Flexible Gas Piping - Evolving Technology & Industry

Size: px
Start display at page:

Download "Flexible Gas Piping - Evolving Technology & Industry"

Transcription

1 Flexible Gas Piping - Evolving Technology & Industry NARUC Annual Meeting Austin, Texas November 8, 2015

2 Flexible Gas Piping Corrugated Stainless Steel Tubing (CSST) Flexible Continuous lengths Jacketed Yellow CSST - insulative Black CSSTs arc protective designs Fittings Field attachable Transition to NPT

3 ANSI Performance Standard - Fuel Gas Piping Systems Using CSST 1983 GRI Residential Gas Piping Program Innovative piping systems Gas competiveness Japanese technology AGA 1-87 Requirements for CSST ANSI LC Harmonized w/ CSA in 1997 ANSI LC 1 /CSA

4 CSST Benefits ~ 75% fewer joints than rigid Productivity Seismic/settling Gas competiveness w/ electric Increased gas utilization

5 Industry Lightning Experience 2003 Frisco, TX 2006 Class action enhanced warnings 2009 NFPA 54 direct bond 2013 GTI report, Bonding Effectiveness 2015 NFPA Public Inputs

6 Industry Safeguards Yellow CSST Installation Safeguards Direct-bond Separation Chase Exclusion Protective Jacketed CSST ICC-ES PMG listing criteria LC1024 (2010) LC1027 (2011)

7 Lightning Test for Protective Jacketed CSST Accredited lightning testing laboratory Lightning generator delivers defined charge to sample Test Charge & Waveform Lightning Generator Electrode CSST Test Sample Ground

8 Lightning Tests and Listings Utilized by the CSST Industry ICC-ES PMG Listing Criteria Parameter LC1024 LC1027 Test Charge (Coulombs) 4.5 C 36 C Min. Peak Current (Amps) 1,000 A 30,000 A Test Charge Basis Assumption of 2 coulomb maximum transient arcing energy w/in building 50 th percentile of negative lightning flashes ground * * Informed from SAE ARP5412B Aerospace Recommended Practice, Aircraft Lightning Environment and Related Test Waveforms

9 Lightning

10 Occurrence Lightning Strikes Magnitude and Frequency Negative Flash to Ground Parameter: Cumulative Charge Transfer 50 th Percentile 50% 50% Cumulative Charge Transfer (Coulombs) Informed from SEA ARP5412B Aerospace Recommended Practice, Aircraft Lightning Environment and Related Test Waveforms Distribution model

11 Industry Tests for Protective Jacketed CSST Sec Indirect Effects 2, Represent 50 th percentile of negative lightning flashes measured at ground LC1027-Lubbock FGS - Lubbock, TX, Fuel Gas Subcommittee and city staff, minimum CSST arc resistance requirement, 8/26/15. 1

12 LC1024-listed CSST Single Layer Conductive Jacketed CSST Semi-conductive polymer layer Spread and dissipate energy 4.5 Coulomb test Black jacket

13 LC1027-listed CSST Metallically Shielded CSST Multi-layer Metallic shield between polymer layers Shield-to-fitting electrical continuity Spread and dissipate energy 36 Coulomb test Black Jacket

14 Industry Reports and Articles Whitepaper (Titeflex) Comparison of Listing Criteria for Protective-Jacketed CSST APGA Source Emerging CSST Products Feature article, July 2015

15 Recent National Press Lawyers, Lightning and Building Codes Public safety Role of litigation in product development Buddy Holly s Hometown Unlikely Pioneer with Lightning and CSST Lubbock, TX, minimum requirement for LC1027-rated CSST

16 ANSI LC 1 CSST Performance Standard Fuel Gas Piping System Using CSST Yellow CSST performance requirements Since 1991 Sec Arc resistant jacket (optional) Since Coulomb (C) electrical arcing test Extreme temperature Resistance to corrosion Resistance to installation damage

17 ANSI LC 1 CSST Performance Standard Recent proposals to ANSI LC 1 performance standard Increase 4.5 C electrical arcing test to 36 C Test in direct contact Add low voltage withstand Proposals have moved to working groups CSA process and maintenance Working groups open to outside experts

18 Public Inputs to NFPA Public CSST Comments 16 Restrictive LC1027 minimum, protective jacket Direct-bonding limits 50-ft max. bond wire length Clamp location 6 separation req t Metal studs exclusion Provide ground fault current path Single layer conductive jacketed Yellow jacket

19 NFPA Can the NFPA 54 Technical Committee rely on higher CSST performance levels into the ANSI LC 1? Gas Associations support for improvements? ANSI LC 1 Test Area Electrical Arcing Withstand Electrode to Test Sample Low Voltage Withstand 2014 LC 1 Working Group 4.5 C 36 C 1/8 air gap Contact with sample No Test Add test for residential current fault

20 A CSST Future More robust performance standard Lightning resistance Low voltage withstand Metallically Shielded or equivalent performing CSST Installation productivity Joint reduction Seismic performance Greater reliability

21 Thank you

FLEXIBLE GAS PIPING CSST: INSIDE AND OUT

FLEXIBLE GAS PIPING CSST: INSIDE AND OUT FLEXIBLE GAS PIPING CSST: INSIDE AND OUT CSST: A CATEGORY IS BORN From Black Iron Pipe to CSST In 1989, Corrugated Stainless Steel Tubing (CSST) is introduced as a safer, smarter alternative to iron piping

