Delaware River Waterfront Corporation

Similar documents
EXECUTIVE SUMMARY EXECUTIVE SUMMARY

{Best Practices. Summary of Tools, Strategies and Best Practices from 11 Michigan Case Study Communities

Welcome to the Public Meeting!

Philadelphia Trail Master Plan

India Basin/Hunters Point Shoreline Community Workshop May 21, 2008

ARISE: The Rock Renaissance Area Redevelopment & Implementation Strategy

Potential Green Infrastructure Strategies May 6, 2015 Workshop

CHAPTER 3 PUBLIC OUTREACH

CHAPTER 8 ISSUES, CONCERNS, CONSTRAINTS AND OPPORTUNITIES

Lake Arlington Master Plan. Presented by Randle Harwood, Planning and Development Director October 27, 2015

Whitemarsh Comprehensive Plan Update: Housing & Land Use. Public Workshop #3: September 20, 2018

FUNDING CORRIDOR REVITALIZATION

Courthouse Square Planning & Urban Design Study Citizens Advisory Commission on Housing

St. Helens Waterfront Redevelopment Project Oregon Brownfield Forum May 2016

10.0 Open Space and Public Realm

Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Planning and Capital Projects

INTEGRATING FAST FERRY SERVICE IN WOODBRIDGE

Planning for Waterfront Communities

At first Work Session on October 22, At second Work Session on November 19, At third Work Session on December 3, 2015

North Fair Oaks Community Plan Summary and Information

TOWN COUNCIL / PLANNING COMMISSION

RIDGES TO RIVERS OPEN SPACE NETWORI< OF THE MID-COLUMBIA DRAFT ACTION PLAN

Chapter 1.0 Introduction

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

Preface. Erie. Scranton. Allentown. Pittsburgh. Harrisburg. Philadelphia

KBE/KARIN BACON ENTERPRISES INC.

Office of Greenways & Trails Providing Statewide Leadership and Coordination. Southeast Greenways and Trails Summit October 1-3, 2017

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Route 1 Corridor Study

Ivywild On The Creek PRELIMINARY CREEK DISTRICT MASTER PLAN

THE TOWN OF WASAGA BEACH

About Momentum Midland

East Midtown Greenway East 53 rd 61 st Street. Community Board 8 Project Introduction November 16, 2017

Independence Boulevard Area Plan Planning Committee Public Comment May 18, 2010

ALMONO. Hazelwood, City of Pittsburgh. A riverfront investment opportunity combining residential, office and light industrial uses A L M O N O S I T E

WAC #7 3/14/14. Coachella General Plan Update

Making Transit Oriented Development Work For Boonton, NJ

ULI St. Louis Technical Assistance Panel

ASPEN HILL Minor Master Plan Amendment

ROUND ONE PROJECTS. Capital Grants 18 DELAWARE VALLEY REGIONAL PLANNING COMMISSION

SUN-B11-From Gray to Green; Revitalizing Milwaukee s Industrial Heart

The transportation system in a community is an

A Better City Request for Qualifications

Wisconsin downtown action council Downtown project case study profile

CENTRAL ESTUARY PLAN AVISION FOR OAKLAND S WATERFRONT

RE-Imagining the Downtown Colorado Springs Master Plan

Implementation Guide Comprehensive Plan City of Allen

W&OD PARK MASTER PLAN. The City s Greenest Street. DRAFT W&OD Trail Master Plan v4.docx Page 1

Oroville Area Urban Greening Plan. Joint Meeting of the Oroville Planning, Park, and Arts Commissions October 12, 2015

G. RECREATION AND OPEN SPACE ELEMENT. The following summarizes the Recreation and Open Space Element:

DISCUSSION TOPIC: ST JOHNS RIVER & ITS TRIBUTARIES (BPII) 2030 COMPREHENSIVE PLAN POLICES AND REGULATORY FRAMEWORK

Streets for People, Place-Making and Prosperity. #TOcompletestreets

Regional Open Space Conservation Plan. Regional Staff Committee January 18, 2018

Arkansas River Corridor

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES

NORTH CLAYMONT AREA MASTER PLAN COMMUNITY WORKSHOP #1 FEBRUARY 3, 2016

JANUARY 19, 2011 CENTRAL AVENUE-METRO BLUE LINE TRANSIT-ORIENTED DEVELOPMENT IMPLEMENTATION PROJECT COMMUNITY FORUM

City of Tacoma Planning and Development Services

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

Somers Point Master Plan

NorthPoint, Inc. Community-Based Development Concept

UO North Campus Conditional Use Permit Project

Draft Memorandum #1: Goals and Vision for Revitalization

City of Tacoma Planning and Development Services

Draft Cary Community Plan Review Part 3: Shop, Engage, Serve, Special Area Plans, Other Updates. October 27, 2015 Police Department Training Room

