1 Ventilation design for the Boleo project S.B. Patton Agapito Associates, Grand Junction, Colorado, USA G.L. Skaggs Agapito Associates, Grand Junction, Colorado, USA S. Britton Baja Mining Corp., Vancouver, BC, Canada ABSTRACT: Boleo is an underground copper-cobalt-zinc-manganese project currently under construction near the town of Santa Rosalía in the state of Baja California Sur, Mexico. The deposit consists of seven soft-rock ore beds, or mantos, faulted into irregular-sized blocks of mineable ore. Over 94 percent of ore will be derived from underground mining. Current plans show over thirty underground mines will be developed during the anticipated project life in Mantos 1, 2, 3 and 4. Underground mining operations will consist of room-and-pillar mining with pillar recovery using standard drum-style continuous mining machines, shuttle cars, and continuous haulage typically found in coal, potash and salt mines. Upon achieving steady-state full production, the Boleo underground mines will have up to six continuous mining units set up at one time, either mining on advance or retreat, with no more than three units in any one mine at the same time. The challenge to the ventilation design is to size and design the controls for a main mine fan that would be interchangeable between mines operating at various production rates and operating lives. To manage risks to workers associated with heat stress and strain during the hotter months of operation, mine ventilation air cooling is also necessary. This paper presents the ventilation design, fan and cooling system selection for the Boleo mines. 1 Introduction The Boleo property is held by the Mexican company, Minera y Metalúrgica del Boleo S.A. de C.V. (MMB). MMB is owned 70% by Baja Mining Corp. and 30% by a consortium of Korean companies. Underground mining operations at the El Boleo project (Boleo) at Santa Rosalía, Baja California Sur, Mexico, will consist of room-andpillar mining with pillar extraction in Mantos 1, 2, 3, and 4. Refer to Figure 1 for a location map. Over thirty underground mines are projected to be developed during the anticipated project life. Mineralization is not uniform throughout the manto thickness nor is it consistent horizontally, making mine planning difficult. The area is highly faulted, requiring numerous underground mines to minimize fault crossings. Upon achieving full steady-state production, the Boleo underground mines will have up to six continuous mining units (sections) set up at one time, either mining on advance or retreat, with no more than three units in any one mine at the same time. Detailed information on the project is available in the Technical Report (Baja Mining Corp. 2010). The room-and-pillar mining method with pillar recovery on retreat is typical for bedded deposits. Four of the six production units will be equipped with shuttle car face haulage, and two will be equipped with continuous haulage systems. When pillaring, units will be equipped with mobile roof supports. To accommodate equipment Figure 1. Location map (Baja Mining Corp. 2010). clearances, development entries and crosscut widths vary between 5.25 meters (m) and 6.00 m. Mines are developed with either three- or four-entry mains and submains, with single-entry pillaring crosscuts driven off entries on 25-m centers. Panels are three entries wide and are otherwise similar in configuration to the mains and sub-mains. Pillaring crosscuts are driven 5.25 m wide, 90 off the sides of the
2 outside panel entries to a maximum depth of 125 m from the conveyor belt centerline. Due to the time dependency of pillar stability during retreat mining, the pillaring crosscuts are developed as the mains advance except when there is significant lag between advance and retreat. A typical layout showing the rooms and panels for the M301 and M303 mines is included in Figure 2. M301 Test Mine Mains Sub- Mains Panel Panel Mains mining activities is not anticipated to be a major concern because the ore is damp and easy to cut, however, respirable dust from roof drilling is likely. The composition of the roof material is not expected to cause severe problems with silica dust. A dust monitoring program will be implemented as soon as mining begins. Worker health and efficiency (productivity) can be severely impacted by heat stress and strain, which can be brought on by high workplace temperatures and humidity. In addition, workplace safety can be negatively impacted by the physiological disorders that heat stress victims suffer. The hot and humid summer climate creates a hot work site for most of the year. A hot work site has been defined as one where any combination of air temperature, humidity, radiation, and air speed exceeds a wet bulb globe temperature of 26.1 degrees Celsius ( C (MSHA 2001). The Santa Rosalía summer ambient air temperatures (dry bulb) for a recent 6-year period have averaged 38.9 C for the months of June, July, and August. Peak temperatures during these months have reached 45 C at least once during each of those months. Relative humidity averages 30 to 40%. Research has shown that the lowest accident rates have been related to miners working below 21.1 C and the highest rates to temperatures of 26.7 C and above (MSHA 2001). A target face quantity of 16.5 cubic meters per second (cms) was selected based on air quality concerns. Figure 2. Typical mine layout. 2 Ventilation Air Quality Regulatory compliance is typically the primary driver in establishing the air quality and quantity. A brief search for local, state, or national regulatory requirements in Mexico for ventilating mines of the type envisioned for the Boleo project did not reveal any specific regulations. Therefore, the United States (US) Mine Safety and Health Administration s (MSHA) metal and non-metal mine safety and health regulations (Code of Federal Regulations [CFR] Title 30 Parts 56 and 57) were utilized for the Boleo project basis of design. Heat is a key safety and productivity concern. Diesel Particulate Matter (DPM) is expected to be the most significant ventilation air quality contaminant to which the underground mine work force will be exposed. Based on historical information, it is anticipated that neither methane nor hydrogen sulfide gases will be encountered during mining. Oxygen may be deficient in the old mine workings. There may be hydrogen sulfide may in the old workings at or below the water table. A potential, but not yet determined, mine environmental contaminate is radon. Although the deposit is not classified as a uranium deposit, uranium is frequently present in clay or similar deposits. Suspended dust from 3 Design Basis The mine ventilation system being planned is a blowing system. This system is recommended due to the many old workings that will be intersected as the new mines are developed. Because the mine s pressure is higher than atmospheric, any poor quality air present in the old workings will not be drawn into the mine. Any openings from the old workings to the surface will allow air leakage through the old works to the outside. Leakage into the old workings will have to be controlled to the extent that adequate air is provided in the mine s return-air courses. The basic assumptions used for the ventilation planning are included in Table 1. The belt entry carries fresh air which is isolated from the return air by a single line of Kennedy stoppings. The main travelway is placed in the return air to minimize the contribution from diesel equipment of dust and heat at the face. Travel by the work crews at shift change will occur when mining is not taking place, thereby minimizing exposure to the crews. Box checks isolate the belt drives. Air lock doors are planned at the conveyor belt drives to facilitate access to equipment for installation and repair. 4 Ventilation System Analysis Detailed analysis of the mine ventilation systems was completed using VnetPC2007 and Ventsim modeling software.
