1 Training Title POWER SYSTEM PROTECTION IN UTILITIES & INDUSTRIAL ELECTRICAL NETWORKS Training Duration 5 days Training Venue and Dates Power System Protection in Utilities & Industrial Electrical Networks & Protective Relaying March $4,250 Abu Dhabi, UAE In any of 5 star hotel. Exact venue will be informed later. Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch Training Certificate Define Management Consultancy & Training Certificate of course completion will be issued to all attendees. Language: English TRAINING OVERVIEW COURSE DESCRIPTION Delegates will gain an overall appreciation of the applicable standards and working practices for: Equipment Design and selection of Electrical Equipments Installation Testing and Commissioning Maintenance WHO SHOULD ATTEND Managers, Engineers and Technicians, responsible for the design, installation and testing of electrical installations, who require to refresh their knowledge and skills.

2 TRAINING METHODOLOGY The latest educational methods and strategies are employed. The course is designed to maximize delegate participation. From the outset the goals of each participant are discussed to ensure needs are fulfilled as far as possible. Questions and answers are encourages throughout and at the daily wrap-up sessions. This gives participants the opportunity to discuss with other delegates and the presenter their specific problems and appropriate solutions. All delegates take away a manual of all the material presented. Only minimum note taking is encouraged to ensure maximum delegate attention during the seminars. OUTLINE Equipment design, installation, testing and maintenance Review of basics of Electrical Engineering Generation / Utility side equipment: Generators, switchgears, industrial & Current Transformers, Fuse, Switch and Combination units, Circuit Breakers, Contractors, Protection and metering And Grounding, Selection of cables, Energy savings and reduction of losses due to power quality problems. Introduction to panel design: Switch gears and Switchboards System Earthing. Installation: cable laying, termination and earthing. Testing: Type test, Routine test, Site Test (commissioning test) Maintenance and failure reduction: Conditions Monitoring, Periodic Test, Visual Inspection, and Failure Reporting. Power System Design Power system design issues, system stability, protection and control Power system modeling: Line sequence impedances, Generator sequence impedances. Transformer impedances, Per unit parameters Power system grounding Performance & design of transmission lines, design of EHV transmission lines, advantages and disadvantages of HVAC and HVDC Selection of sizes and locations of generating stations and substations Designs of distribution systems, economics of distribution systems Power System Electrical Transients

3 Transients characterization, balanced fault analysis, Unbalanced fault analysis Three phase faults, asymmetric faults, Fault transients, Fault Monitoring / Recording, Effects of grounding, Grounding potential rise-safety Electromechanical Transients and Stability, System Stabilization Protection Fundamentals Protection philosophy, Zones of protection, Protective equipment, overcurrent protection Overvoltage and Undervoltage protection, Overfrequency and Underfrequency protection Zone distance protection, Differential protection Pilot relaying, Computer relaying Power System Protection & Control Principles of circuit interruption, types of circuit-breakers and switch gears SF6 power circuit breakers, voltage control, power system control Control of reactive power & power factor Interconnected control & frequency ties, supervisory control Case Studies, Last Day Review, Discussions & Assessments will be carried out.... TRAINING INSTRUCTOR ENG. ESSAM MOHAMED ATEF Summary of Profile

4 More than sixteen years with a very good technical, managerial skills gained from the field of electrical Maintenance & installation for big electrical projects especially in the gas and oil fields graded from electrical Maintenance engineer, junior, senior, section head Maintenance engineer, electrical department manager and maintenance planning dept. manager, in the other hand applied most of my gained Experience in the field of training either inside or outside country My Last jobs activities covered :-- Maintenance electrical Engineer Electrical instructor Planning Engineer using Sap system ver. 4.7 Pre commissioning electrical engineer Education B.SC degree in electrical power engineering in 1989 from faculty of engineering Cairo university Two years diploma of industrial systems technology based on micro-processor & computer applications of control systems from faculty of engineering Ain shams university Experience Present work Maint. Dept Mgr at cairo main office at Petrobel co.( ENI joint venture)- the scope of works include the following: Carried out the technical & commercial evaluations for electrical maintenance purchasing requisitions by being a member of committee formed to evaluate the electrical tenders for all fields. And make a proper recommendations to the two managing directors or bid of committee Performing tender out& follow up the commissioning, pre commissioning phases for the up grading maintenance projects. Carried out the required maintenance contracts either global, continuous services or emergency services required by concerned Maint. Dept. whenever in any company fields following up and introduce a technical and managerial report for operation manger about all the maintenance activities either planned or unplanned maintenance for all company fields ( Abu Rides oil fields- Abu Madi and port Fouad gas fields ) according to the plant maintenance module ( PM) module of SAP system following up executing for the up grading of sap system co. to be upgraded to version 4.7 ( PM- module ) with ENI

5 Being as a technical key member for Executing the technical and commercial phases for electrical equipment purchase requisitions issued by all fields through tenders ( prepare and evaluate the technical clarifications for submitted bidders ) 2005 till now Technical member of the main committee for executing the following ongoing big projects with the corresponding activities:- Fire Fighting system of Tank batteries 8/1, 8/2 and 10/1 located at Abu Rudies field with turn over 2,4 MM$ where prepare & submitted tender documents to the main contractor and following up and shared in the engineering, purchasing, installation, commissioning and start up for the Fire fighting system at the mentioned area. ( the project will be finished at the end of 2007) Inst. system and F.F. system for Feiran new pumping station with turn over 500,000$ which located at Abu Rudies field and following up and shared in the engineering, purchasing, installation, commissioning and start up for the Fire fighting system at the mentioned area. The project already commissioned at march 2007 lease to purchase contract for RAS Garra water injection plant located at Abu Rudies field ( the tender in the commercial evaluation) with turn over 2 MM$ and I prepared all the electrical material specification which normally used in hazardous area-zone 2 Port Fouad gas plant, up grading of lighting system with 500,000 U$ turn over most of the material prepared to be used in Hazardous locations up grading of oil gathering at tank batteries 8-1, 8-2 with turn over 1.1 MM$ ABU RUDIES electrical network study by CESI Prepare and execute the following training courses :- Electrical installation in Hazardous area (specially in oil and gas fields) at ETS Co. ( now become oil and gas skills co. OGS which belongs to EGPC, the course were attended by KHAldA, AMERIA, AGIBA & Petrochemical Co's. the attendees were mixture of chemical, process and electrical engineers (15 persons- ranged experience 5-20years old in oil and gas fields)- the course was held on March 2007 two days seminar specially made for GUPCO ( for REHAB Project), the main aim of this seminar is to apply the new polices by BP in the use of electrical equipments in the hazardous locations the seminar material approved by Bp Aug.-07( the seminar was held at OGS premises)

