1 NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC Chuck Mozina, Consultant Beckwith Electric Company

2 NERC Reliability Standards Transmission System Generator Coordination - PRC STATUS OF STANDARD: + Approved by NERC Aug Approved by FERC July Effective Date For Compliance Starts Oct. 1, Time to Implement Months PURPOSE: To Set Load-Responsive Generator Protective Relays at Level such that Generators do not Trip During System Disturbances, Avoiding Damage to Generator. APPLICABILITY: Generator Owners, Transmission Owners, Distribution Providers APPLIES TO: + Generating Unit(s) + Generator Step-Up Transformer. + Auxiliary Transformers that Supply Auxiliary Power When Generator is On-Line + Backup Transmission Line Protection for Lines Exiting Power Plants

3 NERC PRC-023 Transmission System Loadability J X Z3 Zrelay 30 = 0.85 x VL-L 3 3 Max. Torque Angle 30 0 R

4 NERC Generator Setting Guide Western Protective Relay Conference 2014

5 Basic Generator Excitation System NERC Simulation Increased Load at Generator Transmission Bus to Pull Down Voltage to 0.85 PU

6 PRC Load-Dependent Generator Relays

7 PHASE DISTANCE IMPEDANCE BACKUP (21)

8 System Phase Fault Backup (21) For a fault at F, the approximate apparent impedance effect is:

9 Transformation from MW-MVAR to R-X Plot MVA = kv 2 Z ( R c ) R v MW MVAR R-X PLOT

10 Phase Backup (21) Setting Criteria: Options PRC-025-1

11 Phase Backup (21) Setting Criteria: Option #1 PRC-025-1

12 Phase Backup (21) Setting Criteria: Option #2 PRC-025-1

13 Phase Backup (21) Setting Criteria: Option #3 PRC-025-1

14 IEEE PHASE BACKUP (21) SETTING COORDINATION 30.0 jx LONGEST LINE (WITH IN FEED), 75.5 OHMS GCC GCC ZONE2 Can t Provide Remote BU due to Loadability Constraints SH OR T E ST LI N E (NO INFEED) ZONE 2 50% to 67% OF RPFA MTA ZONE1 SYSTEM May have to Upgrade Transmission System Protection Delineated Pri & BU and Local BF. RPFA ZONE TRANSFORMER HIGH SIDE R -5.0

15 NERC vs. IEEE PHASE BACKUP (21) SETTING COORDINATION Proposed NERC Test Points NERC Test Point Converted to an Impedance at Close to.95 pu voltage (Option 1)

16 IS LOAD ENCROACHMENT A GOOD IDEA? SUGGESTED BY PRC NERC Test Points NERC Test 1.0pu Mw + j [1.5 Mw pu] Mvars

17 Voltage Control/Restraint Overcurrent (51V)

18 Voltage Control/Restraint Overcurrent (51V) Not as Good as 21 Method of Providing Phase Fault Transmission System Backup Difficult to Coordinate with Transmission Line Impedance Relays Originally Designed for Industrial System Backup Protection

19 VOLTAGE RESTRAINT (51VR) CHARACTERISTIC Voltage Restraint Characteristic Tap Setting as % of Tap Setting at Rated Voltage Input Voltage (% of rated voltage)

20 PHASE BACKUP (51VR) SETTING CRITERIA: OPTIONS PRC-025-1

21 PHASE BACKUP (51VR) SETTING CRITERIA: OPTION #1 PRC-025-1

22 PHASE BACKUP (51VR) SETTING CRITERIA: OPTION #2 PRC-025-1

23 PHASE BACKUP (51VR) SETTING CRITERIA: OPTION #3 PRC-025-1

24 PHASE BACKUP (51VC) SETTING CRITERIA: OPTIONS PRC-025-1

25 GENERATOR STEP-UP TRANSFORMERS (GSU) & AUXILIARY TRANSFORMERS

26 GSU 51T APPLICATION Western Protective Relay Conference 2014

27 GSU (51T) SETTING CRITERIA: OPTIONS GSU PRC Western Protective Relay Conference 2014

28 GENERATOR STEP-UP 51T TRANSFORMERS OPTION #1 PRC-025-1

29 GENERATOR STEP-UP 51T TRANSFORMERS OPTION #2 PRC-025-1

30 AUXILARY TRANSFORMERS COVERED BY PRC-025-1

31 AUXILARY TRANSFORMERS (51) SETTING CRITERIA: OPTION PRC-025-1

32 POWER PLANT TRANSMISSION LINE BACKUP PROTECTION

33 Transmission Line Backup Relays (21)

34 Transmission Line Backup Relays (21)

35 TRANSMISSION LINE BACKUP (21) SETTING CRITERIA: OPTION #1 PRC-025-1

36 TRANSMISSION LINE BACKUP (21) SETTING CRITERIA: OPTION #2 PRC-025-1

37 Conclusions As a Result of NERC Analysis of 2003 Blackout Data, NERC Developed Voltage Ride-Through Criteria for Power Plants. The Voltage Ride-Through Setting Options are Outlined in NERC Standard for Load Responsive Relays (PRC-025-1). Adopted by FERC on July 2014 with Order Effective as of Order Oct.1, The Standard will Result in Very Limited Remote Backup by Generator 21 and 51V relays. This May Require Upgrade of Transmission Line Protection for Lines Exiting Power Plants.

