Originally prepared by B. Cheek Low Temperature Probe Station (LTPS) Assembly and Disassembly Procedures

Size: px
Start display at page:

Download "Originally prepared by B. Cheek Low Temperature Probe Station (LTPS) Assembly and Disassembly Procedures"

Transcription

1 Low Temperature Probe Station (LTPS) Assembly and Disassembly Procedures I. Introduction This is a new document detailing with pictures the procedure to disassemble, prep and clean, and reassemble the LTPS for testing device. For more information to properly maintain and operate the LTPS, refer to B. Cheek's Low Temperature Probe Station (LTPS) Operating Procedures document. II. Procedure Methods and Materials. NOTE: It is required to wear gloves during the disassembly and assembly of the LTPS! Must also use safety glasses when handling any chemicals, i.e. vacuum grease, thermal Ngrease, IPA, methanol Disassembly of the LTPS 1. Use the silver screws with rings and screw them down in the two open holes on the outer top shield to make transporting it later much easier. Don t tighten screws as this will damage probe station. The lid is heavy. 2. Remove each screw one by one on the top shield and place the screws somewhere secure and clean. (For step 1 & 2, see Fig. 1) Silver screws Outer top shield Fig. 1 Silver screws with rings and removing the screws 1

2 3. Place the outer shield on a clean and secured area, such as the wafer handling station. 4. Before removing the screws on the inner radiation shield (lid w/ Mylar tape), place the shield ring (RIFAD) down to help prevent screws from falling to the chamber. DO NOT DROP SCREWS INTO CHAMBER! They cannot be recovered easily and can damage the system! (For step 4 see Fig. 2) Shield ring Inner radiation shield Fig. 2 Placing the shield ring in. NOTE: Remember to wear gloves! 5. The screw handle for the inner radiation shield can be attached to the inner radiation shield now. (Fig. 3) Do not tighten the handle screw as this will cause damage to the radiation shield. 6. Remove each screw one by one and place in a safe and secured area. After the screws have been safely removed, the shield ring can be removed. Make sure all screws have been removed properly! (Fig. 4) 7. Remove the inner radiation shield and carefully place it in a safe and clean area. Be careful not to tear the Mylar tape! 2

3 Screw handle Fig. 3 Handle for inner shield Fig. 4 Removing screws 8. You are now at the inner chamber of the LTPS. (Fig. 5) Fig. 5 Inner chamber of LTPS Loading a sample 1. Loosen the screws to the sample holders (need at least 2 hold down spots per sample) 2. Place the sample on the center of the stage, or between the desired probes 3. Tighten the screws, not too tightly or sample may be damaged 4. Verify the condition of the probes is good and each will make contact to the sample a. Maneuver the optics and physically check the probes using the camera system. Once the system is reassembled it will be too late--must disassemble and start over! b. Check that all devices can be reached by the probes, otherwise reposition the sample. c. At final inspection, make sure that the probes are at least ¼ off the sample before closing the system. Once vacuum is applied, the probes 3

4 will dive towards the sample surface and potentially damage the probes or the sample. Cleaning 9. To clean the station, you will need Isopropanol, Vacuum grease, Ngrease/Thermal Grease, and TechniCloth wipers. (Fig. 6) Remember to wear gloves and protective eyewear! TechniCloth Wipe Vacuum Grease Isopropanol Ngrease Fig. 6 Supplies for cleaning Fig. 7 Step 10 Fig. 8 Step 10 cont. 4

5 Fig. 9 Step 11 Fig. 10 Step Apply the isopropanol to a TechniCloth wipe and clean the excess Ngrease from the outer edge where the inner radiation shield used to sit. Also wipe down any part that may have been touched earlier to remove fingerprints and debris. (Fig. 7 & 8) 11. If needed apply more isopropanol on the wipe and clean the excess vacuum grease from the outer ring where the outer shield used to sit. (Fig. 9) 12. Remove the black O-ring from the outer rim and again using isopropanol and a wipe, clean the ring and place it back in the outer rim. (Fig. 10) 13. Wipe down the inside of the inner radiation shield (the non-mylar side) and the edge of the lid using a wipe and isopropanol. (Fig. 11 & 12 next page) 14. Do the same for the outer shield, though both sides can be cleaned with the isopropanol. Be careful not to SCRATH THE WINDOW. (Fig. 13 next page) Fig. 11 Step 13 Fig. 12 Step 13 cont. Mylar 5

6 Fig. 13 Step 14 NOTE: Compressed air can be used to dry the shields, BUT DO NOT USE COMPRESSED AIR ON THE MYLAR SIDE! Assembly 15. After the sample has been loaded and everything has been cleaned, take the Ngrease and apply a small amount around the screw holes on the inner rim where the inner radiation shield sits to make a good thermal seal. (Fig 14 & 15) Fig. 14 Small amount of Ngrease Fig. 15 Application of Ngrease 16. Place the inner radiation shield back on with Mylar-side up. Replace the shield ring RIFAD (to prevent the screws and washers from falling into the VTPS) and remove replace the screws one-by-one. Remove the screw handle before tightening in a criss-cross pattern. (Fig. 16) 6

7 Fig. 16 Step Now it is time to replace the outer shield. Remove the shield ring and using a small amount of vacuum grease, apply some around each of the screw holes and on the outer ring. This will help ensure a good vacuum seal. Also remember to apply some vacuum grease around the O-ring. (Fig. 17 & 18). Fig. 17 Vacuum grease on screw holes Fig. 18 Vacuum grease outer ring 18. Place the outer radiation shield back on and replace the all the screws one-by-one and remove the screw with handles before tightening in a criss-cross pattern. (Fig. 19 & 20). 19. You have (hopefully) successfully disassembled and reassembled the Low Temperature Probe Station. 7

