF NEW 5" DIA. PVC STORM 0.86% STP- 0 L.F. OF NEW SLOTTED DRAIN W/-FOOT WIDE, " THICK CONCRETE APRON ADJACENT TO EACH SIDE OF THE SLOT. CONNECT TO EXISTING " DIA. RCP STORM SEWER WITH CONCRETE COLLAR -FOOT MINIMUM AROUND PIPE (EMERGENCY OVERFLOW ROUTE) NEW ' DIA. CATCH BASIN (OPEN GRATE) RIM = N INV = " SE INV = L.F. OF NEW 5" DIA. PVC STORM 0.8% STP NEW SOUTHEAST RECREATIONAL BUILDING FIRST FLOOR EL = NEW ' DIA. CATCH BASIN (OPEN GRATE) RIM = " NW INV = " S INV = 85.5 NOT FOR CONSTRUCTION NEW ' DIA. CATCH BASIN (OPEN GRATE) RIM = " SW INV = " E INV = L.F. OF NEW " DIA. PVC STORM STP L.F. OF NEW " DIA. PVC STORM STP L.F. OF NEW " DIA. PVC STORM SEWER@.% STP- NEW ' DIA. STORM MANHOLE (CLOSED LID) RIM = " W INV = " E INV = # # L.F. OF NEW 5" DIA. PVC STORM 0.8% STP-9 NEW ' DIA. CATCH BASIN (OPEN GRATE) RIM = " N INV = " S INV = L.F. OF NEW 5" DIA. PVC STORM 0.8% STP-8 NEW ' DIA. STORM MANHOLE (CLOSED LID) RIM = " N INV = 85. 5" S INV = 85. " W INV = L.F. OF NEW 5" DIA. PVC STORM STP-7 State of Wisconsin Department of Administration Division of Facilities Development 60 W. DAYTON STREET, MADISON, WI EXISTING LABAHN ARENA NEW ' DIA. INLET (OPEN GRATE) RIM = " E INV = NEW ' DIA. CATCH BASIN (OPEN GRATE) RIM = " E INV = L.F. OF NEW " DIA. PVC STORM STP- NEW ' DIA. CATCH BASIN(OPEN GRATE) RIM = " W INV = 855. " E INV = L.F. OF NEW " DIA. PVC STORM STP NEW SEDIMENTATION CHAMBER ROWS OF 6'-"X7'-"X7'-" PRECAST RC BOX CHAMBERS - " PVC EQUALIZATION PIPES BETWEEN THE BOX CULVERT ROWS N RIM = (CLOSED LID) S RIM = (CLOSED LID) OUTSIDE TOP = INSIDE TOP = INSIDE BOTTOM = 89.7 PERMANENT POOL = " N INV. = 85.7 " W INV. = L.F. OF NEW " DIA. PVC STORM STP-6 NEW ' DIA. CATCH BASIN (OPEN GRATE) RIM = " W INV = 85.0 " E INV = Southeast Recreational Facility Replacement University of Wisconsin Madison, Wisconsin Revisions Sheet Title: No. Date: Description: NOTES:. MAINTAIN CODE REQUIRED SEPARATION BETWEEN SEWER AND WATER FACILITIES.. PIPE LENGTHS ARE TO CENTER OF THE STRUCTURE, UNLESS OTHERWISE NOTED.. SEWER INSTALLATION SHALL PROCEED FROM DOWNSTREAM TO UPSTREAM.. CONTRACTOR SHALL ADJUST ALL EXISTING AND NEW UTILITY CASTINGS, MANHOLES, CLEANOUTS AND ACCESS BOXES TO PROPOSED GRADING. 5. CONNECT SANITARY BUILDING SEWER, STORM SEWER AND WATER SERVICE TO CITYOF MADISON OWNED MAINS IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS AND PERMIT REQUIREMENTS OF THE CITY. 6. MAINTAIN PROPER DRAINAGE AT ALL TIMES DURING CONSTRUCTION. LEGEND SITE LIMITS NEW STORM SEWER NEW STORM CATCH BASIN/INLET NEW STORM MANHOLE / ACCESS RISER EMERGENCY OVERFLOW ROUTE Graphic Scale DFD Number Set Type Date Issued Sheet Number 0' 5' 0' 0' 0' LT XX /8/06 C0

13 SEDIMENTATION CHAMBER DETAIL

14 E. CAMPUS MALL SITE UTILITY PLAN NEW 6' DIA. STORM MANHOLE (CLOSED LID) RIM = EX. 9"X5" E&W INV = 85.0 " S INV = L.F. OF NEW " DIA. PVC STORM 0.67% STP- W. DAYTON STREET 66 L.F. OF NEW 8" DIA. PVC SANITARY 0.5% E. LAKE STREET NEW ' DIA. CATCH BASIN (OPEN GRATE) W/ CURB FRAME AND GRATE RIM = EX.5" NE INV = 85. 5" S INV = 85.0 CONNECT TO EX. 8" DIA. SANITARY SEWER AT INV L.F. OF NEW 8" DIA. PVC SANITARY 0.0% Consultant: NEW ' DIA. SANITARY MANHOLE (CLOSED LID) RIM = " N INV = " SE INV = L.F. OF NEW 8" DIA. PVC SANITARY 0.50% COMPANIES, LLC NEW ' DIA. SANITARY MANHOLE (CLOSED LID) RIM = " NW INV = 89. 8" S INV = " STORM SEWER CONNECTION TO BUILDING INV = " SANITARY SEWER CONNECTION TO BUILDING INV = 89.8 FIRE HYDRANT AND AUXILIARY VALVE TO BE RELOCATED L.F. OF NEW 5" DIA. PVC STORM 0.86% STP- 0 L.F. OF NEW SLOTTED DRAIN -" DIA. PIPE W/-FOOT WIDE, " THICK CONCRETE APRON ADJACENT TO EACH SIDE OF THE SLOT. CONNECT TO EXISTING " DIA. RCP STORM SEWER WITH CONCRETE COLLAR -FOOT MINIMUM AROUND PIPE NEW ' DIA. CATCH BASIN (OPEN GRATE) RIM = N INV = " SE INV = NEW SOUTHEAST RECREATIONAL BUILDING FIRST FLOOR EL = L.F. OF NEW 5" DIA. PVC STORM 0.8% STP-0 NEW ' DIA. CATCH BASIN (OPEN GRATE) RIM = " NW INV = " S INV = 85.5 NOT FOR CONSTRUCTION L.F. OF NEW " DIA. PVC STORM NEW ' DIA. CATCH BASIN (OPEN GRATE) RIM = " SW INV = " E INV = STP- 5 L.F. OF NEW " DIA. PVC STORM STP L.F. OF NEW 8" DIA. CHILLED WATER SERVICE PIPE 5 L.F. OF NEW 8" DIA. CHILLED WATER RETURN PIPE 7 L.F. OF NEW " DIA. PVC STORM SEWER@.% STP- NEW ' DIA. STORM MANHOLE (CLOSED LID) RIM = " W INV = " E INV = # # L.F. OF NEW 5" DIA. PVC STORM 0.8% STP-9 NEW ' DIA. CATCH BASIN (OPEN GRATE) RIM = " N INV = " S INV = L.F. OF NEW 5" DIA. PVC STORM 0.8% STP-8 9 L.F. OF NEW 8" DIA. PVC SANITARY 0.55% NEW 5' DIA. VALVE VAULT W/ 8" VALVE TAP INTO EXISTING WATER MAIN RIM = xxx (CLOSED LID) 58 L.F. OF NEW 8" DIA. DIP WATER MAIN NEW ' DIA. SANITARY MANHOLE (CLOSED LID) RIM = " N INV = " SW INV = NEW ' DIA. STORM MANHOLE (CLOSED LID) RIM = " N INV = 85. 5" S INV = 85. " W INV = L.F. OF NEW 5" DIA. PVC STORM STP-7 State of Wisconsin Department of Administration Division of Facilities Development 60 W. DAYTON STREET, MADISON, WI 575 NEW ' DIA. CATCH BASIN (OPEN GRATE) RIM = " E INV = EXISTING LABAHN ARENA NEW ' DIA. CATCH BASIN (OPEN GRATE) RIM = " E INV = L.F. OF NEW " DIA. PVC STORM STP- 86 NEW ' DIA. CATCH BASIN (OPEN GRATE) RIM = " W INV = 855. " E INV = L.F. OF NEW " DIA. PVC STORM STP-5 NEW ' DIA. SANITARY MANHOLE (CLOSED LID) RIM = " NE INV = " SW INV = L.F. OF NEW 8" DIA. PVC SANITARY 0.% 860 L.F. OF NEW 8" DIA. PVC SANITARY 0.9% NEW SEDIMENTATION CHAMBER ROWS OF 6'-"X7'-"X7'-" PRECAST RC BOX CHAMBERS - " PVC EQUALIZATION PIPES BETWEEN THE BOX CULVERT ROWS N RIM = (CLOSED LID) S RIM = (CLOSED LID) OUTSIDE TOP = INSIDE TOP = INSIDE BOTTOM = 89.7 PERMANENT POOL = " N INV. = 85.7 " W INV. = L.F. OF NEW " DIA. PVC STORM STP-6 NEW ' DIA. CATCH BASIN (OPEN GRATE) RIM = " W INV = 85.0 " E INV = Southeast Recreational Facility Replacement University of Wisconsin Madison, Wisconsin Revisions Sheet Title: No. Date: Description: NOTES:. MAINTAIN CODE REQUIRED SEPARATION BETWEEN SEWER AND WATER FACILITIES.. PIPE LENGTHS ARE TO CENTER OF THE STRUCTURE, UNLESS OTHERWISE NOTED.. SEWER INSTALLATION SHALL PROCEED FROM DOWNSTREAM TO UPSTREAM.. CONTRACTOR SHALL ADJUST ALL EXISTING AND NEW UTILITY CASTINGS, MANHOLES, CLEANOUTS AND ACCESS BOXES TO PROPOSED GRADING. 5. CONNECT SANITARY BUILDING SEWER, STORM SEWER AND WATER SERVICE TO CITYOF MADISON OWNED MAINS IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS AND PERMIT REQUIREMENTS OF THE CITY. 6. MAINTAIN PROPER DRAINAGE AT ALL TIMES DURING CONSTRUCTION. NEW ' DIA. SANITARY MANHOLE (CLOSED LID) RIM = " NE INV = " SW INV = 85.9 G LEGEND SITE LIMITS NEW SANITARY SEWER NEW STORM SEWER NEW STORM CATCH BASIN/INLET NEW STORM MANHOLE / ACCESS RISER NEW GAS SERVICE NEW WATER SERVICE NEW WATER VALVE / VALVE BOX Graphic Scale DFD Number Set Type Date Issued Sheet Number 0' 5' 0' 0' 0' LT XX /8/06