38 NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC Questions?

Standard PRC Transmission Relay Loadability

Standard PRC Transmission Relay Loadability A. Introduction 1. Title: Transmission Relay Loadability 2. Number: PRC-023-2 3. Purpose: Protective relay settings shall not limit transmission loadability; not interfere with system operators ability

More information

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS This standard was reviewed and approved by key managers on September 6, 2011. Officer approval of this revision is not required. 1.0 SCOPE 1.1 This guide applies to the interconnection of a Utility with

More information

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS This standard was reviewed and approved by key managers with final approval by an officer of Oncor Electric Delivery on. 1.0 SCOPE 1.1 This guide applies to the interconnection of a Customer with the Company

More information

TOP R4 Unknown Operating State

TOP R4 Unknown Operating State TOP-004-2 R4 Unknown Operating State September 30, 2014 Greg Sorenson, PE Senior Compliance Engineer gsorenson.re@spp.org 501.688.1713 Outline Requirement Language Study Outcomes and Limitations Self-Check

More information

Protection Coordination Workshop. Robert W. Cummings Director of System Analysis and Reliability Initiatives

Protection Coordination Workshop. Robert W. Cummings Director of System Analysis and Reliability Initiatives Protection Coordination Workshop Robert W. Cummings Director of System Analysis and Reliability Initiatives February 17-18, 2010 2 System Protection and Control Performance Improvement Initiative The Initiative

More information

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and 2. Number: PRC-005-1b 3. Purpose: To ensure all transmission and generation Protection Systems affecting the reliability

More information

Appendix B. FRCC regional application of the term transmission Protection Systems

Appendix B. FRCC regional application of the term transmission Protection Systems Appendix FRCC regional application of the term transmission Protection Systems This is a clarification of the FRCC regional application of the term transmission Protection Systems as used in the PRC -series

More information

Protection System Maintenance

Protection System Maintenance Protection System Maintenance A Technical Reference September 13, 2007 Prepared by the System Protection and Controls Task Force of the NERC Planning Committee Table of Contents Table of Contents 1. Introduction

More information

Standard PRC 004 5(i) Protection System Misoperation Identification and Correction

Standard PRC 004 5(i) Protection System Misoperation Identification and Correction Standard PRC 004 5(i) Protection System Misoperation Identification and Correction A. Introduction 1. Title: Protection System Misoperation Identification and Correction 2. Number: PRC 004 5(i) 3. Purpose:

More information

Power System Protection Part 2 Dr.Prof. Mohammed Tawfeeq. Zones of Protection

Power System Protection Part 2 Dr.Prof. Mohammed Tawfeeq. Zones of Protection 84 Power System protection Dr. Mohamad Tawfeeq Zones of protection Zone of protection of a relay is the place or the distance that the relay can protect easily.fig.1 shows an example of protection zones

More information

4. Applicability: 4.1. Functional Entities: 4.2. Facilities:

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: Standard PRC-005-2(i) Protection System A. Introduction 1. Title: Protection System 2. Number: PRC-005-2(i) 3. Purpose: To document and implement programs for the maintenance of all Protection Systems

More information

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and 2. Number: PRC-005-1.1b 3. Purpose: To ensure all transmission and generation Protection Systems affecting the reliability

More information

Standard PRC-005-4(X) Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

Standard PRC-005-4(X) Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Standard PRC-005-4(X) Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Standard Development Timeline This section is maintained by the drafting team during the development

More information

Standard PRC Protection System Misoperation Identification and Correction

Standard PRC Protection System Misoperation Identification and Correction Standard PRC-004-4 Protection System Misoperation Identification and Correction Standard Development Timeline This section is maintained by the drafting team during the development of the standard and

More information

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and 2. Number: PRC-005-1.1b 3. Purpose: To ensure all transmission and generation Protection Systems affecting the reliability

More information

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance A. Introduction 1. Title: Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance 2. Number: PRC-005-6 3. Purpose: To document and implement programs for the maintenance of all

More information

Microgrid Fault Protection Based on Symmetrical and Differential Current Components

Microgrid Fault Protection Based on Symmetrical and Differential Current Components Microgrid Fault Protection Based on Symmetrical and Differential Current Components Prepared for Public Interest Energy Research California Energy Commission Prepared by Hassan Nikkhajoei and Robert H.

