Anglo American Platinum; Mogalakwena Mine: Construction of Bridge and Gravel Road. Consultation with community members 26 July 2016
|
|
- Alyson Day
- 5 years ago
- Views:
Transcription
1 Anglo American Platinum; Mogalakwena Mine: Construction of Bridge and Gravel Road Consultation with community members 26 July 2016
2 AGENDA Welcome and introduction. Meeting protocol. Purpose of the meeting. Project background. Project location. Project description. 2
3 AGENDA CONTINUED Site plan. Summary of environmental impacts. Alternatives. Regulatory process followed. Regulatory process going forward. Questions / Comments. 3
4 WELCOME AND INTRODUCTION Introduction of parties involved in the project. Anglo American Platinum: Mogalakwena Mine Shangoni Management Services 4
5 MEETING PROTOCOL Please sign the attendance register. Please feel free to ask questions. Please ask questions that are specific to the construction of the bridge and gravel road project. 5
6 PURPOSE OF THE MEETING To present background information on the project to the community and to provide an opportunity for questions and comments relating to the project. This meeting forms part of the public participation process, and will be structured in the format of a Public Participation / Consultation Meeting. All concerns/comments will be recorded and included within a Public Participation Report that will be submitted to the DMR along with the project s Basic Assessment Report 6
7 PROJECT BACKGROUND Applicant: Anglo American Platinum Mogalakwena Mine Project Name Construction of a Bridge and Gravel Road Project Location Farm Zwartfontein 818 LR, Limpopo Province 7
8 PROJECT LOCALITY MAP 8
9 PROJECT DESCRIPTION LDV s and HDV s are currently using the same access road at Mogalakwena Mine (MPM). Due to mainly safety considerations, MPM is proposing a new LDV road that will be used separately from the current haul road. The proposed road will cross the Mohlosane River and therefore, MPM proposes to construct a bridge, which will cater for vehicles of a maximum of 8 tonnes, over the Mohlosane River. An existing overgrown track will be cleared and upgraded to a LDV gravel road and will be lengthened by approximately 3.35 kilometres. 9
10 PROJECT DESCRIPTION Activity applied for: Listing Notice 1: GNR 983 of 2014 Activity 19: The infilling or depositing of any material of more than 5 cubic metres into, or the dredging, excavation, removal or moving of soil, sand, shells, shell grit, pebbles or rock of more than 5 cubic metres from- (i) a watercourse; (ii) the seashore; or (iii) the littoral active zone, an estuary or a distance of 100 metres inland of the high-watermark of the sea or an estuary, whichever distance is the greater 10
11 PROJECT DESCRIPTION Activity applied for: Listing Notice 1: GNR 983 of 2014 Activity 56: The widening of a road by more than 6 metres, or the lengthening of a road by more than 1 kilometre- (i) where the existing reserve is wider than 13,5 meters; or (ii) where no reserve exists, where the existing road is wider than 8 metres; excluding where widening or lengthening occur inside urban areas. 11
12 PROJECT DESCRIPTION Activity applied for: Listing Notice 1: GNR 983 of 2014 Activity 12: The development of- (iii) bridges exceeding 100 square metres in size; (xii) infrastructure or structures with a physical footprint of 100 square metres or more; where such development occurs- (a) within a watercourse; (b) in front of a development setback; or (c) if no development setback exists, within 32 metres of a watercourse, measured from the edge of a watercourse; - 12
13 PROJECT DESCRIPTION The Construction of the Bridge and Gravel Road will include the following: Construction of an LDV bridge over the Mohlosane river, that will include the excavation of the bedrock for the foundation; Armouring of the banks of the river; Upgrade of an existing overgrown track to a gravel road; Lengthening the gravel road to link it to the bridge; 13
14 PROJECT DESCRIPTION CONTINUED Bridge specifications are as follows: Type: LDV bridge. Surface area of the bridge location: m2 Main bridge components: Abutment foundation and wall o Length: m o Width: m o Height: m (including foundation of the bridge) Parapet o Length: m o Width: m o Height: m 14
15 PROJECT DESCRIPTION CONTINUED Bridge deck o Length: m o Width: 12 m Road specifications are as follows: Type: Earth / gravel road. Width: 15m Length: 3.35 Km 15
16 SITE PLAN 16
17 SUMMARY OF ENVIRONMENTAL IMPACTS The following High and Medium rated environmental impacts were identified (after mitigation): Noise generated by vehicles clearing/removing vegetation, during grading and sloping activities and during the construction of the bridge. Soil compaction as part of clearing activities at the gravel road as well as construction activities for the bridge. Construction activities impacting on the aquatic ecosystem within the river. 17
18 SUMMARY OF ENVIRONMENTAL IMPACTS Clearing of vegetation communities will result in a loss of habitat or fragmentation of habitat and may then alter the current dynamics of fauna assemblages. The use of the gravel road and bridge may result on animal mortalities. Visual impact due to the presence of the bridge and vehicles using the gravel road. 18
19 ALTERNATIVES ASSESSMENT Construction of the bridge and gravel road versus No-project Option 19
20 ALTERNATIVES ASSESSMENT 20
21 ALTERNATIVES ASSESSMENT 21
22 Basic Assessment process (90 days (excluding 15 Dec 05 Jan)) REGULATORY PROCESS FOLLOWED Application form Application date: 9 May 2016 Draft BAR and EMPr Notifications: 04 July 2016 Registered post: 05 July 2016 Newspaper advert: 1-7 July 2016 in Bosveld Newspaper. Meeting (26 July 2016): Consultation with Skimming community members Minutes: Compile and distribute minutes of the meeting. Public review 04 July August 2016 The I&APs have been provided with the opportunity to review the draft BAR for 30 days. Viewing stations Mogalakwena Library. Public place in the village Shangoni website ( za).
