1 WATER-SUPPLY WELL PITLESS ADAPTER OR PITLESS UNIT, AND WELDED OR THREADED FITTING. Subpart 1. Pitless adapter or pitless unit. Except as provided in subpart 2, a connection to a casing of a water-supply well made less than 12 inches above the established ground surface must be made with a pitless adapter or pitless unit. The connection must not be submerged in water at the time of installation. Native materials must be packed tightly around the pitless adapter or pitless unit to the ground surface. The pitless adapter or pitless unit must: A. be constructed to provide complete clearance within the internal diameter of the casing; B. be designed to be field-welded by holding the welding rod in a vertical or horizontal position, or bench-welded before field installation with a material as corrosion-resistant as the parent material; C. have all threaded joints watertight with no threads exposed; D. impart no taste, odor, or toxic material to the water; and E. connect to the casing by a threaded connection, welded connection, bolted flange with gasket, clamp and gasket, or compression gasket. A welded, solvent welded, or threaded coupling, adapter, or swaged fitting meeting the material standards of part , , or , may be used to connect a casing to a pitless adapter or unit. Additionally, a pitless unit using a compression seal must provide for the well casing to extend at least 2.5 inches into the throat of the pitless unit. The compression collar must be held in place with corrosion-resistant bolts, nuts, and washers. The installer of a clamp-on or weld-on pitless adapter must use a guide or template for cutting the hole in the casing to accommodate the pitless adapter. Pitless adapters and units are fittings attached to or replacing the casing, usually below the frost line, that allow a water discharge line to exit the casing below frost and not freeze, allow the pump to be removed without excavation, and allow the casing to be extended above grade for proper venting, service, and sanitary protection. A pitless adapter is a fitting inserted into a hole in the side of the casing. A pitless unit is a fitting and upper casing that replaces the casing from the frost line to above the surface. Pitless adapters and units are so named because they replace the old, unsafe, and unsanitary practice of putting wells in pits. Water discharge connections to a water-supply well casing made lower than 12 inches above-grade (even if the connection is above-ground) must be made with an approved pitless. A connection for venting or remediation (remedial well), water level measurement, treatment, or electrical may be made with a fitting as described in subpart 2 below. 331
2 Water-supply well connections made higher than 12 inches above-grade must be made with a threaded connection, welded connection, rubber expansion sealer, or a bolted flange as detailed in Minnesota Rules, part The top of the casing must be covered with a well cap, cover, or pump base as detailed in Minnesota Rules, part The casing extension, from the pitless adapter above-ground, must be made of material which meets the casing standards as detailed in Minnesota Rules, parts through The casing extension for factory-made pitless units including the spool, adapter, discharge and upper casing extension may be of materials not meeting the casing standards of Minnesota Rules, parts through if the entire unit has been approved by the MDH as an engineered unit. The water may be pumped down so that the connection is not submerged in water during installation. This requires a clear-way -type pitless. The clear-way requirement applies to all casing sizes, and to open hole wells as well as screened wells. Clear-way means that when the pull pipe, internal drop pipe fitting assembly, actuator, discharge elbow, spool, drop pipe, and pump are removed; no portion of the pitless extends inside the inner wall of the casing. This allows for removal or installation of a full-sized screen or pump, and allows full casing access for rehabilitation or repair. A pitless unit must be at least as large as the casing, and may be larger. A 4-inch pitless may not be placed on a 6-inch casing. However, a 6-inch pitless may be placed on a 4-inch casing. The rules require that no casing threads be exposed on threaded pitless units. Many of the pitless units currently available have threads exposed when the pitless is threaded onto the casing and upper casing extension. The use of pitless units with buried threads is encouraged. However, the department will allow pitless units with exposed threads to be used if the units otherwise meet the standards of these rules and if all exposed threads are corrosion protected by use of a protective coating. The protective coating must be designed to provide corrosion protection for buried steel, and does not include tape or other wrapping products. It is recommended that all water contact components meet ANSI/NSF Standard 61. This allows pitless units (or adapters) which are threaded onto the casing, welded to the casing, bolted with a gasket, clamped with a gasket ( clamp-on type), or compression fittings ( Dresser type or Kwick-connect type). The guide is required for holes cut with a torch, reciprocating saw, or method other than a hole saw. The guide must be followed to cut the correct size hole. Slag, burrs, or rough edges on surfaces which contact a gasket or O -ring must be smoothed. The correct size hole saw must be used in order to prevent leaks. A leak at the pitless is a common cause of bacterial contamination of the well. Leaks may occur from a cross threaded casing or discharge line; undertightened, over-tightened, or broken clamp; irregular shaped hole; missing or defective gasket; separation due to frost; and damage from vehicles. A list of pitless adapters and units which currently meet the standards is included in the appendix. The list only includes approved models commonly available, and does not include models out of production which still may be in stock. Models not on the list may be used if they meet the requirements in these rules. The MDH may be contacted to review additional models. 332
3 Subp. 2. Welded or threaded fitting. A welded or threaded fitting meeting the requirements of part , subpart 2, may be connected to the side, cap, or cover, of a water-supply well casing and be used for venting, remediation, measurement of water levels or testing, treatment, or for an electrical connection. A water discharge line must be connected with a pitless unit or pitless adapter. STAT AUTH: MS s 103I.101; 103I.111; 103I.205; 103I.221; 103I.301; 103I.401; 103I.451; 103I.501; 103I.525; 103I.531; 103I.535; 103I.541; 103I.621; HIST: 33 SR [Repealed, 17 SR 2773] [Repealed 33 SR 211] [Repealed, 17 SR 2773] PRIMING WATER-SUPPLY WELL PUMPS. A pump that requires priming for ordinary use must not be installed on a watersupply well unless the well is only used for a water irrigation system. An irrigation well pump must be primed only with water free of contamination and carrying a measurable chlorine residual. An irrigation well equipped with a centrifugal pump may be primed without chlorination when the pump is filled with water taken directly from the well. This does not prohibit the use of a jet or centrifugal pump, or prelube lines on turbines. It is intended to prohibit pumping equipment that requires opening of the well and introduction of water for each use. This requirement prohibits ordinary pitcher pumps. STAT AUTH: MS s 103I.101; 103I.221; 103I.301; 103I.621; ; ; ; ; ; ; HIST: 17 SR [Repealed, 17 SR 2773] WATER-SUPPLY WELL SUCTION LINE. Subpart 1. Construction. As specified in part , a suction line for a water-supply well must be constructed of: Jet pumps operate by creating a partial vacuum, drawing water into the pump. When a jet pump is not located over the well, a single suction line (in the case of a shallow well jet pump), or a suction line and a pressure line (in the case of a two pipe or a deep well jet pump) connect the well with the pump. If the pipe is above ground (and not flooded) and a leak occurs, the pump will break suction and not work. If the line is buried, and a hole or other leak occurs, contaminants and near-surface water may be drawn into the 333
