REPORT TO BOARD ON PREFERENCES tbp/architecture CCSF Facilities Master Plan, October 23, 2016

Similar documents
AvalonBay Communities + BRIDGE Housing. Mission Housing Habitat for Humanity Pacific Union Development Corporation

Preci nct P l ans Figure 56 Campus Aerial Photo, 2008 CAL STATE EAST BAY, HAYWARD CAMPUS MASTER PLAN

Subcampus Recommendations

CAMPUS MASTER PLAN DRAFT PLAN UPDATE JANUARY

District Facilities Master Plan

This is the East Carolina University Comprehensive Facilities Master Plan Final Draft Plan Review. This workbook reviews the campus draft master plan

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

Ohlone College Measure G Project Scope Revisions

Dyersville Downtown Plan. Open House October 24, 2017

campus master plan VIRGINIA STATE UNIVERSITY

U n i v e r s i t y o f S o u t h C a r o l i n a A i k e n. Land Plan Study

38 Queen s University Campus Master Plan Part 1

Master Plan Visioning #1 Section 3 Informal amphitheater at Community Development Services Building. Section 3 MP Visioning #1

EXISTING CONDITIONS 41. Existing Conditions

Moreno Valley College: Conceptual Master Planning - Site Analysis Lasselle Street, Moreno Valley, CA 92551

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010

Public input has been an important part of the plan development process.

University of Minnesota. MINNEAPOLIS CAMPUS DEVELOPMENT FRAMEWORK February 11, 2016

CAL POLY MASTER PLAN UPDATE, March 2015

University of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT

University of Denver Land Use Plan Update I. Executive Summary

UCSF Parnassus Heights Re-Envisioning Process

EXISTING VEHICULAR & PEDESTRIAN CIRCULATION

City of Ennis. Downtown Master Plan Catalyst Projects

Phase 1 : Understanding the Campus Context. Phase 2 : APPROACHES - Alternates & Preferred Plan

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

Boise State University October 7-8 Workshop # 2 MASTER PLAN UPDATE. Ayers Saint Gross

UNCW CAMPUS MASTER PLAN

Boise State University October 8 - Workshop # 2. MASTER PLAN UPDATE Executive Committee Ayers Saint Gross

UMBC Facilities Management. UMBC Facilities Master Plan Update

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

1999 Approval to replace World War I monument and relocate plaques Approval to rehabilitate the Chase Mill building and surrounding site

C AMPUS MASTER PLAN THE C AMPUS PLAN

Gas Works Site Land-Use Study

FROST CAMPUS MASTER PLAN SIR SANDFORD FLEMING COLLEGE

ATTACHMENT A. SILVERDALE DESIGN STANDARDS Amendments to the Waaga Way Town Center Chapter


4.8 LAND USE AND PLANNING

Westwind Developments Ltd. PIONEER LANDS AREA STRUCTURE PLAN - PROPOSED AMENDMENT

Downtown North Las Vegas Demonstration Site Project. Project Update

C a m p u s I d e n t i t y

Redevelopment Concept. Site Potential

Community Response Buchanan Elementary. December 13, 2016

WESTERN ILLINOIS UNIVERSITY

INTRODUCTION. Strive to achieve excellence in all areas of operational sustainability.

TEMPLE MEDICAL & EDUCATION DISTRICT

Town Center (part of the Comprehensive Plan)

The University District envisions, in its neighborhood

Multimodal Station Planning Working Session Rebuilding a Better I-84 in Hartford. August 10, 2017

Complete Neighbourhood Guidelines Review Tool

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

THE GAS PLANT DISTRICT MASTER PLAN SCENARIO 2. COMMUNITY MEETING August 6, 2018

LANGAN LANDSCAPE ARCHITECTURE + PLANNING FOR COLLEGES & UNIVERSITIES

12 February CAMPUS MASTER PLAN UPDATE Focus Group - Wayfinding & Signage

Planning Board Briefing

TOWN COUNCIL / PLANNING COMMISSION

A Vibrant Downtown. Chapter 5 Cary Public Art Opportunities 31

WEST LOOP DESIGN GUIDELINES CHECKLIST

REGIONAL ACTIVITY CENTER

Bus Rapid Transit Backgrounder. December 2016

SCCCD District Wide Facilities Master Plan FRESNO CITY COLLEGE TOWN HALL MEETING MAY2012