23 Basic Assessment process (90 days (excluding 15 Dec 05 Jan)) REGULATORY PROCESS GOING FORWARD Public/community Consultation meeting Notifications to be done as per EIA regulations: . Registered post. Newspaper advert. Minutes: Compile and distribute minutes of the meeting. Draft BAR and EMPr Public Participation Report: Compilation of Public Participation report for inclusion as an annexure to the final BAR report. Final BAR and EMPr Submission due date: Due date: 08 August 2016 (subject to change). 23
24 QUESTIONS / COMMENTS 24
BACKGROUND INFORMATION DOCUMENT:
BACKGROUND INFORMATION DOCUMENT: Proposed Construction of Mpophomeni Shopping Centre, Umgungundlovu District Municipality, KZN A Project of Dymatron (Pty) Ltd 21 NOVEMBER 2014 BID DOCUMENT DESCRIPTION
More informationENVIRONMENTAL IMPACT ASSESSMENT
ENVIRONMENTAL IMPACT ASSESSMENT NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FOR THE SARATOGA VEGETATION CLEARING SECTION 24G ON PORTION 4 OF THE FARM KLAAS VOOGDS RIVIER NO. 40, ROBERTSON, WESTERN
More informationBACKGROUND INFORMATION DOCUMENT
BACKGROUND INFORMATION DOCUMENT PROPOSED UPGRADING OF THE N2 NATIONAL ROAD FROM KRAAIBOSCH TO DIE VLEIE BASIC ENVIRONMENTAL IMPACT ASSESSMENT The South African National Roads Agency Society Limited (SANRAL)
More informationPURPOSE OF MEETING MEETING GUIDELINES PROJECT BACKGROUND ESKOM CLOCOLAN-FICKSBURG 88 KV POWERLINE, FREE STATE
ESKOM CLOCOLAN-FICKSBURG 88 KV POWERLINE, FREE STATE DRAFT BASIC ASSESSMENT REPORT PUBLIC REVIEW LANDOWNERS MEETING FICKSBURG 23 JULY 2013 T his project is being conducted on behalf of Eskom PRESENTATION
More informationAttention: Interested and Affected Party (I&AP) Commenting Period: 22 November January 2018 GNEC Code: 20327
22 November 2017 Attention: Interested and Affected Party (I&AP) Commenting Period: 22 November 2017 15 January 2018 GNEC Code: 20327 Dear Interested and Affected Party INFORMING START OF 30 DAY PUBLIC
More informationSIBAYA WATERLINE BASIC ASSESSMENT PROCESS. PRE-APPLICATION MEETING WITH EDTEA March 2016
SIBAYA WATERLINE BASIC ASSESSMENT PROCESS PRE-APPLICATION MEETING WITH EDTEA March 2016 Agenda Item No. Topic 1. Welcome & Introduction 2. Purpose of the Meeting 3. Presentation 4. Queries / Discussion
More informationFabriek Street 45 Paarl. P.O. Box 2632 Paarl Tel: Cell:
11 July 2016 Organisation: Department of Environmental Affairs and Development Planning Attention: Mr. Shafeeq Mallick NOTICE OF FIRST PUBLIC PARTICIPATION PERIOD: 12 July 2016 15 August 2016 GNEC Code:
More informationRIVER MAINTENANCE MANAGEMENT PLAN APPLICATION
RIVER MAINTENANCE MANAGEMENT PLAN APPLICATION NOTICE OF PUBLIC PARTICIPATION PERIOD OF A RIVER MAINTENANCE MAANGEMENT PLAN (RMMP) FOR THE PROPOSED MAINTENANCE OF THE KM 8.920 CULVERT, WAARBURGH ROAD, PAARL,
More informationBASIC ASSESSMENT PROCESS
BASIC ASSESSMENT PROCESS NOTICE OF A BASIC ASSESSMENT PROCESS FOR THE PROPOSED MIXED USE DEVELOPMENT ON THE REMAINDER OF PORTION 2, REMAINDER OF PORTION 7, PORTION 7, REMAINDER OF PORTION 9, REMAINDER
More informationDEVELOPMENT PERMIT SENSITIVE ECOSYSTEMS
DEVELOPMENT PERMIT SENSITIVE ECOSYSTEMS What is the Sensitive Ecosystem Development Permit Area (SEDPA)? Surrey s SEDPA is made up of two distinct classifications of the natural environment: Streamside
More informationScarborough Waterfront Project
Scarborough Waterfront Project Public Information Centre #1 Environmental Assessment Terms of Reference September 10, 2014 Agenda Open House Presentation 7:00 to 7:30 pm Presentation 7:30 to 8:15 pm History
