Maintenance Best Practices & Intervals for Substation Equipment. Presented by: Paul Schlies, President/CEO Energis High Voltage Services, Inc.

Size: px
Start display at page:

Download "Maintenance Best Practices & Intervals for Substation Equipment. Presented by: Paul Schlies, President/CEO Energis High Voltage Services, Inc."

Transcription

1 Maintenance Best Practices & Intervals for Substation Equipment Presented by: Paul Schlies, President/CEO Energis High Voltage Services, Inc.

2 Background - 40 Years in the Industry Education NWTC (Northeast WI Technical College) Work History Wisconsin Public Service (WPS) 24 years American Transmission Company (ATC) 6 years Energis High Voltage Resources, Inc. 10 years

3 No One Right Way There s no one answer to a perfect Substation Maintenance Schedule. Today we ll be using our industry and utility experience, but your engineering firm, the manufactures equipment spec s, insurance requirements, and NETA Standards should also be considered. Along with our recommendations, we ve included survey results of maintenance schedules from individuals within the electrical utility. The information is included in the handout for your review, but because of today s time limitations we won t discuss. Electronic copies of this presentation are available.

4 Why Perform Substation Equipment Testing? Safety Public Employees Improve Reliability Reduce customer outages Reduce Costs Reduce unplanned maintenance cost Reduce insurance/liability cost Plan and budget asset upgrades

5 Transformer Testing Power Factor Ratio Insulation Winding Resistance SFRA (Sweep Frequency Response Analysis) DGA and Oil Quality

6 Transformer Maintenance Verify oil level in main tank & LTC Verify oil level in bushing Verify insulator integrity Verify tank integrity and free of oil leak Inspect surge arrestors Verify paint is in good condition Record winding/liquid temperatures (current & max) Record LTC position indicator & operation counter (current & max raise/lower) Verify correct operation of fans and free of bird nests Verify correct operation pumps (if applicable) Verify nitrogen pressure (if applicable) Verify transformer and pad are level Verify control cabinet is free of moisture Verify cabinet heater operation Frequency

7 Transformer Maintenance Thermographic Imaging (Infrared) Transformer oil analysis (DGA) Power factor Winding resistance test Transformer turns ratio test Insulation test Calibrate temperature gauge Verify alarms points Verify Bucholtz relay operation Verify rapid pressure rise relay operation SFRA (sweep frequency response analysis) Vibration & acoustic testing Frequency Annual Annual New install & after fault operation Dependent on criticality of equipment

8 Industry Survey Results Transformers

9 Circuit Breakers Testing Power Factor Speed Micro-ohm Ratio Bushing Current Transformer SF6 Gas Installation Testing (e.g. Air Mag)

10 Circuit Breaker Maintenance Verify breaker is level Verify paint is in good condition Verify insulator integrity Verify SF6 gas pressure (check oil level in oil breaker) Record operation counter number Verify control cabinet is free of moisture and cabinet is working Check control voltages & operation of breaker Thermographic Imaging (Infrared) Verify tank heaters (if applicable) Motion testing (speed test) Micro-Ohm (ductor) contacts Test SF6 gas for moisture, purity & SO2 content Check alarm points in control house Frequency Annual Annual Annual

11 Battery & Charger Testing Specific Gravity Cell Strap Connection Resistance Internal Cell Resistance Voltage Readings

12 Batteries & Charger Maintenance Visual inspection of electrolyte levels Visual inspection of battery jars Verify no battery grounds exist Record battery voltage & current Specific gravity Intercell impedance/resistance Strap resistance Individual cell voltages/total cell voltage Equalize voltages Verify charger alarms Check voltage ripple Frequency Annual Annual Annual Annual Dependent on battery test results Annual Annual

13 Vacuum Breaker Testing Thermographic Imaging (Infrared) Insulation Resistance Test Micro-ohm Contact Resistance Hi-pot Vacuum Bottles

14 Vacuum Breaker Maintenance Verify insulator integrity Verify control cabinet is free of moisture Verify cabinet heater operation Record operation counter number Thermographic Imaging (Infrared) Insulation resistance test Hi-pot vacuum bottles Frequency

15 Relay Testing Perform as found test Perform as left test Test relays to installed setting Trip test relays

16 Relay Maintenance Check relays for damage Found test Left test Trip test relays Frequency 5-10 years 5-10 years 5-10 years

17 Voltage Regulator Testing Maintenance usually based on manufacturers recommended operations and load. DGA Oil Analysis Frequency - Annual or Biannual

18 Circuit Switcher Testing Micro-ohm Insulation Test Verify Mechanical Operation Verify Electrical Operation Frequency for All Every 5 years

19 Questions to Think About If asked by a lawyer that is suing you because of a piece of equipment that did not trip, how would you provide the information asked? How do you document the performed maintenance & testing results? What type of test forms do you have? Where do you have this information at your facility?

