1 D R A F T Testing of performance of precooling refrigerator in the fill/vent line at Indiana Revision: 0.00 Prepared: Z. Tang, Indiana University, Nov Checked: Hermann, Nann, Indiana University, yyyy Approved: Mike Snow, Indiana University, yyyy 1. Scope One of the largest modifications to the target system operated at LANSCE was the 10 m long vacuum/fill/vent line and addition of the precooling refrigerator. The function of the vacuum/vent line is to connect the cryostat isolation vacuum to pump system and relief system located outside the experimental cave. Inside the vacuum/vent line is coaxially the hydrogen fill/vent line that connects the LH2 vessel to the gas handling and the relief system. The precooling cryo- refrigerator is connected to the fill/vent system at the 6 way cross. Its first stage is connected to a thermal radiation shield, and its second stage is connected to the copper sleeved elbow part of the hydrogen fill/vent line. Its purpose is to cool down the incoming hydrogen gas and thus help to shorten the target filling process. The vacuum/fill/vent line was designed and built at Indiana University. Because of its length, it was not possible to test the line and the precooling cryo- refrigerator with the cryostat at Indiana, instead, a separate test was performed to verify the performance of the precooling system. This document summarizes the results of the test. 2. Set up and measurement The performance of the precooling system was estimated and results presented in the document Filltimeestimate.pdf that can be found at Figure 1 and 2 show the setup for the performance test. The long pipe is in its transportation box, in the foreground pump lines for the vacuum can be seen and also the helium gas input, in the test helium gas was used. Figure 2 shows the other end of the system where the cry- refrigerator is and the gas outlet. During the test the cryo- refrigerator was cold and the helium gas flow rate was varied and the temperature of the outgoing gas and the refrigerator was monitored. 3. Results A thermometer, which measured the gas temperature, was located about 6.5 away from the end of the fill/vent line (see attachment). Two different helium flow rates
2 were used. We found that when there is no helium flow, the base temperature of the fill/vent line was 28 K, and with 6.4 SLPM flow the temperature stabilized to 26 K, and at 14 SLPM the temperature reached 101 K. Even though with 6.4 SLPM flow, the temperature of gas is actually less than the base temperature of 28 K, we did notice an increase in the heat load from second stage of the refrigerator which temperature changed from 14.5 K to 20 K. Attached is a copy from the logbook. The pre- cooling system performed as expected. Fig. 1. The vacuum/fill/vent line in its transport box and with the test components. In the foreground is the vacuum flex line and the inlet of helium gas.
3 Fig. 2. The cryo- refrigerator end of the vacuum/fill/vent line. The cryo- refrigerator is behind the vertical pipe section. On the top of the vertical pipe section is the outlet of the helium gas. The temperature sensor for the gas is inside about 6 from the end flange of the tube.
4
5
6
7
8
9
10
11
12
Modifications and Improvements to the NPDGamma Liquid Hydrogen Target System and Safety
Modifications and Improvements to the NPDGamma Liquid Hydrogen Target System and Safety Prepared: H. Nann, Indiana University, November 01, 2011 Checked: S. Penttila, ORNL, November 01, 2011 Approved:
More informationDescription of the Ortho-to-Para Convertor and Internal Plumbing of the Hydrogen Target
Description of the Ortho-to-Para Convertor and Internal Plumbing of the Hydrogen Target Prepared: M. Snow, Indiana University, March 08, 2011 Checked : H. Nann, Indiana University, October 25, 2011 Approved:
More informationUHV Flow Cryostats. Ultra High Vacuum Flow cry stats CRYO INDUSTRIES
UHV Flow Cryostats Ultra High Vacuum Flow cry stats INDUSTRIES Ultra High Vacuum Flow Cryostats: Models RC-102 and RC-110 Cryo offers Models RC-102 and RC-110 Ultra High Vacuum continous flow cryostats,
More informationConcept of a Powerful Cryogen-Free Dilution Refrigerator with Separate 1K Stage
Concept of a Powerful Cryogen-Free Dilution Refrigerator with Separate 1K Stage Kurt Uhlig Walther-Meissner-Institute Garching 85748, Germany ABSTRACT Helium-3,4 dilution refrigerators (DR) are the workhorses
More informationMetal hydride storage system for MICE experiment at Rutherford Appleton Laboratory. Technical specification.