15 LANDSCAPE PLAN 5

16 LANDSCAPE PLANT LIST UW Madison SERF PLANT PALETTE Key Botanical Name Common Name Quantity Size Spec Comments Deciduous Trees AF Acer x. freemanii 'Sienna' Sienna Glen Maple 5.5" Cal. B&B Branching shall start at 7'-0" AL Amelanchier laevis 'Cumulus' Cumulus Alleghany Serviceberry " Cal. B&B Single, Straight Leader CA Cornus alternafolia Pagoda Dogwood 6' Ht. CC Carpinus caroliniana 'J.N. Strain' J.N. Strain of Musclewood " Cal. B&B Single, Straight Leader CV Crategus viridis 'Winter King' Winter King Hawthorn " Cal. B&B Low branching or multi-stem GB Ginkgo biloba 'Magyar' Magyar Ginkgo.5" Cal. B&B Branching shall start at 7'-0" PC Pyrus calleryana 'Chanticleer' Chanticleer Flowering Pear.5" Cal. B&B Match specimens; branching shall start at 5'-0" QR Quercus robur 'Skymaster' Skymaster English Oak " Cal. B&B Branching shall start at 7'-0" QS Quercus x schuettei Swamp x Bur Oak.5" Cal. B&B Single, straight leader; branching shall start at 5'-0" m UF Ulmus 'Frontier' Frontier Elm " Cal. B&B Single, straight leader; branching shall start at 5'-0" m VP Viburnum prunifolium'mckrouge' Forest Rouge Blackhaw Viburnum 5' Ht. B&B Multi-Stem, Min. Leaders Evergreen Trees Deciduous Shrubs Am Aronia melanocarpa 'Morton' Iroquois Beauty Black Chokeberry 7 #5 Cont. Space '-0" o.c. Cf Cornus stolonifera 'Farrow' Arctic Fire Red Twig Dogwood 5 #5 Cont. Space '-6" o.c. Hk Hypericum kalmianum 'Ames' Ames St. John's Wort # Cont. Space '-0" o.c. Ha Hydrangea arborescens 'Annabelle' Annabelle Hydrangea 5 gal. Cont. Space as indicated on plans Po Physocarpus opulifolius 'Seward' Summer Wine Ninebark 0 #5 Cont. Space 5'-0" o.c. Ra Rhus aromatica 'Gro-Low' Gro-Low Fragrant Sumac 9 # Cont. Space 5'-0" o.c. Rt Rhus typhina 'Bailtiger' Tiger Eyes Cutleaf Staghorn Sumac gal. Cont. See plan for spacing Evergreen Shrubs Tm Taxus x media 'Tauntonii' Taunton Yew 8 8" spr. Cont. Space '-0" o.c. Perennials / Ornamental Grasses ah Amsonia hubrichtii 'Halfway to Arkansas' Halfway to Arkansas Narrow Leaf Blue Star 6 gal. Cont. Space '-0" o.c. as Allium 'Summer Beauty Summer Beauty Allium 5 gal. Cont. Space " o.c. bt Baptisia x varicolor 'Twilite' Twilite Prairieblues Wild Indigo 6 gal. Cont. Space 6" o.c. cak Calamagrostis acutiflora 'Karl Foerster' Karl Foerster Feather Reed Grass gal. Cont. Space " o.c. ce Carex eburnea IvorySedge 7 gal. Cont. Space " o.c. cn Calamintha nepeta ssp. nepeta Lesser Calamintha 07.5" Cont. Space 8" o.c. cr Carex rosea Golden Star Sedge 6 gal. Cont. Space " o.c. da Dryopteris affinis 'The King' The King Golden Scaled Male Fern 6 gal. Cont. Space " o.c. di Dryopteris intermedia Fancy Fern 5 gal. Cont. Space " o.c. ep Echinacea pallida Pale Purple Coneflower 90 gal. Cont. Space " o.c. ev Epimedium x versicolor 'Sulphureum' Yellow Flowered Epimedium gal. Cont. Space " o.c. ha Hosta 'Blue Angel' Blue Angel Hosta gal. Cont. Space 0" o.c. hf Hosta 'Fire Island' Fire Island Hosta 6 gal. Cont. Space " o.c. pa Polystichum acrostichoides Christmas Fern 5 gal. Cont. Space 8" o.c. pv Panicum virgatum 'Shenandoah' Shenandoah Switch Grass 5 gal. Cont. Space 6" o.c. sa Sedum 'Autumn Fire' Autumn Fire Sedum 9 gal. Cont. Space 5" o.c. sh Sporobolus heterolepis Prairie Dropseed gal. Cont. Space " o.c. sm Salvia nemorosa 'May Night' May Night Salvia gal. Cont. Space 5" o.c. ss Schizachyrum scoparium 'The Blues' The Blues Little Bluestem 8 gal. Cont. Space " o.c. 6

17 Mechanical Penthouse Roof (TOS) 96' - 0" Roof Access (TOS) 95' - 0" 7 - Roof TOS 9' - 8" 8-0 Level Mezzanine 95' - 8" 0-0 Level 907' - 8" Level Mezzanine 889' - 8" LaBahn Arena Connection 880' - 0" Level 87' - 8" Main Entry Door Levele 869' - " Level 856' - 0" / Basement Mechanical 8' - 8" W

18 Roof Access s (TOS) 95 ' - 0" Roof TOS 9 ' - 8" - Level Mezzanine 95 ' - 8" 6-0 Level 907 ' - 8" Level Mezzanine 889 ' - 8" LaBahn Arena Connection 880 ' - 0" Level 87 ' - 8" GENERATOR SCREEN WALL Level 856' - 0" Basement Mechanical 8' - 8" S

19 Mechanical Penthouse Roof (TOS) 96' - 0" Roof Access (TOS) 95' - 0" Roof TOS 9' - 8" - Level Mezzanine 95' - 8" Level 907' - 8" 50-0 Lev el Mezzanine 889' - 8" -9 Level 87' - 8" Level el 856' - 0" Basement Mechanical 8' - 8"

