Modifications and Improvements to the NPDGamma Liquid Hydrogen Target System and Safety
|
|
- Carmel Stafford
- 6 years ago
- Views:
Transcription
1 Modifications and Improvements to the NPDGamma Liquid Hydrogen Target System and Safety Prepared: H. Nann, Indiana University, November 01, 2011 Checked: S. Penttila, ORNL, November 01, 2011 Approved: M. Snow, Indiana University, October 2x, SCOPE The scope of this document is to record changes to the structure of the liquid hydrogen target system, to its safety, and to its operational baseline established at LANSCE when the NPDGamma Liquid Hydrogen System was approved and successfully operated in FP12 in Changes were made for the thickness of the beam entrance windows, the target alignment inside the isolation vacuum chamber, the copper radiation shield, to the two cryo-cooler flanges and the chimney flange, the thermal conduction between the cryo-coolers and the LH 2 vessel, the thermometry and heaters, the ortho-to-para converter (OPC), and the neutron shielding inside the isolation vacuum chamber. 2. THICKNESS OF THE BEAM ENTRANCE WINDOWS During the operation in 2006, it was found that the neutron beam created too much background signal in the gamma detectors due to interactions in the entrance windows to the target vessel and the isolation vacuum chamber. To reduce this background contribution, the thicknesses of entrance windows to the target vessel and the isolation vacuum chamber (cryostat) seen by the neutron beam were reduced. 2.1 New Target Vessel A new target vessel was designed and built meeting the safety requirements of Section VIII of the ASME Boiler and Pressure Vessel Code. Figures 1 and 2 show the liquid hydrogen target vessel and its entrance window, the thickness of which was reduced from to in a diameter of 9. A Finite Element Analysis (FEA) was performed by Claire Luttrell at ORNL to see if the new target vessel can have a large enough Maximum Allowable Working Pressure (MAWP). The results of the FEA analysis (see
2 show that the vessel can withstand a maximum internal pressure of 137 psi. Based on this new design, the target vessel was fabricated from 6061-T6 aluminum and U stamped by the ASME authorized vendor Ability Engineering Technology, Inc., of South Holland, IL. The FEA analysis, performed by Ability Engineering, yielded a target vessel MAWP of psi ( see selreport%20copy.pdf). Consequently, it was pressure tested at 72 psi. AbilityVesselReport.pdf gives an overall vendor report on the design, QA, and testing/certification of the target vessel. Fig. 1 The LH 2 target vessel assembly drawing.
3 Fig. 2 The thinner beam entry window in the target vessel. 2.2 New Thinner Entrance Windows for the Cryostat The target cryostat has a two-layer entrance window, i.e. the windows are formed by two parallel windows with a small gap between them. The windows are bolted with 36 1/4-20 size bolts on the bolt circle of for the inner window and 15.0 for the outer window giving an axial sealing force of 2300 lb/inch and 2100 lb/inch on these bolt circles, respectively. The thickness of each window was reduced from to A Finite Element Analysis (FEA) was performed by Walt Fox at Indiana University to see if the two new windows can withstand the Maximum Allowable Working Pressure (MAWP) set by two parallel rupture disks, each with a set point of 7.0 psid. The results of the FEA analysis (see show that the cryostat can withstand a maximum internal pressure of 31 psi. The FEA analysis was performed with 6061-T0 aluminum, the weakest temper of 6061 aluminum. The new windows were fabricated by hydro-forming from 6061-T6 aluminum by the ASME authorized vendor Ability Engineering Technology, Inc., of South Holland, IL.
4 3. TARGET ALIGNMENT INSIDE THE ISOLATION VACUUM CHAMBER The relative location of the neutron beam and the hydrogen vessel has to be well known for the NPDGamma experiment. Unfortunately, during the 2006 run at LANSCE, the LH2 vessel alignment with respect to the neutron beam was not enough well known. Thus the precision of the mechanical interfaces between the target vessel, the G-10 spacers (Fig. 3), and the radiation shields was improved. These improvements have no effect on the target operation and safety. Fig. 3 The G-10 spacer to align the target vessel. 4. COPPER RADIATION SHIELD AND ITS UPSTREAM COVER LID During the 2006 LANSCE run it was found that the thermal and mechanical contact between the upstream lid on the copper radiation shield and the cylindrical portion of the shield was not sufficient. This led to an increased heat load on and thermal gradient in the target vessel. The copper radiation shield was redesigned to improve this contact area and the ease of installation. Bolts were added to improve the thermal contact of the radiation shield by mechanical force. This will result in a better temperature distribution in the target and less heat flow to the LH2 target. These improvements have no effect on the target safety.