4 system, particularly if the soil is saturated. A suction line may only be buried if it is installed within an outer, concentric pipe with the annular space between the pipes filled with water from the system and maintained at system pressure (concentric piping). A diagram follows subpart 3. Part refers to the Minnesota Plumbing Code, water service pipe standards. The material standards from the Minnesota Plumbing Code are summarized after each material type. A. copper; The Minnesota Plumbing Code requires seamless-tube, Type K soft-temper or Type L soft-temper copper meeting ANSI Standard H23.1 or ASTM Standard B88 with brass or bronze flare fittings or cast bronze and wrought solder joint pressure fittings. B. galvanized iron or steel; The Minnesota Plumbing Code requires steel pipe to be Schedule 40 or above and meet ANSI Standard B36.1 or B36.20, or ASTM Standard A53, and wrought iron pipe must be Schedule 40 and above and meet ANSI B36.2. Fittings must be malleable fittings 150 pounds per square inch and above meeting ANSI Standard B16.3 or ASTM Standard A197, or steel unions meeting FS Standard WW-V-531 C. All exposed threads must be coal tar enamel coated and wrapped. C. cast iron; The Minnesota Plumbing Code requires cast iron-mechanical (gland type) pipe meeting ANSI Standards A21.11, A21.2, A21.4, A21.6, or A21.8 with water-service fittings meeting ANSI A21.10; and with bends, tees, and plugs anchored by rods; and thrust blocks or anchor rods behind all changes of direction of 45 degrees or greater. D. plastic pipe. The Minnesota Plumbing Code requires plastic pipe to be at least 150 pounds per square inch minimum working pressure for municipal water service and 100 pounds per square inch for other service. The materials allowed include: polyethylene meeting ASTM Standard D2239 or D2737, or ANSI Standard B72.1; ABS pipe meeting ASTM Standard D2282, or ANSI Standard B72.3; PVC pipe meeting ASTM Standard D2241 or D1785, or ANSI B72.2; and polybutylene meeting ASTM Standard D2662 or D2666. For well water irrigation systems, aluminum pipe may also be used. Subp. 2. Extensions. A suction line extending outside the well casing must be protected by being: A. fully exposed in a building as specified in part ; BUILDING REQUIREMENTS The building must be constructed at or above the established ground surface. If a floor drain is installed, it must discharge to the established ground surface, a gravel pocket, or a sewer constructed to prevent backup of sewage within 50 feet of the well. Materials or chemicals that may cause contamination of the well or groundwater, including fertilizers, pesticides, petroleum products, paints, and cleaning solvents, must not be stored in the building. 334
5 Any door must be hinged to swing outward. There must be a durable watertight concrete floor. The building must be constructed exclusively to contain and protect the well, pump, water treatment equipment and water treatment chemicals. No other uses of the building are permitted. The building must not be contained in, or part of, another building, except that a well house may be constructed with not more than one wall in common with another building. The common wall must not allow access to, or be open to, the well house. B. fully exposed above the established ground surface; or C. installed within an outer, concentric pipe with the annular space between the pipes filled with water from the system and maintained at system pressure. Concentric piping is simply placing one pipe inside another, (see Figure 27). The inner (suction) pipe is protected by the outer (pressure) pipe. If a hole develops, surface water or soil will not be drawn into the water stem. On a shallow well system, the space between the pipes is filled with water at system pressure, but is not circulated. On a deep well suction system, the water between the pipes is circulated down the well to the jet or venturi as the drive water. Concentric piping is the only legal option for a buried suction line. Connecting concentric pipe requires a special concentric pitless, special fittings such as concentric seal crosses or ball elbows, and accurate cutting and careful assembly of pipes. Subp. 3. Exception. An unprotected suction line may be installed below the established ground surface for an irrigation well if the well is: A. located in an agricultural field; B. installed in an unconfined aquifer in unconsolidated material; and C. used for a manifold collection system under negative pressure. STAT AUTH: MS s 103I.101; 103I.221; 103I.301; 103I.621; ; ; ; ; ; ; HIST: 17 SR 2773; 33 SR
6 336
7 [Repealed, 17 SR 2773] WATER-SUPPLY WELL PUMP DISCHARGE LINES. A buried discharge line between a water-supply well casing and the pressure tank in an installation, including a deep well turbine or a submersible pump, must not be under negative pressure at any time. If a check valve is installed in a buried water line between the well casing and the pressure tank, the water line between the well casing and the check valve must meet the requirements of part unless equipped with a vacuum release or combination air release and vacuum release device located between the check valve and the well. Pump discharge lines must be constructed of materials approved in part , subpart 1. Minnesota Rules, part refers to suction lines, and contains the requirement for concentric plumbing. If a check valve is installed in the buried portion of the water discharge line, the piping must be concentric, unless a vacuum-release valve is installed. A vacuum-release valve may also be referred to as a vacuum air-release or vacuum-relief valve for water service. Devices such as the Watts N36 or equivalent provide vacuum protection but do not discharge trapped air. Devices such as the Val Matic model 100 through 116 provide protection from a vacuum and exhaust trapped air. Minnesota Rules, Chapter 4725 require that pump discharge line materials be copper, galvanized iron or steel, cast iron, or plastic pipe meeting the standards of the Minnesota Plumbing Code, part , for water service pipe (water line between well and pressure tank). The requirements of the Minnesota Plumbing Code, part are summarized above in Minnesota Rules, part , and are not found in the appendix. The drop pipe or turbine column in a well is not considered part of the pump discharge line for purposes of these rules. The rules do not contain material standards for drop pipe or column. MINNESOTA PLUMBING CODE WATER-SERVICE LINE REQUIREMENTS In addition to the material standards for pump discharge lines (water service pipe) which reference the material standards of the Minnesota Plumbing Code, potable water service lines must meet the installation standards of the Minnesota Plumbing Code, part The Minnesota Plumbing Code requirements of part are summarized below. The rule part is not reproduced in the appendix. The Minnesota Plumbing Code requires a 10-foot separation between a water-service line and a building drain or sewer. If a 10-foot separation cannot be maintained, the administrative authority (local government enforcing the Minnesota Plumbing Code) may allow the water and sewer line in the same trench, less than 10 feet apart, if the bottom of the water line is at least 12 inches higher than the sewer, and if the water pipe is placed on a shelf on one side of the trench. Both the sewer and water pipes must be air tested. Where the 10-foot separation cannot be maintained and the 12-inch vertical separation and location on the shelf cannot be maintained, the administrative authority may allow a closer separation if the sewer pipe is approved plastic or cast iron and the water pipe is copper, cast iron, or plastic and both are air tested. Where the water line must cross the sewer line, the water line must be at least 12 inches higher than the sewer within 10 feet of the crossing. Where this is not feasible, the sewer must be of approved materials from at least 10 feet on either side of the crossing. 337