More information

Flexible Gas Piping by OmegaFlex

Flexible Gas Piping by OmegaFlex Flexible Gas Piping by OmegaFlex All of the safety, ease and performance you ve come to expect from OmegaFlex s flexible gas piping only better. Proven Performance TracPipe Counterstrike has millions of

More information

Yellow Corrugated Stainless Steel Tubing (CSST) Questions and Considerations

Yellow Corrugated Stainless Steel Tubing (CSST) Questions and Considerations Yellow Corrugated Stainless Steel Tubing (CSST) Questions and Considerations 1) What is the concern with yellow CSST? Corrugated Stainless Steel Tubing (CSST) is a flexible gas line material introduced

More information

Electrical Protection of CSST Gas Piping Systems. Bob Torbin, PE Omega Flex, Inc.

Electrical Protection of CSST Gas Piping Systems. Bob Torbin, PE Omega Flex, Inc. Electrical Protection of CSST Gas Piping Systems Bob Torbin, PE Omega Flex, Inc. Standard Yellow Arc-Resistant Black CSST Product Standard National Standard ANSI LC-1 Performance-based standard Listed

More information

Bonding Requirements For Gas Piping Systems

Bonding Requirements For Gas Piping Systems Bonding Requirements For Gas Piping Systems Bob Torbin February 2008 Summary of Presentation Why do we bond and ground systems? What are the requirements in the codes? What are the CSST bonding requirements?

More information

CSST Installation Requirements in the Fuel Gas Codes

CSST Installation Requirements in the Fuel Gas Codes CSST Installation Requirements in the Fuel Gas Codes Paul Cabot American Gas Association Course Description Correct gas pipe sizing, installation, and appliance connections are vital steps that help ensure

More information

IFGC-2012 AMENDED IFGC-2015 IFGC-2018 CHAPTER 1 SCOPE AND

IFGC-2012 AMENDED IFGC-2015 IFGC-2018 CHAPTER 1 SCOPE AND CHAPTER 1 SCOPE AND CHAPTER 1 SCOPE AND ADMINISTRATION ADMINISTRATION 301.1.2 LP-Gas installations. Whenever there is a conflict between this code and NFPA 54 and B+NFOA 58 as adopted by the Nevada LP-Gas

More information

2015 National Fuel Gas Code Summary List of Revisions Updated: 04/24/14

2015 National Fuel Gas Code Summary List of Revisions Updated: 04/24/14 The following list contains a summary of the significant revisions in the 2015 National Fuel Gas Code approved by the National Fuel Gas Code Committee, ANSI ASC Z223 and NFPA 54. PIPING Various Brass REVISED

More information

2018 National Fuel Gas Code Summary List of Revisions Updated: 7/27/17

2018 National Fuel Gas Code Summary List of Revisions Updated: 7/27/17 The following list contains a summary of the significant revisions in the 2015 National Fuel Gas Code approved by the National Fuel Gas Code Committee, ANSI ASC Z223 and NFPA 54. 1.1.1.1 (B), (C), & (D)

More information

FACT SHEET 2018 National Fuel Gas Code Summary List of Revisions rev

FACT SHEET 2018 National Fuel Gas Code Summary List of Revisions rev This fact sheet provides an overview of the significant revisions in the 2015 National Fuel Gas Code approved by the National Fuel Gas Code Committee, ANSI ASC Z223 and NFPA 54. These revisions are published

More information

DESIGN AND INSTALLATION GUIDE. Commercial I Industrial I Residential. SEPTEMBER 2017

DESIGN AND INSTALLATION GUIDE. Commercial I Industrial I Residential. SEPTEMBER 2017 DESIGN AND INSTALLATION GUIDE Commercial I Industrial I Residential SEPTEMBER 2017 www.gastite.com SECTION 1: INTRODUCTION / SEPTEMBER 2017 Important Lightning Safety Warning LIGHTNING SAFETY WARNING 1

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 ARTESYN PRODUCT TESTING SERVICES 2900 South Diablo Way, Suite 190 Tempe, AZ 85282 Tom Tuttle Phone: 602 228 7869 Email: tom.tuttle@artesyn.com ELECTRICAL (EMC)

More information

Design and Installation Guide

Design and Installation Guide c o m m e r c i a l i n d u s t r i a l r e s i d e n t i a l Design and Installation Guide www.gastite.com Important Lightning Safety Warning LIGHTNING SAFETY WARNING 1 PROPERLY BONDING and grounding

More information

Electrical Grounding For Oil and Gas Applications

Electrical Grounding For Oil and Gas Applications Electrical Grounding For Oil and Gas Applications Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq The Oil &

More information

FIRE AND MATERIALS 2005

FIRE AND MATERIALS 2005 DELEGATE HANDBOOK All Photographs Courtesy of San Francisco Convention & Visitors Bureau FIRE AND MATERIALS 2005 31st January - 1st February 2005 Fisherman's Wharf, San Francisco USA Organised by www.intercomm.dial.pipex.com

More information

Errata ANSI Z223.1 National Fuel Gas Code 2015 Edition

Errata ANSI Z223.1 National Fuel Gas Code 2015 Edition Errata ANSI Z223.1 National Fuel Gas Code 2015 Edition Reference: Various Errata Z223.1-2015-1 Issue Date: 3/10/16 National Fuel Gas Code user: The American Gas Association (AGA) notes the following errors

