1 York Potash Project Mine, MTS and MHF Environmental Statement, Part 2 Chapter: 16 Land Use and Soils Appendix 16.5 Outline Soil Management Plan

2 Document title: Status: Draft Report Date: 21 August 2014 Project name: York Potash Project Project number: PB1110 Client: York Potash Limited Client contact: James Barrie Reference: PB1110/Outline SMP/303250/Lond Drafted by: Alison Hallas Checked by: John Bevan, Phil Williamson Date / initials check: 17 September 2014 Approved by: Date / initials approval: Part 2 Chapter 16 Land Use and Soils Appendix 16.5 Outline Soil Management Plan i

3 Summary This document forms the Outline Soil Management Plan (SMP) for the York Potash Project. It is intended to provide further information to the Local Planning Authorities regarding soil management best practice and mitigation as described in the various ES chapters and how it will be implemented during the construction phase. It includes generic best practice soil management measures and specific measures focused on the characteristics of soils found on each site and the proposed earthworks and reinstatement. An updated full SMP will be completed once the earthworks contractors have been appointed and design finalised in order to ensure that the method statements are developed with full consideration of their proposed working methods and can therefore suitable for application throughout the earthworks period. Part 2 Chapter 16 Land Use and Soils Appendix 16.5 Outline Soil Management Plan ii

4 Summary... ii 1 Introduction The York Potash Project Site Location and Description Management Plan Purpose Management Plan Structure Soil Management Best Practice Mine Surface Development Site Soil Management Plan Description of baseline Summary of Proposed Earthworks Summary of Restoration and End Use Specific requirements for soil management at the site Lady Cross Plantation Site Soil Management Plan Description of baseline Summary of Proposed Earthworks Summary of Restoration and End Use Specific requirements for soil handling at the site Lockwood Beck site Soil Management Plan Description of baseline Summary of Proposed Earthworks Summary of Restoration and End Use Specific requirements for soil management at the site Tocketts Lythe site Soil Management Plan Description of baseline Summary of Proposed Earthworks Summary of Restoration and End Use Specific requirements for soil handling at the site Figures Appendix 1: Soil Resources, Agricultural Use and Quality of Land Reports Appendix 2: Mine Surface Development Site Earthworks Phasing Documents Appendix 3: YPP 100 Year Decommissioning Strategy report Appendix 4: Lady Cross Plantation Site Earthworks Phasing Documents Part 2 Chapter 16 Land Use and Soils Appendix 16.5 Outline Soil Management Plan iii

5 Appendix 5: Lockwood Beck Site Earthworks Phasing Documents Appendix 6: Tocketts Lythe Site Earthworks Phasing Documents Appendix 7: Earthworks Best Practice Method Sheets Part 2 Chapter 16 Land Use and Soils Appendix 16.5 Outline Soil Management Plan iv

6 1 Introduction 1.1 The York Potash Project York Potash Limited (YPL), a subsidiary of Sirius Minerals plc., intends to develop a mining operation situated in North Yorkshire to Mine the world class deposits of polyhalite mineral found here. The York Potash Project (YPP) area lies between Scarborough and Whitby, extending approximately 16 kilometres inland from the coast and up to 14km offshore (Figure 1). 1.2 Site Location and Description The onshore aspects of the project comprise a series of elements: The Mine, the surface works and ancillary facilities for which are located at the Mine surface development, near Whitby. The Materials Transport System, to be installed within a tunnel below ground, will extend approximately 36.5km from the Mine surface development site to the Wilton site at Teesside where the Materials Handling Facility (MHF) will be located. There will be three intermediate shafts installed along the route located approximately 9km, 24km and 29km from the Mine site where spoil from construction of the tunnel will be deposited. The depth of the tunnel will vary between 360m and 120m below the surface at the shaft sites. Port facilities will be located at Bran Sands at Teesside. In addition, Construction Accommodation and Construction Park and Ride facilities will be located 1.6km to the south of Whitby with the Operational Park and Ride located 2km to the east of Whitby. The Mine and intermediate shaft sites are located in agricultural areas. At these sites, the surface deposits comprise predominantly natural topsoil and subsoil. Intrusive soil resource surveys have been completed at these sites to gather information on the nature of the soils present and support the development of a Soil Management Plan (SMP) for use during the construction phase earthworks. The Wilton site is in industrial use and, in large part, is previously developed. It has significant deposits of made ground (ground which has been previously excavated/reworked and contains anthropogenic materials such as brick, concrete, coal, clinker and pottery). However, some areas of the site contain natural soils. The port site comprises previously industrial land (made ground) and hence no SMP is necessary. At the park and ride facilities, some earthworks are expected. Best practice for handling natural soils is provided in Section 2 for these sites to help preserve this resource. 1.3 Management Plan Purpose This document forms the Outline Soil Management Plan (SMP) for the York Potash Project. It is intended to provide further information to the Local Planning Authorities regarding soil management best practice and mitigation as described in the various ES chapters and how it will be implemented during the construction phase. The full SMP will be completed once the earthworks contractors have been appointed in order to ensure that the method statements are developed with full consideration of Part 2 Chapter 16 Land Use and Soils Appendix 16.5 Outline Soil Management Plan 1