DRAFT Metal hydride storage system for MICE experiment at Rutherford Appleton Laboratory. Technical specification. MICE Collaboration Contact persons: Dr Thomas Bradshaw Head of Cryogenics Section Tel:
More informationA Small Refrigerator System for Cooling Thermal Shield of a Large Superconducting Magnet
1NS-T 517.IP9 (0804 1 IXS T 517 INSTITUTE FOR NUCLEAR STUDY UNIVERSITY OF TOKYO KKK Internal 92 17 r ebruary 1993 Tanashi, Tokyo 188 Japan A Small Refrigerator System for Cooling Thermal Shield of a Large
More informationCan one cool the MICE magnets and the Hydrogen Absorbers with Small Coolers? Michael A Green Oxford University Physics Oxford OX1 3RH, UK
Can one cool the MICE magnets and the Hydrogen Absorbers with Small Coolers? Michael A Green Oxford University Physics Oxford OX1 3RH, UK 1 To small use coolers or not to use small coolers? That is the
More informationA THIN GOLD COATED HYDROGEN HEAT PIPE -CRYOGENIC TARGET FOR EXTERNAL EXPERIMENTS AT COSY
6 th Conference on Nuclear and Particle Physics 17-21 Nov. 2007 Luxor, Egypt A THIN GOLD COATED HYDROGEN HEAT PIPE -CRYOGENIC TARGET FOR EXTERNAL EXPERIMENTS AT COSY M. Abdel-Bary a, S. Abdel-Samad a,
More informationBulk CO2 Systems Technical Service Bulletin
Bulk CO2 Systems Technical Service Bulletin Component Change TSB-BEV-1009 Date: April 6, 2017 Subject: New design Fill Box/Assemblies and updated vent line connections (Update to TSB-BEV-1006). (Updated
More informationBosch. Gas Condensing Boiler. Applications Manual. 100, 151 Combi Boiler 57, 100, 131, 151 Heating Boiler
WARNING: Improper installation, setup, modification, operation or maintenance of the heating system can cause personal injury and property damage. Follow each appliances' instructions precisely. For assistance
More informationINSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS
INDEECO Circulation Heaters are designed to provide years of trouble free operation if properly installed and maintained. Please read and follow these instructions for installing and maintaining the heater.
More informationCryogenics for Neutral Beam Injector System
Cryogenics for Neutral Beam Injector System Ch. Chakrapani, S.K.Sharma, A.K.Chakraborty, B.Sridhar, Vishnu.B. Patel, Siddharth Sheth, N.V.M.Rao, Mainak. B, G.B.Patel, M.J.Singh Janardhan.U, S.Rambabu,
More informationPerformance test of a helium refrigerator for the cryogenic hydrogen system in J-PARC
Proceedings of ICEC -ICMC 8, edited by Ho-Myung CHANG et al. c 9 The Korea Institute of Applied Superconductivity and Cryogenics 978-89-978-- Performance test of a helium refrigerator for the cryogenic
More informationAVAILABILITY AND RELIABILITY OF CERN CRYOPLANTS
AVAILABILITY AND RELIABILITY OF CERN CRYOPLANTS on behalf of the Cryogenics for Accelerator Group Accelerator Technology Department CERN, Geneva, Switzerland Outline Introduction Cryogenic systems layout
More informationNiles Steel Tank Hot Water Generator Installation and Operation Manual
Niles Steel Tank Hot Water Generator Installation and Operation Manual Contents: Contents 1 Hazard definitions 1 1. General Information.... 2 Availability... 3 Optional Control Packages... 5 2. Installation....