5 5. EXTRA BOLTS FOR THE INDIUM SEALS IN THE TWO CRYO-COOLER FLANGES AND THE FILL/VENT LINE FLANGE The existing 6 bolts on the flanges for the cryo-refrigerators and the fill/vent line adaptor were not enough to reliably supply enough axial force to ensure that the indium o-rings sealed reliably. Thus the number of bolts in the flanges was approximately tripled (see Fig. 4). Fig. 4 Added bolt holes on the top of the isolation vacuum chamber. In addition, a bridge clamp and some toe clamps for the upper refrigerator flange were constructed according to the design shown in Fig. 5. This will provide more axial force to the joint and make it more reliable and decrease the probability for leaks.
6 Fig. 5 Bridge and toe clamps for the upper refrigerator cryo-refrigerator flange. 6. IMPROVEMENT OF THE THERMAL CONDUCTION BETWEEN CRYO- COOLERS AND THE LH 2 VESSEL The thermal contact between the cryo-refrigerators and the LH 2 target vessel was smaller than desired. Thus it was redesigned to increase the thermal conductance as well to increase the surface area of contact between the refrigerators and the target vessel. The ring clamp used previously has been replaced by a tab on the end of the target vessel with a flat surface (see Fig. 6) that can be directly bolted to the new bar (shown in Fig. 7) with an increased cross sectional area. This will improve the cooling of the target vessel, but has no effect on safety.
7 Fig. 6 Flat surface on the end of the target vessel for the thermal link. Fig. 7 Thermal connection bar between the target vessel and the upper cryo-cooler
8 7. THERMOMETRY AND HEATERS The thermometry of the LH 2 target as it was used at LANSCE did not give enough information on the status of the system. There were too few heaters to implement some desired target recirculation modes. Thus more heaters and thermometers were added, especially to the upper region of the target and the fill/vent line. A new electrical feed-through was added to the chimney to accommodate the new wires. This will improve the knowledge of the target state, but has no effect on safety. 8. ORTHO-TO-PARA CONVERTER AND ITS CONFLAT FLANGE There were four problems with the lower OPC during the runs at LANSCE: its volume was too small, the hard soldered CF flange was distorted, its knife edge was warped, and the stainless steel mesh on the bottom of the cup was glued in with the epoxy partially covering the flow channel. Thus a new, larger volume OPC with a new CF flange was designed and built (see Fig.8). The heat exchange area between the catalyst and the body of the OPC was also increased. Fig. 8 The assembly of the new ortho-to-para converter.
9 This new design of the OPC improves the seal, makes the installation easier, reduces stresses in other parts of the target, and increases the reliability of the joint. 9. NEUTRON SHIELDING AROUND THE TARGET VESSEL During the operation in 2006 at LANSCE, it was found out that there were several gaps in the 6 Li neutron shielding inside the isolation vacuum chamber. The escaped neutrons produced background γ-radiation from their capture in the walls of the isolation vacuum chamber and the CsI detectors. Thus the 6 Li neutron shielding was redesigned to reduce the number of escaped neutrons and thus the γ-radiation background in the CsI detectors. In addition, the thermal connection bar and the ortho-to-para converter were covered with shielding. Figures 9 and 10 show the new neutron shielding. These improvements have no effect on the target safety. Fig. 9 A cut view of the cryostat, the improved neutron shielding shown in blue.
10 Fig. 10. A model view of the target vessel and interconnected piping. White shells are 6 Li loaded neutron absorber.
Description of the Ortho-to-Para Convertor and Internal Plumbing of the Hydrogen Target
Description of the Ortho-to-Para Convertor and Internal Plumbing of the Hydrogen Target Prepared: M. Snow, Indiana University, March 08, 2011 Checked : H. Nann, Indiana University, October 25, 2011 Approved:
More informationD R A F T. Testing of performance of precooling refrigerator in the fill/vent line at Indiana. Revision: 0.00
D R A F T Testing of performance of precooling refrigerator in the fill/vent line at Indiana Revision: 0.00 Prepared: Z. Tang, Indiana University, Nov- 10-2011 Checked: Hermann, Nann, Indiana University,
More informationS&T HEAT EXCHANGERS Part II: Main Parts, Conical Transitions, Shell & Heads, Nozzle Design.
S&T HEAT EXCHANGERS Part II: Main Parts, Conical Transitions, Shell & Heads, Nozzle Design. STUDY NOTES Instructor: Javier Tirenti training@arvengconsulting.com www.arvengconsulting.com Table of contents
More informationAldrich Blowdown Separators & Cooling Manifolds
Aldrich Blowdown Separators & Cooling Manifolds ASME Section VIII U Stamped & National Board Registered Construction: Aldrich blowdown separators are constructed of 3/8 thick carbon steel shell and 3/8
More informationUHV Flow Cryostats. Ultra High Vacuum Flow cry stats CRYO INDUSTRIES
UHV Flow Cryostats Ultra High Vacuum Flow cry stats INDUSTRIES Ultra High Vacuum Flow Cryostats: Models RC-102 and RC-110 Cryo offers Models RC-102 and RC-110 Ultra High Vacuum continous flow cryostats,
More informationVacuum Insulated Pipe
Product Catalog Innovation. Experience. Performance. Vacuum Insulated Pipe Ensuring liquid supply capabilities. Any application - Any time Ensuring liquid supply capabilities. Any application - Any time
More informationCan one cool the MICE magnets and the Hydrogen Absorbers with Small Coolers? Michael A Green Oxford University Physics Oxford OX1 3RH, UK
Can one cool the MICE magnets and the Hydrogen Absorbers with Small Coolers? Michael A Green Oxford University Physics Oxford OX1 3RH, UK 1 To small use coolers or not to use small coolers? That is the
More informationTable of Contents. Check the LCLS Project website to verify 2 of 12 that this is the correct version prior to use.