7 their proposed working methods and are therefore suitable for application throughout the earthworks period. The full SMP will provide recommendations on land access, soil handling and erosion control for excavations at each of the sites where significant excavations of natural soil will be undertaken. The recommendations will be based upon the findings and interpretation of the soil surveys conducted between March and April 2014 by Land Research Associates (reports reference 932/1c, 932/2a, 932/4a and 932/3a Appendix 1). The mitigation measures above would be set out in a Soil Management Plan (SMP), including construction method statements for soil handling, which would be produced by a competent soil science contractor and agreed with the relevant regulator, in advance of the works. This would be completed pre-construction once an earthworks contractor has been appointed and detailed earthworks phasing information is available. The contractor would be required to comply with the SMP. No detailed soil management plan is necessary for soils of the woodland areas. The only site where significant earthworks are planned for woodland soils is the Mine surface development site. Here, the woodland soils were found to be a poor quality resource (see Section 3). 1.4 Management Plan Structure The remainder of this Outline SMP follows the following structure: Section 2: Soil management best practice Section 3: Mine surface development site SMP Section 4: Lady Cross Plantation Site SMP Section 5: Lockwood Beck Site SMP Section 6: Tocketts Lythe Site SMP Each site SMP has been presented as a standalone document for completion prior to mobilisation of the earthworks contractors and use throughout the earthworks. 2

8 2 Soil Management Best Practice The following best practice guidance and techniques will be applied throughout the York Potash Project, on all sites where earthworks are undertaken. The earthworks will be completed in general accordance with the following guidance: Defra (2009) Construction Code of Practice for the Sustainable Use of Soils on Construction Sites. MAFF (2000) Good Practice Guide for Handling Soils. General mitigation measures which will be applied at each of the YPP sites include: Soils handling, storage and reinstatement must be undertaken by a competent and suitably experienced contractor; Topsoil will be stored adjacent to where it is extracted, wherever practical; Excavated subsoil will be stored separately from the topsoil, with sufficient separation to ensure segregation; Soils should be handled according to their characteristics e.g. within wooded areas it is unlikely that topsoil resources of any quality could be separated and preserved for reuse. If current wooded areas are to be used for storage it would not be necessary to undertake topsoil stripping. Topsoils from agricultural land may be treated as a single resource for stockpiling and reuse (see Appendix 1); Where under storage areas, loosening of subsoils is proposed when dry to improve permeability before the topsoil is replaced; For most after-uses, subsoils may be treated as a single resource for stockpiling; During wet periods, limiting mechanised soil handling in areas where soils are highly vulnerable to compaction; Restricting movements of heavy plant and vehicles to specific routes and avoidance of trafficking of construction vehicles in areas of the site which are not subject to construction phase earthworks. Minimising the excavation footprint where possible; and In circumstances where construction has resulted in soil compaction, further remediation may be provided, through an agreed remediation strategy. 3