More informationUntreated Compressed Air is Destructive. Protect Your Equipment and Save Money
Untreated Compressed Air is Destructive A compressor takes in atmospheric air load with contaminates and moisture. At 75 F (23.9 C) and 75% relative humidity, a 500 SCFM (850 NM3HR) air compressor takes
More informationDevelopment of a Dilution Refrigerator for Low-Temperature Microgravity Experiments
Paper 72-P 1 Development of a Dilution Refrigerator for Low-Temperature Microgravity Experiments Pat R. Roach NASA Ames Research Center Moffett Field, CA 94035 and Ben P. M. Helvensteijn Sterling Software
More informationAvailable online at ScienceDirect. Physics Procedia 67 (2015 )
Available online at www.sciencedirect.com ScienceDirect Physics Procedia 67 (2015 ) 111 115 25th International Cryogenic Engineering Conference and the International Cryogenic Materials Conference in 2014,
More informationCrown Boiler Company
Crown Boiler Company 1 Phantom Boiler System Combi Kit Instruction Manual I Product Description This kit adds the ability to generate DHW, as well as heat, ( combi capability) to select Phantom models
More informationProperties of a two stage adiabatic demagnetization refrigerator
IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS Properties of a two stage adiabatic demagnetization refrigerator To cite this article: H Fukuda et al 2015 IOP Conf. Ser.: Mater.
More informationPocket Dilution Cooler
Pocket Dilution Cooler T. Prouvé, N. Luchier, L. Duband CEA/DSM/INAC/SBT Grenoble, 38054 Cedex 9, France ABSTRACT We have developed a compact, self-contained dilution cooler that can be operated from a
More informationWhat is an Integrated Detector Assembly? Aron Traylor. College of Optical Sciences The University of Arizona 29 November 2010.
What is an Integrated Detector Assembly? Aron Traylor College of Optical Sciences The University of Arizona 29 November 2010 Traylor 1 Various IDA s Traylor 2 Why are they used? Integrated Detector Assemblies
More informationVariable Temperature Microprobe Systems
Variable Temperature Microprobe Systems the world s resource for variable temperature solid state characterization 2 The Variable Temperature Microprobe System The variable temperature microprobe system
More informationSTORAGE TANK INSTALLATION and OPERATION MANUAL
LST-I-O 100161529_2000014416 Rev F STORAGE TANK INSTALLATION and OPERATION MANUAL LOW LEAD CONTENT The information contained in this manual is intended for use by qualified professional installers, or
More informationThe dilution process. 4K flange. Still. Heat exchangers. Mixing chamber
cryogenic systems CRYOCONCEPT has been supplying dilution refrigerators since 2000. In partnership with the low temperature department of the CEA located in Saclay (France), our company adjusted and improved
More informationDesign and Construction Standards SECTION PLUMBING EQUIPMENT
SECTION 15450 PLUMBING EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES: A. Water heaters. B. Packaged water heating systems. C. Water storage tanks. D. Water softeners. E. Pumps. F. Circulators. 1.2 REFERENCES
More informationBuildingName The Description of the Project P DOCUMENTS
ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION
More informationRequirements for Repair of a Miniature Liquid Helium-3 Refrigerator
Document: Version A April 26, 2005 Table of Contents 1 Introduction:... 3 1.1 General:... 3 1.2 Scope:... 3 1.3 Applicable Documents:... 3 1.4 Reference Documents:... 3 2 Mechanical Requirements:... 3
More informationInstallation & Operation Manual Models:
SJS-I-O Rev C Installation & Operation Manual Models: 60-119 : If the information in this manual is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss
More informationA CRYOGENIC TEST STATION FOR SUBCOOLING HELIUM HEAT EXCHANGERS FOR LHC
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics Large Hadron Collider Project LHC Project Report 386 A CRYOGENIC TEST STATION FOR SUBCOOLING HELIUM HEAT EXCHANGERS FOR
More informationMemorandum. Introduction. Details. To: G. Ediss R. Groves N. Horner A. R. Kerr D. Koller G. Lauria S. -K. Pan. J. Webber. K. Crady
Memorandum To: G. Ediss R. Groves N. Horner A. R. Kerr D. Koller G. Lauria S. -K. Pan cc: From: J. Webber J. Effland K. Crady Date: 26 February 2002 Rev: 27 February 2002 jee G. Ediss pointed out that