20 Roof Access (TOS) 95' - 0" 7 - Roof TOS 9' - 8" 8-0 Level Mezzanine 95' - 8" 0-0 Level 907' - 8" 6-0 Lev el M Mezz anine 889' - 8" NATATORIUM ENTRANCE Level 87' - 8" Main Entry Door Level 869' - " Level 856' - 0" Basement Mechanical 8' - 8"

21 FLOOR PLAN - BASEMENT AE00 AE0 AE0 AE J H G F 7 AE.5 E 56'-0" AE0 D AE0 AE0 AE0 8 AE.5 AE00 C B A 5'-7 /8" '-6 /" '-0 7/8" STAIR POOL FLOOR MECHANICAL SPACE POOL CHEMICAL STORAGE 07 CONTROL AREA 006 POOL MECHANICAL 00 ELEV MACHINE ROOM ELEV 007 AE.5 AE5 POOL CHEMICAL STORAGE CONTROL AREA 005 AE5 SURGE TANK - 50M 00 FILTRATION PUMP AND STORAGE - 50M 00 COAT PREFINISHED LOUVER HOISTWAY 008 AE.5 AE5 SURGE TANK - DIVE 00 STAIR AE5 '-6 /" 6'-0 7/8" 67'-" 05'-8 /8" FLUID APPLIED WATER PROOFING AND " XPS RIGID INSULATION - TYPICAL AT ALL FOUNDATION WALLS AE50 AE00 AE0 AE0 COAT PREFINISHED LOUVER STRUCTURAL SLAB WITH WATER STOPS TYPICAL WATER PROOFING UNDER SLAB-TYPICAL INSULATED ALUMINUM FRAME 6'-" 9'-0" 79'-7" '-9" 8'-" 0'-9" CORE & SHELL FLOOR PLAN - BASEMENT LEVEL /6" = '-0" N

22 FLOOR PLAN - LEVEL AE0 AE00 AE0 FLUID APPLIED WATER PROOFING AND " OF INSULATION BELOW GRADE AE00 AE0 CLEAR ANODIZED ALUMINUM ENTRY SYSTEM WITH " INSULATED GLAZING, PROVIDE PUSH BUTTON ADA OPERATOR AT ONE PAIR OF INNER AND OUTER DOORS 7'-" '-8" 9'-0 /6" AE50 AE5 09'-0 /6" AE50 PRECAST COLUMN COVERS - COLOR AND FINISH TO MATCH BUILDING PRECAST PANELS AE00 AE.5 AE0 AE0 AE00 ALUMINUM AREAWELL COVER AE5 AE0 7'-" 8'-" 7'-0 /6" 0'-9 5/6" 9'-7 /6" AE50 AE85 AE9 AE9 AE9 AE5 '-8" AE5 STAIR 5 0'-5 /" 8 AE.5 6 AE.5 7 AE5 8'-" AE550 AE5 AE550 AE550 '-8 9/" '-8 9/" AE550 '-0" 6'-8" AE5 AE5 5 AE.5 AE5 '-0 /" 7'-0" '-0 /" 9'- /8" 5'-7 9/6" '- /" '-0 /6" '-" '- 9/" '- /" 7'-6 /6" 6'-0" 6'- 9/6" 7 AE.5 0'- /8" 8'- 5/6" " INSULATED PRECAST PANELS INSULATED OVERHEAD DOOR () X8 INSULATED ALUMINUM DOORS AND FRAME AE0 AE0 FLUID APPLIED WATER PROOFING AND " OF INSULATION BELOW GRADE AE5 9'- 9/6" LA BAHN AE.5 CONNECTION ELEV VESTIBULE 96'- /" 6'-" 9'-0" 8'- /" AE50 '-0" 5'- 9/6" 9'- 9/6" AE5 98'-0 /" AE00 AE5 7'-0 /6" '- /" '-0 /" 5'-6 /6" AE.5 '- 7/8" '-0 /" '-" 5'-" AE5 ' X 7' ACCESS DOOR ALUMINUM GRATE WITH HATCH AT AREAWELL AE0 X8 INSULATED ALUMINUM DOOR/FRAME AE AE0 AE0 ALUMINUM AREAWELL COVER STEPPED FOUNDATION WALL WITH FLUID APPLIED VAPOR BARRIER AND " XPS RIGID INSULATION BELOW GRADE WITH " PRECAST PANELS ABOVE GRADE 0'-6" x 8'-0" GENERATOR WITH '-0" CLEARANCE AROUND GENERATOR 5' - 8" HIGH PRECAST CONCRETE ENCLOSURES-COLOR FINISH TO MATCH PRECAST PANELS AT BUILDING N

23 6 FLOOR PLAN - LEVEL AE00 AE0 AE0 CLEAR ANODIZED ALUMINUM ENTRY SYSTEM WITH - " INSULATED GLAZING PROVIDE PUSH BUTTON ADA OPERATOR AT ONE PAIR OF INNER AND OUTER DOORS AE00 AE0 97'- /" '-5 /" '-0 /" 6'-7 /" '-0 7/8" '-0" 96'-8 /6" '- /8" '-9 /6" ALTERNATE '-0 /" ALTERNATE AE50 6'-7 /" 8'-6" '-8" 6'-" '-8" 6'-" '-8" 7'-6 /6" ALTERNATE AE50 AE85 AE9 AE9 AE5 6 ALTERNATE AE.5 AE5 AE9 6'-6 /8" 6'-7 /" 6'-7 /" 6'-7 /" 7'-0 9/" AE5 AE50 7'- 5/8" AE5 AE0 AE0 AE0 AE00 ALTERNATE INSULATED ALUMINUM DOOR AND FRAME ALTERNATE AE5 ALTERNATE ALTERNATE AE00 AE5 70'-7 /6" 9'- /6" '-6" 8'-0 /" '-0 /" 8 AE.5 STAIR 5 0'- /" 8 AE5 AE550 AE5 '-" ALTERNATE 60'- 9/" 7'-9 7/" 8'-" 58'-0 7/" 7 AE.5 5 AE.5 ALTERNATE ALTERNATE AE57 AE0 AE5 7'-0 7/" '-9 /6" OPEN TO BELOW 8'-8 /" 0'- 9/6" 0'- 9/6" ELEV AE.5 AE.5 ALTERNATE AE5 ALTERNATE 8'-7 /" 8'-5 5/6" 0'-6 /6" 8'-5 5/6" 0'-6 /6" 8'- 7/" 0'-" 55'-" 0'-0 7/8" 8'-5 5/6" 0'-6 /6" 8'-5 5/6" 0'-6 /6" 8'-5 5/6" 0'-6 /6" 8'-5 5/6" 0'-6 /6" 8'-5 5/6" 0'-6 /6" 8'-5 5/6" 0'-6 /6" 8'-5 5/6" 5'- /6" 98'- /" ALTERNATE AE00 AE50 AE5 AE5 0'-6" 9'-9" 0'-" ALTERNATE 6" 6" '-0 /" ALTERNATE AE5 INSULATED ALUMINUM DOOR AND FRAME LABAHN CONNECTION ABOVE AE0 AE0 N

24 FLOOR PLAN - LEVEL MEZZANINE AE0 AE AE00 AE0 AE0 AE00 AE50 AE85 AE9 AE9 AE9 AE5 BELOW 0'-0 /" 7'- /" 70'-9 /" 6'-0" AE50 AE5 6 AE.5 AE50 BELOW AE5 AE5 AE0 AE0 AE0 AE00 8" CAPS STAIR 5 AE5 '- /" 0'- /" '- /" ALTERNATE 8 AE.5 AE00 OPEN TO BELOW AE5 7'- /" 5'- 5/6" '-0" 8'- /6" 0'-" 5'-0" AE5 ALTERNATE ALTERNATE ALTERNATE 9 AE5 LABAHN CONNECTION 5 AE50 0'- 9/6" 7'-6 5/8" ELEV AE.5 OPEN TO BELOW AE5 ALTERNATE ALTERNATE AE00 ALTERNATE OPEN TO BELOW ALTERNATE AE5 ALTERNATE ALTERNATE AE.5 ALTERNATE ALTERNATE WITH 8" CAPS '- /" ALTERNATE 7 AE.5 5 AE5 '-" AE.5 ALTERNATE ALTERNATE AE57 AE0 ALTERNATE AE5 ALTERNATE AE5 6" '-0 /" '-9 /6" 7'-0 7/" 60'- 9/" 7'-9 7/" 8'-" 5'-8 /" '-0" 8'-7 /" 8'-5 5/6" 0'-6 /6" 8'-5 5/6" 0'-6 /6" 8'- 7/" 0'-7" 7'-0" 7'-9" 0'-0 7/8" 8'-5 5/6" 0'-6 /6" 8'-5 5/6" 0'-6 /6" 8'-5 5/6" 0'-6 /6" 8'-5 5/6" 0'-6 /6" 8'-5 5/6" 9'-6 /6" 8'-5 5/6" 5'- /6" 0'-6" 9'-9" AE0 AE0 98'- /" N

