CHAPTER 8 DISASTER CONTROL PLAN
|
|
- Cameron Gibson
- 5 years ago
- Views:
Transcription
1 CHAPTER 8 DISASTER CONTROL PLAN 8.0 DISASTER OR EMERGENCY CONTROL PLAN KSPL management has planned policy in environmental protection, ensuring safety and health of all employees as well as well being of the people in the surrounding areas. It is likely that any activity of the plant can create threat / danger / hazard due to storage of alcohol. Proposed captive power generation plant also can cause fire, electrocution and explosion hazards. Karan Sugar Pvt. Ltd. is already covered under Factories Act 1948 & Maharashtra Factories Rules 1963 with all amendments till today and all directives from Director Safety, Health & Environment [SHE] are binding on KSPL. KSPL management is bound to appoint a qualified Safety Officer. On site and off site disaster control plans, their perfect implementation will be part and parcel of the project & duty of safety officer. To lessen the probability of hazard to materialize & avoid the consequent damage, a disaster management and control plan has been worked out for whole complex Type of Disaster at KSPL complex Disaster can occur at site or off site i.e. disaster on campus or disaster in nearby area causing indirect damage to site area and the complex. Disaster is classified into two categories such as, Natural and Manmade calamities: Natural calamities :- Flood, Storm / typhoon, Earthquake, Tsunami, Heavy mist, fog, hail storm, eruption of volcano, Land slide Man made calamities involve:- Fire & Explosion, All types of leakages & spillage, Electrocution, Accidents during excavation, construction activities, erection, or sabotage, rail & road accidents, mass agitation, looting, morcha, mass agitation, war etc. The identified Dangerous areas in the complex are:- 1. Boiler area - Explosion 2. Oil tanks - Fire and spillage 3. Turbine section - Explosion
2 4. Electrical rooms - Fire and electrocution 5. Transformer area - Fire and electrocution 6. Cable - Fire and electrocution 7. Storage facilities Fire / spillage for fuel and alcohol Considering various probabilities the management & safety department will create safety awareness & preparedness in all employees and people in vicinity area in case of any emergency & a chalk out plan to overcome the disaster in time. This includes preparation of onsite and offsite disaster control plans, impart training to staff and employees, conducting regular mock drills at least 2 times in a calendar year, reports schemes to DISH & take their guidance for the perfect implementation Level of Accident If there is any disaster in any part of plant/work place due to any reason the level of accidents from damage point of view may vary. Accordingly accident prevention program will have to be initiated by safety department simultaneously Critical targets during emergency Level I Accidents Under this level disaster may happen due to electrocution, fire explosion, oil spillage and spontaneous ignition of combustible material. This level has probability of occurrence affecting persons inside the plant. Level II Accidents In second level cases of sabotage and compete failure of all automatic control/warning systems, and also if the start up fuel oil stored in tank and covered by tank bunds leaks out. However, probability of occurrence of Level II Accidents reduces due to the proposed adequate security training, and education level of plant personnel for the captive power plant Site emergency control room (SECR) & site main controller In each segment of work from domestic level to war fighting team level approach always helps. If concerned man is aware of his duty at his place & need of the time he can complement to huge task of containing the damage of the disaster. To overcome the emergency in its occurrence it is the strategy to get prepared in advance, plan for the team effort, educate others and reduce all effects of disaster.
3 In case of any disaster main responsibility lies with the Chairman and Board of Directors, where they nominate one person as responsible who will be Chief incidence controller. In case of disaster key person like Chief engineer, Chief chemist, Distillery manager, Safety officer will be appointed as the site main incidence controller and will commence respective duties in that capacity to curtail the emergency & minimize the losses may be occurring. People in all departments can render assistance in form of contacting external persons or agencies, district, state and central authorities, hospital & ambulance contact, police department for evacuation if needed for people in the vicinity with assistance of state transport buses. People from maintenance department are to rectify the fault in system as early as possible. Security persons have to assist in fire fighting & segregation of material to avoid losses. All situations should be visualized and plan safety operations involving all staff in factory to get any sort of external help / assistance in time to lessen all sorts of damage. To ensure disaster is controlled effectively a site emergency control room (SECR) will be established at the plant site. The SECR shall keep following information and accessories ready and prominently displayed and start to act as detailed if the emergency occurs: List of telephone numbers of Chairman & Directors KSPL, Chief Engineer, Chief Chemist, Distillery Manager, Administration Manager. Telephone numbers of Sarpanch and members of Panchayat of Harwad village, members of city council of Shirol town, Collector, Kolhapur district, Shirol regional State road transport depot office, Kolhapur District & local fire brigade station, home guard, civil defense, N.C.C. unit, State crisis group, Shirol, crisis group. All material handling & incoming vehicle traffic to be stopped or diverted All out going lines to be used to contact above authorities. Captive power plant layout with details of inventories and locations of fuel storage areas Oil / furnace oil storage tanks, bagasse, rice husk, coal storage yard etc. Hazard identification chart, maximum number of people working at a time, assembly points etc List of village and their population in the vicinity of proposed plant
4 Public address system like loud speaker, battery operated speaker, sirens, Whistles, batteries, signaling flags etc. Rechargeable and battery operated torch lights and invertors. Tie up with nearest hospital for medical assistance and facility for stretchers, chairs etc. List of registered medical practitioners in vicinity. Study map showing various villages and towns in the vicinity of plant. Muster Roll of all present employees. Note pads and ball pens to record message received and instructions to be passed to concerned persons The blow up copy of Layout plan showing areas where accident could occur. Accident mock drill for at least 2 times in a calendar year is to be a part of Routine exercise. The report before such drill has to be submitted to DISH for information and approval Disaster preventive measures The proposed plant will have following preventive measures to avoid occurrence of disasters: I. Specification & marking of safe area to gather in emergency. II. Design, manufacture and construction of plant, machineries and buildings will be as per national and international codes as applicable in specific cases and laid down by statutory authorities. III. Provision of adequate access ways for movement of equipment and personnel. IV. Minimum two numbers of gates to escape during disaster shall be provided. V. Fuel oil storage shall be in protected and fenced. The tank will be housed in a dyke wall. As per regulations of Chief Controller of Explosives, it s testing & certification will be performed each 5 years regularly.
