Stakeholders Advisory Working Groups (SAWGs) Smart Growth and TOD Land Use (#11) SAWG Meeting

Similar documents
Planning Board Briefing

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Transportation. Strategies for Action

Sustainably Repositioning Greyfield Sites. Greyfield Sites Anywhere

The University District envisions, in its neighborhood

Access Management: An Overview

Comprehensive Plan Advisory Panel Meeting #3

Rapid Transit Implementation Working Group Transit Oriented Development and Transit Villages January 12, 2017

Robbinsdale LRT Station. CDI Development Guidelines. August Overview

CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES. City of Greensburg Comprehensive Plan. Introduction. Vision Statement. Growth Management Goals.

Civic Center District

THE NEIGHBORHOOD TODAY

MONTGOMERY COUNTY METRO STATION AREA DESIGN CHARRETTE

NJ s Land Use and Transit Policies

Multimodal Station Planning Working Session Rebuilding a Better I-84 in Hartford. August 10, 2017

PLAN ELEMENTS WORKSHOP. April 5, 2016

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

Status Report: MD 355 Project

ROBBINSDALE LRT STATION CDI DEVELOPMENT GUIDELINES

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

DRAFT. Waterfronts and Open Spaces. 10 The Riverfront Open Space System

Subarea 4 Indian Creek. Vision The combination of park networks and transportation amenities make Subarea 4 the greenest hub in the Corridor.

b r a n c h av e n u e tr a n s it co r r i d o r r e vita lization pl a n a m o d el fo r s u b u r ban retro fit

Small Area Plan. South Gateway

Moody Centre Station TOD Area Today

Developer Panel Summary Report

Lower Merion Commercial Districts Issues and Characteristics Handbook November 2013

WELCOME and introduction

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

CHAPTER 7: Transportation, Mobility and Circulation

Public Meeting March 10 th 2011

Albert Lea. Redevelopment Plan. 701 Xenia Avenue South, Suite 300 Minneapolis, MN Tel: (763) Fax: (763) wsbeng.

South Nyack New NY Bridge & Shared-Use Path

Shared Principles and Emerging Plan Directions

Complete Neighbourhood Guidelines Review Tool

Rock Spring Master Plan Community Meeting #8: Preliminary Recommendations

Clairtrell Area Context Plan

L E A R N LEARN. Is there additional information or existing conditions that should be considered as part of the planning process?

City of Long Beach. creating vibrant and exciting places

DRAFT ROOSEVELT ROAD. District Recommendations. Figure 5.23 The Roosevelt Road Corridor

Northwest commuter rail station US 36 BRT. Westminster Station

Lynn Housing Authority and Neighborhood Development. Washington Street Gateway District Plan A p r i l

The transportation system in a community is an

Issues, Challenges & Opportunities

Town Center (part of the Comprehensive Plan)

A Plan for the Heart of the Region: Tukwila, WA

Community Design Guidelines. Port Wallace DRAFT

Urban Analysis. Downtown Zanesville like any city, has been physically modified through time as it

Sub Area 2: Downtown Overland Park

C. Westerly Creek Village & The Montview Corridor

Planning Districts INTRODUCTION

Figure 3-1: Public Realm Plan

Welcome to the Oakridge Centre Open House

Mary Hills Nature Area. Roadway Lighting. The Minneapolis Clinic of Neurology Courage Kenny Rehabilitation Institute

DRAFT. 10% Common Open Space

5-AUTOMOBILE CIRCULATION & PARKING

REDLANDS TRANSIT VILLAGES SPECIFIC PLAN

Status Update (2006 vs. Now) Citizen s Advisory Committee February Plan for Prosperity

A larger version of this map is located on the last page of this PDF.

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Making the case for Sustainable Transport Project Potential

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

Hockessin Community Redevelopment Plan

Port Lavaca Future Land Use

final report CGC41249 Hamlet of Nanuet Transit Oriented Development Plan Town of Clarkstown, New York Cambridge Systematics, Inc.