More information

NFPA 54 UPDATE. Paul Cabot American Gas Association

NFPA 54 UPDATE. Paul Cabot American Gas Association NFPA 54 UPDATE Paul Cabot American Gas Association PRESENTATION TOPICS Summary Listing Schedule Revisions Definitions/General Piping Appliances and Appliance Installation Venting 2015 Edition Revision

More information

CSST Flexible Gas Pipe. System Design and Installation Manual

CSST Flexible Gas Pipe. System Design and Installation Manual CSST Flexible Gas Pipe System Design and Installation Manual Suggested Tools for Installation of HOME-FLEX Use to cut HOME-FLEX tubing to desired length. Tubing Cutter Use to remove yellow protective jacket

More information

ASC Z223 SECOND PUBLIC REVIEW DRAFT

ASC Z223 SECOND PUBLIC REVIEW DRAFT Copyright 2016 by American Gas Association and the National Fire Protection Association, All Rights Reserved BSR Z223.1 20xx NFPA 54 20xx National Fuel Gas Code 2018 Edition ASC Z223 SECOND PUBLIC REVIEW

More information

Analysis of Changes for the 5 th Edition (2014) of the Florida Codes

Analysis of Changes for the 5 th Edition (2014) of the Florida Codes Analysis of Changes for the 5 th Edition (2014) of the Florida Codes Changes to the Florida Building Code, Fuel-Gas This Analysis of Changes for the 5 th Edition (2014) of the Florida Codes is intended

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on National Fuel

More information

Bowthorpe EMP surge arrester Distribution metal oxide surge arrester DA0 Series, (IEC)

Bowthorpe EMP surge arrester Distribution metal oxide surge arrester DA0 Series, (IEC) Energy Division Bowthorpe EMP surge arrester Distribution metal oxide surge arrester DA0 Series, (IEC) Bowthorpe EMP distribution metal oxide surge arrester DA0 series Tyco Electronics Bowthorpe EMP business

More information

ENERGY PRODUCTS DIVISION. Polymeric Surge Arresters Reliable protection for power equipment upto 800kV

ENERGY PRODUCTS DIVISION. Polymeric Surge Arresters Reliable protection for power equipment upto 800kV ENERGY PRODUCTS DIVISION LV MV HV Polymeric Reliable protection for power equipment upto 800kV Raychem Polymeric Surge Arrester Safety and reliability are vital in energy industry and Raychem RPG's Energy

More information

CSST Flexible Gas Pipe. System Design and Installation Manual

CSST Flexible Gas Pipe. System Design and Installation Manual CSST Flexible Gas Pipe System Design and Installation Manual Suggested Tools for Installation of HOME-FLEX Tubing Cutter Use to cut HOME-FLEX tubing to desired length. Note: Turn knob slowly while rotating

More information

INSTALLATION INSTRUCTIONS AH12 WALL MOUNT HOOD

INSTALLATION INSTRUCTIONS AH12 WALL MOUNT HOOD Read and Save These Instructions All Hoods Must Be Installed By A Qualified Installer INSTALLATION INSTRUCTIONS AH12 WALL MOUNT HOOD Read All Instructions Thoroughly Before Beginning Installation WARNING

More information

DESIGN AND INSTALLATION GUIDE

DESIGN AND INSTALLATION GUIDE FLASHSHIELD FLEXIBLE GAS PIPING DESIGN AND INSTALLATION GUIDE Commercial I Industrial I Residential OCTOBER 2017 www.gastite.com FLASHSHIELD INSTALLER INFORMATION & UPDATES 1) When using the XR3 fitting,

More information

Educational Course Application

Educational Course Application garyklinka@hotmail.com Page 1 of 19 STATE OF WISCONSIN Department of Safety and Professional Services Educational Course Application Personal information you provide may be used for secondary purposes

More information

PART GENERAL 1.01 SECTION INCLUDES

PART GENERAL 1.01 SECTION INCLUDES Specification Number: 26 24 16.06 Product Name: Emergency Lighting Control NQ Circuit Panelboards: 240 Vac, 48 Vdc Maximum SECTION 26 24 16.06 Emergency Lighting Control NQ Circuit Panelboards: 240 Vac,

More information

Re: Energy Conservation Standards for Residential Boilers; Proposed Rule Docket Number EERE-2012-BT-STD-0047

Re: Energy Conservation Standards for Residential Boilers; Proposed Rule Docket Number EERE-2012-BT-STD-0047 September 29, 2015 Ms. Brenda Edwards U.S. Department of Energy Building Technologies Program, Mailstop EE-5B 1000 Independence Avenue SW Washington, DC 20585-0121 Re: Energy Conservation Standards for

More information

199,000 to 4,000,000 Btu/h 150 to 4500 Gallons Storage

199,000 to 4,000,000 Btu/h 150 to 4500 Gallons Storage R ISO 9001 COMMERCIAL DOMESTIC HOT WATER GENERATOR Gas, Oil or Combination Gas/Oil 199,000 to 4,000,000 Btu/h 150 to 4500 Gallons Storage NOW AVAILABLE WITH... NO TANK LINING REQUIRED NO ANODES REQUIRED