9 3 Mine Surface Development Site Soil Management Plan 3.1 Description of baseline The detailed survey undertaken of Soil Resources and Agricultural Use and Quality of Land (Appendix 1) confirmed that heavy clay loam topsoil was encountered in the west and north east of the site, overlying dense slowly permeable clay subsoil, with a thin intervening layer of moderately permeable upper subsoil in some locations. The remainder of the agricultural areas of the site were found to have medium clay loam soils, usually overlying heavier slowly permeable subsoils. A representative profile of the heavy loamy over clayey soils is: m Dark greyish brown heavy clay loam with many distinct fine red root channel mottles; very slightly stony; moderately developed coarse sub-angular blocky structure; friable to firm. There was an abrupt smooth boundary to the next layer m Grey (clay with many distinct strong brown mottles; stoneless or very slightly stony; weakly developed very coarse prismatic to massive structure; very firm. There was a gradual smooth boundary to the next layer m+ Strong brown heavy clay loam with many distinct coarse grey mottles; stoneless; massive (structureless). A representative profile of the medium fine loamy soils is: m Very dark greyish brown medium clay loam; very slighty stony; well-developed medium to coarse sub-angular blocky structure; friable. There was an abrupt smooth boundary to the next layer m Greyish brown sandy clay loam with abundant distinct fine brownish grey and yellowish brown mottles; slightly stony; moderately developed medium to coarse angular blocky structure; friable. There was a clear smooth boundary to the next layer m+ Grey heavy clay loam with abundant coarse strong brown mottles; slightly stony; weak very coarse angular blocky to prismatic structure; firm. Soils in the woodland areas were found to be highly variable but mainly of similar types to the agricultural soils (fine loamy soils or fine loamy over clayey soils), often with an organic/peaty upper horizon. The soil types identified are shown in the Soil Resources and Agricultural use and Quality report for the site (Appendix 1). The soil survey of the site concluded that the topsoil in agricultural areas is a clay loam and therefore whilst naturally fertile, is also susceptible to compaction, and difficult to handle during wet periods using machinery without causing structural degradation. Subsoil was noted generally to be highly susceptible to compaction (see Appendix 1) due to its clayey and loamy composition. Two subsoil resources exist at the site: a moderately permeable upper subsoil of fine loamy soils and a slowly permeable material found below 50cm in the fine loamy soils or immediately below the topsoil in the clay soils (see Map 1 in the Soil Resources and Agricultural use and Quality report for the site - Appendix 1). Soils of the woodland areas were noted to be of low quality and unlikely to be degraded further by mechanised handling. The soils under plantation are variable and often previously disturbed by forestry operations. 4

10 3.2 Summary of Proposed Earthworks The earthworks phasing plans, volume calculations and outline method statements are provided in Appendix 2. The outline method statements will be revised and updated following appointment of the earthworks contractors. Table 3.1 Key features of the earthworks Mine surface development site Description Timescale Drawing reference A series of permanent landscaped bunds will be formed and shallow excavations made for surface water attenuation ponds, building foundations and construction platforms. Material will be excavated from depth for the Mine workings. Soils will be stored in temporary stockpiles. - YP-P2-CX-030 The bunds will be formed using spoil excavated from the Mine workings, subsoil and topsoil. The volumes of each material to be used in each bund and each pond excavation have been provided - YP-P2-CX-032 Excavations and fill requirements for construction platform areas have also been provided - YP-P2-CX-033 The earthworks will progress in 7 phases with topsoil and subsoil progressively stripped as required to accommodate spoil deposition and development infrastructure. Plans for each phase and a summary of works have been provided - YP-P2-CX-034 and YP-P2-CX-034 Phase 1 will include the following earthworks: Soil stripping and formation of the site access road Soil stripping and reuse for formation of temporary surface water attenuation ponds Soil stripping, formation and restoration of two noise attenuation bunds Soil stripping for two permanent spoil deposition bunds Placement of inert material from the shaft platform area in permanent bunds and in formation of attenuation ponds (clay liner) Months 1 to 6 YP-P2-CX-070 to YP-P2-CX-073 5

11 Description Timescale Drawing reference Power cable diversion Restoration of part of bund F and commencement of restoration of a second bund (D) Phase 2 will include the following earthworks: Re-engineering of site won clay and placement of pyritic mudstone in spoil deposition bund (D) Soil stripping and formation of temporary inert material stockpile Soil stripping from welfare buildings area Placement of spoil in bund (E) and commencement of restoration Months 7 to 17 YP-P2-CX-074 Phase 3 will include the following earthworks: Completion of restoration of bund E Completion of spoil placement and restoration of the remainder of bund D Re-engineering of site won clay for containment of bund H and placement of pyritic mudstone Restoration of the exhaust ventilation shaft area (bund I) Temporary stockpiling of non-hazardous non inert material Months 18 to 24 YP-P2-CX-075 Phase 4 will include the following earthworks: Re-engineering of site won clay for containment of the north east of bund F, placement of pyritic mudstone and restoration Subsoil stripping and excavation of inert superficial deposits from the welfare buildings area. Temporary stockpiling of the inert material Soils stripping and placement or stockpiling of non-hazardous non inert material in bund C Temporary stockpiling of non-hazardous non inert material Months 25 to 32 YP-P2-CX-076 6