3 Table 1. Ventilation system design assumptions Main Entries and Sub-mains Maximum of four entries, primarily due to spacing between faults, ground control, and to minimize development expense. Pressure Across Ventilation Controls Mine ventilation control devices (stoppings, overcasts, airlock doors, regulators, and similar devices) will be subjected to a maximum of 1.7 to 2 kpa pressure differential. Air Velocity without Dust Control Maximum of 2.5 meters per second (m/s) Air Velocity with Dust Control Maximum 5 m/s Entry Layout Center entries of a four-entry main or sub-main are intake air and the two outside entries are return air. Belt Conveyor Intake air entry. Primary Travelway Return air entries. Oxygen Deficiency May exist in worked out areas. Main Mine Fan Arrangement Blowing fan located outby the mine portal entrance. Pressure Drop across Air Cooling 0.5 kpa at 100 cms Coils Cooling Coils Velocity Limit 5 m/s Stopping s Kennedy stoppings specified for ease of installation and removal for re-use upon retreat Development Heading Dead-end Blowing or exhausting fan arrangements with lay-flat tubing or spiral-wrap tubing, Entries and Crosscuts with spiral-wrap tubing to turn corners. Entry Size 1.8 m high minimum 5.25 m wide (belt entry 6.0 m) Main Mine Fan Portal Opening 3.0 m high 5 m wide Friction Factors Belt: kg/m 3 Intake and return: kg/m 3 Chiller branch P/Q: 570 cms Lay-flat tubing: kg/m 3 Intake and return: kg/m 3 Resistance/1,000 m Belt: Ns 2 /m 6 Intake/return: Ns 2 /m 6 Quantity Assumptions 16.5 cms at the working face DPM control requires at least cms per brake kw Leakage 60% leakage due to old works and temporary stopping construction Average Air Density kg/m 3 Fan Efficiency 65% Engineering Controls Belt conveyor on intake Travel way in return Box checks on belt to isolate belt drives from intake air Curtain control of openings into old works Three times the fan quantity rating at the intake to the auxiliary fan Individual sections on a separate split of air, split ventilation on four-entry mains/sub-mains Refrigeration Design ambient conditions 40.6 C at 40% relative humidity. Mine fan heats air to 43.3 C. Intake air is cooled to 25 C. Main Fans Spendrup Model direct drive, axial flow, mine duty, cm-diameter, 1180 rpm. Quantity: 47 to 118 cms Total pressure: 0.75 to 1.7 kpa Skid-mounted motor size: 186, 298, or 447 kw VFD control Auxiliary Fans Blowing or exhausting face ventilation, depending on location Spendrup model direct drive, axial flow fan. Quantity: 8.5 to 9.5 cms Total Pressure: 2.24 kpa Skid-mounted motor size: 29.8 kw Tubing: 76.2cm lay flat and spiral wrap
4 4.1 Main Ventilation System A series of representative branch schematics were created for large and small mines with three and four entry mains. Two representative schematics are shown in Figures 3 and 4 for mines M301 and M303, respectively. Fixed quantities and/or fixed pressure heads were applied to the modeled system to determine the pressure/quantity relationship required to deliver the target of 16.5 cms fresh air per working section in the mine. Fans were selected and the fan curve was entered into the models. The auxiliary system at the active face on the pillaring crosscuts was simulated using Ventsim. The pillaring crosscuts maximum depth is 125 m. This length is the limit of the continuous haulage system. For the pillaring crosscuts, a 125-m length of 76.2-cm-diameter lay-flat tubing was attached to the fan to blow air up to the face. Exhaust air returns through the mine entry. 4.3 Cooling System To counter the high heat and humidity of the ambient air, refrigeration chillers will be used to cool the mine air at the intake portal, inby the main mine fan. Due to the scarcity of fresh water, the chillers will use cooling coils located just inby the fan portal instead of evaporative sprays. To minimize power requirements, the chillers will selfmodulate based on predetermined set points. The conceptual design of the refrigeration plant and air cooler systems was provided by Bluhm Burton Engineering (BBE). Ambient conditions of 40.6 C and 40% relative humidity will be cooled to 25 C at an airflow of 104 cms. The 2,240-kilowatt (kw) design duty of the air cooler was provided by BBE (2006). Figure 3. M301 mine branch layout. 5 Ventilation Equipment Selection Fan sizes were based on the large mines and, thus, could deliver too much air for the smaller mines. For the fans to operate efficiently in the mines at other stages of the mine life, the fans need to be portable and capable of operating at variable horsepower, speed and blade settings 5.1 Main Fans The main fans selected to provide the pressure and quantity signature required is the Spendrup Fan Co , or equivalent. To facilitate the changing fan duties over the variable mine sizes, the direct drive hub-mounted motors are interchangeable from 186, 298, or 447 kw. The fans will be skid-mounted. Motors will be equipped with variable frequency drives (VFD), allowing the fan speed to be modified as the mine demand varies. In addition, the fan blades are individually adjustable. The fan curve is included here as Figure 5. Figure 6 shows a diagram of the main mine fan. Figure 4. M303 mine branch layout. 4.2 Face Ventilation System The face ventilation layout, utilizing fans with tubing, during development of the mains, submains and panels, is typical for the mining industry. The face ventilation for these areas is a combination of blowing and exhausting. 5.2 Auxiliary Fans The fan selected for auxiliary ventilation is the Spendrup Fan Co. Series with a 29.8 kw motor, or equivalent. The auxiliary fan will be skid-mounted and will be installed in a cutout of the crosscut or entry, depending on the requirements. Figure 7 show the auxiliary fan curve. Figure 8 is a photo of the auxiliary fan.
