NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1
|
|
- Anis Mills
- 5 years ago
- Views:
Transcription
1 NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC Chuck Mozina, Consultant Beckwith Electric Company
2 NERC Reliability Standards Transmission System Generator Coordination - PRC STATUS OF STANDARD: + Approved by NERC Aug Approved by FERC July Effective Date For Compliance Starts Oct. 1, Time to Implement Months PURPOSE: To Set Load-Responsive Generator Protective Relays at Level such that Generators do not Trip During System Disturbances, Avoiding Damage to Generator. APPLICABILITY: Generator Owners, Transmission Owners, Distribution Providers APPLIES TO: + Generating Unit(s) + Generator Step-Up Transformer. + Auxiliary Transformers that Supply Auxiliary Power When Generator is On-Line + Backup Transmission Line Protection for Lines Exiting Power Plants
3 NERC PRC-023 Transmission System Loadability J X Z3 Zrelay 30 = 0.85 x VL-L 3 3 Max. Torque Angle 30 0 R
4 NERC Generator Setting Guide Western Protective Relay Conference 2014
5 Basic Generator Excitation System NERC Simulation Increased Load at Generator Transmission Bus to Pull Down Voltage to 0.85 PU
6 PRC Load-Dependent Generator Relays
7 PHASE DISTANCE IMPEDANCE BACKUP (21)
8 System Phase Fault Backup (21) For a fault at F, the approximate apparent impedance effect is:
9 Transformation from MW-MVAR to R-X Plot MVA = kv 2 Z ( R c ) R v MW MVAR R-X PLOT
10 Phase Backup (21) Setting Criteria: Options PRC-025-1
11 Phase Backup (21) Setting Criteria: Option #1 PRC-025-1
12 Phase Backup (21) Setting Criteria: Option #2 PRC-025-1
13 Phase Backup (21) Setting Criteria: Option #3 PRC-025-1
14 IEEE PHASE BACKUP (21) SETTING COORDINATION 30.0 jx LONGEST LINE (WITH IN FEED), 75.5 OHMS GCC GCC ZONE2 Can t Provide Remote BU due to Loadability Constraints SH OR T E ST LI N E (NO INFEED) ZONE 2 50% to 67% OF RPFA MTA ZONE1 SYSTEM May have to Upgrade Transmission System Protection Delineated Pri & BU and Local BF. RPFA ZONE TRANSFORMER HIGH SIDE R -5.0
15 NERC vs. IEEE PHASE BACKUP (21) SETTING COORDINATION Proposed NERC Test Points NERC Test Point Converted to an Impedance at Close to.95 pu voltage (Option 1)
16 IS LOAD ENCROACHMENT A GOOD IDEA? SUGGESTED BY PRC NERC Test Points NERC Test 1.0pu Mw + j [1.5 Mw pu] Mvars
17 Voltage Control/Restraint Overcurrent (51V)
18 Voltage Control/Restraint Overcurrent (51V) Not as Good as 21 Method of Providing Phase Fault Transmission System Backup Difficult to Coordinate with Transmission Line Impedance Relays Originally Designed for Industrial System Backup Protection
19 VOLTAGE RESTRAINT (51VR) CHARACTERISTIC Voltage Restraint Characteristic Tap Setting as % of Tap Setting at Rated Voltage Input Voltage (% of rated voltage)
20 PHASE BACKUP (51VR) SETTING CRITERIA: OPTIONS PRC-025-1
21 PHASE BACKUP (51VR) SETTING CRITERIA: OPTION #1 PRC-025-1
22 PHASE BACKUP (51VR) SETTING CRITERIA: OPTION #2 PRC-025-1
23 PHASE BACKUP (51VR) SETTING CRITERIA: OPTION #3 PRC-025-1
24 PHASE BACKUP (51VC) SETTING CRITERIA: OPTIONS PRC-025-1
25 GENERATOR STEP-UP TRANSFORMERS (GSU) & AUXILIARY TRANSFORMERS
26 GSU 51T APPLICATION Western Protective Relay Conference 2014
27 GSU (51T) SETTING CRITERIA: OPTIONS GSU PRC Western Protective Relay Conference 2014
28 GENERATOR STEP-UP 51T TRANSFORMERS OPTION #1 PRC-025-1
29 GENERATOR STEP-UP 51T TRANSFORMERS OPTION #2 PRC-025-1
30 AUXILARY TRANSFORMERS COVERED BY PRC-025-1
31 AUXILARY TRANSFORMERS (51) SETTING CRITERIA: OPTION PRC-025-1
32 POWER PLANT TRANSMISSION LINE BACKUP PROTECTION
33 Transmission Line Backup Relays (21)
34 Transmission Line Backup Relays (21)
35 TRANSMISSION LINE BACKUP (21) SETTING CRITERIA: OPTION #1 PRC-025-1
36 TRANSMISSION LINE BACKUP (21) SETTING CRITERIA: OPTION #2 PRC-025-1
37 Conclusions As a Result of NERC Analysis of 2003 Blackout Data, NERC Developed Voltage Ride-Through Criteria for Power Plants. The Voltage Ride-Through Setting Options are Outlined in NERC Standard for Load Responsive Relays (PRC-025-1). Adopted by FERC on July 2014 with Order Effective as of Order Oct.1, The Standard will Result in Very Limited Remote Backup by Generator 21 and 51V relays. This May Require Upgrade of Transmission Line Protection for Lines Exiting Power Plants.
