An Urban Approach To Roundabouts, Mini-Roundabouts and Circles

Similar documents
Rt 29 Solutions Hydraulic Planning Advisory Panel. September 28, 2017

LOCATION AND DESIGN DIVISION

What s New in Roundabout Design?

Allen Street Civic District Redevelopment Area Plan Redevelopment Plan & Proposal State College Planning Commission State College Redevelopment

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

New Stanton Project Update July 3, 2012

I.T.S. PLAN ALONG I-95 INSTALL FIBER OPTIC LINE PROJECT SHOWING Tuesday, June 18, 2013, 1:30pm Ashland Residency Conference Room

The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the

FHWA INVEST. And the Harbor Bridge Project

2040 Long Range Transportation Plan

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

Public input has been an important part of the plan development process.

Lehigh Acres Land Development Regulations Community Planning Project

Route 1 Corridor Study

Technical Bullet Series on Clay Brick Pavers

Johnson Street Bridge Public Realm Update

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

AGENDA ACTION ITEMS INFORMATION ITEMS

The Auburn Plan Designing the Future of Auburn February 28, 2005

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

Const. ROADS - Description

Project Consulting Team:

d Escoto, M. City of Chicago Streetscape and Urban Design Program, Chicago Department of Transportation. (2003). Streetscape Guidelines.

Mississippi Drive Corridor Revitalization. A DestinationTransportation Project...

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.1 STAFF REPORT February 21, 2012 BRIGHTON LANDING SPECIFIC PLAN & DEVELOPMENT PROJECT

BUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5

Ref: March 21, Ms. Jody Kablack Director of Planning and Community Development Town of Sudbury 278 Old Sudbury Road Sudbury, MA 01776

PROJECT SHOWING MINUTES

Corridor Identity. Section 9. Introduction. Corridor Guiding Principles

New Braunfels Growth & Development. Garry Ford, Jr., P.E., PTOE City Engineer City of New Braunfels

Green Book 7 th Edition Summary of Changes. Jim Rosenow NCITE Geometric Design Committee August 30, 2018

Portage Parkway Environmental Assessment Public Information Centre No. 1

Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ)

North Hutchinson Island 7.55 Acres Vacant Land Approved for 30 Townhome Units

Welcome & Introductions

The Arlington County Park and Recreation Commission and Department of Parks, Recreation and Cultural Resources. PEG APPLICATION FORM Fiscal Year 2012

Meridian Hills Improvements

Tonight s Agenda. Summary Presentation Open House. Group Discussion Next Steps: online community wide survey

117 E. Louisa St. #1 Seattle, WA January 29, 2016

BRADENTON RIVERWALK EXPANSION MASTER PLAN

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

Cleveland Innerbelt Bridge / Central Viaduct Cleveland City Planning Commission October 2, 2009

ROBINSON STREET WORKSHOP REPORT STREETSCAPE PRIORITIZATION

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

SCTPO Project Summary September 2014

VEHICULAR AND PEDESTRIAN CIRCULATION

Executive Summary. NY 7 / NY 2 Corridor

Future Proposed Development

4/8/2015 Item #10D Page 1

RESOLUTION NO R

A/E REVIEW CHECKLIST SITE & LANDSCAPE

Metro. Activity Center Design Guidelines. Recommendations For Developing Focused, Mixed-Use Commercial/Residential Centers

Fairfax County Parkway (Route 286) Widening Project

The University District envisions, in its neighborhood

Chapter 2, Section C: Urban Design and Visual Resources A. INTRODUCTION

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N

Concept Evaluations 2 May 2009

December 1, 2014 (revised) Preliminary Report -- Thomas Jefferson Site Evaluation

Atlanta BeltLine Subarea 3 Master Plan Update

FDOT D4 Complete Streets

TO: Denver Planning Board FROM: Analiese Hock, Senior City Planner DATE: March 13, 2018 RE:

3 Focusing the Vision Following the second workshop, the Project

Creating Complete Roadway Corridors:

SDOT DPD. SDOT Director s Rule DPD Director s Rule DCLU DR SED DR of 7 CITY OF SEATTLE

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010

Community Meeting November 18, 2015

I-25 / Rio Bravo Interchange. I-25 / Rio Bravo Interchange. Presenters 11/30/2016 THIRD PUBLIC MEETING DECEMBER 1, 2016 NMDOT CN A300280

Roanoke Rapids Streetscape Master Plan. City Council Presentation

PROJECTS UNDER CONSTRUCTION

4 January 11, 2012 Public Hearing APPLICANT:

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

California Environmental Quality Act (CEQA) Environmental Review Process

Response: The public school use, including the SWM facility, is within the R-1 District.

BENJAMIN BANNEKER PARK FRAMEWORK PLAN (PLAN ADOPTION)

Seattle Transit Master Plan

Old Town Neighborhoods Plan. Choices Event Wednesday, December 9, 2015

Union Station Master Plan Task 2 Briefing

CITY OF WESTERVILLE, PLANNING AND DEVELOPMENT. BASSEM BITAR / (614) /

West Kendall Corridor June 11, 2014

3. Additional driveways may be permitted where determined by the Planning Commission to adequately accommodate traffic or ensure public safety.