6 classification of Electrical equipment used in Hazardous area course were attended by EL FURAT Petroleum CO AFPC engineers ( instrument, project & electrical Syrian Engineers) maintenance plan and reliability engineers course for AFPC Engineers March 2004 till end of the year N P C C Project No. 2026/2110 working as Project commissioning electrical engineer at NPCC-UAE on Aramco project NO 2026 fabrication,transportation and installation of No.8 off shore platforms with pipe lines and cables Contract Numbers; (OOK) & (IK) Prepare and execute with NPCC elec. technician the pre- commissioning plane for ARAMCO platforms at MFY of NPCC area during construction ( the platforms then installed at ABU saffeh gulf area ( TP-2, ABSF 90/97, ABSF 62,130/135, ABSF 119/126,ABSF 63,110/116, ABSF 100/106, ABSF 10/15, ABSF 17/22 and living quarter L-Q) Preparing the agreed split of responsibilities according to the contract for the mechanical completion, pre- commissioning (functional tests ), performance acceptance and testing for the free issued material and equipments supplied by contractors as per Aramc standards concerning the electrical and instruments equipments Make a plane for Preparing the request for inspection NPCC QC before proceeding any commissioning activities ( RFI) to ARAMCO and The mechanical completion include preparing the pre commissioning dossiers and carried out all the necessary activities inside the dossier according to Armco standers and the dossier cover the following: The mechanical completion activities include the following: vendor equipment check list cable tray and cable support check list cables and wire check list conduit check list power, lighting & control cables insulation resistance and continuity testing by megger check list grounding check list field test megger reading for non electrical equipment grounding system field test megger reading for electrical equipment grounding system field test megger reading for grounding system

7 switch rack check list ( 115, 15 kv, 480 v switch gear) panel boards check list including (Fire fighting panels indoor) squirrel cage induction motors check list squirrel cage induction motors insulation check list Transformer test record Insulation resistance records Oil dielectric test Oil immersed transformer check list Dry type transformers check list Battery and battery charger inspection and test record Navaid check list The pre commissioning functional test activities include the following: battery system low voltage cables medium voltage cables (5-35 kv) molded case circuit breakers low and medium voltage power circuit breaker diesel electric generator neutral grounding system and system grounding power socket & lighting metal clad switch gear medium and low voltage motor control center NEMA frame, form wound induction and synchronous motors Out door bus structure and protective relays Sf6 mounted switch gear Surge arrestors Dry type and oil immersed transformers

8 UPS and harmonic filter unit Voltage and current transformers The performance acceptance and testing activities include the following: AC power dist. System NAV aids Lighting and power panels Battery chargers 15, 115 kv switchgear Make a plane for Preparing the request for inspection (RFI) to ARAMCO and NPCC QC before proceeding any commissioning activities Moving to DEMA RIG at RAS TANORA for following up the pre commissioning activities. The project include the following major electrical equipments: 115/15 KV, 50 MVA oil power transformers (Mfr.Paules) 15 KV switch gear (Mfr. ABB) Battery chargers & batteries (Mfr. IMETEK solid state controls) 480 V motor control centers (Mfr S. Siemens, ABB& G.E) Power & lighting Panels (Mfr.Crouse-Hinds& SIEMENS) Nav. Aid system ( Mfr.Tide land) Motor Different ratings( Mfr.Siemens, Brook crompton) 15KV/480V pad type transformer Dry type transformer 480V Switch racks (Mfr. Cruse-Hinds) Lighting Systems Power, control cables From 2002 till March 2004

9 Syria- Al- Furat Petroleum company (Shell joint venture) Worked as technical electrical instructor through Tri star Co.( which has the long contract basis with El-Furat petroleum co. the co. were responsible of train the national Syrian staff and make gradual replacement of the foreign staff) The training cover the following phases; basic, technical and on job training,in addition. trine a general course of basic computer for all disciplines, the mentioned trainings periods lasted for three groups consequently for Syrian national staff. During the off periods prepare and train the graduate and technical & maintenance. management courses either held in house or in Cairo head offices and the courses topics were as follow: electrical maintenance courses which cover the elec. maintenance for electrical equipments which frequently used in oil and gas fields electrical installation course in hazardous area planned and scheduled maintenance course computerized maintenance management system course electrical protection system course hazardous area classifications course N.b this courses are repeated in different times according to the requirements of the motherco. Syria-Dier Ezor Petroleum Company (Total joint venture) Worked as technical electrical instructor in the following phases of training; technical and on job training, The mentioned trainings lasted for one group of Syrian national staff Beside working as a trainer the following activities are frequently done during the training phases : Upgrade the existing technical material ( either in basic, technical or job training phases) and adopted the material in the form of leaflets to suit the level of trainees Prepare and mark (quiz, mid, final and reminder tests) Prepare from scratch, technical material that frequently required for new staff in order to be familiar with the strategies & polices that frequently applied in oil and gas fields( example GMC course: General Maintenance Concept of oil and gas fields & CSSI: Company Specific Site Induction ) Prepare the technical assistance educational tools and aids ( example : C.D, video,.. etc)

10 Preparing the necessary material for training the technician, and train graduate engineer and maintenance teem through a chain of courses held in Egypt & Syria Belaiym petroleum co Electrical Maintenance section head and promoted to act as Electrical department manager Job responsibilities scheduling and executing the corrective,preventive of electrical Maintenance programs according to Maintenance polices guidelines participation in preparations of electrical budget (annual and revised) performance monitoring and troubleshooting for plants electrical equipments Operating all plant electrical utilities, conducting fast repair for the electrical equipments belongs to the production lines through a team of skilled elect. engineers and technicians worked as a planner in Abu Madi gas field using computerized Maintenance management system ( C.M.M.S ) software package sap R/3.the system organize and cost calculated for the preventive Maintenance orders and unplanned Maintenance loanee from Abu Madi gas fields to port found gas fields for participation in the following big projects The scope of participations is witness,installations, commissioning & stat up of the electrical equipments for the following big projects : Wakar gas plant( on &off shore) Darfeel gas plant( on &off shore) Basic design for Temsah platform Baltium gas plant on &off shore During this periods representing the co./ field in front of the officials authorities for the following Representing port fouad fields as a task force coordinator for year 2000 compliance problem & attended all meetings,shared for preparing the contingency plane represents petrobel co. as a technical member for delivering 16 &22 inches gas pipe lines to Gasco co