More informationBACKGROUND INFORMATION DOCUMENT (BID) AND INVITATION TO PARTICIPATE
To: Interested and Affected Parties 2 October 2017 NOTIFICATION OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FOR THE PROPOSED DEVELOPMENT OF RESIDENTIAL HOUSING ON PORTION 56 OF THE FARM CHELSEA NO. 25,
More informationRLE.1 Rural Living Environment
Index.1 Description and Expectations.2 Objectives.3 Policies.4 Guidance RLE.2 Landuse RLE.2.1 Eligibility Rules RLE.2.2 Notification Rules RLE.2.3 Discretionary Activities RLE.3 Subdivision RLE.3.1 Eligibility
More informationBASIC ASSESSMENT REPORT. Background Information Document
BASIC ASSESSMENT REPORT Background Information Document BASIC ASSESSMENT FOR THE PROPOSED LUIPERDSHOEK 33 KV POWER LINE PROJECT TO BE LOCATED NORTH OF THE TOWN OF POFADDER IN THE NORTHERN CAPE (DEA Ref
More informationNON-TECHNICAL SUMMARY
Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland
More informationCLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
704 RIVER AND STREAM CONSERVATION AREA (RSCA) 704.01 PURPOSE Section 704 is adopted to: A. Maintain the integrity of the rivers and streams in the County by minimizing erosion, promoting bank stability,
More informationMonday, September 14, :00 A.M. AV 201 Conference Room AGENDA
SAN JOAQUIN COUNTY MULTI-SPECIES HABITAT CONSERVATION AND OPEN SPACE PLAN HABITAT TECHNICAL ADVISORY COMMITTEE MEETING & HTAC FINANCIAL SUB-COMMITTEE MEETING San Joaquin Council of Governments Regional
More informationWESTERN CAPE GOVERNMENT: DEPARTMENT OF TRANSPORT AND PUBLIC WORKS
WESTERN CAPE GOVERNMENT: DEPARTMENT OF TRANSPORT AND PUBLIC WORKS PROPOSED UPGRADE OF TRUNK ROAD 11/1 TO FREEWAY STANDARDS, FROM THE POTSDAM INTERCHANGE TO THE MELKBOS INTERCHANGE (N7/1), CAPE TOWN FINAL
More informationLocal Area Key Issues Paper No. 11: Extractive industry - Yandina Creek and Browns Creek Road
Draft Sunshine Coast Planning Scheme Review of Submissions Local Area Key Issues Paper No. 11: Extractive industry - Yandina Creek and Browns Creek Road Key Issue: No. of submissions: Sites identified
More informationThe Jigsaw: Legal Instruments for Biodiversity Planning in South Africa
The Jigsaw: Legal Instruments for Biodiversity Planning in South Africa Annual Conference, Environmental Law Association AUGUST 2012 Dr. Marie Parramon-Gurney Head of Programmes: Sustainability and Development
More informationPANSHANGER QUARRY, Hertfordshire
PANSHANGER QUARRY, Hertfordshire Proposed enhanced restoration of Phases F & H Briefing Note 1 March 2015 INERT (INACTIVE) RESTORATION MATERIALS, CONTROLS AND OPERATIONS 1 Introduction This briefing note
More informationMEETING HELD AT THE EDTEA OFFICES (ethekwini) ON 03 July 2018 AT 10h00. Ms. Naadira Nadasen (NN) Mrs Chen read (CR) and Mrs Tejal Singh (TS)
MINUTES OF THE PRE-APPLICATION MEETING IN RESPECT OF THE APPLICATION FOR ENVIRONMENTAL AUTHORISATION OF THE PROPOSED BEACHWOOD RESORT AND ESTATE DEVELOPEMENT MEETING HELD AT THE EDTEA OFFICES (ethekwini)
More informationCape Environmental Assessment Practitioners(Pty)
BACKGROUND INFORMATION DOCUMENT (BID) Introduction Cape Environmental Assessment Practitioners(Pty) Ltd Reg. No. 2008/004627/07 Telephone: (044) 874 0365 First Floor, Eagles View Building Facsimile: (044)
More informationPUBLIC CONSULTATION MACROBERT INCORPORATED GREENWAY FARMS (PTY) LTD BOKPOORT OPERATIONS INTEGRATED WATER USE LICENCE APPLICATION
MACROBERT INCORPORATED GREENWAY FARMS (PTY) LTD BOKPOORT OPERATIONS INTEGRATED WATER USE LICENCE APPLICATION Report: JW35/16/F481 - Rev 2 PUBLIC CONSULTATION APPENDIX E - Table of Contents E.1 Minutes