25 FLOOR PLAN - LEVEL AE AE00 AE0 AE0 AE0 0'- /" 7'-5 5/" 70'-8 /" 6'-0" AE00 AE50 AE9 AE9 AE9 AE5 AE50 AE5 AE50 AE.5 AE0 AE0 WITH 8" CAPS AE5 OPEN TO AE00 BELOW 0 AE5 OPEN TO BELOW '- /" ALTERNATE 7 AE5 AE.5 AE5 5 AE.5 ALTERNATE '-" STAIR 5 AE5 '- /" 0'- /" AE05 AE57 AE0 ALTERNATE AE0 8 AE.5 AE00 AE5 AE5 AE.5 AE.5 ALT. AE5 AE5 6 AE50 5 AE5 AE5 AE00 8'-7 /" 8'-5 5/6" 0'-6 /6" 8'-5 5/6" 0'-6 /6" 8'- 7/" 0'-7" 7'-0" 7'-9" 7'-9" 0'-6" 9'-9" 7'-7 9/" 5'-8 /" '-0" 5'-0" 8'-6" 0'-7 /6" 9'-7 9/6" 0'- 9/6" 98'- /" '-0 /" '-9 /6" 7'-0 7/" 60'- 9/" 7'-9 7/" 8'-" 5'-8 /" '-0" 8'- 5/6" AE AE0 AE0 N 5

26 FLOOR PLAN - LEVEL MEZZANINE AE0 AE AE00 AE0 '- /" AE00 AE0 7'- /6" 99'-0 /6" 5'-" 6'- 7/8" 99'-5 /" AE50 AE9 AE9 AE9 AE5 WITH 8" CAPS AE50 AE5 X PAVERS AE50 ROOF ASSEMBLY ALTERNATE X PAVERS AE00 6'- /" AE5 5 AE5 AE5 ALT. AE5 5 AE.5 7 AE.5 5 AE5 5'-0" STAIR 5 AE.5 AE0 AE0 AE0 AE00 AE5 WITH 8" CAPS 7'-6 7/" '- /" 8 AE.5 9'- /6" 0'- /" OPEN TO BELOW 0'- 9/6" AE.5 AE5 7 AE5 AE50 0'- 9/6" AE00 OPEN TO BELOW AE5 AE.5 '- 9/6" 6 AE5 AE5 '-0 /" 70'-7 5/" AE05 AE57 8'-7 /" AE0 8'-7 /" 8'-5 5/6" 0'-6 /6" 8'-5 5/6" 0'-6 /6" 8'-5 5/6" 0'-5 9/" 5'-" '-8 9/" 8'-5 5/6" 0'-6 /6" 8'-5 5/6" 0'-6 /6" 8'-5 5/6" 0'-6 /6" 8'-5 5/6" 0'-6 /6" 8'-5 5/6" 0'-6 /6" 8'-5 5/6" 0'-6 /6" 8'-5 5/6" '-6 5/" 9'-9" AE AE0 AE0 N 6

27 PERSPECTIVE FROM WEST

28 PERSPECTIVE FROM WEST

29 PERSPECTIVE FROM EAST

30

GRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC.

GRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC. GRAND ARBOR RESERVE BIRCHWOOD POINT, LOT-1 10203 MINERAL POINT ROAD MADISON, WISCONSIN GRAND ARBOR RESERVE, LLC 6417 ODANA RD MADISON, WISCONSIN 53719 CONTACT: DAN SCHMIDT PHONE: 608-285-8680 FAX: 608-255-3387

More information

MADISON, WI 418 S. Gammon Road April 24, 2009 Madison, WI 53719

MADISON, WI 418 S. Gammon Road April 24, 2009 Madison, WI 53719 MADISON, WI 418 S. Gammon Road April 24, 2009 Madison, WI 53719 VICINITY MAP NOT TO SCALE LEGEND SITE DATA TABLE GENERAL SITE DATA ZONING LAND USE LOT AREA RESTRICTIONS LOT AREA IMPERVIOUS AREA PERVIOUS

More information

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING. STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING. ATTACH FABRIC TO POSTS WITH MINIMUM 3 ZIP TIES (50 LB. TENSILE) PER POST IN TOP 8" OF FABRIC. MONOFILAMENT GEOTEXTILE FABRIC PER MNDOT TABLE

More information

URBAN DESIGN COMMISSION REVIEW AND APPROVAL

URBAN DESIGN COMMISSION REVIEW AND APPROVAL APPLICATION FOR AGENDA ITEM # URBAN DESIGN COMMISSION Project # REVIEW AND APPROVAL Action Requested DATE SUBMITTED: June 30, 2010 Informational Presentation x Initial Approval and/or Recommendation UDC

More information

CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS

CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS 2010 EDITION CITY OF OZARK, MISSOURI REVISIONS TO THE 2009 EDITION The following revisions have been made to the 2009 edition of the city

More information

tarleton oak Board of Architectural Review Original Submission Date: April 24, 2018 (Phase I & II) Resubmission Date: June 26, 2018 (Phase II Only)

tarleton oak Board of Architectural Review Original Submission Date: April 24, 2018 (Phase I & II) Resubmission Date: June 26, 2018 (Phase II Only) tarleton oak Board of Architectural Review Original Submission Date: April 24, 2018 (Phase I & II) Resubmission Date: June 26, 2018 (Phase II Only) Table of Contents 1. Location Map and Project Information

More information

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX L-1 TREE PLANTING (TYPICAL SECTION) L-2 TREE ANCHORING - TYPE A (FOR TREES LARGER THAN 2 INCHES CALIPER) L-3 TREE ANCHORING - TYPE B (FOR TREES UP

More information

Wisconsin Contractors Institute Continuing Education

Wisconsin Contractors Institute Continuing Education Wisconsin Contractors Institute Continuing Education Erosion & Sediment Control Course # 12775 2 hours Wisconsin Contractors Institute N27 W23953 Paul Road, Suite 203 Pewaukee, WI 53072 Website: www.wicontractorsinstitute.com

More information

SECOND LEVEL REAR TERRACE ENLARGEMENT SEE SHEET L.104 EXHAUST SHAFT STAIR C ELEV. SERVICE CORR. RESIDENTIAL STORAGE RESIDENTIAL/RETAIL LOADING DOCK

SECOND LEVEL REAR TERRACE ENLARGEMENT SEE SHEET L.104 EXHAUST SHAFT STAIR C ELEV. SERVICE CORR. RESIDENTIAL STORAGE RESIDENTIAL/RETAIL LOADING DOCK Xref CompositeBackground_KGD.dwg SPACES 99505 KISHIMOTO.GORDON.DALAYA PC expressly reserves its common law copyright and other Xref..\..\ FILES\XREF\VC_A_Section Marks.dwg SOUTH GEORGE MASON STREETSCAPE

More information

John F. Kennedy STEM High School Green Infrastructure Information Sheet

John F. Kennedy STEM High School Green Infrastructure Information Sheet John F. Kennedy STEM High School Green Infrastructure Information Sheet Location: 127 Preakness Avenue Paterson, NJ 07522 Ward: 2 Green Infrastructure Description: Bioswale and bioretention system series

More information

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS July 23, 2018 Page 1 of 7 STANDARD LEGEND SYMBOLS (September, 1973)... AS-101A STANDARD LEGEND SYMBOLS (September, 1973)... AS-101B

More information

KDHE Clean Water Neighbor Program Sunset Zoo Bio-Retention Area Gardens (K-State Demonstration Project)

KDHE Clean Water Neighbor Program Sunset Zoo Bio-Retention Area Gardens (K-State Demonstration Project) KDHE Clean Water Neighbor Program Sunset Zoo Bio-Retention Area Gardens (K-State Demonstration Project) The Kansas Department of Health and Environment (KDHE) has provided financial assistance to this

More information

CHURCH STREET MAIN STREET CHURCH STREET

CHURCH STREET MAIN STREET CHURCH STREET CHURCH STREET NOTES:. See Civil Sheets for Roadway, Crosswalks, Utilities, Lighting, and Maintenance of Traffic. 2. Refer to this sheet for brick and concrete unit paver laying patterns. See detail sheets