38 NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC Questions?
Standard PRC Transmission Relay Loadability
A. Introduction 1. Title: Transmission Relay Loadability 2. Number: PRC-023-2 3. Purpose: Protective relay settings shall not limit transmission loadability; not interfere with system operators ability
More informationTRANSMISSION ENGINEERING STANDARDS SUBSTATIONS
This standard was reviewed and approved by key managers on September 6, 2011. Officer approval of this revision is not required. 1.0 SCOPE 1.1 This guide applies to the interconnection of a Utility with
More informationTRANSMISSION ENGINEERING STANDARDS SUBSTATIONS
This standard was reviewed and approved by key managers with final approval by an officer of Oncor Electric Delivery on. 1.0 SCOPE 1.1 This guide applies to the interconnection of a Customer with the Company
More informationTOP R4 Unknown Operating State
TOP-004-2 R4 Unknown Operating State September 30, 2014 Greg Sorenson, PE Senior Compliance Engineer gsorenson.re@spp.org 501.688.1713 Outline Requirement Language Study Outcomes and Limitations Self-Check
More informationProtection Coordination Workshop. Robert W. Cummings Director of System Analysis and Reliability Initiatives
Protection Coordination Workshop Robert W. Cummings Director of System Analysis and Reliability Initiatives February 17-18, 2010 2 System Protection and Control Performance Improvement Initiative The Initiative
More informationA. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing
A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and 2. Number: PRC-005-1b 3. Purpose: To ensure all transmission and generation Protection Systems affecting the reliability
More informationAppendix B. FRCC regional application of the term transmission Protection Systems
Appendix FRCC regional application of the term transmission Protection Systems This is a clarification of the FRCC regional application of the term transmission Protection Systems as used in the PRC -series
More informationProtection System Maintenance
Protection System Maintenance A Technical Reference September 13, 2007 Prepared by the System Protection and Controls Task Force of the NERC Planning Committee Table of Contents Table of Contents 1. Introduction
More informationStandard PRC 004 5(i) Protection System Misoperation Identification and Correction
Standard PRC 004 5(i) Protection System Misoperation Identification and Correction A. Introduction 1. Title: Protection System Misoperation Identification and Correction 2. Number: PRC 004 5(i) 3. Purpose:
More informationPower System Protection Part 2 Dr.Prof. Mohammed Tawfeeq. Zones of Protection
84 Power System protection Dr. Mohamad Tawfeeq Zones of protection Zone of protection of a relay is the place or the distance that the relay can protect easily.fig.1 shows an example of protection zones
More information4. Applicability: 4.1. Functional Entities: 4.2. Facilities:
Standard PRC-005-2(i) Protection System A. Introduction 1. Title: Protection System 2. Number: PRC-005-2(i) 3. Purpose: To document and implement programs for the maintenance of all Protection Systems
More informationA. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing
A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and 2. Number: PRC-005-1.1b 3. Purpose: To ensure all transmission and generation Protection Systems affecting the reliability
More informationStandard PRC-005-4(X) Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance
Standard PRC-005-4(X) Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Standard Development Timeline This section is maintained by the drafting team during the development
More informationStandard PRC Protection System Misoperation Identification and Correction
Standard PRC-004-4 Protection System Misoperation Identification and Correction Standard Development Timeline This section is maintained by the drafting team during the development of the standard and
More informationA. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing
A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and 2. Number: PRC-005-1.1b 3. Purpose: To ensure all transmission and generation Protection Systems affecting the reliability
More informationStandard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance
A. Introduction 1. Title: Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance 2. Number: PRC-005-6 3. Purpose: To document and implement programs for the maintenance of all
More informationMicrogrid Fault Protection Based on Symmetrical and Differential Current Components
Microgrid Fault Protection Based on Symmetrical and Differential Current Components Prepared for Public Interest Energy Research California Energy Commission Prepared by Hassan Nikkhajoei and Robert H.
More informationFigure 30: Sample Case 8
6.9 Sample Case 8 C-A, φ-φ fault on Line 512 Hidden failure: Line 504 PCB scheme low set fault detector picked up This case illustrates the security of the line. With the low set fault detector of the
More informationStandard PRC Disturbance Monitoring Equipment Installation and Data Reporting
A. Introduction 1. Title: Disturbance Monitoring Equipment Installation and Data 2. Number: PRC-018-1 3. Purpose: Ensure that Disturbance Monitoring Equipment (DME) is installed and that Disturbance data
More informationPRC-005. Tips and Updates. February 25th, Jonathan Hayes
PRC-005 Tips and Updates February 25th, 2014 Jonathan Hayes jhayes@spp.org 501.614.3509 NERC Standards Violations 3 Overview PRC-005-1 Current Issues / Best Practices PRC-005-2 Standard Implementation
More informationStandard PRC-005-3(i) Protection System and Automatic Reclosing Maintenance
A. Introduction 1. Title: Protection System and Automatic Reclosing 2. Number: PRC-005-3(i) 3. Purpose: To document and implement programs for the maintenance of all Protection Systems and Automatic Reclosing
More informationStandard PRC Protection System Misoperation Identification and Correction
Standard PRC-004-3 Protection System Misoperation Identification and Correction A. Introduction 1. Title: Protection System Misoperation Identification and Correction 2. Number: PRC-004-3 3. Purpose: Identify
More informationFACILITY CONNECTION STANDARD
FACILITY CONNECTION STANDARD Preface: This Facility Connection Standard applies to any connection to the electric system of Westar Energy, Inc. or Kansas Gas and Electric Company, both doing business as
More informationThree Terminal 230kV System Protection and Restoration at Calpine s Creed and Goose Haven Energy Centers Suisun City, California
Three Terminal 230kV System Protection and Restoration at Calpine s Creed and Goose Haven Energy Centers Suisun City, California Larry Henriksen POWER Engineers, Inc. Hailey, Idaho Daren Phelps Calpine
More information2005 EAF Melt Shops in North America MARKET STUDY Final Report
2005 EAF Melt Shops in North America MARKET STUDY Final Report Prepared for: by: AIM Project # 344 September 2005 FOREWORD This Report was prepared by AIM Market Research. Neither AIM Market Research,
More informationStandard PRC-005-3(X) Protection System and Automatic Reclosing Maintenance
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationStandard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance
Standard PRC-005-5 Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Standard Development Timeline This section is maintained by the drafting team during the development
More informationSupplementary Reference & FAQ. Draft
PRC-005-2 Protection System Maintenance Supplementary Reference & FAQ Draft 1 July 29, 2011 Prepared by the Protection System Maintenance and Testing Standard Drafting Team Supplementary Reference and
More informationStandard PRC-005-X Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationRelay Performance Index for a Sustainable Relay Replacement Program
Relay Performance Index for a Sustainable Relay Replacement Program Aaron Feathers, Abesh Mubaraki, Nai Paz, Anna Nungo Pacific Gas & Electric Company San Francisco, CA Western Protective Relay Conference
More informationSupplementary Reference and FAQ
Supplementary Reference and FAQ PRC-005-2 Protection System Maintenance October 2012 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents Table of
More informationSupplementary Reference and FAQ - Draft
Supplementary Reference and FAQ - Draft PRC-005-2 Protection System Maintenance May, 2012 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents Table
More informationTransmission Line Protection End to End Testing