Table of Contents Summary...3 Mechanical Design Specifications...3 Vacuum...3 Materials...5 Support Requirements...5 Cabling...6 Light Path...6 BLM Synchrotron Radiation Assembly (BL11)...7 Other Requirements...9
More informationGASEOUS HYDROGEN SYSTEMS
CHAPTER 7 GASEOUS HYDROGEN SYSTEMS SECTION 701 GENERAL 701.1 Scope. The installation of gaseous hydrogen systems shall comply with this chapter and Chapters 30 and 35 of the Fire Compressed gases shall
More informationHVAC BASIC MATERIAL AND METHODS 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS
230500 HVAC BASIC MATERIAL AND METHODS PART 1 GENERAL 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS A. Section 230000 Basic HVAC Requirements B. Section 230523 Valves C. Section 230510 Chilled
More informationISIS Design Division Electrical Engineering. S Birch. September 2012.
S Birch. September 2012. Mitigation against EMI/RFI noise on Detector cabling and Data Acquisition Electronics. Brief overview of an IEC 61508 Neutron Instrument Personnel Protection Interlock System.
More informationC. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.
SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers
More informationliquid heating The density of the liquid changes as its temperature increases. This causes energy to be transferred throughout the liquid.
1 liquid is heated in a beaker. liquid heating The density of the liquid changes as its temperature increases. This causes energy to be transferred throughout the liquid. How does the density change and
More informationMetal Turbine Exhaust Joints An analysis of metal and fabric GTX expansion joints
The expansion joints, for a large Westinghouse turbine, are used between a hot turbine diffuser and cold HRSG inlet; the internal gas temperature is 1100ºF average. The two fabrics have thermal monitors
More informationScienceDirect. Development progress of critical equipment in the CSNS cryogenic hydrogen system
Available online at www.sciencedirect.com ScienceDirect Physics Procedia 67 (2015 ) 233 238 25th International Cryogenic Engineering Conference and the International Cryogenic Materials Conference in 2014,
More informationC22 Bulletin # October 1993 Supersedes May 1993
ENGINEERING DATA H C22 SERIES EVAPORATOR UNITS UP-FLO AIR-CONDITIONING AND HEAT PUMP *12,100 to 73,000 Btuh (3.5 to 21.4 kw) Cooling Capacity *ARI Standard 210/240 Certified Ratings with Matching Outdoor
More informationSuperCDMS SNOLAB: Road to 100 mm Germanium Detectors
SuperCDMS SNOLAB: Road to 100 mm Germanium Detectors H. Chagani University of Minnesota for the SuperCDMS Collaboration 23 July 2012 The SuperCDMS Soudan Detector: izip interleaved Z-sensitive Ionisation
More informationA THIN GOLD COATED HYDROGEN HEAT PIPE -CRYOGENIC TARGET FOR EXTERNAL EXPERIMENTS AT COSY
6 th Conference on Nuclear and Particle Physics 17-21 Nov. 2007 Luxor, Egypt A THIN GOLD COATED HYDROGEN HEAT PIPE -CRYOGENIC TARGET FOR EXTERNAL EXPERIMENTS AT COSY M. Abdel-Bary a, S. Abdel-Samad a,
More informationC. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.
SECTION 22 10 00 PLUMBING PIPING AND PUMPS PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.
More informationDesign Optimization of Evaporator Clip by FEA (ANSYS)
Design Optimization of Evaporator Clip by FEA (ANSYS) Giridhar Kumar Abhijit Kulkarni Global Technology and Engineering Centre,Whirlpool of India Ltd. Pune, India Abstract Structural rigidity of refrigerator
More informationDECOMMISSIONING OF THE REACTOR VESSEL OF THE COMPACT SODIUM COOLED NUCLEAR REACTOR FACILITY (KNK)
DECOMMISSIONING OF THE REACTOR VESSEL OF THE COMPACT SODIUM COOLED NUCLEAR REACTOR FACILITY (KNK) J. Benkert, F. Willman Westinghouse Electric Germany GmbH Mannheim / D K. Brockmann, I. Hillebrand Research
More informationMechanical Concept of the TESLA Detector
Mechanical Concept of the TESLA Detector Klaus Sinram Snowmass August 2005 Ties Behnke, FLC Franz Czempik, ZMEA1 Peter Hassler, ZM1 Helmut Hirsemann, ZMEA1 Jan Kuhlmann, ZMEA1 Cornelius Martens, ZM1 Norbert
More informationMetal hydride storage system for MICE experiment at Rutherford Appleton Laboratory. Technical specification.