8 The Minnesota Plumbing Code requires a water service line to be a minimum of 10 feet from a cesspool, septic tank, septic tank drainage field, seepage pit, soil treatment system, buried tank containing petroleum or chemicals, or any other source of pollution. STAT AUTH: MS s 103I.101; 103I.111; 103I.205; 103I.221; 103I.301; 103I.401; 103I.451; 103I.501; 103I.525; 103I.531; 103I.535; 103I.541; 103I.621; ; ; ; ; ; ; HIST: 17 SR 2773; 33 SR [Repealed, 17 SR 2773] PRESSURE TANKS FOR WATER-SUPPLY WELLS. Subpart 1. Venting. A pressure relief or air release valve on a pressure tank that contains subterranean gas and is located in a building must be vented to the outside. The venting requirement is intended to prevent the build-up of potentially toxic or explosive gasses (i.e., methane or hydrogen sulfide) in confined spaces (i.e., basements or well rooms) where pressure tanks are located. This applies primarily to hydropneumatic-pressure tanks without a bladder or other airwater separation (galvanized tanks). Minnesota Rules, Chapter 4725 do not require a pressure release valve on a pressure tank, but one is recommended. In some circumstances, high-pressure submersible pumps can produce sufficient pressures to rupture (explode) a pressure tank. Typical submersible pumps are set with a 40 psi cut-in and 60 psi cut-out. A 75 or 80 psi release valve offers protection to pressure tanks that commonly have maximum (new) working pressure ratings of 90 to 125 psi. Subp. 2. Buried tanks. A buried or partially buried pressure tank installed on a water-supply well must: A. be identified with the manufacturer's name, a serial number, the allowable working pressure, and the year fabricated; B. have an interior coating that complies with ANSI/NSF Standard e if the tank has an interior coating in contact with water; An interior tank coating is not required. However, if the tank has a coating, the coating must meet ANSI/NSF Standard 61. NSF publishes a quarterly booklet of listed products, their website contains a list, and products are marked with the NSF logo. C. have a minimum one-fourth inch wall thickness for a steel pitless adapter tank attached directly to the well casing; D. have all connections to the pressure tank welded or threaded; and E. be installed above the water table. A list of approved, buried pressure tanks is contained in the appendix. A pressure tank with a galvanized interior coating or other component which exceeds 8 percent lead may not be used. 338
9 The DLI, Boiler Division, has reported that all water-pressure tanks using air as a pressurant, located in commercial or public buildings, or in apartment buildings larger than a six-plex, must be inspected and certified by the DLI. Pressure tanks located on public supplies serving businesses, churches, and communities are included. Pressure tanks used in commercial or public buildings which are 120 gallons or larger must be rated by the ASME. Tanks with volumes less than 5 cubic feet and having a 100 pound, ASME relief valve are exempt from the ASME tank rating requirements. STAT AUTH: MS s 103I.101; 103I.111; 103I.205; 103I.221; 103I.301; 103I.401; 103I.451; 103I.501; 103I.525; 103I.531; 103I.535; 103I.541; 103I.621; ; ; ; ; ; ; HIST: 17 SR 2773; 33 SR [Repealed, 17 SR 2773] VENTING WATER-SUPPLY WELLS. Subpart 1. Venting exceptions. A water-supply well must be vented unless the well: A. is a flowing well; B. casing is used as a suction pipe; C. has a packer jet assembly; D. is used as a remedial well; or E. is constructed with a watertight seal in lieu of a casing extension as specified in part , subpart 2. A vent is required to eliminate negative pressure from occurring when the pump starts and the water level drops. Negative pressure can draw in contaminants through electrical conduits or other connections to the casing. A vent also exhausts toxic gases such as hydrogen sulfide which can cause asphyxiation in confined spaces such a well house, and exhausts explosive gases such as methane. Vents are not required for flowing wells, wells with packer-jet pumps, remedial wells, wells that use the casing as a suction pipe, and wells in areas where the regional flood level is more than 5 feet above the ground surface. The venting requirement does not prohibit the use of a drawdown seal installed below the static water level in a well. However, the use of drawdown seals above the static water level is prohibited and the use of drawdown seals is generally not recommended. Subp. 2. Vent construction. A well vent must: A. be constructed of materials complying with parts to , or , subpart 1; B. have watertight joints and terminate at least five feet above the regional flood level unless provided with a watertight seal as specified in part , subpart 2; 339
10 C. terminate a minimum of 12 inches above the established ground surface or the floor of a building as specified in part , except that a vent for a community public water-supply well must terminate a minimum of 18 inches above the established ground surface and the floor of a building as specified in part ; D. be screened with a noncorrosive mesh screen having openings of 1/16 -inch or less and pointed downward; and E. be connected to the casing according to part The vent must be constructed of well casing materials (Minnesota Rules, parts through ), or materials approved for pump suction and discharge lines (Minnesota Rules, part , subpart 1). The regional flood is the 100-year flood and is explained in Minnesota Rules, part , subpart 40b. If the flood level is more than 5 feet above the ground surface, Minnesota Rules, part , subpart 2, allows the casing to terminate: 10 feet above the ground if a watertight seal without a vent is installed; 2 feet above the ground if an outer cement-grouted protective casing and waterproof threaded cap or compression seal are installed; or 2 feet above ground if a sealed, flowing well pitless, and a waterproof nonvented well cap are installed The vent and the top of the casing must both terminate at least 12 inches above grade, or 12 inches above the floor of a well house. If the casing is exactly 12 inches above the ground surface and an overlapping cap with a built-in underside vent is used, the vent will terminate too low. In this case, the casing should be left more than 12 inches above-grade. The vent for a community public water-supply well must be 18 inches above-grade as required in Minnesota Rules, part Screened openings must be 16 mesh or less (16 squares per inch, essentially window screen size) and be constructed of a noncorrosive material such as brass, aluminum, or fiberglass. Upside down U -shaped vents or mushroom-type vents may be used. All vents, whether constructed on a water-supply well or another type of well, must meet the requirements of this part. The practice of drilling a hole in a casing is not an approved venting method. Subp. 3. Screened vents. A screened vent incorporated into the underside of a well cap or cover may be used. Minimum vent diameter or open area sizes have not been established; however, very small diameter vents on the underside of caps may provide inadequate air flow and result in the freezing of the vent in winter or plugging with debris. Also, it has been observed that some under-cap screens are not securely fastened to the cap and can fall out. Care should be taken to use a vent of adequate size, quality, and construction. 340