More information

2012 NC Building Code Chapter 2, 602.4, , , Chapter 35 Cross-Laminated Timber. ( Item B-1)

2012 NC Building Code Chapter 2, 602.4, , , Chapter 35 Cross-Laminated Timber. ( Item B-1) 2012 NC Building Code Chapter 2, 602.4, 2302.1, 2303.1.4, Chapter 35 Cross-Laminated Timber. (141209 Item B-1) (Add a definition in Chapter 2) [BS] CROSS-LAMINATED TIMBER. A prefabricated engineered wood

More information

THE HARD WATER WATER HEATER

THE HARD WATER WATER HEATER R ISO 9001 ATMOSPHERIC GAS STORAGE WATER HEATER 140,000 to 1,400,000 Btu/h 125 and 250 Gallon Tank Series 80% THERMAL EFFICIENCY NOW AVAILABLE WITH... ENGINEERED DUPLEX ALLOY FIRE TUBES AND OPTIONAL STORAGE

More information

Handling Petroleum Products & Static Ignition Hazards Introduction

Handling Petroleum Products & Static Ignition Hazards Introduction Handling Petroleum Products & Static Ignition Hazards Introduction Static electricity in one form or another is a phenomenon of nature and often results in electrostatic discharges that can cause fires

More information

2015 IRC Significant Changes For Mechanical and Fuel Gas with LSUCCC Amendments

2015 IRC Significant Changes For Mechanical and Fuel Gas with LSUCCC Amendments 2015 IRC Significant Changes For Mechanical and Fuel Gas with LSUCCC Amendments Based on the International Residential Code (IRC ) GR PPN 1208 Course Approval # 12085 Description This seminar reviews and

More information

Comparison of IEEE 323 and IEC Shows Notable Consistency (cont)

Comparison of IEEE 323 and IEC Shows Notable Consistency (cont) International Electrotechnical Commission (IEC) 60780 Nuclear power plants Electrical equipment of the safety system Qualification Richard T. Wood Oak Ridge National Laboratory presented at IEEE Subcommittee

More information

ASABE and International Standardization: A Decade of Harmonization and Collaboration

ASABE and International Standardization: A Decade of Harmonization and Collaboration ASABE and International Standardization: A Decade of Harmonization and Collaboration 24th Annual Meeting of the Club of Bologna International standards: opportunity or problem November 9-11, 2013 Hannover,

More information

Design and Installation Guide

Design and Installation Guide C O M M E R C I A L I N D U S T R I A L R E S I D E N T I A L Design and Installation Guide www.gastite.com www.gastite.com 2010, GENERAL 11/21/08 Important Gastite Lightning Safety Warning Table of Contents

More information

Curriculum Vitae - Gregory W. Miller, P.E. June Miller Engineering Services 2205 Barnett Dr. Cedar Park, TX 78613

Curriculum Vitae - Gregory W. Miller, P.E. June Miller Engineering Services 2205 Barnett Dr. Cedar Park, TX 78613 Curriculum Vitae - Gregory W. Miller, P.E. June 2014 2205 Barnett Dr. Cedar Park, TX 78613 E-Mail: gmiller@forensicpe.com Phone: 512-986-5396 Cell: 512-401-6377 Overview and Forensic Specializations Construction

More information

Commercial Industrial Residential DESIGN & INSTALLATION GUIDE. November 2008

Commercial Industrial Residential DESIGN & INSTALLATION GUIDE. November 2008 Commercial Industrial Residential DESIGN & INSTALLATION GUIDE www.gastite.com Important Lightning Safety Warning LIGHTNING SAFETY WARNING 1 PROPERLY BONDING and grounding the Corrugated Stainless Steel

More information

WATLOW IND. WATROD Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2.00

WATLOW IND. WATROD Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2.00 I&M NUMBER: 316-42-8-1 Page: 1 _ Pre Installation Check to make sure that heater received is the same as that ordered. Elements may come in contact with each other during shipment. Minor adjustments to

More information

Mechanical Appliance and Equipment Inspection Checklist

Mechanical Appliance and Equipment Inspection Checklist 34 2015 IRC Performing Residential Mechanical s Mechanical Appliance and Equipment Checklist Inspect Mechanical Appliance and Equipment Comments / I. Identify possible mechanical appliance and equipment

More information

The following preprint is based on the First Revision Draft of the 2018 edition of NFPA 54/Z223.1.

The following preprint is based on the First Revision Draft of the 2018 edition of NFPA 54/Z223.1. Copyright 2016 by American Gas Association and the National Fire Protection Association, All Rights Reserved BSR Z223.1 20xx NFPA 54 20xx National Fuel Gas Code 2018 Edition NOTE: This preprint of the

More information

1.03 DELIVERY, STORAGE, AND HANDLING Heater will be stored to secure against damage and handled per manufacturer s recommendations.

1.03 DELIVERY, STORAGE, AND HANDLING Heater will be stored to secure against damage and handled per manufacturer s recommendations. HVAC Guideline Specifications supraschwank Packaged Luminous Infrared Radiant Gas Heater Combined Intensity (produces both Low and High Intensity radiant output) Commercial/Industrial Applications Size

More information

DESIGN AND INSTALLATION GUIDE

DESIGN AND INSTALLATION GUIDE Metallically-Shielded CSST DESIGN AND INSTALLATION GUIDE Commercial I Industrial I Residential www.gastite.com FlashShield Installer Information and Updates 1) When using the XR3 fitting, proper removal