20 Testing to NETA Specifications NETA is an organization that serves the electrical testing industry by offering accreditations of 3 rd party electrical testing firms, certifying electrical testing technician and producing American National Standards. Free download available: Appendix B Frequency of Maintenance Test netaworld.org

21 Want a Copy of this Presentation? Talk to Paul, Brad, or Bill. or Send request to: info@energisinc.com Contact information: Paul Schlies pschlies@energisinc.com Bill Gilbert bgillbert@energisinc.com Brad Beyer bbeyer@energisinc.com

22 Questions Thank you for your time and attention.

IEEE Transformer Committee PC Distribution Transformer Monitoring - User

IEEE Transformer Committee PC Distribution Transformer Monitoring - User IEEE Transformer Committee PC57.167 Distribution Transformer Monitoring - User Mark Scarborough Electrical Engineering Consultant DuPont January 9, 2019 Transformer Types in DuPont Control power Dry-type

More information

Becoming a NETA Accredited Company

Becoming a NETA Accredited Company Application Information Highlights: Requirements 2 Definitions 3 Revenue worksheet 4 Matrix 5 Full-service checklist 6 Test Reports 9 Technicians 10 Benefits 11 Process 12 Contact Us: Toll-free: 888.300.NETA

More information

Property risk solutions

Property risk solutions Property risk solutions Inside this issue Welcome to this edition of the Property risk solutions newsletter. This quarterly publication focuses on fixed fire protection and human element safety solutions

More information

Guide to Transmission Equipment Maintenance

Guide to Transmission Equipment Maintenance Guide to Transmission Equipment Maintenance March 2018 Revision History Issue Date Update 1 September 2013 First Issue 2 March 2016 Updated in response to SEM-15-071 Decision Paper Outturn Availability.

More information

Monitoring of Electrical Equipment Failure Indicators and Alarming

Monitoring of Electrical Equipment Failure Indicators and Alarming Past, Present and Future Maintenance Practices: Monitoring of Electrical Equipment Failure Indicators and Alarming Author: Gabe Paoletti, P.E. Eaton Corporation Senior Member, IEEE gabrieljpaoletti@eaton.com

More information

Engineering Design & Testing Corp./EDT Engineers, P.C.

Engineering Design & Testing Corp./EDT Engineers, P.C. ENGINEER: ELECTRICAL ALBERT M. ROSE, P.E. Engineering Design & Testing Corp. Post Office Box 940520 Maitland, Florida 32794 Telephone: (407) 865-9900 amrose@edtengineers.com EDUCATION: 1981 Bachelor of

More information

Appendix B. FRCC regional application of the term transmission Protection Systems

Appendix B. FRCC regional application of the term transmission Protection Systems Appendix FRCC regional application of the term transmission Protection Systems This is a clarification of the FRCC regional application of the term transmission Protection Systems as used in the PRC -series

More information

NERC PRC Compliance Guide

NERC PRC Compliance Guide www.eepowersolutions.com Keeping an Eye on Your Critical Power! NERC PRC-005-2 Compliance Guide Ensure Reliability of Critical Backup Power Eagle Eye Power Solutions, LLC www.eepowersolutions.com To Order

More information

Predictive Maintenance Training

Predictive Maintenance Training Predictive Maintenance Training Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq This predictive maintenance

More information

Balance of Plant Maintenance

Balance of Plant Maintenance Balance of Plant Maintenance Planning AWEA Project Performance & Reliability Workshop Mike Moore Discuss Some Statistics Key Learning Objectives Discuss Maintenance Planning Generator Breakers Power Cables

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between //--// if not applicable to project. Also, delete any other item or paragraph

More information

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance A. Introduction 1. Title: Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance 2. Number: PRC-005-6 3. Purpose: To document and implement programs for the maintenance of all

More information

Alarm Getting Started

Alarm Getting Started Alarm Getting Started What s in your Ring Alarm Kit Contents 1. Connect Base Station Ring Motion Detector Ring Keypad 2. Set up devices 3. Start with Security 4. Explore 5. Troubleshooting Ring Base Station

More information

What Utility Analytics means to Exelon

What Utility Analytics means to Exelon What Utility Analytics means to Exelon Presented by Bart Enright IT Director Smart Grid Initiatives at ComEd Exelon s Analytic Journey Exelon Utilities Overview T&D Grids Data Visualization Data Analytics/Notifications

More information

Energy Audit. This guide is for a 6 month Silver Award project. It is suitable for both group and individual volunteering.

