1 November 14, 2014 ADDENDUM No. 5 Seward Montessori School Addition and Remodeling th Avenue South Minneapolis, MN LSE Project No This Addendum forms a part of the Contract Documents and modifies the original Bid Documents dated October 23, Acknowledge receipt of this Addendum in the space provided on the Bid Form. Reference made to the Project Manual and Drawings shall be used as a guide only. Bidders shall determine the work affected by Addendum items. CHANGES TO THE PROJECT MANUAL VOLUME I 1. None CHANGES TO THE PROJECT MANUAL VOLUME II 2. Section Fuel-Fired, Domestic Water Heaters a. Article 2.01, sub-paragraph A.1: Add the following as acceptable manufacturers: PVI, Lochinvar, Rheem, and State. 3. Section Panelboards b. Article 2.03: Revise sub-paragraph D to read: i. D. Doors: Concealed hinges; secured with flush latch with tumbler lock; keyed alike. Covers are in door construction with full piano hinge so door does not have to be removed to access inside of panel. 4. Section Wireless Clock Systems c. The clock system is not wireless but an extension of the existing system. Replace entire Section with the attached Section Provide 120 volts to the clocks, locations are shown on plan sheets ELLV1111, ELLV1122, ELLV Section Video Camera Surveillance System a. Article 1.02: Revise sub-paragraph 6 to read: NEW CAMERA NETWORK SERVERS ARE BY OWNER. b. Article 2.03: Revise sub-paragraph B to read: i. B. ELECTRIC LOCK 1. Manufacturer: Von Duprin 2. Model Number: Electronic Latch Retraction LSE No L:\2014\ MPS Seward\ADMIN\Common\Bidding 11/14/2014

2 Seward Montessori School Addendum 3 Page 2 of 2 Addition and Remodeling 3. Quantity: To be determined by Door Schedule c. Article 2.03: Revise sub-paragraph C to sub-paragraphs C. and D. to read: ii. C. REQUEST TO EXIT 1. Manufacturer: T-Rex 2. Model number: LT 3. Quantity: To be determined by Door Schedule iii. D. MOTION SENSOR DOOR CONTACT 1. Manufacturer: GE 2. Model Number: 1076C-M, Recessed Door Contact ¾ Magnetic Contact Brown Long gap SPDT 3. Quantity: To be determined by Door Schedule d. Article 2.03: Re-label existing sub-paragraphs D, E, F, G, H, and I respectively. CHANGES TO THE DRAWINGS VOLUME 1 of 2 1. None CHANGES TO THE DRAWINGS VOLUME 2 of 2 2. Sheet ME9501, Pump Schedule a. Refer to pumps P-5 and P-6. Provide size 4x4x7 at 3500 rpm in lieu of 4x4x11 at 1800 rpm. 3. Sheet ME9501, Pump Schedule a. Add the following note to pumps P-4, 5, 6, 7, 8; Provide SiC/SiC seals in lieu of the specified seal. 4. Sheet ME9501, a. Delete the Air Separator Schedule. 5. Sheet ME9501, Fin Tube Radiation schedule a. Delete fin tube radiation type FTR Sheet ME9502, Gas Water Heater Schedule a. Provide a PVI model 50 L 130A-GCML water heater in lieu of the AO Smith model BTH 500. The AO Smith model BTH 500 is an acceptable alternate water heater. The base design is the PVI. Lochinvar, Rheem, and State are also acceptable water heater manufactures. 7. Sheet MEHV 1115 a. Connect the side stream filter on the system side of the isolation valves for pump P-6. Refer to Detail 10/ME9001 for additional information. Locate the side stream filter on the east wall of the boiler room. Route pipes at least 8 AFF when transitioning from the pump to the filter location. b. Drawing 1/MEHV1115: Add the following general note: GAS PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE ASTM A 53 TYPE E OR S WITH WELDED JOINTS. VALVES IN THE NATURAL GAS SYSTEM SHALL BE 2 OR 3 PIECE FULL PORT BALL VALVES. VALVES SHALL BE RATED FOR USE IN NATURAL GAS SYSTEMS. PROVIDE A VENT FOR ANY GAS REGULATOR. ROUTE VENT TO OUTSIDE OF THE BUILDING AND TERMINATE WITH GAS VENT CAP. PRIME AND PAINT GAS PIPING BLUE TO MATCH EXISTING GAS PIPE. END OF ADDENDUM 5 LSE No L:\2014\ MPS Seward\ADMIN\Common\Bidding 11/14/2014

3 KARGES-FAULCONBRIDGE, INC. KFI: SEWARD MONTESSORI SCHOOL ADDITION & REMODELING SECTION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section SUMMARY A. Section Includes: 1. Add to existing Simplex 6400 master clock control unit. 2. Secondary indicating clocks. 3. Clock circuit power boosters. 4. Interface with public-address/intercom system. 5. System wire and cable DEFINITIONS A. NIST: The National Institute of Science and Technology. B. PC: Personal computer. C. UTC: Universal time coordinated. The precisely measured time at zero degrees longitude; a worldwide standard for time synchronization ACTION SUBMITTALS A. Product Data: For each type of product indicated. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes (including available colors) for each product indicated and describe features and operating sequences, both automatic and manual, for the following: 1. Master unit. 2. Indicating clocks. 3. Signal equipment. 4. Equipment enclosures and back boxes. 5. Accessory components. B. Shop Drawings: For clock systems. Include plans, elevations, sections, details, and attachments to other work. 1. Wiring Diagrams: For power, signal, and control wiring and correction circuits. a. Identify terminals and wiring color codes to facilitate installation, operation, and maintenance. b. Indicate recommended wire types and sizes, and circuiting arrangements for field-installed system wiring. Show protection from overcurrent, static discharge, and voltage surge. 2. Details of mounting, anchoring, and fastening devices for the following system components: a. Surface-mounted and semi recessed secondary indicating clocks. b. Master clock enclosures. c. Clock circuit power boosters. Addendum