5 VI. Proper color coding for all process water, air & steam lines will be done. VII. Proper insulation for all steam & condensate, hot water lines will be done. VIII. Provision of circuit brakers, isolation switches, signals will be provided as per electricity act & rules. IX. Proper & rigid bonding and earthing to all equipment will be arranged. X. Meger value of earthing connections will be checked each 6 months and the same record will be available. XI. System of fire hydrants comprising, of electrical motor driven fire pumps is planned. The fire hydrant system will have electrical motor and a generator driven jockey pump to keep the fire hydrant system properly pressurized. XII. Automatic water sprinkling system is planned for all transformers FIRE FIGHTING SYSTEM AS PER (TAC) NORMS: The fire detection and protection system has been planned to meet the above objective according to Tariff Advisory Committee (TAC) of India. The complete fire protection system will comprise of the following (a) Sprinkler system Automatic with manual switchover sprinkler system will be installed for fire detection & alarm system followed by initiation of water spays in area with likelihood of fire hazards. (b) Fire Hydrant Fire hydrants are provided at all around in the plant at specific distance as per TAC Norms. (c) Portable fire extinguishers Various areas of the plant have one or more of the above system depending upon the particular nature of risk involved in that area. (d) Portable Chemical Fire Extinguishers These are intended as a first line of defense, and hence are stationed at strategic locations in different buildings and also for outdoor facilities. Portable fire extinguishers are foam type; carbon dioxide type and multipurpose dry chemical (MPDC) type.
6 (e) Fire Detection and Alarm System This system comprises fire alarm panels, automatic fire detectors, manual call points and fire siren (hooter). The main fire alarm panel provides both visual and audible alarm of fire in any protected areas of the plant. Manual break glass type fire alarms are provided at strategic locations where high hazards exits. Automatic fire detectors are provided for coal handling areas and in plant areas such as control rooms, switchgear rooms, cable galleries etc. First Aid A first aid centre with adequate facilities is provided. An Ambulance is provided at site to carry affected people to hospital. Security The security requirements of the company premises are taken care by CSO assisted by a Fire In charge. Safety - The required safety appliances are distributed at different locations of the plant to meet any eventualities. Evacuation Procedure As the major hazard is due to fire, which has more or less localized impact no mass evacuation, procedures are required. Evacuation would involve only of the people working very close to the fire area. Emergency Control Center Provision is made to establish an Emergency Control Centre (ECC) from which emergency operations are directed and coordinated. The ECC consists of one room, located in an area that offers minimal risk being directly exposed to possible accidents.
7 The ECC is always ready for operation and provided with the equipment and supplies necessary during the emergency such as: Updated copies of the On site Disaster Management Plan. Emergency telephone numbers. The names, phone number, and address of external agencies, response Organizations and neighboring facilities. The adequate number of telephone (more than two). Emergency lights. List of fire extinguishers with their type no. and location, capacity, etc. Personal protective equipment. Safety helmets List of quantity & location. Clock. Status boards/message board. Material safety data sheets for chemicals handled at the facility. Fire is one of the main causes to initiate an emergency situation. It always pays in time if due attention is given to all materials and combustibles present on site and their quantities in time. It can occur any time and hence one aught to be vigilant and cautious nature of management and all staff always helps to lessen the cases of fire accidents. To meet any sort of challenges in case of fires, BIS 2190 provides Indian standards for firefighting equipment. All firefighting equipment and extinguishers have to be planned according to this standard as explained in the table below.
8 There are 4 classes of fire extinguishers: Class Materials Extinguisher A Cotton, Cloth, paper, wood Water type B Oils, Hydrocarbons, Alcohol, Greases CO 2 type C Gases, CNG, LPG, Acetylene, Foam type D Electrical & metals Foam Recommendation The fire tender, which will be part of project with following minimum fire fighting arrangements, shall be procured: Water tank liters CO liters Foam tank - 45 liters CO 2 type fire extinguishers - 6 nos. of 4.5 kg each 8.7. Location type of fire extinguishers Turbo-generator area CO 2 Type, Foam Type Dry chemical powder. Cable galleries CO 2 Type, Foam Type Dry chemical powder High voltage panel CO 2 Type, Foam Type Dry chemical powder. Control rooms CO 2 Type, Foam Type Dry chemical powder. MCC rooms CO 2 Type, Foam Type Dry chemical powder. Pump houses CO 2 Type, Foam type dry chemical powder. Fuel tank Area CO 2 type, Foam Type Dry chemical powder Sand Basket.