12 Description Timescale Drawing reference Phase 5 will include the following earthworks: Re-engineering of site won clay for containment and restoration of west and south of bund C Placement of spoil in the east of bund C Months 33 to 40 YP-P2-CX-077 Phase 6 will include the following earthworks: Temporary stockpiling of non-hazardous non inert material in the east of bund C Completion of bund H using stockpiled inert material Restoration of bunds G and H Restoration of soil on the temporary stockpile area Months 41 to 46 YP-P2-CX-078 Phase 7 will encompass the completion of spreading of soils from the temporary stockpile site (east of bund C) to the final restoration contours (minimal earthworks) - YP-P2-CX-079 Volumes of materials movements are provided in the Earthworks Strategy Volumes spreadsheet in Appendix Summary of Restoration and End Use During the operational life of the Mine, the areas of the site not used for mining and associated infrastructure would be restored to landscaping and habitat creation. Following decommissioning, the land would be restored to agricultural, forestry or amenity use (potentially including nature conservation). Further information is provided in the YPP 100 Year Decommissioning Strategy report (Appendix 3). The landscape restoration plan for the site (including soil restoration depths) has been designed for these end uses. The preservation of the soil resource and protection of soil structure at the site will be important in order to achieve suitable restored soil conditions for these land uses. 3.4 Specific requirements for soil management at the site Management of agricultural soils The topsoil of the land is a resource of moderate quality; it is naturally fertile, but susceptible to compaction when wet. Topsoils of the agricultural land may be treated as a single resource for stockpiling and reuse. 7

13 The better-draining soils at the site have moderately permeable upper subsoil, which is highly susceptible to compaction and sealing which will increase runoff. The heavier soils have naturally slowly permeable occurring immediately below the topsoil, but are susceptible to compaction which can cause sealing and severe wetness problems. In both cases therefore, where under storage areas subsoils require loosening when dry to improve permeability before the topsoil is replaced. Timing of mechanised operations (including loosening) is critical to avoid degradation. Two subsoil resources exist at the site: i) the moderately permeable upper subsoil of fine loamy soils and ii) slowly permeable material found below 50 cm in the fine loamy soils or immediately below the topsoil in the clay soils (see Map 1 in the Soil Resources and Agricultural use and Quality report for the site - Appendix 1). For most after-uses, subsoils may be treated as a single resource for stockpiling. Areas not being built over should not be trafficked by construction vehicles as this will render the soils impermeable, preventing percolation of rainfall beyond the base of the topsoil, which will quickly become saturated. Stripped topsoil should be stored in separate resource bunds, preferably no more than 3-4 m high, kept grassed and free from construction traffic until required for re-use. The Construction Code of Practice for Sustainable Use of Soils on Construction Sites (Defra 2009) provides guidance on good practice in soil handling Management of woodland soils The soils under plantation are variable and often previously disturbed by forestry operations. Attempts to strip soils from woodland areas to be used for soil stockpiling and other activities relating to the mining operations would first require tree stump removal, and given the fact the soils are heavy and undrained, it is highly unlikely that topsoil resources of any quality could be separated and preserved for reuse. Due to the low quality of the baseline soil resource, where currently wooded areas are to be used for storage it is not necessary to undertake topsoil stripping. Where these soils are to be excavated to install infrastructure they should be stockpiled separately from better quality soils of agricultural areas, and preserved for lower demand uses following reinstatement Soil Handling Soil quality can be impaired by incorrect handling, separation, storage and replacement. Particular problems arise from: Handling soils at inappropriate moisture content. Inappropriate use of machinery. Incorrect topsoil stripping depth resulting in dilution with underlying subsoil. Failure to separate contrasting subsoil layers resulting in impaired drainage and/or reduced soil moisture storage. Poor storage separation resulting in mixing. Excess stockpile height leading to compaction damage, runoff and erosion. 8