Energy Audit. This guide is for a 6 month Silver Award project. It is suitable for both group and individual volunteering. Energy Audit About this project This guide is for a 6 month Silver Award project. It is suitable for both group and individual volunteering. SILVER 6 MONTHS GROUP INDIVIDUAL Through this project you ll

More information

PRASA S MISSION CRITICAL SERVICES UPS & ATS AMC BATTERY & INVERTER AMC DATA CENTERS AMC GRID-TO-CHIP MAINTENANCE FIRE DETECTION AMC DATA CENTER AMC

PRASA S MISSION CRITICAL SERVICES UPS & ATS AMC BATTERY & INVERTER AMC DATA CENTERS AMC GRID-TO-CHIP MAINTENANCE FIRE DETECTION AMC DATA CENTER AMC PRASA S MISSION CRITICAL SERVICES UPS & ATS AMC BATTERY & INVERTER AMC DATA CENTERS AMC GRID-TO-CHIP MAINTENANCE FIRE DETECTION AMC DATA CENTER AMC Downtime Is Not An Option The industrial uninterruptible

More information

Security + Automation Made Easy QUICK START GUIDE

Security + Automation Made Easy QUICK START GUIDE Security + Automation Made Easy QUICK START GUIDE To set up your yard sign, attach the sign to the post with the two provided screws. Then slide the top and bottom pieces of the post into the gray coupler.

More information

Standard PRC-005-3(i) Protection System and Automatic Reclosing Maintenance

Standard PRC-005-3(i) Protection System and Automatic Reclosing Maintenance A. Introduction 1. Title: Protection System and Automatic Reclosing 2. Number: PRC-005-3(i) 3. Purpose: To document and implement programs for the maintenance of all Protection Systems and Automatic Reclosing

More information

Standard PRC Protection System and Automatic Reclosing Maintenance. Standard Development Roadmap

Standard PRC Protection System and Automatic Reclosing Maintenance. Standard Development Roadmap Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed:

More information

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan Standard PRC-005-2 Protection System Maintenance A. Introduction 1. Title: Protection System Maintenance 2. Number: PRC-005-2 3. Purpose: To document and implement programs for the maintenance of all Protection

More information

Batt-Safe Battery String Monitoring System

Batt-Safe Battery String Monitoring System Batt-Safe Battery String Monitoring System Technical White Paper October 2010 Introduction Battery monitoring systems are categorized as either cell monitors or string monitors. Battery cell monitors provide

More information

Preliminary Operations and Maintenance Plan Baron Winds Project

Preliminary Operations and Maintenance Plan Baron Winds Project Preliminary Operations and Maintenance Plan Baron Winds Project August 2017 Table of Contents 1. Introduction... 3 2. O&M Philosophy and Process... 3 3. Typical O&M Responsibilities and Maintenance Schedules...

More information

4. Applicability: 4.1. Functional Entities: 4.2. Facilities:

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: Standard PRC-005-2(i) Protection System A. Introduction 1. Title: Protection System 2. Number: PRC-005-2(i) 3. Purpose: To document and implement programs for the maintenance of all Protection Systems

More information

AT10.1 Series Microprocessor-Controlled Float Battery Charger (single phase input)

AT10.1 Series Microprocessor-Controlled Float Battery Charger (single phase input) STANDARD SAMPLE SPECIFICATION AT10.1 Series Microprocessor-Controlled Float Battery Charger (single phase input) A battery charger shall be furnished in accordance with the following specification: 1.0

More information

Standard PRC-005-3(X) Protection System and Automatic Reclosing Maintenance

Standard PRC-005-3(X) Protection System and Automatic Reclosing Maintenance Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

FACILITY MANAGEMENT DEFICIENCIES IN CRITICAL ACCESS HOSPITALS (CAH)

FACILITY MANAGEMENT DEFICIENCIES IN CRITICAL ACCESS HOSPITALS (CAH) FACILITY MANAGEMENT DEFICIENCIES IN CRITICAL ACCESS HOSPITALS (CAH) Presented by: Alise Howlett, Assoc. AIA, CFPE, CHFM Standards Advisor, EM/PE/LS HFAP A better healthcare survey experience 1 FREQUENT

More information

Outages Happen 24/7. So Should Monitoring. / PREVENT POWER TRANSFORMER FAILURE WITH HELP FROM VAISALA

Outages Happen 24/7. So Should Monitoring. / PREVENT POWER TRANSFORMER FAILURE WITH HELP FROM VAISALA Outages Happen 24/7. So Should Monitoring. / PREVENT POWER TRANSFORMER FAILURE WITH HELP FROM VAISALA Power Transformer Monitoring that Works There s nothing worse than an unplanned outage, in terms of

More information

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan Standard PRC-005-2 Protection System Maintenance A. Introduction 1. Title: Protection System Maintenance 2. Number: PRC-005-2 3. Purpose: To document and implement programs for the maintenance of all Protection

More information

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities

More information

PRC-005. Tips and Updates. February 25th, Jonathan Hayes

PRC-005. Tips and Updates. February 25th, Jonathan Hayes PRC-005 Tips and Updates February 25th, 2014 Jonathan Hayes jhayes@spp.org 501.614.3509 NERC Standards Violations 3 Overview PRC-005-1 Current Issues / Best Practices PRC-005-2 Standard Implementation

More information

Chapter 8: Troubleshooting. 8: Troubleshooting 8 TROUBLESHOOTING... 3

Chapter 8: Troubleshooting. 8: Troubleshooting 8 TROUBLESHOOTING... 3 8: Troubleshooting 8 TROUBLESHOOTING... 3 8.0 NO HEAT... 3 8.1 NO OR LOW FLOW CONDITION... 3 8.2 NOZZLE DOES NOT PICK UP COMPONENT... 3 8.3 NO MOTION... 3 8.4 MACHINE ALARM CONDITIONS & ALARM SCREEN...