4 SEWARD MONTESSORI SCHOOL KARGES-FAULCONBRIDGE, INC. ADDITION & REMODELING KFI: CLOSEOUT SUBMITTALS A. Operation and Maintenance Data: For clock and program control to include in emergency, operation, and maintenance manuals QUALITY ASSURANCE A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. B. Comply with NFPA REGULATORY REQUIREMENTS A. Equipment and components furnished shall be of manufacturer s latest model. B. Transmitter and receiver shall comply with FCC rules and may not cause harmful interference. C. System shall be installed in compliance with local and state authorities having jurisdiction DELIVERY STORAGE AND HANDLING A. Deliver components to the site in the manufacturer's original packaging. Packaging shall contain manufacturer's name and address, product identification number, and other related information. B. Store equipment in finished building, unopened containers until ready for installation PROJECT SITE CONDITIONS A. Clocks shall not be installed until painting and other finish work in each room is complete. B. Coordinate installation of GPS receiver for access to the roof or exterior side wall so that the bracket and related fasteners are watertight. C. Provide each clock as specified on the drawings as part of the phased construction schedule. Coordinate with general/construction manager for scheduling SYSTEM STARTUP A. At completion of installation and prior to final acceptance, turn on the equipment; ensure equipment is operating properly, and clocks are functioning. The Engineer and Owner shall be notified 10 working days in advance to witness the system start-up. PART 2 - PRODUCTS 2.01 MASTER AND SECONDARY CLOCK SYSTEM A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. SimplexGrinnell LP (add to existing system). 2. Sapling ( if new system) 3. No substitutions Addendum

5 KARGES-FAULCONBRIDGE, INC. KFI: SEWARD MONTESSORI SCHOOL ADDITION & REMODELING B. System Functions and Features: 1. Supply power to remote indicating clocks. 2. Maintain correct synchronized time and transmit time-correction signals over dedicated system wiring from a master clock to any type of secondary indicating clocks, including the following: a. Analog Synchronous Clocks: Correct for minute- and second-hand synchronization at least once each hour and for hour-hand synchronization at least once each day. 3. Initiate and execute programs for scheduled automatic operation of remote devices. 4. Provide for manual control of programmed signal and equipment-switching circuits. 5. Communicate with remote PC for access to UTC time base and to permit programming from remote location. 6. Maintain system access security with a minimum of two levels of user-access control to restrict use of system controls to authorized personnel. Levels of access apply to both local access and access from a remote computer. Access to user programming and control functions is accomplished by entering a minimum three-digit code. Access levels include the following: a. Access to review existing programs only. b. Access to normal system operating controls. c. Access to all user-programming and control functions. 7. Regulate system timing functions using power-line frequency, backed up for power outages by an internal battery-powered, crystal-controlled oscillator. 8. Regulate system timing functions using power-line frequency, backed up for power outages by an internal battery-powered, crystal-controlled oscillator, and automated periodic reference to NIST or UTC time signals. Reference time signals shall be automatically accessed at programmable intervals. 9. Automatically check functioning of LEDs, switches, input keys, central processor, read-only memory, random access memory, and output circuits. A display on the control panel or a remote computer with the proper access code shall indicate failure by identifying faulty component or circuit and shall recommend corrective action. 10. Provide programming for automatic daylight savings time correction. 11. Provide for adjustments to master clock output signals. Duration of momentary signal shall be individually programmable for each signal and equipment-control output circuit from 1 to 99 seconds. Signals shall be programmable for either on or off switching to suit equipment-operation scheduling MASTER CLOCK A. Description: Microprocessor-based, software-controlled unit complying with Class A device requirements in 47 CFR Programming and control switches. 2. Informational Display: LED or backlit LCD type. a. Normally shows current time, date, and day of week display. b. Provides programming cues when system is being programmed. 3. Output Circuits for Power and Correction of Secondary Indicating Clocks: 4. Wired Synchronous Clock Power-and-Correction Circuits: For analog and digital clocks. Relay controlled. a. Wired Synchronous Digital Clock Power-and-Correction Circuits. b. Data Output Port for Digital Secondary Clock Correction Circuit: RS485 or similar circuit for scheduled periodic correction signals. 5. Modem and PC interface software suitable for remote programming and automatic NIST or UTC synchronization. 6. Circuits for Audible Signal Devices: Relay controlled, manually switchable, using controls on the master clock. Rated 120-V ac. 7. Power Supplies: Capacity for internal loads and power-and correction circuits of connected clocks. Addendum