14 The ease of soil handling is affected by soil type. Heavy clay soils are difficult to handle when wet without causing structural damage. Conversely sandy soils are resistant to handling damage across a range of moisture contents. Generally the risk of soil handling damage during wet conditions can be minimised by careful attention to the restrictions described in and of this report. Mechanised soil handling will only take place when soils are below plastic limit in accordance with the MAFF Good Practice Guide for Handling Soils. Before soil handling during winter months and following heavy rain at other times, the moisture status of the soils will be checked by the operator. Stripping should only take place using an excavator as described by Sheet 1 in the MAFF Good Practice Guide for Handling Soils (see Appendix 7). [To be completed in discussion with the appointed contractor to agree acceptable earthworks activities during winter months.] Topsoil and subsoil resources should be stripped and stored separately heaps 3-4m in height, avoiding over-compaction. Topsoil should be stripped to depths provided for each area of the site (see Appendix xx of this report [to be completed]), which will avoid dilution with subsoil. In most places there is a distinct colour difference between topsoil and subsoil that should aid accurate stripping. Where land will be restored to agricultural or forestry use, upper subsoil should be stripped to a depth of 0.25 m and stockpiled separately from underlying material, taking care to replace in the correct order. The following methods should be followed to ensure that suitable conditions exist and that damage to soils is minimised: Machinery operation: a tracked hydraulic excavator should be used to load topsoil and subsoil. The soils should be stripped, stockpiled, removed from storage (Sheet 3 in the MAFF Good Practice Guide) and replaced by tracked hydraulic excavator using the loose tipping technique (Sheet 4 in MAFF Good Practice Guide see Appendix xx), with only gentle firming by tracked vehicles. Rainfall during operations: during rainfall and soon after it ceases there will always be surplus water in the surface layers of soil. If earthmoving continues the surface layer will become compacted, ruts will be formed and any further rain will lie on the surface and tend to drain away far more slowly than previously. Conditions will then tend to deteriorate further during earthmoving with consequential damage to soils. Consequently, soil stripping should be suspended wherever possible during heavy rainfall. After rainfall, the wetness of the soil should be checked (by the earthworks contractor) before recommencing mechanised soil handling. Detailed, site specific methods sheets for soil handling are provided in Appendix 7. [To be completed in discussion with the appointed contractor to agree acceptable earthworks activities during winter months] Prevention of erosion Given the soil types present at the site, risk of erosion is generally low. However, soil erosion by water can be initiated even on gentle slopes and heavy soils where inappropriate management is applied. Even in the absence of significant erosion on these areas, surface runoff can initiate erosion on adjoining susceptible land, particularly when exacerbated by surface compaction or the creation of channels which concentrate runoff (e.g. furrows or vehicle tracks). General erosion management principles should apply to the site: 9

15 Minimise the amount of bare soil. Where possible, avoid operations in heavy rainfall or commencing operations when heavy rainfall is predicted. Avoid soil compaction damage and loosen soils where this occurs (as detailed in soil handling plan Method Sheet see Appendix 7 [to be completed]). Leave bare surfaces rough to encourage infiltration and minimise surface runoff. Grass seeding of all soil stockpiles that would be in place for more than 12 months. This relates to temporary soil stockpiles in place for more than 12 months and permanent spoil storage mounds Compliance monitoring Compliance monitoring will be required during and after construction. An example programme for each stage is outlined below. During construction Visual observation of soil trafficking, stripping, storage and reinstatement methods should be made on the commencement of work by a suitably qualified professional. A limited number of pit excavations to quality-control newly reinstated soils following restoration. Audit of contractor against this SMP and if necessary suggested improvements provided to contractor Following completion Initial compliance monitoring following reinstatement of soils should include visual assessment at selected locations. Visual assessment should include evidence of erosion and of surface wetness which may indicate drainage/compaction problems. A limited number of pit excavations may be made to evaluate potential compaction/drainage problems where identified. Should any specific problems be reported by neighbouring landowners, these should be thoroughly investigated and remediation strategies employed as appropriate. Continuing monitoring can then be employed where necessary Mitigation and Remediation Remediation should not be necessary if the SMP detail is adhered to. However, should any problems be identified, it is important that the causes are correctly identified. Soil erosion Where erosion has initiated on disturbed areas it may be appropriate to install control structures or barriers to check the flow of runoff, and/or loosen compacted surfaces to encourage infiltration on vehicle traffic areas (details are provided in the accompanying Method Sheets; see Appendix 7 [to be completed]). In the event that major erosion has already occurred, specialist advice should be sought on remediation. Soil compaction 10