DRAFT Metal hydride storage system for MICE experiment at Rutherford Appleton Laboratory. Technical specification. MICE Collaboration Contact persons: Dr Thomas Bradshaw Head of Cryogenics Section Tel:
More informationBryan Water-Pak Indirect Systems 360,000 BTU to 4,500,000 BTU Inputs 199 to 3,533 Gallons Storage Capacity
Form No. 2300-7 (Rev. 2/99) Gas, il or Dual Fuel Fired Bryan Water-Pak Indirect Systems 360,000 BTU to 4,500,000 BTU Inputs 199 to 3,533 Gallons Storage Capacity Originators of the Flexible Water Tube
More informationDomestic Pump Condensate Transfer Equipment
Bulletin S-944L Domestic Pump Condensate Transfer Equipment CONDENSATE RETURN UNITS BOILER FEED UNITS LOW NPSH PUMPS VACUUM HEATING UNITS INDUSTRIAL VACUUM UNITS www.domesticpump.com Condensate Return
More informationMarine Heat Exchangers SALES SERVICE REPAIR
Marine Heat Exchangers SALES SERVICE REPAIR Heat Transfer Equipment THE BROADEST SELECTION AVAILABLE FOR GENERAL HEATING AND COOLING. PRODUC 104-32 Shell & Tube Heat Exchangers PRE-ENGINEERED FOR GENERAL
More informationHeat Transfer Equipment
Heat Transfer Equipment THE BROADEST SELECTION AVAILABLE FOR GENERAL HEATING AND COOLING. PR ODUC Shell & Tube Heat Exchangers PRE-ENGINEERED FOR GENERAL APPLICATIONS SX2000 Pre-engineered fixed tubesheet
More informationInternational Reactor Bulletin 1100 Corporation. Standard and Custom Reactors for the Chemical Process Industries
International Reactor Bulletin 1100 Corporation Standard and Custom Reactors for the Chemical Process Industries 2 International Reactor Corporation 521 Kiser Street Dayton, Ohio 45404-1641 Phone: 937-224-4444
More informationHYDRONIC SPECIALTIES TACO AC(F)-PAX 05/15/2008
SECTION 15181 - HYDRONIC SPECIALTIES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Air separators B. Expansion tanks C. Pump accessories 1.2 RELATED SECTIONS A. Section - Plumbing Piping Specialties B. Section
More informationBORSIG WASTE HEAT BOILERS FOR NITRIC ACID, CAPROLACTAM AND FORMALDEHYDE PLANTS PROCESS HEAT EXCHANGER. A Member of KNM Group Berhad
BORSIG PROCESS HEAT EXCHANGER WASTE HEAT BOILERS FOR NITRIC ACID, CAPROLACTAM AND FORMALDEHYDE PLANTS A Member of KNM Group Berhad The Company BORSIG Process Heat Exchanger GmbH (a member of the BORSIG
More informationSpinTron 2: 2-inch High Vacuum Magnetron Sputter Source Product Installation and Use
www.directvacuum.com www.micromagnetics.com Micro Magnetics, Inc. 421 Currant Road, Fall River, MA 02720 Phone: (508)672-4489 admin@micromagnetics.com SpinTron 2: 2-inch High Vacuum Magnetron Sputter Source
More informationSECTION ELECTRIC WATER HEATERS
SECTION 22 36 01 ELECTRIC PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More information2/4TXCC037BC3HCA 2/4TXCB042BC3HCA 4TXCC044BC3HCA 2/4TXCC043BC3HCA 2/4TXCB048BC3HCA
18- AH39D1-4 Cased Aluminum "Convertible" Coils 2/4TXCA018BC3HCA 2/4TXCA024BC3HCA 2/4TXCB025BC3HCA 2/4TXCB031BC3HCA 4TXCB032BC3HCA 2/4TXCB036BC3HCA ALL phases of this installation must comply with NATIONAL,
More informationMELAMINE DRYERS PRESENTATION MELAMINE DRYERS
MELAMINE DRYERS INSTRUMENT AIR MELAMINE DRYER TYPICAL FLOW DIAGRAM FABRIC FILTER MP STEAM ROTARY VALVE EXHAUST FAN STEAM HEATER INTAKE FAN WET MELAMINE CONDENSATE LP STEAM STEAM DRYER SCREW FEEDER DRIED
More informationCalMag Filter Installation Instructions
Calming troubled waters CalMag Filter Installation Instructions Please note: This filter is unique and does not have or need a messy top mounted air bleed valve. Air is channelled via a snorkel arrangement
More informationHYDRONIC SPECIALTIES TACO MPT Tank(s) 05/30/2012. A. Multi-Purpose Tank buffer tank, air separator, and hydraulic decoupler
SECTION 15181 - HYDRONIC SPECIALTIES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Multi-Purpose Tank buffer tank, air separator, and hydraulic decoupler B. Expansion tanks C. Pump accessories 1.2 RELATED SECTIONS
More informationPackaged Semi-Instantaneous Steam Fired Water Heater
MODEL STX Packaged Semi-Instantaneous Steam Fired Water Heater Shell and Tube Style Heater Features Reliable Only high grade materials used in construction to ensure long operating life Heat exchange pressure
More informationShay Boiler Nelson Riedel