More information!"#"$%&'"()*%+*,*-.%/"0.%(,$*&$,(*+%/*)1"* 2"314314("*!.2)/.5)* 0/%-$"/2!,$*+./"*2),).%(*-%,/!/%%'6*78*',/51*9:7;*
!"#"$%&'"()*%+*,*-.%/"0.%(,$*&$,(*+%/*)1"* 2"314314("*!.2)/.5)* 0/%-$"/2!,$*+./"*2),).%(*-%,/!/%%'6*78*',/51*9:7;* Meeting Agenda Item Discussion Item Presenter 1. Opening and Welcome 2. Introductions
More informationAim to Reclaim. Introduction
Aim to Reclaim Introduction Welcome to Aim to Reclaim, a virtual lab that takes you inside the world of copper mining. You may remember that the mining process involves four important phases: Exploration,
More information6Natural. Environment Development Permit Guidelines
6Natural Bylaw 2600-2016, being "Official Community Plan Bylaw, 2016" Schedule "A" CITY OF ABBOTSFORD OFFICIAL COMMUNITY PLAN Environment Development Permit Guidelines Part V - 6-1 Area Subdivision or
More informationMAYFIELD WEST SECONDARY PLAN PHASE 2
MAYFIELD WEST SECONDARY PLAN PHASE 2 Public Open House #3 February 25, 2010 Draft Preferred Land Use Scenario TOWN OF CALEDON PLANNING & DEVELOPMENT DEPARTMENT Open House Agenda TOWN OF CALEDON 1. Welcome
More informationSINGITA SWENI LODGE EXPANSION: SUMMARY REPORT - BAR
7 PROJECT: SINGITA SWENI LODGE EXPANSION: SUMMARY REPORT - BAR Basic Environmental Assessment for Lodge expansion and Refurbishment of the Singita Sweni Lodge, within the Singita Private Concession in
More informationAPPENDIX D PUBLIC NOTIFICATIONS
APPENDIX D PUBLIC NOTIFICATIONS APPENDIX D1 NEWSPAPER ADVERT APPENDIX D2 CORRESPONDENCE TO I&APs 18 February 2011 Dear Interested and Affected Party (I&AP), NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT FOR
More informationMeeting Agenda. City of Guelph. River Systems Advisory Committee. Agenda Items. Item 1, 2 and 3. Item 4 Ward to Downtown Pedestrian Bridge
Meeting Agenda City of Guelph River Systems Advisory Committee September 19, 2018 City Hall, Meeting Room B From 4:00 to 6:00 p.m. Meeting Chair: Mariette Pushkar Agenda Items Welcome to all Item 1, 2
More information5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS
5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically
More information64 Mineral Extraction Area Rules
64 Mineral Extraction Area Rules 64.1 Introduction For the purposes of this Chapter: Active Area, in relation to a Mineral Extraction Area (MEA), is that part of the Mineral Extraction Area which is owned
More information240 and 242 Finch Avenue West Zoning By-law Amendment Application Preliminary Report
REPORT FOR ACTION 240 and 242 Finch Avenue West Zoning By-law Amendment Application Preliminary Report Date: March 1, 2019 To: North York Community Council From: Director, Community Planning, North York
More information1. The EIA System in Japan
Index 1. The EIA System in Japan 2. The Environmental Impact Assessment Law (1) Objective (2) Revision of the Environmental Impact Assessment Law (3) Projects subject to EIA (4) Who implements EIA? (5)
More informationENVIRONMENTAL IMPACT ASSESSMENT
ENVIRONMENTAL IMPACT ASSESSMENT NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FOR THE PROPOSED HAASENDAL DEVELOPMENT AND KUILS RIVER GOLF COURSE RE-DEVELOPMENT ON ERF 23580, ERF 23579, ERF 23582, ERF
More informationSITE INVESTIGATION REPORT: CONSTRUCTION OF NTUMBA VEHICULAR/PEDESTRIAN BRIDGE ACROSS A STREAM IN ROOKDALE, OKHAHLAMBA LOCAL MUNICIPALITY
SITE INVESTIGATION REPORT: CONSTRUCTION OF NTUMBA VEHICULAR/PEDESTRIAN BRIDGE ACROSS A STREAM IN ROOKDALE, OKHAHLAMBA LOCAL MUNICIPALITY PREPARED ON BEHALF OF: ECA CONSULTING CIVIL & STRUCTURAL ENGINEERS