11 supervisor and following up the installations,commissioning and start up of LAN/Wan cables network as a member of commissioning team commissioning and stat up for sap R/3 software system from Agip Italy as a planner concerning CMMS(computerized Maintenance management system) module Belaiym petroleum co Electrical junior / senior engineer in Abu Madi gas fields Job responsibilities Preventive, corrective Maintenance, repair, troubleshooting and overhauling for the following equipments that used frequently on gas treatment plants : Gas turbine (3.65 MW,turbo generators Mfr.Nuova Pignone, Mark II,frame 1 with speed tronic and suvimac control systems) Generators Mfr.( Ansaldo.italy,Avk west Germany,Kato USA) Generator control panels Mfr( IME,Nouva pigone,c.g.t caterpillar Italy) Excitation control system ( Ansldo,Avk,kato) Medium and low voltage switch gear ( Mfr.Sace,Tozzi Italy & Merline Geriane France ) Medium and low voltage control circuits Medium and low voltage motors with different rating and types. (Up to one Mw.) Automatic fire alarm, fire fighting systems and gas detection systems Mfr. (Fas,Silvani,Ciodue,Eusebi,Photan) U.p.s & D.c systems Mfr.( Sice,Arros,Convel,Moran, Exide power ware Buildings and gas plants lighting systems. Calling and intercom systems Mfr. ( Fitre,Italtel,selta). Due to the expansions for Abu madi gas fields I participated for the following projects (i.e. the scope of participations is witness,installations, commissioning, & stat up of the electrical equipments) El-Qara integrated plant project Abu-madi LTS upgrading facilities Revamping for the electrical equipments of LTS electrical power network Cairo electric distribution co. H.V Electrical Maintenance engineer Job responsibilities

12 Perform preventive Maintenance,troubleshooting for high voltage electrical equipments in 66/11 Kv substations (which include 25 MVA power transformer circuit breakers and high voltage switchgears )also calibrations and tests all the protections relays Participation for the installations and commissioning for the upgraded high voltage equipments in medium & high voltage network Engineering contracting co Electrical engineer Job responsibilities Carrying out the preparation of in/out faxes,tenders execution,delivering, the spare parts which used for high voltage electrical equipments that required Maintenance by electrical distribution companies Trainings I had been participated in many training courses and seminars (abroad &local) the following selected training courses are :- Abroad training Load shedding system based on programmer logic controller Telemeqanique Square d,france Medium and low voltage switchgear Merline Gerane France Operation,control and Maintenance of gas turbine Nouva Pignone Italy Computerilized Maintenance. Management system AGIP ITALY. LOCAL TRAINING Operation, Maintenance of Gas Turbines on Talkha Zone. Gas turbine characteristics,and performance evaluation in the field.( American University Cairo ) Electrical installation in hazardous area.( First Egyptian Eng.co ) Protection of electrical power network ( Development Research & Tech.planning center ) Cairo university Methods of choice for Electric motors for different industrial applications ( Electronic Research Institute ) Bearing tech ( Skf) basic of selecting electric motors ( Electronic Research Institute ) Planning of Maintenance. Operation ( American university in Cairo)

13 digital control system DCS (Enpi ) Power electronics ( Enpi ) Electric power system protection ( Suez oil refinery ) Uninterruptible power supply ups ( Electronic Research Institute) Uninterruptible power supply ups ( El- Giza System Co.) Vibration (Enpi) Micro processor control of electrical machine (Electronic research Institute) Planning and Maintenance Operation (American university in cairo ) programmable logic controller Plc (DATCO) Development of management skills for a new manager.(international Expertise Association.) Cmms training course as planner scope ( Agip rep. In head office.) Programmer logic controller (Target) How to deal with others, Management and development Arab center Developing strategies & techniques of management (Acct) Self power &successful management for mangers (Totality) presentation skills at Agyptish- deutsche Akademie Fur Wirtschaft Und technic Designing and sizing of plant electrical equipment by NAIT

Active or challenging position in a positive work environment where teamwork and effort are appreciated.

Active or challenging position in a positive work environment where teamwork and effort are appreciated. MAHMOUD ABD EL AZIZ MAHMOUD 7 FAHMY ABD EL GALIL ELQUNATER EL KHIRIA Tel: (02)42183308, Mobile: 010666-59-210 & 0128-565-3556 E-mail: zizo_zizo27@hotmail.com Eng.M.Aziz.Zm@gmail.com JOB OBJECTIVE Active

More information

SELECTION, INSTALLATION & TESTING OF ELECTRICAL EQUIPMENTS IN HAZARDOUS AREA

SELECTION, INSTALLATION & TESTING OF ELECTRICAL EQUIPMENTS IN HAZARDOUS AREA Training Title SELECTION, INSTALLATION & TESTING OF ELECTRICAL EQUIPMENTS IN HAZARDOUS AREA Training Duration 5 days Training Venue and Dates REF EE019 Selection, Installation & Testing of Electrical Equipments

More information

650-EL-C-E-1995 Senior Electrical Engineer. PERSONAL DATA Nationality : Egyptian Birth Date : 06/01/1969 Marital Status : Married

650-EL-C-E-1995 Senior Electrical Engineer. PERSONAL DATA Nationality : Egyptian Birth Date : 06/01/1969 Marital Status : Married 650-EL-C-E-1995 Senior Electrical Engineer Holds a B. Sc. in Electrical Engineering and has about 16 years experience in the field of electrical construction, pre-commissioning and follow up activities

More information

Training Fees 4,000 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch.