Shay Boiler Nelson Riedel Nelson@NelsonsLocomotive.com Initial: 11/13/03 Last Revised: 06/06/2004 Early in the project I decided to contract the boiler fabrication to a professional. This was primarily
More informationD-11 OUTLINE SPECIFICATION FOR HTHW (ABOVE GRADE) HYDRONIC PIPING
D-11 OUTLINE SPECIFICATION FOR HTHW (ABOVE GRADE) HYDRONIC PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationHYDRONIC SPECIALTIES TACO AC(F)-CA 05/08/2008
SECTION 15181 - HYDRONIC SPECIALTIES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Air separators B. Expansion tanks C. Pump accessories 1.2 RELATED SECTIONS A. Section - Plumbing Piping Specialties B. Section
More informationInstallation &Operating
Salvajor TroughVeyor Model TVL & TVR Trough Conveying and Food Waste Disposing System TroughVeyor Model TV Models Available: 300-TVR, 500-TVR, 750-TVR 300-TVL, 500-TVL, 750-TVL 2 Typical Installations
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 22 3300 - ELECTRIC, DOMESTIC WATER HEATERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationFinal Design Report. for the M.I.C.E. 2 slot VLPC Cryocooler Cryostat
Final Design Report for the M.I.C.E. 2 slot VLPC Cryocooler Cryostat D-ZERO ENGINEERING NOTE # 3823.000-EN-579 Dec. 13, 2005 Authors: Russell A. Rucinski Alan Bross PPD/MD/D0 Operations Fermi National
More information4.8 FARADAY CUP ASSEMBLY OPTION
4.8 FARADAY CUP ASSEMBLY OPTION The Faraday cup assembly, mounted on the front end of the Electron Gun, is positioned by either a rotary feedthrough or a pneumatic actuator assembly, located on one of
More informationWater Piping and Pumps
Technical Development Program DISTRIBUTION SYSTEMS Water Piping and Pumps PRESENTED BY: Michael Ho carriertdp@gmail.com 424-262-2144 Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section
More informationWelding Job Knowledge
Heat Treatment - Part 3 When it is not possible to place the entire component in a furnace for heat treatment (because of the size of the fabrication, circumferential welds in a pipework system or when
More informationGuide Specifications
Guide Specifications Hot Water fired Adsorption Liquid Chillers Bry-Air Adsorption Chiller Overview The chiller shall be a Bry-Air ADC series. The chiller shall consist of a robust, compact, packaged chiller
More informationKINNEY OIL MIST ELIMINATORS
KINNEY OIL MIST ELIMINATORS Models: A B, B1 & B2 C1 D & D1 Instruction Manual 1855-1 Revision 12/01 TABLE OF CONTENTS DESCRIPTION... 1 OPERATION... 1 ELEMENTS... 2 OIL RETURN METHODS... 3 DIRECT DRAIN
More informationCased Aluminum "Convertible" Coils 4TXCB003CC3HC** 4TXCB004CC3HC** 4TXCC005CC3HC** 4TXCC006CC3HC**
18- AH44D1-4 Cased Aluminum "Convertible" Coils 4TXCB003CC3HC 4TXCB004CC3HC 4TXCC005CC3HC 4TXCC006CC3HC 4TXCC007CC3HC 4TXCC008CC3HC 4TXCD009CC3HC 4TXCD010CC3HC May be "A" or "B" ALL phases of this installation
More informationHigh Capacity Instantaneous Steam Fired Water Heater
MODEL F High Capacity Instantaneous Steam Fired Water Heater Features Compact High Capacity Design Packaged System Water heater is factory assembled on an all welded steel mounting frame to save time and
More informationDOLPHIN FRESH WATER SHELL AND TUBE EVAPORATOR
DOLPHIN FRESH WATER SHELL AND TUBE EVAPORATOR INTRODUCTION Dolphin offers Shell & Tube Evaporators. These components utilize the latest technology tubing available. FRESH WATER DX SHELL & TUBE EVAPORATORS
More informationSECTION HEATING BOILER FEEDWATER EQUIPMENT
SECTION 23 53 00 HEATING BOILER FEEDWATER EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes boiler feedwater pumps, de-aerators, accessories, controls and tanks. 1.2 REFERENCES A. ASME (American
More informationRESEARCH AND TECHNOLOGY BUILDING RENOVATION 05/18/09 SECTION REFRIGERANT PIPING AND SPECIALITIES
SECTION 23 23 00 REFRIGERANT PIPING AND SPECIALITIES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Refrigerant piping. 2. Unions, flanges, and couplings. 3. Pipe hangers and supports. 4. Refrigerant
More informationINSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR COMMERCIAL INDIRECT POWERED WATER HEATER
INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR COMMERCIAL INDIRECT POWERED WATER HEATER ELECTRIC HEATER COMPANY BASE MODEL T Edition 0 HUBBELL ELECTRIC HEATER COMPANY P.O. BOX 88 STRATFORD, CT 0665
More informationXFEL Collimation and Beam Switchyard Vacuum Issues