More information

APPENDIX F: DETAIL DRAWINGS

APPENDIX F: DETAIL DRAWINGS APPENDIX F: DETAIL DRAWINGS DRAWING DIVISION 100 GENERAL NOTES 200 ROAD WAYS 300 TRAFFIC CONTROL 400 FENCES 500 SEDIMENT CONTROL 600 SANITARY AND STORM SEWERS 700 WATERMAIN 800 PARKS AND LANDSCAPING 900

More information

FEB 2016 COUNTY MAP NTS

FEB 2016 COUNTY MAP NTS COUNTY MAP NTS MILWAUKEE COUNTY SHEET INDEX N. 76TH STREET N. 70TH STREET N. 60TH STREET PROJECT LOCATION N. PARK PLAZA COURT ALDI'S SITE N. 51ST STREET SHEET SHEET TITLE G1 TITLE SHEET G2 GENERAL SYMBOLS

More information

PLANT LIST (CONTRACTOR RESPONSIBLE FOR ALL PLANTS SHOWN ON PLAN) SHRUBS PERENNIALS/ORNAMENTAL GRASSES

PLANT LIST (CONTRACTOR RESPONSIBLE FOR ALL PLANTS SHOWN ON PLAN) SHRUBS PERENNIALS/ORNAMENTAL GRASSES PLANT LIST (CONTRACTOR RESPONSIBLE FOR ALL PLANTS SHOWN ON PLAN) REVISIONS U.S. ROUTE 3 NORTH HIGH STREET 3 HHR BMW 7 SNM BGM 5 BMW BGM 3 BMW 0 HHR 0 HHR 3 BMW 3 5 4 4 CBF PGC QTY KEY BOTANICAL NAME COMMON

More information

Tree Pits Construction Guide

Tree Pits Construction Guide Tree Pits Construction Guide What are tree pits? Tree pits collect stormwater runoff from small carpark areas or roads. Runoff filters through the tree roots and surrounding soil mix, trapping sediment

More information

STANDARD DETAILS QUICK REFERENCE

STANDARD DETAILS QUICK REFERENCE STANDARD DETAILS QUICK REFERENCE Note: DWGs need to be saved locally before opening file. Requires AutoCad, DWG TrueView, or Autodesk Design Review (the later two are available for free from http://usa.autodesk.com/)

More information

WithersRavenel WILDWOOD SUBDIVISION RECREATION SITE LANDSCAPE PLAN L1.0 PRELIMINARY. Engineers Planners Surveyors HOLLY SPRINGS, NC

WithersRavenel WILDWOOD SUBDIVISION RECREATION SITE LANDSCAPE PLAN L1.0 PRELIMINARY. Engineers Planners Surveyors HOLLY SPRINGS, NC WILDWOOD SUBDIVISION - PLANT SCHEDULE PLANT TYPE QTY KEY BOTANICAL NAME COMMON NAME ROOT CALIPER HEIGHT NOTES 3 ACB Acer buergerianum Trident Maple B&B 2 1/2" 12'-14' BUFFER TREE (2%) CANOPY TREES ORN.

More information

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs The following form is to be filled out by the Project Consultant(s) and submitted to the City of Kitchener, Planning Division for

More information

Old Mill Community Association Bioretention Facility

Old Mill Community Association Bioretention Facility Project Overview This project will install a bioretention facility in a community recreation area owned by the Old Mill Community Association, Inc. Drainage from the area is currently unmanaged and has

More information

SITE PLAN REVIEW APPLICATION AND CHECKLIST

SITE PLAN REVIEW APPLICATION AND CHECKLIST SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description

More information

Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information

Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information Bridgewater State University Virtual Commons - Bridgewater State University Phase II Final Report Taunton River Watershed Project 2011 Final Report: Appendix C. LID Parking Lot Design and Teaching Tool

More information

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA REFERENCE DRAWINGS FOR REET ROCK HILL, SOUTH CAROLINA COVER SHEET 1 OF 6 GENERAL NOTES 2 OF 6 REMOVE WIRE AND NYLON TWINE FROM BALL AND CANOPY. SOAK ROOT BALL AND PLANT PIT IMMEDIATELY AFTER INSTALLATION.

More information

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.

More information

Thorncreek Thorncreek pavilions DESIGN GUIDELINES May 18, 2016

Thorncreek Thorncreek pavilions DESIGN GUIDELINES May 18, 2016 Thorncreek pavilions DESIGN GUIDELINES May 18, 2016 Contents \\ 3 contents 1. GENERAL STANDARDS - Thorncreek Pavilions...4 1.1 Introduction...4 1.2 Landscape Character...4 1.3 Monumentation...8 1.4 Fencing

More information

O C U L U S. Village Center Square

O C U L U S. Village Center Square Village Center Square Meeting Agenda The Last Time We Met Key Points that we heard from the Community & County Staff Design Refinements Public Art: Introduction of Artist 1 The Last Time We Met 2 3 Cafe

More information

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 1 ITEM 709 TRIANGULAR FILTER FABRIC FENCE

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 1 ITEM 709 TRIANGULAR FILTER FABRIC FENCE AFTER FEBRUARY 1, 2010 ITEM 709 TRIANGULAR FILTER FABRIC FENCE 709.1 Description. This work shall consist of furnishing, installing, and removing temporary erosion protection and sediment control triangular

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES 01050-1 Construction Surveying 1 LS 01500-1 Temporary Fences & Barricades 1,500 LF 02600-1 Shoring, Cofferdam, Temp. Sheeting, & Dewatering 1 LS 01565-1 Storm Drainage & Erosion Sediment Control 1 LS 01565-2

More information

CITY OF SOUTH BURLINGTON, VERMONT SOUTH BURLINGTON CITY OFFICE STORMWATER IMPROVEMENTS JUNE 2014

CITY OF SOUTH BURLINGTON, VERMONT SOUTH BURLINGTON CITY OFFICE STORMWATER IMPROVEMENTS JUNE 2014 CITY OF SOUTH BURLINGTON, VERMONT SOUTH BURLINGTON CITY OFFICE STORMWATER IMPROVEME PROJECT LOCATION JUNE 2014 PREPARED BY:. 125 COLLEGE STREET - 4TH FLOOR BURLINGTON, VERMONT 05401 GENERAL NOTES: LEGEND:

More information

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK 13440 DELTA PROJECT NO. 2017.226.001 SEPTEMBER 2017 ISSUED FOR BID INDEX OF DRAWINGS GENERAL CIVIL ARCHITECT/ENGINEER PROJECT

More information

Fall 2017 Construction Update

Fall 2017 Construction Update Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,

More information

Thornton commons DESIGN GUIDELINES

Thornton commons DESIGN GUIDELINES Thornton commons DESIGN GUIDELINES June 29, 2016 Contents \\ 3 contents 1. GENERAL STANDARDS - Thornton Commons...4 1.1 Introduction...4 1.2 Landscape Character...4 1.3 Monumentation...8 1.4 Fencing /

More information

FHWA 534_J031. TEA-5A01(833) EN , P101,M501 See Tabulation Below for Section Numbers

FHWA 534_J031. TEA-5A01(833) EN , P101,M501 See Tabulation Below for Section Numbers FHWA 534_J31 TEA-5A1(833), P1,M51 See Tabulation Below for Section Numbers ALL CONSTRUCTION IS TO BE PERFORMED WITHIN EXISTING RIGHT OF WAY STP-5A1(611) M51 TEA-5A1(833) RECOMMENDED FOR CONSTRUCTION 12/28/216

More information

6.1 Bioretention Areas

6.1 Bioretention Areas SAN MATEO COUNTYWIDE WATER POLLUTION PREVENTION PROGRAM 6.1 Bioretention Areas Figure 6-1. Bioretention Area. Source: City of Brisbane Bioretention areas 1, or rain gardens, are concave landscaped areas

More information

County of El Dorado Standard Plans

County of El Dorado Standard Plans County of El Dorado Standard Plans Table of Contents Section 1 General Standards GS-01 General Legend and Abbreviations Section 2 Roads and Streets RS-01 RS-02 RS-03 RS-04 RS-05 RS-06 RS-07 RS-08 RS-20

More information

STORM WATER MANAGEMENT STUDY. Johnson County Park and Recreation District Verhaeghe Park