16 Areas used as haul roads will be ripped (mechanical breaking up of the soil surface) to loosen subsoils prior to topsoil replacement. Compaction damage following soils reinstatement may be evidenced by standing water at the land surface, or by poor plant growth, resulting either from soil waterlogging or drought stress due to inhibited rooting depth. Where compacted subsoil layers are observed, they should be loosened/ripped using commercial subsoiling equipment (e.g. a winged tine). 4 Lady Cross Plantation Site Soil Management Plan 4.1 Description of baseline Soil surveys at the Lady Cross Plantation site identified that topsoils are present within the site and these, along with the upper subsoils, have a sandy clay loam or medium clay loam texture (see Appendix 1). Observations made by hand augering confirmed the following characteristics of the soil: At 0-0.2m depth the soil was black, slightly stony with a well-developed medium and fine subangular structure. There was a clear smooth boundary to the next colour variation. At m depth the soil is greyish brown in colour and sandy clay loam in texture. The soil also has many distinct medium brownish yellow and yellowish red mottles, is slightly stony and has a weakly developed medium to coarse sub-angular block structure. The soil is grey in colour with a heavy clay loam texture. There are also many distinct medium yellowish red and reddish yellow mottles at m depth. At m the soil has a medium clay loam texture and is brown in colour with common distinct fine grey mottles. Woodland areas within the sites are limited to approximately 0.21 ha at Lady Cross Plantation. Woodland soils have therefore not been considered further as a separate resource. 4.2 Summary of Proposed Earthworks The earthworks phasing plans, volume calculations and outline method statements are provided in Appendix 4. The outline method statements will be revised and updated following appointment of the earthworks contractors. Table 4.1 Key features of the earthworks Lady Cross Plantation Description Timescale Drawing reference One permanent landscaped spoil deposition bund will be formed and shallow excavations made for surface water attenuation ponds, building foundations and construction platforms. Material will be excavated from depth for the Mine shaft. Soils will be stored in temporary stockpiles. The bunds will be formed using spoil excavated from the Mine shaft, subsoil and topsoil. The - YP-P2-CX YP-P2-CX

17 Description Timescale Drawing reference volumes of each material to be taken from each excavation and used in each bund have been provided The earthworks will progress in 6 phases with topsoil and subsoil progressively stripped as required to accommodate spoil deposition and development infrastructure. A plan summarising the works within each stage and the locations of works within each stage has been provided. Further detail of the earthworks phasing within the spoil deposition mound has also been provided Month 3 to 41 Months 3 to 38 YP-P2-CX-442 YP-P2-CX-443 Volumes of materials movements are provided in the Earthworks Strategy Volumes spreadsheet in Appendix Summary of Restoration and End Use Operational phase infrastructure will be contained within an area covering 1 ha at each site; the remainder will be returned to either agricultural use, habitat enhancement or possibly amenity use (land may be used to create a network of footpaths for use by the general public including those staying at the nearby caravan park). The operational phase site layout is shown on drawings YP-P2-CX-441 in Appendix Specific requirements for soil handling at the site Soil Management Topsoil The fine loamy topsoil covering much of the site is a resource of moderate quality if retained for use in landscaping; it is susceptible to compaction if handled when wet and therefore, wherever possible, handling should not occur during or within 24 hours after heavy rain. Other than heavy rainfall periods, soil conditions are usually suitable for topsoil stripping and stockpiling between the beginning of May and the end of September at this site. Outside of this period, soils are likely to be wet for long periods and therefore susceptible to structural damage. At these times mitigation techniques to avoid damage in wet conditions should be employed, as described in section Where possible, stripped topsoil should be stored in separate resource bunds no more than 3-4 m high, and kept grassed and free from construction traffic until required for re-use. Subsoil 12

18 The soils have permeable upper subsoil of slightly variable depth, which is a better quality resource than the lower subsoil for soil profile restoration. Stripping and separate storage of this material to a depth of 20 cm following topsoil removal would provide for the creation of better-draining soil profiles if required. For other uses (such as restoration to woodland plantation or habitat areas) subsoils may be stripped and reused as a single resource. Subsoils will benefit from loosening before topsoil replacement. If soil is to be handled when wet, the recommended method is to strip topsoil and subsoil in narrow sections using an excavator. Dozers should not be used in these soil conditions. Transport vehicles should only run on the basal layer (i.e. on the ground surface following stripping of subsoil to the required stockpiling depth), thus avoiding compaction damage. Soil conditions should be checked prior to handling operations and should not proceed if soils are found to be waterlogged. The Construction Code of Practice for Sustainable Use of Soils on Construction Sites (Defra 2009) provides full details of recommended methods Soil Handling Soil quality can be impaired by incorrect handling, separation, storage and replacement. Particular problems arise from: Handling soils at inappropriate moisture content. Inappropriate use of machinery. Incorrect topsoil stripping depth resulting in dilution with underlying subsoil. Failure to separate contrasting subsoil layers resulting in impaired drainage and/or reduced soil moisture storage. Poor storage separation resulting in mixing. Excess stockpile height leading to compaction damage, runoff and erosion. The ease of soil handling is affected by soil type. Heavy clay soils are difficult to handle when wet without causing structural damage. Conversely sandy soils are resistant to handling damage across a range of moisture contents. Generally the risk of soil handling damage during wet conditions can be minimised by careful attention to the restrictions described in Section of this report. Stripping should only take place using an excavator as described by Sheet 1 in the MAFF Good Practice Guide for Handling Soils (see Appendix 7 [to be completed]). Topsoil should be stripped to depths provided for each area of the site (see Appendix 7 of this report [to be completed]), which will avoid dilution with subsoil. In most places there is a distinct colour difference between topsoil and subsoil that should aid accurate stripping. Upper subsoil should be stripped to a depth of 20 cm and stockpiled separately from underlying material, taking care to replace in the correct order. The following stages should be followed to ensure that suitable conditions exist and that damage to soils is minimised: 13