11 Subp. 4. Gas. Any toxic or flammable gas must be vented from the well to the outside atmosphere. STAT AUTH: MS s 103I.101; 103I.111; 103I.205; 103I.221; 103I.301; 103I.401; 103I.451; 103I.501; 103I.525; 103I.531; 103I.535; 103I.541; 103I.621; ; ; ; ; ; ; HIST: 17 SR 2773; 33 SR HYDROFRACTURING WATER-SUPPLY WELLS. Subpart 1. Scope. This part applies to hydrofracturing a water-supply well, as defined in part , subpart 30f. A remedial water-supply well, or other well or boring regulated by this chapter, must not be hydrofractured. Hydrofracturing must be done by a well contractor licensed according to Minnesota Statutes, section 103I.525. Hydrofracturing is the process of injecting water into (igneous or metamorphic) bedrock at pressures high enough to open existing fractures or create new fractures in order to increase water yield. Hydrofracturing uses one or more (typically two) inflatable packers to isolate a portion of the formation. This is done to concentrate the pressures in a more localized area, and avoid fracturing areas that may compromise the integrity of the well, produce sediment, or produce little water. The packer (or packers) is inflated, and high pressure water, commonly from 500 to 2,000 psi, is pumped into the formation. The water may open existing fractures wider, propagate fractures further, and in some cases create new fractures. Hydrofracturing is not always successful, and carries risks. Hydrofracturing involves high pressures capable of damaging wells, affecting nearby wells, and causing injuries to workers and bystanders. Hydrofracturing a dry hole is rarely successful. Wells producing a few tenths of a gallon per minute to a few gallons per minute are the typical candidates for hydrofracturing. A hydrofracturing job is often considered successful if the yield increases from 1/2 to a few times the original. Minnesota Rules, Chapter 4725 allow only a water-supply well completed in igneous or metamorphoric rock to be hydrofractured. However, a variance may be granted for other wells or borings in appropriate situations. The variance allows for review of the specific circumstances. Only a full licensed well contractor (not a limited contractor) may hydrofracture. Subp. 2. Injection materials, water, and proppants A. Water used for hydrofracturing must be potable water containing a chlorine residual. The use of surface water, unless obtained from a public water system, is prohibited. B. Additives must meet the requirements of ANSI/NSF Standard e as determined by a person accredited by the ANSI under ANSI Standard Z C. Proppants may be used to hold the joints and fractures open, and must be inert, clean, and nontoxic materials, including chlorinated, non-calcareous, washed sand. The rules do not allow surface water to be used for hydrofracturing, unless the surface water is the treated potable water from a public system that draws its supply from a surface water source. 341
12 Proppants are granular materials sometimes injected along with the water to hold fractures open. Proppants are not commonly used in Minnesota, but when they are, round quartz sand grains are typically used. Ceramic beads are less frequently used. Subp. 3. Restrictions. The following restrictions apply when hydrofracturing. A. The upper packer must be a minimum of 50 feet below the established ground surface. B. Hydrofracturing must not occur inside a casing. The upper packer must be a minimum of ten feet below the lower termination of a casing. C. Hydrofracturing must only be done in igneous or metamorphic bedrock. D. A water-supply well must not be hydrofractured unless located according to the isolation distances in parts and The restrictions are designed to prevent damage to the well casing, and prevent interconnection of surface or near surface contaminants with the well. Examples of igneous or metamorphoric bedrock include granite, gneiss, basalt, and quartzite. Sandstone and limestone are not igneous or metamorphic rocks. In order to hydrofracture a new or old well, the well must be in compliance with all of the isolation or setback distances in rule. A notification or permit is not required for hydrofracturing; however, reporting is required as described below. Subp. 4. Requirements. The following requirements apply when hydrofracturing. The person hydrofracturing must: A. remove additives injected during hydrofracturing; B. disinfect a hydrofractured water-supply well upon completion of hydrofracturing, according to part C. collect a water sample from a hydrofractured water-supply well used for drinking or other potable purposes, and test the sample according to part ; and D. complete and submit a well and boring construction record, or amended record, within 30 days of completion of hydrofracturing. Additives do not include proppants, but do include any treatment chemicals injected. The disinfection and water sample requirements are the same as for a new well since the hydrofracturing opens the well, injects water, and creates fractures that may connect new water sources. If hydrofracturing is occurring at the time of well construction, a single well and boring construction record using the official preprinted form should be completed. If hydrofracturing occurs at a later date, and the contractor who drilled the well is hydrofracturing the well, the contractor may photocopy the original well record, amend the record to report the hydrofracturing, and submit the amended photocopy. If the contractor hydrofracturing the well did not drill the well, a work copy Well and Boring Record 342
13 should be completed. A search should be made for the Minnesota unique well number by looking for the well tag, searching County Well Index, or asking the well owner. If the Minnesota unique well number is found, it should be reported on the work copy; otherwise the well number should be left blank. STAT AUTH: MS s 103I.101; 103I.111; 103I.205; 103I.221; 103I.301; 103I.401; 103I.451; 103I.501; 103I.525; 103I.531; 103I.535; 103I.541; 103I.621 HIST: 33 SR [Repealed, 17 SR 2773] 343
14 End of Pitless, Pumps, Vents, Hydrofracturing Section 344
GASEOUS HYDROGEN SYSTEMS
CHAPTER 7 GASEOUS HYDROGEN SYSTEMS SECTION 701 GENERAL 701.1 Scope. The installation of gaseous hydrogen systems shall comply with this chapter and Chapters 30 and 35 of the Fire Compressed gases shall
More informationVSA SEWAGE PUMP. Capacities to 1600 gpm, Heads to 120, Horsepower range 3/4 thru 40, 3 thru 6 discharge, 1750 and 1150 operation.
Brochure# 228E 122011 TYPE VSA SEWAGE PUMP Capacities to 100 gpm, Heads to 120, Horsepower range 3/ thru 0, 3 thru discharge, 1750 and 1150 operation. HIGHLIGHTS Wet-Pit Installations Pumps Suspend From
More informationC. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.