8 Fig. 19 Placing outer radiation shield back Fig. 20 Screwing in place outer shield 8

9 Fig. 21 Fully assembled Low Temperature Probe Station 9

10 D. Lakeshore 340 Temperature Controller 1. Check that system temperature is controlled from sensor A, display reads Loop: A 2. Change sensor by pressing menu key Control Channel (use up/down arrows) 3. Press Enter to set and Cancel Screen to exit. Note: System will not heat unless the Heat display reads ON. Forced cooling/heating START: 1. Press menu key Setpoint and enter the desired temperature 2. Press Enter to set and Cancel Screen to exit 3. Press menu key Heater Range and set power to 100 W, use up/down arrows 4. Press Enter to set then Escape to exit screen 5. Display Heat should read 100 W STOP: Press the menu key Heater Off Quick warm up to release vacuum, change sample, or shut down LTPS 1. Press the menu key Setpoint to 300 K on sensor A 2. Press Enter to set then Escape to exit screen, display Setp should read 300 K 3. Press menu key Heater Range and set power to 100 W, use up/down arrows 4. Press Enter to set then Escape to exit screen, display Heat should read 100 W 5. Wait for system to reach 300 K on sensors A and B 6. Press the menu key Heater Off to stop further heating 7. Unplug the heater and relay connections (labeled H/T HTR) from the Heater Output port (rear-panel) 8. Plug in #1 heater block (labeled #1 HTR BLK) into the Heater Output ports 9. Press the menu key Control Channel to change to sensor C, use up/down arrow 10. Press the menu key Setpoint to 295 K on sensor C 11. Press menu key Heater Range and set to power to 100 W, use up/down arrows 12. Shut OFF the main power to the compressor (See section III. E) DO NOT open the system until all 4 sensors read room temperature (~294 K) NOTE: To increase warm up time Argon can be added to the chamber. Only very experienced users should do this. As the temperature increases the pressure increases and must periodically be released or damage can occur. E. BOC Edwards Pump 10

11 Start up: Make sure the turbo flex-line (hose) is connected between the feedthrough port on the LTPS chamber and the pump. The black knob on the LTPS chamber should be fully open, if not turn the knob counterclockwise. 1. Turn the main system power ON (power switch located on the backside) 2. From the CYCLE menu, turn the backing pump ON 3. Let the system evacuate to ~ 1x10-3 Torr 4. From the CYCLE menu, turn the turbo pump ON. The progress bar on the main menu indicates that the turbo pump is winding up. 5. System should evacuate to final pressure of ~ 1x10-6 Torr 6. Close off the feedthrough port on the LTPS by turning black knob clockwise *Special case: Noise in measurement system may be related to vibrations in flex-line connected to the pump. 1. Close off the black valve to the chamber by rotating clockwise 2. Remove the flex-line and measure 3. Optional: Reconnect flex-line and continue pumping 4. Replace plastic cap on the hose. 7. Shut down the main system power (see next section) DO NOT turn full system ON before step 3, may wear out the turbo pump Shut down: Make sure the feedthrough port on the LTPS chamber is closed-off. May disconnect the turbo flex-line (hose) connected to the feedthrough port for easier access to the manipulators and to reduce vibrations in the measurement. 1. From the CYCLE menu, turn the backing and turbo pumps OFF 2. Let the turbo pump completely wind down (watch progress bar) 3. Turn the system power OFF (power switch located on the backside) DO NOT turn main system power off before step 2, turbo pump will wear out Pressurize chamber: Connect Argon to chamber. Watch and make sure to not over pressurize chamber. This can be done by watching the probe bellows. Add argon until bellows start to sag slightly. Immediately turn off Argon and release some pressure. F. Sumitomo Compressor/ Chiller Start up: Make sure that the wall mounted switch in ET 109 is in the OFF position and the chiller in the back room has been plugged in at least 12 hours (should be powered on at all times). The green light indicates the main power to the system is ON. For chilling, flip the toggle switch located on the front of the chiller to ON. Always check chiller water level before use. 11

12 1. Press the wall mounted switch in ET 109 to the ON position. a. If the system is not running, check that the toggle switch on the chiller itself is in the ON position. b. The switch to chiller should remain in the ON position. The toggle switch in ET 109 is used to control the chiller. c. Check the chiller water pressure and level gauge. The water pressure should be 60 psi. 2. Check the pressure gauge on backside of the compressor (~ 1.6 MPa) 3. Turn the main system power on the sumitomo compressor ON. The VTPS should have a vacuum pressure of less than 10-4 torr. 4. Monitor the cooling lines coming from the chiller a. Incoming is cold b. Outgoing is warm 5. After a few minutes, check the sumitomo compressor gauge again (~ MPa) 6. Monitor compressor gauge periodically throughout measurements Final system shut down order Compressor then chiller Shut down: If the pump is still running, follow the shut down procedures outlined in section III. E before proceeding. 1. Bring system up to room temperature (~294 K) 2. Turn the main system power OFF to the compressor 3. Turn the main system power OFF to the chiller (wall mounted switch) Specific Information: Never lose vacuum on LTPS unless all 4 sensors read room temperature (~294 K) Must continually pump (compressor ON) on to the LTPS above 300 K At T > 300 K, NEVER run the system MORE than 15 minutes without cooling!!!!! Probes move significantly during temperature ramping (up or down), watch the monitor closely and/or lift probes between Setpoints (T > 100 K) Materials Acetone (used to clean cables, shields, system components ) Clean wipes (used with Acetone to clean) Ngrease (thermal conductivity/contact grease) Used on the inner radiation shield (brass w/mylar covering) Vacuum grease (light convalescent grease) Used on outer shield (silver) and to seal all O-rings Maintenance: Keep the system and general area clean 12

13 Wipe down system with alcohol and clean wipes each time it is assembled/disassembled to keep the grease and dirt from building up want to control contaminants entering the system Make sure ground leads to each mat are always connected to protect devices Reference Sources: System manuals and related information located in: Cabinet or Y:\Low Temp Probe Station\Equip_Data_Sheets Contacts: Bill Knowlton x65705 Greg Collison x65729 Janis Research Company, INC. (978) Jewel Drive, Wilmington, MA Elizabeth Taylor (Technician) cell: (978) Scott Azer (Sales) x120 Zuyu Zhao (Design) Updates: 13

INSTALLATION INSTRUCTIONS # BURNER ASSEMBLY REPLACEMENT

INSTALLATION INSTRUCTIONS # BURNER ASSEMBLY REPLACEMENT INSTALLATION INSTRUCTIONS # 00-858726 BURNER ASSEMBLY REPLACEMENT C24GA BURNER ASSEMBLY REPLACEMENT Verify steamer has a K3 relay (1, Fig. 1) installed. If K3 relay is not in steamer, one must be installed