9 Offices & Godowns Foam or Dry chemical powder Type. Crushers house CO 2 Type, Foam Type dry chemical powder. Alcohol storage tank area, foam type dry chemical powder and sand basket Alarm system to be followed during disaster On the receiving of message of Disaster from Site Main Controller, fire station control room attendant will crash Siren WAVING TYPE for 5 minutes. Incident controller will arrange to broad cast disaster message through public address system. On receiving the message of Emergency Over from incident Controller the fire station control room attendant will give All Clear Signal by sounding alarm straight for two minutes. The features of alarm system will be explained to one and all to avoid panic or misunderstanding during disaster. It is necessary to take one trial for perfect functioning of the siren at least once in one week with prior intimation to Kolhapur District Collector. 8.9 Precautions to be taken in handling and storage of Alcohol: Storage in tightly closed containers in cool, dark, well-ventilated area. Protect containers from physical damage. Keep heat, fire and flame away. Outside building or underground storage is recommended Risk Assessment: Environment General Assessment: The environment is at risk of exposure during transportation, storage, disposal, or destruction of ethyl alcohol. In almost every scenario, the threat of environmental exposure is contingent upon the proper handling of the chemical substance. Accidental spills, large or small, can result in fire, explosion, and possible contamination of the surrounding environmental mediums (water, soil, and air) Recommended Risk-Reduction Measures: Proper training of all transporters will reduce the likelihood of an accident resulting in a leak or spill to the environment. The correct use of DOT labeling (per the MSDS) on all containers, trucks, and rail
10 cars will enable emergency responders to react properly and quickly to any disaster thereby reducing the potential risk to the environment and to personnel. Storage of ethyl alcohol shall be segregated from incompatible chemicals to minimize the risk of cross contamination or contact. Buildings designated for storage shall be equipped with appropriate fire protection systems (alarms, sprinklers, emergency lighting, and portable extinguishers). Equipment shall be designed to meet explosion-proof standards. If a spill or leak to the environment has occurred, fire department, emergency response, and/or hazardous materials spill person should be notified immediately. Cleanup should be attempted only by those trained in proper spill containment procedures. Contaminated soils should be removed for incineration and replaced with clean soil. If ethyl alcohol should contact the water table, aquifer, or navigable waterway, time is: of the essence. It is highly soluble in water and, therefore, total containment and remediation may not be entirely possible. When such spills occur, the local and/or state emergency response authorities must be notified. A comprehensive emergency response of disaster awareness/recovery plan should be in place prior to any operations involving the use, transportation, storage, or disposal of ethyl alcohol. If ethyl alcohol is spilled or leaked, the following specific steps are recommended: a) Restrict persons not wearing protective clothing from area of spill or leak until cleanup is complete and area can be opened for normal work. b) Ventilate area and remove ignition sources. c) Absorb liquids in vermiculite, dry sand, earth, or a similar material and deposit in sealed containers. Use non-sparking tools. d) It may be necessary to dispose of ethyl alcohol as a hazardous waste. The responsible state agency or the regional office of the federal Environmental Protection Agency (EPA) should be contacted for specific recommendations.
RISK ASSESSMENT AND HAZARD MANAGEMENT
Hazard analysis involves the identification and quantification of the various hazards (unsafe condition) that may exist in the plant. On the other hand, risk analysis deals with the identification and
More informationM/s. Uttam Sugar Mills Limited 1
1 RISK ASSESSMENT AND HAZARD MANAGEMENT Hazard analysis involves the identification and quantification of the various hazards (unsafe condition) that exist in the plant. On the other hand, risk analysis
More informationRISK STUDIES. Housekeeping practices requiring contact with solid and liquid wastes
Risk Assessment and Hazard Management RISK STUDIES Hazard analysis involves the identification and quantification of the various hazards (unsafe condition) that exist in the plant. On the other hand, risk
More informationDMP & RISK MANAGEMENT PLAN
DMP & RISK MANAGEMENT PLAN An industry with its complex of activities involving various plant machineries, raw materials, products operations, intermediates and environmental discharge has a number of
More informationA. RISK ASSESSMENT AND DISASTER MANAGEMENT PLAN
A. RISK ASSESSMENT AND DISASTER MANAGEMENT PLAN 7.1 RISK ASSESSMENT Risk assessment forms an integral part of EIA study. Risk assessment study deals with identifying and evaluating the magnitude of impending
More informationDISASTER MANAGEMENT PLAN 3.0 IDENTIFICATION OF MAJOR HAZARD POTENTIAL
DISASTER MANAGEMENT PLAN 1.0 DISASTER (EMERGENCY) A disaster or an emergency, occurring in a project is one, as a result of a malfunctioning of the normal operating procedures or an intervention of an