Transmission Line Protection End to End Testing Hands on Relay School, March 15, 2018 Chris Gallacher Protection Engineer Greg Sharpes Senior Relay Technician Mark Babin Senior Relay Technician Presentation
More informationElectrical Energy department
Al-Balqa Applied University Power systems Protection course Dr Audih al-faoury Electrical Energy department 2018-2019 Department of Electrical Energy Engineering 1 Part 1 Power System protection Introduction
More informationELECTRICAL BULLETIN
PO Box 697 Halifax, Nova Scotia B3J 2T8 Labour and Workforce Development ELECTRICAL BULLETIN 2011-01 From: David MacLeod,C.E.I.,P.Eng. Pg 1 of 6 Provincial Chief Electrical Inspector Date: January 5,2011
More information4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan
Standard PRC-005-2 Protection System Maintenance A. Introduction 1. Title: Protection System Maintenance 2. Number: PRC-005-2 3. Purpose: To document and implement programs for the maintenance of all Protection
More informationDistributed Generation (greater than 10kW) Connecting to Vector s electricity network
Distributed Generation (greater than 10kW) Connecting to Vector s electricity network Important information about installing distributed generation with capacity greater than 10 kilowatts Purpose of this
More information4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan
Standard PRC-005-2 Protection System Maintenance A. Introduction 1. Title: Protection System Maintenance 2. Number: PRC-005-2 3. Purpose: To document and implement programs for the maintenance of all Protection
More informationPRC (I) August 9, Authored by
STANDARD APPLICATION GUIDE PRC-004-5 (I) PROTECTION SYSTEM MISOPERATION IDENTIFICATION AND CORRECTION August 9, 2016 Authored by Mark Gutzmann, Xcel Energy Ding Lin, Manitoba Hydro Joe Livingston, Great
More informationStandard Development Roadmap
Standard PRC-005-2 Protection System Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.
More informationPRC NERC Protection System Maintenance Standard PRC-005-2
PRC-005-2 NERC Protection System Maintenance Standard PRC-005-2 Frequently Asked Questions FREQUENTLY ASKED QUESTIONS - Practical Compliance and Implementation (Draft 1) April 16, 2010 Informative Annex
More informationNational Grid Requirements for Interconnection of Parallel Generation
National Grid Requirements for Interconnection of Parallel Generation ESB 756 2017 Revision Review of Changes for RI Jurisdiction, version August 23, 2017 By: National Grid, Retail Connections Policy &
More informationContents. Preface. Chapter 2 Faults, types and effects The development of simple distribution systems Faults-types and their effects 7
Practical Power System Protection for Engineers and Technicians Contents Preface ix Chapter 1 Need for protection 1 1.1 Need for protective apparatus 1 1.2 Basic requirements of protection 2 1.3 Basic
More informationPANELBOARDS & BUILDING DISTRIBUTION
262416 PANELBOARDS & BUILDING DISTRIBUTION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Distribution panelboards 2. Power panelboards B. Related Sections: 1.02 POLICY 1. CU Standard 260500, Basic
More informationBrown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA
PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities
More informationNational Grid / Supplement to Specifications for Electrical Installations / ESB ver Doc. File: ESB _ver3_
National Grid / Supplement to Specifications for Electrical Installations / ESB 756-2017 ver. 3.0 Doc. File: ESB756--0617_ver3_0 08-03-2017.docx PREFACE ESB 756-2017 references all requirements for parallel
More informationTo: Honorable Public Utilities Board Submitted by: /s/ Douglas Draeger AGM Engineering and Operations
AGENDA ITEM NO.: 5.D.1 MEETING DATE: 0/4/014 ADMINISTRATIVE REPORT NO.: 014-48 To: Honorable Public Utilities Board Submitted by: /s/ Douglas Draeger AGM Engineering and Operations From: Tito R. Nagrampa
More informationSudden Pressure Relays and Other Devices that Respond to Non-Electrical Quantities
Sudden Pressure Relays and Other Devices that Respond to n-electrical Quantities SPCS Input for Standard Development in Response to FERC Order. 758 System Protection and Control Subcommittee December 2013
More informationJune 4, 2014 VIA ELECTRONIC FILING. Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C.
