Richard Blauvelt Don Krause Keith Rule Harold Shoemaker WPI B&W Services Inc. PPPL DOE/FETC

Size: px
Start display at page:

Download "Richard Blauvelt Don Krause Keith Rule Harold Shoemaker WPI B&W Services Inc. PPPL DOE/FETC"

Transcription

1 DEMONSTRATION OF A LIGHTWEIGHT PORTABLE CRIMPER YIELDING GASTIGHT SEALS FOR THE EFFICIENT REMOVAL OF TRITIUM CONTAMINATED TUBING AND PIPE ON THE MOUND D&D LARGE SCALE DEMONSTRATION AND DEPLOYMENT PROJECT Richard Blauvelt Don Krause Keith Rule Harold Shoemaker WPI B&W Services Inc. PPPL DOE/FETC ABSTRACT The Mound Plant in Miamisburg Ohio was constructed just after WW II to continue its role in the development and production of nuclear weapons that began as part of the Manhattan Project in several separate laboratories in Dayton. From 1947 until the end of the Cold War, Mound played a key role in the production of both nuclear and non-nuclear components of the U.S. nuclear weapons arsenal. With the cessation of nuclear weapons production, Mound has been designated as a site to be closed and turned over to the local community for possible commercial reindustrialization. The shutdown involves a massive D&D effort of Mound s nuclear facilities, some of which are being demolished while others are cleaned up to industrial or free release standards. The major D&D project is focussed on the tritium processing facilities at Mound with the R/SW Building complex slated for demolition and the T Building scheduled for clean up to free release. A significant portion of this work involves the removal of gloveboxes, vacuum and transfer pumps, tanks and other pieces of process equipment contaminated with tritium and tritium compounds. Connecting all of this equipment are literally miles of stainless steel and copper tubing ranging from capillary tubing utilized for sampling and analysis to larger double walled (tube within a tube) transfer lines which were used to move large quantities of tritium from lab to lab and between process buildings. The removal of this tubing safely and efficiently represents a daunting challenge for the B&W Team responsible for the D&D of these tritium facilities, a project that is on the critical path for closure of the Mound Plant. The potential for release of tritium during these operations requires that extreme care be exercised, as the allowable release goals are relatively small. The baseline approach to this problem involves a series of steps including; 1. Purging the line to remove contamination to the extent possible with the purge gas going to a tritium effluent removal facility (TERF) 2. Constructing a sweep enclosure at the point of the tubing cut to ensure any release of tritium is captured. 3. Cutting the tube with traditional techniques such as saws, tubing or bolt cutters. 4. Capping the ends of the tubes immediately afterward. This innovative technology demonstration involves the use of a portable relatively lightweight hydraulically powered crimper that delivers 10,000psi and applies 12 tons of force to the crimping area. In addition, a specially modified die focuses that force and provides a pattern of indentations in the tubing that enhances the seal and facilitates the final cut. The result is a gastight seal that ensures containment of any residual tritium contamination and removes the necessity for any containment around the cutting area. The final cut can then be made with a tool from baseline tool kit, preferable a bolt cutter that generates little or no secondary waste as opposed to a saw or tubing cutter. While there are numerous crimping tools available commercially, this particular unit is unique in the ability to provide the leaktight seal that is so critically important to the safe removal of tritium contaminated tubing. This paper will provide details regarding the search for a suitable base tool and the redesign of the dies. It will also describe the cold testing that was conducted on a variety of tubing configurations. In addition, information will be presented that compares the performance and cost of this technology to the baseline approach. Demonstration data will be collected on actual contaminated tubing removal in the SW Building and recommendations will be presented concerning the deployment of this technology at the Mound site and other applicable D&D sites.

2 INTRODUCTION The Mound Facility is an ideal candidate for a D&D Focus Area Large Scale Demonstration and Deployment Project since its closure requires the D&D of numerous radioactively contaminated facilities. The tritium operations areas in T Bldg. and the SW/R Bldg. complex are on the critical path for the closure project. This means that the deployment of innovative technologies into this baseline project is not only an attractive idea but something that may be required if the projected cost and scheduled are to be met. A number of innovative technology candidates have been identified for potential demonstration in the Mound project ranging from characterization techniques to decontamination and dismantlement methods to preparation of waste for disposal. The specific technology being evaluated in this demonstration is commercially available hydraulically powered pipe crimper that has been modified to exert 12 tons of crimping force on a small surface area of a tube or pipe. The crimping head itself is relatively lightweight at approximately 8 lbs. with a remote power unit that can be moved around easily. The dies for the head have been modified by PPPL personnel to focus the crimping force and provide a pattern of creases in the tubing that results in a leak tight seal even when the contaminated tube is surrounded by another tube for containment. The potential for crimping and subsequently cutting the tubing without the need for some type of protective enclosure of the tubing or the necessity for placing the workers in air supplied suits are the primary potential benefits for this technology demo. Removal and disposal of several thousand feet of tritium-contaminated stainless steel capillary and single and double jacketed tubing is a significant and time consuming part of the decontamination and decommissioning of the Mound Tritium Facilities. The capillary tubing typically consists of 1/8 OD stainless steel tubing some of which is inside of a 3/8 OD stainless steel tubing that provides secondary containment. The capillary tubing was primarily used for sampling where small hold-up volumes were desirable. Other transfer lines are larger in diameter and also double jacketed. An example of some of the tubing is shown in figure 1. Figure 1-Capillary tubing requiring crimping and removal

3 In order to remove this tubing, it must be safely cut (and sealed) into lengths that are suitable for packaging into waste containers for disposal as low level radioactive waste. Currently, the tubing is cut using various manual cutting tools (i.e. hacksaw, sawzall cutting torch, tubing cutter, etc.). This paper summarizes the demonstration of a hand-held, remotely powered crimper for removing the tritium-containing capillary and transfer tubing. Burndy Electric, a division of Framatome Connectors, USA, offers a hand-held crimping unit capable of producing 10,000 psi of hydraulic pressure with a resulting force of 12 tons. This unit may prove to be a safer, more cost-effective method for the removal of contaminated tubing. This crimper is intended for use in conjunction with a shearing tool such as a bolt cutter to isolate and remove tubing. It is expected that, upon completion of the tests set forth in this paper, the remote-powered pipe crimper will be incorporated into a new procedure for tubing removal. In addition to its mobility, the primary advantage of this technology when applied to tritium D&D is that this unit creates a leak-tight crimp. It is expected that tritium emissions from the tubing removal operation will be substantially reduced or could be eliminated altogether. The expected advantages of this technology include; 1. A portable lightweight small crimping head that will enhance worker comfort, safety and productivity. 2. A transportable power unit with a 25 ft. hose that combined with the head allows crimping in confined or high bay areas. 3. A specially fabricated die incorporating a pair of embedded stainless steel dowel pins that concentrate the crimping force over a small surface area, providing a leak tight seal. 4. A reduction in airborne emissions for the total D&D project The unit is pictured in figure 2 Figure 2-the AC powered Burndy crimper A series of tests are being run to show that this innovative technology provides a significant advantage to other techniques for a variety of single and double walled tubing and pipe up to 1 inch in diameter. This advantage is the result primarily of the leaktight seal that the crimper provides to the tube. The baseline approach requires that a vacuum be pulled on one end of the tube being cut and a cap or other type of seal be placed on the end of the tube immediately after cutting. Because there is a potential for off gassing, radiological controls usually require that an enclosure be constructed around the cut to allow any venting to