More informationa. CFCs. b. HCFCs. c. Pressurized nitrogen. d. Compressed dry air. 17. The state of the refrigerant leaving the condenser of a refrigeration system
Core 1. Ozone in the stratosphere above the earth consists of: a. Molecules containing 3 oxygen atoms. b. Molecules of 2 oxygen atoms. c. Radioactive particles. d. Pollutants that have risen from ground
More informationChiller installation, contractor s scope of work:
Chiller installation, contractor s scope of work: See complete DTS O&M Manual for further details Pre-planning: Provide installation surface Either, ground level concrete pad 5 W x 12 L x min 4 depth,
More informationThe New SMC Dilution Refrigerator
The New SMC Dilution Refrigerator J. M. Kyynäräinen a, M.P. Berglund b, and T.O. Niinikoski a a CERN, 1211 Geneva 23, Switzerland b Low Temperature Laboratory and Institute of Particle Physics Technology
More information10 K Airborne Cryocooler and
10 K Airborne Cryocooler and High Efficiency Heat Exchangers W. Gully, P. Hendershott, E. Marquardt, D.S. Glaister, and C. Wilson Ball Aerospace & Technologies Corp. Boulder, CO, 80306-1062 ABSTRACT Ball
More informationVariable Temperature Options for Optical Experiments
Variable Temperature Options for Optical Experiments the world s resource for variable temperature solid state characterization 2 The Variable Temperature Options for Optical Experiments MMR Technologies
More information3.5 Cryosurface & Cryogenic Feed-through Specification
3.5 Cryosurface & Cryogenic Feed-through Specification The tubing, cryosurfaces, and feed-through must be free of oil and moisture before connecting it to the refrigeration unit. Failure to comply with
More informationRefrigerated Cooling System
109 Lukens Drive New Castle, DE 19720 Thermal Analysis & Rheology A SUBSIDIARY OF WATERS CORPORATION Refrigerated Cooling System Manual Addendum For use with the following: DSC 10, 910, 912, 2010, 2910
More informationWORKPLACE INSPECTION CHECKLIST FOR LABORATORY ENVIRONMENTS
WORKPLACE INSPECTION CHECKLIST FOR LABORATORY ENVIRONMENTS Standard OHS Workplace Inspection Checklist Review Date: Next Review: Inspection Site: Inspection Team: Contacts: Written Laboratory Safety Policies/Procedures/Records
More informationSECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS
SECTION 22 34 00 (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS System shall provide a complete hot water return throughout the entire system with balancing (flow control) valves not less than 10 feet from
More informationInstallation & Operation Manual Models: TSU
TSU-I-O Rev A Installation & Operation Manual Models: TSU 150-940 CAUTION: This appliance is not intended for potable water. This manual must only be used by a qualified heating installer / service technician.
More informationVIESMANN. Installation instructions VITOCELL 300-B. for contractors. Vitocell 300-B Type EVBA-A. Dual mode DHW cylinder, 300 and 500 l
Installation instructions for contractors VIESMANN Vitocell 300-B Type EVBA-A Dual mode DHW cylinder, 300 and 500 l VITOCELL 300-B 1/2017 Dispose after installation. Safety instructions Please follow these
More informationUser s Information Manual Models: ER152, ER202, ER252, ER302, and ER402
ERP-USER_100161005_2000003726_Rev D User s Information Manual Models: ER152, ER202, ER252, ER302, and ER402 If the information in this manual is not followed exactly, a fire or explosion may result causing
More informationPRE INSTALLATION PROCEDURES
PRE INSTALLATION PROCEDURES DANGER! ELECTRICAL SHOCK HAZARD. Only qualified personnel who have read and understand this entire manual should attempt to install, or service this WL250 Water Treatment System,
More informationINSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo
INSTALLATION, OPERATION AND MAINTENANCE Ariterm Vedo CONTENTS General...3 Installation...4-5 Laddomat 21 Connection diagram...6 Temperature control valve...7 About burning wood...8 Operation...9-11 Service
More informationCIRCO 6 Solar Circulation Unit
TECHNICAL INFORMATION / INSTALLATION INSTRUCTIONS CIRCO Solar Circulation Unit CIRCO Solar Circulation Unit in combination with the intelligent SUNGO controllers, it is the safe and reliable heart of a
More information4.8 FARADAY CUP ASSEMBLY OPTION
4.8 FARADAY CUP ASSEMBLY OPTION The Faraday cup assembly, mounted on the front end of the Electron Gun, is positioned by either a rotary feedthrough or a pneumatic actuator assembly, located on one of