More information

SuperKlean Washdown Products

SuperKlean Washdown Products February 2012 DURAMIX 8000 INSTALLATION AND MAINTENANCE INSTRUCTIONS **DO NOT THROW AWAY AFTER INSTALLATION** **SAVE AND DISPLAY PROMINENTLY WHERE THIS EQUIPMENT IS USED** WARNING HIGH PRESSURE AND HOT

More information

Rev B, 9/2/2009. Kodiak Chiller Overview

Rev B, 9/2/2009. Kodiak Chiller Overview 930-0001 Rev B, 9/2/2009 Kodiak Chiller Overview Presentation Outline Phone: 781-933-7300 Lytron Technical Support Contact Information 3 Introduction 4 Part I: Unpacking 5 Part II: Installation 7 Part

More information

Guide for Thin Film Evaporation Edited 7/22/13 by Stephen Albright, BJAM & Steven Palefsky

Guide for Thin Film Evaporation Edited 7/22/13 by Stephen Albright, BJAM & Steven Palefsky Guide for Thin Film Evaporation Edited 7/22/13 by Stephen Albright, BJAM & Steven Palefsky N.B. This guide is written largely for use with the Thin-Film Tunneling with Superconductors instructional lab.

More information

HEATING AND AIR CONDITIONING

HEATING AND AIR CONDITIONING WJ HEATING AND AIR CONDITIONING 24-1 HEATING AND AIR CONDITIONING TABLE OF CONTENTS page SERVICE PROCEDURES REFRIGERANT OIL LEVEL...1 REFRIGERANT RECOVERY....1 REFRIGERANT SYSTEM CHARGE...1 REFRIGERANT

More information

Buehler Cast N Vac 1000 Embedding System

Buehler Cast N Vac 1000 Embedding System Buehler Cast N Vac 1000 Embedding System Standard Operating Procedure Revision: 1.0 Last Updated: Nov 17 2016, Revised by Matt Bilton Overview This document will provide a detailed operation procedure

More information

Instruction Manual DIGITAL MANIFOLD FOR HVAC/R SYSTEMS

Instruction Manual DIGITAL MANIFOLD FOR HVAC/R SYSTEMS English Instruction Manual DIGITAL MANIFOLD FOR HVAC/R SYSTEMS 99 Washington Street Melrose, MA 02176 Phone 781-665-1400 Toll Free 1-800-517-8431 Visit us at www.testequipmentdepot.com Instruction Manual

More information

2016 Ideal Vacuum (505) V 1.1

2016 Ideal Vacuum (505) V 1.1 Doc. Ref. IdealCUBE-6x121416 pg. 1 User Manual Table of Contents 6x6x6 Vacuum Cube Specification Sheet...3 Assembling a Vacuum Cube system...3 Vacuum Cube Frame...3 Plate Installation...4 Mounting for

More information

VACUUM CHAMBER PM TECHNIQUE AMAT 5500 TXZ CHAMBER

VACUUM CHAMBER PM TECHNIQUE AMAT 5500 TXZ CHAMBER VACUUM CHAMBER PM TECHNIQUE AMAT 5500 TXZ CHAMBER OBJECTIVE: TO EFFECTIVELY PM THE AMAT 5500 TxZ IN A TIMELY MANNER, WHILE IMPROVING TOOL RECOVERY AND PARTICLE PERFORMANCE Vacuum Chamber: Vacuum Chamber

More information

Owner s Manual. Model AC375C Refrigerant Recovery, Recycle, and Recharge Unit

Owner s Manual. Model AC375C Refrigerant Recovery, Recycle, and Recharge Unit Owner s Manual Model AC375C Refrigerant Recovery, Recycle, and Recharge Unit Model AC375C Recover, Recycle, and Recharge Unit for R-12 or R-134a Refrigerant Voltage: 220 230; 50 60 Hz SAFETY DEFINITIONS:

More information

Installation Manual PS-225 & PS-275

Installation Manual PS-225 & PS-275 Installation Manual PS-225 & PS-275 Table of Contents Pre-Uncrating Checklist... 1 Verifying System Requirements... 2 Verifying System Direction... 2 Verifying the Electrical Requirements... 2 Removal

More information

IPad Air 2 REPAIR GUIDE. Version Edition

IPad Air 2 REPAIR GUIDE. Version Edition IPad Air 2 REPAIR GUIDE Version 1 2016 Edition IPad Air 2 REPAIR GUIDE LCD AND DIGITIZER REPLACEMENT RiAna Soto Repair Training Specialist rsoto@cellairis.com FOR EVERY REPAIR MAKE SURE TO COMPLETE, INITIAL,

More information

McNeil Group University of Michigan. MBraun Glovebox. Preparing Items To Be Brought Into the Glovebox

McNeil Group University of Michigan. MBraun Glovebox. Preparing Items To Be Brought Into the Glovebox MBraun Glovebox Preparing Items To Be Brought Into the Glovebox Equipment Glassware, stirbars, needles, spatulas and pretty much anything that can go in the oven: should be dried in the oven for at least

More information

INSTALLATION MANUAL. Split-type Air Conditioner (Cooling and Heating) Outdoor Unit UQB09JJWC UQB12JJWC. Indoor Unit AQB09JJWC AQB12JJWC

INSTALLATION MANUAL. Split-type Air Conditioner (Cooling and Heating) Outdoor Unit UQB09JJWC UQB12JJWC. Indoor Unit AQB09JJWC AQB12JJWC AQB09JJ6WC_IM_E_2585 2006.4.17 4:26 PM Page 17 INSTALLATION MANUAL Indoor Unit AQB09JJWC AQB12JJWC Outdoor Unit UQB09JJWC UQB12JJWC ENGLISH FRANÇAIS ESPAÑOL Split-type Air Conditioner (Cooling and Heating)

More information

SERVICE PROCEDURE FOR RETROFITTED A/C SYSTEMS

SERVICE PROCEDURE FOR RETROFITTED A/C SYSTEMS Classification: Reference: Date: HA94-005 NTB94-091 September 26, 1994 SERVICE PROCEDURE FOR RETROFITTED A/C SYSTEMS APPLIED VEHICLE(S): All models except Quest equipped with a retrofitted A/C system SERVICE

More information

Eccotemp L5 and L10 Comprehensive Troubleshooting Guide

Eccotemp L5 and L10 Comprehensive Troubleshooting Guide http://waterheatertimer.org/tent-city-usa-water-heater.html Eccotemp L5 and L10 Comprehensive Listed below are some common questions and troubleshooting guidelines for our various models. Always remember

More information

Linkam Scientific Instruments USER GUIDE TS1500 TS1200 TS1000. High Temperature Stage

Linkam Scientific Instruments USER GUIDE TS1500 TS1200 TS1000. High Temperature Stage Linkam Scientific Instruments TS1500 TS100 TS1000 High Temperature Stage USER GUIDE Contents Before Setting Up your Equipment... 3 Important Notice... 4 Warranty... 4 Technical Support... 4 Equipment Maintenance...