Training Fees 4,000 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch. Training Title ADVANCED GC PROCESS Training Duration 5 days Training Venue and Dates Advanced GC Process 5 17 21 February, 2019 $4,000 Dubai, UAE Trainings will be conducted in any of the 5 star hotels.

More information

EE034: Electrical Maintenance for Engineers & Technicians

EE034: Electrical Maintenance for Engineers & Technicians EE034: Electrical Maintenance for Engineers & Technicians EE034 Rev.001 CMCT COURSE OUTLINE Page 1 of 6 Training Description: We have taken all the latest techniques and know-how relating to electrical

More information

Contents. Preface. Chapter 2 Faults, types and effects The development of simple distribution systems Faults-types and their effects 7

Contents. Preface. Chapter 2 Faults, types and effects The development of simple distribution systems Faults-types and their effects 7 Practical Power System Protection for Engineers and Technicians Contents Preface ix Chapter 1 Need for protection 1 1.1 Need for protective apparatus 1 1.2 Basic requirements of protection 2 1.3 Basic

More information

266-CS-TMS-E-2008 Automation & Instrumentation Engineer. PERSONAL DATA Nationality : Egyptian Birth Date : 23/08/1986

266-CS-TMS-E-2008 Automation & Instrumentation Engineer. PERSONAL DATA Nationality : Egyptian Birth Date : 23/08/1986 266-CS-TMS-E-2008 Automation & Instrumentation Engineer Holds a B. Sc. in Industrial Electronics and Control Engineering and has about 3 years experience with deep understanding of Electrical Engineering,

More information

PROFILE. industrial services rental trading

PROFILE. industrial services rental trading PROFILE industrial services rental trading Introduction Power Corp General Trading & Contracting Company W.L.L. is incorporated by technocrats having vast experience in Engineering and Construction field

More information

Holds a B. Sc. in Electronics & Communication Engineering and has over 8 years hands-on experience working in I&C field.

Holds a B. Sc. in Electronics & Communication Engineering and has over 8 years hands-on experience working in I&C field. 102740-ICX-CMOS-E-2007 I&C Engineer Holds a B. Sc. in Electronics & Communication Engineering and has over 8 years hands-on experience working in I&C field. PERSONAL DATA Nationality : Egyptian Birth Date

More information

PERSONAL PROFILE WORK EXPERIENCES. August 2005 to Present Astaldi Arabia Ltd. Construction Engineer/Supervisor E & I

PERSONAL PROFILE WORK EXPERIENCES. August 2005 to Present Astaldi Arabia Ltd. Construction Engineer/Supervisor E & I PERSONAL PROFILE Date of Birth : August 30, 1974 Place of Birth : Tanjay City, Negros Oriental, Philippines Age : 37 Gender : Male Status : Married Height : 5 8 Weight : 74 kg. Citizenship : Filipino Religion

More information

MANNYBEL V. URDAS JR.

MANNYBEL V. URDAS JR. MANNYBEL V. URDAS JR. Personal Profile: Goal and results oriented person with a strong technical background and education.10 years of experience in electrical/instrumentation maintenance and construction,

More information

MUE162 HEAT EXCHANGER

MUE162 HEAT EXCHANGER MUE162 HEAT EXCHANGER Design, Operation, Performance, Inspection, Maintenance and Repair H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction:

More information

INTRODUCTION TAQQAT Global Co. Abdulla Fouad Group

INTRODUCTION TAQQAT Global Co. Abdulla Fouad Group TAQQAT PROFILE INTRODUCTION TAQQAT Global Co. is a subsidiary of Abdulla Fouad Group, one of the pioneer organizations in the Kingdom of Saudi Arabia with over 65 years of untainted service. TAQQAT Global

More information

Predictive Maintenance Training

Predictive Maintenance Training Predictive Maintenance Training Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq This predictive maintenance

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES SECTION 26 36 23 AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. General provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority. Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code

More information

Client's Name. Duration (Months) ESD control system upgrading in SALAM CORE PLANT. Target Engineering had conducted detailed engineering in 1993.

Client's Name. Duration (Months) ESD control system upgrading in SALAM CORE PLANT. Target Engineering had conducted detailed engineering in 1993. Year Category Sub-Category Job description 1994 System Integration ESD 1997 System Integration PCS Client's Name End User Industry Country Duration (Months) ESD control system upgrading in SALAM CORE PLANT.

More information

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE TYPE APPROVAL CERTIFICATE Certificate No: TAA00000VH This is to certify: That the Power Management System with type designation(s) Delomatic 4 Issued to DEIF A/S SKIVE, Denmark is found to comply with

More information

Product Guide Low Voltage Switchboard & Switchgear

Product Guide Low Voltage Switchboard & Switchgear Product Guide 2018 Low Voltage Switchboard & Switchgear General INESING low voltage switchgear is completely designed and engineered by INESING using circuit breakers from a leader manufacturers like ABB,

More information

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions. 11/16/12 TerraView First Revision No. 15-NFPA 720-2012 [ Global Input ] Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

More information

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities

More information

FuTech Systems Service Profile

FuTech Systems Service Profile FuTech Systems Service Profile 2010 Overview Catering to the Customer Our team of Engineers, Project Managers and Technicians will see that your project is installed on-time, in budget and according to

More information

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS This standard was reviewed and approved by key managers on September 6, 2011. Officer approval of this revision is not required. 1.0 SCOPE 1.1 This guide applies to the interconnection of a Utility with

More information

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS This standard was reviewed and approved by key managers with final approval by an officer of Oncor Electric Delivery on. 1.0 SCOPE 1.1 This guide applies to the interconnection of a Customer with the Company

More information

Standard PRC 004 5(i) Protection System Misoperation Identification and Correction

Standard PRC 004 5(i) Protection System Misoperation Identification and Correction Standard PRC 004 5(i) Protection System Misoperation Identification and Correction A. Introduction 1. Title: Protection System Misoperation Identification and Correction 2. Number: PRC 004 5(i) 3. Purpose:

More information

About Esri NeA. Esri NeA Training Profile 2012

About Esri NeA. Esri NeA Training Profile 2012 About Esri NeA Stemming from Esri s commitment to meet the needs and demands of the GIS community in the Middle East and North Africa, Esri established Esri Northeast Africa (Esri NeA). Esri NeA is a free

More information

1S25. Arc Fault Monitor 4 Zones, 8 Sensors. Features. Introduction. ARC Fault Protection

1S25. Arc Fault Monitor 4 Zones, 8 Sensors. Features. Introduction. ARC Fault Protection Technical Bulletin Arc Fault Monitor 4 Zones, 8 Sensors Features Four independent arc fault tripping zones 1 or 2 arc fault sensors per zone allowing up to 8 arc fault sensors per module Trip indication

More information

A. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program.

A. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program. 15682 CENTRIFUGAL WATER CHILLERS ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 236416 An optional

More information

CONTENTS AUTOMATIC TRANSFER SWITCHES

CONTENTS AUTOMATIC TRANSFER SWITCHES CONTENTS AUTOMATIC TRANSFER SWITCHES PART 1 GENERAL 1.1 Related Documents 1.2 Summary 1.3 References 1.4 Quality Assurance 1.5 Submittals 1.6 Delivery, Storage and Handling 1.7 Instructions And Training

More information

Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus

Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus ADDENDUM FORM INVITATION TO TENDER: 2016-067 ADDENDUM NO: 1 DATE ISSUED: June 23, 2016 ISSUED BY: Monty Thibeault DESCRIPTION: Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus

More information

FACILITY CONNECTION STANDARD

FACILITY CONNECTION STANDARD FACILITY CONNECTION STANDARD Preface: This Facility Connection Standard applies to any connection to the electric system of Westar Energy, Inc. or Kansas Gas and Electric Company, both doing business as

More information

ELECTRICAL CURRICULA OUTLINE CORE CURRICULUM 2015

ELECTRICAL CURRICULA OUTLINE CORE CURRICULUM 2015 ELECTRICAL CURRICULA OUTLINE CORE CURRICULUM 2015 Basic Safety (Construction Site Safety Orientation) (12.5 Hours) (Module ID 00101-15) Presents basic jobsite safety information to prepare workers for

More information

CONSULTING Training Courses

CONSULTING Training Courses CONSULTING Training Courses 2 EXPLOLABS TRAINING MAKES THE DIFFERENCE 1. GENERAL Why training by Explolabs Consulting? For training in the specialized, high-risk field of explosion protection, one needs

More information

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY A new twist on the National Electrical Code - a practical application workshop. If you sign up in this class, prepare to work! Day 1: Fundamentals of OSHA requirements for performing electrical work -

More information

COURSE DETAILS. ECSSA in conjunction with PCCE Training are offering a. One Day Review Course

COURSE DETAILS. ECSSA in conjunction with PCCE Training are offering a. One Day Review Course Course upgrade details: F01.1 31st August 2016 COURSE DETAILS ECSSA in conjunction with PCCE Training are offering a One Day Review Course on Fire Detection & Alarm Systems (IS3218:2013) System Design,

More information

copyright UIPS 10 th Street King Abdulaziz St. 7 th Street Al Noor Mosque 4 th Street 2 nd Street Prince Bander Street Ramada Gulf

copyright UIPS 10 th Street King Abdulaziz St. 7 th Street Al Noor Mosque 4 th Street 2 nd Street Prince Bander Street Ramada Gulf UIPS LOCATION 10 th Street 10 th Street 7 th Street Al Meflah Building, 4th Floor, Suit 4B 7th Cross King Abdul Aziz Road Al Khobar, Kingdom of Saudi Arabia King Abdulaziz St. 7 th Street 4 th Street 4

More information

Part: I TECHNICAL SPECIFICATION

Part: I TECHNICAL SPECIFICATION Part: I TECHNICAL SPECIFICATION GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TECHNICAL SPECIFICATIONS FOR THE WORK OF DESIGN, SUPPLY, ERECTION AND COMMISSIONING INCLUDING CIVIL WORK OF NITROGEN INJECTION

More information

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan Standard PRC-005-2 Protection System Maintenance A. Introduction 1. Title: Protection System Maintenance 2. Number: PRC-005-2 3. Purpose: To document and implement programs for the maintenance of all Protection

More information

Regional Training. Seminar. » EasyPower Hands-On» Protective Device Coordination» Arc Flash Hazard Analysis. March 12-16, 2018 Austin, TX

Regional Training. Seminar. » EasyPower Hands-On» Protective Device Coordination» Arc Flash Hazard Analysis. March 12-16, 2018 Austin, TX Regional Training» EasyPower Hands-On» Protective Device Coordination» Arc Flash Hazard Analysis Seminar March 12-16, 2018 Austin, TX DoubleTree Austin EasyPower, state-of-the-art Power System Analysis

More information

TRANS ATLANTIC TRADING ENTERPRISE INC.

TRANS ATLANTIC TRADING ENTERPRISE INC. TA GLOBAL SOLUTIONS INDUSTRIAL COMMERCIAL RESIDENTIAL AUTOMATION +1 (416) 317-3325 +1 (647) 294-2594 www.transatinc.com info@transatinc.com ELECTRICAL BUSWAY DISTRIBUTION EQUIPMENT TRANSFORMERS CIRCUIT

More information

4. Applicability: 4.1. Functional Entities: 4.2. Facilities:

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: Standard PRC-005-2(i) Protection System A. Introduction 1. Title: Protection System 2. Number: PRC-005-2(i) 3. Purpose: To document and implement programs for the maintenance of all Protection Systems

More information

Standard PRC-005-3(i) Protection System and Automatic Reclosing Maintenance

Standard PRC-005-3(i) Protection System and Automatic Reclosing Maintenance A. Introduction 1. Title: Protection System and Automatic Reclosing 2. Number: PRC-005-3(i) 3. Purpose: To document and implement programs for the maintenance of all Protection Systems and Automatic Reclosing

More information

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance A. Introduction 1. Title: Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance 2. Number: PRC-005-6 3. Purpose: To document and implement programs for the maintenance of all

More information

Control and Safety in Gas and Oil Complex Industries. Turkey, Istanbul, Wyndham Grand Istanbul Levent. Training Course :

Control and Safety in Gas and Oil Complex Industries. Turkey, Istanbul, Wyndham Grand Istanbul Levent. Training Course : Training Course : Control and Safety in Gas and Oil Complex Industries Training Course For One Week In Turkey, Istanbul, Wyndham Grand Istanbul Levent Which Be Held As Under Details : Tel. : 00965 22610021