STORM WATER MANAGEMENT STUDY. Johnson County Park and Recreation District Verhaeghe Park STORM WATER MANAGEMENT STUDY Johnson County Park and Recreation District Verhaeghe Park Prepared By: The Clark Enersen Partners 1251 NW Briarcliff Parkway, Suite 400 Kansas City, MO 64116 October, 2017

More information

Town of Essex Small Site Erosion Control Guide

Town of Essex Small Site Erosion Control Guide Town of Essex Small Site Erosion Control Guide Why do we need to protect against erosion? Water Quality: Erosion and the transport of sediment and pollutants impacts the water quality of nearby streams

More information

PLANS FOR THE CONSTRUCTION OF A NEW COMMERCIAL BUILDING FOR: & MONTGOMERY ROAD, SYCAMORE TOWNSHIP, HAMILTON COUNTY, OHIO ZONED "E"

PLANS FOR THE CONSTRUCTION OF A NEW COMMERCIAL BUILDING FOR: & MONTGOMERY ROAD, SYCAMORE TOWNSHIP, HAMILTON COUNTY, OHIO ZONED E GENERAL NOTES: PLANS FOR THE CONSTRUCTION OF A NEW COMMERCIAL BUILDING FOR: 1086 & 10875 MONTGOMERY ROAD, SYCAMORE TOWNSHIP, HAMILTON COUNTY, OHIO LOCATION MAP 17 1.00 Acres PROPOSED SITE 12 OWNER / APPLICANT:

More information

CHAPTER 4: GENERAL LANDSCAPING STANDARDS 4.1 ALL PLANT STOCK 4.2 TREES

CHAPTER 4: GENERAL LANDSCAPING STANDARDS 4.1 ALL PLANT STOCK 4.2 TREES CHAPTER 4: GENERAL LANDSCAPING STANDARDS This chapter describes plant material minimum standards that apply to landscaping both on private property (on-site) and within the public right-of-way (off-site).

More information

C Knothe & Bruce Architects, LLC OVERALL SITE PLAN 1 C-1.0 CAMBRIDGE COURT LOT 1 OF CSM 4463 LOT 2 CSM 4463 RANDOLPH DRIVE PIZZA HUT

C Knothe & Bruce Architects, LLC OVERALL SITE PLAN 1 C-1.0 CAMBRIDGE COURT LOT 1 OF CSM 4463 LOT 2 CSM 4463 RANDOLPH DRIVE PIZZA HUT SHEET INDEX SITE C- C-1.1 C-1.2 C-1.3 C-1.4 C-2.0 C-3.0 C-4.0 C-5.0 L- L-2.1 ARCHITECTURAL A- A-2.1 OVERALL SITE PLAN SITE PLAN SITE LIGHTING FIRE DEPARTMENT ACCESS LOT COVERAGE EXISTING CONDITIONS EROSION

More information

DESIGN SCENE SUBJECT INDEX

DESIGN SCENE SUBJECT INDEX DESIGN SCENE SUBJECT INDEX CHAPTER 1: TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY BRIDGE & APPROACH PLANS CONSTRUCTION PLAN FOR EXCEPTIONS EXCEPTION CLARIFICATION GOVERNING SPECIFICATIONS

More information

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET TABLE OF CONTENTS: ABBREVIATIONS: SHEET NO. A SHEET DESCRIPTION REFERENCE SHEETS TITLE SHEET COS CSO GPM PVC SF CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

More information

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT 8 8 CONCRETE RAMP WOOD STEPS SWIMMING POOL 8 METAL POOL ENCLOSURE FENCE 9 SINGLE LEAF METAL GATE 0 LAWN HANGING CANOPY WITH DOWN LIGHTS METAL & GLASS AWNING AMENITY ROOM WITH FOLDING GLASS WALLS CONCRETE

More information

Erosion Control for Home Builders in the. City of Jacksonville

Erosion Control for Home Builders in the. City of Jacksonville Erosion Control for Home Builders in the City of Jacksonville Eroding construction sites are a leading cause of water quality problems in Jacksonville. For every acre under construction, about a dump truck

More information

5. BUMPOUT STORMWATER PLANTER

5. BUMPOUT STORMWATER PLANTER 5.1 DESCRIPTION A bumpout stormwater planter is a type of bioretention facility located within street right-of-way (ROW) in an enlarged amenity zone between the street and the sidewalk created when the

More information

Landscaping Your Development

Landscaping Your Development Landscaping Your Development Contact Phone 311 Outside Edmonton: 780-442-5311 Web edmonton.ca/landscapingmajordevelopments Email sdcurrentplanning@edmonton.ca In Person/Mail Current Planning Service Centre

More information

White Street Area Sewer Separation, Project ID Date Issued: June 8, 2015

White Street Area Sewer Separation, Project ID Date Issued: June 8, 2015 White Street Area Sewer Separation, Project ID 11240090 Date Issued: June 8, 2015 ADDENDUM NO. 3 This addendum will only be distributed via e-mail, but will remain available for viewing on the MSDGC website

More information

HILCORP ALASKA, LLC HAPPY VALLEY MIDDLE NATURAL GAS EXPLORATION PROJECT DEEP CREEK UNIT BOUNDARY PROPOSED ACCESS ROAD T02S T03S R14W

HILCORP ALASKA, LLC HAPPY VALLEY MIDDLE NATURAL GAS EXPLORATION PROJECT DEEP CREEK UNIT BOUNDARY PROPOSED ACCESS ROAD T02S T03S R14W , LLC STERLING HWY. M.P. 142.8 28 33 TIM AVE. DEEP CREEK UNIT BOUNDARY 27 26 25 TIM AVE. CULVERT REPLACEMENT PROPOSED ACCESS ROAD 34 35 36 T2S T3S 31 NINILCHIK, ALASKA 5 4 3 2 BEGIN ROAD CONSTRUCTION 1

More information

Alternative Stormwater Management Practice RAIN GARDENS

Alternative Stormwater Management Practice RAIN GARDENS Alternative Stormwater Management Practice RAIN GARDENS Description The rain garden is a stormwater management practice to manage and treat small volumes of stormwater runoff using a conditioned planting

More information

PS12 CITY OF TERRE HAUTE VIGO COUNTY, INDIANA DRAWING NO. EXISTING AND NEW STRUCTURE DATA TABLE JW, CM. No. DATE DESCRIPTION REVISED BY JLH ACS

PS12 CITY OF TERRE HAUTE VIGO COUNTY, INDIANA DRAWING NO. EXISTING AND NEW STRUCTURE DATA TABLE JW, CM. No. DATE DESCRIPTION REVISED BY JLH ACS C JW, CM EXISTING AND NEW STRUCTURE DATA TABLE PS12 #5933 NEW OUTFALL STRUCTURE #1 1"=60' EXISTING OPENING THROUGH TREE LINE ( SEWER AND OUTFALL STRUCTURE SHALL BE INSTALLED AT THIS LOCATION TO AVOID ANY

More information

TABLE OF CONTENTS I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08

TABLE OF CONTENTS I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08 TABLE OF CONTENTS Sheet Number Title Revision Date I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08 STREETS ST-1 LOCAL STREETS 03/17/08 ST-1A LOCAL STREETS, 2015 GENERAL PLAN 11/15/04 ST-2 COLLECTOR AND ARTERIAL

More information

Low Flow Rates Low Filtration Sandy Soils Medium Flow Rates Medium Filtration Clayey Soils [1] High Flow Rates High Filtration Polluted Soils

Low Flow Rates Low Filtration Sandy Soils Medium Flow Rates Medium Filtration Clayey Soils [1] High Flow Rates High Filtration Polluted Soils Filter Ponds DE-WATERING SEDIMENT CONTROL TECHNIQUE Low Flow Rates Low Filtration Sandy Soils Medium Flow Rates Medium Filtration Clayey Soils [1] High Flow Rates High Filtration Polluted Soils [1] Capture

More information

REMOVE 20' OF STONE WALL C.C.B. REBUILD 20' OF R=1,000.00' L=130.00' CONSTRUCTION STONE WALL ENTRANCE PER DETAIL R=1,000.00' L=65.09' DMH U.P. HYD.