4 be captured. The crimper will negate the need such an enclosure, with a tremendous saving in time and materials The full scale demonstration is being conducted in SW Building, room 2. This is the location of a former mass spectrometer facility used in conjunction with tritium operations. It contains all of the types of tubing that the project is interested in including in the demo. Phase I of the demonstration included a number of crimps on an variety of tubing types and was a cold test that could be performed in a designated area adjacent to SW Building. Phase I provided training for pipe fitters in the use of the crimper and also verified the ability of the crimper to make a leak tight seal with the types of tubing, both single and double walled that will be encountered in SW2. The demonstration with contaminated tubing will involve crimping a fixed number of linear feet of tube with both the Burndy crimper and the baseline approach, with attention given to the similarity of the scenarios such as the number of interferences or other complications encountered in real work. As part of the full scale demo certain prerequisites were necessary such as; all demo participants in a pre-job briefing must review and sign the applicable Radiological Work Permit (RWP). A pre-job conference must be scheduled with the RCT to accomplish this task any discuss. The demonstration data collector/test engineer will ensure that all necessary forms for collecting data will be available before, during, and after the demonstration including forms specific to the demo and forms common to both processes. All those participating in the demonstration will be familiar with the facility s operational procedures, and proper responses to alarms and emergencies. TECHNICAL APPROACH Prior to the demonstration, shakedown tests were run with a sampling of the types of tubing and pipe of interest to dampen the learning curve for the use of the crimper. This is in addition to and a precursor the Phase I work described above. It provided a familiarity with the basic operation and maintenance of the equipment and identified any problems or limitations before beginning the actual demonstration phase: The demonstration is being conducted in two phases. Each phase will provide data that will be relevant to either the performance of the crimper or the operating cost per linear foot of tubing crimped or treated with the baseline approaches. Phase I Phase I activities took place adjacent to SW building and measured the performance of the Burndy crimper for the crimping and leak-tight sealing of a variety of tubing from ¼ inch to 1 inch. Each tube sample was sealed on one end and placed in a fixture that enabled a vacuum to be placed on the tubing interior. The tubes were then crimped in a one crimp and three-crimp pattern (separate tests). The crimps were cut with a bolt cutter and the leak tightness of the crimped tubing was measured with a vacuum gauge, looking for a rate of rise. In addition to several examples of single walled tubing, both copper and stainless steel, the two double-walled transfer tubing configurations utilized at Mound were also tested. Furthermore, a test was conducted that demonstrated the performance of a crimp on tubing containing water and tubing containing oil. The results of phase I were somewhat obscured by a design flaw in the test fixture which did not allow for isolation of each test tube from the rest of the system. However, sufficient data was collected to justify the scheduling of phase II. Furthermore, this cold work allowed the workers to notice that there was some movement in the jaws at the outside edge of the die that resulted in an uneven distribution of the force on the tube surface. To compensate for this motion, the dowels in the die were raised at the open end by.015. The crimping head with the raised dowels can be seen in figure 3.

5 Figure 3-the crimping head Phase II Phase II activities will involve side by side comparisons of the crimp and cut approach with the baseline technology of using cutters or saws with the primary focus on labor data and airborne tritium monitoring. An equal number of feet for each type of tubing/piping will be identified and tagged. The plan would call for a minimum five crimp/cuts to be made for each type/size of tubing. Standard operating procedures for the baseline and the crimp/cut will be followed as called out in the work instructions for SW2 piping removal. Data from phase I may be used to petition for relief from any requirements for local air sweeping during the cut. In addition to the collection of labor data, each cut will be closely monitored for any tritium release. Preliminary phase II work has been completed on both single and double walled tubing in SW2. Each section of tubing was between 20-25ft. in length and had been under a slow purge with air to an effluent removal system prior to the crimp and cut. A sensitive portable tritium monitor was used to sniff the area adjacent to the cut to detect any release. There was none. An example of the crimp is depicted in figure 4.

6 Figure 4-examples of the crimped surface of a single wall 3/8 OD tube CONCLUSIONS Although additional hot testing remains to be done, the initial results with the crimper have been very promising. This technology has been well accepted by the workers in the field. In fact, they quickly improved upon the process by crimping and then bending the tubing rather than cutting at each crimp. By using this technique, the number of cuts in a 20 foot section of tubing can be reduced from 10 to 2. This is an obvious benefit in time savings and reduces the potential for release. Currently, the project is evaluating options for a power assist with the cutting phase of this operation since the current approach of using long handled bolt cutters is a cumbersome operation and not well suited especially at higher elevations and in cramped spaces. The project is also deploying this technology to a non-rad application associated with removal of breathing air stations at the plant. These stations have no isolation valves and the entire system must be shut done for the removal of one station. There is then a time consuming startup procedure. With the Burndy crimper, a station can be isolated with a total shutdown. It is anticipated that this technology will enjoy additional deployments at both the Mound plant and other DOE facilities.