4.1.A NORTHWEST QUADRANT MASTER PLAN

Union Station Master Plan Task 2 Briefing

Carlsbad Village Redevelopment Concept Summary of Features

WESTERN ILLINOIS UNIVERSITY

E N V I S I O N

BELLEVUE COLLEGE Campus Master Plan February 29, 2016 (Space Needs Updated on 04/13/2016) Bellevue College Campus Master Plan April 13, :08 PM

Overview and Update of the Rutgers-New Brunswick Physical Master Plan. January 2015

The transportation system in a community is an

CITY OF UNION CITY MINUTES GENERAL PLAN ADVISORY COMMITTEE

2010 Update to the Los Angeles Valley College Facilities Master Plan Board of Trustees February 23, 2011

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

Courthouse Square Planning & Urban Design Study. Courthouse Square Working Group #13 October 15, 2014

Civic Center District

WEST OAKLAND SPECIFIC PLAN Final Plan. 2. Vision & Goals. 2.1 Community-Based Goals and Objectives

MASTER PLAN DIAGRAMS DISTRICT CAMPUS OVERVIEW

1 Welcome! UBC Okanagan Master Plan Update - Open House

11.0 TRANSPORTATION ELEMENT

U T D N o r t h C a m p u s T O D and D o w n t o w n D e n t o n T O D

iii. Visioning framework

Community Sensitive Design: (Context Sensitive Design)

CIVIC CENTER PUBLIC REALM PLAN OVERVIEW

theme 4 : Penn connects...

NEIGHBORHOOD 7: FEE LANE AREA. Aerial View of Briscoe and McNutt Dormitories

Broadway District Specific Plan. Community Workshop #2 February 23,2016

WELCOME and introduction

NORTH HARBOR INITIATIVE

TH E U N IVE RSIT Y O F FLO R I DA LANDSCAPE MASTER PLAN REPORT

Brown University: Institutional Master Plan Amendment #2. CPC Meeting: December 1, 2009

FUTURE LAND USE ELEMENT

SOLANO COMMUNITY COLLEGE DISTRICT. June 19, 2013 SOLANO COMMUNITY COLLEGE DISTRICT 2012 FACILITIES MASTER PLAN

There are five comprehensive goals that inform the Urban Design element at FIU. They are:

3. Flexibility of changing use of technology needs should be an integral part of the design of learning spaces. Walls that are easily reconfigured.

THE LANDMARK PROJECT: ST. GEORGE CAMPUS BEFORE AND AFTER

Corridors. Re-vitalize our Corridors and Gateways

T e c h n i c a l M e m o r a n d u m. October Date. Georgia State University Master Plan Update. Project

Urban Analysis. Downtown Zanesville like any city, has been physically modified through time as it

4- PA - LD - LIVELY DOWNTOWN. LD - Background

Achieving a Vision. Master Plan 2009 Belknap Campus August 10 11, UofL Belknap Campus Master Plan Update

LOS ANGELES MISSION COLLEGE MASTER PLAN Master Plan DESIGN & DEVELOPMENT PRINCIPLES

Transcription:

PURPOSE The purpose of this report is to update the Board on the Facilities Master Plan initiative. PROCESS The Board conducted a Study Session about Phase 1 Needs on August 18, 2016. Since that time, the Working Group has worked with the consultants to identify opportunities at each site, and to the prepare draft diagrams of development options for the Ocean Campus. On October 17, 2016, workshops were conducted with College and public stakeholders to discuss the opportunities and options. The comments were used to draft a preliminary diagram of the features that were preferred by the participants. More workshops will be held in November to discuss the draft Preferred Option. A presentation to the Board is scheduled in November to discuss this work with the Board and receive comments. By the end of the Fall 2016 semester, the product of Phase 2 Options will be the Preferred Option for the Facilities Master Plan. Work will continue in Spring 2017 on Phase 3 Recommendations. DISTRICT-WIDE PLANNING PRINCIPLES Based on the findings of Needs, the Facilities Master Planning Principles for all locations include: Educational Drivers: Facilities planning should be driven by the College s educational vision, rather than to locate functions wherever space is available. Consistent Quality: Improve or replace facilities to provide modern instructional and support space in every building and at every location. Further, provide consistent signage and collegiate space at every location. Align to State Standards: Reprogram or reconfigure existing spaces in order to create a mix of space types (classrooms, labs, offices, Other, etc.) that meets state standards. Reuse or eliminate excess space. Intuitive Wayfinding: Develop facilities that will locate functions in a safe, convenient, logical organization of routes, buildings and usable open spaces. At the Ocean Campus, this includes designing facilities to overcome the topography, such as orienting buildings to the same level, as well as providing bridges, elevators, etc. Clusters for Synergy: Locate related programs and services together to create a convenient flow of work. Support collegial relationships by developing comfortable spaces for study, professional development, events and informal gathering. At the Ocean Campus, this includes clustering Student Development services, and strengthening connections between the campus and the surrounding neighborhood. Transit and Bike Friendly: Encourage the use of transit and bicycles by, for example, providing convenient routes between transit stops and campus destinations, as well as safe routes and parking for bikes. Resource Efficiency: Upgrade and replace facilities to improve energy efficiency, water conservation, and the sustainability of all locations. 1