More informationSlough International Freight Exchange Proposals, Colnbrook+
Welcome Welcome to this exhibition, which is being held in connection with our proposals for a new freight exchange facility on land to the north of the A4. Please take this opportunity to look at the
More informationHabitat Connectivity and Wildlife Corridor Stakeholder Meeting
Habitat Connectivity and Wildlife Corridor Stakeholder Meeting VENTURA COUNTY PLANNING DIVISION JUNE 8, 2017 Agenda Introductions, Meeting Goal, and Format January 2017 Board Action Current Project Phasing
More informationRempstone Extension - East Leake 2014
Overall Restoration of East Leake Quarry Sand Martin Face Southern Agricultural Corridor Wetland Ponds/Conservation Corridor following Sheepwash Brook Reinstated Bridleway/Footpaths Southern Agricultural
More informationTown and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION
Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION Application Site and Description of Development Proposed new quarry at Culham, Oxfordshire Land and Mineral
More informationOverview Report. Proposed Development
Overview Report Proposed Development the construction of a 1km cycle/pedestrian trail including a new footbridge, new car park and entrance road at Drumshanbo Lock and a new pedestrian/cycle road crossing,
More informationHartest river corridor survey
Hartest river corridor survey Project no. Report Date 56/15 Final 21st September 2015 Prepared by Penny Hemphill BSc. Hons Checked by Simone Bullion BSc. Hons, PhD., MCIEEM SWT Trading Ltd Suffolk Wildlife
More informationDraft Submission of Chilcompton Parish Council to Mendip Local Plan
Draft Submission of Chilcompton Parish Council to Mendip Local Plan Note: This is a draft for consultation. The Parish Council urges all villagers and other stakeholders to send comments to: parishclerk@chilcompton.org.
More informationCONSTRUCTION SPECIFICATION FOR RIP-RAP, ROCK PROTECTION, AND GRANULAR SHEETING
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 511 NOVEMBER 2018 (Formerly OPSS 511, November 2013) Note: The MUNI implemented in November 2018 replaces OPSS 511 COMMON, November 2013 with no technical
More informationVancouver. Title of the Initiative. Initiative Duration. Submitted by. Comments by the Jury
134 Vancouver Title of the Initiative Initiative Duration Submitted by Comments by the Jury Visionary Vancouver: Creating a Welcoming and Sustainable Place for All 2009-2020 Wendy Au, Deputy City Manager,
More informationStation Street/Haig Road Extension Environmental Assessment (EA)Study. Welcome
Station Street/Haig Road Extension Environmental Assessment (EA)Study Welcome Welcome to this Public Information Centre (PIC) meeting. Please record your attendance and obtain a comment sheet at the registration
More informationSECTION 5: REACH RECOMMENDATIONS/MAPS
SECTION 5: REACH RECOMMENDATIONS/MAPS This section describes areas of concern and provides specific recommendations for each project reach. Locations of stormwater drains were from GIS coverage supplied
More informationWelcome to the Public Consultation Exhibition
Welcome to the Public Consultation Exhibition Today is your opportunity to: Speak to the team Learn more about the project Leave feedback on the plans The Secretary of State for Transport has recognised
More informationTOWN COUNCIL / PLANNING COMMISSION
Workshop #3 TOWN COUNCIL / PLANNING COMMISSION January 20, 2011 Consultant Team In Attendance Tonight BMS Design Group Nevada City and San Francisco Michael Smiley, AICP, ASLA Partner-in-Charge Nancy L.