5 Figure 5. Spendrup main mine fan curve. Figure 6. Spendrup main mine fan diagram. Figure 8. Spendrup face fan showing skid and guards. 5.3 Air Conditioning Trane (2011) cooling systems were selected for the air conditioning application at the mines. The cooling system includes the air-cooled helical rotary water chillers (500 ton), coil bank and pump skid with control systems. The equipment is designed to accommodate either one or two chillers per mine, depending on the mine size. Figure 9 shows the original plan and section view of the proposed installation of the chiller and fan. Field experience with the portal entry resulted in the decision to enclose the cooling coils in external ductwork to reduce the portal width to 5.25 m. 6 Summary and Conclusion Underground mining commenced in September At full production, the room-and-pillar mining method is expected to generate ore at a rate of approximately 10,000 wet tonnes per day at the Boleo project. Ventilation and air conditioning will be provided to multiple mines using the same fan model with three motor-size options paired with either one or two chiller units. The ventilation fan motors will be equipped with VFDs to allow the speed of the fan to change. The fan blades are adjustable so that they can provide airflows appropriate to individual mines. All ventilation equipment will be skid-mounted to facilitate relocation to other mines. Figure 7. Spendrup auxiliary fan curve. 7 References Baja Mining Corp., (2010), El Boleo (Boleo) Project Technical Report Update Baja California South Mexico, March 2, 206 p. < /static/technical_reports/2010%20mar%20-%20techn ical%20report.pdf> accessed by S Patton 2/15/2012.
6 Figure 9. Fan and chiller.
7 Bluhm Burton Engineering (PTY) Ltd. (2006), Specification and Cost Estimate for Surface Air Cooler Santa Rosalia, Mexico, November 3, 4 p. Mine Safety and Health Administration (MSHA) (2001), Heat Stress in Mining, SM6, National Mine Health and Safety Academy, Beaver, WV, 14 p. Trane (2011), Baja Mining Minera Boleo Cooling System Submittal to ICA Fluor Daniel, April 14, 47 p.
8 Figure 9. Fan and chiller.
Reconciliation of ventilation and production expansion in a potash mine
Reconciliation of ventilation and production expansion in a potash mine Kyle Penner a, Euler De Souza b a PotashCorp, Rocanville Division, Saskatchewan, Canada b Queen's University, Kingston, Ontario,
More informationMaximizing Volumetric Efficiency for Ventilation Systems in Temporarily Reduced Flow Environments of Block Cave Mines
Maximizing Volumetric Efficiency for Ventilation Systems in Temporarily Reduced Flow Environments of Block Cave Mines Garrett Schult a, Brian Prosser a, Daniel Brown b, Jeremy Wolgram b a SRK Consulting,
More informationEvaluation Report 509
Printed: June 1987 Tested at: Lethbridge ISSN 0383-3445 Group 5i Evaluation Report 509 Prairie Pride TR-36 Series Ventilation Fans A Co-operative Program Between ALBERTA FARM MACHINERY RESEARCH CENTRE
More informationUnion County Vocational - Technical Schools Scotch Plains, New Jersey
SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Balancing Air Systems: a. Constant-volume air systems. b. Variable-air-volume systems. 2.