ORGANIZATIONAL CONCEPT FOR THE OCEAN CAMPUS One of the most strongly requested ideas for campus improvements is Community. Campus users, including students, faculty, staff, administrators and neighbors want to feel connected to each other and to their physical environment. The proposed strategy for the Ocean Campus is centered on this idea. It focusses on improving and repurposing key buildings that have good bones, replacing facilities that have outlived their useful lives, reorganizing pedestrian and vehicular circulation, and creating a more pleasing integration of the campus within the surrounding neighborhood. It is important that every face of the campus and the buildings should be the good side. The College also wants to eliminate all bungalows, minimize disruptions during construction and minimize costs for temporary swing space. Image A. Potential Buildings to Modernize or Replace. The buildings circled in BLUE are in good candidates for reprogramming or modernization based on a technical assessment of condition, as well as how well they function to support modern instruction and support services. The new Multi-Use Building has a flexible design that could support a variety of uses, and is located in a prime position for visibility and access. Rather than a costly renovation of specialized labs in the Science Building, it is proposed that a more cost-effective approach is to relocate Science programs to a new building, and return the iconic facility to an Instructional Building. The Visual Arts Building and Batmale Hall are both in need of modernization to extend their useful lives and house general instruction. The facilities circled in RED require extensive renovation and/or are not constructed to be readily reconfigured. This condition makes it advisable to replace them, rather than renovate. It is proposed that all bungalows should be replaced with permanent space. 2

Image B. Potential Building Sites, Circulation and Conceptual Directions The light blue shapes show the location of potential building sites, some of which would be made available by the removal of existing facilities. These are proposed sites for replacement facilities, as well as future development. The green circles indicate the edges of the campus that are most visible and interactive with the surrounding community on Ocean and Phelan Avenues. There are opportunities to amplify the synergistic relationship between both entities through the pedestrian experience, points of access and the resolution of traffic conflicts. Many transit lines bring College commuters to the Balboa Park BART station, Ocean Avenue and the new City College Terminal. The yellow lines indicate the original north-south and east-west organization of the Ocean Campus, emphasizing its prominence between Ocean and Phelan Avenues. Unfortunately, these routes traverse steep slopes and meet at the summit, which tends to intensify the challenges of navigating the campus topography on the east campus. On the other hand, it creates a logical line that reaches through the Science Building and across to the west campus and potential development on the Balboa Reservoir. The orange circle shows the existing path of Cloud Circle and the potential to create a looped pathway that unifies the east and west campus. This line is generally on one level with more gentle slopes. It is an excellent route around which to organize campus development. Most buildings that are in good conditions, or that are candidates for renovation, are oriented on this line. The existing half-loop on the east side is not designed to sufficiently serve all the existing use by pedestrians, vehicles, bikes, service vehicles and accessible parking. It could be reconfigured as a major promenade to better separate and support all those functions. The red lines indicate secondary pathways between the campus perimeter and the interior. Most of the routes, especially on the east and south sides, traverse steep slopes. It is important to develop buildings and site improvements that make these routes convenient, as well as intuitively organized. The blue stars are gateway access points between the surrounding neighborhood and the campus. Each one is an opportunity to announce the identity of the campus and to extend a welcome. Gateways should be developed to establish 3