More information

COMPANY PROFILE Electrical & Instrumentation Contractor

COMPANY PROFILE Electrical & Instrumentation Contractor COMPANY PROFILE Electrical & Instrumentation Contractor Engineering I Supply I Installation I Testing I Commissioning Maintenance I Fabrication I Ship Repairing ABOUT US The year was 2003, where there

More information

Standard PRC Protection System Misoperation Identification and Correction

Standard PRC Protection System Misoperation Identification and Correction Standard PRC-004-3 Protection System Misoperation Identification and Correction A. Introduction 1. Title: Protection System Misoperation Identification and Correction 2. Number: PRC-004-3 3. Purpose: Identify

More information

ENVIRONMENTAL ETHICS AND PROJECT MANAGEMENT OF ARCHITECTURE

ENVIRONMENTAL ETHICS AND PROJECT MANAGEMENT OF ARCHITECTURE 19-004 The 2005 World Sustainable Building Conference, ENVIRONMENTAL ETHICS AND PROJECT MANAGEMENT OF ARCHITECTURE Seiki TAGAWA Ph.D 1 1 Department of Design and ure, Hokkaido Tokai University, 224 Chuwa

More information

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES Part One General 1.01 Scope A. It is the intent of this specification to provide a medium voltage automatic transfer system. B. All components, testing and services specified and required for a complete

More information

Development of standards for MV Switchgear for Arc Flash protection. ABB Group May 20, 2013 Slide 1

Development of standards for MV Switchgear for Arc Flash protection. ABB Group May 20, 2013 Slide 1 Development of standards for MV Switchgear for Arc Flash protection May 20, 2013 Slide 1 Development of standards for MV Switchgear for Arc Flash protection Bryan Johnson ABB South Africa Shaping the world

More information

Arc Flash Analysis: IEEE Method versus the NFPA 70E Tables July 2017 / 1910DB1702

Arc Flash Analysis: IEEE Method versus the NFPA 70E Tables July 2017 / 1910DB1702 Arc Flash Analysis: IEEE Method versus the NFPA 70E Tables July 2017 / 1910DB1702 by Reza Tajali, Schneider Electric Engineering Services Summary 1.0 Abstract 2.0 OSHA and NFPA Rules 3.0 Use of NFPA 70E

More information

Standard PRC Transmission Relay Loadability

Standard PRC Transmission Relay Loadability A. Introduction 1. Title: Transmission Relay Loadability 2. Number: PRC-023-2 3. Purpose: Protective relay settings shall not limit transmission loadability; not interfere with system operators ability

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 This section specifies the furnishing, complete installation, and connection of automatic transfer switches. 1.2 RELATED WORK A. Section 14 21 00, ELECTRIC

More information

Heat Transfer Equipment - Heat Exchangers. UAE, Dubai, Cityseason Suites Hotel. Training Course : Training Course For One Week In

Heat Transfer Equipment - Heat Exchangers. UAE, Dubai, Cityseason Suites Hotel. Training Course : Training Course For One Week In Training Course : Heat Transfer Equipment - Heat Exchangers Training Course For One Week In UAE, Dubai, Cityseason Suites Hotel Which Be Held As Under Details : Tel. : 00965 22610021 99600277, Fax : 00965

More information

ANSI/NETA Standards Update

ANSI/NETA Standards Update Specifications and Standards Activity ANSI/NETA Standards Update NOW AVAILABALE!!!! NETA Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems The NETA Acceptance Testing

More information

1.3 REFERENCE STANDARDS

1.3 REFERENCE STANDARDS SECTION 28 4600 FIRE DETECTION AND ALARM PART 1 -GENERAL 1.1 SECTION INCLUDES A. Fire alarm system design and installation, including all components, wiring, and conduit. B. Circuits from protected premises

More information

Distributed Generation (greater than 10kW) Connecting to Vector s electricity network

Distributed Generation (greater than 10kW) Connecting to Vector s electricity network Distributed Generation (greater than 10kW) Connecting to Vector s electricity network Important information about installing distributed generation with capacity greater than 10 kilowatts Purpose of this

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 61892-2 Edition 2.0 2012-03 Mobile and fixed offshore units Electrical installations Part 2: System design INTERNATIONAL ELECTROTECHNICAL COMMISSION PRICE CODE XC ICS 47.020.60

More information

Securing a Better Future Securing a Better Job The IGS Security Academy guide to careers in the private security industry

Securing a Better Future Securing a Better Job The IGS Security Academy guide to careers in the private security industry Securing a Better Future Securing a Better Job The IGS Security Academy guide to careers in the private security industry http://academie-igs.com TABLE OF CONTENTS: Is this book for you? 4 Why choose a

More information

IEEE Transformer Committee PC Distribution Transformer Monitoring - User

IEEE Transformer Committee PC Distribution Transformer Monitoring - User IEEE Transformer Committee PC57.167 Distribution Transformer Monitoring - User Mark Scarborough Electrical Engineering Consultant DuPont January 9, 2019 Transformer Types in DuPont Control power Dry-type

More information

Landscape, Agriculture, Irrigation. Oil & Gas. Defence HVAC. Manufacturing & Process Industries. Electro - Mechanical CORPORATE BROCHURE

Landscape, Agriculture, Irrigation. Oil & Gas. Defence HVAC. Manufacturing & Process Industries. Electro - Mechanical CORPORATE BROCHURE Oil & Gas Landscape, Agriculture, Irrigation Defence HVAC Electro - Mechanical Manufacturing & Process Industries CORPORATE BROCHURE Introduction START Electrical Switchgear Assembly LLC., an ISO 9001

More information

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Standard PRC-005-5 Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Standard Development Timeline This section is maintained by the drafting team during the development

More information

EGYPTO ENERGY SEVICES

EGYPTO ENERGY SEVICES EGYPTO ENERGY SEVICES CONTENTS Introduction. Mission & Vision HSQE Scope of Service. Capability & Resources. Questions INTRODUCTION EGYPTO is an Egyptian Company. EGYPTO is a well-established, diversified