The European Vacuum Issues Torsten Wohlenberg Beam Dynamic Meeting 1 general remarks Lengths of the vacuum system : Collimation: total length ~ 226m Beam Switchyard: total of TL+T1+T2~150m+132m+112m~394m
More informationHeated tools. Semiconductor equipment
Heated tools Semiconductor equipment Ceramic heating elements made of silicon nitride and aluminum nitride can be manufactured as tools in various shapes. The heating function can be integrated in complex
More informationNorcold Instillation Instructions ARP Yahoo Group DRAFT Norcold General Installation Instructions
Norcold General Installation Instructions Introduction The following are general instructions for the installation of the ARP control. The refrigerator used as an example is a Norcold N641.3. Most of the
More information2-Stage 4 K Closed Cycle Refrigerator Systems
2-Stage 4 K Closed Cycle Refrigerator Systems Variable Temperature Closed Cycle Refrigerator Systems Cryo Industries manufactures closed cycle cryogenic workstations for a large variety of experimental
More information2-Stage 4 K Closed Cycle Refrigerator Systems
CRYO 2-Stage 4 K Closed Cycle Refrigerator Systems Variable Temperature Closed Cycle Refrigerator Systems Cryo Industries manufactures closed cycle cryogenic workstations for a large variety of experimental
More informationVacuum furnaces with gas cooling/ gas quenching
Vacuum furnaces with gas cooling/ gas quenching Vacuum furnaces for hardening, brazing, tempering, annealing Your application defines the furnace design Your application defines how the furnace should
More informationPackaged Steam Fired Water Heater
MODEL ST Packaged Steam Fired Water Heater Utilizes Steam To Heat Domestic Water, Semi-Instantaneous or Storage Type Heaters Features Reliable Packaged System Only high grade materials used in construction
More informationConcept of a Powerful Cryogen-Free Dilution Refrigerator with Separate 1K Stage
Concept of a Powerful Cryogen-Free Dilution Refrigerator with Separate 1K Stage Kurt Uhlig Walther-Meissner-Institute Garching 85748, Germany ABSTRACT Helium-3,4 dilution refrigerators (DR) are the workhorses
More informationSCHMIDT- BRETTEN GASKETED PLATE HEAT EXCHANGERS
SCHMIDT- BRETTEN GASKETED PLATE HEAT EXCHANGERS API Schmidt-Bretten Leadership in plate heat exchangers since 1879. API Schmidt-Bretten traces its roots to 1879 in Germany when company founder Wilhelm
More informationCHIMNEYS AND VENTS CHAPTER 8
CHAPTER 8 CHIMNEYS AND VENTS SECTION 801 GENERAL 801.1 Scope. This chapter shall govern the installation, maintenance, repair and approval of factory-built chimneys, chimney liners, vents and connectors.
More informationAging Tests of of Full Scale CMS Cathode Strip Muon Chambers
Aging Phenomena in Gaseous Detectors Aging Tests Full Scale CMS Cathode Strip Muon Chambers CMS Endcap Muon Collaboration Oleg Prokiev Fermilab, Batavia, IL, IL, USA USA Oleg Prokiev Aging Phenomena in
More informationFuel Cell Stack CVM Chip Solder Joint Structural Analysis with ANSYS Sub-Modeling Technique
Fuel Cell Stack CVM Chip Solder Joint Structural Analysis with ANSYS Sub-Modeling Technique Kemal Ozgur, Ph.D., P.Eng. Senior Engineer Ballard Power Sysems John Kenna Manager, Product Development Ballard
More informationThermal Vacuum Cycling Test Facility for the Qualification of Near Sun Missions Solar Panels
Volume 118 No. 16 2018, 1291-1308 ISSN: 1311-8080 (printed version); ISSN: 1314-3395 (on-line version) url: http://www.ijpam.eu ijpam.eu Thermal Vacuum Cycling Test Facility for the Qualification of Near
More informationTransfer of Heat. There are three ways in which heat is transferred from one body to another. These are
Transfer of Heat In the precious chapter you have learnt that heat flows from a body at a higher temperature to a body at a lower temperature, but how does this transfer take place? You will find the answer
More informationDevelopment of Large Size Hybrid Fan
Technical Paper Toshihiko Nishiyama Kengo Koshimizu Keiichi Inaba A lot of small fans with three-dimensional, wide chord length, forward swept figure, and/or shroud ring have been developed and manufactured
More informationRefinery Vacuum Towers. State of the Art. (Extended Abstract)
Paper 357b Refinery Vacuum Towers State of the Art (Extended Abstract) Andrew W. Sloley CH2M HILL 21 Bellwether Way, Unit 111 Bellingham, WA 98225 Prepared for Presentation at the American Institute of