19 Machinery operation: a tracked hydraulic excavator should be used to load topsoil and subsoil. The soils should be stripped, stockpiled, removed from storage (Sheet 3 in the MAFF Good Practice Guide see Appendix 7 [to be completed]) and replaced by tracked hydraulic excavator using the loose tipping technique (Sheet 4 in MAFF Good Practice Guide see Appendix 7 [to be completed]), with only gentle firming by tracked vehicles. Rainfall during operations: during rainfall and soon after it ceases there will always be surplus water in the surface layers of soil. If earthmoving continues the surface layer will become compacted, ruts will be formed and any further rain will lie on the surface and tend to drain away far more slowly than previously. Conditions will then tend to deteriorate further during earthmoving with consequential damage to soils. Consequently, soil stripping should be suspended during heavy rainfall wherever possible. After rainfall, the wetness of the soil should be checked (by the earthworks contractor) before recommencing mechanised soil handling. Detailed methods sheets for soil handling are provided in Appendix 7 [to be completed] Prevention of erosion Given the soil types present at the site, risk of erosion is generally low. However, soil erosion by water can be initiated even on gentle slopes and heavy soils where inappropriate management is applied. Even in the absence of significant erosion on these areas, surface runoff can initiate erosion on adjoining susceptible land, particularly when exacerbated by surface compaction or the creation of channels which concentrate runoff (e.g. furrows or vehicle tracks). General erosion management principles should apply across the site: Minimise the amount of bare soil. Avoid operations in heavy rainfall or commencing operations when heavy rainfall is predicted. Avoid soil compaction damage and loosen soils where this occurs (as detailed in soil handling plan Method Sheet see Appendix 7 [to be completed]). Leave bare surfaces rough to encourage infiltration and minimise surface runoff. Grass seeding of all soil stockpiles that would be in place for more than 12 months. This relates to temporary soil stockpiles in place for more than 12 months and permanent spoil storage mounds Compliance monitoring Compliance monitoring will be required during and after construction. An example programme for each stage is outlined below. During construction Visual observation of soil trafficking, stripping, storage and reinstatement methods should be made on the commencement of work by a suitably qualified professional. A limited number of pit excavations to quality-control newly reinstated soils following restoration. Audit of contractor against this SMP and if necessary suggested improvements provided to contractor 14

20 Following completion Initial compliance monitoring following completion should include visual assessment at selected locations. Visual assessment should include evidence of erosion and of surface wetness which may indicate drainage/compaction problems. A limited number of pit excavations may be made to evaluate potential compaction/drainage problems where identified. Longer-term monitoring should include a rapid reconnaissance at selected locations within the site once restoration is complete and planting in areas of habitat or grass/crops in agricultural areas have established. Visual indicators of poor plant/crop performance (relative to surrounding areas outside the site) can be used to assess potential damage which may then be investigated in further detail. Should specific problems be reported by landowners, these need to be thoroughly investigated and remediation strategies employed as appropriate. Continuing monitoring can then be employed where necessary Mitigation and Remediation Remediation should not be necessary if the management plan detail is adhered to. However, should agricultural management problems be identified by landowners/operators in the season following restoration and returning of the site to its end use, it is important that the causes are correctly identified. Soil erosion Where erosion has initiated on disturbed areas it may be appropriate to install control structures or barriers to check the flow of runoff, and/or loosen compacted surfaces to encourage infiltration on vehicle traffic areas (details are provided in the accompanying Method Sheets; see Appendix 7 [to be completed]). In the event that major erosion has already occurred, specialist advice should be sought on remediation. Soil compaction Areas used as haul roads should be ripped (mechanical breaking up of the soil surface) to loosen subsoils prior to topsoil replacement. Compaction damage following soils reinstatement may be evidenced by standing water at the land surface, or by poor plant/crop growth, resulting either from soil waterlogging or drought stress due to inhibited rooting depth. Existence of over-compacted layers should be initially assessed by inspection of shallow pits. This is particularly important in establishing cause with reference to damage to drainage systems as described below. Where compacted subsoil layers are observed, they should be loosened/ripped using commercial subsoiling equipment (e.g. a winged tine). Specialist grassland subsoilers (which minimise vegetation disturbance) are also commercially available. Should compaction damage occur in areas which are restored to grass, it may be additionally necessary to cultivate the topsoil and reseed to grass to remove near-surface compaction. Topsoil compaction will be removed automatically by cultivation in arable fields and is therefore unlikely to be an issue. 15