More information

Figure 30: Sample Case 8

Figure 30: Sample Case 8 6.9 Sample Case 8 C-A, φ-φ fault on Line 512 Hidden failure: Line 504 PCB scheme low set fault detector picked up This case illustrates the security of the line. With the low set fault detector of the

More information

Standard PRC Disturbance Monitoring Equipment Installation and Data Reporting

Standard PRC Disturbance Monitoring Equipment Installation and Data Reporting A. Introduction 1. Title: Disturbance Monitoring Equipment Installation and Data 2. Number: PRC-018-1 3. Purpose: Ensure that Disturbance Monitoring Equipment (DME) is installed and that Disturbance data

More information

PRC-005. Tips and Updates. February 25th, Jonathan Hayes

PRC-005. Tips and Updates. February 25th, Jonathan Hayes PRC-005 Tips and Updates February 25th, 2014 Jonathan Hayes jhayes@spp.org 501.614.3509 NERC Standards Violations 3 Overview PRC-005-1 Current Issues / Best Practices PRC-005-2 Standard Implementation

More information

Standard PRC-005-3(i) Protection System and Automatic Reclosing Maintenance

Standard PRC-005-3(i) Protection System and Automatic Reclosing Maintenance A. Introduction 1. Title: Protection System and Automatic Reclosing 2. Number: PRC-005-3(i) 3. Purpose: To document and implement programs for the maintenance of all Protection Systems and Automatic Reclosing

More information

Standard PRC Protection System Misoperation Identification and Correction

Standard PRC Protection System Misoperation Identification and Correction Standard PRC-004-3 Protection System Misoperation Identification and Correction A. Introduction 1. Title: Protection System Misoperation Identification and Correction 2. Number: PRC-004-3 3. Purpose: Identify

More information

FACILITY CONNECTION STANDARD

FACILITY CONNECTION STANDARD FACILITY CONNECTION STANDARD Preface: This Facility Connection Standard applies to any connection to the electric system of Westar Energy, Inc. or Kansas Gas and Electric Company, both doing business as

More information

Three Terminal 230kV System Protection and Restoration at Calpine s Creed and Goose Haven Energy Centers Suisun City, California

Three Terminal 230kV System Protection and Restoration at Calpine s Creed and Goose Haven Energy Centers Suisun City, California Three Terminal 230kV System Protection and Restoration at Calpine s Creed and Goose Haven Energy Centers Suisun City, California Larry Henriksen POWER Engineers, Inc. Hailey, Idaho Daren Phelps Calpine

More information

2005 EAF Melt Shops in North America MARKET STUDY Final Report

2005 EAF Melt Shops in North America MARKET STUDY Final Report 2005 EAF Melt Shops in North America MARKET STUDY Final Report Prepared for: by: AIM Project # 344 September 2005 FOREWORD This Report was prepared by AIM Market Research. Neither AIM Market Research,

More information

Standard PRC-005-3(X) Protection System and Automatic Reclosing Maintenance

Standard PRC-005-3(X) Protection System and Automatic Reclosing Maintenance Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Standard PRC-005-5 Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Standard Development Timeline This section is maintained by the drafting team during the development

More information

Supplementary Reference & FAQ. Draft

Supplementary Reference & FAQ. Draft PRC-005-2 Protection System Maintenance Supplementary Reference & FAQ Draft 1 July 29, 2011 Prepared by the Protection System Maintenance and Testing Standard Drafting Team Supplementary Reference and

More information

Standard PRC-005-X Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

Standard PRC-005-X Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Relay Performance Index for a Sustainable Relay Replacement Program

Relay Performance Index for a Sustainable Relay Replacement Program Relay Performance Index for a Sustainable Relay Replacement Program Aaron Feathers, Abesh Mubaraki, Nai Paz, Anna Nungo Pacific Gas & Electric Company San Francisco, CA Western Protective Relay Conference

More information

Supplementary Reference and FAQ

Supplementary Reference and FAQ Supplementary Reference and FAQ PRC-005-2 Protection System Maintenance October 2012 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents Table of

More information

Supplementary Reference and FAQ - Draft

Supplementary Reference and FAQ - Draft Supplementary Reference and FAQ - Draft PRC-005-2 Protection System Maintenance May, 2012 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents Table

More information

Transmission Line Protection End to End Testing

Transmission Line Protection End to End Testing Transmission Line Protection End to End Testing Hands on Relay School, March 15, 2018 Chris Gallacher Protection Engineer Greg Sharpes Senior Relay Technician Mark Babin Senior Relay Technician Presentation