More informationInstallation, Operation and Maintenance Instructions for Thermax Semi-Storage Calorifier
OM001 Installation, Operation and Maintenance Instructions for Thermax Semi-Storage Calorifier These operating and maintenance instructions are for standard semi-storage calorifiers (vessels fitted with
More information1997 STANDARD for APPLICATION OF SOUND RATING LEVELS OF OUTDOOR UNITARY EQUIPMENT. Standard NORTH FAIRFAX DRIVE! ARLINGTON, VIRGINIA 22203
1997 STANDARD for APPLICATION OF SOUND RATING LEVELS OF OUTDOOR UNITARY EQUIPMENT Standard 275 4301 NORTH FAIRFAX DRIVE! ARLINGTON, VIRGINIA 22203 IMPORTANT SAFETY RECOMMENDATIONS It is strongly recommended
More informationThe superconducting TF magnetic system of Tore Supra
The superconducting TF magnetic system of Tore Supra (CEA Cadarache) Association EURATOM-CEA, CEA/DSM/IRFM 0 1 1. Introduction TORE SUPRA TF system contribution The revolution of superfluid helium 1.8
More informationInstallation, operation and maintenance. Accumulator tank. Acc-tank 500 CU. Acc-tank 500 UB ver: Supersedes:
Installation, operation and maintenance Accumulator tank Acc-tank 500 CU 2010-11-2 ver: Supersedes: Acc-tank General information 1011 Read through these instructions carefully before carrying out installation,
More informationCOOLVAC
Vacuum Solutions Application Support Service LEYBOLD VACUUM GA 12.123/3.02 COOLVAC 800 1500 3000 Refrigerator Cryopumps Cat. Nos 892 61/63 892 56 893 21/23 Operating Instructions Description Contents Page
More informationApplications and Accessories, Cryo Pumps
General Applications and Accessories, Cryo Pumps Cryo pumps Application UHV systems Beam tubes in particle accelerators Transfer chambers / Loadlock General research Evaporation coating systems Sputtering
More informationMaintenance and Reliability Design Aspects SNS 2K Refrigeration System
Maintenance and Reliability Design Aspects SNS 2K Refrigeration System Dana M. Arenius, JLab Cryogenics Systems Group Donald Richied, SNS Cryogenics Systems Group Cryo2004 Operations Workshop March 29-April
More informationScienceDirect. Development progress of critical equipment in the CSNS cryogenic hydrogen system
Available online at www.sciencedirect.com ScienceDirect Physics Procedia 67 (2015 ) 233 238 25th International Cryogenic Engineering Conference and the International Cryogenic Materials Conference in 2014,
More informationAHRI Releases November 2011 U.S. Heating and Cooling Equipment Shipment Data
January 12, 2012 Contact: Monica Cardenas, AHRI Communications Director Phone: 703.600.0377 AHRI Releases November 2011 U.S. Heating and Cooling Equipment Shipment Data Residential Storage Water Heaters
More informationMeasured Performance of Four New 18 K Helium Refrigerators for the LHC Cryogenic System
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics Large Hadron Collider Project LHC Project Report 796 Measured Performance of Four New 18 kw@4.5 K Helium Refrigerators
More informationCryopumps, Cryogenics
Cryopumps, Cryogenics 182.01.02 Excerpt from the Product Section C12 Edition 2010 Contents General Applications and Accessories Cryopumps........................................ C12.03 Cryogenics........................................
More informationdewar or an electrically powered cooler. The sensitive detector surfaces are thus protected from moisture and condensable contaminants.
Germanium Detectors The Company Canberra Industries is the world's largest manufacturer of nuclear radiation detection and analysis systems. In order to better serve our customers worldwide, Canberra operates
More informationSECTION PLUMBING EQUIPMENT
PART 1 GENERAL 1.1 SECTION INCLUDES A. Water heaters B. Packaged water heating systems C. Water storage tanks D. Water softeners E. Pumps F. Circulators 1.2 REFERENCES SECTION 22 30 00 PLUMBING EQUIPMENT
More informationINTA ION MODERN BAR / BATH SHOWER MIXER CP
INTA ION MODERN BAR / BATH SHOWER MIXER 910000CP INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS PLEASE LEAVE THESE INSTRUCTIONS WITH THE USER Page 1 of 10 INTRODUCTION This installation guide has
More informationProcess Control PIP PCEA001 Fixed Gas Detection Guidelines
November 2015 Process Control PIP PCEA001 PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared from the technical
More informationCryogenics. Overview of the Jefferson Lab 12GeV Upgrade. J. Creel, K. Dixon, P. Knudsen, J. Wilson Jr.