SECTION 22 10 00 PLUMBING PIPING AND PUMPS PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.
More informationB. HI Compliance: Design, manufacture, and install pumps in accordance with HI "Hydraulic Institute Standards."
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationD. NEMA Compliance: Provide electric motors and components which comply with NEMA standards.
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationSECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Pipe and Pipe Fittings. B. Air compressor. C. Air receiver and accessories. D. Aftercooler. E. Refrigerated air dryer. F. Pressure reducing station. 1.02 RELATED
More informationA. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 "Building Services Piping.
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationOWNER S MANUAL AND INSTALLATION GUIDE PLEASE READ THIS MANUAL CAREFULLY BEFORE ATTEMPTING INSTALLATION
ClearChoice Economy Under Sink Drinking Water System OWNER S MANUAL AND INSTALLATION GUIDE PLEASE READ THIS MANUAL CAREFULLY BEFORE ATTEMPTING INSTALLATION Congratulations on the purchase of your ClearChoice
More informationMASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING. A. This Section includes the following sanitary drainage piping specialties:
SECTION 221319 - SANITARY WASTE PIPING SPECIALTIES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following sanitary drainage piping specialties: 1. Backwater valves. 2. Cleanouts. 3. Floor
More informationSECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS
SECTION 22 34 00 (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS System shall provide a complete hot water return throughout the entire system with balancing (flow control) valves not less than 10 feet from
More informationBrown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS
SECTION 23 70 00 AIR HANDLING UNITS PART 1. GENERAL 1.1 Section includes air-handling units to 15,000 cfm and accessories. 1.2 Related Sections 1 : A. Division 01 - Brown University Standard for Narragansett
More informationMercy Hospital of Buffalo Catholic Health System 2 nd Floor Patient Holding Center 3 rd Floor Locker Rooms Shaflucas Architects, PC Project No.
SECTION 22 63 13 GAS PIPING FOR LABORATORY AND HEALTHCARE FACILITIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationFEATURES. Other Fed-Flush Arrangements
Brochure # 0710 TYPE TYPE... VSAF SEWAGE EJECTOR SYSTEM Flows to 600 gpm, Heads to 120, 1 thru 40 HP. Discharge size 4, 1750 and 1150 RPM, strainer in discharge pipe. HIGHLIGHTS Installations where rags
More informationSECTION LABORATORY and DE-IONIZED WATER SYSTEMS STANDARD CONSTRUCTION STANDARD
PART 1: GENERAL 1.01 Codes and Standards: A. Plumbing Code Compliance: Comply with applicable portions of National Standard Plumbing Code pertaining to selection and installation of Plumbing materials
More informationSTOP. SAFETY INFORMATION Please read and understand this entire manual before attempting to assemble, operate or install the product.
STOP Power supply required Questions, problems, missing parts? Before returning to your retailer, call our customer service department at 1-800-742-5044, 7:30 a.m. - 5 p.m., EST, Monday - Friday. 115 volts
More informationInstallation and Operation Manual
How To Install, Operate and Maintain Your Reverse Osmosis System FILTER CARTRIDGE CONFIGURATION MAY BE SUBJECT TO CHANGE. 475 PRO SERIES 475BP PRO SERIES INSTALLERS: PLEASE READ ALL INSTRUCTIONS BEFORE
More informationICP Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.
ICP Plumbing Exam Name: Date: Score: Carefully read each question and then circle the letter of the best answer. 1. A 1 inch diameter faucet, where the inside edge of the spout opening is 2.5 inches away
More informationWater Distribution Study Guide Class III (Made available by: Kansas Rural Water Association)
Water Distribution Study Guide Class III (Made available by: Kansas Rural Water Association) 1. Which one of the following types of pumps works on the basis of inertia or mass moving in a circular motion?
More informationLevel I Chapter 1 Worksheet
Chapter 1 Worksheet 1. For applicability requirements of the Plumbing Code, refer to: a. Building Code b. Administration and Enforcement Code c. Plumbing Code d. Residential Code 2. The provisions of the
More informationHydrotherapy Jets (Remote Water Quality System)
Page 1 of 6 Parts List (_) - 50 Roll of Flex PVC pipe 1-3/4 HP Circulating Centrifugal Pump 1 25 Roll of Flex PVC pipe 4-1 1 / 2 " Tees 2-1 1 / 2 " Ball Valves 2 - Female slip couplers 4-1/2" 90 degree
More information475 PRO SERIES Reverse Osmosis System Installation & Operation Manual
PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLING AND USING THIS SYSTEM 475 PRO SERIES Reverse Osmosis System Installation & Operation Manual Model STAGE 1 STAGE 2 STAGE 3 STAGE 4 OUTPUT 475 SEDIMENT CARBON
More informationHALLMARK INDUSTRIES INC. HALLMARK INDUSTRIES INC. Safety WARNING WARNING. Must reset the voltage! Shallow Well Jet Pumps
Safety Important Safety Instructions SAVE THESE INSTRUCTIONS - This manual contains important instructions that should be followed during installation, operation, and maintenance of the product. Save this
More informationCOBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM
SECTION 21 10 00 PART 1 - GENERAL 1.1 CODES A. Work shall conform to NFPA 13 Sprinkler Systems, 2002 Edition and NFPA 24 Outside Protection, 2002 Edition. NFPA 14 Standpipe Systems, 2000 Edition and International
More informationDirect Exhaust Venting Kit Instructions
CONDENSING GAS BOILER 220/299/300/399 Direct Exhaust Venting Kit Instructions Evergreen 220/299/300/399 Kit part number 383-500-769 STOP! Read before proceeding Hazard definitions The following defined
More informationSECTION DOMESTIC WATER PIPING SPECIALTIES
SECTION 22 11 19 DOMESTIC WATER PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationVALVES SECTION 15100
VALVES SECTION 15100 PART 1 GENERAL 1.1 DESCRIPTION A. The requirements of this SECTION apply to all Work of this DIVISION where applicable. The valves, materials, and methods herein are generally common
More informationSECTION HYDRONIC PIPING
SECTION 23 21 13 HYDRONIC PIPING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes pipe and fitting materials, joining methods, special-duty valves, and specialties for the following: 1. Hot-water
More informationSunRay 1000 Solar Water Pasteurizer Installation Instructions
SunRay 1000 Solar Water Pasteurizer Installation Instructions Safe Water Systems, Inc. 1600 Kapiolani Blvd., Suite 721 Honolulu, Hawaii 96814 Phone: 808-949-3123 Fax: 808-949-3103 E-mail: info@safewatersystems.com
More informationREFRIGERANT PIPING SYSTEM
PART 1 GENERAL 1.01 DESCRIPTION A. The requirements of this section apply to the refrigerant piping system connecting refrigeration and HVAC equipment specified in other sections of these specifications.