More information

Electrical Energy department

Electrical Energy department Al-Balqa Applied University Power systems Protection course Dr Audih al-faoury Electrical Energy department 2018-2019 Department of Electrical Energy Engineering 1 Part 1 Power System protection Introduction

More information

ELECTRICAL BULLETIN

ELECTRICAL BULLETIN PO Box 697 Halifax, Nova Scotia B3J 2T8 Labour and Workforce Development ELECTRICAL BULLETIN 2011-01 From: David MacLeod,C.E.I.,P.Eng. Pg 1 of 6 Provincial Chief Electrical Inspector Date: January 5,2011

More information

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan Standard PRC-005-2 Protection System Maintenance A. Introduction 1. Title: Protection System Maintenance 2. Number: PRC-005-2 3. Purpose: To document and implement programs for the maintenance of all Protection

More information

Distributed Generation (greater than 10kW) Connecting to Vector s electricity network

Distributed Generation (greater than 10kW) Connecting to Vector s electricity network Distributed Generation (greater than 10kW) Connecting to Vector s electricity network Important information about installing distributed generation with capacity greater than 10 kilowatts Purpose of this

More information

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan Standard PRC-005-2 Protection System Maintenance A. Introduction 1. Title: Protection System Maintenance 2. Number: PRC-005-2 3. Purpose: To document and implement programs for the maintenance of all Protection

More information

PRC (I) August 9, Authored by

PRC (I) August 9, Authored by STANDARD APPLICATION GUIDE PRC-004-5 (I) PROTECTION SYSTEM MISOPERATION IDENTIFICATION AND CORRECTION August 9, 2016 Authored by Mark Gutzmann, Xcel Energy Ding Lin, Manitoba Hydro Joe Livingston, Great

More information

Standard Development Roadmap

Standard Development Roadmap Standard PRC-005-2 Protection System Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

More information

PRC NERC Protection System Maintenance Standard PRC-005-2

PRC NERC Protection System Maintenance Standard PRC-005-2 PRC-005-2 NERC Protection System Maintenance Standard PRC-005-2 Frequently Asked Questions FREQUENTLY ASKED QUESTIONS - Practical Compliance and Implementation (Draft 1) April 16, 2010 Informative Annex

More information

National Grid Requirements for Interconnection of Parallel Generation

National Grid Requirements for Interconnection of Parallel Generation National Grid Requirements for Interconnection of Parallel Generation ESB 756 2017 Revision Review of Changes for RI Jurisdiction, version August 23, 2017 By: National Grid, Retail Connections Policy &

More information

Contents. Preface. Chapter 2 Faults, types and effects The development of simple distribution systems Faults-types and their effects 7

Contents. Preface. Chapter 2 Faults, types and effects The development of simple distribution systems Faults-types and their effects 7 Practical Power System Protection for Engineers and Technicians Contents Preface ix Chapter 1 Need for protection 1 1.1 Need for protective apparatus 1 1.2 Basic requirements of protection 2 1.3 Basic

More information

PANELBOARDS & BUILDING DISTRIBUTION

PANELBOARDS & BUILDING DISTRIBUTION 262416 PANELBOARDS & BUILDING DISTRIBUTION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Distribution panelboards 2. Power panelboards B. Related Sections: 1.02 POLICY 1. CU Standard 260500, Basic

More information

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities

More information

National Grid / Supplement to Specifications for Electrical Installations / ESB ver Doc. File: ESB _ver3_

National Grid / Supplement to Specifications for Electrical Installations / ESB ver Doc. File: ESB _ver3_ National Grid / Supplement to Specifications for Electrical Installations / ESB 756-2017 ver. 3.0 Doc. File: ESB756--0617_ver3_0 08-03-2017.docx PREFACE ESB 756-2017 references all requirements for parallel

More information

To: Honorable Public Utilities Board Submitted by: /s/ Douglas Draeger AGM Engineering and Operations

To: Honorable Public Utilities Board Submitted by: /s/ Douglas Draeger AGM Engineering and Operations AGENDA ITEM NO.: 5.D.1 MEETING DATE: 0/4/014 ADMINISTRATIVE REPORT NO.: 014-48 To: Honorable Public Utilities Board Submitted by: /s/ Douglas Draeger AGM Engineering and Operations From: Tito R. Nagrampa

More information

Sudden Pressure Relays and Other Devices that Respond to Non-Electrical Quantities

Sudden Pressure Relays and Other Devices that Respond to Non-Electrical Quantities Sudden Pressure Relays and Other Devices that Respond to n-electrical Quantities SPCS Input for Standard Development in Response to FERC Order. 758 System Protection and Control Subcommittee December 2013

More information

June 4, 2014 VIA ELECTRONIC FILING. Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C.