More informationFan Selection. and Energy Savings
Fan Selection and Energy Savings Reducing power consumption by minimizing system pressure loss and choosing the right equipment HBy BRIAN MLEZIVA Greenheck Fan Corp. Schofield, Wis. Power Consumption HVAC
More informationModeling the Underground Ventilation System at the Waste Isolation Pilot Plant to Ensure Proper Ventilation Alignment
Modeling the Underground Ventilation System at the Waste Isolation Pilot Plant to Ensure Proper Ventilation Alignment By: N. Wineinger 1*, K. Wallace 1, J. Farnsworth 2 1 Mine Ventilation Services, a business
More informationSECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC
SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationTESTING, ADJUSTING AND BALANCING
PART 1 GENERAL 1.01 DESCRIPTION A. Work Included: After completion of the work of installation, owner is responsible for procuring an air balancing and testing agency to test and regulate all components
More informationCommercial Buildings Chilled water systems efficiency By Jens Nørgaard, Senior Application Manager, Grundfos, Denmark
Commercial Buildings Chilled water systems efficiency By Jens Nørgaard, Senior Application Manager, Grundfos, Denmark Introduction: Energy use is the single largest operating expense in commercial office
More informationCOLD STORAGE WAREHOUSE, USING DIRECT EXPANSION AMMONIA REFRIGERANT Ray Clarke ISECO Consulting Services Pty Ltd
COLD STORAGE WAREHOUSE, USING DIRECT EXPANSION AMMONIA REFRIGERANT Ray Clarke ISECO Consulting Services Pty Ltd Abstract This paper presents the design approach adopted for the expansion of a large existing
More informationFundamental Principles of Air Conditioners for Information Technology
Fundamental Principles of Air Conditioners for Information Technology By Tony Evans White Paper #57 Revision 2 Executive Summary Every Information Technology professional who is responsible for the operation
More informationEC, energy efficient building services
Propeller 22 Best practice examples of reduced power consumption in building services and refrigeration by integrated control of EC fans and motors. Author: Dr Simon Bradwell, Managing Director; ebmpapst
More informationLife-of-mine ventilation and refrigeration planning for Resolution Copper Mine
Life-of-mine ventilation and refrigeration planning for Resolution Copper Mine by S. Bluhm*, R. Moreby, F. von Glehn*, and C. Pascoe Synopsis Resolution Copper Mine is planned to be a 2000 m deep panel
More informationBrine Generation Study
DOE/WIPP 00-2000 Brine Generation Study April 2000 Waste Isolation Pilot Plant Carlsbad, New Mexico Processing and final preparation of this report was performed by the Waste Isolation Pilot Plant Management
More informationSECTION 5 COMMERCIAL REFRIGERATION UNIT 22 CONDENSERS UNIT OBJECTIVES UNIT OBJECTIVES 3/22/2012
SECTION 5 COMMERCIAL REFRIGERATION UNIT 22 CONDENSERS UNIT OBJECTIVES After studying this unit, the reader should be able to explain the purpose of the condenser in a refrigeration system. describe differences
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 23 0594 - TESTING, ADJUSTING, AND BALANCING (TAB) PART 1 - GENERAL 1.1 SUMMARY A. This Section includes testing, adjusting and balancing HVAC systems to provide design conditions as indicated by
More informationAdvance Release September 2009
Vertical Air Cooled DSV Series R 410A Model DSV096 DSV120 DSV144 DSV180 Nominal Cooling (Tons) 8 10 12 15 Refrigerant R 410A R 410A R 410A R 410A Cooling Performance Gross Cooling Capacity(Btu/h) 95,000*
More informationCONTENTS. B. System Design and Performance Requirements
15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes
More informationSeries V Layout Guidelines
VT0, VT1, VF1,VF0,VC1 & VCA Open circuit cooling towers, closed circuit cooling towers, and evaporative condensers all depend upon an adequate supply of fresh, ambient air to provide design capacity. Other
More informationCity of Duluth Festival Center 04/25
SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationTorad Rotary Spool Compressor
Torad Rotary Spool Compressor Communication White Paper By: Torad Engineering, LLC Cumming, Georgia USA Torad Rotary Spool Compressor Introduction: The rotary spool compressor shares various attributes
More informationOIL AND GAS INDUSTRY
FIRED HEATER DESIGN This case study demonstrates the implementation of an API 560 fired heater compound component in Flownex. It also shows how Flownex has been used during the process design and preliminary
More informationFans: Features and Analysis
Technical Development Program COMMERCIAL HVAC EQUIPMENT Fans: Features and Analysis PRESENTED BY: Michael Ho Version 1.2 Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7 Section
More informationIntroduction to Fans. The Basics of Fan Principles and Terminology
Introduction to Fans The Basics of Fan Principles and Terminology Airflow Principles A fan is a rotating device that creates pressure differential that results in air movement Pressure rise in a fan Downstream
More informationBoiler Basics. Design and operation
Boiler Basics Design and operation A boiler is an enclosed vessel that provides a means for combustion heat to be transferred into water until it becomes heated water or steam. The hot water or steam under
More informationGreenJet Transfer Fans
GreenJet Transfer Fans Model GJX High Performance Axial Transfer Fan April 2018 GreenJet As cars park in an underground parking structure, carbon monoxide (CO) and other noxious fumes are emitted into
More informationCHOOSING A COOLING SYSTEM
CHOOSING A COOLING SYSTEM Do you dread the thought of enduring another sweltering summer of sleepless nights? Can you no longer bear living in a hot box and want to install a cooling system but don t know
More informationHeat pump and energy recovery systems
SBS5311 HVACR II http://ibse.hk/sbs5311/ Heat pump and energy recovery systems Ir. Dr. Sam C. M. Hui Faculty of Science and Technology E-mail: cmhui@vtc.edu.hk Oct 2017 Contents Basic concepts Air-to-air
More informationSubmittal Data Performance Data Electrical Data
ERMS Series Submittal Data Submittal Data Unit Designation: Job name: Architect: Engineer: Contractor: Performance Data Revision: 07/01/11 Cooling Capacity: EER: Heating Capacity: COP: Ambient Air Temp:
More informationMath. The latent heat of fusion for water is 144 BTU s Per Lb. The latent heat of vaporization for water is 970 Btu s per Lb.