More information

REPORT* OF THE MOTIONS COMMITTEE 2017 NFPA TECHNICAL MEETING JUNE 7, 2017 BOSTON, MA

REPORT* OF THE MOTIONS COMMITTEE 2017 NFPA TECHNICAL MEETING JUNE 7, 2017 BOSTON, MA REPORT* OF THE MOTIONS COMMITTEE 2017 NFPA TECHNICAL MEETING JUNE 7, 2017 BOSTON, MA I. Introduction This is the Report* of the s Committee listing Certified Amending s that may be presented at the 2017

More information

CSI Master Format 2004 Guide Specification for: Freezer Frost Heave Prevention (Mineral Insulated)

CSI Master Format 2004 Guide Specification for: Freezer Frost Heave Prevention (Mineral Insulated) CSI Master Format 2004 Guide Specification for: Freezer Frost Heave Prevention (Mineral Insulated) System for preventing frost heave in freezers, cold rooms and ice arenas with temperature control, monitoring,

More information

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART # INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #238-39387-00 THIS INSTRUCTION SUPPLEMENT IS ONLY INTENDED TO GIVE INSTALLATION INSTRUCTIONS AND INFORMATION RELATED TO THE INDUCED

More information

nimbus new ESE LIGHTNING ROD NF C :2011 standard Designed and tested in full accordance with the new

nimbus new ESE LIGHTNING ROD NF C :2011 standard Designed and tested in full accordance with the new L1 ESE LIGHTNING ROD new Designed and tested in full accordance with the new NF C 17-102:2011 standard NF C 17-102:2011 200 ka Bureau Veritas certifies that the Nimbus range lightning rods have been subjected

More information

! The Caution Symbol (exclamation point) alerts you to a "CAUTION", a safety or

! The Caution Symbol (exclamation point) alerts you to a CAUTION, a safety or I&M NUMBER: 316-42-10-1 Page: 1 Pre Installation Check to make sure that heater received is the same as that ordered. Elements may come in contact with each other during shipment. Minor adjustments to

More information

Bowthorpe MV Surge Arresters OCP, Open Cage Polymeric series. Energy Division

Bowthorpe MV Surge Arresters OCP, Open Cage Polymeric series. Energy Division Bowthorpe MV Surge Arresters OCP, Open Cage Polymeric series Energy Division http://energy.tycoelectronics.com Bowthorpe Surge Arresters OCP, Open Cage Polymeric series Bowthorpe pioneered the development

More information

DESIGN INSTALLATION GUIDE COMMERCIAL INDUSTRIAL RESIDENTIAL. NOVEMBER

DESIGN INSTALLATION GUIDE COMMERCIAL INDUSTRIAL RESIDENTIAL. NOVEMBER abcde DESIGN & INSTALLATION GUIDE COMMERCIAL INDUSTRIAL RESIDENTIAL NOVEMBER 2006 www.gastite.com ii Table of Contents SECTION 1.0 INTRODUCTION 1.1 General User Warnings...1 1.2 Limitations of the Guidelines...3

More information

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

INSTALLATION, OPERATION AND MAINTENANCE MANUAL GE Digital Energy Power Quality INSTALLATION, OPERATION AND MAINTENANCE MANUAL GE TRANQUELL Enhanced Thermal Protection (ETP) Series Integrally Mounted Medium and High Exposure Surge Protective Devices

More information

EVALUATION RISK ACCORDING UNE :2 / UNE 21186:2011 / NFC :2011 SELECTION OF PROTECTIVE MEASURES AGAINST LIGHTNING

EVALUATION RISK ACCORDING UNE :2 / UNE 21186:2011 / NFC :2011 SELECTION OF PROTECTIVE MEASURES AGAINST LIGHTNING EVALUATION RISK ACCORDING UNE 62.305:2 / UNE 21186:2011 / NFC 17-102:2011 SELECTION OF PROTECTIVE MEASURES AGAINST LIGHTNING Project: Instatie de protectie impotriva trasnetului Scoala Gimnaziala Gogosu

More information

2012 ICC Code Development Hearings 2012 Code Development Cycle:

2012 ICC Code Development Hearings 2012 Code Development Cycle: 2012 ICC Code Development Hearings 2012 Code Development Cycle: The 2012 International Code Council (ICC), Code Development Hearings were held from April 29 thru May 8, 2012. The deadline for public comment

More information

At its meeting of August 7-9, 2012, the Standards Council considered the above referenced matter.

At its meeting of August 7-9, 2012, the Standards Council considered the above referenced matter. SC #12-8-56 D#12-15 Amy Beasley Cronin Secretary, Standards Council 30 August 2012 To: Interested Parties Subject: Standards Council Decision (Final): D#12-15 Standards Council Agenda Item: SC#12-8-56

More information

Pellet Vent INSTALLATION INSTRUCTIONS

Pellet Vent INSTALLATION INSTRUCTIONS Pellet Vent INSTALLATION INSTRUCTIONS A MAJOR CAUSE OF CHIMNEY RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCES (AIR SPACES) TO COMBUSTIBLE MATERIALS. IT IS OF THE UTMOST IMPORTANCE THAT THIS PELLET

More information

TURBOPOWER. Non-Condensing Gas, Oil or Combination Gas/Oil Storage Water Heater. 199 to 4000 MBH 150 to 4500 Gallons Tanks 25-year Warranty. PVI.