More informationEnclosure 4- RISK ASSESSMENT
Enclosure 4- RISK ASSESSMENT RISK ASSESSMENT Risk is a potential that a chosen action or activity will lead to a loss of human or property. Risk assessment is a step for Risk Management. Risk assessment
More informationEnvironmental emergency preparedness and response
.0 Purpose The purpose of this procedure is to establish a system for handling emergencies arising out of fire or others. 2.0 Scope Activities, operations and services including maintenance that is associated
More information1.1 Introduction. A. Risk assessment and, B. Disaster Management Plan
1.1 Introduction A. Risk assessment and, B. Disaster Management Plan A. Risk Assessment And Hazard Management Hazard analysis involves the identification and quantification of the various hazards (unsafe
More informationERDMP & RISK ASSESSMENT REPORT
ERDMP & RISK ASSESSMENT REPORT Emergency Response and Disaster Management Plan (ERDMP) The scope of ERDMP is listed below (i) The identification of emergencies; (ii) The mitigation measures that attempt
More informationM.P. Bhawan Risk Assessment. Chankya Puri, New Delhi
RISK ASSESSMENT M.P. Bhawan At Chankya Puri, New Delhi Risk associated with the proposed project Main hazards identified for the project include. Fire due to LPG/PNG leakage Hazard pertaining to Fire in
More informationHAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus
HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus Issued By: Office of Finance and Administration Name: Chief Financial Officer Effective Date: November
More informationHAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus
HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus Purpose: This document outlines the University of Southern Maine s (USM) contingency plan for emergency
More informationEMERGENCY PREPAREDNESS - POLLUTION INCIDENT RESPONSE PROGRAM
Page: 1 of 12 EMERGENCY PREPAREDNESS - POLLUTION INCIDENT RESPONSE PROGRAM TABLE OF CONTENTS 1. PURPOSE... 2 2. SCOPE... 2 3. REFERENCES... 2 4. DEFINITIONS... 3 5. RESPONSIBILITIES... 4 NOTE: LICENCE
More informationProposed Commercial Project at Plot No. C3A, Sector-16B, Greater Noida West (U.P)
SAFETY AND DISASTER MANAGEMENT PLAN India has been traditionally vulnerable to natural disasters on account of its unique geo climatic conditions. Floods, droughts, cyclones, earthquakes and landslides
More information5.0 CONTINGENCY PLAN. It is necessary to amend the plan if:
5.0 CONTINGENCY PLAN This Contingency Plan for the Safety-Kleen Systems, Inc. - Denton Recycle Center is prepared in accordance with the requirements of 40 CFR 264 Subpart D and 40 CFR 264.37. The intent
More informationSchool EMERGENCY PLAN
School EMERGENCY PLAN The following outline covers the main criteria for emergency guidelines for this facility and its operations. The outline will be under review with local officials and details are
More informationNITOL INSURANCE COMPANY LIMITED
NITOL INSURANCE COMPANY LIMITED 1. Name and Address of the Insured : PROPOSAL FORM 2. Nature of Risk : 3. Location : 4. Period of Insurance : From: To: 5. Sum Insured : (Section-wise) (a) Section-I (Property
More informationEMERGENCY PREPAREDNESS & RESPONSE PROCEDURE
1 of 12 2 of 12 CONTENTS 1.0 OBJECTIVES...3 2.0 SCOPE...3 3.0 DEFINITION OF TERMS...3 4.0 RESPONSIBILITIES & AUTHORITIES...4 5.0...4 5.1 Emergency Scenario Identification...4 5.2 Emergency Response Team...4
More informationFire Safety Plan (FSP) Review Checklist 1
Fire Safety Plan (FSP) Review Checklist 1 (Component of a BC Fire Code (BCFC) compliance inspection) COMPANY INFORMATION Company name: Building Name: Address: Street # and name City/Province Postal Code
More informationFire Safety Plan (FSP) Review Checklist 1
Fire Inspection & Prevention Initiative Fire Safety Plan (FSP) Review Checklist 1 (Component of a BC Fire Code (BCFC) compliance inspection) Date: COMPANY INFORMATION Company Name: Building Name: Address:
More informationEMERGENCY PREPAREDNESS - POLLUTION INCIDENT RESPONSE PROGRAM
Manager Page: 1 of 12 EMERGENCY PREPAREDNESS - POLLUTION INCIDENT RESPONSE PROGRAM TABLE OF CONTENTS 1. PURPOSE... 2 2. SCOPE... 2 3. REFERENCES... 2 4. DEFINITIONS... 3 5. RESPONSIBILITIES... 4 NOTE:
More informationSCALES NW EMERGENCY ACTION PLAN
Purpose Each SCALES NW, INC location shall have a written Emergency Action Plan, appropriate to the hazards of the workplace, in order to respond to an emergency that may require rescue or evacuation.
More informationCHAPTER 8 OCCUPATIONAL HEALTH AND SAFETY
CHAPTER 8 OCCUPATIONAL HEALTH AND SAFETY 8.1 Health and Safety Aspects Plant operation will involve storage handling and use of fuels and several chemicals. Some of these chemicals may be hazardous in
More informationEstablishment of new clinker grinding unit capacity Million TPA (OPC & PPC Cement), at village - Satha, Tehsil - Koil, District - Aligarh (UP)
7.3 Risk Assessment and Hazard Management Hazard analysis involves the identification and quantification of the various hazards (unsafe condition) that in the plant. On the other hand, risk analysis deals
More informationChapter 7: ADDITIONAL STUDIES
Chapter 7: ADDITIONAL STUDIES Risk is the probability or severity of occurrence of a harmful consequence due to hazards. Hazard is a situation that poses a level of threat to life health or environment.