Cryogenics Overview of the Jefferson Lab 12GeV Upgrade D. Arenius,, V. Ganni, J. Creel, K. Dixon, P. Knudsen, J. Wilson Jr. Stanford Linear Accelerator Center May 9-11, 2006 Cryogenic Operations Workshop
More informationSECTION PLUMBING EQUIPMENT
PART 1 GENERAL 1.01 SECTION INCLUDES A. Water heaters. B. Packaged water heating systems. C. Domestic water heat exchangers. D. Water storage tanks. E. Water softeners. F. Reverse osmosis equipment. G.
More informationLinde Kryotechnik AG. Liquefaction and refrigeration plants for research, science and industry. Helium solutions.
Linde Kryotechnik AG Liquefaction and refrigeration plants for research, science and industry. Helium solutions. Helium provides the ultimate cold. In 1911, just three years after he succeeded in liquefying
More information2-Stage 4 K Closed Cycle Refrigerator Systems
CRYO 2-Stage 4 K Closed Cycle Refrigerator Systems Variable Temperature Closed Cycle Refrigerator Systems Cryo Industries manufactures closed cycle cryogenic workstations for a large variety of experimental
More informationDoc. No. SP R0. CXI Reference Laser. Prepared by: Jean-Charles Castagna Signature Date Design Engineer
ENGINEERING SPECIFICATION DOCUMENT (ESD) Doc. No. SP-391-000-73 R0 System LUSI SUB-SYSTEM CXI Prepared by: Jean-Charles Castagna Signature Date Design Engineer Co-Authored by: Paul Montanez Signature Date
More information2-Stage 4 K Closed Cycle Refrigerator Systems
2-Stage 4 K Closed Cycle Refrigerator Systems Variable Temperature Closed Cycle Refrigerator Systems Cryo Industries manufactures closed cycle cryogenic workstations for a large variety of experimental
More informationVapour Jet Refrigerator / Heat Pump R853
Vapour Jet Refrigerator / Heat Pump R853 Enables demonstration and investigation of the combined Rankine and Vapour Compression Cycle Is an example of a refrigerator or heat pump driven by a Heat Input
More informationContact person Date Reference Page Björn Folkeson P (15) Energy and bioeconomy
Contact person Björn Folkeson 2016-06-27 6P04381 1 (15) Energy and bioeconomy +46 10 516 54 46 bjorn.folkeson@sp.se Thermal Integration Ltd 8 Curzon Road Sudbury Suffolk CO10 2XW Great Britain Testing
More informationContact person Date Reference Page Daniel Månsson P (13) Energy and circular economy
Contact person Daniel Månsson 2017-04-18 7P01636 1 (13) Energy and circular economy +46 10 516 53 28 daniel.mansson@ri.se Fortes Import Installatie Agenturen B.V. Loodsboot 26 NL-3991 CJ Houten Nederländerna
More informationHERZ-DR-T-90. Radiator Control Valves with Pre-Setting Function by Means of Double Cone, Suitable for Conversion to Thermostatic Operation. H max.
Radiator Control Valves with Pre-Setting Function by Means of Double Cone, Suitable for Conversion to Thermostatic Operation Standard Sheet for 6823/ 6824 Edition 1000 (0999) 6823 6824 Special Models 1
More informationRefrigeration Technology in Building Services Engineering
Unit 70: Unit code: T/600/0459 QCF Level: 3 Credit value: 10 Guided learning hours: 60 Unit aim Refrigeration Technology in Building Services Engineering This unit develops an understanding of the principles,
More informationOil burners fuel unit with solenoid valve
Oil burners fuel unit with solenoid valve Type VM www.deltapumps.com VM1 - VM4U flanged Certified Quality System Printed in Germany VM_e.pdf - 18.05.08 Page 1/6 Oil burners fuel unit with solenoid valve
More informationBio System Installation
Bio System Installation Installation at the Danish Biobank, Copenhagen. The Project In January 2012 Statebourne were awarded the Tender to equip the Danish National Biobank at the Statens Serums Institute.