TURBOPOWER. Non-Condensing Gas, Oil or Combination Gas/Oil Storage Water Heater. 199 to 4000 MBH 150 to 4500 Gallons Tanks 25-year Warranty. PVI. TURBOPOWER Non-Condensing Gas, Oil or Combination Gas/Oil Storage Water Heater E N GI N E E R E D D U P L E X A L L O Y 199 to 4000 MBH 150 to 4500 Gallons Tanks 25-year Warranty PVI.com Ultra Reliable,

More information

Status Report of the SPE Oil and Gas Reserves Committee Where Is Our Focus?

Status Report of the SPE Oil and Gas Reserves Committee Where Is Our Focus? Status Report of the SPE Oil and Gas Reserves Committee Where Is Our Focus? John Ritter Chair Society of Petroleum Engineers (SPE), Oil and Gas Reserves Committee (OGRC) Ad Hoc Group of Experts on the

More information

NATURAL GAS PIPING

NATURAL GAS PIPING SECTION 15496 - NATURAL GAS PIPING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

GAS FIRED BOILERS FOR FORCED HOT WATER VENTING ADDENDUM. ECR International Ltd. - Olsen Division P.O. Box 900 Wallaceburg, Ont.

GAS FIRED BOILERS FOR FORCED HOT WATER VENTING ADDENDUM. ECR International Ltd. - Olsen Division P.O. Box 900 Wallaceburg, Ont. ODV-B GAS FIRED BOILERS FOR FORCED HOT WATER VENTING ADDENDUM ECR International Ltd. - Olsen Division P.O. Box 900 Wallaceburg, Ont. N8A5E5 TABLE OF CONTENTS HORIZONTAL PIPING... PAGES 1-10 WARNINGS...

More information

INSTALLATION INSTRUCTIONS WALL MOUNT LINER INSERT

INSTALLATION INSTRUCTIONS WALL MOUNT LINER INSERT Read and Save These Instructions All Hoods Must Be Installed By A Qualified Installer INSTALLATION INSTRUCTIONS WALL MOUNT LINER INSERT Read All Instructions Thoroughly Before Beginning Installation WARNING

More information

INSTALLATION INSTRUCTIONS WALL MOUNT LINER INSERT

INSTALLATION INSTRUCTIONS WALL MOUNT LINER INSERT Read and Save These Instructions All Hoods Must Be Installed By A Qualified Installer INSTALLATION INSTRUCTIONS WALL MOUNT LINER INSERT Read All Instructions Thoroughly Before Beginning Installation WARNING

More information

INSTALLATION INSTRUCTIONS WALL MOUNT LINER INSERT

INSTALLATION INSTRUCTIONS WALL MOUNT LINER INSERT Read and Save These Instructions All Hoods Must Be Installed By A Qualified Installer INSTALLATION INSTRUCTIONS WALL MOUNT LINER INSERT Read All Instructions Thoroughly Before Beginning Installation WARNING

More information

INSTALLATION INSTRUCTIONS WALL MOUNT LINER INSERT

INSTALLATION INSTRUCTIONS WALL MOUNT LINER INSERT Read and Save These Instructions All Hoods Must Be Installed By A Qualified Installer INSTALLATION INSTRUCTIONS WALL MOUNT LINER INSERT Read All Instructions Thoroughly Before Beginning Installation WARNING

More information

2012 Virginia Residential Fuel Gas Code & 2012 International Fuel Gas Code Update Training

2012 Virginia Residential Fuel Gas Code & 2012 International Fuel Gas Code Update Training 2012 Virginia Residential Fuel Gas Code & 2012 International Fuel Gas Code Update Training ----------------------------- Henrico County Department of Building Construction and Inspections Before we begin

More information

2012 Virginia Residential Fuel Gas Code & 2012 International Fuel Gas Code Update Training

2012 Virginia Residential Fuel Gas Code & 2012 International Fuel Gas Code Update Training 2012 Virginia Residential Fuel Gas Code & 2012 International Fuel Gas Code Update Training ----------------------------- Henrico County Department of Building Construction and Inspections Before we begin

More information

WATLOW IND. FIREBAR Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00

WATLOW IND. FIREBAR Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00 I&M NUMBER: 316-42-2-1 Page: 1 Pre Installation Check to make sure that heater received is the same as that ordered. Elements may come in contact with each other during shipment. Minor adjustments to elements

More information

SECTION CENTRAL BATTERY INVERTERS. A. This Section includes fast-transfer central battery inverters with the following features:

SECTION CENTRAL BATTERY INVERTERS. A. This Section includes fast-transfer central battery inverters with the following features: PART 1 - GENERAL 1.1 SUMMARY A. This Section includes fast-transfer central battery inverters with the following features: 1. Emergency-only circuits. 1.2 DEFINITIONS A. LCD: Liquid-crystal display. B.