More informationChapter 7: ADDITIONAL STUDIES
Chapter 7: ADDITIONAL STUDIES Risk is a potential that a chosen action or activity will lead to a loss of human or property. Risk assessment is a step for Risk Management. Risk assessment is determination
More informationFIRE EMERGENCY ACTION PLAN (EAP)
FIRE EMERGENCY ACTION PLAN (EAP) Gorseinon Institute December 2012 1 TABLE OF CONTENTS SECTION 1 Workplace Details Page 3 SECTION 6 Means of Escape Page 9 SECTION 2 Organisation and Responsibility 4 SECTION
More information7.2 SAFETY CODE FOR BUILDING & FIRE FIGHTING SYSTEM
CLERNCE FOR EXPNSION OF GROUP HOUSING PROJECT "ECO VILLGE - III" T PLOT NO GH-06, SECTOR - 16 B, GRETER NOID, U.P. 7. RISK SSESSMENT & DMP 7.1 INTRODUCTION The construction project involves lot of activities
More informationChapter 1: ADDITIONAL STUDIES
Chapter 1: ADDITIONAL STUDIES Risk is a potential that a chosen action or activity will lead to a loss of human or property. Risk assessment is a step for Risk Management. Risk assessment is determination
More informationRISK ASSESSMENT, DISASTER MANAGEMENT AND SAFETY MEASURES (ONSITE & OFFSITE)
RISK ASSESSMENT, DISASTER MANAGEMENT AND SAFETY MEASURES (ONSITE & OFFSITE) Project: Residential apartment by M/S Puravankara projects Ltd at Municipal No 5, Lalbagh Road, Ward No 48, Sudhamanagar Ward,
More informationTo: All SAAS Accredited Certification Bodies Subject: Clarification to Emergency and Health & Safety Requirements in the SA8000 Standard
SOCIAL ACCOUNTABILITY ACCREDITATION SERVICES To: All SAAS Accredited Certification Bodies Subject: Clarification to Emergency and Health & Safety Requirements in the SA8000 Standard Background: After an
More informationFire Prevention and Protection Plan
Fire Prevention and Protection Plan Last Reviewed: 09/28/16 I. PURPOSE... 2 II. SCOPE... 2 III. REFERENCES... 2 IV. RESPONDING TO A FIRE... 2 A. First, call 911.... 2 B. Then, call Community Safety...
More informationContingency/Emergency Plan for all Hazards Page 1 of 9
Contingency/Emergency Plan for all Hazards Page 1 of 9 1. OBJECTIVE To ensure that through providing emergency procedures and guidelines that in the case of an emergency, personnel will be able to act
More informationRISK ASSESSMENT. Prepared by:-m/s PerfactEnviro Solutions Pvt. Ltd. 76. M/s Alton Buildtech India Pvt. Ltd.
RISK ASSESSMENT Prepared by:-m/s PerfactEnviro Solutions Pvt. Ltd. 76 RISK ASSESSMENT Risk is a potential that a chosen action or activity will lead to a loss of human or property. Risk assessment is a
More informationRISK ASSESSMENT, ITS MITIGATION & DISASTER MANAGEMENT PLAN
RISK ASSESSMENT, ITS MITIGATION & DISASTER MANAGEMENT PLAN 1.0 General All projects, whether industrial or otherwise, do have some pitfalls. The gravity of such happenings depends on manufacturing process,
More informationRISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN
RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN RISK ASSESSMENT The phases of an emergency includes: 1. Risk assessment 2. Mitigation 3. Preparedness 4. Response 5. Recovery Areas of Risk includes: Naturally
More informationHAZARDOUS WASTE CONTINGENCY PLAN
HAZARDOUS WASTE CONTINGENCY PLAN 1.0 Introduction In accordance with Federal, State, and local requirements, a Contingency Plan or Chemical Emergency Plan is required for response to fires, explosions,
More informationBUILDING EMERGENCY ACTION PLAN. for Your Building Name
BUILDING EMERGENCY ACTION PLAN for Your Building Name Building Emergency Action Plan for Non-residential Campus Buildings Building Name: SAMPLE ONLY Date of last update/review: 01/01/2013 (The plan should
More informationTraining Toolbox Series. ICA11v1.0 Information, Digital Media & Technology
Vocational Education and Training Training Toolbox Series ICA11v1.0 Information, Digital Media & Technology Cert I, II and III Classroom Handouts 2 Section 10 Emergency Planning, Accident Reporting and
More informationWHAT IS FIRE DISASTER? Fire Disaster is an occurrence or an incident of such magnitude which creates a situation in which the normal life is suddenly
TOPIC : FIRE DISASTER MANAGEMENT PRESENTED BY :- AMALENDU BANERJEE, DIVISIONAL OFFICER, WBFES WHAT IS FIRE DISASTER? Fire Disaster is an occurrence or an incident of such magnitude which creates a situation
More informationFire Safety. Version 1.0
This document is intended to provide basic safety guidelines for the Physical Plant Department at Community College of Allegheny County. The information provided in this guide may vary by site. Version
More informationThese telephone numbers are provided as a general aid to emergency notification. Be advised that additional agencies may be required to be notified.