More informationD10. Outstanding Natural Features Overlay and Outstanding Natural Landscapes Overlay
D10. Outstanding Natural Features Overlay and Outstanding Natural Landscapes Overlay D10.1. Background These provisions give effect to Policy 15(a) of the New Zealand Coastal Policy Statement 2010, and
More informationD10. Outstanding Natural Features Overlay and Outstanding Natural Landscapes Overlay
D10. Outstanding Natural Features Overlay and Outstanding Natural Landscapes Overlay D10.1. Background These provisions give effect to Policy 15(a) of the New Zealand Coastal Policy Statement 2010, and
More informationRt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016
Rt. 29 Solutions Project Delivery Advisory Panel January 7, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Dec
More informationCITY OF KELOWNA MEMORANDUM. Date: June 20, 2001 File No.: Z City Manager Planning and Development Services Department
CITY OF KELOWNA MEMORANDUM Date: June 20, 2001 File No.: Z00-1033 To: From: City Manager Planning and Development Services Department Subject: APPLICATION NO. Z00-1033 OWNER: ELDORADO RANCH LTD. AT: JIM
More informationCommissioners Road West Realignment Environmental Assessment
City of London Commissioners Road West Realignment Environmental Assessment Public Information Centre No. 1 March 30, 2017 Welcome to the Public Information Centre This first Public Information Centre
More informationSoil & Site Evaluator - Need to Know
Soil & Site Evaluator - Need to Know I. The professional will understand the factors of soil development and demonstrate their importance to site evaluations. A. Topography 1. Landscape & landform description
More informationBASIC ASSESSMENT PROCESS THE PROPOSED CANELANDS EXTENSION, KWAZULU-NATAL KZN DAEA REF NO: DM/0031/2012 BACKGROUND INFORMATION DOCUMENT AUGUST 2012
BASIC ASSESSMENT PROCESS THE PROPOSED CANELANDS EXTENSION, KWAZULU-NATAL KZN DAEA REF NO: DM/0031/2012 BACKGROUND INFORMATION DOCUMENT AUGUST 2012 WHAT DOES THIS DOCUMENT TELL YOU? This document aims to
More informationProgress on implementation of the REDZs and Power Corridors SAPVIA Protea Hotel Balalaika 25 November 2016
Progress on implementation of the REDZs and Power Corridors SAPVIA Protea Hotel Balalaika 25 November 2016 Ms D Fischer Integrated Environmental Management Support Background Implementation systems Progress
More informationResponse by the Wiltshire Archaeological and Natural History Society
Highways England Consultation A303 Stonehenge Response by the Wiltshire Archaeological and Natural History Society Background About the Society Founded in 1853 to educate the public by promoting, fostering
More informationGREEN NETWORK APPLICATIONS IN ESTONIA
GREEN NETWORK APPLICATIONS IN ESTONIA Kalev Sepp, Tuuli Veersalu, Martk Külvik Estonian University of Life Sciences 1 WHY? BACKGROUND - POLITICAL By adopting the Pan-European Biological and Landscape Diversity
More informationDon Narrows Workshop DRAFT MEETING REPORT Saturday, May 24, 2008 South Regent Park Recreation Centre
Don Narrows Workshop DRAFT MEETING REPORT Saturday, May 24, 2008 South Regent Park Recreation Centre Introduction to the Workshop & this Report On Saturday, May 24, 2008 Toronto and Region Conservation
More informationThe Napa River Flood Protection Project
The Napa River Flood Protection Project Creating Flood Protection and Restoring Geomorphic and Biological Processes Jeremy Sarrow, Napa County Flood Control & Water Conservation District June 2, 2014.
More informationGadsden County Planning Commission Agenda Request
Date of Meeting: November 16, 2017 To: From: Through: Subject: Gadsden County Planning Commission Agenda Request Honorable Chairperson and Members of the Board Jill A. Jeglie, AICP, Senior Planner Clyde
More informationONLINE PUBLIC INFORMATION CENTRE
ONLINE PUBLIC INFORMATION CENTRE County Road 17 Bridge Replacements Detail Design and Environmental Assessment GWP 4203-15-00 The Ministry of Transportation Ontario (MTO) has retained CH2M Hill and Dillon
More informationAPPENDIX F: EXTERNAL APPROVALS
1.0 RESPONSIBILITIES When the City is constructing the Park or Open Space Development lands (OPTION I), after the subdivision construction process is completed by the Developer, Open Space Development
More informationAPPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania
APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS In West Sadsbury Township, Chester County, Pennsylvania TABLE OF CONTENTS I. Introduction 3 II. Importance of Stormwater Management
More informationIUCN World Heritage Advice Note Environmental Assessment & World Heritage
FINAL DRAFT, 07 June 2013 1 IUCN World Heritage Advice Note Environmental Assessment & World Heritage This Advice Note is intended to provide States Parties and other stakeholders with guidance on integrating
More informationENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report
Page 1 of 18 ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville Environmental Screening Report July 2011 Page 2 of 18 Table of Contents 1.0 INTRODUCTION
More informationSanta Cruz River Master Plan. Presented to the Arizona Floodplain Management Association Spring Conference June 8-10, 2011
Santa Cruz River Master Plan Presented to the Arizona Floodplain Management Association Spring Conference June 8-10, 2011 Introduction Who is FICO? 2 Project Team Kimley-Horn and Associates, Inc. River
More informationWorking Group Meeting
April 4,, 2017 Parks Operations Bldg Working Group Meeting Arts Districts Overview Stormwater/RPA/Stream Considerations First Principles Agenda 7:00pm 7:05pm 7:10pm 7:40pm 8:30pm 9:40pm 9:45pm Welcome
More informationNATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) CHAPTER 1: INTRODUCTION
February 2016 NATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) CHAPTER 1: INTRODUCTION 1. INTRODUCTION This Environmental Impact Assessment Report (EIR) has been compiled as part of an
More informationAPPENDIX J PERFORMANCE STANDARDS FOR GRAVEL MINE, PIT MINE, OR QUARRY
APPENDIX J PERFORMANCE STANDARDS FOR GRAVEL MINE, PIT MINE, OR QUARRY A. Purpose: 1. Regulatory Requirement and Use Mitigation: The purpose of this appendix is to provide a regulatory context (standards)
More informationCherry Beach Shoreline Protection Infrastructure Conceptual Design and Class EA
Welcome Cherry Beach Shoreline Protection Infrastructure Conceptual Design and Class EA May 3, 2012 Study Area Cherry Beach neighbourhood is located in lower Stoney Creek on Lake Ontario, east of Millen
More informationDigital Terrestrial Television Infrastructure Rollout. Environmental Impact Assessment - Corridor -
Digital Terrestrial Television Infrastructure Rollout Environmental Impact Assessment - Corridor - 1 1 ENVIRONMENTAL IMPACT ASSESSMENT (EIA): CORRIDOR 1.1 INTRODUCTION Corridor is a small farming community
More information511 - RIP RAP - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511
511 - - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511 511.1 GENERAL 511.1.1 Rip Rap 511.1.2 Rock Protection Excavation for placing Rip Rap, Rock Protection and Gravel
More informationLower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary
TABLE OF CONTENTS Page Executive Summary 1.0 INTRODUCTION...1-1 1.1 Purpose of the Undertaking...1-1 1.2 Study Area Description...1-1 1.3 Description of the Undertaking...1-1 1.4 Rationale for the Undertaking...1-2
More informationArchaeological Monitoring of Land at 29 Royal Pier Road, Gravesend, Kent
Archaeological Monitoring of Land at 29 Royal Pier Road, Gravesend, Kent Site Code ROY/WB/15 Report for Dr Maxted Date of report 06/10/2015 SWAT ARCHAEOLOGY Swale and Thames Archaeological Survey Company
More informationCitywide Integrated Stormwater Management Plan (ISMP) DRAFT ACTION PLAN REVIEW Public Consultation November 16 th, 2016
Citywide Integrated Stormwater Management Plan (ISMP) DRAFT ACTION PLAN REVIEW Public Consultation November 16 th, 2016 1 Agenda DRAFT ACTION PLAN REVIEW Public Consultation Time 6:00 6:05 6:05 6:20 6:20
More informationNC Division of Coastal Management
November 14, 2016 NC Division of Coastal Management NCBIWA Update NC Coastal Area Management Act (1974) Balances competing coastal pressures through development permitting and creation of a Coastal Resources
More informationHonorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee
Memorandum DATE January 23, 2019 CITY OF DALLAS TO Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee SUBJECT I-30 East Project Update On Monday, January 28, 2019,
More informationPHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED DEVELOPMENT ERF 3 ROBERTSON WESTERN CAPE PROVINCE
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED DEVELOPMENT ERF 3 ROBERTSON WESTERN CAPE PROVINCE Prepared for BOLAND ENVIRO Att: Mr Nik Wullschleger PO Box 250 Worcester 6849 Fax: (023) 347 0336 By
More informationMAYFIELD WEST SECONDARY PLAN PHASE 2
MAYFIELD WEST SECONDARY PLAN PHASE 2 Council Information Workshop February 16, 2010 Draft Preferred Land Use Plan TOWN OF CALEDON PLANNING & DEVELOPMENT DEPARTMENT Workshop Agenda TOWN OF CALEDON 1. Welcome
More informationWWT Steart Marshes: a coastal wetland that works for people and wildlife
Background Environment Agency required to compensate for loss of internationally important intertidal habitat from process of coastal squeeze (3000ha in next 100 years) Severn Estuary: 200km flood defence
More informationThe London 2012 Olympic Park and Green Network Legacy
2012 Central Scotland Green Network Forum How Green Networks make our Towns and Cities Livable The London 2012 Olympic Park and Green Network Legacy Neil Mattinson Senior Partner LDA Design The Story Begins.