More information

CodeNotes. Solar Water Heating Systems Based on the 2018 International Solar Energy Provisions (ISEP ) Introduction OFFICIAL

CodeNotes. Solar Water Heating Systems Based on the 2018 International Solar Energy Provisions (ISEP ) Introduction OFFICIAL CodeNotes is provided courtesy of the ICC PMG Official Membership Council OFFICIAL CodeNotes Solar Water Heating Systems Based on the 2018 International Solar Energy Provisions (ISEP ) Introduction Solar

More information

940ES Tankless Water Heater

940ES Tankless Water Heater Engineering Submittal Sheet Dimensions and Connections B C D C Combustion air inlet Exhaust outlet Optional combustion air inlet Top view Top view A Hot water outlet Cold water inlet E F Front view Side

More information

GPS 140 NEC Requirements for Generators. Professional Development Seminar Series NEC Requirements for Generators

GPS 140 NEC Requirements for Generators. Professional Development Seminar Series NEC Requirements for Generators GPS 140 NEC Requirements for Generators WHAT YOU WILL LEARN NEC requirements for on-site power generation. Recent events have created increased interest in standby power This module organizes NEC requirements

More information

Module number 8 provides an on-line, self-paced training seminar on portions of Chapter 14-Fuel Gas, Chapter 25-Ohio Plumbing Code; Chapter 29-Fire

Module number 8 provides an on-line, self-paced training seminar on portions of Chapter 14-Fuel Gas, Chapter 25-Ohio Plumbing Code; Chapter 29-Fire Module number 8 provides an on-line, self-paced training seminar on portions of Chapter 14-Fuel Gas, Chapter 25-Ohio Plumbing Code; Chapter 29-Fire Suppression Systems; and Chapter 34-National Electric

More information

Energy Division. Bowthorpe MV Surge Arresters OCP, Open Cage Polymeric series

Energy Division. Bowthorpe MV Surge Arresters OCP, Open Cage Polymeric series Energy Division Bowthorpe MV Surge Arresters OCP, Open Cage Polymeric series At the core of the Bowthorpe OCP design is our improved ZnO varistor disk, which has superior thermal and electrical characteristics

More information

XRRS Specification Fire Ready Hood

XRRS Specification Fire Ready Hood XRRS Specification Fire Ready Hood ************************************************************************************************************************ Note to User: This document is subject to copyright

More information

for combining TwO gas furnaces for PARAllel OPeRATIONs using The Rccl-cOIl (heating ANd AIR conditioning)

for combining TwO gas furnaces for PARAllel OPeRATIONs using The Rccl-cOIl (heating ANd AIR conditioning) INsTAllATION INsTRucTIONs for combining TwO gas furnaces for PARAllel OPeRATIONs using The Rccl-cOIl (heating ANd AIR conditioning) TO BE INSTALLED BY A QUALIFIED, LICENSED SERVICE PERSON. TO AVOID UNSATISFACTORY

More information

BDM Direct Vent systems are for use with direct vent gas fired appliances.

BDM Direct Vent systems are for use with direct vent gas fired appliances. INSTALLATION INSTRUCTIONS Pro-Form DIRECT VENT SYSTEM Tested to ANSI Z21.88-2009 /CSA 2.33-2009 REPORT # 369-P-02b-6.5 Read through all venting and appliance instructions before beginning your installation.

More information

U.S. Codes & Standards for Energy Storage Systems. Joe Cain, P.E. Chair, SEIA Codes & Standards Working Group

U.S. Codes & Standards for Energy Storage Systems. Joe Cain, P.E. Chair, SEIA Codes & Standards Working Group U.S. Codes & Standards for Energy Storage Systems Joe Cain, P.E. Chair, SEIA Codes & Standards Working Group Regulatory Update: U.S. Codes & Standards Agenda NFPA 70 (NEC) UL 1973 & 9540 Fire Codes NFPA

More information

940ES Tankless Water Heater

940ES Tankless Water Heater Engineering Submittal Sheet Overview and Certifications LOW-LEAD U P C C US Massachusetts Plumbing Board Approved Engineering Specifications Water heater shall be a Model Therm 940 ES. Plant shall consist

More information

CHANGES TO THE TEXT OF THE 2010 CODE BOOKS

CHANGES TO THE TEXT OF THE 2010 CODE BOOKS The State Uniform Fire Prevention and Building Code (the Uniform Code) includes the publications that are incorporated by reference in Parts 1220 to 1227 of Title 19 of the New York Codes, Rules and Regulations

More information

SPECIFICATION FOR GAPLESS METAL OXIDE DISTRIBUTION TYPE SURGE ARRESTERS WITH POLYMERIC HOUSING

SPECIFICATION FOR GAPLESS METAL OXIDE DISTRIBUTION TYPE SURGE ARRESTERS WITH POLYMERIC HOUSING SPECIFICATION FOR GAPLESS METAL OXIDE DISTRIBUTION TYPE SURGE ARRESTERS WITH POLYMERIC HOUSING Page 1 of 10 CONTENTS 1 SCOPE 2 DEFINITIONS 2.1 SURGE ARRESTER 2.2 GAPLESS METAL-OXIDE SURGE ARRESTERS 2.3

More information

INFORMATION FOR TANKLESS WATER HEATERS

INFORMATION FOR TANKLESS WATER HEATERS GAS PIPING INFORMATION FOR TANKLESS WATER HEATERS Details Details regarding regarding properly properly sized sized gas lines lines for for use use with with tankless tankless water water heaters heaters

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 NATIONAL TECHNICAL SYSTEMS (NTS) - LONGMONT 1736 Vista View Drive Longmont, CO 80504-5242 Mr. Eric Loucks Phone: 303 776 7249 ELECTRICAL Valid To: August 31,

More information

"ESDDR" Series Electric Humidifier

ESDDR Series Electric Humidifier ESDDR-1 Deionized, Demineralized, or Reverse Osmosis Water "ESDDR" Series Electric Humidifier The Electric Humidifier from PURE Humidifier Co. is loaded with features and options. All you need is deionized,