HVAC Math The latent heat of fusion for water is 144 BTU s Per Lb. The latent heat of vaporization for water is 970 Btu s per Lb. Math F. to C. Conversion = (f-32)*(5/9) C. to F. Conversion = C * 9/5 +
More informationLow Profile Layout Guidelines
Low Profile Layout Guidelines Open circuit cooling towers, closed circuit cooling towers, and evaporative condensers all depend upon an adequate supply of fresh, ambient air to provide design capacity.
More informationPDH & Professional Training
510 N. Crosslane Rd. Monroe, Georgia 30656 (770) 266-6915 fax (678) 643-1758 PDH & Professional Training PDH Storm, by Engineers Edge, LLC CONTENTS 1. INTRODUCTION 1.1 GENERAL CRITERIA 1.2 DESIGN PROCEDURE
More informationSECTION PACKAGE AIR COOLED WATER CHILLER PART 1 GENERAL 1.01 SECTION INCLUDES. A. Chiller package. B. Charge of refrigerant and oil.
1 1 1 1 1 1 1 1 0 1 0 1 SECTION 1 PACKAGE AIR COOLED WATER CHILLER PART 1 GENERAL 1.01 SECTION INCLUDES A. Chiller package. B. Charge of refrigerant and oil. C. Controls and control connections. D. Chilled
More informationHEATING AND VENTILATION
SECTION 14-102.04 14-102.04/ 1 2007OC19 DESCRIPTION The heating, ventilation and air conditioning (HVAC) system is designed to optimize passenger comfort. The system regulates interior vehicle atmosphere,
More informationPROJECT MANUAL GUIDE SPECIFICATIONS FOR: PFANNENBERG SERIES CC COMPACT PACKAGED CHILLERS PART 1 GENERAL
PROJECT MANUAL GUIDE SPECIFICATIONS FOR: PFANNENBERG SERIES CC COMPACT PACKAGED CHILLERS PART 1 GENERAL 1.1 SUMMARY A. Packaged Chillers offer a self-contained means of producing cooling liquid primarily
More informationPulse Jet Baghouse ASTEC PULSE JET BAGHOUSE. for Asphalt Facilities
Pulse Jet ASTEC PULSE JET BAGHOUSE for Asphalt Facilities ASTEC PULSE JET BAGHOUSE FOR ASPHALT MIXING PLANTS Astec baghouses deliver superior performance and efficiency, while helping your plant meet
More informationEquipment Layout Manual. For Cooling Towers, Evaporative Condensers & Closed Circuit Coolers
Equipment Layout Manual For Cooling Towers, Evaporative Condensers & Closed Circuit Coolers for LIFE Equipment Layout Manual Table of Contents Introduction Introduction... 2 Induced Draft Counterflow Unit
More informationDIVISION 15 MECHANICAL
DIVISION 15 MECHANICAL A. GENERAL DESIGN CONDITIONS 1. Design occupied spaces to maintain 72 F and a space dew point temperature not to exceed 55 F. 2. Design classroom and office space buildings with
More informationCork Institute of Technology Higher Certificate in Engineering in Building Services Engineering Award
Cork Institute of Technology Higher Certificate in Engineering in Building Services Engineering Award Instructions Answer FIVE questions, All questions carry equal marks. (NFQ Level 6) Autumn 2006 Building
More informationEqUIPMENT LAYOUT MANUAL
Bulletin 311-E Metric NEW! EqUIPMENT LAYOUT MANUAL For Cooling Towers, Evaporative Condensers, Closed Circuit Coolers Reduced Clearance Dimensions with EVAPCO Induced Draft Counterflow Products 3 Table
More informationHebei Datang International Wangtan Power Company, China
Analysis of the Performance of Induced Draft (ID) Fans at a 600MW Thermal Power Unit before and after Installation of MV Variable Frequency Drives (VFD) Hebei Datang International Wangtan Power Company,
More informationDEHUMIDIFICATION: Ice Arena Application & Product Guide. Design, construct and operate to control indoor humidity in ice rinks
DEHUMIDIFICATION: Ice Arena Application & Product Guide Design, construct and operate to control indoor humidity in ice rinks Munters is the world leader in dehumidification Munters is the largest manufacturer
More informationINVESTIGATION FINDINGS III IMPACT OF INADEQUATE VENTILATION AND DISCHARGE SYSTEMS
INVESTIGATION FINDINGS III IMPACT OF INADEQUATE VENTILATION AND DISCHARGE SYSTEMS SUMMARY Ammonia odours were reported in the community close to the time of the incident (Appendix D) and firefighters reported
More informationSeries PACKAGED ROOFTOP UNITS, HEAT PUMPS AND OUTDOOR AIR HANDLING UNITS. Features:
RZ PACKAGED ROOFTOP UNITS, HEAT PUMPS AND OUTDOOR AIR HANDLING UNITS Features: Air-cooled condenser, water-cooled condenser, or evaporative-cooled condenser packaged rooftop units from 55-240 tons Water-source
More informationASHRAE Safety Standards. Mechanical Rooms and Gas Detection in Commercial Applications
HA University ASHRAE Safety Standards Mechanical Rooms and Gas Detection in Commercial Applications presented by Greg Kaufman - Honeywell Analytics Gas Hazards Three main types of Gas Hazards: Flammable
More information9. Cooling Water System
9.1 Water quality The fresh water in the cooling water system of the engine must fulfil the following requirements: ph... Hardness... Chlorides... Sulphates... min. 6.5...8.5 max. 10 dh max. 80 mg/l max.
More informationSECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC
PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 23 0593 TESTING, ADJUSTING, AND A. Testing, adjustment, and balancing of air systems. B. Testing, adjustment, and balancing of hydronic, steam, and refrigerating
More informationSECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS
SECTION 15732 - PACKAGED ROOFTOP AIR CONDITIONING UNITS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Package roof top unit. B. Heat exchanger. C. Refrigeration components. D. Unit operating controls. E. Roof
More informationINTRODUCTION. Special Applications of Package Air Conditioners. Instant Cooling Requirement in Wedding Ceremonies
Pakistan s Largest Manufacturers of Air-Conditioners PACKAGE TYPE UNIT FOR MOBILE APPLICATIONS Provides Turnkey Projects Conceptual Planning to Commissioning of HVACR Projects THE LARGEST MANUFACTURER
More information(2) 325 tpd York Chlorine Liquefier Systems
(2) 325 tpd York Chlorine Liquefier Systems The liquefier is a split bundle and serves as both the primary liquefier and the secondary liquefier. The total for each York system is 325 tons liquid Cl2,
More informationTunnel Axial Flow Fan
Tunnel Axial Flow Fan TUNNEL AXIAL FLOW FAN Tunnel fans are an axial flow fans and moves an airstream along the axis of the fan. The air is pressurized by the aerodynamic lift generated by the fan blades,
More informationSECTION REFRIGERATION EQUIPMENT. A. Section Includes: Refrigeration equipment for insulated cold storage rooms including necessary accessories.
SECTION 15650 REFRIGERATION EQUIPMENT PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Refrigeration equipment for insulated cold storage rooms including necessary accessories. B. Related Section: 1. 11400
More informationHood Depot Internatioonal, Inc., Phone S. Powerline Road, Deerfield Beach, FL
The Kitchen Cool by Hood Depot is a conditioned make up air unit design with flexibility, form and function kept in mind. Our unit offers a variety of configurations that allow the customer to customize
More informationAppendix 13. Categories of Cooling and Heating systems
EcoShopping - Energy efficient & Cost competitive retrofitting solutions for Shopping buildings Co-funded by the European Commission within the 7 th Framework Programme. Grant Agreement no: 609180. 2013-09-01
More information3 rd Generation of VRV. The professional solution for your professional project
3 rd Generation of VRV The professional solution for your professional project CONTENT What is VRV? Definition, History, Concept VRVIII Range Outdoor units, indoor units. VRVIII features Piping limits,
More informationLayout. Guidelines11. Chapter 11: Layout Introduction
Guidelines11 Chapter 11: Layout 37 Layout 1. Introduction Open circuit cooling towers, closed circuit cooling towers and evaporative condensers all depend upon an adequate supply of fresh, ambient air
More informationDSH Model Air Cooled Self Contained Indoor Packaged Units 2-5 Tons Preliminary Application Data
DSH Model Air Cooled Self Contained Indoor Packaged Units 2-5 Tons Preliminary Application Data July 28, 2008 Page 1 1 of 3 PROJECT: TAG: Gross Cooling Capacity [Btuh]: 25,240* Design CFM: 800 Seasonal
More informationEnergy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE
This article was published in ASHRAE Journal, March 20145 Copyright 2015 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission
More informationSeries. Packaged Rooftop Units, heat pumps and Outdoor air handling Units. Features:
RL Packaged Rooftop Units, heat pumps and Outdoor air handling Units Features: Air-cooled condenser, water-cooled condenser, or patented AAON evaporative-cooled condenser, with capacities from 45-240 tons
More informationCall us today! (800)
500 TON AIR-COOLED CHILLER PA-ACCTR-500 Call us today! (800)341-4297 The 500-Ton portable chiller package features a Trane RTAC chiller unit. Trane leads the industry in providing some of the most reliable,
More informationROTARY DRYER CONSTRUCTION
ROTARY DRYER The Rotary Dryer is a type of industrial dryer employed to reduce or to minimize the liquid moisture content of the material it is handling by bringing it into direct contact with a heated
More informationChallenges and Methods of Estimating a Conceptual HVAC Design
Challenges and Methods of Estimating a Conceptual HVAC Design ABSTRACT In any conceptual HVAC design, estimators are faced with the challenge of trying to capture all of the pieces that complete a system.
More informationRN/RQ. Series PACKAGED ROOFTOP UNITS, AIR-SOURCE HEAT PUMPS, WATER-SOURCE/ GEOTHERMAL HEAT PUMPS, & OUTDOOR AIR HANDLING UNITS.