Silverdale Regional Center

WALTER RAND TRANSPORTATION CENTER

Sherri Ferguson. President/CEO Portland Chamber of Commerce. Tennessee Certified Economic Developer Capstone Project

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

Queensborough Eastern Neighbourhood Node. Community Open House

Chapter 4. Linking Land Use with Transportation. Chapter 4

A Healthy Future Walkability Through Community Design. Fit Families North Carolina October 18, 2004

ALTERNATIVE STATION AREA -

This Review Is Divided Into Two Phases:

Public Consultation Summary: Lakeview Place Making Workshop January 30, 2008.

Key Themes and Responses May 2016

THE 355/270 CORRIDOR:

Elliot Park 4. Neighborhood Master Plan. The Master Plan

Rockland County. Tappan Zee Corridor. Transit-Oriented Development Study

Affordability & Equity

Walnut Creek BART Station

Executive Summary. NY 7 / NY 2 Corridor

KCATA Transit Oriented Development Initiatives

International Blvd. TOD Plan Public Workshop #1

NORTH CLAYMONT AREA MASTER PLAN COMMUNITY WORKSHOP #1 FEBRUARY 3, 2016

Taming Tysons Corner Transforming the Quintessential Edge City

Asheville Design Center March 2010

October 25 Downtown Partnership and Action Plan Workshop Record of Group Table Results

Courthouse Square Planning & Urban Design Study. Courthouse Square Working Group #13 October 15, 2014

Port Credit Local Advisory Panel October 20 th Meeting

Comprehensive Plan & Station Area Zoning

INDEPENDENCE BOULEVARD AREA PLAN

Ivywild On The Creek PRELIMINARY CREEK DISTRICT MASTER PLAN

SECTION TWO: Urban Design Concepts

Tyvola & Archdale Transit Station Area Plan. June 5, 2008

ULI St. Louis Technical Assistance Panel

Section4 Design Vision & Implementation Plan

Transcription:

Presentation - Part II Tappan Zee Bridge/I-287 Corridor Project July 21, 2010

Slide 1. David Kooris (Regional Plan Association) welcomed members of the Land Use Stakeholders Advisory Working Groups (SAWGs) and began his portion of the night s presentations on TOD in the Tappan Zee Corridor. Slide 2. TOD can improve economic development and expanded tax base, mitigate congestion, reduce greenhouse gas emissions, improve air quality, preserve Open Space, and create efficient transportation investments. Slide 3. From a regional perspective, transit offers the opportunity to address greenhouse gas emissions, focus sustainable economic growth, and make long-term transportation investments that serve all citizens and workers. Through this technical assistance program, we re primarily addressing the Community and Local Government perspectives, but, because the TZB/I-287 corridor is a regional investment, we are also keeping this perspective in mind as we work with municipalities and citizens to plan for the future. - 2 -

Slide 4. Two different kinds of TOD Workshops include: Transit-Oriented Development Technical Assistance Program, and the Rockland County TOD Workshop. Slide 5. The first three case studies are from the ongoing Tappan Zee TOD training sessions. Slide 6. White Plains - 3 -

Slide 7. Frame station with plaza or other open space as gateway to downtown. Depress some local buses, shuttles, taxis, and kiss-and-ride on block bound by New, Lexington, Hamilton, and Bank. Deck that block with a building or at least wrap it with buildings along Hamilton. Wrap existing office buildings with new retail or other active uses at ground floor to bring them down to the street. Bring BRT up to existing bus station. Slide 8. Bring BRT closer to rail station. Same plaza idea as in previous. Mixeduse building on block bounded by New, Lexington, Hamilton, and Bank and on block to south of station. Slide 9. Tarrytown - 4 -

Slide 10. Challenges: topography presents significant challenges linking surrounding neighborhoods to station area; need to link rail station with downtown further up the hill, cul-de-sac office and residential developments have few sidewalks and make walking difficult; and discontinuity in greenway network. Slide 11. Opportunities: open spaces and aqueduct trail can be stitched together and completed; Riverwalk can be completed; significant redevelopment potential along 119 in Greenburgh; new TOD at station can be expanded and stitched together with downtown through infill strategy. Slide 12. Targeted infill can act as a bridge up the hill between the station area and new TOD and the traditional downtown. Public housing site presents an opportunity for mixed-income redevelopment. Parcel just north of new Village Hall could be developed or an amphitheatre or Spanish steps style park could bring residents down to the waterfront. - 5 -