Authority Cited: HSC 25504(b); 19 CCR 2731; 22 CCR 66262.34(a)(4), 22CCR 66265.50-.65 Page 1 of 7 All facilities that handle hazardous materials in HMBP quantities must have a written emergency response
More informationCENTRAL STATE HOSPITAL PLAN SAFE USE HANDLING AND STORAGE OF FLAMMABLE AND COMBUSTIBLE LIQUIDS
Page 1 of 6 CENTRAL STATE HOSPITAL PLAN SUBJECT: SAFE USE HANDLING AND STORAGE OF FLAMMABLE AND COMBUSTIBLE LIQUIDS ANNUAL REVIEW MONTH: RESPONSIBLE FOR REVIEW: APRIL CSH SAFETY DIRECTOR LAST REVISION
More informationEmergency Evacuation Plan South Patterson Building (SPB)
Emergency Evacuation Plan 1700 South Patterson Building (SPB) 2014 Table of Contents Section I: Purpose and Objectives Section II: General Guidelines Section III: Responsibilities of Emergency Coordinator
More informationFire Protection. A Health and Safety Guideline for Your Workplace. Introduction. Fire Prevention and Control. Workplace Assessment
A Health and Safety Guideline for Your Workplace Fire Protection Introduction Fire Protection is an organized approach designed to prevent fires. In the event of a fire, a fire protection program will
More informationFACILITY OF EMERGENCY PLAN. (Template)
FACILITY OF EMERGENCY PLAN (Template) Date: Table of Contents RECORD OF AMENDMENTS... 2 DISTRIBUTION LIST... 3 EMERGENCY PLAN AUTHORIZATION... 4 INTRODUCTION... 5 PURPOSE... 6 AIM... 6 ACTIVATING AND IMPLEMENTING
More informationNATIONAL COMPETENCY STANDARD
NATIONAL COMPETENCY STANDARD WSQ Framework : WSH Professionals Competency Category : Implement operational control of WSH Competency Code : WP-IC-302C-1 Competency Unit : Coordinate implementation of emergency
More informationIYRS School of Technology & Trades RCRA CONTINGENCY PLAN Bristol Facility 40 CFR 265 Subpart D 29 CFR Emergency Evacuation
International Yacht Restoration School 253 Franklin Street Bristol, RI 02809 RCRA Environmental Compliance Version 1.0 July 2015 IYRS School of Technology & Trades RCRA CONTINGENCY PLAN Bristol Facility
More informationTHE FACTORIES A D OTHER PLACES OF WORK ACT (Cap 514)
THE FACTORIES A D OTHER PLACES OF WORK ACT (Cap 514) I EXERCISE of the powers conferred by section 41 2(k) of the Factories and other places of Work Act, the Minister for Labour and Human Resource Development
More informationFIRE SAFETY POLICY & EMERGENCY EVACUATION POLICY
FIRE SAFETY POLICY & EMERGENCY EVACUATION POLICY Under the terms of the Regulatory Reform (Fire Safety) Order 2005, and subsequent regulations, Seaford College must ensure the safety from fire of all staff,
More informationEmergency Evacuation or Lockdown
Emergency Evacuation and Lockdown Policy RATIONALE Emergency and evacuation situations in an education and care service can arise in a number of circumstances and for a variety of reasons. In the event
More informationGUIDELINES FOR EMERGENCY PLANNING AND PREPAREDNESS. High-Hazard
GUIDELINES FOR EMERGENCY PLANNING AND PREPAREDNESS High-Hazard This document shall apply to all Group H, High-Hazard occupancies. GENERAL Scope Reporting of emergencies, coordination with emergency response
More informationRAMBLER PARK FIRE SAFETY INFORMATION
RAMBLER PARK FIRE SAFETY INFORMATION Parmenter Realty Partners 7557 Rambler Rd. Dallas, Texas 75231 214-373-9561 214-373-9620 (fax) RAMBLER PARK RAMBLER PARK FIRE SAFETY INFORMATION II. Objective To provide
More informationThe Social Accountability International (SAI) Fire Safety Checklist
The Social Accountability International (SAI) Fire Safety Checklist Introduction The Social Accountability International (SAI) Fire Safety Checklist is a guidance tool prepared for SA8000 & BSCI Auditors
More informationToday, we re going to talk about emergency action and fire prevention. We hope we never have to face an emergency situation like a fire in our
Today, we re going to talk about emergency action and fire prevention. We hope we never have to face an emergency situation like a fire in our workplace, but we must always be prepared, just in case. Your
More information1.1.1 HAZARD IDENTIFICATION
1.1 RISK ASSESSMENT Risk is a potential that a chosen action or activity will lead to a loss of human or property. Risk assessment is a step for Risk Management. Risk assessment is determination of qualitative
More informationSPILL PREVENTION AND RESPONSE PLAN
1. PURPOSE The purpose of this plan is to document spill prevention and response requirements. Each D&D Tech Systems, Inc. work site will develop a spill prevention and response plan based on the requirements
More informationOUTLINE FOR FIRE PREVENTION ACTIVITY
OUTLINE FOR FIRE PREVENTION ACTIVITY Background Buildings under construction present unique fire exposures that require special attention. Fires can result in major losses and long delays in the completion
More informationPOLLUTION INCIDENT RESPOSE MANAGEMENT PLAN MIROTONE CHIPPING NORTON UPDATED 28 th MARCH 2018 BY JOHN DAVEY
POLLUTION INCIDENT RESPOSE MANAGEMENT PLAN MIROTONE CHIPPING NORTON UPDATED 28 th MARCH 2018 BY JOHN DAVEY Page 1 of 15 1. Purpose The purpose of Mirotone s Pollution Incident Response Management Plan
More informationEMERGENCY ACTION PLANS HOW READY ARE YOU?