6 SEWARD MONTESSORI SCHOOL KARGES-FAULCONBRIDGE, INC. ADDITION & REMODELING KFI: Enclosure: Metal cabinet with locking front panel. When cabinet is locked, display indication shall be visible on or through front panel face. Arrange cabinet for surface, semi recessed, or flush mounting as indicated. 9. Housing: Rack-mounting metal enclosure with display indication visible on front panel face. 10. Battery Backup for Time Base: Lithium battery to maintain the timekeeping function and retain the programs in memory during outage of normal ac power supply for up to 10 years. 11. Electrostatic Discharge Resistance: Master clock and secondary indicating clocks shall be tested and certified according to IEC in both human-discharge and direct-injection modes SECONDARY INDICATING CLOCKS A. Analog Clock: Equipped with a sweep second hand. Movement shall be driven by self-starting, permanently lubricated, sealed synchronous motor equipped with a correcting solenoid actuator, or be a microprocessor-based, second impulse unit, compatible with the master clock. 1. Typical of American Time and Signal AllSync 12 Clock Semi Flush Steel Case U55BHAA Typical of American Time and Signal AllSync 12 Clock Surface Steel Case U54BHAA Typical of American Time and Signal AllSync 15 Clock Semi Flush Plastic Case U65BHAA Typical of American Time and Signal AllSync 15 Clock Surface Plastic Case U64BAAA307 B. Interval-Timer Clock: Digital microprocessor-controlled, 4-inch unit with 2-1/2-inch, red LED digital display for hours and minutes and 1-5/16-inch display for seconds; a separately mounted, mode-control switch; and the following features: 1. Display Visibility: Hour and minute numerals readable at 30 feet in normal ambient light. 2. Operating Modes: a. Normal: Clock operates as a regular secondary system clock, displaying corrected time in normal display configuration, selectable between 12- and 24-hour formats, with "PM" digital display for 12-hour format. b. Count-Down or Count-Up Timer: Selected by mode-control switch count-up and countdown positions, and capable of being preset at the mode-control station. 3. Mode-Selector Switch: Push-button or rotary, multiposition type, flush mounted; with start, stop, and reset capability in both count-up and count-down modes. 4. Audible tone signal: Housed in clock or mode-selector-switch box. Sounds at end of preset up or down count. C. Secondary Indicating Clock Characteristics: 1. Clock Type: Analog. 2. Face Configuration: Single or Double. 3. Mounting: Semi recessed. 4. Nominal Dimensions: 12 diameter. 5. Dial Face Color: Black. 6. Analog Clock Crystal: Clear polycarbonate. 7. Face Color: White. 8. Display Height: Coordinate in field. 9. Digital Clock Lens: Antiglare acrylic material. 10. Battery Backup: Yes. 11. Interval-Timer Display: Yes PROGRAM SIGNAL DEVICES A. Bells: Heavy-duty, modular, vibrating type with the following sound-output ratings measured at 10 feet: 1. 4-Inch Bell: 90 db. a. Typical of Edwards volt vibrating type 340-4N Inch Bell: 95 db. a. Typical of Edwards volt vibrating type 340-6N Addendum

7 KARGES-FAULCONBRIDGE, INC. KFI: SEWARD MONTESSORI SCHOOL ADDITION & REMODELING Inch Bell: 104 db. a. Typical of Edwards volt vibrating type N5 B. Clock Buzzers: Adjustable output signal device designed for mounting within clock housing or outlet box. 1. Sound-Output Rating Measured at 3 Feet: 75 db. 2. Audible Tone Frequency: Manufacturer's standard between 120 Hz and 2 khz. C. Outdoor Signal Equipment: Weatherproof models listed for outdoor use. D. Mounting Arrangement for Signal Devices: Designed for attachment with screws on the mounting plate of a flush-mounted back box unless otherwise indicated. E. Enclosures for Flush-Mounting Bells and Horns: Enclosure, mounting plate, and grille assembly shall be furnished by device manufacturer to match features of the device to be mounted. Enclosure shall be recessed in wall, completely enclosing the device, with grille mounting over the open side of the enclosure and flush with the wall. F. Connection Provision for Signal-Indicating Devices: Wire pigtail or compression splice CLOCK CIRCUIT POWER BOOSTER A. Description: Transformer power supply, mounted in steel cabinet with hinged door, and having fuseprotected input and output circuits BACK BOXES FOR SECONDARY INDICATING CLOCKS AND PROGRAM DEVICES A. Description: Box and cover-plate assembly shall be furnished by device manufacturer and be suitable for device to be mounted. Back boxes shall be equipped with knockouts and hanger straps or mounting adapters arranged for flush mounting the device unless otherwise indicated GUARDS A. Description: Formed-steel wire, shaped to fit around guarded device, with 1-inch maximum clearance. 1. Mounting Provisions: Fixed tabs, welded to guard and arranged for screw attachment to mounting surface. 2. Finish for Indoor Devices: Clear epoxy lacquer over zinc plating. 3. Finish for Outdoor Devices: Black powder coat over zinc plating and primer CONDUCTORS AND CABLES A. 120-V AC and Class 1 Signal and Control Circuits: Stranded, single conductors of size and type recommended by system manufacturer. Materials and installation requirements are specified in Section "Low-Voltage Electrical Power Conductors and Cables." B. Class 2 and Class 3 Signal and Control Circuits: Single conductor or twisted-pair cable, unshielded, unless manufacturer recommends shielded cable. C. Data Circuits: Category 6 minimum, unshielded, twisted-pair cable, unless manufacturer recommends shielded cable. D. Insulation: Thermoplastic, not less than 1/32 inch thick. E. Plenum Cable: Listed and labeled for plenum installation. Addendum