a hierarchy that supports easy wayfinding. Gateways at Ocean Avenue and the City College Terminal walkway are oriented for the convenience of transit users. The blue line indicates a proposed new vehicular route to the east side of the east campus. It would carry away traffic from westbound Ocean Avenue and I-280 to a re-oriented parking capacity and Maintenance facilities. This would tend to decrease the volume of vehicles at the Wellness Center gateway and put the focus on pedestrians. DEVELOPMENT CONCEPT FOR OCEAN CAMPUS Image C. Neighborhood Concept The Centralized Services area is comprised of functions that are utilized by almost all campus users, including Student Development Services, the Library and the Student Union. The Student Union houses the Cafeteria, Student Activities, Bookstore and Culinary Arts instruction. This creates a centralized hub of campus activity that College members yearn for. The Instruction and Community area on the west campus takes advantage of the visibility and existing meeting rooms to provide a venue for community activities as well as instruction. The Arts and Instruction cluster brings together on the west campus all Arts instruction (performing, visual, communications) with a performance venue. This site was identified for the PAEC in the 2004 master plan, and it is likewise prominent and accessible. The STEM neighborhood provides a home for Science, Technology, Engineering and Math in new and newly-renovated facilities on the north side. The Athletics area encompasses the Wellness Center (including the Natatorium), Stadium, track, fields and courts. Parking capacity is reoriented from the far west side in order to be located closer to destinations in proposed structures on the west and east campuses. 4

WORKSHOPS ON OPTIONS FOR DEVELOPMENT OF OCEAN CAMPUS The Working Group developed options for the development of the Ocean Campus. The major difference between Option 1 and 2 is the location of the Student Union, as well as the Child Development Center. Image D. Ocean Campus Option 1 Image E. Ocean Campus Option 2 COMMENTS ON OPTIONS FROM COLLEGE/PUBLIC WORKSHOPS The concepts and Options for the Ocean Campus were discussed at workshops with College members and the public on October 17, 2016. The participants like the organizational concept for its focus on community, intuitive organization, and overcoming the topography. There was general consensus of Options 1 and 2 because they both follow this concept. Most participants preferred Option 1 because the Student Union and its adjacent outdoor spaces access spectacular Bay views, and are more protected from wind and weather on the east side of the hill. There was also great interest in Option 2 for the way that the Phelan Avenue location of the Student Union knits together the east and west sides of the campus. In general, the consensus conversation suggested there is a preference to locate the Student Union to the east of the existing Science Building, and to develop the lawn west of the Science building and both sides of Phelan Avenue to create a strong sense of a unified, dignified, and energized Ocean Campus of City College. 5

PREFERRED FEATURES FOR OCEAN CAMPUS DEVELOPMENT Image F. Ocean Campus Draft Preferences This image shows existing buildings, as well as draft proposed renovations and new facilities. Student Development Services, including first contact services for new students, is prominently located at the Ocean/Phelan corner. New gateway plazas are located at intersections that are near transit stops on Ocean Avenue. They draw users into the campus on both sides and lift them between elevations. The Student Union is in the center of the east campus, creating a heart of campus life. New instructional facilities complete a frame around the summit quad, creating an interior pathway for uphill/downhill and north/south circulation. Usable open space surrounds the Student Union on both sides. The new STEM Building is in the STEM neighborhood on the north side. A new, unobtrusive central plant is integrated toward the interior of the campus. The existing Science Building, Visual Arts Building and Batmale Hall are renovated to house instruction. The Arts Complex holds a prominent place on the west campus. There is a new parking structure to provide parking in this quadrant of the campus. The Child Development Center is shown located on the west side of Phelan; this is a different location than shown on the two initial options, resulting from lack of consensus on which location is preferred. This new possible location remains to be reviewed and discussed, and should be considered as just a placeholder in this Draft Preferred Option. Landscaping and site improvements on both sides of Phelan Avenue activate and unify the east and west sides. This creates a City College experience along the route, and in views from surrounding streets and buildings. A promenade reaches all the way from the Balboa Reservoir to the Instructional (Science) Building, where the interior circulation brings users up to 6