More information

OTO BONDER OWNER S MANUAL WITH CIRCULATING SYSTEM MACHINERY DIVISION - - L to R Unit Shown

OTO BONDER OWNER S MANUAL WITH CIRCULATING SYSTEM MACHINERY DIVISION - - L to R Unit Shown GBAC RROTO OTO BONDER BONDER WITH CIRCULATING SYSTEM G B MACHINERY DIVISION OWNER S MANUAL L to R Unit Shown - - IMPORTANT FOREWORD 1) To ensure efficiency, the GBAC must be properly maintained. Carefully

More information

TRAULSEN RBC50, RBC100 & RBC200 BLAST CHILLERS

TRAULSEN RBC50, RBC100 & RBC200 BLAST CHILLERS TRAULSEN RBC50, RBC100 & RBC200 BLAST CHILLERS basic service guide -NOTICE- This Manual is prepared for the use of qualified personnel. It should not be used by those not properly qualified. Before proceeding

More information

Installation Instructions

Installation Instructions Installation Instructions SELECTRONIC Thermostatic Mixing Valve 0XTMV070 Certified to comply with ASME A.8.M 0 American Standard M97 Specifications Installation Adjust Temperature Service Replacement Parts

More information

Nanoscale Fabrication & Characterization Facility. Thermionics E-Beam Evaporator Users Guide

Nanoscale Fabrication & Characterization Facility. Thermionics E-Beam Evaporator Users Guide Nanoscale Fabrication & Characterization Facility Thermionics E-Beam Evaporator Users Guide The model VE-180 provides thin film coating of virtually any material quickly, cleanly and efficiently. Our system

More information

CONSTANT SUCTION UNIT

CONSTANT SUCTION UNIT CONSTANT SUCTION UNIT OPERATOR/MAINTENANCE M A N U A L Squire-Cogswell/Aeros Instruments Inc 1111 Lakeside Drive Gurnee, IL 60031-4099 1-800-662-5822/847-855-0800 Fax: 847-855-6218 www.aerosinstruments.com

More information

Experiment #6 Photolithography: Microprocessing Technology Fabrication of the microstructures with SPR photoresist

Experiment #6 Photolithography: Microprocessing Technology Fabrication of the microstructures with SPR photoresist Experiment #6 Photolithography: Microprocessing Technology Fabrication of the microstructures with SPR photoresist The Steps involved in Fabrication: Students will fabricate microstructures on the surface

More information

INSTALLATION MANUAL. Split-type Air Conditioner (Cooling and Heating) Indoor Unit AQB18J6WC AQB24J2WC. Outdoor Unit UQB18J6WC UQB24J2WC

INSTALLATION MANUAL. Split-type Air Conditioner (Cooling and Heating) Indoor Unit AQB18J6WC AQB24J2WC. Outdoor Unit UQB18J6WC UQB24J2WC AQB8J6WC_IM_E_25864 2006.4.4 3:29 PM Page 7 INSTALLATION MANUAL Indoor Unit AQB8J6WC AQB24J2WC Outdoor Unit UQB8J6WC UQB24J2WC ENGLISH FRANÇAIS ESPAÑOL Split-type Air Conditioner (Cooling and Heating)

More information

5700-E Sediment Filter Installation & Start-Up Guide

5700-E Sediment Filter Installation & Start-Up Guide Clean Water Made Easy www.cleanwaterstore.com 5700-E Sediment Filter Installation & Start-Up Guide Thank you for purchasing a Clean Water System! With proper installation and a little routine maintenance

More information

SCIF SOP for BSL 2 samples on Aria3

SCIF SOP for BSL 2 samples on Aria3 Date Last Modified: July 2, 2015 Author: David Gravano SCIF SOP for BSL 2 samples on Aria3 Overview of BSL-2+ Sorting Area and Procedures: This document aims to provide a description of the facility, instrumentation,

More information

Standard Operating Procedures

Standard Operating Procedures CENTER FOR NANOSCALE SCIENCE AND ENGINEERING Standard Operating Procedures MMR Low Temperature Micro Probe Matt Deye and Brian Wajdyk Page 1 of 8 Important Gloves should be worn when handling stage, refrigerators,

More information

Refrigerant Recovery Machine. Model No Operating Manual

Refrigerant Recovery Machine. Model No Operating Manual Refrigerant Recovery Machine Model No. 25700 Operating Manual Safety Precautions WARNING : TO PREVENT PERSONAL INJURY AND / OR EQUIPMENT DAMAGE, CAUTION - Risk of injury. This equipment should only be

More information

Clean Water Made Easy

Clean Water Made Easy Clean Water Made Easy http://www.cleanwaterstore.com Pro-OX 1650 Iron Filter Installation & Start-Up Guide Thank you for purchasing a Clean Water System! With proper installation and a little routine maintenance

More information

6L PRESSURE COOKER. Instruction Manual. Model: PLA1424

6L PRESSURE COOKER. Instruction Manual. Model: PLA1424 6L PRESSURE COOKER Instruction Manual Model: PLA1424 Due to ongoing product improvements, specifications and accessories may change without notice. Actual product may differ slightly to that depicted.

More information

Fisher Scientific Model 281A Vacuum Oven. Installation and Operating Manual Rev. 0

Fisher Scientific Model 281A Vacuum Oven. Installation and Operating Manual Rev. 0 Fisher Scientific Model 281A Vacuum Oven Installation and Operating Manual 30979 Rev. 0 Preface Models covered in this manual: Catalog numbers Models numbers Voltage 13-262-50 6288 120V 13-262-51 6289

More information

User manual Flushing device VAS 6337/1a

User manual Flushing device VAS 6337/1a User manual Flushing device VAS 6337/1a 2 Content Safety warnings 3 Flushing with R134a refrigerant 4 1.0 Preparing the Vehicle AC System 4 1.1 Connecting the recovery recharge Unit 6 1.2 Flush procedure

More information

Glovebox Usage Manual v1.4. When you enter the lab walk straight to the log book. Enter all information including N2 and O2/H2O levels.