NUCLEAR INDUSTRY STANDARD PROCESS Radiological Protection. Level 3 Information Use. Use and Control of HEPA Filtration and Vacuum Equipment

NUCLEAR INDUSTRY STANDARD PROCESS Radiological Protection. Level 3 Information Use. Use and Control of HEPA Filtration and Vacuum Equipment NUCLEAR INDUSTRY STANDARD PROCESS Radiological Protection Level 3 Information Use Use and Control of HEPA Filtration and Vacuum Equipment NISP-RP-008 Industry Approval Date: October 30, 2018 This is an

More information

Use and Control HEPA Filtration and Vacuum Equipment NISP-RP-08

Use and Control HEPA Filtration and Vacuum Equipment NISP-RP-08 NUCLEAR INDUSTRY STANDARD PROCESS Radiological Protection Use and Control HEPA Filtration and Vacuum Equipment NISP-RP-08 This is an industry document for standardizing radiation protection processes used

More information

Chapter 12 HOT WORK OPERATIONS. Purpose:

Chapter 12 HOT WORK OPERATIONS. Purpose: Chapter 12 Hot Work Operations Chapter 12 HOT WORK OPERATIONS Purpose: To provide written procedures to prevent the outbreak of fire, fire alarm activations, and smoke and odor migration in buildings resulting

More information

Cost, time and water savings gained through optimized tank cleaning

Cost, time and water savings gained through optimized tank cleaning Cost, time and water savings gained through optimized tank cleaning Abstract: Specific case studies on the benefits of rotary impingement and CIP optimization vs. the standard tank cleaning processes.

More information

REFRIGERANT PROCEDURE

REFRIGERANT PROCEDURE REFRIGERANT PROCEDURE 1. PURPOSE Chlorofluorocarbons contained in some refrigerants are considered to be ozone depleting compounds and therefore damaging to the environment. The Environmental Protection

More information

CRIMPERS AND CUTTERS. Information. CH Range. SC Range. BC Range. BC Accessories. HCH Range. CT Range. HWC Range. HSWC Range. HWRC Range.

CRIMPERS AND CUTTERS. Information. CH Range. SC Range. BC Range. BC Accessories. HCH Range. CT Range. HWC Range. HSWC Range. HWRC Range. RIMPERS ND UTTERS Information General information on crimping tools 122 H Range able crimping heads s 123 124 S Range Selfcontained cable crimping tools s 1 126 Range attery operated cable crimping tools

More information

Revisions to this application specification include: Updated document to corporate requirements Changed product types in table in Figure 6

Revisions to this application specification include: Updated document to corporate requirements Changed product types in table in Figure 6 This specification covers the requirements for application of PLASTI GRIP Terminals and Splices for commercial applications. The terminals and splices consist of precision formed metal wire barrel insulated

More information

STAINLESS STEEL TRAP VALVE STATION

STAINLESS STEEL TRAP VALVE STATION STAINLESS STEEL TRAP VALVE STATION MAKES A LONG STORY... 36 [914 MM]...SHORT. 4.75 [121 MM] THE INNOVATION IS INTEGRATION Armstrong stainless steel Trap Valve Station (TVS) reduces your costs for installation,

More information

Thermoplastic K-LINK hoses and accessories for refrigeration and air conditioning system

Thermoplastic K-LINK hoses and accessories for refrigeration and air conditioning system Thermoplastic K-LINK hoses and accessories for refrigeration and air conditioning system Bulletin ACH-GB The Air Conditioning / Refrigeration System The domestic and industrial Air Conditioning / Refrigeration

More information

MobileCrimp Crimper Die Selection Table For MegaCrimp. MobileCrimp. Die Sets (ordered separately) Digital Dial Control

MobileCrimp Crimper Die Selection Table For MegaCrimp. MobileCrimp. Die Sets (ordered separately) Digital Dial Control MobileCrimp 4-20 Crimper This lightweight, versatile crimper is powerful enough to crimp up to 1-1/4" four spiral-wire hose Weighing approximately 57 pounds, this new field crimper combines the latest

More information

EMPTYING, DISMANTLING AND DEMOLITION OF RADIOACTIVE WASTE DISPOSAL "ALFR" ON SITE OF NPP RHEINSBERG

EMPTYING, DISMANTLING AND DEMOLITION OF RADIOACTIVE WASTE DISPOSAL ALFR ON SITE OF NPP RHEINSBERG EMPTYING, DISMANTLING AND DEMOLITION OF RADIOACTIVE WASTE DISPOSAL "ALFR" ON SITE OF NPP RHEINSBERG ABSTRACT F. Krause, M. Schönherr Energiewerke Nord GmbH (EWN) Kernkraftwerk Rheinsberg D-16831 Rheinsberg

More information

Soot Mitigation Strategies

Soot Mitigation Strategies Soot Mitigation Strategies Walter P. Drosjack, P.E. David L. Oar, P.E., F.S.F.P.E. 32 nd Nuclear Air Cleaning Conference June 18-19, 2012 Who is URS? URS is one of the world s largest engineering, construction

More information

Geothermal ORC Systems Using Large Screw Expanders

Geothermal ORC Systems Using Large Screw Expanders Purdue University Purdue e-pubs International Compressor Engineering Conference School of Mechanical Engineering 2014 Geothermal ORC Systems Using Large Screw Expanders Tim R. Biederman cyrq, United States

More information

INSTALLATION. The optional swivel-mounting base is recommended; it positions the crimp loop in virtually any orientation.

INSTALLATION. The optional swivel-mounting base is recommended; it positions the crimp loop in virtually any orientation. The following manufacturer s tools will work in the Universal Power Crimper: AMP, Buchanan, Burndy, Bendix, Berg, Clark, Daniels, Deutsch, Molex-ETC, Hollingsworth, ITT Cannon, Molex, Thomas & Betts and

More information

Section 2 Safety, Tools and Equipment, Shop Practices Unit 5 Tools and Equipment

Section 2 Safety, Tools and Equipment, Shop Practices Unit 5 Tools and Equipment Section 2 Safety, Tools and Equipment, Shop Practices Unit 5 Tools and Equipment Unit Objectives After studying this chapter, you should be able to: Describe hand tools used by the air-conditioning, heating,

More information

Section 2 Safety, Tools and Equipment, Shop Practices Unit 5 Tools and Equipment. Unit Objectives 3/1/2012. General Hand Tools (1 of 6)

Section 2 Safety, Tools and Equipment, Shop Practices Unit 5 Tools and Equipment. Unit Objectives 3/1/2012. General Hand Tools (1 of 6) Section 2 Safety, Tools and Equipment, Shop Practices Unit 5 Tools and Equipment Unit Objectives After studying this chapter, you should be able to: Describe hand tools used by the air-conditioning, heating,

More information

RK12ID Remote Dieless Crimping Tool

RK12ID Remote Dieless Crimping Tool INSTRUCTION MANUAL Serial Number RK12ID Remote Dieless Crimping Tool Read and understand all of the instructions and safety information in this manual before operating or servicing this tool. Register

More information

MICHIGAN S ONLY AUTHORIZED WARRANTY SERVICE CENTER. Industrial Equipment Rental & Service