RN/RQ Series PACKAGED ROOFTOP UNITS, AIR-SOURCE HEAT PUMPS, WATER-SOURCE/ GEOTHERMAL HEAT PUMPS, & OUTDOOR AIR HANDLING UNITS RQ Series Features: Air-cooled or water-cooled condenser, with unit capacities
More informationProposal Information Template Commercial and Industrial Fans and Blowers 2017 Appliance Efficiency Standards
Proposal Information Template 2017 Appliance Efficiency Standards Appliance Standards Awareness Project (ASAP), Northwest Energy Efficiency Alliance (NEEA), Natural Resources Defense Council (NRDC), American
More informationCall us today! (800)
150 TON AIR-COOLED CHILLER PA-ACCTR-150 Call us today! (800)341-4297 The 150-Ton portable chiller package features a Trane RTAC chiller unit. Trane leads the industry in providing some of the most reliable,
More informationDesign Based Comparative Study of Several Condensers Komal B. Dabhi 1, Prof. S. B. Thakore 2 1 Chemical Engg. Dept., L. D. College of Engineering, Ahmedabad 380015 2 Chemical Engg. Dept., L. D. College
More informationAdding More Fan Power Can Be a Good Thing
This article was published in ASHE Journal, May 14. Copyright 14 ASHE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission of
More informationProject Number: P15441
Multidisciplinary Senior Design Kate Gleason College of Engineering Rochester Institute of Technology Rochester, New York 14623 Project Number: P15441 MINI-AIR: PERSONAL COOLING DEVICE Alexander Cornell
More informationService Step by Step Trouble-Shooting Check-List
WARNING: Only Data Aire trained technician or experience technicians should be working on Data Aire Equipment. Protect yourself at all times and work safe. Date: Dates at the job site: From: to Job#: Serial#:
More informationCatalog Air Cooled Split System Condensing Units for Rooftop Systems and Air Handlers
Air Cooled Split System Condensing Units for Rooftop Systems and Air Handlers Models RCS 025C through 135C 25 to 135 Tons R-22/R407C Refrigerant Catalog 221-1 Table of Contents Introduction.... 3 The Condensing
More information3rd International Conference Polymers in Mining", University of Lancaster, United Kingdom (The Plastics and Rubber Institute), September 26-27, 1989
3rd International Conference Polymers in Mining", University of Lancaster, United Kingdom (The Plastics and Rubber Institute), September 26-27, 1989 FIRE HAZARD EVALUATION OF MINE CONVEYOR BELTS BY: Harry
More informationCHAPTER I INTRODUCTION. In the modern life, electronic equipments have made their way
1 CHAPTER I INTRODUCTION In the modern life, electronic equipments have made their way in to practically every part, which is from electronic gadgets to high power computers. Electronic components have
More informationHeat Pumps SB SERIES. Vertical Self-Contained Unit Water-Source Heat Pumps (3-18 tons) Features:
Heat Pumps SB SERIES Features: Vertical self-contained units with capacities from 3-18 tons ECM driven direct drive backward curved plenum supply fans for improved energy Double wall rigid polyurethane
More informationB. Section Transfer Switches: Automatic transfer switch.
SECTION 263213 - ENGINE GENERATORS PART 1 GENERAL 1.1 SECTION INCLUDES A. Packaged engine generator set. B. Exhaust silencer and fittings. C. Remote control panel. D. Battery and charger. E. Weatherproof
More informationAir-Cooled Split System Condensing Unit for Rooftop Systems and Air Handlers
Catalog 221-1 Air-Cooled Split System Condensing Unit for Rooftop Systems and Air Handlers Model RCS 025C to 135C R-22/R-407C Refrigerant Contents Introduction............................... 3 The Condensing
More informationSECTION LOW VOLTAGE POWER PANELBOARDS - SPECTRA
PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Low voltage power panelboards 1.02 RELATED SECTIONS 1.03 REFERENCES
More informationMAC-036HE-02-L High Efficiency Air-Cooled Chiller Air-Cooled Chillers for Global Residential and Light Commercial Micro Climates Rev 1.
MAC-036HE-02-L High Efficiency Air-Cooled Chiller Air-Cooled Chillers for Global Residential and Light Commercial Micro Climates Rev 1.1 HVAC Guide Specifications Air-Cooled Liquid Chiller with Low Ambient
More informationMAC-048HE-01-L High Efficiency Air-Cooled Chiller Air-Cooled Chillers for Global Residential and Light Commercial Micro Climates Rev 1.
MAC-048HE-01-L High Efficiency Air-Cooled Chiller Air-Cooled Chillers for Global Residential and Light Commercial Micro Climates Rev 1.1 HVAC Guide Specifications Air-Cooled Liquid Chiller with Low Ambient
More information30GH Air-Cooled Liquid Chillers 30GH Nominal cooling capacity kw
Air-Cooled Liquid Chillers Nominal cooling capacity 21-94 kw Carrier is participating in the Eurovent Certification Programme. Products are as listed in the Eurovent Directory of Certified Products. The
More informationFEDERAL REGISTER Vol. 73, No. 179 Rules and Regulations. DEPARTMENT OF LABOR (DOL) Mine Safety and Health Administration ( MSHA) 30 CFR Part 75
FEDERAL REGISTER Vol. 73, No. 179 Rules and Regulations DEPARTMENT OF LABOR (DOL) Mine Safety and Health Administration ( MSHA) 30 CFR Part 75 RIN 1219-AB40 Fire Extinguishers in Underground Coal Mines
More informationSelecting the Correct Fan
Selecting the Correct Fan Ryan B. Johnson Air Purification Company Sales Engineer Member, ASHRAE Pikes Peak Chapter rjohnson@airpurificationcompany.com 1 Your Speaker circa 1998 Fan Types Applications
More informationAIR HANDLING UNITS Vibration Isolation Air Filtration Equipment Ductwork.
SECTION 15855 AIR HANDLING UNITS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15240 - Vibration Isolation. 2. 15885 - Air Filtration Equipment. 3. 15890 - Ductwork. 1.02 REFERENCES A. Air Moving
More informationEmerging Technologies: VFDs for Condensers. Douglas T. Reindl Director, IRC University of Wisconsin-Madison. University of Wisconsin-Madison
Emerging Technologies: VFDs for Condensers Douglas T. Reindl Director, IRC University of Wisconsin-Madison University of Wisconsin-Madison 1 We ve looked at VFDs on Evaporators and compressors, what is
More informationHeat Pumps SA SERIES. Vertical Self-Contained Unit Water-Source Heat Pumps (23-70 tons) Features:
Heat Pumps SA SERIES SA Series Vertical Self-Contained Unit Water-Source Heat Pumps (23-70 tons) Features: Vertical self-contained units with capacities from 23 70 tons Direct drive backward curved plenum
More informationPACKAGED ROOFTOP UNITS, AIR-SOURCE HEAT PUMPS, WATER-SOURCE / GEOTHERMAL HEAT PUMPS, & OUTDOOR AIR HANDLING UNTS. RQ Series.