Proposed Kenmount Hill CDS Amendment. Public Hearing October 25 th, 2018

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

Welcome to the. Open House

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

Innovative Transportation Planning, Design & Technology in Fairfax County, VA

Creative Engineering Group Inc, (Creative) Construction Engineering and Inspection (CEI) Professionals

HARBOR BRIDGE. Randall C. Grones, PE - SPD. US 181 Harbor Bridge October

City of Burlington Downtown Street Design & Construction Standards

Dogpatch/22nd Street Greening

The following concept plans and illustrations are the result of this 10 month study of the alley connections from CSU to the River District.

Rt 29 Solutions Hydraulic Planning Advisory Panel. September 14, 2017

Appendix L 2006 LADOT Pedestrian and Traffic Counts

Achieving a Vision. Master Plan 2009 Belknap Campus August 10 11, UofL Belknap Campus Master Plan Update

Status Update (2006 vs. Now) Citizen s Advisory Committee February Plan for Prosperity

POCKET COMMUNITY PLAN

Portland was a beautiful city, but in the 1960s and 1970s, its population grew very fast.

Request for Proposals: Architectural/Design Guidelines

WELCOME WHY A TEMPORARY PATHWAY? WE WANT TO HEAR FROM YOU

Transcription:

An Urban Approach To Roundabouts, Mini-Roundabouts and Circles presented by Thomas E. Flynn, P.E., PTOE City Transportation Engineer City of Richmond, VA Presented for VDOT Roundabout Workshop September 17, 2013

Presentation Outline Residential Traffic Circles - Used in low volume, typically residential areas - Installed or in development-34 Mini-Roundabouts - Used in higher volume, typically collector streets - One under construction Modern Roundabouts - Used at busier (often signalized) commercial/residential intersections - Installed or under development -9

Residential Traffic Circle Purpose: slow traffic in residential, low volume area Provide horizontal deflection 5 to 6 feet

Richmond Model- City of Seattle, WA Sought FHWA guidance Over 1,000 installed Use Object Marker Obstruction Sign (OM1-3) Allow left turns both around and in front of circle

Design Criteria Must accommodate quint/emergency vehicle on left turn Accommodate thru tractor trailer movements (sometimes) Landscaping key: 1. tree s 2. shrub s 3. flowers Obstruction sign (left and right), one-way sign on larger circles, YIELD signs Neighborhood encouraged to maintain

Design Criteria Larger circles use one-way signs Intersection of Bruton, New Kent, and Riverside

Design Criteria Larger circles use oneway signs Intersection of McDonough and 32 nd

Performance 64% crash reduction (15 circles)

Mini- roundabout Smaller roundabout (up to 80 diameter) Allows trucks to turn left over circle Can fit within existing intersection boundaries, lowering costs

Richmond Example Bliley/Blakemore intersection Cost -approx. $50,000 -uses minimal -asphalt paver Construction - Fall, 2013

Current Richmond Roundabouts Lombardy and Admiral

Current Richmond Roundabouts Highland Park

Current Richmond Roundabouts Jefferson, 25 th and M

Current Richmond Roundabouts Monument and Allen

Current Richmond Roundabouts Duval and 8 th

Current Richmond Roundabouts Duval and 8th

Under Design Richmond Roundabouts Fairfield and 23 rd Award contract- Fall 2013 Before Pics

Under Design Richmond Roundabouts Nine Mile, Fairfield and M Award contract Fall 2013

Under Design Richmond Roundabouts Nine Mile, Fairfield and M

Under Design Richmond Roundabouts Six Points (Meadowbridge, Dill, 2 nd ) Award contract December 2013

Under Design Richmond Roundabouts Six Points (Meadowbridge, Dill, 2 nd )

Monument and Allen Upgrade Begin design - August 2013

Idlewood and Downtown Express Ramp

Idlewood and Downtown Express Ramp Begin Design - Fall 2013

Richmond Roundabouts Rejected A P. Hill Statue- Laburnum and Hermitage Roanoke and Forest Hill Hull and Belt Hull and 32 nd

Richmond Roundabouts Rejected Hull and Belt

Roundabout Crash Patterns Crashes Per Year Location Before After Comments Lombardy St & Admiral Rd. 0.8 2.6 All fender benders 1 st Ave., 3 rd Ave., Trigg St., Matthews St. 0.2 0 25 th, Jefferson & M Sts. 1.7 2.0 8 th & Duval St. 0.1 0 Monument Ave & Allen St 16.5 9.3 Partial roundabout, 75% crashes wet conditions

Design Considerations- Signage MUTCD (2009) Section 2A.04, Excessive use of signs Regulatory and warning signs should be used conservatively because these signs, if used to excess tend to lose their effectiveness. Driver s attention should be focused on roundabout geometrics and other traffic

Design Considerations- Signage Highland Park

Design Considerations Speed Control Slow in-slow out

Design Considerations - Landscaping Robust Landscaping to Reinforce Geometrics Factors: 1. Trees and shrubs will enhance traffic control 2. Visually enhance crosswalks 3. Low maintenance

Design Considerations - Landscaping

Design Considerations - Lighting Use to enhance landscaping, emphasize pedestrian crossings and travel ways

Design Considerations - Lighting Use to enhance landscaping, emphasize pedestrian crossings Consider concentrating on pedestrian crossings Richmond roundabouts typically rely on traditional intersection cobra heads (would wash out lighting focused on pedestrian crossings)

Design Considerations - Lighting Consider solar road studs activated guiding lights system to guide driver Approaching car activates running lights as driver passes through roundabout, or simply have all lights on when dark.

Questions?