More informationSemi-Instantaneous Indirect Fired Water Heater
MODEL BWX Semi-Instantaneous Indirect Fired Water Heater Use Boiler Water Or HTHW To Heat Domestic Water Features Reliable Only high grade materials used in construction to ensure long operating life Hydrastone
More informationDIRTCAL - DIRTMAG dirt separator
864.07 www.caleffi.com DIRTCAL - DIRTMAG dirt separator Copyright 206 Caleffi 5462-546 -5465-5465M - NA5465 - NA5465M Series Installation, commissioning and servicing instructions Function In heating and
More informationTechnical Development Program
Technical Development Program COMMERCIAL HVAC CHILLER EQUIPMENT Water-Cooled Chillers PRESENTED BY: Omar Rojas Sales Engineer Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7
More informationINSTALLATION, COMMISSIONING AND OPERATING MANUAL
INSTALLATION, COMMISSIONING AND OPERATING MANUAL 1 YTBV-D-CE42_0109 CONTENT Available models and capacities Supplier information Warranty Safety Emergency stops/ shutdowns About this manual Models Physical
More informationSECTION CHILLERS
SECTION 15650 PART I - GENERAL 1.01 WORK INCLUDED A. Extent of work shall be as indicated on Drawings and provisions of this section, including schedules and equipment lists associated with either Drawings
More informationConversion Instructions Logano G234X. Gas boiler. Please read carefully before installing and servicing. Gas boiler
Gas boiler UPON COMPLETION OF THE INSTALLATION THE INSTALLER MUST INSTRUCT THE OWNER AND OPERATOR ON THE FUNCTIONALITY AND THE PROPER OPERATION OF THE BOILER AND THE HEATING SYSTEM. INSTALLER MUST REVIEW
More informationThe original VAD development work at A Finkl & Sons,
STEELMAKING AND CASTING Renaissance of the VHD (VAD) plant Following re-evaluation of the VHD (VAD) vacuum heating degassing (vacuum arc degassing) process, INTECO has made a number of design modifications
More informationSECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings.
SECTION 15481 COMPRESSED AIR SYSTEM PART 1 - GENERAL 1.1 SECTION INCLUDES A. Pipe and pipe fittings, including valves, unions and couplings. B. Air compressor. C. After cooler. D. Refrigerated air dryer.
More informationSECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS
SECTION 22 34 00 (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS System shall provide a complete hot water return throughout the entire system with balancing (flow control) valves not less than 10 feet from
More informationInstant hot water Feed-Forward system unlimited supply accurate to +/- 4 F
Count on Graham for proven reliability. Graham is one of the world s foremost designers and manufacturers of vacuum and heat transfer equipment with over a half-century of proven experience. Our in-house
More informationFORCED AIR CONVECTION THERMAL SWITCH CONCEPT FOR RESPONSIVE SPACE MISSIONS
FORCED AIR CONVECTION THERMAL SWITCH CONCEPT FOR RESPONSIVE SPACE MISSIONS 6 August 26 2 th AIAA/USU Small Sat Conference Andrew D. Williams Air Force Research Laboratory, Space Vehicles Directorate Kirtland
More informationAPPENDIX 3J FOOD SERVICES SPECIFICATIONS
APPENDIX 3J FOOD SERVICES SPECIFICATIONS 1. FOOD SERVICES 1.1 Design Consultant Project Co will retain as part of its professional design team a qualified food service consultant that is a professional
More information2.2 Drawing and Parts List
2.2 Drawing and Parts List 2.2.1 Structural Drawing (SHD-20U~750U) Names of Parts: 1. Main switch 2. Insulated layer 3. Blower 4. Material storage tank 5. Electric heating box 6. Control box 7. Overheat
More informationSYNCHROTRON RADIATION ABSORPTION AND VACUUM ISSUES IN THE IR*
SYNCHROTRON RADIATION ABSORPTION AND VACUUM ISSUES IN THE IR* J. T. Seeman, SLAC, Menlo Park, CA 94025 USA Abstract The PEP-II B-Factory (3.1 GeV e+ x 9.0 GeV e-) at SLAC operated from 1999 to 2008, delivering
More informationcussons Refrigeration Assembly Range TECHNOLOGY REFRIGERATION AND AIR CONDITIONING CUSSONS TECHNOLOGY LABORATORY RECOMMENDATION
REFRIGERATION AND AIR CONDITIONING CUSSONS LABORATORY RECOMMENDATION Cussons Refrigeration laboratories are offered to provide teaching to a range of different skill levels. In all the laboratories teaching