More information

Side Entry Insulation Damage Repair Sleeve (SEIDRS) Raychem Devices Products

Side Entry Insulation Damage Repair Sleeve (SEIDRS) Raychem Devices Products 1.0 Scope This specification covers the design, performance and qualification requirements for Raychem Side Entry Insulation Damage Repair Sleeve. 1.1 Description. Raychem SEIDRS covered by this specification

More information

WATLOW IND. WATROD Circulation Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00

WATLOW IND. WATROD Circulation Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00 I&M NUMBER: 316-42-5-1 Page: 1 Pre Installation Check to make sure that heater received is the same as that ordered. Watlow heaters are built to comply with UL and CSA dielectric requirements, it may be

More information

A Pipe as Versatile and Flexible as Your Business

A Pipe as Versatile and Flexible as Your Business A Pipe as Versatile and Flexible as Your Business Multi-Flex Five Layer Composite Pipe: Multi-Flex consist of five layers. All layers are permanently bonded with each other during the production process.

More information

Leading Trends in Chemical Processing

Leading Trends in Chemical Processing Leading Trends in Chemical Processing Assessment of Dust Explosion Hazards Practical Facts to Consider Presented by: Ashok Ghose Dastidar, PhD MBA, Vice President, Dust & Flammability Testing and Consulting

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES SECTION 26 36 23 AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. General provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Electrical Product Pathfinder Group Electric kettles

Electrical Product Pathfinder Group Electric kettles Electrical Product Pathfinder Group Electric kettles Identifying failure drivers and opportunities for life extension. Version 4 December 2013 About this project This work aims to provide simple and accessible

More information

Innovation for prevention, safety and protection against lightning

Innovation for prevention, safety and protection against lightning www.int-sl.ad Innovation for prevention, safety and protection against lightning Integrated Quality, Environmental and Product Management System ISO 9001:2008 / ISO 14001:2004. Product certification No.

More information

Model LTN-3R Outdoor Rated Uninterruptible Power System Single Phase

Model LTN-3R Outdoor Rated Uninterruptible Power System Single Phase Model LTN-3R Outdoor Rated Uninterruptible Power System Single Phase General Specification 550 VA/Watts 1300 VA/Watts 1.0 GENERAL This specification defines the electrical and mechanical characteristics

More information

CSI Master Format 2004 Guide Specification for: Flow Maintenance of Aboveground Fuel Oil Lines

CSI Master Format 2004 Guide Specification for: Flow Maintenance of Aboveground Fuel Oil Lines CSI Master Format 2004 Guide Specification for: Flow Maintenance of Aboveground Fuel Oil Lines System for flow maintenance of aboveground fuel oil lines with Proportional Ambient Sensing Control (PASC),

More information

Navigating The Product Certification Maze: Building Codes and Product Standards. AGENDA be Covered

Navigating The Product Certification Maze: Building Codes and Product Standards. AGENDA be Covered AGENDA be Covered Navigating The Product Certification Maze: Understanding the Product Testing & Certification Process and Certification Marks BSC Course No. 49-6664 Presenter: Lisa Reiheld, CSA Group

More information

WATLOW IND. WATROD Modular Duct Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2

WATLOW IND. WATROD Modular Duct Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2 I&M NUMBER: 316-42-15-1 Page: 1 _ Pre Installation Check to make sure that heater received is the same as that ordered. Elements may come in contact with each other during shipment. Minor adjustments to

More information

Electrical Protection and Transportation Installations for Non-domestic Buildings

Electrical Protection and Transportation Installations for Non-domestic Buildings Unit 53: Electrical Protection and Transportation Installations for Non-domestic Buildings Unit code: H/601/1392 QCF level: 5 Credit value: 15 Aim This unit provides learners with an opportunity to develop

More information

Neil Hewitt Electrical & Air Conditioning P/L

Neil Hewitt Electrical & Air Conditioning P/L VISUAL SAFETY EXAMINATION / INSPECTION CHECKLIST Examination / inspection checklist Customer:... Date:... Address:... Phone:...... Mobile:... Contact:... Inspection Activity Yes No NA General Basic protection

More information

CSI Master Format 2004 Guide Specification for: Snow Melting (Mineral Insulated)

CSI Master Format 2004 Guide Specification for: Snow Melting (Mineral Insulated) CSI Master Format 2004 Guide Specification for: Snow Melting (Mineral Insulated) Typical system for snow melting of pavers, concrete and asphalt surfaces with temperature and moisture sensing control,

More information

... with Knowledge Solutions Lightning Protection Standards

... with Knowledge Solutions Lightning Protection Standards Lightning Protection Standards Richard Bouchard Employed With UL for 24 Years Technical Advisor for UL s Lightning Protection Services Member of NFPA 780 Technical Panel Certification for Residential Building

More information

ENERGY, OIL & GAS. astsensors.com macrosensors.com. Transducer & Transmitter Capabilities. Your sensor business partner...

ENERGY, OIL & GAS. astsensors.com macrosensors.com. Transducer & Transmitter Capabilities. Your sensor business partner... Transducer & Transmitter Capabilities Your sensor business partner... astsensors.com macrosensors.com About Us AST The mission of American Sensor Technologies, Inc. is to be your sensor business partner...

More information

TANKLESS WATER HEATING

TANKLESS WATER HEATING TANKLESS WATER HEATING With any gas appliance, it is essential that the gas supply system be properly sized to support the BTU load of the system. Tankless water heaters can be a great solution to provide

More information