June 4, 2014 VIA ELECTRONIC FILING. Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. June 4, 2014 VIA ELECTRONIC FILING Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 RE: Errata to Petition of the North American Electric

More information

NERC s Compliance Enforcement Initiative Find, Fix, Track and Report Implementation

NERC s Compliance Enforcement Initiative Find, Fix, Track and Report Implementation NERC s Compliance Enforcement Initiative Find, Fix, Track and Report Implementation Compliance Committee Meeting Open Ken Lotterhos, Associate General Counsel and Director of Enforcement February 8, 2012

More information

Reliability Fundamentals of System Protection

Reliability Fundamentals of System Protection Report to the Planning Committee Reliability Fundamentals of System Protection NERC System Protection and Control Subcommittee December 2010 Table of Contents 1. Background... 1 2. Introduction to System

More information

2000 System Disturbances

2000 System Disturbances 2000 System Disturbances Review of Selected Electric System Disturbances in North America North American Electric Reliability Council Princeton Forrestal Village 116-390 Village Boulevard Princeton, New

More information

Lecture 4 Power System Protection. Course map

Lecture 4 Power System Protection. Course map Lecture 4 Power System Protection 1 Course map 2 1 Outline of the Lecture Relays and IEDs Protection Principles Protection requirements Protection Schemes 3 What can we control? Breakers Valves Tap changers

More information

Distribution Control Center Operator Training

Distribution Control Center Operator Training Distribution Control Center Operator Training OnlineTraining 15-Hour Course COURSE I BASIC DISTRIBUTION 1. Introduction to Distribution Systems a. Terminology b. Basic electricity and Ohm s Law c. BES

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 This section specifies the furnishing, complete installation, and connection of automatic transfer switches. 1.2 RELATED WORK A. Section 14 21 00, ELECTRIC

More information

New fire control system design for fire fighting and rescue equipment Jianguo LUO1, a, Zehao BU2, b

New fire control system design for fire fighting and rescue equipment Jianguo LUO1, a, Zehao BU2, b 6th International Conference on Information Engineering for Mechanics and Materials (ICIMM 2016) New fire control system design for fire fighting and rescue equipment Jianguo LUO1, a, Zehao BU2, b 1 Department

More information

Vector Shift. Robert Westmancoat

Vector Shift. Robert Westmancoat Vector Shift Robert Westmancoat Overview Loss of Mains Protection why do we need it? Detecting a fault what methods are used? What s the risk? changing power system Observations & Analysis real-life events

More information

POWER SYSTEM INCIDENT REPORT: TRIP OF DOUBLE CIRCUIT MACKAY- COLLINSVILLE TEE - PROSERPINE 132 KV LINES AND STRATHMORE SVC ON 29 DECEMBER 2010

POWER SYSTEM INCIDENT REPORT: TRIP OF DOUBLE CIRCUIT MACKAY- COLLINSVILLE TEE - PROSERPINE 132 KV LINES AND STRATHMORE SVC ON 29 DECEMBER 2010 POWER SYSTEM INCIDENT REPORT: TRIP OF DOUBLE CIRCUIT MACKAY- COLLINSVILLE TEE - PROSERPINE 132 KV LINES AND STRATHMORE ON 29 PREPARED BY: Electricity System Operations Planning and Performance FINAL Disclaimer

More information

Synchrophasor Technology in Control Centers Clemson University, SC March 12, 2014 Vikram S. Budhraja

Synchrophasor Technology in Control Centers Clemson University, SC March 12, 2014 Vikram S. Budhraja Clemson University Power Systems Conference Synchrophasor Technology in Control Centers Clemson University, SC March 12, 2014 Vikram S. Budhraja Outline Synchrophasor Technology Infrastructure Lessons

More information

Major Fault Caused by Stator Winding Circuit Ring Failure

Major Fault Caused by Stator Winding Circuit Ring Failure Case study Major Fault Caused by Stator Winding Circuit Ring Failure Joël Pedneault-Desroches, P. Eng. Presentation Outline Introduction Inspection report Chronology of events Repair Conclusion 2 Introduction

More information

Machinery Room Electrical Best Practices

Machinery Room Electrical Best Practices Machinery Room Electrical Best Practices Brad Heeres Angus-Young Associates February 8, 2007 Understand and comply with applicable codes and standards The National Electrical Code requirements for a safe

More information

Introduction Consultant shall incorporate the material in the DSS into the project specifications.