Glovebox Usage Manual v1.4. When you enter the lab walk straight to the log book. Enter all information including N2 and O2/H2O levels. Logbook Glovebox Usage Manual v1.4 When you enter the lab walk straight to the log book. Enter all information including N2 and O2/H2O levels. Nitrogen tank Alert Daeri Tenery or Andre Gesquiere if the

More information

AUC Cell Washer. User Manual

AUC Cell Washer. User Manual AUC Cell Washer User Manual WARRANTY Spin Analytical Inc., warrants this product to be defect free in both material and workmanship for 90 days from the date of shipment. Labor services are guaranteed

More information

Desoldering Tool. Instruction Manual

Desoldering Tool. Instruction Manual Desoldering Tool Instruction Manual Thank you for purchasing the Hakko 472D desoldering tool with digital temperature display. Please read this manual before operating the Hakko 472D. Keep this manual

More information

Dacor Technical Service

Dacor Technical Service Attention: This manual is just a section from the complete Wall Oven Service Manual. If you find that you require the complete service manual, which includes exploded views and parts, use and care information

More information

Oerlikon Ebeam Evaporator SOP short. UNT Cleanroom

Oerlikon Ebeam Evaporator SOP short. UNT Cleanroom Oerlikon Ebeam Evaporator SOP short UNT Cleanroom 1. Transfer sample holder into process chambers: Log in FOM to access the software Go to the software and log in with user1 and password user1 Go to transport

More information

4.8 FARADAY CUP ASSEMBLY OPTION

4.8 FARADAY CUP ASSEMBLY OPTION 4.8 FARADAY CUP ASSEMBLY OPTION The Faraday cup assembly, mounted on the front end of the Electron Gun, is positioned by either a rotary feedthrough or a pneumatic actuator assembly, located on one of

More information

Installation Manual PS-200 & PS-201

Installation Manual PS-200 & PS-201 Installation Manual PS-200 & PS-201 Table of Contents Pre-Uncrating Checklist... 1 Verifying System Requirements... 2 Verifying System Direction... 2 Verifying the Electrical Requirements... 2 Removal

More information

Operation and Maintenance Haskris LX-Series, R-Series, WW-Series, OPC-Series

Operation and Maintenance Haskris LX-Series, R-Series, WW-Series, OPC-Series Section 1: Temperature Control Your Haskris will have one of three different types of controller. Use table 1-1 to identify the relevant controller. The controller may appear different than examples. Contact

More information

Arizona State University NanoFab PARYLENE COATER. Rev D

Arizona State University NanoFab PARYLENE COATER. Rev D Arizona State University NanoFab PARYLENE COATER Rev D Table of Contents Contents Table of Contents... 1 1. Purpose / Scope... 2 2. Reference Documents... 2 3. Equipment / Supplies / Material... 2 4. Safety...

More information

an ISO 9001:2015 Registered Company

an ISO 9001:2015 Registered Company an ISO 9001:2015 Registered Company Mark IV (672001-VHY) 18865 Goll St. San Antonio, TX 78266 Phone: 800-862-6658 Sales: sales@vintageair.com Tech Support: tech@vintageair.com www.vintageair.com 902001-VHY

More information

Transmission Cooling System J Operation Manual. TRANSFLOW Transmission Cooling System Service Tool J

Transmission Cooling System J Operation Manual. TRANSFLOW Transmission Cooling System Service Tool J Transmission Cooling System J-45096 Operation Manual TRANSFLOW Transmission Cooling System Service Tool J-45096 1 Safety Precautions WARNING: TO PREVENT PERSONAL INJURY AND/OR DAMAGE TO EQUIPMENT: ALLOW

More information

Oxygen Concentrator Procedure

Oxygen Concentrator Procedure Page 1 of 19 Oxygen Concentrator Procedure Section 1: Investigating Normal Operation Section 2: Determining Cause of Malfunction Appendices A: Using an oxygen sensor B: Using a pressure gauge C: Using

More information

Dryer. User manual DV22K6800** DV22K A-00_EN (US)_ indd :15:41

Dryer. User manual DV22K6800** DV22K A-00_EN (US)_ indd :15:41 Dryer User manual DV22K6800** DV22K6800-03650A-00_EN (US)_151211.indd 1 2015-12-11 7:15:41 Before installation Read through the following instructions before installing the dryer, and keep this manual

More information

TEMPERATURE CONTROLLERS

TEMPERATURE CONTROLLERS Instruction Manual: H1 T-12 Thermostat PILOT GUARD INTRODUCTION: SCOPE: This instruction manual includes installation, operation, and parts information for the Kimray Thermostat and Pilot Guard. Refer

More information

Bench-Top Vacuum Oven with 28 segments programmable controller

Bench-Top Vacuum Oven with 28 segments programmable controller Bench-Top Vacuum Oven with 28 segments programmable controller DZF-6000F Series Vacuum Oven MTI Corporation www.mtixtl.com 1 Safety notes DZF Vacuum Oven Please read the following safety notes carefully

More information

INSTALLATION, OPERATION & MAINTENANCE MANUAL BERG TEMPERATURE CONTROL UNIT

INSTALLATION, OPERATION & MAINTENANCE MANUAL BERG TEMPERATURE CONTROL UNIT INSTALLATION, OPERATION & MAINTENANCE MANUAL BERG TEMPERATURE CONTROL UNIT TABLE OF CONTENTS Description Page # Introduction 3 Customer Support 3 Model Number Nomenclature 4 Control Panel 5 Display Panel

More information

13-1. Temperature Regulator

13-1. Temperature Regulator -1 Step 0 Type/Structure/Features Please refer to this for type, structure and features of. Step 1 Selection Please look at the ID chart to choose the right products depending on the intended uses. Details

More information

Mercury Mixing Kit (Code: ME1053)

Mercury Mixing Kit (Code: ME1053) Mercury Mixing Kit (Code: ME1053) The installation and commissioning of the UFH mixing kit system must be exclusively performed by qualified personnel in accordance with the national guidelines and/or