Slide 13. Structured parking would free up land area for redevelopment. Coupled with currently vacant sites, these parcels could house residential and commercial infill oriented around the BRT station. This office park with existing buildings could transition into a mixed-use activity hub located between White Plains and Tarrytown. Slide 14. A greenway network could stitch together the existing surrounding open spaces into a public realm that would add value to adjacent development and provide recreational opportunities for residents and workers. Slide 15. Orangetown/Nyack/South Nyack - 6 -

Slide 16. Challenges: topography makes connection between downtown Nyack and potential BRT station area with surrounding neighborhoods difficult; some areas on the edges of the main street need investment; the gateway to the village along Route 59 is auto-oriented, pedestrian unfriendly and an unwelcoming entrance; the South Nyack interchange creates a significant barrier as does the intersection of Mountainview and 59. Slide 17. Opportunities: many people live within walking distance of the station area and downtown if their walk could be made easier; downtown is a great mixed-use neighborhood heart; underpass redesign and redevelopment in proposed station area would make a great gateway; chance around South Nyack interchange to link and expand trail networks. Slide 18. Intersection improvements at 59 and Mountainview (with potential reconfiguration of exit ramp to eliminate 5-way intersection), including sidewalk improvements, cross walks, and landscaping would serve as gateway. Redevelopment along 59 between Mountainview and Highland Ave would extend village fabric to east. BRT station could be used to bridge the poor pedestrian conditions under the highway by activating that frontage. - 7 -

Slide 19 reate a bike and pedestrian route parallel to the thruway linking 9W with 59 and the BRT. Deck over the thruway at the Interchange 10 and create a park that stitches together the community. Create a connection from bridge to river road for cyclists and pedestrians. Slide 20. The new parkland would need to only cover a portion of the thruway that is most crucial to create a visual and physical linkage. Limited commercial development in newly created parcels could provide a node of amenities for the village without becoming a draw from outside. Slide 21. The final four case studies were produced at a Regional Plan Association-led workshop with support from Rockland County Planning, Rockland County Economic Development Corporation, and Orange & Rockland Utility in 2007. - 8 -

Slide 22. Rockland County Tappan Zee Corridor Transit-Oriented Development Study, Workshop Report, February 2007, Palisades Mall Site Slide 23. New road linkages and station location must be designed to minimize conflict and overlap between station and mall traffic. Opportunity to transition the mall from single-use retail to mixed-use by decking parking and incorporating residential uses. Passive stormwater management (green roofs, blue streets, and wetland reconstruction) should be employed to mitigate flooding. Slide 24. Rockland County Tappan Zee Corridor Transit-Oriented Development Study, Workshop Report, February 2007, Nanuet Site - 9 -

Slide 25. The Nanuet Mall presents one of the greatest opportunities for redevelopment and infill along the corridor that will be within walking distance of future transit and is within walking distance of a current rail line. This stretch of Route 59 could be remade into a town center for Clarkstown with bike and pedestrian improvements and buildings that front on the street and are pedestrian oriented incrementally infilled within existing retail parcels. The station was proposed to be move further east where it is more central to the redevelopment possibilities along 59 and at the Mall. Slide 26. Rockland County Tappan Zee Corridor Transit-Oriented Development Study, Workshop Report, February 2007, Airmont-Montebello Site Slide 27. Limited redevelopment potential here but targeted residential and office infill could transition this into a more mixed-use and walkable node. Create a slow speed ring road to bypass the intersection for users. Implement access management to interconnect adjacent parking lots, minimize curb cuts, and enable shared parking to ease traffic flow and minimize points of conflict between cars and between cars and pedestrians. - 10 -

Slide 28. Rockland County Tappan Zee Corridor Transit-Oriented Development Study, Workshop Report, February 2007, Suffern Site Slide 29. Build off of Suffern s walkable and transit-oriented village fabric. Target infill to the existing Port Jervis line station area. Bring more residential into the downtown. Explore opportunities to create a transfer station here between the Port Jervis line and the new TZB cross-county rail line. Ensure that redevelopment at the quarry site is linked to the downtown and designed as an extension of the Village rather than a disconnected appendage. Preserve a large piece of the Tilcon site for open space and recreational uses. Slide 30 Moving Forward - 11 -