More informationEVALUATION OF A NEUTRON-PHOTON SHIELD FOR TRANSURANIC (TRU) WASTE CONTAINERS
EVALUATION OF A NEUTRON-PHOTON SHIELD FOR TRANSURANIC (TRU) WASTE CONTAINERS M. Gallegos, R. Ruby, E. J. Sullivan, R. J. Wishau Los Alamos National Laboratory ABSTRACT The Los Alamos National Laboratory
More informationTitle: Semiconductor detectors with proximity signal
Final Report Title: Semiconductor detectors with proximity signal readout (Topic 45/b) Company XIA LLC Principal Investigator Dr. Stephen J. Asztalos Address: 31057 Genstar Rd, Hayward, CA 94544 Grant
More informationShay Plumbing IX - Feed Water Pipes
Shay Plumbing IX - Feed Water Pipes Nelson Riedel Nelson@NelsonsLocomotive.com Initial: 11/28/03 Last Revised: 06/06/2004 Feed Water Pipe Orientation: Photos of a couple of the Cass shays were reviewed
More informationCargo Tank Vacuum Damage Jack Rademacher Chief Engineer
Cargo Tank Vacuum Damage Jack Rademacher Chief Engineer 2014 WALKER GROUP EXPO SUCK-IN EVENT A BAD WAY TO START YOUR DAY!!! 2014 WALKER GROUP EXPO SUCK-IN EVENT The concluding event of the 2014 Walker
More informationAir-Cooled Variable Speed Drive Screw Chillers. Super Efficient Super Quiet. Cooling Capacity Range kw R134a
Air-Cooled Variable Speed Drive Screw Chillers Super Efficient Super Quiet Cooling Capacity Range 540-1405 kw R134a World s first low sound Air-Cooled variable speed drive screw chiller The recognition
More informationQuality Heat Exchangers
Quality Heat Exchangers Brazed Plate Heat Exchangers Series TPL With partnership into the future FUNKE is a leader in the development and production of quality heat exchangers with a heat transfer area
More informationOil Trap Cleaning Procedure
Oil Trap Cleaning Procedure R. Bunker, D. Noble, and R. Schnee Department of Physics, Syracuse University, Syracuse, NY 13244, USA (Dated: November 28, 2012) 1 FIG. 1. The RES pumping station and its anti-backstreaming
More informationPhillips. HORIZONTAL AND VERTICAL ASSEMBLIES For Ammonia (R-717) and Halocarbon Refrigerants
Phillips REFRIGERATION MECHANICAL PUMP RECIRCULATORS BULLETIN MPR-03E Engineering Data VALVES VESSELS SYSTEMS CONTROLS HORIZONTAL AND VERTICAL ASSEMBLIES For Ammonia (R-717) and Halocarbon Refrigerants
More information1.1 This section applies to air handling units for HVAC Systems.
AIR HANDLING UNITS GENERAL INFORMATION 1.1 This section applies to air handling units for HVAC Systems. DESIGN REQUIREMENTS 2.1 Design Criteria a. The decision to use modular central station air handling
More informationSPRAY COOLING BOF HOODS by David A. Lehr, Senior Engineer UCAR Carbon Company Inc., Parma, OH
SPRAY COOLING BOF HOODS by David A. Lehr, Senior Engineer UCAR Carbon Company Inc., Parma, OH INTRODUCTION UCAR1!1 Spray-Cooled Systems are furnace components that utilize a nonpressurized water cooling
More informationInstruction Manual. B Issue B. next Pump Accessories
Instruction Manual B811-00-880 Issue B next Pump Accessories This page has been intentionally left blank. Contents Section Page 1 Introduction... 1 Contents gea/0086/06/10 1.1 Scope and definitions...
More informationTOP AND CABINET PARTS For Models: WTW6600SW3, WTW6600SG3, WTW6600SB3 (White) (Biscuit) (Black)
TOP AND CABINET PARTS AUTOMATIC WASHER 1 08 Printed In U.S.A. (drd) 1 Part No. Rev. B TOP AND CABINET PARTS 1 Literature Parts W10113000 Use & Care Guide W10026571 Tech Sheet W10106480 Quick Start Guide
More informationLINDOFLAMM thermal engineering.
Catalogue LINDOFLAMM thermal engineering. Tailored solutions for every heating application. 02 LINDOFLAMM thermal engineering. Tailored solutions for every heating application. Contents. 03 All-round offering
More informationAPPLICA TION OF SPRA Y COOLED TECHNOLOGY TO A BOP SHOP FURNACE HOOD
APPLICA TION OF SPRA Y COOLED TECHNOLOGY TO A BOP SHOP FURNACE HOOD In 1993, U.S. Steel learned ofan innovative system to cool BOF hoods known as spray cooling. The method was discovered as plans for replacing
More informationMore heat energy means more of what type of energy? Does the mass change? So, what must change? What is the same in both containers?
Quest Chapter 21-23 # Problem Hint 1 When a container of gas is heated, what happens to the average speed of its molecules? 1. Additional information is needed. 2. increases 3. doesn t change 4. decreases
More information