EMERGENCY ACTION PLANS HOW READY ARE YOU? Richard Pletz P.G. Safety Manager Amec Foster Wheeler is now part of Wood. PLC Wood is a global leader in the delivery of project, engineering and technical services
More informationFire Drill Policy. Facilities Manager DCD. Statutory. Principal. Staff. REVIEW DATE 20 th August Owner. Version Number: 8 Legal Sign:
Fire Drill Policy REVIEW DATE 20 th August 2018 Owner Facilities Manager Version Number: 8 Legal Sign: DCD Type of Policy: Statutory Authorized by: Principal Authorized by Board: 14 th September 2017 Effective
More information6.0 Emergency preparation
6.0 Emergency preparation IN THIS SECTION: 6.1 Prepare for an emergency 6.2 Spill kits 6.3 Control measures in the Hazardous Substances Calculator 39 Even the most safety conscious organisation can have
More informationPROCEDURE FOR EMERGENCY PREPAREDNESS AND RESPONSE
Consolidated Construction Consortium Ltd. PROCEDURE NO. : CSP- 4.4.7 REV.NO. 1 DATE: 04.04.2014 AND RESPONSE PAGE 1 OF 7 AND RESPONSE 1 04.04.2014 Oil flooding / spillage is added 0 16-04-2008 First issue
More informationNOTTINGHAM CITY HOMES
APPENDIX 1 NOTTINGHAM CITY HOMES FIRE SAFETY POLICY 2013/14 Draft for Board Uncontrolled when printed Page 1 of 14 DOCUMENT CONTROL Identification and Approval Status Document Title: Nottingham City Homes
More informationEl Segundo Fire Department. Unified Program (UP) Form CONSOLIDATED CONTINGENCY PLAN I. FACILITY IDENTIFICATION
I. FACILITY IDENTIFICATION BUSINESS NAME 3 FACILITY ID # 1 9 0 1 3 3 0 SITE ADDRESS 103 CITY 104 ZIP CODE 105 The Consolidated Contingency Plan provides businesses a format to comply with the emergency
More informationLABORATORY SAFETY SERIES: Planning For Emergencies
1525 LABORATORY SAFETY SERIES: Planning For Emergencies Leader s Guide Marcom Group Ltd. INTRODUCTION TO THE PROGRAM Structure and Organization Information in this program is presented in a definite order,
More informationCPP - (2 2.6 (3.0 (2 25 MW) & WHRB (2 20 MW)
7.4 RISK ASSESSMENT AND DISASTER MANAGEMENT PLAN 7.4.1 & Damage Control Risk assessment is the determination of quantitative or qualitative value of risk related to a concrete situation and a recognized
More informationPollution Incident Response Management Plan
1) INTRODUCTION The Pollution Incident Response Procedure has been prepared to set out specific requirements for achieving compliance with the relevant requirements in the POELA Act, 2011. These instructions
More information45KLPD Molasses Based Distillery cum Ethanol Plant
193 7.0 Introduction Distillery Industry is associated with potential hazards that effect employee and environment. It would normally require the assistance of emergency services to handle it effectively.
More informationOctober 1, Full *2 Sprinkler System
School of Visual Arts Safety Report In compliance with the federal Jeanne Clery Disclosure of Campus Security Policy and Campus Crime Statistics Act {20 U.S.C. 1092(f)} October 1, 2016 Introduction The
More informationRisk assessment is a term used to describe the overall process or method where you:
RISK ASSESSMENT RISK ASSESSMENT Risk is a potential that a chosen action or activity will lead to a loss of human or property. However, Hazard is a situation that poses a level of threat to life health
More informationCHAPTER 8: RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN
CHAPTER 8: RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN RISK ASSESSMENT The phases of an emergency includes: 1. Risk assessment 2. Mitigation 3. Preparedness 4. Response 5. Recovery Areas of Risk includes:
More informationSafety Best Practices Manual
CHAPTER 24 OSHA Compliance Checklist te: This is not a comprehensive checklist. It is designed for a typical corporate aviation maintenance department. You must consult the OSHA 1910 Regulations for specific
More informationPesticide Emergencies: Contingency Planning 1
PI257 1 Frederick M. Fishel 2 The purpose of contingency planning is to prevent an emergency situation from becoming a catastrophic event. This document provides insight on how to develop a contingency
More informationEvacuation Fire Safety Program
Evacuation Fire Safety Program Emergency Procedures Provisions must be made for prompt medical attention in case of serious injury. The location and phone number of emergency service providers will be
More informationIf there are more than ten people working other than on the ground floor,
Fire safety information sheet Introduction This information sheet is designed to give our safety representatives a basic understanding of fire safety and fire risk assessments under the current law. This
More informationTABLE OF CONTENTS Part 6 Legal Basis for Fire Safety Planning... 2
TABLE OF CONTENTS Part 6 Legal Basis for Fire Safety Planning... 2 6.1] GENERAL... 2 6.2] EXCERPTS FROM 2012 BC FIRE CODE PART 2 BUILDING AND OCCUPANT FIRE SAFETY... 3 6.3] EXCERPTS FROM 2012 BC FIRE CODE
More information7.0 GENERAL 7.1RISK ASSESSMENT. STEP 1: DEFINE THE PROJECTS/TASKS Project Proponents : M/s. Goel Ganga Developers (I) Pvt. Ltd
7.0 GENERAL This chapter covers Risk Assessment Studies for the construction and operation phase, the safety precautions that have to be taken during construction phase and the Disaster Management Plan
More informationH&S Forum. Fire Safety Policy Glascote Academy
Fierte Multi Academy Trust Health and Safety Policy Handbook Reference Number HR 103 Issue 6 Approved By H&S Forum Date September 2016 To be reviewed September2017 Policy Title Fire Safety Policy Glascote
More informationChurchSafety InfoSheet: New Fire Regulations Regulatory Reform (Fire Safety) Order 2005
ChurchSafety InfoSheet: New Fire Regulations Regulatory Reform (Fire Safety) Order 2005 New Fire Regulations are being brought in that affect all Churches and Places of Worship. All Places of Worship will
More informationFIRE PROTECTION PROGRAM
Fire Protection Program Page 1 of 13 FIRE PROTECTION PROGRAM 1.0 Objective The objective of this performance assessment is to evaluate the effectiveness of the laboratory's fire protection program as implemented
More informationTitle: Fire Protection Effective Date: 7/1/2013 Control Number: THG_0039 Revision Number: 1 Date: 10/23/2015 Annual Review Completed: 5/13/2015
Title: Fire Protection Effective Date: 7/1/2013 Control Number: THG_0039 Revision Number: 1 Date: 10/23/2015 Annual Review Completed: 5/13/2015 Fire Protection I. INTRODUCTION II. GENERAL GUIDELINES III.