More information

Quick Start Guide. 4MP Vandal Dome Fixed Lens IP Camera O4D1

Quick Start Guide. 4MP Vandal Dome Fixed Lens IP Camera O4D1 Quick Start Guide 4MP Vandal Dome Fixed Lens IP Camera O4D1 Version 1.1.1 Welcome Thank you for purchasing this Network camera! This manual is designed to be a reference tool for your system. Please read

More information

MODEL 7000 SUCTION UNIT

MODEL 7000 SUCTION UNIT MODEL 7000 SUCTION UNIT OPERATOR S MANUAL Caution Federal law restricts this device to sale by or on order of a physician, or any other practitioner licensed by the law of the State in which he practices

More information

Teaching Lab Headway Spinner SOP

Teaching Lab Headway Spinner SOP Teaching Lab Headway Spinner SOP The Headway Photoresist Spinner is designed for manual application of photoresist and spinon products. It accommodates miscellaneous substrates and wafers using an assortment

More information

474 DESOLDERING STATION

474 DESOLDERING STATION 474 DESOLDERING STATION INSTRUCTION MANUAL Thank you for purchasing 474 Desoldering Station. Please read the manual before using the unit. Keep manual in accessible place for future reference. Manufacturer:

More information

OWNER S MANUAL. Models: Herkules Equipment Corporation 2760 Ridgeway Court Walled Lake, MI USA Fax

OWNER S MANUAL. Models: Herkules Equipment Corporation 2760 Ridgeway Court Walled Lake, MI USA Fax Part# 1000692 7/12/99 tn INSTRUCTIONS This manual contains important information concerning the installation and operation of the gun washers listed at the right. Read manual thoroughly and keep for future

More information

Installation Instructions

Installation Instructions Installation Instructions SELECTRONIC Thermostatic Mixing Valve 605XTMV Certified to comply with ASME A.8.M 005 American Standard M968808 Specifications Installation Adjust Temperature Service Replacement

More information

Parts & Material Included

Parts & Material Included O² Hydro Well System Installation, Use & Care Guide Parts & Material Included 1. Funnel 11. Drain Line 21. Air Head 2. Media Tank Distributer Tube 12. Air Release 22. Drain Fitting 3. Air Tank Distributer

More information

MODEL URS-1: FACTORY RETROFIT PROGRAM

MODEL URS-1: FACTORY RETROFIT PROGRAM MODEL URS-1: FACTORY RETROFIT PROGRAM The USR-1 unit has gone through extensive testing in order to attain maximum performance. It has been determined that in order to set the unit for all weather operation,

More information

INSTALLATION, OPERATION AND SERVICE MANUAL AERATION SYSTEMS FEATURING AIR COMPRESSOR AND AIR ELIMINATOR TANK

INSTALLATION, OPERATION AND SERVICE MANUAL AERATION SYSTEMS FEATURING AIR COMPRESSOR AND AIR ELIMINATOR TANK INSTALLATION, OPERATION AND SERVICE MANUAL AERATION SYSTEMS FEATURING AIR COMPRESSOR AND AIR ELIMINATOR TANK FOR USE WITH 1 CU. FT. AUTOMATIC BACKWASHING FILTERS 7-LAER1047-115 AERATION SYSTEM 7-LAER1047-230

More information

COMMERCIAL GRADE UNDER COUNTER REFRIGERATION RANGE

COMMERCIAL GRADE UNDER COUNTER REFRIGERATION RANGE COMMERCIAL GRADE UNDER COUNTER REFRIGERATION RANGE The Grand Deluxe Range designed with the bar and restaurant industry in mind. The Grand Deluxe line of kegerators are built to stand up to heavy use in

More information

Fleck 2510 Sediment Filter Installation & Start-Up Guide

Fleck 2510 Sediment Filter Installation & Start-Up Guide Clean Water Made Easy www.cleanwaterstore.com Fleck 2510 Sediment Filter Installation & Start-Up Guide Thank you for purchasing a Clean Water System! With proper installation and a little routine maintenance

More information

Reliability in Laboratory Centrifuges Since Operator s Manual. Models 614B, 614L, 614U/UL and 614V/VL Laboratory Centrifuge. Rev. 5.

Reliability in Laboratory Centrifuges Since Operator s Manual. Models 614B, 614L, 614U/UL and 614V/VL Laboratory Centrifuge. Rev. 5. Reliability in Laboratory Centrifuges Since 1932 Rev. 5.0 Operator s Manual Models 614B, 614L, 614U/UL and 614V/VL Laboratory Centrifuge Description: Intended Use: The Drucker model 614 is a low-cost,

More information

Owner s Manual. Terpene Trap CF 1000

Owner s Manual. Terpene Trap CF 1000 Owner s Manual Terpene Trap CF 1000 IMPORTANT SAFETY INFORMATION: Please carefully read this manual before attempting to use your Terpene Trap. For your safety, comply with all safety instructions and

More information

Cleaning the internal optics surfaces

Cleaning the internal optics surfaces Cleaning the internal optics surfaces The face of the fiber-optic assembly and the lens are directly exposed to sample fluids inside the analyzer s flow cell. Automatic rinse cycles use high-pressure rinse

More information

NO LONGER IN PRODUCTION

NO LONGER IN PRODUCTION M7-00 thru -00 Service and Parts Manual Self-Contained Steam Sterilizer Serial Number Prefixes: RB, CR, CP, CS, FM, FN -00 M7 thru -00 NO LONGER IN PRODUCTION Some service parts may not be available for

More information

Standard Operating Manual

Standard Operating Manual Standard Operating Manual SOLITEC 5110-C/PD Manual Single-Head Coater Page 1 of 14 Contents 1 Picture and Location 2 Process Capabilities 2.1 Cleanliness Standard 2.2 Recipes 2.3 Performance of SOLITEC

More information

INSTRUCTION MANUAL 4-WAY BALL VALVE Digital Manifold

INSTRUCTION MANUAL 4-WAY BALL VALVE Digital Manifold LOW VAC INSTRUCTION MANUAL 4-WAY BALL VALVE Digital Manifold REF HIGH SPECIAL FEATURES Low battery indicator Displays 63 refrigerants Displays corresponding saturation, dew or bubble point temperature