8 SEWARD MONTESSORI SCHOOL KARGES-FAULCONBRIDGE, INC. ADDITION & REMODELING KFI: F. Conductor Color-Coding: Uniformly identified and coordinated with wiring diagrams. G. Shielding: For speaker-microphone leads and at other locations recommended by manufacturer; No. 34 AWG tinned, soft-copper strands formed into a braid or equivalent foil. 1. Minimum Shielding Coverage on Conductors: 60 percent PATHWAYS A. Intercommunication and Program System Raceways and Boxes: Comply with requirements in Section Specifying "Raceway and Boxes for Electrical Systems." B. Intercommunication and Program System Raceways and Boxes: Same as required for electrical branch circuits specified in Section Specifying "Raceway and Boxes for Electrical Systems." C. Outlet boxes shall be no smaller than 2 inches wide, 3 inches high, and 2-1/2 inches deep. D. Flexible metal conduit is prohibited. PART 3 - EXECUTION 3.01 EXAMINATION A. Verify that construction is complete in spaces to receive equipment and that rooms are clean and dry. B. Verify that 120 volt electrical outlet is located within 6 feet of location of transmitter and the outlet is operational and properly grounded WIRING METHODS A. Wiring Method: Install cables in raceways. Conceal raceway and cables except in unfinished spaces. 1. Comply with requirements for raceways and boxes specified in Section Specifying "Raceway and Boxes for Electrical Systems." B. Wiring Method: Conceal conductors and cables in accessible ceilings, walls, and floors where possible. C. Wiring within Enclosures: Bundle, lace, and train cables to terminal points with no excess and without exceeding manufacturer's limitations on bending radii. Provide and use lacing bars and distribution spools ELECTRICAL CONNECTIONS A. Make splices, taps, and terminations on numbered terminal strips in junction, pull, and outlet boxes; terminal cabinets; and equipment enclosures. B. Use splices for connections to clocks and signal devices. C. Ground clocks, programming equipment, and conductor and cable shields to eliminate shock hazard and to minimize ground loops, common-mode returns, noise pickup, cross talk, and other impairments IDENTIFICATION A. Comply with Section Specifying "Identification for Electrical Systems." Addendum

9 KARGES-FAULCONBRIDGE, INC. KFI: SEWARD MONTESSORI SCHOOL ADDITION & REMODELING B. Color-code wires, and apply wire and cable marking tape to designate wires and cables so they are uniformly identified and coordinated with wiring diagrams throughout the system FIELD QUALITY CONTROL A. Perform tests and inspections. 1. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect components, assemblies, and equipment installations, including connections, and to assist in testing. B. Tests and Inspections: 1. Perform operational-system tests to verify compliance with the Specifications and make adjustments to bring system into compliance. Include operation of all modes of clock correction and all programming and manually programmed signal and relay operating functions. 2. Verify that units and controls are properly labeled and interconnecting wires and terminals are identified. C. Clock system will be considered defective if it does not pass tests and inspections. D. Prepare test and inspection reports ADJUSTING A. Program system according to Owner's requirements. Set system so signal devices operate on Ownerrequired schedules and are activated for durations selected by Owner. Program equipment-control output circuits to suit Owner's operating schedule for equipment controlled. B. Adjust sound-output level of adjustable signal devices to suit Owner's requirements. C. Occupancy Adjustments: When requested within 12 months of date of Substantial Completion, provide on-site assistance in adjusting system to suit actual occupied conditions. Provide up to two visits to Project during other-than-normal occupancy hours for this purpose DEMONSTRATION A. Train Owner's maintenance personnel to adjust, operate, and maintain clock-and-program-control system components CLEANING A. Prior to final acceptance, clean exposed surfaces of clocks, using cleaning methods recommended by clock manufacturer. Remove temporary labels from clock faces. Do not remove labels from backs of clocks PROTECTION A. Protect finished installation until final acceptance of the project. END OF SECTION Addendum

10 SEWARD MONTESSORI SCHOOL KARGES-FAULCONBRIDGE, INC. ADDITION & REMODELING KFI: This page is left blank intentionally Addendum

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 27 COMMUNICATIONS SECTION PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEMS

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 27 COMMUNICATIONS SECTION PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEMS SECTION 275116 - PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Preamplifiers. 2. Power amplifiers. 3. Microphones. 4. Control console. 5. Loudspeakers.

More information

SECTION FIRE ALARM SYSTEMS

SECTION FIRE ALARM SYSTEMS SECTION 28 3100 PART 1 -GENERAL 1.01 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this

More information

Hinesville First United Methodist Church SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

Hinesville First United Methodist Church SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 28 3111 DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Fire-alarm control unit. 2. Manual fire-alarm boxes. 3. System smoke detectors. 4. Heat detectors.

More information

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION INTRUSION DETECTION

SECTION INTRUSION DETECTION (NOTE TO DESIGNER: These Specifications are basic minimum criteria to be met in preparing the final specifications for this section, which is the responsibility of the Designer.) SECTION 28 16 00 INTRUSION

More information

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1. SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers

More information

A. This Section includes the following lighting control devices:

A. This Section includes the following lighting control devices: Attachment G LIGHTING CONTROL SPECIFICATIONS (Download Document separately) LIGHTING CONTROL SPECIFICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including

More information

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL SECTION 16400 AUTOMATIC TRANSFER SWITCHES 1.01 RELATED DOCUMENTS PART 1 - GENERAL A. Drawings and general provisions of Contract, including General Conditions and Division 1 Specification sections, apply

More information

A. This Section includes the following lighting control devices:

A. This Section includes the following lighting control devices: SECTION 26 09 23 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

1. Division 26 Section Electrical General Requirements. 2. Division 26 Section "Wiring Devices" for wall-box dimmers and manual light switches.

1. Division 26 Section Electrical General Requirements. 2. Division 26 Section Wiring Devices for wall-box dimmers and manual light switches. PART 1 - GENERAL... 1 1.1 RELATED DOCUMENTS... 1 1.2 SUMMARY... 1 1.3 REFERENCES... 2 1.4 DEFINITIONS... 2 1.5 SUBMITTALS... 2 1.6 QUALITY ASSURANCE... 3 1.7 COORDINATION... 3 1.8 DELIVERY, STORAGE, AND

More information

PWGSC Ontario MULTIPLEX FIRE ALARM SYSTEM Sect Region Project Page 1 Number R

PWGSC Ontario MULTIPLEX FIRE ALARM SYSTEM Sect Region Project Page 1 Number R Region Project Page 1 PART 1 - GENERAL 1.1 REFERENCES.1 CAN/ULC-S524-2006, Standard for the Installation of Fire Alarm Systems..2 CAN/ULC-S525-2007, Audible Signal Device for Fire Alarm Systems..3 CAN/ULC-S526-2007,