MICHIGAN S ONLY AUTHORIZED WARRANTY SERVICE CENTER. Industrial Equipment Rental & Service MICHIGAN S ONLY AUTHORIZED WARRANTY SERVICE CENTER Industrial Equipment Rental & Service Bending Classic Electric Bender for Conduit & Pipe Item #555C Electric Bender Item #854DX Bend 1/2" to 2" RIGID/IMC/EMT

More information

KH-80 HYDRAULIC CRIMPER OPERATORS MANUAL

KH-80 HYDRAULIC CRIMPER OPERATORS MANUAL KH-80 HYDRAULIC CRIMPER OPERATORS MANUAL 1 SAFETY PRECAUTIONS READ AND IDENTIFY ALL COMPONENT PARTS BEFORE USING CRIMPER. CRIMPER CAN PRODUCE 80 TONS OF FORCE. KEEP BOTH HANDS AWAY FROM PINCH POINTS. CONSULT

More information

MARK-COSTELLO WASTE STERILIZER SPECIFICATION SHEET

MARK-COSTELLO WASTE STERILIZER SPECIFICATION SHEET MARK-COSTELLO WASTE STERILIZER SPECIFICATION SHEET The Mark-Costello Waste Sterilzer is designed and manufactured in accordance with the following specifications: Vessel shall be built in accordance with

More information

Rotary Impingement Tank Cleaning Equals Significant Water and Cost Savings

Rotary Impingement Tank Cleaning Equals Significant Water and Cost Savings Rotary Impingement Tank Cleaning Equals Significant Water and Cost Savings Specific information and case studies on the benefits of rotary impingement and cleanin-place (CIP) optimization vs. the standard

More information

TECHNICAL SERVICE GUIDE

TECHNICAL SERVICE GUIDE GE Consumer Home Services Training TECHNICAL SERVICE GUIDE LOKRING Connectors Pub # 31-9067 01/01 IMPORTANT SAFETY INFORMATION Before cutting or using a torch on refrigerant tubes, recover the refrigerant

More information

The Essentials Of Working With R-410A

The Essentials Of Working With R-410A The Essentials Of Working With R-410A By Norm Christopherson Several major manufacturers are producing comfort air conditioning equipment using refrigerant 410A. The trend towards the use of 410A continues

More information

Vacuum Gauge. Measures lower-than-atmospheric pressure Digital scales. microns psi in. Hg millibars pascals torr millitorr

Vacuum Gauge. Measures lower-than-atmospheric pressure Digital scales. microns psi in. Hg millibars pascals torr millitorr Vacuum Gauge Measures lower-than-atmospheric pressure Digital scales microns psi in. Hg millibars pascals torr millitorr (Sealed Unit Parts Co., Inc.) Compound Gauge Measures pressure and vacuum Low-side

More information

This section applies to the use of cord- and plug-connected equipment, including cord sets (extension cords).

This section applies to the use of cord- and plug-connected equipment, including cord sets (extension cords). (B) Portable Electric Equipment. This section applies to the use of cord- and plug-connected equipment, including cord sets (extension cords). (1) Handling. Portable equipment shall be handled in a manner

More information

ENERGY CONTROL LOCKOUT/TAGOUT PROGRAM PLAN

ENERGY CONTROL LOCKOUT/TAGOUT PROGRAM PLAN ENERGY CONTROL LOCKOUT/TAGOUT PROGRAM PLAN Published by Environmental Health and Safety Last updated: 1/25/2017 Page 1 of 16 1. INTRODUCTION John Jay College Environmental Health and Safety (EHS) office

More information

Saskatchewan Evaluation and Certification Guide. Appendix D

Saskatchewan Evaluation and Certification Guide. Appendix D Saskatchewan Evaluation and Certification Guide Appendix D NFPA 1002 Fire Apparatus Driver/Operator Professional Qualifications Revised 2013 Emergency Management and Fire Safety Page 1 of 13 Table of Contents

More information

Rutgers Environmental Health and Safety (REHS)

Rutgers Environmental Health and Safety (REHS) Rutgers Environmental Health and Safety (REHS) Program Name: Laboratory Laser Safety Program Responsible Executive: Executive Director of REHS Adopted: February 20, 2001 Reviewed/Revised: July 10, 2018

More information

WHY THE REMOVAL OF NONCONDENSABLE GASES AND AIR IS CRITICAL IN A STEAM SYSTEM

WHY THE REMOVAL OF NONCONDENSABLE GASES AND AIR IS CRITICAL IN A STEAM SYSTEM BEST PRACTICE NO. 30 WHY THE REMOVAL OF NONCONDENSABLE GASES AND AIR IS CRITICAL IN A STEAM SYSTEM Air and noncondensable gases are one of the major problems in a steam system that can cause production

More information

DECOMMISSIONING OF THE REACTOR VESSEL OF THE COMPACT SODIUM COOLED NUCLEAR REACTOR FACILITY (KNK)

DECOMMISSIONING OF THE REACTOR VESSEL OF THE COMPACT SODIUM COOLED NUCLEAR REACTOR FACILITY (KNK) DECOMMISSIONING OF THE REACTOR VESSEL OF THE COMPACT SODIUM COOLED NUCLEAR REACTOR FACILITY (KNK) J. Benkert, F. Willman Westinghouse Electric Germany GmbH Mannheim / D K. Brockmann, I. Hillebrand Research

More information

NISH Report: Team Catalyst Paper Folding Machine

NISH Report: Team Catalyst Paper Folding Machine 1 : Team Catalyst Paper Folding Machine ABSTRACT Ohio University s Team Catalyst was given a task to find a customer who was physically or mentally handicapped and required further assistance in order

More information

2.13 RADIOLOGICAL INCIDENTS and EMERGENCIES RCT STUDY GUIDE Identify in general how an RCT should respond to an emergency.