June 4, 2014 VIA ELECTRONIC FILING Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 RE: Errata to Petition of the North American Electric
More informationNERC s Compliance Enforcement Initiative Find, Fix, Track and Report Implementation
NERC s Compliance Enforcement Initiative Find, Fix, Track and Report Implementation Compliance Committee Meeting Open Ken Lotterhos, Associate General Counsel and Director of Enforcement February 8, 2012
More informationReliability Fundamentals of System Protection
Report to the Planning Committee Reliability Fundamentals of System Protection NERC System Protection and Control Subcommittee December 2010 Table of Contents 1. Background... 1 2. Introduction to System
More information2000 System Disturbances
2000 System Disturbances Review of Selected Electric System Disturbances in North America North American Electric Reliability Council Princeton Forrestal Village 116-390 Village Boulevard Princeton, New
More informationLecture 4 Power System Protection. Course map
Lecture 4 Power System Protection 1 Course map 2 1 Outline of the Lecture Relays and IEDs Protection Principles Protection requirements Protection Schemes 3 What can we control? Breakers Valves Tap changers
More informationDistribution Control Center Operator Training
Distribution Control Center Operator Training OnlineTraining 15-Hour Course COURSE I BASIC DISTRIBUTION 1. Introduction to Distribution Systems a. Terminology b. Basic electricity and Ohm s Law c. BES
More informationSECTION AUTOMATIC TRANSFER SWITCHES
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 This section specifies the furnishing, complete installation, and connection of automatic transfer switches. 1.2 RELATED WORK A. Section 14 21 00, ELECTRIC
More informationNew fire control system design for fire fighting and rescue equipment Jianguo LUO1, a, Zehao BU2, b
6th International Conference on Information Engineering for Mechanics and Materials (ICIMM 2016) New fire control system design for fire fighting and rescue equipment Jianguo LUO1, a, Zehao BU2, b 1 Department
More informationVector Shift. Robert Westmancoat
Vector Shift Robert Westmancoat Overview Loss of Mains Protection why do we need it? Detecting a fault what methods are used? What s the risk? changing power system Observations & Analysis real-life events
More informationPOWER SYSTEM INCIDENT REPORT: TRIP OF DOUBLE CIRCUIT MACKAY- COLLINSVILLE TEE - PROSERPINE 132 KV LINES AND STRATHMORE SVC ON 29 DECEMBER 2010
POWER SYSTEM INCIDENT REPORT: TRIP OF DOUBLE CIRCUIT MACKAY- COLLINSVILLE TEE - PROSERPINE 132 KV LINES AND STRATHMORE ON 29 PREPARED BY: Electricity System Operations Planning and Performance FINAL Disclaimer
More informationSynchrophasor Technology in Control Centers Clemson University, SC March 12, 2014 Vikram S. Budhraja
Clemson University Power Systems Conference Synchrophasor Technology in Control Centers Clemson University, SC March 12, 2014 Vikram S. Budhraja Outline Synchrophasor Technology Infrastructure Lessons
More informationMajor Fault Caused by Stator Winding Circuit Ring Failure
Case study Major Fault Caused by Stator Winding Circuit Ring Failure Joël Pedneault-Desroches, P. Eng. Presentation Outline Introduction Inspection report Chronology of events Repair Conclusion 2 Introduction
More informationMachinery Room Electrical Best Practices
Machinery Room Electrical Best Practices Brad Heeres Angus-Young Associates February 8, 2007 Understand and comply with applicable codes and standards The National Electrical Code requirements for a safe
More informationIntroduction Consultant shall incorporate the material in the DSS into the project specifications.