LEED-ND 101: Practical Strategies for Achieving Sustainability Goals. Travis Parker Lakewood Planning Director

RESOURCE PACKET River Crossing

New York Green: Mission

Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018

BENJAMIN BANNEKER PARK FRAMEWORK PLAN (PLAN ADOPTION)

Schuylkill River Greenway

DALY CITY VISIONING PROCESS COMMUNITY WORKSHOP 3 MAY 8, 2008

City of Meriden Harbor Brook Flood Control Project Overview

Silverwood Masterplan Kickoff Meeting. Jim Neidhart Dane County Parks Planning

The Five Components of the McLoughlin Area Plan

Manhattanville Development Proposal: Project Description

Best Practices Appendix: Waterfront Communities

Comprehensive Plan Advisory Panel Meeting #3

PORT OF SAN FRANCISCO

2030 Comprehensive Plan VISION STATEMENT

WELCOME TO THE CHOUTEAU GREENWAY DESIGN, DEVELOPMENT AND CONSTRUCTION WORKING GROUP!

Memorandum CITY OF DALLAS

Pine Street Waterfront Overlay CITY OF ROSEBURG PINE STREET WATERFRONT OVERLAY FEBRUARY City of Roseburg

Riverwalk Dreams compiled by Thomas P. Healy November 16, 2017

Chapter 4. Linking Land Use with Transportation. Chapter 4

ALLEN CREEK GREENWAY. Citizens Advisory Committee Meeting #5 July 19, Allen Creek Greenway Master Plan. July 2017

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

PLAN ELEMENTS WORKSHOP. April 5, 2016

Natural Capital City Model - Birmingham

A Great Neighborhood in Lawrence, Massachusetts

Sherri Ferguson. President/CEO Portland Chamber of Commerce. Tennessee Certified Economic Developer Capstone Project

Yadkin River Greenway Feasibility Study Fact Sheet Village of Clemmons, Town of Lewisville, Town of Bermuda Run

Small Area Plan. South Gateway

DRAFT City of Titusville 2040 Comprehensive Plan Future Land Use, Housing, and Transportation Elements April 16, 2018

Public input has been an important part of the plan development process.

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

PARK AND RECREATION MASTER PLAN UPDATE

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

A Canadian Initiative to advance Conservation, Connections, Collaboration and Leadership for Parks and Protected Areas

AN OPEN AND TRANSPARENT PLANNING PROCESS

Transcription:

Delaware River Waterfront Corporation

Delaware River Waterfront Corporation Created in January 2009 to replace Penn s Landing Corporation o Open, accountable, effective leadership o New Board of Directors Smaller, corporate model, relevant professional expertise o 501(c)3, formerly 501(c)4 o Adopted Sunshine Act

Context Oregon to Allegheny Avenues, I-95 to Delaware River

Dual Mission of DRWC: Planning / Development & Programming Planning / Development o o o Catalyze high quality investment in public parks, trails, wetlands, maritime, residential, retail, hotel, and other improvements Use DRWC s financing, land acquisition, and development capabilities Leverage public and foundation funds to attract private development and corporate sponsorship; generate high ROI for all investors Programming o o o Build on existing, highly successful year-round public events program at Penn s Landing and Festival Pier Expand cultural, entertainment, and recreation programming to reach neighborhoods in DRWC s expanded territory Complement DRWC s development mission by generating more demand for and excitement about the riverfront

Current Projects Master Plan for the Central Delaware Riverfront Race Street Pier Pier 53 Interim Bicycle Trail Penn Treaty Park Improvements