More information

POOL WINTERIZING INSTRUCTIONS

POOL WINTERIZING INSTRUCTIONS TASK CHECKLIST 1. Clean the Filter 2. Remove the Deck Equipment 3. Clean the Pool 4. Lower the Water Level 5. Apply Chemicals 6. Freeze Proof Equipment & Plumbing Lines 7. Put on the Winter Cover Note:

More information

A/C-HEATER SYSTEM - MANUAL

A/C-HEATER SYSTEM - MANUAL A/C-HEATER SYSTEM - MANUAL 1986 Isuzu Trooper II 1986 A/C-HEATER SYSTEM Isuzu A/C-Heater Systems - Manual P UP, Trooper II * PLEASE READ THIS FIRST * CAUTION: When discharging air conditioning system,

More information

Manual v1 Page 1 of 19. Manual. Laboratory autoclave

Manual v1 Page 1 of 19. Manual. Laboratory autoclave Manual 20.2.2015 v1 Page 1 of 19 Manual Laboratory autoclave Autoclave using steam for the treatment of material and laboratory processes e.g. sterilization, as an aid in research and development CertoClav

More information

Series 1140 and 1141 Temperature Regulators

Series 1140 and 1141 Temperature Regulators Hoffman Specialty Installation & Maintenance Instructions HS-504(E) Series 1140 and 1141 Temperature Regulators! CAUTION FOLLOW ALL INSTALLATION AND OPERATING INSTRUCTIONS. TURN OFF WATER OR STEAM BEFORE

More information

PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST PLYMOUTH BELVEDERE

PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST PLYMOUTH BELVEDERE PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST 1966-67 PLYMOUTH BELVEDERE CONTROL & OPERATING INSTRUCTIONS The controls on your new Perfect Fit system. Offers complete comfort capabilities in virtually every

More information

Safety Warnings. Work area safety. Electrical Safety. Personal Safety

Safety Warnings. Work area safety. Electrical Safety. Personal Safety Table of Contents Safety Warnings...2 Work area safety...2 Electrical Safety...2 Personal Safety...2 Power tool use and care...3 Service...3 Hammer safety warnings...3 Product Layout...4 Product Description...4

More information

Clean Water Made Easy. CWS Time Clock Softener Installation & Start Up Guide. Questions?

Clean Water Made Easy. CWS Time Clock Softener Installation & Start Up Guide. Questions? Clean Water Made Easy www.cleanwaterstore.com CWS Time Clock Softener Installation & Start Up Guide Thank you for purchasing a Clean Water System! With proper installation and a little routine maintenance

More information

TC-710 RECYCLING BALER

TC-710 RECYCLING BALER OPERATING AND MAINTENANCE INSTRUCTIONS TC-710 RECYCLING BALER READ INSTRUCTIONS THOROUGHLY BEFORE OPERATING 3451 S. 40th Street Phoenix, AZ 85040 602.437.5020 800.223.4540 www.tsissg.com info@tsissg.com

More information

Before using your machine, you must familiarize yourself with all of its components.

Before using your machine, you must familiarize yourself with all of its components. USE AND MAINTENANCE MANUAL FOR THE FOAMTEC 1800 NOTE: As with all electrical equipment, care and attention must be exercised at all times during its use, in addition to ensure that routine and preventative

More information

Ebb & Flow System

Ebb & Flow System 113501 Ebb & Flow System Actual system may differ from what is shown. System requires a timer to control the main pump and to set watering cycles. Additional purchase required. 2016 FarmTek All Rights

More information

Audi-Larm Audible Alarm

Audi-Larm Audible Alarm Audi-Larm Audible Alarm MAINTENANCE AND REPAIR TAL 1706 (L) Rev. 7 MSA 2017 Prnt. Spec. 10000005389(I) Mat. 10093084 Doc. 10093084 REPLACEMENT KITS AND PARTS LIST TAL 1706 (L) Rev. 7-10093084 2 Exploded

More information

474A+ TIP CARE AND USE INSTRUCTION MANUAL DESOLDERING STATION

474A+ TIP CARE AND USE INSTRUCTION MANUAL DESOLDERING STATION TIP CARE AND USE. Tip Temperature High soldering temperatures can degrade the tip. Use the lowest possible soldering temperature. The excellent thermal recovery characteristics ensure efficient and effective

More information

Air Conditioner. user installation & manual manual. imagine the possibilities

Air Conditioner. user installation & manual manual. imagine the possibilities ARFSSSBWK Series ARFSSSCUR AJ JNADCH Series Air Conditioner user installation & manual manual This manual is made with 100% recycled paper. imagine the possibilities Thank you for purchasing this Samsung

More information

Pre-Installation Instructions. Installation Instruction. Installation Instructions. kah. wall. Warning. User s Manual and warranty

Pre-Installation Instructions. Installation Instruction. Installation Instructions. kah. wall. Warning. User s Manual and warranty Pre-Installation Instructions Installation Instruction User s Manual and warranty Installation plate Junction valve Check if the accessories fit your toilet dimension and then install bidet seat. Remote

More information

AUTOMOTIVE AIR CONDITIONER REFRIGERANT HANDLING SYSTEM

AUTOMOTIVE AIR CONDITIONER REFRIGERANT HANDLING SYSTEM Guangzhou Junliye Import&Export Co., Ltd. AUTOMOTIVE AIR CONDITIONER REFRIGERANT HANDLING SYSTEM OPERATION MANUAL 1. Cautions: Wear the glove and eye protection glass to protect the skin and eyes from

More information

XPS-ProDry User s Guide Dryer Base

XPS-ProDry User s Guide Dryer Base XPS-ProDry User s Guide XPS-ProDry User s Guide Dryer Base For Use with Inkjet Imaging Systems Manual Part#: M-3120 Revision: August 2005 XPS-ProDry User s Guide Written by Frank Mauri & John Brand Published

More information

ASSEMBLY and INSTALLATION INSTRUCTIONS. Pipe wrench Ratchet 3/8 socket 9/16 socket 11/16 socket 3/16 Allen key 3/32 Allen key 9/64 Allen key

ASSEMBLY and INSTALLATION INSTRUCTIONS. Pipe wrench Ratchet 3/8 socket 9/16 socket 11/16 socket 3/16 Allen key 3/32 Allen key 9/64 Allen key ASSEMBLY and INSTALLATION INSTRUCTIONS Gas Conversion Kit Tube Heaters View these instructions online at www.lbwhite.com Kit Contents: DESCRIPTION QTY. Instructions 1 Burner orifi ce 1 Manifold pipe 1