DIVISION 16 - ELECTRICAL Section 16000 - General Discussion Introduction Consultant shall incorporate the material in the DSS into the project specifications. Refer any questions, clarifications regarding
More information38-SDMS-01 SPECIFICATIONS FOR FAULT INDICATORS FOR UNDERGROUND DISTRIBUTION NETWORKS
SPECIFICATIONS FOR FAULT INDICATORS FOR UNDERGROUND DISTRIBUTION NETWORKS This specification is property of SEC and subject to change or modification without any notice CONTENTS Clause Page 1.0 SCOPE 3
More informationSupplementary Reference and FAQ - Draft
Supplementary Reference and FAQ - Draft PRC-005-2 Protection System Maintenance January 17May, 2012 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents
More informationCommissioning the Fire Suppression System for 500/230 kv Transformers of EGAT s Nongchok Substation
Commissioning the Fire Suppression System for 500/230 kv Transformers of EGAT s Nongchok Substation S. Chaipitak, Electricity Generating Authority of Thailand, +6624362432, Chaipitak.som@egat.co.th ABSTRACT
More informationLineVision TM. Non-Contact Transmission Line Monitoring and Dynamic Line Rating
LineVision TM Non-Contact Transmission Line Monitoring and Dynamic Line Rating Jonathan Marmillo, Business Development M: 484-368-4630 E: jmarmillo@genscape.com www.genscape.com 2017 Genscape Incorporated.
More informationNeed for a Bipole III rating of 2300 Mw to transmit Keeyask power.
Need for a Bipole III rating of 2300 Mw to transmit Keeyask power. Introduction Further to the Technical Assessment of the Need for the Bipole III Line, dated 21 November 2014- Dennis Woodford P. Eng.
More informationInnovative Real-Time Contingency Analysis Enhancements for Transmission Operations
Innovative Real-Time Contingency Analysis Enhancements for Transmission Operations Xiaodong Liu Trevor W. Tessin Richard A. Flynn 2016 IEEE PES General Meeting, Boston July 17-21, 2016 Outline Eversource
More informationArc Flash Analysis: IEEE Method versus the NFPA 70E Tables July 2017 / 1910DB1702
Arc Flash Analysis: IEEE Method versus the NFPA 70E Tables July 2017 / 1910DB1702 by Reza Tajali, Schneider Electric Engineering Services Summary 1.0 Abstract 2.0 OSHA and NFPA Rules 3.0 Use of NFPA 70E
More informationRD:30 Specification No. TI/SPC/PSI/AUTOTR/0090 For 50U5/150 MVA, 220/132 kv Auto Transformer
RD:30 Specification No. TI/SPC/PSI/AUTOTR/0090 For 50U5/150 MVA, 220/132 kv Auto Transformer Annexure-4 TECHNICAL SPECIFICATIONS FOR NITROGEN INJECTION FIRE PREVENTION AND EXTINGUISHING SYSTEM FOR OIL
More informationPS6 SERIES. Installation PS6 SERIES. Power Supplies c/w Fire Panel Interface, EOL Trigger and Standby Power Option
Installation PS6 SERIES Power Supplies PS6 SERIES Power Supplies c/w Fire Panel Interface, EOL Trigger and Standby Power Option Installation and Specifications Manual ISDPS6_SERIES 08121590 PCN15016 R05/15GR
More informationStandard PRC Protection System and Automatic Reclosing Maintenance. Standard Development Roadmap
Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed:
More informationNumerical Relay MELPRO TM -S Series
Numerical Relay MELPRO TM -S Series MODEL COC4 - A02S1 INSTRUCTION MANUAL 1 / 37 JEP0-IL9540 - Safety precautions - Before installation, operation, maintenance, and inspection, please be sure to read this
More informationPerformance Neuro-Fuzzy for Power System Fault Location
International Journal of Engineering and Technology Volume 3 No. 4, April, 2013 Performance Neuro-Fuzzy for Power System Fault Location 1,2 Azriyenni, 1 M.W. Mustafa 1 Electrical Engineering, Fakulti Kejuruteraan
More informationFire resistance testing of technical cabinets in accordance with EN
Fire resistance testing of technical cabinets in accordance with EN - Pierre-Yves MAZILLE 0/0/07 Introduction In depth look into specification of..h) in EN - Review of standard fire resistance test methods
More informationVAMP 121. Arc protection unit. User manual
VAMP 121 Arc protection unit User manual VM121.EN014_B Table of contents VAMP 121 Table of contents 1. General... 4 1.1. Arc protection unit VAMP 121... 4 2. Unit configuration... 6 3. Sensors... 8 3.1.