Vision: A World-Class Commercial, Recreational, and Cultural Destination Parks & Open Space o 100-ft wide greenway along water s edge o 7 mile recreational trail o Recreational amenities (boating, fishing) o Habitat preservation Transportation & Accessibility o Walkable scale o Public transit o Minimize impact of automobiles (less visible garages, traffic mgmt.) o Extend streets to waterfront Land Development o Mixed uses commercial, residential, industrial, recreation o High quality urban design o New, cohesive zoning overlay

VISION PLAN MASTER PLAN / IMPLEMENTATION How to guarantee public access? What makes it easier for residents to walk and bike to the river? Which key streets should be extended to the river? How to create a greenway? Where exactly should trails go? Who builds the trails? Who maintains the trails?

GOALS OF MASTER PLAN Evaluate waterfront on parcel by parcel basis and recommend preferred land uses Develop plan for transportation networks including pedestrian/bicycle multi-use trail, public streets, and public transit Recommend investments in public infrastructure and other capital facilities Recommend urban design standards for new development Recommend investment strategies for new development

PROJECT TIMELINE October 2009 Evaluate 23 proposals, select 5 finalist teams Oct. 29 and Oct. 30 Nov. 10 Nov. 11 to Nov. 22 Nov. 23 Interviews with 5 finalist teams Public forum Planning Committee deliberates and selects final firm Planning Committee makes recommendation to DRWC Board of Directors December 2009 January 2009 Contract documents and scope of work finalized Consultant begins work Planning expected to take 12 to 18 months, completion approximately Spring 2011

Cooper Robertson and Partners PRIMARY TEAM PRINCIPALS Cooper Robertson Alexander Cooper Partner-in-Charge Randall Morton Urban Design Partner Jonie Fu Design Partner William Kenworthey Asst. Project Manager Olin Lucinda Sanders Hallie Boyce KieranTimberlake Stephen Kieran James Timberlake SUB-CONSULTANTS Hurley Franks (Public Engagement) CHPlanning (Public Engagement) Preservation Design Partnership (Civil and Env. Eng.) HR & A Advisors (Economic Analyst) Langan Engineering (Civil Engineering) Moffat & Nichol (Marine Engineering) Batta Environmental (Env. Engineering) Montgomery McCracken (Legal) Tony Griffin (Riparian Rights) Karin Bacon (Events) Parsons Brinkerhoff (Transportation) Davis Langdon (Cost Estimating)

Race Street Pier (Pier 11) Build a new showcase public park New York-based Field Operations is designer High profile project - first DRWC open space project, central location, links to tourist attractions and future trail Components: Pier 11 Park Race Street connector Private development at Pier 9 and former PWD building Design completed spring 2010 Construction completed late spring 2011 Estimated Cost Funding Obtained Funding Gap $ 4,250,000 Pier 11 design & construction $ 3,350,000 Pier 11 design & construction $700,000

RACE ST PIER PUBLIC PRESENTATION November 18, 2009 prepared by james corner field operations

SURVEY (AERIAL PHOTO)

SITE PLAN: THE LAWN

SITE PLAN: THE DECK

SITE PLAN: THE SLICE

PIER 53 SOUTH Location: Along the Delaware River at Washington Avenue Size: +/- 8 acres Ownership: DRWC Status: Vacant Pier Suggested Use: Public Access Development Interim fishing pier Recreational trail Enhance value of adjacent Private Investment Opportunity

Pier 11 53 South o Goal: redevelop Pier 53 for ecological/ recreational use (e.g. fishing pier) o Location: along the Delaware River at Washington Avenue o Size: +/- 8 acres o DRWC grant from William Penn Foundation for design/build ($500,000) o PWD grant from DCNR for ecological design ($70,000) o PHS grant from CZM for public outreach ($40,000)

Penn Treaty Park Improvements Leverage existing park, link to trail and greenway Improve landscaping and open space Build east-west connections to draw adjacent communities to the river Residents and stakeholders recently completed master planning process, facilitated by PHS and PennPraxis implementation timing depends on funding

Interim Bicycle Trail New bicycle trail from Mifflin Street to Lombard Street Spearheaded by Center City District Construction complete; awaiting easements for trail opening

Delaware River Waterfront Corporation