More informationSECTION STEAM CONDENSATE PUMPS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 23 22 23 STEAM CONDENSATE PUMPS SPEC WRITER NOTES: 1. Delete between // ---- // if not applicable to project. Also delete any other item or paragraph not applicable
More informationTABLE OF CONTENTS Limitations of Authority...6 Table Swimming Pool, Spa, and Hot Tub Permit Fees...7
TABLE OF CONTENTS CHAPTER 1 ADMINISTRATION..............1 101.0 General.......................1 101.1 Title..........................1 101.2 Scope........................1 101.3 Purpose......................1
More informationB. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.
DIVISION 21 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 GENERAL 1.1 SECTION INCLUDES A. Pipe, fittings, sleeves, escutcheons, seals, and connections for sprinkler systems. 1.2 RELATED REQUIREMENTS
More informationDIVISION 21 FIRE SUPPRESSION FIRE SUPPRESSION GENERAL PROVISIONS .1 PREPARATION OF CONTRACT DOCUMENTS
2006 Edition, Published January 1, 2006; Division Revision Date: June 30, 2016 21 00 00. FIRE SUPPRESSION 21 00 03. GENERAL PROVISIONS.1 PREPARATION OF CONTRACT DOCUMENTS.1.1 PLUMBING CONTRACT: Include
More informationSUBCOURSE EDITION EN US ARMY ENGINEER SCHOOL PLUMBING FIXTURES (PLUMBING IV)
SUBCOURSE EDITION EN5113 5 US ARMY ENGINEER SCHOOL PLUMBING FIXTURES (PLUMBING IV) US ARMY PLUMBER MOS 51K SKILL LEVELS 1 AND 2 COURSE PLUMBING FIXTURES (PLUMBING IV) SUBCOURSE NO. EN5113 US Army Engineer
More informationTier1 Water Home Filtration System
Tier1 Water Home Filtration System Salt-Free Softener OWNERS MANUAL BEFORE YOU BEGIN INSTALLATION, READ THIS ENTIRE MANUAL. FOLLOW THE INSTALLATION INSTRUCTIONS CAREFULLY. 1. Avoid pinched o-rings during
More informationTechnical Data TYPE T14 & T14D TEMPERATURE PILOT SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY SD 4511A T14 PILOT
Technical Data SD 4511A SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY 12586-2035 TYPE T14 & T14D TEMPERATURE PILOT PRINTED IN U.S.A. SD 4511A/9811 5 13 /16 D 4 7 /8 1 13 /16 T14 PILOT
More informationDesign and Construction Standards SECTION PLUMBING EQUIPMENT
SECTION 15450 PLUMBING EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES: A. Water heaters. B. Packaged water heating systems. C. Water storage tanks. D. Water softeners. E. Pumps. F. Circulators. 1.2 REFERENCES
More informationA. This Section includes the following domestic water piping specialties:
SECTION 221119 DOMESTIC WATER PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
More informationOPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"
OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER Electric Heater Company Base Model "BWXP" HUBBELL ELECTRIC HEATER COMPANY P.O. BOX 288 STRATFORD, CT 06615 PHONE: (203)
More informationBuilding Utilities 1 Plumbing and Sanitary Systems
Building Utilities 1 Plumbing and Sanitary Systems Taken from UST Architecture exams by Arch. Rafael Alli Recommended review material for UST Preboard Exam Prepared by: arkireviewph.multiply.com Types
More informationBig-Lock Tubing. Total Solutions for Air, Vacuum and Inert Gas Systems
Big-Lock Tubing Total Solutions for Air, Vacuum and Inert Gas Systems 2 High Quality Aluminum Piping Systems Simply stated there is no equal. Big-Lock from Gardner Denver has taken large diameter piping
More informationPLUMBING INSTALLATIONS
PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT PLUMBING INSTALLATIONS A homeowner guide to plumbing requirements for single-family dwellings November 2017 contents Permit Requirements... 3 Inspection Requirements...
More informationCITY OF PASADENA FIRE DEPARTMENT
Page 1 of 8 CITY OF PASADENA FIRE DEPARTMENT INSTALLATION OF COMMERCIAL SPRINKLERS (Revised 12/10/2014) SCOPE: This standard applies to the design and installation of automatic fire sprinkler systems in
More informationWells and Pump Servicing Tifft Symposium September 23, 2015
Wells and Pump Servicing 2015 Tifft Symposium September 23, 2015 Well s Birth Certificate Completion Report Well Performance Testing Performed during and after construction to determine safe yield and
More informationHYDRONIC SPECIALTIES TACO AC(F)-CA 05/08/2008
SECTION 15181 - HYDRONIC SPECIALTIES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Air separators B. Expansion tanks C. Pump accessories 1.2 RELATED SECTIONS A. Section - Plumbing Piping Specialties B. Section
More informationEL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD
EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD INSTALLATION OF COMMERCIAL FIRE SPRINKLER SYSTEMS STANDARD #C-001 EFFECTIVE 03-25-2009 PURPOSE: To ensure that sprinkler plans submitted for review contain
More informationDIVISION 23 HVAC Hydronic Piping Systems
General Information Programming/ Design Bidding/ Preconstruction Installation/ Construction Closeout/ Warranty QA/QC Checklist Construction Services DIVISION 23 HVAC 23 21 13 Hydronic Piping Systems 01
More informationInstallation Instructions. For the 18 Built-In Dishwasher and Front Color Panels
Installation Instructions For the 18 Built-In Dishwasher and Front Color Panels Printed in USA 154232102 Before You Begin DO NOT INSTALL DISHWASHER UNTIL YOU HAVE READ ALL INSTRUCTIONS. FOR YOUR SAFETY,
More informationMLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN
DIVISION 21 - FIRE SUPPRESSION (REFER TO SECTION 23 05 00 FOR BASIC FIRE SUPPRESSION REQUIREMENTS) 21 05 00 Common Work Results for Fire Suppression 21 13 13 Wet-Pipe Sprinkler Systems END OF SECTION FIRE
More informationSYSTEMS for CATALYTIC FILTERS
OP40U5F, OP40B5F, OP80U10F, OP80B10F, OP120U15F & OP120B15F INSTALLATION, OPERATION & SERVICE INSTRUCTIONS Hydrogen Sulfide Removal SYSTEMS for CATALYTIC FILTERS NO DIAPHRAGMS OR AIR CELLS COMPLETELY CORROSION
More information4-1 1 / 2 " Tees / 2 " hole saw w/ 1/4" drill bit / 2 " Male slip plugs