More information

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Standard PRC-005-5 Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Standard Development Timeline This section is maintained by the drafting team during the development

More information

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS This standard was reviewed and approved by key managers on September 6, 2011. Officer approval of this revision is not required. 1.0 SCOPE 1.1 This guide applies to the interconnection of a Utility with

More information

WIRELESS CCTV. Utility Site Security & Surveillance.

WIRELESS CCTV. Utility Site Security & Surveillance. WIRELESS CCTV Utility Site Security & Surveillance Wireless CCTV WCCTV is the UK s leading provider of site security systems for utilities and critical national infrastructure sites, including power stations,

More information

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and 2. Number: PRC-005-1b 3. Purpose: To ensure all transmission and generation Protection Systems affecting the reliability

More information

Electrical Preventive Maintenance (EPM) Program

Electrical Preventive Maintenance (EPM) Program Electrical Preventive Maintenance (EPM) Program Only qualified and properly trained persons may work on electric circuit parts or equipment. Such persons shall be capable of working safely and shall be

More information

Power System Protection Part 2 Dr.Prof. Mohammed Tawfeeq. Zones of Protection

Power System Protection Part 2 Dr.Prof. Mohammed Tawfeeq. Zones of Protection 84 Power System protection Dr. Mohamad Tawfeeq Zones of protection Zone of protection of a relay is the place or the distance that the relay can protect easily.fig.1 shows an example of protection zones

More information

Transformer On-Line Monitoring

Transformer On-Line Monitoring Transformer On-Line Monitoring Rowland James Entergy November 8, 2004 Prologue Why On-Line Monitoring & Diagnostics? Aging and Failure Modes Failure Statistics Current Monitoring & Analysis Methods Why

More information

2 WOW MOP COMPONENTS. Spray Button Power Button Nozzle. Pad Attach (Shadowed Area) Handle. Reservoir. Base

2 WOW MOP COMPONENTS. Spray Button Power Button Nozzle. Pad Attach (Shadowed Area) Handle. Reservoir. Base USER MANUAL 2 WOW MOP COMPONENTS Spray Button Power Button Nozzle Pad Attach (Shadowed Area) Handle Reservoir Base CARTON CONTENTS 3 Measuring Cup WOW Wet Floor Pads WOW Dry Floor Pads Adapter User Manual

More information

410AREFRIGERANTTRANSITIONGUIDE

410AREFRIGERANTTRANSITIONGUIDE Contactyourlocal ValueFirstrepresenta ve byvisi ng www.valuefirstonline.com/local 410AREFRIGERANTTRANSITIONGUIDE Replace-Retrofit-Repair (seenextpagefordetails) REPLACE OR REPAIR? OUR HVAC EVALUATION HELPS

More information

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS This standard was reviewed and approved by key managers with final approval by an officer of Oncor Electric Delivery on. 1.0 SCOPE 1.1 This guide applies to the interconnection of a Customer with the Company

More information

Emergency Evacuation Lighting Inspection & Maintenance

Emergency Evacuation Lighting Inspection & Maintenance Emergency Evacuation Lighting Inspection & Maintenance Got Questions? We re here to help 1300 038 847 Why Test Emergency Lighting Online Enquiry Australian Standard AS/NZS 2293.2 1995 relates to inspection

More information

DUNHAM-BUSH. Request for start-up and commissioning of Dunham-Bush chillers (Water Cooled or Air Cooled) and Condensing Units.

DUNHAM-BUSH. Request for start-up and commissioning of Dunham-Bush chillers (Water Cooled or Air Cooled) and Condensing Units. DUNHAM-BUSH Request for start-up and commissioning of Dunham-Bush chillers (Water Cooled or Air Cooled) and Condensing Units. Job Name Unit Model Address & Location Unit Serial Number of Units Kindly complete,

More information

Model 3300 Technical Support and Installation Manual

Model 3300 Technical Support and Installation Manual Model 3300 Technical Support and Installation Manual Manual # T15011 Document Revision: A1 1. OVERVIEW 1 2. BASIC OPERATION 1 2.1 General 1 2.2 Field-of-View 2 2.3 Range 2 2.4 Environment 2 2.5 Configuration

More information

Revision: None DCN No. First Issue Date: November 30, 1998 Product: Standard DCT, 120-volts