More informationProject: Location: Date Prepared: Last Reviewed:
Project: Location: Date Prepared: Last Reviewed: Contents Premises Essential Information 4 Definitions & Acronyms 5 Introduction 5 Building Description and Safety Systems 7 General Strategy, Responsibilities
More informationFire Safety. A TUC guide for trade union activists
Fire Safety A TUC guide for trade union activists Contents Section one Introduction 3 Section two The law 4 Section three Fire risk assesment 5 Section four Policies and procedures 6 Section five Enforcement
More informationFIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION
CHAPTER 14 FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION SECTION FC 1401 GENERAL 1401.1 Scope. This chapter shall govern fire safety measures during the construction, alteration, or demolition
More informationPatrick County Horizons Jeb Stuart Hwy. Stuart, Va
Patrick County Horizons 24141 Jeb Stuart Hwy. Stuart, Va. 24171 Emergency Preparedness Plan Severe Weather/Earthquake/Building Damage/Fire/Missing Person Policy: Per page 22 of the PCS licensure manual:
More informationHospital Codes, Safety, Exposure Control, Emergency Plans Handout
Hospital Codes, Safety, Exposure Control, Emergency Plans Handout Procedure for calling any code: Dial 500; tell operator what code to announce and location of code. Code Blue Cardiopulmonary Arrest To
More informationSAFE WORK PROCEDURE. List the Hazards and risk controls as per risk assessment. assessment reference:
Faculty/School: Faculty of Pharmacy Initial Issue Date: Nov 2008 Next Review Date: Oct 2017 SWP Reference Number: Version: 5 Version Issue Date: Oct 2016 SWP Title: Prepared by: Working with flammable
More information5 Key Stages to Risk Assessment
5 Key Stages to Risk Assessment Stage 1: Identify Fire Hazards For a fire to start, three things are needed: A source of ignition Fuel Oxygen If any one of these is missing, a fire cannot start. Taking
More informationEmergency Evacuation Plan. Kettering Labs. School of Engineering
Emergency Evacuation Plan Kettering Labs School of Engineering May 2018 Table of Contents Section I: Purpose and Objectives Section II: General Guidelines Section III: Responsibilities of Emergency Coordinator
More informationUNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW
PROCEDURE Emergency preparedness Issued with the authority of the Chief Commissioner and General Manager of Chief Commissioner signature Chief Executive Officer signature Sponsor Head of Risk Document
More informationEIA REPORT OF PRATHAM RIVIERA (M/S. PRATHAM DEVELOPERS), BILL VILLAGE, VADODARA.
CHAPTER 7 RISK ASSESSMENT ADDITIONAL STUDIES In order to support the environment impact assessment and environment management plan, following additional studies have been included in this report. Risk
More informationEmergency Planning and Release Reporting. Farmington Hills Fire Department James Neufeld
Emergency Planning and Release Reporting Farmington Hills Fire Department James Neufeld ACRONYM Expertise Have you ever seen so many acronyms' in one spot???? Acronyms that open more windows of acronyms
More informationCharlotte Building, 17 Gresse Street, London W1T 1QL
Charlotte Building, 17 Gresse Street, London W1T 1QL Fire Safety Management & Evacuation Procedures Contents 1.0 Introduction 2.0 Means of Escape in Case of Fire 3.0 Means for Giving Warning in Case of
More informationAt Plot No. C-25, RIICO Industrial Area, Village Sotanala, Tehsil Behror, District Alwar (Rajasthan)
1.0 RISK ASSESSMENT AND HAZARD MANAGEMENT Hazard analysis involves the identification and quantification of the various hazards (unsafe condition) that exist in the plant. On the other hand, risk analysis
More informationGENERAL PROCEDURES TO FOLLOW IN CASE OF EMERGENCY SAFETY RULES TO PREVENT FIRES
GENERAL PROCEDURES TO FOLLOW IN CASE OF EMERGENCY SAFETY RULES TO PREVENT FIRES You must keep the premises you occupy clean and tidy: the dirt, spills of flammable liquids and the accumulation of combustible
More informationEmergency Action Plan
Emergency Action Plan Company Name Current as of Company Address Phone Number Contents EMERGENCY ACTION PLAN 2 SCOPE OF THE PLAN 2 Emergency Plan Coordinators 2 First Aid and CPR certified employees 2
More informationHEALTH AND SAFETY INDUCTION CHECKLIST
LIST Listed below is a checklist of health & safety matters, some general and some applicable only to certain jobs. page 1 Section A Mandatory for all Staff 1. HEALTH, SAFETY & ENVIRONMENTAL (HSE) POLICIES
More informationBishopstone Village Hall Health and Safety and Fire Evacuation Policy
Bishopstone Village Hall Health and Safety and Fire Evacuation Policy This document is the Health and Safety policy of the Bishopstone Village Hall Committee, hereinafter referred to as the Trustees. Our
More information