More information

IN2 Lighting Control Devices

IN2 Lighting Control Devices Illinois Math and Science Academy DigitalCommons@IMSA Project Manuals IN2 2015 IN2 Lighting Control Devices Illinois Mathematics and Science Academy Follow this and additional works at: http://digitalcommons.imsa.edu/facility_in2_manuals

More information

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

B. Configuration of system shall be through Schneider Electric in Homewood, Illinois (Jerry Lanfear ).

B. Configuration of system shall be through Schneider Electric in Homewood, Illinois (Jerry Lanfear ). SECTION 28 13 00 - ACCESS CONTROL PART I - GENERAL 1.1 SUMMARY A. This specification section describes the furnishing, installation, commissioning, and programming of a complete, turnkey, hardwired Andover

More information

SECTION (13730) - INTRUSION DETECTION

SECTION (13730) - INTRUSION DETECTION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: SECTION 28 16 00 (13730) - INTRUSION DETECTION 1. Intrusion Detection Sensors 2. Signal Equipment 3. System Controls 4. Alarm Displays 5. Alarm Indicating

More information

SECTION LIGHTING CONTROL DEVICES

SECTION LIGHTING CONTROL DEVICES SECTION 16145 LIGHTING CONTROL DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018 SECTION 26 2913 - ENCLOSED CONTROLLERS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION SECTION 237433, PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

SPECIFICATION: AlarmLine TM INTELLIGENT LINEAR HEAT DETECTION

SPECIFICATION: AlarmLine TM INTELLIGENT LINEAR HEAT DETECTION 1. GENERAL SPECIFICATION 1.1 The contractor shall provide an Intelligent AlarmLine Linear Heat Detection System to perform the following functionality: A. Fire Alarm, Supervisory and Trouble-Event Initiation

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between //--// if not applicable to project. Also, delete any other item or paragraph

More information

LIGHTING CONTROL DEVICES

LIGHTING CONTROL DEVICES SECTION - PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this

More information

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY SECTION 22 11 23.13 DOMESTIC WATER PRESSURE BOOSTING PART 1 - GENERAL 1.1 SUMMARY A. Where utility water pressure cannot adequately meet the pressure requirements of the domestic water systems and where

More information

DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM

DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES SECTION 26 36 23 AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. General provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION LOW VOLTAGE LIGHTING CONTROLS

SECTION LOW VOLTAGE LIGHTING CONTROLS SECTION 26 09 26 LOW VOLTAGE LIGHTING CONTROLS PART 1 - GENERAL 1.01 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 Division 28 ELECTRONIC SAFETY AND SECURITY TABLE OF CONTENTS 28 0000 GENERAL... 2 A. DEFINITIONS...2 28 3111 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 A. DESIGN REQUIREMENTS...2 B. CONSTRUCTION REQUIREMENTS...2

More information

SECTION HEALTHCARE COMMUNICATION AND MONITORING SYSTEM (NURSE CALL)

SECTION HEALTHCARE COMMUNICATION AND MONITORING SYSTEM (NURSE CALL) SECTION 27 52 23 HEALTHCARE COMMUNICATION AND MONITORING SYSTEM (NURSE CALL) PART 1 - GENERAL 1.1 SECTION INCLUDES A. Basic System Requirements B. Stations C. Master Stations/Consoles D. Annunciators,

More information

CRESTRON: GREEN LIGHT NETWORK LIGHTING CONTROLS 1

CRESTRON: GREEN LIGHT NETWORK LIGHTING CONTROLS 1 GREEN LIGHT ARCHITECTURAL DIMMING CONTROLS (GLPD) Crestron Green Light and Green Light Express Network Dimming Control Systems are web accessible, network connected dimming control systems that receive

More information

SECTION CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY

SECTION CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY SECTION 28 0513 -CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Lighting and appliance panelboards 1.02 RELATED SECTIONS A. 16475,

More information

SECTION LIGHTING CONTROLS

SECTION LIGHTING CONTROLS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 09 23 LIGHTING CONTROLS SPEC WRITER NOTE: 1. Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable to

More information

Architect s Project Number of 12 Fire Alarm/Smoke Detection Systems District Master Specs 2013 Edition

Architect s Project Number of 12 Fire Alarm/Smoke Detection Systems District Master Specs 2013 Edition PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 28 31 00 FIRE ALARM AND SMOKE DETECTION SYSTEMS A. Fire alarm and smoke detection systems 1.2 REFERENCES A. NFPA 72 B. NFPA 101 1.3 REGULATORY REQUIREMENTS A.

More information

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS SECTION 26 92 50 PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION ELECTRICAL GENERAL PROVISIONS

SECTION ELECTRICAL GENERAL PROVISIONS PART 1 GENERAL 1.01 SECTION INCLUDES A. General provisions for Electrical Systems B. Wire and cable for 600 volts and less. C. Wiring connectors. D. Electrical tape. E. Heat shrink tubing. F. Wire pulling

More information

SECTION FIRE ALARM

SECTION FIRE ALARM SECTION 16740 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this

More information

SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS

SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS PART 1 GENERAL 1.1 SECTION INCLUDES A. Fire alarm and smoke detection systems 1.2 REFERENCES A. NFPA 72 B. NFPA 101 1.3 REGULATORY REQUIREMENTS A. System: UL listed B. Conform to requirements of NFPA 101

More information

Emery County Senior Center Green River 06/07

Emery County Senior Center Green River 06/07 SECTION 260923 - LIGHTING CONTROL DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions. 11/16/12 TerraView First Revision No. 15-NFPA 720-2012 [ Global Input ] Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

More information

SECTION CENTRAL BATTERY INVERTERS. A. This Section includes fast-transfer central battery inverters with the following features:

SECTION CENTRAL BATTERY INVERTERS. A. This Section includes fast-transfer central battery inverters with the following features: PART 1 - GENERAL 1.1 SUMMARY A. This Section includes fast-transfer central battery inverters with the following features: 1. Emergency-only circuits. 1.2 DEFINITIONS A. LCD: Liquid-crystal display. B.