More informationAccumulator tank. 1000, 750 and 500 litres Aqualux Teknik Aqualux UB Aqualux 750 CU
Installation, operation and maintenance Accumulator tank 1000, 750 and 500 litres Aqualux Teknik Aqualux B Aqualux 750 C Aqualux 750 Teknik with bivalent shunt, optional extra 2012-02-08 ver.: Supersedes:
More informationc o n d e n s e r Glossary of Terms
c o n d e n s e r Glossary of Terms ARI Standard Conditions 85 F. water inlet; 95 F. water out; 105 F. condensing; 0.0005 fouling factor Flow Rate or Velocity The speed at which the condensing water travels
More informationDrink Showcase Equipped with Inverter Freezer
Drink Showcase Equipped with Inverter Freezer MURABAYASHI, Kenji KAGEYAMA, Toshiyuki CHOU, Ikou ABSTRACT In recent years, the impact of earthquakes has increased the demand for replacing products with
More informationInstallation & Operation Manual Models: SIT030, SIT040, SIT050, SIT065, SIT080, & SIT119
SIT-I-O Rev B Installation & Operation Manual Models: SIT030, SIT040, SIT050, SIT065, SIT080, & SIT119 WARNING This manual must only be used by a qualified heating installer / service technician. Read
More informationPIP PCTPA001 Testing of Process Analyzer Systems
January 2016 Process Control PIP PCTPA001 Testing of Process Analyzer Systems PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice
More informationOil burners fuel unit with solenoid valve
Oil burners fuel unit with solenoid valve Type VM www.deltapumps.com VM1 - VM4U flanged Certified Quality System Printed in Italy - DE112/0404 Oil burners fuel unit with solenoid valve Type VM The DELTA
More information3.2 Cryoplant and Cryodistribution
3.2 Cryoplant and Cryodistribution 3.2.1 System Description 1 3.2.1.1 Cryoplant 1 3.2.1.2 LHe Plant 4 3.2.1.3 80K He Loop and LN 2 Subsystem 5 3.2.1.4 Cryodistribution System 6 3.2.1.5 System of Cryogenic
More informationRatio Architects, Inc. Section Refrigerant Piping
SECTION 232300 - REFRIGERANT PIPING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Refrigerant pipes and fittings. 2. Refrigerant piping valves and specialties. 3. Refrigerants. 1.2 ACTION SUBMITTALS
More informationDECOMMISSIONING OF THE REACTOR VESSEL OF THE COMPACT SODIUM COOLED NUCLEAR REACTOR FACILITY (KNK)
DECOMMISSIONING OF THE REACTOR VESSEL OF THE COMPACT SODIUM COOLED NUCLEAR REACTOR FACILITY (KNK) J. Benkert, F. Willman Westinghouse Electric Germany GmbH Mannheim / D K. Brockmann, I. Hillebrand Research
More informationTABLE 1. Specifications: Dimensions: 6¼ x 9 5/8 x 2 ¾
CHRONOMITE INSTANT-FLOW MICRO WATER HEATER INSTALLATION AND OPERATION INSTRUCTIONS - (LOW FLOW MODELS) (Before installation, compare electrical needed for the model of heater selected) TABLE 1 Model No.
More informationInstallation instructions. Pump Group. For wall hung gas-fired condensing boiler GB162-50/65/80/ TD UK/IE (2014/09)
Installation instructions Pump Group For wall hung gas-fired condensing boiler GB6-50/65/80/00 6 70 648 7-000.TD UK/IE 6708374 (04/09) Contents Contents Key to symbols and safety instructions....................