Introduction Consultant shall incorporate the material in the DSS into the project specifications. DIVISION 16 - ELECTRICAL Section 16000 - General Discussion Introduction Consultant shall incorporate the material in the DSS into the project specifications. Refer any questions, clarifications regarding

More information

38-SDMS-01 SPECIFICATIONS FOR FAULT INDICATORS FOR UNDERGROUND DISTRIBUTION NETWORKS

38-SDMS-01 SPECIFICATIONS FOR FAULT INDICATORS FOR UNDERGROUND DISTRIBUTION NETWORKS SPECIFICATIONS FOR FAULT INDICATORS FOR UNDERGROUND DISTRIBUTION NETWORKS This specification is property of SEC and subject to change or modification without any notice CONTENTS Clause Page 1.0 SCOPE 3

More information

Supplementary Reference and FAQ - Draft

Supplementary Reference and FAQ - Draft Supplementary Reference and FAQ - Draft PRC-005-2 Protection System Maintenance January 17May, 2012 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents

More information

Commissioning the Fire Suppression System for 500/230 kv Transformers of EGAT s Nongchok Substation

Commissioning the Fire Suppression System for 500/230 kv Transformers of EGAT s Nongchok Substation Commissioning the Fire Suppression System for 500/230 kv Transformers of EGAT s Nongchok Substation S. Chaipitak, Electricity Generating Authority of Thailand, +6624362432, Chaipitak.som@egat.co.th ABSTRACT

More information

LineVision TM. Non-Contact Transmission Line Monitoring and Dynamic Line Rating

LineVision TM. Non-Contact Transmission Line Monitoring and Dynamic Line Rating LineVision TM Non-Contact Transmission Line Monitoring and Dynamic Line Rating Jonathan Marmillo, Business Development M: 484-368-4630 E: jmarmillo@genscape.com www.genscape.com 2017 Genscape Incorporated.

More information

Need for a Bipole III rating of 2300 Mw to transmit Keeyask power.

Need for a Bipole III rating of 2300 Mw to transmit Keeyask power. Need for a Bipole III rating of 2300 Mw to transmit Keeyask power. Introduction Further to the Technical Assessment of the Need for the Bipole III Line, dated 21 November 2014- Dennis Woodford P. Eng.

More information

Innovative Real-Time Contingency Analysis Enhancements for Transmission Operations

Innovative Real-Time Contingency Analysis Enhancements for Transmission Operations Innovative Real-Time Contingency Analysis Enhancements for Transmission Operations Xiaodong Liu Trevor W. Tessin Richard A. Flynn 2016 IEEE PES General Meeting, Boston July 17-21, 2016 Outline Eversource

More information

Arc Flash Analysis: IEEE Method versus the NFPA 70E Tables July 2017 / 1910DB1702

Arc Flash Analysis: IEEE Method versus the NFPA 70E Tables July 2017 / 1910DB1702 Arc Flash Analysis: IEEE Method versus the NFPA 70E Tables July 2017 / 1910DB1702 by Reza Tajali, Schneider Electric Engineering Services Summary 1.0 Abstract 2.0 OSHA and NFPA Rules 3.0 Use of NFPA 70E

More information

RD:30 Specification No. TI/SPC/PSI/AUTOTR/0090 For 50U5/150 MVA, 220/132 kv Auto Transformer

RD:30 Specification No. TI/SPC/PSI/AUTOTR/0090 For 50U5/150 MVA, 220/132 kv Auto Transformer RD:30 Specification No. TI/SPC/PSI/AUTOTR/0090 For 50U5/150 MVA, 220/132 kv Auto Transformer Annexure-4 TECHNICAL SPECIFICATIONS FOR NITROGEN INJECTION FIRE PREVENTION AND EXTINGUISHING SYSTEM FOR OIL

More information

PS6 SERIES. Installation PS6 SERIES. Power Supplies c/w Fire Panel Interface, EOL Trigger and Standby Power Option

PS6 SERIES. Installation PS6 SERIES. Power Supplies c/w Fire Panel Interface, EOL Trigger and Standby Power Option Installation PS6 SERIES Power Supplies PS6 SERIES Power Supplies c/w Fire Panel Interface, EOL Trigger and Standby Power Option Installation and Specifications Manual ISDPS6_SERIES 08121590 PCN15016 R05/15GR

More information

Standard PRC Protection System and Automatic Reclosing Maintenance. Standard Development Roadmap

Standard PRC Protection System and Automatic Reclosing Maintenance. Standard Development Roadmap Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed:

More information

Numerical Relay MELPRO TM -S Series

Numerical Relay MELPRO TM -S Series Numerical Relay MELPRO TM -S Series MODEL COC4 - A02S1 INSTRUCTION MANUAL 1 / 37 JEP0-IL9540 - Safety precautions - Before installation, operation, maintenance, and inspection, please be sure to read this