Revision: None DCN No. First Issue Date: November 30, 1998 Product: Standard DCT, 120-volts Figure 1Document: SPEC-112 Revision: None DCN No. First Issue Date: November 30, 1998 Product: Standard DCT, 120-volts construction requirements of UL approved Class H (180 C) insulation system. Transformers

More information

Refrigerator/Freezer Thermometer

Refrigerator/Freezer Thermometer The McKesson triple display digital thermometer simultaneously shows the current, minimum and maximum temperatures and updates continuously. An audible and visual alarm will trigger when the temperatures

More information

Consumer Products Catalog

Consumer Products Catalog Consumer Products Catalog C O N T R O L S Home Monitoring & Lighting This affordable line from Reliance Controls permits you to monitor your home or cabin for power outages, flooding, temperature drop

More information

Protect anything, anywhere, anytime.

Protect anything, anywhere, anytime. Set-up Guide Protect anything, anywhere, anytime. cell burst Built-in Features www.tattletalealarm.com ALARM SYSTEM IN A BOX 1.2 watt Cellemetry radio PIR motion 115 db Siren Safety strobe light Lighted

More information

Standard Development Roadmap

Standard Development Roadmap Standard PRC-005-2 Protection System Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

More information

Spectron LSN (Life Safety Network) Suggested Specifications

Spectron LSN (Life Safety Network) Suggested Specifications 1. General 1.1 Scope A Dual-Lite Spectron LSN (Life Safety Network) Series Inverter System shall be furnished to provide a reliable source of power, and shall operate during a utility line deficiency without

More information

BE PREPARED FOR POWER OUTAGES

BE PREPARED FOR POWER OUTAGES IMPORTANT SAFETY INFORMATION BE PREPARED FOR POWER OUTAGES Keep safe around electricity YOUR ELECTRICITY NETWORK Aurora Energy is responsible for delivering safe, reliable electricity supply to more than

More information

1126 Series Ceiling Mount PIR Motion Detector

1126 Series Ceiling Mount PIR Motion Detector Installation Sheet 1126 Series Ceiling Mount PIR Motion Detector Description The 1126 Series PIR (Passive Infrared) Motion Detectors are a compact wireless PIR. The 1126 Series offer 360, Wide Angle, or

More information

Innovative EEE mini-projects list

Innovative EEE mini-projects list 1 Innovative EEE mini-projects list SEM-133. Checking and auto control of water level using wireless sensor. SEM-140. Wireless 3-phase motor starter using RF technology. SEM-185. Designing of Haptic Keypad

More information

Supplementary Reference and FAQ - Draft

Supplementary Reference and FAQ - Draft Supplementary Reference and FAQ - Draft PRC-005-2 Protection System Maintenance May, 2012 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents Table

More information

Zerio Plus EDA-D6000 Radio Combined Heat Detector and Sounder Installation Instructions

Zerio Plus EDA-D6000 Radio Combined Heat Detector and Sounder Installation Instructions Zerio Plus EDA-D6000 Radio Combined Heat Detector and Sounder Installation Instructions EN54-3:2001+A1:2002+A2:2006 EN54-5:2000+A1:2002 EN54-25:2008 0359 Electro Detectors Ltd. Electro House Edinburgh

More information

Design Manual Installation Operation Maintenance

Design Manual Installation Operation Maintenance Design Manual Installation Operation Maintenance Model FT194 UV/IR Portable Flame Detector Test Lamp 23282 Mill Creek Drive, Suite 215 Laguna Hills, CA 92653 USA +1.949.583.1857 Phone +1.949.340.3343 Fax

More information

Electrical Problems. Fuse(s) blow or circuit breaker trips. Does the unit use circuit breakers or fuses? Replace with correct fuse(s)

Electrical Problems. Fuse(s) blow or circuit breaker trips. Does the unit use circuit breakers or fuses? Replace with correct fuse(s) Electrical Problems Fuse(s) blow or circuit breaker trips Does the unit use circuit breakers or fuses? Fuse(s) Circuit breakers Are the fuses dual element time delay? Is the circuit breaker HACR rated?

More information

June 4, 2014 VIA ELECTRONIC FILING. Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C.