REMOVE 20' OF STONE WALL C.C.B. REBUILD 20' OF R=1,000.00' L=130.00' CONSTRUCTION STONE WALL ENTRANCE PER DETAIL R=1,000.00' L=65.09' DMH U.P. HYD. 45.2' EROSION CONTROL NOTES: 1. EROSION CONTROLS SHALL BE INSTALLED PRIOR TO ANY EXCAVATION. EROSION CONTROLS SHALL BE MAINTAINED IN GOOD CONDITION AT ALL TIMES. EROSION CONTROLS SHALL REMAIN UNTIL SUCH

More information

PROPOSED PLANT LIST prune back ex. forsythia to create neat hedge appearance reset capstone, repoint ex. wallwhere required provide 4 wide clear openi

PROPOSED PLANT LIST prune back ex. forsythia to create neat hedge appearance reset capstone, repoint ex. wallwhere required provide 4 wide clear openi PROPOSED PLANT LIST prune back ex. forsythia to create neat hedge appearance reset capstone, repoint ex. wallwhere required provide 4 wide clear opening for new front steps to #472 entry ex. 36 Oak SB-3

More information

ASPEN GROVE PROJECT NO. 53B2390 D-1 DETAIL STANDARD NOTES CITY OF MADISON

ASPEN GROVE PROJECT NO. 53B2390 D-1 DETAIL STANDARD NOTES CITY OF MADISON ASPEN GROVE D-1 DETAIL STANDARD NOTES ORIGINATOR:, STREETS DIVISION REV. DATE: PLOT NAME: PLOT SCALE: THE LOCATION AND INFORMATION FOR PROPOSED NEW TREES, IN THE PUBLIC RIGHT OF WAY OR ON PUBLIC LANDS

More information

WHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area

WHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area City/CCSD 28E Agreement February 14, 2017 Page 1 28E Agreement Between the City of Cedar Rapids, Iowa (City) and College Community School District (CCSD) Regarding the construction of a roundabout at the

More information

Within the enclosed attachments you will find our formal sign package proposal for 101 W. Broadway in Monona, WI.

Within the enclosed attachments you will find our formal sign package proposal for 101 W. Broadway in Monona, WI. June 8 th, 2015 Plan Commission City of Monona 5211 Schluter Road Monona, WI 53716 Re: Signage Package 103 W. Broadway Dear Plan Commission members, Within the enclosed attachments you will find our formal

More information

Northgate Link (University District to Northgate)

Northgate Link (University District to Northgate) Northgate Link (University District to Northgate) 4.3-mile light rail extension Stations at U District, Roosevelt and Northgate Completion: 2021 62,000 daily boardings added to system by 2030 1 U District

More information

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015 GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado Schematic Design January 2015 1 2 3 4 5 6 7 8 9 DESIGN WORKSHOP Landscape Architecture Land Planning Urban Design Tourism Planning Asheville Aspen Austin

More information

PROPOSED DRAINAGE PATTERNS

PROPOSED DRAINAGE PATTERNS 1121 1118.50 Basin Floor 1120 1119 0 N 100 200 PROPOSED DRAINAGE PATTERNS Deroiser Drive Riverwood Drive County 260 0 100 200 Project Name: Riverwood Drive LITTLE FALLS TOWNHOMES Project Location: LITTLE

More information

2-B-18-UR. Revised: 3/27/2018

2-B-18-UR. Revised: 3/27/2018 Revised: 3/27/2018 Revised: 3/27/2018 GI FOR KIDS A MEDICAL OFFICE BLDG. 0000 BOARDWALK BLVD. KNOXVILLE, TENNESSEE CONSTRUCTION PRELIMINARY - NOT FOR Landscape Plan Target Publix Town Center Boulevard

More information

Philbrook Avenue Wetlands and Stream Riparian Restoration Project Planting Plan 2009 REVISED AUGUST 24, 2009

Philbrook Avenue Wetlands and Stream Riparian Restoration Project Planting Plan 2009 REVISED AUGUST 24, 2009 Philbrook Avenue Wetlands and Stream Riparian Restoration Project Planting Plan 2009 REVISED AUGUST 24, 2009 Submitted by Boyle Associates Per Request of Gorrill Palmer Consulting Engineers & the Cumberland

More information

TREE CONSERVATION REPORT

TREE CONSERVATION REPORT CLIENT: TREE CONSERVATION REPORT RIVE D T I R P S E THE SITE WAS REVIEWED ON FEBRUARY 7, 20 TO DETERMINE THE SIZE, QUANTITY AND SPECIES OF EXISTING TREES. THERE WERE NO EXISTING TREES FOUND ON THE SITE.

More information

n1. Design 5.4.6a Urban Bioretention 5.4.6a Urban Bioretention Variations: Planter box, Extended tree pits, Stormwater curb extensions.

n1. Design 5.4.6a Urban Bioretention 5.4.6a Urban Bioretention Variations: Planter box, Extended tree pits, Stormwater curb extensions. 5.4.6a Urban Bioretention Variations: Planter box, Extended tree pits, Stormwater curb extensions. Description: Urban bioretention SCM are similar in function to regular bioretention practices except they

More information

Kittson Parkway / Watershed Park Parking Lot

Kittson Parkway / Watershed Park Parking Lot Kittson Parkway / Watershed Park Parking Lot Date Constructed: Summer 2005 Site Location / Description: Kittson Parkway, North Delta, British Columbia. Permeable parking lot adjacent to Watershed Park;

More information

Appendix G. Detailed Design

Appendix G. Detailed Design Appendix G Detailed Design G1: Construction details Construction detail drawings usually include important details and specifications for required project design elements. This section provides information

More information

The George Washington University Square Phase 1 Design Garage Base Building

The George Washington University Square Phase 1 Design Garage Base Building The George Washington University Square 103 - Phase 1 Design Garage Base Building DRAWING INDEX SHEET TITLE COVER SHEET AP1 AERIAL PHOTOGRAPH SECOND STAGE APPROVAL AUGUST 16, 2010 D1 D2 S1 S2 DEVELOPMENT

More information

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration Model Construction SWPPP Planning & Development Services 1800 Continental Place Mount Vernon WA 98273 voice 360-416-1320 inspections 360-416-1330 www.skagitcounty.net/stormwaterpermitting Permit #: General

More information

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL STANDARD SPECIFICATIONS SECTION 01570 TEMPORARY EROSION AND SEDIMENT CONTROL PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements, procedures, and methods related to responsibilities for providing

More information

A0.1 TITLE SHEET. Santa Barbara, CA Suite C. 156 West Alamar Ave. 21 E. VICTORIA STREET ste 200 SANTA BARBARA, CA (805)

A0.1 TITLE SHEET. Santa Barbara, CA Suite C. 156 West Alamar Ave. 21 E. VICTORIA STREET ste 200 SANTA BARBARA, CA (805) PROJECT CODE: 1446 FILENAME: 1446 A0.1 Cover.dwg KKC APPROVALS: DATE: NO: DATE: Mar 31, 2016, 12:21pm COMMENTS: A0.1 TITLE SHEET MECH. ROOM DOOR VICINITY MAP N NORTH - PARKING SPACE STATISTICS SOUTH -

More information

Rainwater Management an issue for the 21 st Century. Hydrological Cycle

Rainwater Management an issue for the 21 st Century. Hydrological Cycle Canadian Society of Landscape Architects CONGRESS 2014 Rainwater Management an issue for the 21 st Century Don Crockett, BCSLA, CSLA Principal, Golder Associates Ltd. May 2014 Hydrological Cycle PRE- URBAN

More information

Illinois Urban Manual

Illinois Urban Manual Illinois Urban Manual Jim Nelson: Association of Illinois Soil and Water Conservation Districts (AISWCD) Funding for this project provided, in part, by the Grand Victoria Foundation of Elgin IL, the Governor

More information

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District The following is a list of the minimum requirements required on Soil Erosion and Sediment Control

More information

LOT 1, SPRINGVALE SUBDIVISION DATE: APRIL 16, 2015

LOT 1, SPRINGVALE SUBDIVISION DATE: APRIL 16, 2015 5 6 10 9 10 DATE: APRIL 16, 2015 DATE: APRIL 16, 2015 BUFFER LANDSCAPE 25'-0" CASE NO: CSP 2015-001 PROPERTY LINE NOTES LEGEND PROPERTY LINE DETENTION POND 5,574 S.F. A. THE DESIGN SHOWN IS CONCEPTUAL.

More information

L1.0 PLANTING PLAN AT GRADE 1/8'' = 1'-0'' BROOKLYN AVE MIXED USE PROJECT 4717 BROOKLYN AVE NE BID SET PLANTING PLAN AT GRADE REVISIONS PLANT SCHEDULE

L1.0 PLANTING PLAN AT GRADE 1/8'' = 1'-0'' BROOKLYN AVE MIXED USE PROJECT 4717 BROOKLYN AVE NE BID SET PLANTING PLAN AT GRADE REVISIONS PLANT SCHEDULE REVISIONS PLANT SCHEDULE QUANT BOTANICAL NAME ACER NIGRUM 'GREEN COLUMN' COMMON NAME SIZE GREEN COLUMN MAPLE " CAL SPACING STREET TREE FORM AMERICAN HOREAM /" CAL # ACER GINNALA FLAME FLAME AMUR MAPLE,

More information

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE Please complete this narrative form and submit with your SWPPP drawings. Refer to Kitsap County Stormwater Design Manual Vol.