More information

Performance Neuro-Fuzzy for Power System Fault Location

Performance Neuro-Fuzzy for Power System Fault Location International Journal of Engineering and Technology Volume 3 No. 4, April, 2013 Performance Neuro-Fuzzy for Power System Fault Location 1,2 Azriyenni, 1 M.W. Mustafa 1 Electrical Engineering, Fakulti Kejuruteraan

More information

Fire resistance testing of technical cabinets in accordance with EN

Fire resistance testing of technical cabinets in accordance with EN Fire resistance testing of technical cabinets in accordance with EN - Pierre-Yves MAZILLE 0/0/07 Introduction In depth look into specification of..h) in EN - Review of standard fire resistance test methods

More information

VAMP 121. Arc protection unit. User manual

VAMP 121. Arc protection unit. User manual VAMP 121 Arc protection unit User manual VM121.EN014_B Table of contents VAMP 121 Table of contents 1. General... 4 1.1. Arc protection unit VAMP 121... 4 2. Unit configuration... 6 3. Sensors... 8 3.1.

More information

SEL Arc-Flash Solutions

SEL Arc-Flash Solutions SEL Arc-Flash Solutions Arc-Flash Protection at the Speed of Light Protect personnel and equipment Detect arc-flash events and send a trip signal in as little as 2 ms to enhance safety and minimize equipment

More information

Electric Power Group Presents. Welcome!

Electric Power Group Presents. Welcome! Electric Power Group Presents Maximizing Use of Synchrophasor Technology for Everyday Tasks Welcome! The meeting will begin at 2:00 p.m. ET / 11:00 a.m. PT Jan. 18, 2017 Today s Topic: Synchrophasor Intelligence

More information

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices. SECTION 16470 PANELBOARDS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16120 - Wire and Cable. 3. 16475 - Overcurrent Protective Devices. 1.02 SYSTEM DESCRIPTION A. Performance

More information

SEL Arc-Flash Solutions

SEL Arc-Flash Solutions SEL Arc-Flash Solutions Arc-Flash Protection at the Speed of Light Protect personnel and equipment. Detect arc-flash events and send a trip signal in as little as 2 ms to enhance safety and minimize equipment

More information

PART 4 ELECTRICAL STANDARDS

PART 4 ELECTRICAL STANDARDS PART 4 ELECTRICAL STANDARDS 1.0 INTRODUCTION AND SCOPE: These standards reflect the general requirements and recommendations of elevator contractors, with respect to the power distribution system to achieve

More information

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:

More information

The North American Electric Reliability Corporation ( NERC ) hereby submits

The North American Electric Reliability Corporation ( NERC ) hereby submits December 8, 2009 VIA ELECTRONIC FILING Neil Thomson SaskPower, Law, Land Regulatory Affairs 2025 Victoria Ave. Regina, Saskatchewan S4P 0S1 Re: North American Electric Reliability Corporation Dear Mr.

More information

WHAT TO EXPECT DURING A FIRE DOOR INSPECTION

WHAT TO EXPECT DURING A FIRE DOOR INSPECTION WHAT TO EXPECT DURING A FIRE DOOR INSPECTION Basic Fire Door Inspections 1. Fire door basic function 2. Understanding codes 3. Responsibility of end user 4. Common fire door deficiencies 5. What your door

More information

1S25. Arc Fault Monitor 4 Zones, 8 Sensors. Features. Introduction. ARC Fault Protection

1S25. Arc Fault Monitor 4 Zones, 8 Sensors. Features. Introduction. ARC Fault Protection Technical Bulletin Arc Fault Monitor 4 Zones, 8 Sensors Features Four independent arc fault tripping zones 1 or 2 arc fault sensors per zone allowing up to 8 arc fault sensors per module Trip indication

More information

Remote NAC Power Supply D7038

Remote NAC Power Supply D7038 Operation and Installation Guide Remote NAC Power Supply D7038 D7038 REMOTE NAC POWER SUPPLY Page 2 2005 Bosch Security Systems Contents Contents 1.0 Overview...5 1.1 Module Control...5 1.1.1 Option Bus

More information

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:

More information

OPERATING INSTRUCTIONS COP-IE, COP-I, COP-E (ANSI 50,51,50N,51N)

OPERATING INSTRUCTIONS COP-IE, COP-I, COP-E (ANSI 50,51,50N,51N) OPERATING INSTRUCTIONS COP-IE, COP-I, COP-E (ANSI 50,51,50N,51N) MRM PROCOM Pvt Ltd An ISO-9001-2008 certified organization Works: Plot No. 20-21, Sector 59, Phase II, Faridabad, Haryana -121004 Ph: 0129-4700400