RN/RQ Series PACKAGED ROOFTOP UNITS, AIR-SOURCE HEAT PUMPS, WATER-SOURCE / GEOTHERMAL HEAT PUMPS, & OUTDOOR AIR HANDLING UNTS RQ Series Features: Air-cooled or water-cooled condenser, with unit capacities
More informationCB/CF. Series CONDENSERS AND CONDENSING UNITS. Features:
CB/CF CONDENSERS AND CONDENSING UNITS CF CB Features: 2-70 ton air-cooled condensing units and remote air-cooled condensers Air-source heat pump configurations for energy efficient heating Variable capacity
More informationHeat Pumps SB SERIES. Vertical Self-Contained Unit Water-Source Heat Pumps (3-18 tons) Features:
Heat Pumps SB SERIES SB Series Vertical Self-Contained Unit Water-Source Heat Pumps (3-18 tons) Features: Vertical self-contained units with capacities from 3-18 tons ECM driven direct drive backward curved
More informationMAC-060HE-01-L High Efficiency Air-Cooled Chiller Air-Cooled Chillers for Global Residential and Light Commercial Micro Climates Rev 1.
MAC-060HE-01-L High Efficiency Air-Cooled Chiller Air-Cooled Chillers for Global Residential and Light Commercial Micro Climates Rev 1.2 HVAC Guide Specifications Air-Cooled Liquid Chiller with Low Ambient
More informationThe Condensate Water Systems
The Condensate Water Systems Condenser: A closed vessel in which steam is condensed by abstracting the heat and where the pressure is maintained below atmospheric pressure is known as a condenser. The
More informationBrown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS
SECTION 23 70 00 AIR HANDLING UNITS PART 1. GENERAL 1.1 Section includes air-handling units to 15,000 cfm and accessories. 1.2 Related Sections 1 : A. Division 01 - Brown University Standard for Narragansett
More informationWelcome! Opening Remarks. FadyAbu Jamra, President of ASHRAE Qatar Oryx Chapter Mark Stevens, Executive Director, AMCA International
Welcome! Opening Remarks FadyAbu Jamra, President of ASHRAE Qatar Oryx Chapter Mark Stevens, Executive Director, AMCA International Thank you, sponsors! Maico Gulf Hira Walraven Ruskin Titus Gulf Aero
More informationINTEGRATION OF DEMAND RESPONSE INTO TITLE 20 FOR HOT FOOD HOLDING CABINETS
Design & Engineering Services INTEGRATION OF DEMAND RESPONSE INTO TITLE 20 FOR HOT FOOD HOLDING CABINETS Phase1: Demand Response Potential DR 09.05.07 Report Prepared by: Design & Engineering Services
More informationAmbient (ºF) Temperature Rise Above
Spec-00488 Heat CPH FX (763) Dissipation 422-2600 422-2211 in Electrical Enclosures Technical Thermal Management Information Heat Dissipation in Sealed Electrical Enclosures The accumulation of heat in
More informationHeat Recovery Units. Heat Recovery 1
Heat Recovery Units Heat Recovery 1 Heat Recovery Unit Why? A heat recovery unit (HRU) can help make mechanical ventilation more cost effective by reclaiming energy from exhaust airflows. HRUs use air-to-air
More informationPharmaceutical Facility Design
PhEn-602 Pharmaceutical Facility Design J. Manfredi Notes 9A PhEn-602 J. Manfredi 1 Primary & Secondary HVAC units Primary Primary air handling unit arrangement: One unit is responsible for all of the
More informationSECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY
SECTION 22 11 23.13 DOMESTIC WATER PRESSURE BOOSTING PART 1 - GENERAL 1.1 SUMMARY A. Where utility water pressure cannot adequately meet the pressure requirements of the domestic water systems and where
More informationCHP-turbine room. CHP can capture almost EXTRACTED STEAM 20 PSI HIGH-PRESSURE STEAM 1250 PSI HEAT EXCHANGER HOT WATER SUPPLY F
5 6 HIGH-PRESSURE STEAM is routed from the wood-chp boiler to the turbine. TURBINE BLADES spin at nearly 00 revolutions per second. Steam acting on the turbine blades creates mechanical energy in the TURBINE.
More informationDISTRIBUTION SYSTEMS. Water Piping and Pumps
DISTRIBUTION SYSTEMS Water Piping and Pumps Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection and application topics. They are targeted
More informationCondensing Units CUS 15-60
Condensing Units CUS 15-60 General Description UNIT IDENTIFICATION AIR COOLED CONDENSING UNIT CUS... Condensing Unit with Propeller Fan and Scroll Compressor 15-60... Model Size D... Double Circuit e.g....
More informationAir flow management tutorial session. ACC Users Group 8 th Annual Conference Dallas, 4 October 2016 Sander Venema Howden Netherlands
tutorial session ACC Users Group 8 th Annual Conference Dallas, 4 October 2016 Sander Venema Howden Netherlands Howden Group 2016 Introduction Basic definitions Basics of fan performance Basics of fan
More information