June 4, 2014 VIA ELECTRONIC FILING. Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. June 4, 2014 VIA ELECTRONIC FILING Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 RE: Errata to Petition of the North American Electric

More information

Standard PRC-005-4(X) Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

Standard PRC-005-4(X) Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Standard PRC-005-4(X) Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Standard Development Timeline This section is maintained by the drafting team during the development

More information

CAUTION & SYMBOL DEFINITIONS:

CAUTION & SYMBOL DEFINITIONS: 1441 Rice Street, St. Paul, MN 55117-3899 USA Phone (651) 487-8844 Fax (651) 487-8857 info@coolairinc.com www.coolairinc.com CAUTION & SYMBOL DEFINITIONS: LBW-50 SPECIFICATIONS (cont d) CAUTION: Gives

More information

Nest Thermostat E Pro Installation & Configuration Guide

Nest Thermostat E Pro Installation & Configuration Guide Nest Thermostat E Pro Installation & Configuration Guide Last updated: December 2017 Version: 1.0 Table of Contents General Information 2 Nest Thermostat Installation Features 2 HVAC System Compatibility

More information

STA16 SELECTRONIC ALARM ANNUNCIATORS DESIGN, INSTALLATION AND OPERATING MANUAL STA16

STA16 SELECTRONIC ALARM ANNUNCIATORS DESIGN, INSTALLATION AND OPERATING MANUAL STA16 ST-97106N Revised 07-04 Section 25 (00-02-0283) STA16 SELECTRONIC ALARM ANNUNCIATORS DESIGN, INSTALLATION AND OPERATING MANUAL STA16 Certain danger to human safety and to equipment may occur if some equipment

More information

Portable central unit for several parameters

Portable central unit for several parameters MultiTracker Portable central unit for several parameters Parameter options: Dissolved Oxygen Sludge Blanket Suspended Solids All sensors are members of the new Cerlic Multiseries family. n Quick and reliable

More information

Advantage Services Capabilities

Advantage Services Capabilities Advantage Capabilities Achieve optimal results for the life of your facility. www.usa.siemens.com/service Building Automation Ensures automation systems and controls are performing at optimal levels, maintaining

More information

LH 3 Resina Capper Document No. LH3

LH 3 Resina Capper Document No. LH3 Purpose To safely turn on, operate, and turn off the capper. Scope This procedure applies to any packaging employees. General Requirements The following requirements must be met. Instructions This section

More information

Quality Assurance/ Quality Control. Topic 4 - Audio 46. Key Points

Quality Assurance/ Quality Control. Topic 4 - Audio 46. Key Points Topic 4 - Audio 46 Key Points : Measures taken to increase confidence in results. Quality Assurance: Program that assures that measures are being done and in a timely manner. Precision: How close measurements

More information

WIRELESS CCTV. Site Security & Surveillance.

WIRELESS CCTV. Site Security & Surveillance. WIRELESS CCTV Site Security & Surveillance Wireless CCTV WCCTV is the UK s leading provider of rapid-deployment CCTV Towers, specifically designed to provide all-in-one site security for temporary sites

More information

HOW TO SPECIFY A DELPHIAN SYSTEM

HOW TO SPECIFY A DELPHIAN SYSTEM HOW TO SPECIFY A DELPHIAN SYSTEM Standalone Detector Head with CommonSensor... 3 SafeCAL Detector Head with CommonSensor... 4 Flexirack/Controller System... 5 Infrared Detector Heads... 6 Sage CE Web-enabled

More information

Standard PRC-005-X Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

Standard PRC-005-X Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Guardian Home Technologies Technology for Living Catalog

Guardian Home Technologies Technology for Living Catalog Guardian Home Technologies Technology for Living Catalog page 2 of 13 The Guardian Process 3 Phases Phase 1: Selection During this appointment you ll select the features that you would like Guardian Home

More information

The breaker trips at once when it is set to ON. The breaker trips in few minutes when it is set to ON.

The breaker trips at once when it is set to ON. The breaker trips in few minutes when it is set to ON. Trip of breaker or The breaker trips at once when it is set to O. Measure insulation resistance to ground to see if there is any leakage. Air conditioner can not start up blow of fuse The air conditioner

More information

FACILITY MANAGEMENT DEFICIENCIES IN ACUTE CARE SETTINGS

FACILITY MANAGEMENT DEFICIENCIES IN ACUTE CARE SETTINGS FACILITY MANAGEMENT DEFICIENCIES IN ACUTE CARE SETTINGS Presented by: Alise Howlett, Assoc. AIA,CFPE, CHFM Standards Advisor, EM/PE/LS HFAP A better healthcare survey experience 1 FREQUENT PHYSICAL ENVIRONMENT

More information

How to install your Nest Protect

How to install your Nest Protect How to install your Nest Protect You can easily install your Nest Protect in just a few minutes. Follow the steps in this article to learn how. To set up and install your Nest Protect, you will need: A

More information

WHY ELECTRICAL PREVENTIVE MAINTENANCE IS ESSENTIAL TO A SAFE AND PRODUCTIVE WORKPLACE

WHY ELECTRICAL PREVENTIVE MAINTENANCE IS ESSENTIAL TO A SAFE AND PRODUCTIVE WORKPLACE WHY ELECTRICAL PREVENTIVE MAINTENANCE IS ESSENTIAL TO A SAFE AND PRODUCTIVE WORKPLACE AGENDA SCRWA 14 SEPTEMBER 2016 Definition Why EDPM is essential to productivity Fiscal sustainability Why EDPM is essential