More information

7XG3120 ReyArc20 Arc Fault Monitor Relay Energy Management

7XG3120 ReyArc20 Arc Fault Monitor Relay Energy Management Reyrolle Protection Devices 7XG3120 ReyArc20 Arc Fault Monitor Relay Energy Management 7XG3120 - Arc Fault Monitor Relay The over-current caused by an arc is, due to its resistance, lower than the over-current

More information

PDD-FT-3. Fire Panel Interface With EOL Trigger. Installation and Specifications Manual

PDD-FT-3. Fire Panel Interface With EOL Trigger. Installation and Specifications Manual Installation -3-3 Fire Panel Interface With EOL Trigger Installation and Specifications Manual ISPSFPD-3 PCN16045 R12/17GR 2017 Rutherford Controls Int l dormakaba Group www.rutherfordcontrols.com Phone:

More information

APPLICATION NOTE. Applying pressure sensing in arc flash protection applications with air magnetic circuit breakers

APPLICATION NOTE. Applying pressure sensing in arc flash protection applications with air magnetic circuit breakers APPLICATION NOTE Applying pressure sensing in arc flash protection applications with air magnetic circuit breakers Application note Applying pressure sensing in arc flash protection 2 (6) Revision 1.0

More information

Heathcare Interpretations Task Force

Heathcare Interpretations Task Force Healthcare Interpretations Task Force MEMORANDUM TO: FROM: Heathcare Interpretations Task Force Robert Solomon DATE: May 30, 2014 SUBJ: HITF Meeting Agenda and Meeting Room Location Information Attached

More information

2012 Edition. Tech Topics: Standards & Codes. Note 4, Issue 1. Points of Interest: Introduction. Background. Changes to Definitions in Article 100

2012 Edition. Tech Topics: Standards & Codes. Note 4, Issue 1. Points of Interest: Introduction. Background. Changes to Definitions in Article 100 Significant Changes to the NFPA 70E Standard 2012 Edition Tech Topics: Standards & Codes Note 4, Issue 1 Peter Walsh, PE Sr. Field Engineer Points of Interest: Arc-Rated (AR) vs. Flame-Resistant (FR) Training

More information

ARGO (Technical Support) 2201 Dwyer Avenue Utica, NY (Corporate Sales) 85 Middle Road

ARGO (Technical Support) 2201 Dwyer Avenue Utica, NY (Corporate Sales) 85 Middle Road ARGO (Technical Support) 2201 Dwyer Avenue Utica, NY 13501 (Corporate Sales) 85 Middle Road An ISO 9001-2000 Certified Company Dunkirk, NY 14048 www.argoindustries.com P/N 240005498A, Rev. 1.5 [02/07]

More information

Reduction in db Phase in Degrees Volts Volts -0.

Reduction in db Phase in Degrees Volts Volts -0. AudioQuest NightHawk Stock Pads - - - - -2-3 -3-4 -4 - - - - - -2-3 -3-4 -4 - Attenuation of External Sound vs. 3 2 Measured with 6 Ohm output impedance. -6 6 4 - -4 in Degrees 3 Hz Square Wave..4.3.2.

More information

Letter of Notification For East Lima Station Expansion Project

Letter of Notification For East Lima Station Expansion Project Letter of Notification For East Lima Station Expansion Project PUCO Case No. 18-0906-EL-BLN Submitted to: The Ohio Power Siting Board Pursuant to Ohio Administrative Code Section 4906-6-05 Submitted by:

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between //--// if not applicable to project. Also, delete any other item or paragraph

More information

Dennis Mullen System Operations Manager

Dennis Mullen System Operations Manager Dennis Mullen System Operations Manager EPRI Power Switching Safety and Reliability Conference September 14, 2009 Electric System Control Center (ESCC) Member Companies PSNH Operating Company of NU Retail

More information

Intelligent addressable fire alarm control panel

Intelligent addressable fire alarm control panel Intelligent addressable fire alarm control panel Input current consumption: Panel rating: Batteries: Networking and Interfaces Panel to panel communication: Number of panels: Interface port: System capacity

More information

MeSSKO MTraB MaINTeNaNCe-Free dehydrating BreaTher OF The PreMIUM SerIeS TWICe as reliable and SIMPlY effective.

MeSSKO MTraB MaINTeNaNCe-Free dehydrating BreaTher OF The PreMIUM SerIeS TWICe as reliable and SIMPlY effective. MeSSKO MTraB MaINTeNaNCe-Free dehydrating BreaTher OF The PreMIUM SerIeS TWICe as reliable and SIMPlY effective. M es SKO IN S Tr U M e NTS MeSSKO MTraB PreMIUM SerIeS MeSSKO MTraB PreMIUM SerIeS The WaY

More information