2.13 RADIOLOGICAL INCIDENTS and EMERGENCIES RCT STUDY GUIDE Identify in general how an RCT should respond to an emergency. LEARNING OBJECTIVES: 2.13.01 Identify in general how an RCT should respond to an emergency. 2.13.02 Identify how an RCT should respond to a CAM alarm. 2.13.03 Identify how an RCT should respond to a personnel

More information

Eliminating Condensation and Resulting Corrosion. Sulphur Tail Gas and De-Gas Lines

Eliminating Condensation and Resulting Corrosion. Sulphur Tail Gas and De-Gas Lines Eliminating Condensation and Resulting Corrosion In Sulphur Tail Gas and De-Gas Lines By David R. Hornbaker, Controls Southeast, Inc. and Graham M. MacPherson, P.Eng., Millenia Resource Consulting Abstract

More information

MODULATING CONTROL OF LOW NO X BURNERS

MODULATING CONTROL OF LOW NO X BURNERS MODULATING CONTROL OF LOW NO X BURNERS ABSTRACT Manufacturers of today s wall-fired low NO X burners (LNB) recommend a single-position secondary air volume control for in-service burners. Air register

More information

PIP PCTPA001 Testing of Process Analyzer Systems

PIP PCTPA001 Testing of Process Analyzer Systems January 2016 Process Control PIP PCTPA001 Testing of Process Analyzer Systems PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice

More information

K4600 Assembly Directions

K4600 Assembly Directions K4600 Assembly Directions All parts are delivered inside one (1) shipping box. o The base, the bowl and the chair NOTE: A qualified Plumber should be employed to assemble this Shampoo Backwash Unit. Install

More information

a. CFCs. b. HCFCs. c. Pressurized nitrogen. d. Compressed dry air. 17. The state of the refrigerant leaving the condenser of a refrigeration system

a. CFCs. b. HCFCs. c. Pressurized nitrogen. d. Compressed dry air. 17. The state of the refrigerant leaving the condenser of a refrigeration system Core 1. Ozone in the stratosphere above the earth consists of: a. Molecules containing 3 oxygen atoms. b. Molecules of 2 oxygen atoms. c. Radioactive particles. d. Pollutants that have risen from ground

More information

WM 05 Conference, February 27 March 3, 2005, Tucson, AZ

WM 05 Conference, February 27 March 3, 2005, Tucson, AZ ACCELERATED DESIGN AND FABRICATION OF A MOBILE DRUM VENT SYSTEM FOR TRU RETRIEVAL ACTIVITIES IN HANFORD 200 WEST AREA LOW- LEVEL BURIAL GROUND TRENCHES T. Wickland, L. Anderson Nuclear Filter Technology

More information

Cartridge Heaters. Components. Application Guidelines

Cartridge Heaters. Components. Application Guidelines Application Guidelines Up to 1.297" Dia. Up to 60" Lengths Up to 11,500 Watts 120 and 240 Volt Up to 1400 F Max. Working Temp. Modification Available to Fit Custom Applications Type CIR cartridge heaters

More information

EASTERN ARIZONA COLLEGE Fire Department Operations I

EASTERN ARIZONA COLLEGE Fire Department Operations I EASTERN ARIZONA COLLEGE Fire Department Operations I Course Design 2015-2016 Course Information Division Allied Health Course Number FSC 101 Title Fire Department Operations I Credits 6 Developed by B.K.

More information

EXIDE CLEANUP PROJECT Update

EXIDE CLEANUP PROJECT Update EXIDE CLEANUP PROJECT Update City of Los Angeles Planning and Land Use Management Committee Tuesday, June 19, 2018 Slide: 1 DTSC Progress on Exide Closure and Cleanups Corrective Action Stipulation & Order

More information

Lata Mishra Bhabha Atomic Research Centre, INDIA

Lata Mishra Bhabha Atomic Research Centre, INDIA Lata Mishra Bhabha Atomic Research Centre, INDIA Outline of presentation Legal & Regulatory provisions / requirements Safety criteria & Safety objectives PIE s Safety & Seismic categorization Safety provisions

More information

Cased Aluminum Coils "Dedicated Upflow / Downflow" Convertible to horizontal with separately purchased kit

Cased Aluminum Coils Dedicated Upflow / Downflow Convertible to horizontal with separately purchased kit 18-AD32D1-3 Cased Aluminum Coils "Dedicated Upflow / Downflow" Convertible to horizontal with separately purchased kit Upflow models: 4PXCAU24BS3HAA 4PXCBU24BS3HAA 4PXCBU30BS3HAA 4PXCCU30BS3HAA 4PXCBU36BS3HAA

More information

FES - Series Portable Electric Heaters. YES - Series Suspended Electric Heaters CONTENTS

FES - Series Portable Electric Heaters. YES - Series Suspended Electric Heaters CONTENTS FOSTORIA INDUSTRIES, INC. A DIVISION OF FES - Series Portable Electric Heaters YES - Series Suspended Electric Heaters (FES-1524-3E shown) IMPORTANT SAFETY INFORMATION INSIDE Serious injury or death possible.

More information

GLOBAL ENCLOSURE STANDARDS WITHIN THE ELECTRICAL INDUSTRY

GLOBAL ENCLOSURE STANDARDS WITHIN THE ELECTRICAL INDUSTRY GLOBAL ENCLOSURE STANDARDS WITHIN THE ELECTRICAL INDUSTRY Industry standards for electrical enclosures exist to promote safety, encourage design efficiency and define minimum levels of product performance.

More information

UNIQUE USER FRIENDLY MICROMETER STYLE ADJUSTMENT

UNIQUE USER FRIENDLY MICROMETER STYLE ADJUSTMENT The series hose crimper with Micrometer Style Adjustment and 80 ton cylinder has the capacity to crimp hoses up to 1-¼" 4 wire (with standard dies) and up to 1-¼" 6 wire and 2" 4 wire (with larger dies).

More information

Lock Out/Tag Out: Control of Hazardous Energy (LOTO) Environmental Health &Safety / Risk Management

Lock Out/Tag Out: Control of Hazardous Energy (LOTO) Environmental Health &Safety / Risk Management Lock Out/Tag Out: Control of Hazardous Energy (LOTO) Environmental Health &Safety / Risk Management 229-4503 LOTO "Lockout/Tagout (LOTO)" refers to specific practices and procedures to safeguard employees

More information

Presented by: Senior Vice President ConGlobal Industries May 1, 2012

Presented by: Senior Vice President ConGlobal Industries May 1, 2012 Rfi Refrigerated tdclid Cylinder Testing Procedures Presented by: Rene Etcharren Senior Vice President ConGlobal Industries May 1, 2012 1 Halide Flame Testing of New/Recycled Refrigerated Gas from Cylinders

More information

R E D I C O N T R O L S

R E D I C O N T R O L S R E D I C O N T R O L S File Literature Number 1144-01-1 Installation Operation & Maintenance Manual CONTINUOUS REFRIGERANT DEHYDRATOR Model: CD-120 For use with Refrigerants R-11, R-123, R-12, R-22, R-134a

More information

FIRE PROTECTION BUREAU ACCREDITATION AND CERTIFICATION PO Box Olympia WA (360) FAX: (360) AIRPORT FIREFIGHTER

FIRE PROTECTION BUREAU ACCREDITATION AND CERTIFICATION PO Box Olympia WA (360) FAX: (360) AIRPORT FIREFIGHTER 5.2 RESPONSE 5.2.1 Responding to Incidents Daytime Evaluation Sheets: 5.2.1; 5.3.6 Skill Sheet: A Birth STANDARD: 5.2.1 and 5.3.6 TASK: Respond to a daytime incident or accident on and adjacent to the