More informationInstallation Instructions
Installation Instructions Electric Heater Packages KFAEH -CIRCUIT GROUND LUG TERMINAL BLOCK MULTI-CIRCUIT GROUND LUG COOLING CONTROL PLATE ADAPTER PLATE (MUST BE REMOVED WHEN INSTALLING LARGE HEATER) BLOCK
More informationNordic Model CCU0150, 0220 Service Parts Manual (Includes 50Hz. Units)
IMI CORNELIUS INC. www.cornelius.com Nordic Model CCU0150, 0220 Service Parts Manual (Includes 50Hz. Units) Distributed By: Commercial Refrigeration Service, Inc. WWW.866IceMakers.COM 866-IceMakers 623-869-8881
More informationWASTE HEAT RECOVERY FROM DOMESTIC REFRIGERATOR Soma A. Biswas 1, Sandeep M. Joshi 2 1,2 Pillai College of Engineering
WASTE HEAT RECOVERY FROM DOMESTIC REFRIGERATOR Soma A. Biswas 1, Sandeep M. Joshi 2 1,2 Pillai College of Engineering Abstract Refrigeration is a process where the heat moves from low temperature reservoir
More informationReliability and availability analysis of a 10 K helium refrigerator
Reliability and availability analysis of a 0 kw@0 K helium refrigerator J Li,, L Y Xiong, L Q Liu, H R Wang, and B M Wang Key Laboratory of Cryogenics, Technical Institute of Physics and Chemistry, Chinese
More informationVIESMANN. Installation and service instructions. Solar-Divicon SR. Safety instructions. Application. for contractors. Part no and
Installation and service instructions for contractors VIESMANN Solar-Divicon SR Part no. 7419 520 and 7419 521 Safety instructions Please follow these safety instructions closely to prevent accidents and
More informationEnergy Recovery Ventilation
Published on Business Energy Advisor (https://oncor.bizenergyadvisor.com) Home > Energy Recovery Ventilation Energy Recovery Ventilation Proper ventilation is essential for maintaining good indoor-air
More informationFABRICATION AND COMPARISON OF SOLAR WATER HEATER WITH AND WITHOUT SEMI CIRCULAR TROUGH
FABRICATION AND COMPARISON OF SOLAR WATER HEATER WITH AND WITHOUT SEMI CIRCULAR TROUGH Ranganatha 1, Lingaraj. K. Ritti 2, Pavan Kumar 3 1, 2, 3 Department of Mechanical Engineering, Shri Madhwa Vadiraja
More informationEVAC Commercial Marine Equipment TOILET TECHNICAL DATA EVAC 90, SQUATTING TOILET. To main vacuum line, connection Ø50.
Date: 25 Jan 2005 Doc. 1:114E TECHNICAL DATA 5979301 EVAC 90, SQUATTING To main vacuum line, connection Ø50 Service door 600 Push button Fresh water supply connection 1/2" MPT BSP 700 700 Flushing mechanism
More informationa. CFCs. b. HCFCs. c. Pressurized nitrogen. d. Compressed dry air. 17. The state of the refrigerant leaving the condenser of a refrigeration system
Core 1. Ozone in the stratosphere above the earth consists of: a. Molecules containing 3 oxygen atoms. b. Molecules of 2 oxygen atoms. c. Radioactive particles. d. Pollutants that have risen from ground
More informationInstallation, Operating, and Maintenance Manual
www.geo-flo.com Engineered Solutions Making Geothermal Easier Installation, Operating, and Maintenance Manual Part # 3619 Rev. 27APR2017 Geo-Booster Geo-Flo Products Corporation 905 Williams Park Drive
More informationBack to basics. Setting HEVs for Liquid Overfed Evaporators. 13 th Annual IRC R&T Forum May 8-9, 2013
Back to basics Setting HEVs for Liquid Overfed Evaporators 13 th Annual IRC R&T Forum May 8-9, 2013 Todd B. Jekel, Ph.D., P.E. Assistant Director, IRC Overview Valve characteristics Nomenclature Setting
More informationOriginally prepared by B. Cheek Low Temperature Probe Station (LTPS) Assembly and Disassembly Procedures
Low Temperature Probe Station (LTPS) Assembly and Disassembly Procedures I. Introduction This is a new document detailing with pictures the procedure to disassemble, prep and clean, and reassemble the
More informationFRIB Cryogenic Distribution System and Status
IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS FRIB Cryogenic Distribution System and Status To cite this article: V Ganni et al 2015 IOP Conf. Ser.: Mater. Sci. Eng. 101 012034
More informationInstallation & Operation Manual Models: SIT030 - SIT119
SIT-I-O Rev N Installation & Operation Manual Models: SIT030 - SIT119 CAUTION: The heat transfer medium must be water or other nontoxic fluid having a toxicity rating or class of 1, as listed in Clinical
More information