More information

UEE30811 Q-Tracker Work Tasks

UEE30811 Q-Tracker Work Tasks UEE30811 Q-Tracker Work Tasks UEENEEC020B Participate in electrical work and competency development activities Q-Tracker requirements: 40 hours of practical training. 1. Comply with electrical industry/enterprise

More information

Eaton training solutions Accredited CPD seminars. LED Emergency and Mains Lighting Contents. Knowledge for your business

Eaton training solutions Accredited CPD seminars. LED Emergency and Mains Lighting Contents. Knowledge for your business Eaton training solutions Accredited CPD seminars LED Emergency and Mains Lighting Contents Knowledge for your business Energizing a world that demands more. Discover today s Eaton. Powering business worldwide

More information

7XG3120 ReyArc20 Arc Fault Monitor Relay Energy Management

7XG3120 ReyArc20 Arc Fault Monitor Relay Energy Management Reyrolle Protection Devices 7XG3120 ReyArc20 Arc Fault Monitor Relay Energy Management 7XG3120 - Arc Fault Monitor Relay The over-current caused by an arc is, due to its resistance, lower than the over-current

More information

PWGSC Ontario MULTIPLEX FIRE ALARM SYSTEM Sect Region Project Page 1 Number R

PWGSC Ontario MULTIPLEX FIRE ALARM SYSTEM Sect Region Project Page 1 Number R Region Project Page 1 PART 1 - GENERAL 1.1 REFERENCES.1 CAN/ULC-S524-2006, Standard for the Installation of Fire Alarm Systems..2 CAN/ULC-S525-2007, Audible Signal Device for Fire Alarm Systems..3 CAN/ULC-S526-2007,

More information

INVITATION TO TENDER ITT NO. PS KILLARNEY COMMUNITY CENTRE ENERGY UPGRADE ADDENDUM NO. 2

INVITATION TO TENDER ITT NO. PS KILLARNEY COMMUNITY CENTRE ENERGY UPGRADE ADDENDUM NO. 2 FINANCE, RISK AND BUSINESS PLANNING GROUP Supply Chain Management November 4, 2015 INVITATION TO TENDER ITT NO. PS20151058 KILLARNEY COMMUNITY CENTRE ENERGY UPGRADE ADDENDUM NO. 2 RE: Insert attached Section

More information

Guide Specification Model CTG Automatic Transfer Switch

Guide Specification Model CTG Automatic Transfer Switch Guide Specification Model CTG Automatic Transfer Switch PART 1 GENERAL 1.1 Scope A. It is the intent of this specification to secure a transfer switch that has been prototype tested, factory built, production

More information

Standard PRC Protection System Misoperation Identification and Correction

Standard PRC Protection System Misoperation Identification and Correction Standard PRC-004-4 Protection System Misoperation Identification and Correction Standard Development Timeline This section is maintained by the drafting team during the development of the standard and

More information

ELECTRICAL TESTING TECHNICIAN CERTIFICATION PROGRAM STUDY GUIDE Setting the Standard Energizing the Future

ELECTRICAL TESTING TECHNICIAN CERTIFICATION PROGRAM STUDY GUIDE Setting the Standard Energizing the Future ELECTRICAL TESTING TECHNICIAN CERTIFICATION PROGRAM STUDY GUIDE 2016 Setting the Standard Energizing the Future ELECTRICAL TESTING TECHNICIAN CERTIFICATION PROGRAM STUDY GUIDE Table of Contents About the

More information

Element D Services Electrical

Element D Services Electrical PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as a Specification.

More information

ICX-CMOS-E-2003 I&C Erection, Commissioning & Start-up Lead Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS

ICX-CMOS-E-2003 I&C Erection, Commissioning & Start-up Lead Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS 102118-ICX-CMOS-E-2003 I&C Erection, Commissioning & Start-up Lead Engineer Holds a B. Sc. in Electrical Engineering (Communications & Electronics), Pre-master degree and a Diploma in System Developing.

More information

IE Code IE Competency Title Credit OAC Ref.

IE Code IE Competency Title Credit OAC Ref. Compulsory Workplace Competency Standards Level Four IE Code IE Competency Title Credit OAC Ref. IE119-4WC Design and draw electrical and electronic drawings including schematics, 4 F5 maintain documentation

More information

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:

More information

STATEWIDE CAREER/TECHNICAL EDUCATION COURSE ARTICULATION REVIEW MINUTES

STATEWIDE CAREER/TECHNICAL EDUCATION COURSE ARTICULATION REVIEW MINUTES STATEWIDE CAREER/TECHNICAL EDUCATION COURSE ARTICULATION REVIEW MINUTES Articulation Agreement Identifier: ELT 118 (2005-1) Identifier is the postsecondary course prefix followed by Plan-of-Instruction

More information

SHAH SHAHBAZ BAHUDDIN AHMED

SHAH SHAHBAZ BAHUDDIN AHMED - 1 - SHAH SHAHBAZ BAHUDDIN AHMED Objective Association with the growth oriented organization in a capacity Having effective utilization of engineering background and offering Career opportunities. Present

More information

Documentation guide to get your plant on the positive list (Category A1/A2)

Documentation guide to get your plant on the positive list (Category A1/A2) Documentation guide Document officer : MER Secretary: SLS Caseno..: s2016-457 Document no.: d2016-14033-8.0 27-01-2017 Documentation guide to get your plant on the positive list (Category A1/A2) In the

More information

SECTION GENERATOR PARALLELING CONTROLS

SECTION GENERATOR PARALLELING CONTROLS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 23 13 GENERATOR PARALLELING CONTROLS SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

This is a preview - click here to buy the full publication INTERNATIONAL ELECTROTECHNICAL COMMISSION

This is a preview - click here to buy the full publication INTERNATIONAL ELECTROTECHNICAL COMMISSION INTERNATIONAL ELECTROTECHNICAL COMMISSION GUIDE 111 Second edition 2004-07 Electrical high-voltage equipment in high-voltage substations Common recommendations for product standards IEC 2004 Copyright

More information

TYPE APPROVAL CERTIFICATE

TYPE APPROVAL CERTIFICATE TYPE APPROVAL CERTIFICATE Certificate No: TAA00000VH Revision No: 1 This is to certify: That the Power Management System with type designation(s) Delomatic 4 Issued to DEIF A/S Skive, Midtjylland, Denmark

More information

Electrical Grounding For Oil and Gas Applications

Electrical Grounding For Oil and Gas Applications Electrical Grounding For Oil and Gas Applications Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq The Oil &

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Magnetic Flowmeters C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Magnetic Flowmeters C O N T E N T S Revised 04/13/16 SPECIFICATIONS - DETAILED PROVISIONS Section 17210 - Magnetic Flowmeters C O N T E N T S PART 1 - GENERAL... 1 1.01 GENERAL REQUIREMENTS... 1 1.02 PROJECT SPECIFIC REQUIREMENTS... 1 1.03

More information

Holds a B. Sc. in Communications & Electronics Engineering and has about 11 years hands-on experience working in I&C field.