More information

2221 Main Street LANDSCAPE ARCHITECTURAL SET - REVISED REZONING APPLICATION - 19 MAY 2017

2221 Main Street LANDSCAPE ARCHITECTURAL SET - REVISED REZONING APPLICATION - 19 MAY 2017 Main Street LANCAPE ARCHITECTURAL SET - REVISED REZONING APPLICATION - MAY 0 LANCAPE DRAWING INDEX GENERAL NOTES CONNECT LANCAPE ARCHITECTURE INC. DOES SHEET No. SHEET NAME L.0 COVER SHEET AND OVERALL

More information

Te c h S p e c 3. Edge Restraints for Interlocking Concrete Pavements

Te c h S p e c 3. Edge Restraints for Interlocking Concrete Pavements Te c h S p e c 3 Edge Restraints for Interlocking Concrete Pavements Introduction Edge restraints are an essential component of interlocking concrete pavements. Restraints hold the pavers tightly together,

More information

2. HORIZONTAL DATUM = NAD 83. VERTICAL DATUM = NAVD 88.

2. HORIZONTAL DATUM = NAD 83. VERTICAL DATUM = NAVD 88. 1. EXISTING CONDITIONS AND UTILITY INFORMATION SHOWN ON THESE PLANS ARE BASED ON A SET OF PLANS ENTITLED "SCHOOL OF COMMUNICATIONS AND MEDIA BUILDING AND LIFE HALL RENOVATION" DATED MARCH 11, 2015 REVISED

More information

Preliminary Landscape Planting

Preliminary Landscape Planting Southwest Chaska Plan IN T ERCHA NGE DE SIGN The Southwest Chaska Plan creates an implementable plan for the entire Southwest Chaska growth area that includes: County Road 44, the primary east-west street

More information

PLAN SUBMITTER'S CHECKLIST

PLAN SUBMITTER'S CHECKLIST Page 1 of 8 PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and reference the plan sheets/pages where the information may be found, where appropriate, or write

More information

511 - RIP RAP - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511

511 - RIP RAP - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511 511 - - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511 511.1 GENERAL 511.1.1 Rip Rap 511.1.2 Rock Protection Excavation for placing Rip Rap, Rock Protection and Gravel

More information

Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool at Bristol County Agricultural High School, Dighton - Supporting Information

Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool at Bristol County Agricultural High School, Dighton - Supporting Information Bridgewater State University Virtual Commons - Bridgewater State University Phase II Final Report Taunton River Watershed Project 2011 Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 (360) 754-4126 (FAX) Email: cdd@ci.tumwater.wa.us APPENDIX II-C SHORT FORM CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

More information

L0.01. PWL partnership 1:250 TREE PROTECTION GENERAL NOTES TREE LEGEND TREE PROTECTION BARRIER FENCING DETAIL NTS.

L0.01. PWL partnership 1:250 TREE PROTECTION GENERAL NOTES TREE LEGEND TREE PROTECTION BARRIER FENCING DETAIL NTS. TREE PROTECTION GENERAL NOTES THIS INCLUDES TREE SECTION, TREE RETENTION, PROTECTION AND FENCE THINNING. SUBJECT TO TREE LEGEND TREES TO BE REMOVED A. EXCAVATION AROUND TREES. EXCAVATION WITHIN DRIP LINE

More information

VI. STORMWATER TERRACES: Previous Studies

VI. STORMWATER TERRACES: Previous Studies VI. STORMWATER TERRACES: Previous Studies DESIGN PRINCIPLES SHOWCASE FOR UBC SUSTAINABILITY GOALS ACTIVE/ENGAGING EDGES VIEW CORRIDOR TO CENTRAL FEATURE JOURNEY TO/FROM ACADEMIC CORE BACKDROP TO ACHIEVEMENT

More information

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TREES

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TREES PART 1 - GENERAL 1.01 SCOPE A. Work covered by this section includes all of the planning, compliance, design, installation, and warranty elements for new landscaping using trees. Contractor shall furnish

More information

OVERLAKE VILLAGE STATION

OVERLAKE VILLAGE STATION OVERLAKE VILLAGE STATION Today NEIGHBORHOOD CONTEXT PLAN NEIGHBORHOOD CONTEXT PLAN WITH DEVELOPMENT 148TH AVE NE 1/4-MILE RADIUS NE 36TH ST BUS ROUTE BICYCLE ROUTE S.R. 520 NE 31TH ST PEDESTRIAN-BICYCLE

More information

EROSION & SEDIMENT CONTROL

EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL Surface Water Protection During Well Site Construction Kelly Kees, PE WVDEP, Office of Oil and Gas SEDIMENT & EROSION CONTROL PLANS Per West Virginia State Code 22-6-6(d) 22-6A-7(c),

More information

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES Greenville County Technical Specification for: WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES 1.0 Mountainous and Steep Slope Sites 1.1 Description The geographic locations of portions of Greenville County are

More information

220 Perennial Garden. Center. Project Update

220 Perennial Garden. Center. Project Update 3 Center Project Update 220 Perennial Garden The landscape design resembles the relaxed and natural New Wave Planting Style. The layout is less controlled and geometric than traditional gardens. The landscape

More information

Deep-rooted Native Plants Protect Water Quality. Cyndi Ross River Restoration Program Manager

Deep-rooted Native Plants Protect Water Quality. Cyndi Ross River Restoration Program Manager Deep-rooted Native Plants Protect Water Quality Cyndi Ross River Restoration Program Manager 467 square miles of land 126 miles of river 48 communities 1.35 million people 4 main branches Main Upper Middle

More information

PROMENADE IMPROVEMENTS PROJECT SIOUX CITY, IOWA

PROMENADE IMPROVEMENTS PROJECT SIOUX CITY, IOWA PROMENADE IMPROVEMENTS PROJECT SIOUX CITY, IOWA 00% DESIGN DEVELOPMENT PACKAGE Project #99 This plan, undertaken by ISG in 06, was prepared exclusively for the City of All content ISG 06. This plan may

More information

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts Sectional View of Concepts PAVEMENT FEATURES PAVEMENTS INTERSECTION INTERSECTION TREATMENTS LANDSCAPE BUFFER LANDSCAPE DESIGN GPCID CD D: GWINNETT P LACE DRIVE & MALL B COMPLETE STREET DESIGN ELEMENTS

More information

130TH STATION: NEIGHBORHOOD CONTEXT PLAN

130TH STATION: NEIGHBORHOOD CONTEXT PLAN : NEIGHORHOOD CONTEXT PLAN NORTHUP WAY LEGEND NE 20TH ST US ROUTE & NUMER XXX ICYCLE ROUTE OFF STREET ICYCLE FACILITY PROPOSED ICYCLE ROUTE 130TH AVE NE 132ND AVE NE ICYCLE LANE PROPOSED NEW ICYCLE LANE

More information

4. CONCEPT PLAN DEVELOPMENT

4. CONCEPT PLAN DEVELOPMENT 4. CONCEPT PLAN DEVELOPMENT Concept Plan Step 1: Identify Site Constraints and Opportunities Review the existing site to identify constraints and opportunities for GI Practices to meet the RRv. Constraints

More information

EXISTING CONDITIONS. Bellevue College Fountain Renovation

EXISTING CONDITIONS. Bellevue College Fountain Renovation EXISTING CONDITIONS Bellevue College Fountain Renovation 06.26.2016 1 EXISTING VIEWS WEST TO EAST Bellevue College Fountain Renovation 06.26.2016 2 OVERSIZED GRATING & WALL SURROUND UNSIGHTLY CATCH BASIN

More information

CHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES

CHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES CHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES TOPICS Steps Prior to construction Pre-Construction Meeting Defining the Critical Stages with the Contractor Brady s Run Lake Site

More information

SPECIFICATION SECTION:

SPECIFICATION SECTION: SPECIFICATION SECTION: Date: STORM WATER TREATMENT STORMEXX CLEAN CATCH BASIN INSERTS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the Inserts for use at existing storm water catch basins in roadways,

More information