More information

FIREPLACE INSTALLATION

FIREPLACE INSTALLATION CHECK GAS TYPE Use proper gas type for the fireplace unit you are installing. If you have conflicting gas types, do not install fireplace. See retailer where you purchased the fireplace for proper fireplace

More information

INVERTER SPLIT - TYPE

INVERTER SPLIT - TYPE INVERTER SPLIT - TYPE ISSUE No 2 DATE 04/09/08 P/No 2020323A2868 CONTENTS SAFETY PRECAUTIONS Warning 2 Operating temperature 2 BEFORE INSTALLATION Tools needed for installation 3 Items required for installing

More information

347002K/177002K/34900

347002K/177002K/34900 Service Manual Models: 347002K/177002K 34900/347012K Manifold Block Style Recovery/Recycling/Recharging Unit For R-12 or R-134a Only TABLE OF CONTENTS: Theory of Operation and Safety Precautions... 2 Depressurizing

More information

*****Important Read First*****

*****Important Read First***** *****Important Read First***** Unpacking the pug mill First, remove the nails on the four lower sides of the wooden crate. Watch out for the nails. Next, remove the upper wooden crate box. The pug mill

More information

WINDSHIELD REPAIR MANUAL SUPER CINCH

WINDSHIELD REPAIR MANUAL SUPER CINCH WINDSHIELD REPAIR MANUAL FOR SUPER CINCH WWW.GlassProSystems.Com 1-800-395-7380 COPYRIGHT Glass Pro Systems 2006 1 Table of Contents 1. Cover Page 2. Introduction 3. Introduction, continued 4. Parts of

More information

MacDonald Steel Limited

MacDonald Steel Limited DELUXE FILLER / CROWNER MODEL - DFC4 1 REV 00 CAUTION / WARNING READ MANUAL BEFORE OPERATING MACHINE DO NOT EXCEED 50 PSI ON Co2 OR BEER LINES DO NOT EXCEED 100 F (35 C) ON Co2 OR BEER LINES DO NOT HOSE

More information

INSTALLATION INSTRUCTIONS & HOME OWNERS MANUAL AUTOBOOSTER IMPORTANT SAFETY INFORMATION

INSTALLATION INSTRUCTIONS & HOME OWNERS MANUAL AUTOBOOSTER IMPORTANT SAFETY INFORMATION INSTALLATION INSTRUCTIONS & HOME OWNERS MANUAL AUTOBOOSTER IMPORTANT SAFETY INFORMATION When installing or using any high voltage electrical appliance, basic safety precautions should always be followed.

More information

Clean & Clear. Cartridge Filter System Owner s Manual IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

Clean & Clear. Cartridge Filter System Owner s Manual IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS Clean & Clear Cartridge Filter System Owner s Manual IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS SECTION I. SECTION II. SECTION III. SECTION IV. SECTION V. SECTION

More information

kéìíê~=iqd=qìåöëíéå=dêáåçéê= lééê~íáçåë=j~åì~ä=

kéìíê~=iqd=qìåöëíéå=dêáåçéê= lééê~íáçåë=j~åì~ä= NJUMMJVQQJOOQP ïïïk~êåjòçåékåçã kéìíê~iqdlééê~íáçåëj~åì~ä m^dbnlcnm kéìíê~iqdqìåöëíéådêáåçéê lééê~íáçåëj~åì~ä ^o`jwlkbk`lj IfåÅ. OMVNi~ëm~äã~ëaêáîÉpíÉK` `~êäëä~çi`^vomnnjnrrn qéäwtsmkvpnknrmm UMMKVQQKOOQP

More information

SECTION 2 SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES UNIT 8 SYSTEM EVACUATION

SECTION 2 SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES UNIT 8 SYSTEM EVACUATION SECTION 2 SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES UNIT 8 SYSTEM EVACUATION UNIT OBJECTIVES After studying this unit, the reader should be able to Describe a standing pressure test. Choose a leak detector

More information

OWNER S MANUAL MODULAR DIRECT CONNECTED TILTING STEAM JACKETED KETTLE

OWNER S MANUAL MODULAR DIRECT CONNECTED TILTING STEAM JACKETED KETTLE OWNER S MANUAL MODULAR DIRECT CONNECTED TILTING STEAM JACKETED KETTLE MODELS: MT6 MT6T6 MT10 MT10T10 MT10T6 LFT6 LFT10 LFT10T6 LFT10T10 Form Number: S-2306 REV:C 10/12 Printed in U.S.A. 35 Garvey Street

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Accessory Application Publication No. INSTALLATION INSTRUCTIONS PANNIER CASE P/N 08L70-MGZ-D80 COMMON MII Issue Date July 2013 PARTS LIST 1 CYLINDER SET (Type 1 T2.3) Sold separately (1)

More information

DOOR, DRAWER, & PANTRY INSTALL SPECIFICATIONS

DOOR, DRAWER, & PANTRY INSTALL SPECIFICATIONS DOOR, DRAWER, & PANTRY INSTALL SPECIFICATIONS Model # 53830SC Shown Model # 53930SC Shown GENERAL INFORMATION INSTALLER: Leave these instructions with consumer. CONSUMER: Retain for future reference. WARNING

More information

Instructions for Use: Fiberscope and LED Light Source

Instructions for Use: Fiberscope and LED Light Source Instructions for Use: and Brand Name of Product Generic Name of Product Product Code Number(s) Intended Use Range of Applications for Product Key Specifications of Product, FBR-001, FBR-002, FBR-ULB-100,

More information

Page 1 of 18. Part# /5/2013

Page 1 of 18. Part# /5/2013 Part# 1002655-06 8/5/2013 This manual contains important information concerning the installation and operation of the gun washers listed above. Read manual thoroughly and keep for future reference INSTRUCTIONS

More information

AUTOMOTIVE AIR CONDITIONER REFRIGERANT HANDLING SYSTEM

AUTOMOTIVE AIR CONDITIONER REFRIGERANT HANDLING SYSTEM AUTOMOTIVE AIR CONDITIONER REFRIGERANT HANDLING SYSTEM OPERATION MANUAL Index I Caution.... 2 II Notation.. 2 III Technical parameter...3 IV Functions... 3 V Device Description. 3 (I) Control panel. 4

More information