More information

CARD ACCESS CONTROL SYSTEM

CARD ACCESS CONTROL SYSTEM SECTION 13851 CARD ACCESS CONTROL SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Section Includes: A complete, operable, tested, integrated proximity access control system, to operate on a proximity principle where

More information

DIGITAL CENTRALIZED Section NANOMASKIT

DIGITAL CENTRALIZED Section NANOMASKIT Page 1 of 8 1 GENERAL 1.1 RELATED SECTIONS 1.2 REFERENCES.1 Section 16010 Electrical General Requirements.2 Section 16120 Wire and Cable.3 Section 16993 Electrical Starting and Testing General Requirements

More information

SECTION ROTARY-SCREW WATER CHILLERS

SECTION ROTARY-SCREW WATER CHILLERS PART 1 GENERAL 1.01 SECTION INCLUDES A. Factory-assembled packaged chiller. B. Charge of refrigerant and oil. C. Controls and control connections. D. Chilled water connections. E. Electrical power connections.

More information

SECTION PACKAGED COMPRESSOR AND CONDENSER UNITS

SECTION PACKAGED COMPRESSOR AND CONDENSER UNITS SECTION 236200 - PACKAGED COMPRESSOR AND CONDENSER UNITS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions apply

More information

_5120_School_Intercom_Rack_Spec.doc 09/21/04

_5120_School_Intercom_Rack_Spec.doc 09/21/04 ****************************************************************************************** 16720-3 Simplex TrueCom 5120 Inter Communication System Advanced 360 Station, Rack Mounted, Intercom / Paging

More information

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods 1. BASIC ELECTRICAL MATERIALS 1. All conduit and raceway must be 3/4" or larger. Exposed raceway in finished areas shall be in 700 or larger wiremold. Exception: runs to individual devices 10 or less,

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 28 ELEC. SAFETY & SECURITY SECTION CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 28 ELEC. SAFETY & SECURITY SECTION CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY SECTION 280513 - CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Coaxial cabling. 2. RS-232 cabling. 3. RS-485 cabling. 4. Low-voltage control

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Revitalize Building Mechanical Systems (4619)

Revitalize Building Mechanical Systems (4619) SECTION 235216 FIRE-TUBE CONDENSING BOILERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

DIVISION 26 ELECTRICAL SECTION FIRE ALARM SYSTEM

DIVISION 26 ELECTRICAL SECTION FIRE ALARM SYSTEM DIVISION 26 ELECTRICAL SECTION 26 81 11 PART 1 GENERAL 1.01 DESCRIPTION A. Furnish and install all equipment and accessories for a complete local, analog addressable, manually and automatically actuated,

More information

SECTION LOW VOLTAGE POWER PANELBOARDS - SPECTRA

SECTION LOW VOLTAGE POWER PANELBOARDS - SPECTRA PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Low voltage power panelboards 1.02 RELATED SECTIONS 1.03 REFERENCES

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 3323 - CENTRAL BATTERY EQUIPMENT [for Evanston campus only] PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

COLUMBIA PUBLIC SCHOOLS HVAC IMPROVEMENTS - PHASE COLUMBIA, MISSOURI

COLUMBIA PUBLIC SCHOOLS HVAC IMPROVEMENTS - PHASE COLUMBIA, MISSOURI SECTION 283111 FIRE DETECTION AND ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories. SECTION 238113 - PACKAGED TERMINAL AIR CONDITIONERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

A. Provide addressable fire alarm system throughout the facility and supervise wet and preaction fire sprinkler system.

A. Provide addressable fire alarm system throughout the facility and supervise wet and preaction fire sprinkler system. SECTION 283111 - PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load centers.

1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load centers. September 2012, rev. 00 26 2416 Panelboards PART 1. GENERAL 1.01 Summary A. Section includes: 1.02 Definitions 1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load

More information

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES Part One General 1.01 Scope A. It is the intent of this specification to provide a medium voltage automatic transfer system. B. All components, testing and services specified and required for a complete

More information

SECTION PLUMBING EQUIPMENT

SECTION PLUMBING EQUIPMENT PART 1 GENERAL 1.01 SECTION INCLUDES A. Water heaters. B. Packaged water heating systems. C. Domestic water heat exchangers. D. Water storage tanks. E. Water softeners. F. Reverse osmosis equipment. G.

More information

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority. Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 21 2400CA - CLEAN AGENT CHEMICAL SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION IBAS LIGHTING CONTROL

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION IBAS LIGHTING CONTROL PART 0 A/E INSTRUCTIONS 0.01 DESIGN REQUIREMENTS A. Minimum lighting control (base scope of work) shall include all corridors. The lighting in all the corridors shall be turned on (if not already on) if

More information

SECTION ENCLOSED CONTROLLERS

SECTION ENCLOSED CONTROLLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes ac,

More information

SECTION PUBLIC ADDRESS SYSTEMS

SECTION PUBLIC ADDRESS SYSTEMS PART 1 GENERAL 1.1 SECTION INCLUDES A. Amplifier and control equipment B. Input equipment C. Raceways and communications cable D. List of equipment for gym PA system E. List of equipment for cafeteria

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 This section specifies the furnishing, complete installation, and connection of automatic transfer switches. 1.2 RELATED WORK A. Section 14 21 00, ELECTRIC