More information

Clean Water Made Easy

Clean Water Made Easy Clean Water Made Easy http://www.cleanwaterstore.com Pro-OX 2510 Iron Filter Installation & Start- Up Guide Thank you for purchasing a Clean Water System! With proper installation and a little routine

More information

1 Exam Prep NFPA 14 Stand Pipe Systems Questions and Answers (Plumbing Contractors)

1 Exam Prep NFPA 14 Stand Pipe Systems Questions and Answers (Plumbing Contractors) 1 Exam Prep NFPA 14 Stand Pipe Systems Questions and Answers (Plumbing Contractors) 1. What is the minimum diameter for a non-hydraulically calculated Class III fire standpipe that is part of a combined

More information

Design and Evaluation of a Wildfire Sprinkler

Design and Evaluation of a Wildfire Sprinkler Design and Evaluation of a Wildfire Sprinkler September 2017 Roy Campbell Technical report no. 53 Wildfire Operational Research Group http://wildfire.fpinnovations.ca/ fpinnovations.ca FPInnovations is

More information

THE CABLE ACCESSORY COMPANY THE BEST 30 YEARS

THE CABLE ACCESSORY COMPANY THE BEST 30 YEARS THE CABLE ACCESSORY COMPANY THE BEST 30 YEARS Tool Catalogue www.three-d.co.za Contents Cable and Wire Cutters (Hand-held) Wie Duct Cutters (Hand-held) Cable Tie Tensioning Tools Wire Strippers Pre-Insulated

More information

Refrigerated Cylinder Testing Procedures

Refrigerated Cylinder Testing Procedures Refrigerated Cylinder Testing Procedures Presented by: Mike Baldwin Chairman of Depot Division President and CEO of ConGlobal Industries 28 March 2012 1 Halide Flame Testing of New/Recycled Refrigerated

More information

Steam System Best Practices Document No. 11

Steam System Best Practices Document No. 11 Plant Support & Evaluations, Inc 400 Lombardi Ave. Green Bay, WI 54304 888-615-3559 www.plantsupport.com Fax: 888-615-8664 Steam System Best Practices Document No. 11 The Number One Problem in a Steam

More information

Fire Protection in a D&D Environment

Fire Protection in a D&D Environment Fire Protection in a D&D Environment The K-25 Experience by Ken Roy P.E. Multiple Entities BJC (demolish buildings) CH2MHill (operates utilities) BNFL CROET Private concerns (owns and operates office

More information

KEEPING ME FERTILE: EXECTIVE SUMMARY REPORT

KEEPING ME FERTILE: EXECTIVE SUMMARY REPORT KEEPING ME FERTILE: EXECTIVE SUMMARY REPORT Abstract: By: Nick Randolph, Matt Hastzo, Mike Brennen, Pat Boniface, Zack Scherfy Team Keeping ME Fertile worked with a small greenhouse operator by the name

More information

Animal Tissue Culture SQG 3242 Equipment and Lab design. Dr. SITI PAULIENA MOHD BOHARI

Animal Tissue Culture SQG 3242 Equipment and Lab design. Dr. SITI PAULIENA MOHD BOHARI Animal Tissue Culture SQG 3242 Equipment and Lab design Dr. SITI PAULIENA MOHD BOHARI Sign Symbol? Biohazard sign Means? Hazardous For labeling the biological materials that carry a significant health

More information

B. A. T. Basic Appliance Training

B. A. T. Basic Appliance Training B. A. T. Basic Appliance Training BASIC REFRIGERATION presented by Phil Whitehead Program Objective The objective of this program is to give you some of the basic elements that are essential to understanding

More information

5700-E Sediment Filter Installation & Start-Up Guide

5700-E Sediment Filter Installation & Start-Up Guide Clean Water Made Easy www.cleanwaterstore.com 5700-E Sediment Filter Installation & Start-Up Guide Thank you for purchasing a Clean Water System! With proper installation and a little routine maintenance

More information

IDT-12-N Hydraulic Crimping Tool

IDT-12-N Hydraulic Crimping Tool INSTRUCTION MANUAL IDT-12-N Hydraulic Crimping Tool Read and understand all of the instructions and safety information in this manual before operating or servicing this tool. 99945282 REV 6 2009 Ilsco

More information

High Output Vacuum/Pressure Pump

High Output Vacuum/Pressure Pump High Output Vacuum/Pressure Pump User Guide Catalogue Numbers: WP62 115 60 (115 V, 60 Hz) WP62 220 50 (230 V, 50 Hz, 1.1 A) WP62 100 60 (100 V, 50/60 Hz) Notice The information in this document is subject

More information

SECTION LABORATORY EQUIPMENT CONSTRUCTION STANDARD PART 1: GENERAL Scope of Standard

SECTION LABORATORY EQUIPMENT CONSTRUCTION STANDARD PART 1: GENERAL Scope of Standard PART 1: GENERAL 1.01 Scope of Standard A. This standard provides general guidance concerning the specific preferences of the University of Texas at Austin for safety equipment used in or in support of

More information

General Workplace Safety Checklist

General Workplace Safety Checklist Company or Division Name: Workplace Location: Checklist Prepared by: Date of Preparation: General Safety Is the OSHA Job Safety and Health Protection Poster (if required) displayed in a prominent location

More information

Revitalize Building Mechanical Systems (4619)

Revitalize Building Mechanical Systems (4619) SECTION 235216 FIRE-TUBE CONDENSING BOILERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

TRI-PLATE B INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS PART NO EFFECTIVE MARCH 1, 1983 REPRINT APRIL 16, 1999

TRI-PLATE B INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS PART NO EFFECTIVE MARCH 1, 1983 REPRINT APRIL 16, 1999 TRI-PLATE B INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS PART NO. 8801469 EFFECTIVE MARCH 1, 1983 REPRINT APRIL 16, 1999 THE MILK COOLING SYSTEMS SPECIALISTS TM FRE-HEATER Part No. 8801469 Table

More information

D105M COMPONENT IDENTIFICATION

D105M COMPONENT IDENTIFICATION D105M COMPONENT IDENTIFICATION 1 35 TON HYDRAULIC CYLINDER REMOVABLE PUSHER OIL FILL AND VENT PLUG PNEUMATIC START/STOP SWITCH 110 VOLT HYDRAULIC PUMP ADJUSTABLE RAM RETRACTION STOP MICRO-CRIMP ADJUSTER