More informationSEL Arc-Flash Solutions
SEL Arc-Flash Solutions Arc-Flash Protection at the Speed of Light Protect personnel and equipment Detect arc-flash events and send a trip signal in as little as 2 ms to enhance safety and minimize equipment
More informationElectric Power Group Presents. Welcome!
Electric Power Group Presents Maximizing Use of Synchrophasor Technology for Everyday Tasks Welcome! The meeting will begin at 2:00 p.m. ET / 11:00 a.m. PT Jan. 18, 2017 Today s Topic: Synchrophasor Intelligence
More informationSECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.
SECTION 16470 PANELBOARDS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16120 - Wire and Cable. 3. 16475 - Overcurrent Protective Devices. 1.02 SYSTEM DESCRIPTION A. Performance
More informationSEL Arc-Flash Solutions
SEL Arc-Flash Solutions Arc-Flash Protection at the Speed of Light Protect personnel and equipment. Detect arc-flash events and send a trip signal in as little as 2 ms to enhance safety and minimize equipment
More informationPART 4 ELECTRICAL STANDARDS
PART 4 ELECTRICAL STANDARDS 1.0 INTRODUCTION AND SCOPE: These standards reflect the general requirements and recommendations of elevator contractors, with respect to the power distribution system to achieve
More informationA. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.
SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:
More informationThe North American Electric Reliability Corporation ( NERC ) hereby submits
December 8, 2009 VIA ELECTRONIC FILING Neil Thomson SaskPower, Law, Land Regulatory Affairs 2025 Victoria Ave. Regina, Saskatchewan S4P 0S1 Re: North American Electric Reliability Corporation Dear Mr.
More informationWHAT TO EXPECT DURING A FIRE DOOR INSPECTION
WHAT TO EXPECT DURING A FIRE DOOR INSPECTION Basic Fire Door Inspections 1. Fire door basic function 2. Understanding codes 3. Responsibility of end user 4. Common fire door deficiencies 5. What your door
More information1S25. Arc Fault Monitor 4 Zones, 8 Sensors. Features. Introduction. ARC Fault Protection
Technical Bulletin Arc Fault Monitor 4 Zones, 8 Sensors Features Four independent arc fault tripping zones 1 or 2 arc fault sensors per zone allowing up to 8 arc fault sensors per module Trip indication
More informationRemote NAC Power Supply D7038
Operation and Installation Guide Remote NAC Power Supply D7038 D7038 REMOTE NAC POWER SUPPLY Page 2 2005 Bosch Security Systems Contents Contents 1.0 Overview...5 1.1 Module Control...5 1.1.1 Option Bus
More informationStudent Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.
SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:
More informationOPERATING INSTRUCTIONS COP-IE, COP-I, COP-E (ANSI 50,51,50N,51N)
OPERATING INSTRUCTIONS COP-IE, COP-I, COP-E (ANSI 50,51,50N,51N) MRM PROCOM Pvt Ltd An ISO-9001-2008 certified organization Works: Plot No. 20-21, Sector 59, Phase II, Faridabad, Haryana -121004 Ph: 0129-4700400
More information7XG3120 ReyArc20 Arc Fault Monitor Relay Energy Management
Reyrolle Protection Devices 7XG3120 ReyArc20 Arc Fault Monitor Relay Energy Management 7XG3120 - Arc Fault Monitor Relay The over-current caused by an arc is, due to its resistance, lower than the over-current
More informationPDD-FT-3. Fire Panel Interface With EOL Trigger. Installation and Specifications Manual
Installation -3-3 Fire Panel Interface With EOL Trigger Installation and Specifications Manual ISPSFPD-3 PCN16045 R12/17GR 2017 Rutherford Controls Int l dormakaba Group www.rutherfordcontrols.com Phone:
More informationAPPLICATION NOTE. Applying pressure sensing in arc flash protection applications with air magnetic circuit breakers
APPLICATION NOTE Applying pressure sensing in arc flash protection applications with air magnetic circuit breakers Application note Applying pressure sensing in arc flash protection 2 (6) Revision 1.0
More informationHeathcare Interpretations Task Force
Healthcare Interpretations Task Force MEMORANDUM TO: FROM: Heathcare Interpretations Task Force Robert Solomon DATE: May 30, 2014 SUBJ: HITF Meeting Agenda and Meeting Room Location Information Attached
More information2012 Edition. Tech Topics: Standards & Codes. Note 4, Issue 1. Points of Interest: Introduction. Background. Changes to Definitions in Article 100
Significant Changes to the NFPA 70E Standard 2012 Edition Tech Topics: Standards & Codes Note 4, Issue 1 Peter Walsh, PE Sr. Field Engineer Points of Interest: Arc-Rated (AR) vs. Flame-Resistant (FR) Training
More informationARGO (Technical Support) 2201 Dwyer Avenue Utica, NY (Corporate Sales) 85 Middle Road
ARGO (Technical Support) 2201 Dwyer Avenue Utica, NY 13501 (Corporate Sales) 85 Middle Road An ISO 9001-2000 Certified Company Dunkirk, NY 14048 www.argoindustries.com P/N 240005498A, Rev. 1.5 [02/07]
More informationReduction in db Phase in Degrees Volts Volts -0.
AudioQuest NightHawk Stock Pads - - - - -2-3 -3-4 -4 - - - - - -2-3 -3-4 -4 - Attenuation of External Sound vs. 3 2 Measured with 6 Ohm output impedance. -6 6 4 - -4 in Degrees 3 Hz Square Wave..4.3.2.
More informationLetter of Notification For East Lima Station Expansion Project
Letter of Notification For East Lima Station Expansion Project PUCO Case No. 18-0906-EL-BLN Submitted to: The Ohio Power Siting Board Pursuant to Ohio Administrative Code Section 4906-6-05 Submitted by:
More informationSECTION AUTOMATIC TRANSFER SWITCHES
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between //--// if not applicable to project. Also, delete any other item or paragraph
More informationDennis Mullen System Operations Manager
Dennis Mullen System Operations Manager EPRI Power Switching Safety and Reliability Conference September 14, 2009 Electric System Control Center (ESCC) Member Companies PSNH Operating Company of NU Retail
More informationIntelligent addressable fire alarm control panel
Intelligent addressable fire alarm control panel Input current consumption: Panel rating: Batteries: Networking and Interfaces Panel to panel communication: Number of panels: Interface port: System capacity
More informationMeSSKO MTraB MaINTeNaNCe-Free dehydrating BreaTher OF The PreMIUM SerIeS TWICe as reliable and SIMPlY effective.
MeSSKO MTraB MaINTeNaNCe-Free dehydrating BreaTher OF The PreMIUM SerIeS TWICe as reliable and SIMPlY effective. M es SKO IN S Tr U M e NTS MeSSKO MTraB PreMIUM SerIeS MeSSKO MTraB PreMIUM SerIeS The WaY
More information