More informationPUBLIC PARTICIPATION REPORT MINUTES OF PUBLIC MEETING
PUBLIC PARTICIPATION REPORT MINUTES OF PUBLIC MEETING MINUTES OF PUBLIC MEETING IN RESPECT OF ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED TINLEY MANOR SOUTHBANK S COASTAL DEVELOPMENT Umhlali Country
More informationU N. United Nations Decade on Biodiversity. Convention on Biological Diversity. Ref.: SCBD/SPS/DC/SBG/JL/JA/ November 2017
United Nations Decade on Biodiversity Ref.: SCBD/SPS/DC/SBG/JL/JA/86906 23 November 2017 Dear Ms. Goettsche-Wanli, Reference is made to the letter of Mr. Miguel de Serpa Soares, Under-Secretary-General
More informationENVIRONMENTAL ISSUES and TEN-T PROJECTS Key elements for a sustainable network development
ENVIRONMENTAL ISSUES and TEN-T PROJECTS Key elements for a sustainable network development TEN-T Project Management Workshop 2010 George Kremlis DG ENV B4, European Commission 13 January 2010 Environmental
More informationAn Bord Pleanála. Eirgrid Plc. Meath County Council Cavan County Council Monaghan County Council
An Bord Pleanála Ref: PL02.VS0002 Prospective Applicant: Eirgrid Plc. Local Authorities: Meath County Council Cavan County Council Monaghan County Council Nature of Application: Written opinion on information
More informationWelcome. Land adjacent Sandy Lane WALTHAM CHASE THE PROPOSED SITE
Land adjacent Sandy Lane WALTHAM CHASE Existing Linden Homes developments Welcome Welcome to Linden Homes Southern s ( Linden ) public exhibition about its proposals for a range of high-quality homes for
More informationOCEAN POND COTTAGE DEVELOPMENT PLAN
Edinburgh Group Limited 36 Cabot Avenue St. John s, NL A1A 5L9 OCEAN POND COTTAGE DEVELOPMENT PLAN ENVIRONMENTAL ASSESSMENT REGISTRATION JULY, 2014 TABLE OF CONTENTS Page 1. NAME OF UNDERTAKING... 1 2.
More informationENVIRONMENTAL IMPACT ASSESSMENT
ENVIRONMENTAL IMPACT ASSESSMENT NOTICE OF APPLICATION FOR AMENDMENT OF AN ENVIRONMENTAL AUTHORISATION FOR THE HAASENDAL DEVELOPMENT ON PORTIONS 1, 11, 26, 30, 34, 58, AND 87 OF FARM HAASENDAL NO. 222,
More informationEdgeley Pond + Park Public Meeting
Edgeley Pond + Park Public Meeting February 21, 2017 Purpose of the meeting This Public Meeting is an opportunity for you to review the project background, process and provide input. City of Vaughan staff
More informationSanta Barbara County Planning Commission May 11 th, Cuyama Valley Conservancy vs. Troesh Diamond Rock Mine
Santa Barbara County Planning Commission May 11 th, 2011 Cuyama Valley Conservancy vs. Troesh Diamond Rock Mine INTRODUCTION I Who Are We? The Cuyama Valley Conservance openly opposed the mine. In six
More informationAssessment of Landscape, Visual and Natural Character Effects
Assessment of Landscape, Visual and Natural Character Effects Consent Footprint Amendments Mangamaunu Half Moon Bay Okiwi Bay South Report prepared for: New Zealand Transport Agency and KiwiRail Holdings
More informationCity of Surrey PLANNING & DEVELOPMENT REPORT File:
City of Surrey PLANNING & DEVELOPMENT REPORT File: 7916-0362-00 Planning Report Date: July 10, 2017 PROPOSAL: Development Permit Development Variance Permit to allow a truck/trailer staging area and to
More informationTHE CORPORATION OF THE CITY OF WINDSOR Office of the City Solicitor Planning Department
THE CORPORATION OF THE CITY OF WINDSOR Office of the City Solicitor Planning Department REPORT TO THE CITY OF WINDSOR PLANNING ADVISORY COMMITTEE DATE OF REPORT: August 19, 2010 SUBJECT: Official Plan
More informationTRCA Roles and Responsibilities in Planning and Development
TRCA Roles and Responsibilities in Planning and Development Regional Watershed Alliance November 14, 2018 Laurie Nelson, MCIP, RPP Associate Director, Planning and Policy Outline Roles and Legislation
More informationTSHWANE STRENGTHENING PROJECT PHASE 1, GAUTENG PROVINCE: Draft Scoping Report: Apollo - Verwoerdburg July 2009
APPROACH TO UNDERTAKING THE ENVIRONMENTAL SCOPING STUDY CHAPTER 3 An Environmental Impact Assessment (EIA) process refers to that process (as per the EIA Regulations) which involves the identification
More informationIran s Efforts for Progressive of Environmental Impact Assessment In a Transboundry Context
United Nation Economic Commission For Europe Eighth Meeting of the Working Group on EIA Convention (27-29 April 2005) Geneva- Switzerland Country Report on Iran s Efforts for Progressive of Environmental
More informationMaster Environmental Servicing Plan & Secondary Plan
1 East Side Lands Stage 2 Master Environmental Servicing Plan & Secondary Plan Public Consultation Centre #4 March 20, 2018 Welcome! Today s Agenda Please sign in at the registration table. 6:00 pm 6:30
More information