More information

FIREFIGHTER 1 COMPETENCY EVALUATION

FIREFIGHTER 1 COMPETENCY EVALUATION JPR Task(s): Operate Portable Fire Extinguishers Skill No. 1-46 "The Candidate, provided a scenario of each fire class (A, B and C) in an incipient stage, shall demonstrate the operation of extinguishers

More information

a. CFCs. b. HCFCs. c. Pressurized nitrogen. d. Compressed dry air. 17. The state of the refrigerant leaving the condenser of a refrigeration system

a. CFCs. b. HCFCs. c. Pressurized nitrogen. d. Compressed dry air. 17. The state of the refrigerant leaving the condenser of a refrigeration system Core 1. Ozone in the stratosphere above the earth consists of: a. Molecules containing 3 oxygen atoms. b. Molecules of 2 oxygen atoms. c. Radioactive particles. d. Pollutants that have risen from ground

More information

DRAFT REGULATORY GUIDE DG-1069 FIRE PROTECTION PROGRAM FOR NUCLEAR POWER PLANTS DURING DECOMMISSIONING AND PERMANENT SHUTDOWN

DRAFT REGULATORY GUIDE DG-1069 FIRE PROTECTION PROGRAM FOR NUCLEAR POWER PLANTS DURING DECOMMISSIONING AND PERMANENT SHUTDOWN 123-0083.htm at ruleforum.llnl.gov Page 1 of 27 This regulatory guide is being issued in draft form to involve the public in the early stages of the development of a regulatory position in this area. It

More information

Air Compressor Electrical Fire

Air Compressor Electrical Fire Purpose To share lessons learned gained from incident investigations through a small group discussion method format. To understand lessons learned through a Systems of Safety viewpoint. This material was

More information

Development of Eco Friendly Air Conditioning System with the Help of Table Fan

Development of Eco Friendly Air Conditioning System with the Help of Table Fan GRD Journals- Global Research and Development Journal for Engineering Volume 1 Issue 7 June 2016 ISSN: 2455-5703 Development of Eco Friendly Air Conditioning System with the Help of Table Fan Md Shakibul

More information

IAEA Workshop Decommissioning Technologies July 2009 Karlsruhe, Germany. Decommissioning of Hot Cells at the Karlsruhe Reprocessing Plant (WAK)

IAEA Workshop Decommissioning Technologies July 2009 Karlsruhe, Germany. Decommissioning of Hot Cells at the Karlsruhe Reprocessing Plant (WAK) IAEA Workshop Decommissioning Technologies 06-10 July 2009 Karlsruhe, Germany Decommissioning of Hot Cells at the Karlsruhe Reprocessing Plant (WAK) Dr. W. Dander Head of Department Dismantling and Decommissioning

More information

Steam Vacuum Cleaning

Steam Vacuum Cleaning DOE/EM-0416 Steam Vacuum Cleaning Deactivation and Decommissioning Focus Area Prepared for U.S. Department of Energy Office of Environmental Management Office of Science and Technology May 1999 Steam Vacuum

More information

MASS. MARITIME ACADEMY

MASS. MARITIME ACADEMY MASS. MARITIME ACADEMY REFRIGERATION LAB OUTLINE Rev.3 Fall 2015 Table of Content Page Lab #1: Introduction to refrigeration system components, tools and procedures 1 Lab #2: Familiarization, operation,

More information

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS INDEECO Circulation Heaters are designed to provide years of trouble free operation if properly installed and maintained. Please read and follow these instructions for installing and maintaining the heater.

More information

DETERMINING THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING

DETERMINING THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING DETERMINING THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING 18/06/2015 Kory Krueger, PTech PLC Fire Safety Solutions OBJECTIVES Types of Facilities Regulatory Requirements Decommissioning

More information

USER INSTRUCTIONS FOR FLANGE IMMERSION HEATERS USED IN HAZARDOUS LOCATIONS

USER INSTRUCTIONS FOR FLANGE IMMERSION HEATERS USED IN HAZARDOUS LOCATIONS USER INSTRUCTIONS FOR FLANGE IMMERSION HEATERS USED IN HAZARDOUS LOCATIONS APPLICATION INDEECO Explosion proof Electric Immersion Heaters for Hazardous Locations are ccsaus Certified for use in areas (external

More information

F&S Control of Hazardous Energy Program

F&S Control of Hazardous Energy Program University of Illinois at Urbana-Champaign Facilities & Services Division of Safety and Compliance F&S Control of Hazardous Energy Program February 2013 Last updated by: j. neighbors Page 1 of 12 Last

More information

New Power Vented Rheem FVIR Tanks

New Power Vented Rheem FVIR Tanks Technical Bulletin B06-08 Sept 26/ 2006 New Power Vented Rheem FVIR Tanks In the coming weeks new power vented FVIR tanks will be arriving in the field from our tank manufactures. We are supplying some

More information

M O D E L G W T OPERATIONS MANUAL TABLE OF CONTENTS

M O D E L G W T OPERATIONS MANUAL TABLE OF CONTENTS M O D E L G W T - 202 OPERATIONS MANUAL TABLE OF CONTENTS INTRODUCTION... 1 SECTION 1 1.0 SAFETY... 1-1 1.1 EMERGENCY... 1-1 1.2 Know your machine... 1-1 1.3 Power Supply... 1-1 1.4 Keep guards in place....

More information

Contractor Environment, Safety & Health (ESH) Briefing. Suite 100 Bldg. 726 Billerica, MA

Contractor Environment, Safety & Health (ESH) Briefing. Suite 100 Bldg. 726 Billerica, MA Contractor Environment, Safety & Health (ESH) Briefing Suite 100 Bldg. 726 Billerica, MA 1 The purpose of the Contractor ESH briefing is for LMSSC to provide information to all contractors (L1 & L2 - non-lm

More information

ATEX Cleaning System. The SpaceVac ATEX system brings our revolutionary high-level cleaning system to specialist explosive atmospheres worldwide.