More information

Analox 1000 Series. User Manual. Analox Sensor Technology Ltd. 15 Ellerbeck Court, Stokesley Business Park North Yorkshire, TS9 5PT, UK

Analox 1000 Series. User Manual. Analox Sensor Technology Ltd. 15 Ellerbeck Court, Stokesley Business Park North Yorkshire, TS9 5PT, UK Analox 1000 Series User Manual Analox Sensor Technology Ltd. 15 Ellerbeck Court, Stokesley Business Park North Yorkshire, TS9 5PT, UK T: +44 (0)1642 711400 F: +44 (0)1642 713900 W: www.analox.net E: info@analox.net

More information

Refrigerator/Freezer Thermometer

Refrigerator/Freezer Thermometer The McKesson triple display digital thermometer simultaneously shows the current, minimum and maximum temperatures and updates continuously. An audible and visual alarm will trigger when the temperatures

More information

31.05/ Unit-1

31.05/ Unit-1 Semi-Annual Inspection FS Report 31.05/02.06.2015 Unit-1 Customer Representative: GE Field Service Representative: All technical recommendations and information contained in this report are based on GE

More information

POWER UP WITH TP ELECTRIC, INC.

POWER UP WITH TP ELECTRIC, INC. POWER UP WITH TP ELECTRIC, INC. A TPE Industries Company NATURAL GAS & OIL ELECTRICAL CONTRACTORS Compressor Stations Gas Processing Plants Rail Terminals Substations Metering Stations Utility Transmission

More information

C. The system shall be capable of turning luminaires on/off (where supported by the luminaire) as well as full range dimming.

C. The system shall be capable of turning luminaires on/off (where supported by the luminaire) as well as full range dimming. SECTION 260943 SPECIFICATIONS - Wireless Network Lighting Controls. PART 1 - GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY AND KEY SYSTEM DIFFERENTIATORS A. The lighting control system specified herein shall

More information

The system is expanded via the RCC network with each RCC capable of passing information to and from up to 31 detection or output devices.

The system is expanded via the RCC network with each RCC capable of passing information to and from up to 31 detection or output devices. FireCell Radio Hub Fully addressable Wireless activation Third party approved (EN54) 2-way radio communication Loop powered Diagnostics port Range in excess of 150 metres Overview The model FCX-500-001

More information

February 18, What is heat? Touch each image to see how the water molecules react.

February 18, What is heat? Touch each image to see how the water molecules react. What is heat? Touch each image to see how the water molecules react. Where does heat come from? Touch each image and discuss. How can motion create heat? Touch each image to view the different energy levels

More information

NLR ELECTRIC MURRAY HYDRO PLANT NORTH LITTLE ROCK, ARKANSAS

NLR ELECTRIC MURRAY HYDRO PLANT NORTH LITTLE ROCK, ARKANSAS NLR ELECTRIC MURRAY HYDRO PLANT NORTH LITTLE ROCK, ARKANSAS January, 2013 Infrared Inspection Report NLR Electric Murray Hydro Plant Company Contact James Bray Project: 09170113 2605 CHARTER OAK DRIVE,

More information

R E C T I F I E R I N V E R T E R C O N V E R T E R SB7

R E C T I F I E R I N V E R T E R C O N V E R T E R SB7 SCR Battery Charger Product Specifications Description The is RIC Electronics premiere SCR battery charger/rectifier. The provides power to critical DC loads through a wide range of outputs and is engineered

More information

17 TH APRIL 2017 Switch Board Monitoring Protecting Switchboard. Courtesy of ABB. Paul Lee

17 TH APRIL 2017 Switch Board Monitoring Protecting Switchboard. Courtesy of ABB.  Paul Lee 17 TH APRIL Switch Board Monitoring Protecting Switchboard Courtesy of ABB. www.fengshengelectric.com.sg Paul Lee Agenda 1. Introduction 2. IEC 61439 3. Why Switchboard Monitoring 4. Switchboard Monitoring

More information

mtwfs.com Indigo Series Ice Machines: Intelligent thinking inside the box.

mtwfs.com Indigo Series Ice Machines: Intelligent thinking inside the box. mtwfs.com Indigo Series Ice Machines: Intelligent thinking inside the box. No one knows ice better than Manitowoc. Building the perfect ice machine wasn t easy, but inside-of-the-box thinking is just what

More information

STCP 02-1 Issue 005 Alarm & Event Management

STCP 02-1 Issue 005 Alarm & Event Management STCP 02-1 Issue 005 Alarm & Event Management STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission plc Scottish

More information

CONTROL YOUR HOME FROM EVERYWHERE

CONTROL YOUR HOME FROM EVERYWHERE CONTROL YOUR HOME FROM EVERYWHERE WITH YOUR SMART PHONE OR TABLET Control and monitor your home automation system anywhere! The future is the remote controlled home and we do this with affordable innovative