Holds a B. Sc. in Communications & Electronics Engineering and has about 11 years hands-on experience working in I&C field. 102866-ICX-CMOS-E-2005 Lead I&C Commissioning / Maintenance Engineer Holds a B. Sc. in Communications & Electronics Engineering and has about 11 years hands-on experience working in I&C field. PERSONAL

More information

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:

More information

NZQA unit standard version 2 Page 1 of 6. Perform installation and maintenance of telecommunications radio systems and services

NZQA unit standard version 2 Page 1 of 6. Perform installation and maintenance of telecommunications radio systems and services Page 1 of 6 Title Perform installation and maintenance of telecommunications radio systems and services Level 3 Credits 40 Purpose This unit standard covers basic skills for people engaged in installation

More information

Level 3 Certificate in Fire Safety Fire Auditors Xact Consultancy and Training Limited

Level 3 Certificate in Fire Safety Fire Auditors Xact Consultancy and Training Limited Level 3 Certificate in Fire Safety Fire Auditors Xact Consultancy and Training Limited T: 01386 277980 F: 0845 0941 887 qualifications@xact.org.uk www.xact.org.uk 2/3/18-Brochures/L3C FS 2018-18 i Contents

More information

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. SECTION 239950 MECHANICAL COMMISSIONING SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. B. Commissioning

More information

PART 8 - Miscellaneous Services 3rd Revised Sheet 1 SECTION 8 - Other Miscellaneous Services Replacing 2nd Revised Sheet 1

PART 8 - Miscellaneous Services 3rd Revised Sheet 1 SECTION 8 - Other Miscellaneous Services Replacing 2nd Revised Sheet 1 PART 8 - Miscellaneous Services 3rd Revised Sheet 1 Replacing 2nd Revised Sheet 1 BUSY-OUT ARRANGEMENT - ROTARY NUMBER GROUP /1,3/ A. Rates Service and Monthly Installation Equipment USOC Rate Charge Charge

More information

i-con Switchgear Condition Monitoring HV Switchgear Integrated Substation Condition Monitoring ISCM Answers for Infrastructure & Cities.

i-con Switchgear Condition Monitoring HV Switchgear Integrated Substation Condition Monitoring ISCM Answers for Infrastructure & Cities. i-con Switchgear Condition HV Switchgear Integrated Substation Condition ISCM Answers for Infrastructure & Cities. The challenge: Reliable energy supply is the key to success for every enterprise in a

More information

Property risk solutions

Property risk solutions Property risk solutions Inside this issue Welcome to this edition of the Property risk solutions newsletter. This quarterly publication focuses on fixed fire protection and human element safety solutions

More information

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

Atiah Hanash Alzahrani Est. COMPANY PROFILE

Atiah Hanash Alzahrani Est. COMPANY PROFILE مؤسسة عطية حنش الزهران ي Atiah Hanash Alzahrani Est. COMPANY PROFILE TABLE OF CONTENT INTRODUCTION COMPANY SUMMARY QUALITY COMMITMENT PRODUCT & SERVICES PARTNERS & CUSTOMERS CLIENT REFERENCE INTRODUCTION

More information

Firstcool BRIEF SPECIFICATION OF MATERIALS USED. INSULATION PANELS FOR COLD ROOMS REFRIGERATION UNITS CLADDING SHEETS ACCESSORIES INSULATED FLOORS

Firstcool BRIEF SPECIFICATION OF MATERIALS USED. INSULATION PANELS FOR COLD ROOMS REFRIGERATION UNITS CLADDING SHEETS ACCESSORIES INSULATED FLOORS BRIEF SPECIFICATION OF MATERIALS USED. INSULATION PANELS FOR COLD ROOMS Polyurethane/PIR panels are with a density of insulation 40-42 KG/M3 Thickness 100mm, 125mm, 150mm, 200mm, Length, width and height

More information

Rules for Classification and Construction Additional Rules and Guidelines

Rules for Classification and Construction Additional Rules and Guidelines VI Rules for Classification and Construction Additional Rules and Guidelines 7 Guidelines for the Performance of Type Approvals 7 Test Requirements for Statical Converters with Semi-Conductors Edition

More information

Standard PRC Protection System and Automatic Reclosing Maintenance. Standard Development Roadmap

Standard PRC Protection System and Automatic Reclosing Maintenance. Standard Development Roadmap Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed:

More information

To: Honorable Public Utilities Board Submitted by: /s/ Douglas Draeger AGM Engineering and Operations

To: Honorable Public Utilities Board Submitted by: /s/ Douglas Draeger AGM Engineering and Operations AGENDA ITEM NO.: 5.D.1 MEETING DATE: 0/4/014 ADMINISTRATIVE REPORT NO.: 014-48 To: Honorable Public Utilities Board Submitted by: /s/ Douglas Draeger AGM Engineering and Operations From: Tito R. Nagrampa

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between //--// if not applicable to project. Also, delete any other item or paragraph

More information

CIRCUIT BREAKER FAIL PROTECTION

CIRCUIT BREAKER FAIL PROTECTION CIRCUIT BREAKER FAIL PROTECTION This document is for Relevant Electrical Standards document only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any losses

More information

Standard Development Roadmap

Standard Development Roadmap Standard PRC-005-2 Protection System Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

More information

Introduction Consultant shall incorporate the material in the DSS into the project specifications.

Introduction Consultant shall incorporate the material in the DSS into the project specifications. DIVISION 16 - ELECTRICAL Section 16000 - General Discussion Introduction Consultant shall incorporate the material in the DSS into the project specifications. Refer any questions, clarifications regarding

More information