ATEX Cleaning System. The SpaceVac ATEX system brings our revolutionary high-level cleaning system to specialist explosive atmospheres worldwide. ATEX Cleaning System The SpaceVac ATEX system brings our revolutionary high-level cleaning system to specialist explosive atmospheres worldwide. ATEX areas are prone to explosions due to the build up and

More information

5.07 Air Replenishment Systems

5.07 Air Replenishment Systems 5.07 Air Replenishment Systems Reference: 2010 SFFC, Section 511.2 Definitions: CERTIFIED COMPRESSOR. A compressor used by a contractor for maintenance and testing of air replenishment systems that is

More information

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings 1 T Consultant: NOTES, SYMBOLS & ABBREVIATIONS - MECHANICAL Number Description M001 Vestibule 117 LAN/IT Coffee 115 116 Mail Room 118 114 113 112 Scanning 119 Open Office 101 FIRST FLOOR PLAN - MECHANICAL

More information

Field tests on the lateral capacity of poles embedded in Auckland residual clay

Field tests on the lateral capacity of poles embedded in Auckland residual clay Proc. 18 th NZGS Geotechnical Symposium on Soil-Structure Interaction. Ed. CY Chin, Auckland Field tests on the lateral capacity of poles embedded in Auckland residual clay Peter Rodgers Mercury Bay Civil

More information

EQUIPMENT AND PIPING LABELING. 2.1 DOE , Conduct of Operations Requirements for DOE Facilities

EQUIPMENT AND PIPING LABELING. 2.1 DOE , Conduct of Operations Requirements for DOE Facilities Equipment and Piping Labeling Page 1 of 8 1.0 Objective The objective of this surveillance is to verify that laboratory equipment and piping is labeled in a manner such that laboratory personnel are able

More information

DANIEL C. SESSOMS QAS515 April 1, 2003 PRESS EQUIPMENT TOOL DESIGN FOR HUMAN FACTORS

DANIEL C. SESSOMS QAS515 April 1, 2003 PRESS EQUIPMENT TOOL DESIGN FOR HUMAN FACTORS The purpose of this paper is to determine whether hand tools currently being used in press equipment operations can be improved upon from a Human Factors Engineering perspective. Design improvements would

More information

MODEL PR16 POWER ROTARY

MODEL PR16 POWER ROTARY MODEL PR16 POWER ROTARY OPERATION, PARTS & MAINTENANCE MANUAL 6926 Smithville Hwy. McMinnville, TN 37110 Phone: 931-934-2211 Fax: 931-934-2200 Email info@tennsmith.com www.tennsmith.com Proudly Made in

More information

U.S. Department of Energy Washington, DC

U.S. Department of Energy Washington, DC U.S. Department of Energy Washington, DC MINOR CHANGE DOE O 420.1C Approved: 12-4-2012 Chg 2 (MinChg): 7-26-2018 SUBJECT: MINOR CHANGE TO DOE O 420.1C, FACILITY SAFETY 1. EXPLANATION OF CHANGES. This Order

More information

D165-D160 SERIES HYDRAULIC HOSE CRIMPER OPERATORS MANUAL

D165-D160 SERIES HYDRAULIC HOSE CRIMPER OPERATORS MANUAL Page D65-D60 SERIES HYDRAULIC HOSE CRIMPER OPERATORS MANUAL SAFETY PRECAUTIONS Page MODELS COVERED This manual is applicable to different variations of the D60 Series and D65 Series Crimpers. A Standard,

More information

Heat Exchanger Block Replacement Instructions

Heat Exchanger Block Replacement Instructions Series 1-4 Gas-fired water boiler Heat Exchanger Block Replacement Instructions Ultra-80 S1-4 Heat Exchanger Block Replacement Kit, Part No. 383-500-773 Ultra-105 S1-4 Heat Exchanger Block Replacement

More information

Wood Technology 2003 Paper N O. CO 2 Pellet Blasting in the Wood Industry

Wood Technology 2003 Paper N O. CO 2 Pellet Blasting in the Wood Industry Wood Technology 2003 Paper N O CO 2 Pellet Blasting in the Wood Industry By Jerry Ruschau VP North American Sales Manager COLD JET, INC. 455 Wards Corner Road Loveland, Ohio USA 45039 1 CO2 Pellet Blast

More information

NHR-2-25 NHR-2-50 NHR-2-80 NHR-8-80 Powder Capacity: 11 kg (25 lb) 23 kg (50 lb) 36 kg (80 lb) 36 kg (80 lb) *Pump Knockouts: *Pump Adapters

NHR-2-25 NHR-2-50 NHR-2-80 NHR-8-80 Powder Capacity: 11 kg (25 lb) 23 kg (50 lb) 36 kg (80 lb) 36 kg (80 lb) *Pump Knockouts: *Pump Adapters Instruction Sheet P/N 069-0 WARNING: Allow only qualified personnel to perform the following tasks. Follow the safety instructions in this document and all other related documentation. WARNING: Wear an

More information

Operating Manual. Model: Float-Controlled Condensate Trap, PN Safety instructions. 2 General description and usage

Operating Manual. Model: Float-Controlled Condensate Trap, PN Safety instructions. 2 General description and usage Model: 1090 1 Safety instructions Float-Controlled Condensate Trap, PN 16 1.1 Proper use Any improper use, intervention in the design and deviation from the design data automatically lead to termination

More information

OPERATING INSTRUCTIONS

OPERATING INSTRUCTIONS OPERATING INSTRUCTIONS 2005G2 Vacuum Hand Pump July 2008 (Figure 1) Vacuum Hand Pump with Accessories The 2005G2 Vacuum Hand Pump is a convenient and easily operated vacuum device0. It is designed for

More information

ERGOMAX 7 INSTALLATION

ERGOMAX 7 INSTALLATION ERGOMAX 7 INSTALLATION INSTALLATION MUST CONFORM TO LOCAL CODES 1. WITH HYDRONIC BOILERS All ERGOMAX 7 units must be installed vertically. Adjustable feet for levelling are provided. PRESSURE RELIEF VALVE:

More information

Metalworking Vacuum Cleaners One Type Does Not Fit All As the metalworking industry becomes more specialized so does the equipment that cleans it.

Metalworking Vacuum Cleaners One Type Does Not Fit All As the metalworking industry becomes more specialized so does the equipment that cleans it. Metalworking Vacuum Cleaners One Type Does Not Fit All As the metalworking industry becomes more specialized so does the equipment that cleans it. As diverse as the metalworking industry is, it should

More information

451 Black Forest Road Hull, IA Ph: (712) Fax: (712) TS g/hr Turnkey Ozone Generation System

451 Black Forest Road Hull, IA Ph: (712) Fax: (712) TS g/hr Turnkey Ozone Generation System 451 Black Forest Road Hull, IA 51239 Ph: (712) 439-6880 Fax: (712) 439-6733 TS-40 40 g/hr Turnkey Ozone Generation System Installation and Operation Manual TS-40 Manual Cautions, Warnings and Hazards

More information