More information

Drawing Submittal Package

Drawing Submittal Package Project: Customer: Engineer: Pump Manufacturer: Drawing Submittal Package Model GPL + GLU Limited Service Full Voltage Across the Line Start Electric Pump Controller with Automatic Power Transfer Switch

More information

Model 17A00 Expansion Enclosure

Model 17A00 Expansion Enclosure HOME AUTOMATION, INC. Model 17A00 Expansion Enclosure Installation Manual Document Number 17I00-1 Rev A March, 2002 Home Automation, Inc. Model 17A00 Expansion Enclosure Installation Manual Document Number

More information

ANALOX 5001 Carbon Dioxide Monitor. User Manual ANALOX Analox 5001 Carbon Dioxide Monitor User Manual

ANALOX 5001 Carbon Dioxide Monitor. User Manual ANALOX Analox 5001 Carbon Dioxide Monitor User Manual ANALOX 5001 ANALOX 5001 Carbon Dioxide Monitor User Manual Analox Sensor Technology Ltd 15 Ellerbeck Court, Stokesley Business Park North Yorkshire, TS9 5PT T: +44 (0)1642 711400 F: +44 (0)1642 713900

More information

ADAPT Australia Pty Ltd ADAPT-A-POLE Pty Ltd AEMC Instruments apt Group

ADAPT Australia Pty Ltd ADAPT-A-POLE Pty Ltd AEMC Instruments apt Group Hylec Energy Solutions 61 7 96 2220 Phasing Identification HV and LV HV Diagnostic Services www.hvds.co.nz High Voltage Solution 64 2 7419 9952 HV Diagnostix www.hvdiagnostix.co.nz Genus Metering www.genusmetering.com

More information

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and 2. Number: PRC-005-1.1b 3. Purpose: To ensure all transmission and generation Protection Systems affecting the reliability

More information

SECTION SECURITY TESTING AND COMMISSIONING

SECTION SECURITY TESTING AND COMMISSIONING SECTION 280800 - SECURITY TESTING AND COMMISSIONING PART 1 - GENERAL 1.1 WORK INCLUDES A. General Description: This specification section covers the provision of preliminary testing, acceptance testing,

More information

Zerio Plus EDA-R6000 Radio Combined Optical Smoke Detector and Sounder Installation Instructions

Zerio Plus EDA-R6000 Radio Combined Optical Smoke Detector and Sounder Installation Instructions Zerio Plus EDA-R6000 Radio Combined Optical Smoke Detector and Sounder Installation Instructions EN54-3:2001+A1:2002+A2:2006 EN54-7:2000+A1:2002+A2:2006 EN54-25:2008 0359 Electro Detectors Ltd. Electro

More information

Risk Mitigation of Aging Electrical Infrastructure

Risk Mitigation of Aging Electrical Infrastructure Risk Mitigation of Aging Electrical Infrastructure 2014 WWOA Annual Conference 10:55am Thursday October 9 th, 2014 Presented by and Authored by Jeff M. Miller, PE, ENV SP About the Presenter Jeff M. Miller,

More information

PIR Occupancy & Motion Sensor

PIR Occupancy & Motion Sensor PIR Occupancy & Motion Sensor MOS-17C energy conservation - home and office Overview The MOS-17C is a wireless, energy harvesting, ceiling mount, Passive InfraRed (PIR) occupancy sensor. Used for indoor

More information

Enhancing Current Maintenance Practices 04. Managing the Risk 06. Constant Monitoring of Electrical Enclosures 08

Enhancing Current Maintenance Practices 04. Managing the Risk 06. Constant Monitoring of Electrical Enclosures 08 2 Table of Contents Enhancing Current Maintenance Practices 04 Managing the Risk 06 Constant Monitoring of Electrical Enclosures 08 Delta T Alert A Simple Device with Staggering Results 10 An Easy Way

More information

Certification of Thermographers

Certification of Thermographers CFPA-E No 3:2011 F Certification of Thermographers CFPA-E -GUIDELINES FOREWORD The European fire protection associations have decided to produce common guidelines in order to achieve similar interpretation

More information

HONEYWELL PRO 6000 THERMOSTAT MANUAL ARCHIVE

HONEYWELL PRO 6000 THERMOSTAT MANUAL ARCHIVE 07 March, 2018 HONEYWELL PRO 6000 THERMOSTAT MANUAL ARCHIVE Document Filetype: PDF 485.09 KB 0 HONEYWELL PRO 6000 THERMOSTAT MANUAL ARCHIVE Honeywell Vision Pro 8000 Installation Manual. 10 November, 2017

More information

Energy Audits. Central Wisconsin Electric Cooperative.

Energy Audits. Central Wisconsin Electric Cooperative. Energy Audits We are pleased to offer our members two home energy audit options. We would like to help you save money on your electric bill by looking for ways to control your energy use. The best way

More information