More information

SECTION COMPRESSED-AIR EQUIPMENT FOR LABORATORY FACILITIES

SECTION COMPRESSED-AIR EQUIPMENT FOR LABORATORY FACILITIES Page 226119-1 SECTION 226119 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

16.34 Multiplex Fire Alarm System Construction Standards Page 1 of 5

16.34 Multiplex Fire Alarm System Construction Standards Page 1 of 5 Construction Standards Page 1 of 5.1 General Description.1 The University requires that all new fire alarm system control panel, components, and devices, as required for the project, be Secutron 2900 Series

More information

RAZOR RZR SERIES DIE CAST ALUMINUM LED EXIT SIGNS INSTALLATION AND OPERATING INSTRUCTIONS IMPORTANT SAFEGUARDS READ AND FOLLOW ALL SAFETY INSTRUCTIONS

RAZOR RZR SERIES DIE CAST ALUMINUM LED EXIT SIGNS INSTALLATION AND OPERATING INSTRUCTIONS IMPORTANT SAFEGUARDS READ AND FOLLOW ALL SAFETY INSTRUCTIONS RAZOR RZR SERIES DIE CAST ALUMINUM LED EXIT SIGNS INSTALLATION AND OPERATING INSTRUCTIONS IMPORTANT SAFEGUARDS When using electrical equipment, basic safety precautions should always be followed including

More information

DIVISION 8 OPENINGS SECTION OVERHEAD COILING FIRE DOORS. A. Section Metal Fabrications: Support framing and framed opening.

DIVISION 8 OPENINGS SECTION OVERHEAD COILING FIRE DOORS. A. Section Metal Fabrications: Support framing and framed opening. DIVISION 8 OPENINGS SECTION 08 33 23 PART 1 GENERAL 1.1 SECTION INCLUDES A. Overhead coiling counter fire doors. 1.2 RELATED SECTIONS A. Section 05500 - Metal Fabrications: Support framing and framed opening.

More information

SECTION GENERATOR PARALLELING CONTROLS

SECTION GENERATOR PARALLELING CONTROLS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 23 13 GENERATOR PARALLELING CONTROLS SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

Project No Belleville Fire Hall/Headquarters and Emergency Operations Centre Section Belleville, Ontario Page 1 of 10

Project No Belleville Fire Hall/Headquarters and Emergency Operations Centre Section Belleville, Ontario Page 1 of 10 Belleville, Ontario Page 1 of 10 1 GENERAL 1.1 GENERAL REQUIREMENTS.1 The General Conditions of CCDC2-2008, and the General requirements of Division 1, form part of this Section and must read in conjunction

More information

Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA Page 236423-1 Copyright 2009 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA Modified by MSU Physical Plant

More information

5120_School_Intercom_Rack_Spec.doc 10/10/07

5120_School_Intercom_Rack_Spec.doc 10/10/07 ****************************************************************************************** 16720-3 Simplex TrueCom 5120 Inter Communication System Advanced 360 Station, Rack Mounted, Intercom / Paging

More information

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS SECTION 237413 - PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, outdoor, central-station air-handling units (rooftop units) with the

More information

Report on First Revision November 2013 NFPA 731

Report on First Revision November 2013 NFPA 731 Report on First Revision November 2013 NFPA 731 731- Log #FR1 Final Action: (2.3.3) Submitter: Technical Committee Premises Security Recommendation: 2.3.3 UL Publications. Underwriters Laboratories Inc.,

More information

SECTION ISOLATED POWER SYSTEMS

SECTION ISOLATED POWER SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 20 11 ISOLATED POWER SYSTEMS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also, delete any other item or paragraph not applicable to

More information

CRESTRON MEDIAMANAGER INTELLICLASS

CRESTRON MEDIAMANAGER INTELLICLASS CRESTRON MEDIAMANAGER INTELLICLASS Crestron IntelliClass systems provide educators with a simplified yet comprehensive classroom presentation solution that saves time and money. Designed to deliver the

More information

SECTION WATER-SOURCE UNITARY HEAT PUMPS

SECTION WATER-SOURCE UNITARY HEAT PUMPS SECTION 23 81 46 WATER-SOURCE UNITARY HEAT PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:

More information

SECTION HEATING BOILER FEEDWATER EQUIPMENT

SECTION HEATING BOILER FEEDWATER EQUIPMENT SECTION 23 53 00 HEATING BOILER FEEDWATER EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes boiler feedwater pumps, de-aerators, accessories, controls and tanks. 1.2 REFERENCES A. ASME (American

More information

Control Panel. 1.0 GENERAL SCOPE OF WORK Introduction... 2

Control Panel. 1.0 GENERAL SCOPE OF WORK Introduction... 2 Architectural & Engineering Specifications Control Panel 1.0 GENERAL... 2 1.1 SCOPE OF WORK... 2 1.1.1 Introduction... 2 1.2 GENERAL CONDITIONS... 2 1.2.1 After-Sales Support... 2 1.2.2 Quality assurance...

More information

Lake County / Multi-Department Storage Facility / Project / December 12, 2016 SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

Lake County / Multi-Department Storage Facility / Project / December 12, 2016 SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 283111 A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

A. This Section includes transfer switches rated 600 V and less, including the following:

A. This Section includes transfer switches rated 600 V and less, including the following: SECTION 16415 - TRANSFER SWITCHES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Spectron LSN (Life Safety Network) Suggested Specifications

Spectron LSN (Life Safety Network) Suggested Specifications 1. General 1.1 Scope A Dual-Lite Spectron LSN (Life Safety Network) Series Inverter System shall be furnished to provide a reliable source of power, and shall operate during a utility line deficiency without

More information

1.5 CLOSEOUT SUBMITTALS A. Operation and Maintenance Data: For nurse-call equipment to include in emergency, operation, and maintenance manuals.