Section 1: Parts List 1-50 Flex PVC pipe 2-1 1 / 2 " Ball Valves 4-1/2" 90 degree elbows 4 - Lengths of 1/2" PVC 4 - Jet bodies 4 - Jet nozzles 4 - Female slip/female slip unions 2 - Female slip/fpt union
More informationGEOTHERMAL STORAGE TANKS
GEOTHERMAL STORAGE TANKS INSTALLATION OPERATION MAINTENANCE Instruction Manual The storage tank is sold as a component part. It has been factory equipped with a booster element, and thermostat with high
More information200i. Vent/air manual. Installation instructions for vent and air piping. Also read and follow: 200i Boiler manual 200i Control manual
M2i-VAM-2 Cast iron condensing boiler 200i Vent/air manual Installation instructions for vent and air piping Also read and follow: 200i Boiler manual 200i Control manual This manual is intended only for
More informationACT Cartridge Dust Collector
IOM-101-1 ACT Cartridge Dust Collector Installation and Operation Manual ACT Dust Collectors CAUTION! Accidents happen, be careful and always follow all local and federal regulations! Fires and explosions
More informationHYDRONIC SPECIALTIES TACO AC(F)-PAX 05/15/2008
SECTION 15181 - HYDRONIC SPECIALTIES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Air separators B. Expansion tanks C. Pump accessories 1.2 RELATED SECTIONS A. Section - Plumbing Piping Specialties B. Section
More informationFull-line Product Overview
Full-line Product Overview End Suction Centrifugal Pumps This general purpose pump can be configured in frame-mounted and close-coupled, semi-open and enclosed impeller configurations. They are available
More informationHOME INSPECTION CHECKLIST
HOME INSPECTION CHECKLIST Date: Page 1 of 9 Client Name: Address: Tel No: Surname: Email: A WATER METER 1 Is the water meter visible YES NO 2 Water meter registers when water is drawn YES NO 3 Water meter
More informationSECTION PLUMBING EQUIPMENT
PART 1 GENERAL 1.1 SECTION INCLUDES A. Water heaters B. Packaged water heating systems C. Water storage tanks D. Water softeners E. Pumps F. Circulators 1.2 REFERENCES SECTION 22 30 00 PLUMBING EQUIPMENT
More information1.1 This section applies to air handling units for HVAC Systems.
AIR HANDLING UNITS GENERAL INFORMATION 1.1 This section applies to air handling units for HVAC Systems. DESIGN REQUIREMENTS 2.1 Design Criteria a. The decision to use modular central station air handling
More information569, 570, 571, 572 Series
Please read and save this Repair Parts Manual. Read this manual and the General Operating Instructions carefully before attempting to assemble, install, operate or maintain the product described. Protect
More informationSTEAM AND CONDENSATE PIPING AND PUMPS DESIGN AND CONSTRUCTION STANDARD
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationC. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.
SECTION 218800 - FIRE PROTECTION 1. GENERAL A. Provisions of Division 1, GENERAL REQUIREMENTS, and Section 230000, MECHANICAL GENERAL CONDITIONS, and Section 230050, SEISMIC PROTECTION are a part of this
More informationAUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations)
AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations) This standard applies to the design and installation of automatic fire sprinkler systems in conjunction with
More information569, 570, 571, 572 Series
Please read and save this Repair Parts Manual. Read this manual and the General Operating Instructions carefully before attempting to assemble, install, operate or maintain the product described. Protect
More informationSECTION FUEL-FIRED, DOMESTIC WATER HEATERS
SECTION 22 34 00 FUEL-FIRED, DOMESTIC WATER HEATERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationBARRINGTON PRESSURE LITE VITREOUS CHINA SIPHON JET TOILET K-4327
BARRINGTON PRESSURE LITE VITREOUS CHINA SIPHON JET TOILET K-4327 BEFORE YOU BEGIN INSTALLER HAZARD NOTIFICATION WARNING: Risk of injury or water damage. Contents of vessel under pressure can cause severe
More informationCHAPTER 10 TRAPS AND INTERCEPTORS
CHAPTER 10 TRAPS AND INTERCEPTORS 1001.0 Traps Required. 1001.1 Each plumbing fixture, excepting those having integral traps or as permitted in Section 1001.2, shall be separately trapped by an approved
More informationINSTALLATION OF DURAVENT POLYPRO SINGLE WALL POLYPROPYLENE VENTING SYSTEMS
SUPPLEMENT VENTING INSTRUCTIONS FOR INSTALLATION AND OPERATION INSTRUCTION MANUALS FOR THE FOLLOWING PRODUCT TYPES: HIGH EFFICIENCY CONDENSING COMMERCIAL, COMMERCIAL POWER DIRECT VENT, LIGHT DUTY COMMERCIAL
More informationModel AV Alarm Valve With and Without Model RC-1 Retard Chamber European Conformity Valve Trim General Description
Worldwide Contacts www.tyco-fire.com Model AV--00 Alarm Valve With and Without Model RC- Retard Chamber European Conformity Valve Trim General Description The TYCO Model AV--00 Alarm Valves DN, DN0, DN0,
More informationplumbing for greywater
plumbing for greywater october 2015 christina bertea ~union trained journeywoman plumber (1978) ~plumbing contractor (1996) ~greywater action singingwater@jps.net plumbing for greywater basic parts of
More information568X, 587X, 588X Series
Please read and save this Repair Parts Manual. Read this manual and the General Operating Instructions carefully before attempting to assemble, install, operate or maintain the product described. Protect
More informationSECTION WET-PIPE SPRINKLER SYSTEMS
SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION DUCTWORK. A. Section Painting: Weld priming, weather resistant, paint or coating.
SECTION 15890 DUCTWORK PART 1 - GENERAL 1.1 SECTION INCLUDES A. Metal ductwork. B. Duct cleaning. 1.2 RELATED SECTIONS A. Section 09900 - Painting: Weld priming, weather resistant, paint or coating. B.
More informationSECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings.
SECTION 15481 COMPRESSED AIR SYSTEM PART 1 - GENERAL 1.1 SECTION INCLUDES A. Pipe and pipe fittings, including valves, unions and couplings. B. Air compressor. C. After cooler. D. Refrigerated air dryer.