the summit plaza. A new pathway on the west side completes the loop of Cloud Circle. The lawn on the east side is activated with new pathways that bring users to the east side on a more direct route as well as an easier slope. The Multi Use Building is a potential location for the District Offices, where it is accessible to visitors. Another potential location is in the renovated Instruction (Science) Building. The Instruction Building does not have adjacent parking and street access. On the far east side of the east campus, a new road leads to reconfigured parking, including a parking structure that houses the relocated Maintenance facility. The tennis courts are located on top of the structure, visually mitigating the parking structure from the surrounding neighborhood and allowing the corporation yard to be located on the existing tennis courts. This land use idea is being explored with the City of San Francisco who owns the tennis court property. Potential sites for future workforce housing are located adjacent to Judson and Havelock, in the Sunnyside neighborhood. NEXT WORKSHOPS: OCEAN CAMPUS PREFERRED OPTION In the next steps, the Working Group will review the discussion from the Options workshops and the draft Preferences diagram on October 25, 2016. The Preferences will be discussed at the next round of College/Public workshops on November 1 and 2. Options, Preferences, and the Preferred Option will be discussed with the Board at the meeting scheduled for November 17, 2016. OPPORTUNITIES AT THE CENTERS AND FORT MASON The College is continuing to consider many opportunities to locate programs in order to advance its plans for innovations in learning. Data developed in the Facilities Master Plan process could inform that discussion. At this time, it is understood that the District intends to vacate 33 Gough Street, and does not plan to locate future instruction there. Each Center and Fort Mason are relatively small instructional sites; therefore, the data for these locations is studied in the aggregate to identify meaningful trends. There is an overall excess of space at these sites. The needs and opportunities can be described in terms of three categories: Recent Construction or Renovation: The following Centers have the most modern facilities and serve larger enrollments. There is underutilized space at each of these locations. There are many opportunities to improve the utilization by, for example, reprogramming or reconfiguring existing spaces. Chinatown/North Beach: This location is new, with modern instructional and support facilities. The District is currently resolving construction issues. The 2014 FTES = 2,900. Instructional capacity is currently underutilized; there is good potential for increase with reprogramming or limited reconfiguration of spaces. There is a need for faculty office space, and to activate the unused Culinary Café. Mission: This recently-constructed facility has modern instructional and support spaces. The 2014 FTES = 2,200. There is a potential for more utilization of instructional spaces with reprogramming or limited reconfiguration of spaces. There is a need to provide collegiate spaces for collaboration including study and student gathering. Inefficient building systems, acoustical conditions and site security need improvement. John Adams: This center was recently renovated. The 2014 FTES = 1,600. There is a potential for more utilization of instructional areas. The use of the Auditorium and Gymnasium are currently restricted because of noise intrusion into neighboring spaces. These problems could be mitigated by reprogramming of some areas. The Annex could become functional with improvements to comply with the Field Act. There is a need to provide collegiate spaces for collaboration including study and student gathering, and to provide more usable outdoor space. The elevator needs to be updated, and site security needs improvement. 7

Potential Replacement: Facilities in this category do not have good bones for cost-efficient renovations that could support modern instruction. They are potential candidates for limited modernization, or for replacement. The advantage of replacement is that new facilities could be tailored to the meet the needs of the College s education vision. 750 Eddy Street: The permanent home of the Civic Center is vacant and is not in good condition. The 2014 FTES = 300. There is a potential to reconstruct the building while preserving the original 1911 façade. Downtown: The 2014 FTES = 1,600. The first and second floors were recently modernized, but the rest of the facility is not flexible for reorganization of spaces. Further, the District is required to make costly mitigations to an underground tank. There is a need to update instructional spaces to match the educational program, and to provide collegiate spaces for study, hanging out, events and collaboration. Inefficient building systems and site security need improvement. Evans: This facility was constructed as a post office, and not for educational use. The 2014 FTES = 600. The needs include: reconfigure spaces to support instruction and services; provide collegiate space for study, collaboration, events and informal gathering. Inefficient building systems, infrastructure and site security need improvement. Leased by District: The Airport, Fort Mason and Southeast locations are not owned by the District, they serve small enrollments, and their facilities are in poor or largely inactive conditions. There is potential for small improvements, but not for more comprehensive modernization. Airport: The 2014 FTES = 200. This facility is outdated and not in good condition. There is a need to configure spaces to the needs of modern instruction, and to provide collegiate spaces for study, collaboration and events. Fort Mason: This facility is not in good condition. The 2014 FTES = 100. There is a need to update spaces to meet current instructional needs and provide signage. Southeast: Instructional spaces are underutilized. The District s area in this facility includes a sizable quantity of unused space. The 2014 FTES = 100. There is a need to provide collegiate space for study, collaboration and gathering. Image G. Facilities Opportunities at Centers, Instructional Site 8