1.5 CLOSEOUT SUBMITTALS A. Operation and Maintenance Data: For nurse-call equipment to include in emergency, operation, and maintenance manuals. SECTION 27 52 23 - NURSE CALL/CODE BLUE SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:

More information

SECTION COMMERCIAL DOOR OPERATORS OVERHEAD RSX FIRE DOOR OPERATOR

SECTION COMMERCIAL DOOR OPERATORS OVERHEAD RSX FIRE DOOR OPERATOR SECTION 08734 COMMERCIAL DOOR OPERATORS OVERHEAD RSX FIRE DOOR OPERATOR Display hidden notes to specifier by using Tools / Options / View / Hidden Text. PART 1 GENERAL 1.1 SECTION INCLUDES A. Overhead

More information

SECTION (13740) - VIDEO SURVEILLANCE

SECTION (13740) - VIDEO SURVEILLANCE PART 1 GENERAL 1.01 SUMMARY A. Section Includes: SECTION 28 23 00 (13740) - VIDEO SURVEILLANCE 1. CCTV Closed Circuit Television System. B. Related Sections:. 1.02 REFERENCES 1. Section 26 05 00 (16050)

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-28 31 75.00 10 (November 2008) ----------------------------------- Preparing Activity: USACE Superseding UFGS-28 31 75.00 10 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

Standard of Practice - Fire Alarm Systems. NOTE: Significant revisions or additions to the previous standards are highlighted in italics.

Standard of Practice - Fire Alarm Systems. NOTE: Significant revisions or additions to the previous standards are highlighted in italics. A28.1 Standard of Practice - Fire Alarm Systems NOTE: Significant revisions or additions to the previous standards are highlighted in italics. OBJECTIVE OF STANDARD To provide compliant smart addressable

More information

POPE FRANCIS HIGH SCHOOL SPRINGFIELD, MA BID SPECIFICATION PUBLIC ADDRESS AND INTERCOM SYSTEM

POPE FRANCIS HIGH SCHOOL SPRINGFIELD, MA BID SPECIFICATION PUBLIC ADDRESS AND INTERCOM SYSTEM POPE FRANCIS HIGH SCHOOL SPRINGFIELD, MA BID SPECIFICATION PUBLIC ADDRESS AND INTERCOM SYSTEM 1.1 SUMMARY REQUIREMENTS A. The Public Address and Intercom, and Clock systems shall provide the school with

More information

A. Product Data: For each electrical identification product indicated. B. Comply with 29 CFR and 29 CFR

A. Product Data: For each electrical identification product indicated. B. Comply with 29 CFR and 29 CFR September 2012, rev. 00 26 0553 Identification for Electrical Systems PART 1. GENERAL 1.01 Summary A. Section Includes: 1.02 Submittals 1. Identification for raceways. 2. Identification of power and control

More information

SECTION DOMESTIC WATER PUMPS

SECTION DOMESTIC WATER PUMPS SECTION 22 11 23 DOMESTIC WATER PUMPS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following all-bronze and bronze-fitted centrifugal pumps for domestic cold- and hot-water circulation: 1. Close-coupled,

More information

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for detention furniture.

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for detention furniture. SECTION 125500-WALL BED SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

DIVISION 28 ELECTRONIC SAFETY AND SECURITY

DIVISION 28 ELECTRONIC SAFETY AND SECURITY 281300 - ACCESS CONTROL A. General DIVISION 28 ELECTRONIC SAFETY AND SECURITY At the beginning of the project, schedule a meeting with the Facilities Access/Maintenance Coordinator with questions and concerns.

More information

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings 1 T Consultant: NOTES, SYMBOLS & ABBREVIATIONS - MECHANICAL Number Description M001 Vestibule 117 LAN/IT Coffee 115 116 Mail Room 118 114 113 112 Scanning 119 Open Office 101 FIRST FLOOR PLAN - MECHANICAL

More information

DGC-500 DIGITAL GENSET CONTROLLER

DGC-500 DIGITAL GENSET CONTROLLER DGC-500 DIGITAL GENSET CONTROLLER Basler Electric s Digital Genset Controller (DGC-500) offers a low cost microprocessor based integrated alternative for the control and monitoring of small to medium sized

More information

15900 HVAC INSTRUMENTATION AND CONTROLS

15900 HVAC INSTRUMENTATION AND CONTROLS 15900 HVAC INSTRUMENTATION AND CONTROLS PART 1 GENERAL - Andover Controls BAS system is the standard for the University, and may be specified as a proprietary item. 1.0 RELATED DOCUMENTS A. Drawings and

More information

A. AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA) 101: Appendix Dissimilar Materials.

A. AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA) 101: Appendix Dissimilar Materials. B B11.0 DIVISION 08 - OPENINGS SECTION 08 17 00 INTEGRATED DOOR OPENING ASSEMBLIES Specifier Note: Coordinate and edit articles and paragraphs below to suit project requirements. Add section numbers and

More information

A. Section includes split-system air-conditioning units consisting of separate evaporator-fan and compressor-condenser components.

A. Section includes split-system air-conditioning units consisting of separate evaporator-fan and compressor-condenser components. Page 238126-1 SECTION 238126 - This Section includes requirements for the LEED Rating System. However, equipment specified in this Section may not qualify for LEED Rating System prerequisites and credits.

More information

A. The requirements of this Section and the other Division 26, 27 & 28 Sections apply to all the video surveillance system work.

A. The requirements of this Section and the other Division 26, 27 & 28 Sections apply to all the video surveillance system work. PART 1 GNRAL 1.1. APPLICABL PROVISIONS A. The General, Supplementary and other Conditions of the Contract, modifications to the General Conditions, the Drawings, and the applicable provisions of the other

More information