More informationOrange Township Fire Department Fire Prevention Bureau
Orange Township Fire Department Fire Prevention Bureau Under Ground Fire Protection Plan Submittal Checklist Project Name: Project Address: Date: Designers Name: Company Name: Phone Number: Email: Fax:
More informationFIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.
15500 - FIRE PROTECTION PART I DESIGN GUIDELINES A. General 1. Vertical fire pumps shall not be used at the University. 2. coupling piping shall be permitted for sprinkler and standpipe systems only. B.
More information2-Stage Under Counter Filtration System Model: WP-2 LCV
INSTALLATION, OPERATION AND MAINTENANCE MANUAL Save manual for future reference 2-Stage Under Counter Filtration System Model: WP-2 LCV IMPORTANT If you are unsure about installing your WATTS water filter,
More informationGeneral System Layout Sketch
General System Layout Sketch EZ-37 Solar Panels PV panel Glycol Fill Valve Expansion Tank ` 1 Introduction This document describes how to install a Heliatos GH type solar water heating system. These systems
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 22 3300 - ELECTRIC, DOMESTIC WATER HEATERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationPatterson/AMT Inline Circulator Pump Refer to pump manual for General Operating and Safety Instructions.
Please read and save this Repair Parts Manual. Read this manual and the General Operating Instructions carefully before attempting to assemble, install, operate or maintain the product described. Protect
More informationPlumbing. Definitions. Background Factors. Air Chambers. Air Gap (Drainage System) Air Gap (Water Distribution System) Air Lock.
Plumbing Plumbing may be defined as practice, materials, and fixtures used in the installation, maintenance, and alteration of all piping, fixtures, appliances, and appurtenances in connection with sanitary
More informationSummary of Conversion Steps. 1. Obtain the abandonment/conversion permit from the Department of Health.
One of the benefits of connecting to the Central Wastewater System is the opportunity it provides to convert your septic tank into a cistern. For slightly more than the cost of septic tank abandonment
More informationSECTION AIR HANDLING UNIT
SECTION 15800 - AIR HANDLING UNIT PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS, and Section 15030, ELECTRICAL REQUIREMENTS FOR
More informationEUTECTIC EC-10DV Series
EUTECTIC EC-10DV Series DIRECT VENT OIL-FIRED WATER BOILER/NO. 2 OIL VENTING INSTALLATION INSTRUCTIONS CONTENTS..........................................PAGE Basic Guidelines..........................................1
More informationSTORAGE TANK INSTALLATION and OPERATION MANUAL
LST-I-O 100161529_2000014416 Rev F STORAGE TANK INSTALLATION and OPERATION MANUAL LOW LEAD CONTENT The information contained in this manual is intended for use by qualified professional installers, or
More information2. Welding Materials and Procedures shall conform to the ASME Code.
PART 1 GENERAL 1.01 Scope of Standard A. The design guidelines contained herein include the requirements for systems, materials, fittings and valves utilized for fire protection systems at Sam Houston
More informationBarnes Oil Sensor Switch
Elevator sump basins Transformer vaults Leachate wells Garages Barnes BOSS Barnes Oil Sensor Switch Model BOSS BOSS PLUS RPM 3450 3450 Oil Water Switch Cord Length 10 10 Enclosure Rated Options Automatic
More informationPatterson/AMT Inline Circulator Pump Refer to pump manual for General Operating and Safety Instructions.
Please read and save this Repair Parts Manual. Read this manual and the General Operating Instructions carefully before attempting to assemble, install, operate or maintain the product described. Protect
More informationREFRIGERANT PIPING
SECTION 232300 - REFRIGERANT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION HYDRONIC PIPING AND SPECIALTIES
SECTION 15511 HYDRONIC PIPING AND SPECIALTIES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Pipe Materials. 2. Fittings. 3. Specialty Items. 4. Glycol Antifreeze Protection. 5. Process Cooling B.
More informationFrequently Asked Questions
Frequently Asked Questions 1. What is back-siphonage? Back-siphonage is the reversal of normal flow in a system caused by a negative pressure (vacuum or partial vacuum) in the supply piping. 2. What factors
More informationPumps SELECTION OF A PUMP
Pumps SELECTION OF A PUMP A water system needs to move the water produced from the source to its customers. In almost all cases in Minnesota, the source is at a lower elevation than the user so the water
More informationMODEL E
www.burcam.com 2190 Dagenais Blvd. West TEL: 514.337.4415 LAVAL (QUEBEC) FAX: 514.337.4029 CANADA H7L 5X9 info@burcam.com Your pump has been carefully packaged at the factory to prevent damage during shipping.
More informationCHAPTER 1 ADMINISTRATION SECTION 101 (IFGC) GENERAL
CHAPTER 1 ADMINISTRATION SECTION 101 (IFGC) GENERAL 101.1 Title. These regulations shall be known as the North Carolina Fuel Gas Code as adopted by the North Carolina Building Code Council on March 11,
More information1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.
FIRE PROTECTION GENERAL INFORMATION 1.1 Refer to Section 230000 for General Mechanical Requirements. 1.2 Refer to Section 230529 for Hangers and Supports. 1.3 Refer to Section 230553 for Pipe and Equipment
More informationDLKF. EBARA Submersible Sewage Pumps Specifications Project: Model: Chk d: Date:
DLKF A. General: Provide submersible sewage pumps suitable for continuous duty operation underwater without loss of watertight integrity to a depth of 65 feet. Pump system design shall include a guide
More informationWallace & Tiernan Gas Feed Systems V2000 Chlorinator
Wallace & Tiernan Gas Feed Systems V2000 Chlorinator Introduction Siemens Water Technologies chlorination equipment has the benefit of 100 years of experience in gas feed technology. V2000 chlorinators
More informationNFPA 54 UPDATE. Paul Cabot American Gas Association
NFPA 54 UPDATE Paul Cabot American Gas Association PRESENTATION TOPICS Summary Listing Schedule Revisions Definitions/General Piping Appliances and Appliance Installation Venting 2015 Edition Revision
More informationSECTION FIRE PROTECTION. A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section
PART 1 - GENERAL 1.00 GENERAL PROVISIONS A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section 1.01 DESCRIPTION OF WORK A. Work Included: Provide
More informationINSTALLATION INSTRUCTIONS FOR 6532 SERIES PACKAGE HEAT PUMP
INSTALLATION INSTRUCTIONS FOR 6532 SERIES PACKAGE HEAT PUMP RV Products A Division of Airxcel, Inc. P.O. Box 4020 Wichita, KS 67204 1976-360 (1-02) PP TABLE OF CONTENTS 1. Warnings......................................................