21 Damaged drainage systems In temporary construction areas, breakage or blockage of field drainage systems is likely to be evidenced by wet patches at the soil surface upslope of excavation areas. These may be tens of metres away from the area of disturbance, but any wetness occurring downslope or more than 50 m upslope should be assumed to be unrelated to construction activities. Surface ponding can also be caused by soil compaction, but where ponding occurs in dry periods it is likely to be due to drain damage. Where the cause is uncertain it will be ascertained by a small pit excavation. Drainage problems unrelated to surface compaction should be referred to a specialist drainage contractor. A new drainage system will be installed under landscaped spoil deposition areas. 16

22 5 Lockwood Beck site Soil Management Plan 5.1 Description of baseline Topsoils at the Lockwood Beck site were identified as sandy clay loams or clay loams which usually overlie moderately permeable fine loamy upper subsoil. Slowly permeable subsoil mostly occurs at a depth of m below the surface. In some areas the slowly permeable subsoils lay directly below the topsoil (see Appendix 16.1). Observations made by hand augering confirmed the presence of soil which has the following characteristics: From m below the surface the soil is a very dark greyish brown sandy clay loam. This is stoneless with distinct reddish brown root channel mottles and a moderately developed sub-angular blocky structure. At m depth the soil becomes a light brownish grey stoneless sandy clay loam with, many distinct reddish brown mottles, and a weak coarse angular blocky structure. The soil at m depth is a stoneless grey dense heavy clay loam with a very coarse angular blocky to prismatic structure which has a gradual smooth boundary to reddish brown dense silty clay at m depth. Woodland areas within the sites are limited to 0.1ha at Lockwood Beck. Woodland soils have therefore not been considered further as a separate resource. 5.2 Summary of Proposed Earthworks The earthworks phasing plans, volume calculations and outline method statements are provided in Appendix 5. The outline method statements will be revised and updated following appointment of the earthworks contractors. Table xx Key features of the earthworks Lockwood Beck Description Timescale Drawing reference Two permanent landscaped spoil deposition bunds will be formed and shallow excavations made for surface water attenuation ponds, building foundations and construction platforms. Material will be excavated from depth for the Mine shaft. Soils will be stored in temporary stockpiles. The bunds will be formed using spoil excavated from the Mine shaft, subsoil and topsoil. The volumes of each material to be taken from each excavation and used in each bund have been provided - YP-P2-CX YP-P2-CX-433 The earthworks will progress in 6 phases with topsoil and subsoil progressively stripped as required to accommodate spoil deposition and Month 3 to 46 YP-P2-CX

23 Description Timescale Drawing reference development infrastructure. A plan summarising the works within each stage and the locations of works within each stage has been provided. Further detail of the earthworks phasing within the spoil deposition mounds has also been provided Months 3 to 38 YP-P2-CX-423 Volumes of materials movements are provided in the Earthworks Strategy Volumes spreadsheet in Appendix Summary of Restoration and End Use Operational phase infrastructure will be contained within an area covering 1 ha; the remainder will be returned to either agricultural use or habitat enhancement. It is intended that the majority of land at Lockwood Beck would be returned to arable or grassland use. The operational phase site layouts are shown on drawings YP-P2-CX-421 in Appendix Specific requirements for soil management at the site Soil Management Topsoil The fine loamy topsoil of most of the land is a resource of moderate quality; it is naturally fertile, but susceptible to compaction when wet. The coarse loamy topsoils in the north-east are a high quality resource. Fine-textured and coarse-textured topsoils should be stripped and stockpiled separately according to the mapped distribution (see Map 1 in the Soil Resources survey report in Appendix 1: Soil Resources and Agricultural Use and Quality of Land near Stanghow). Subsoil The dominant fine-textured soils at the site (which underlie the whole of the proposed compound area) mainly have moderately permeable upper subsoil, overlying dense, poorly structured subsoil. Stripping of the upper subsoil to a depth of 0.25 m once topsoil has been removed would prevent restored soils developing very poor drainage conditions. Timing of mechanised operations (including loosening) is critical to avoid degradation. The coarse-textured soils have permeable subsoil to depth, which may be usefully used to create good quality restored profiles with free drainage. Areas not being built over should not be trafficked by construction vehicles as this will render the soils impermeable, preventing percolation of rainfall beyond the base of the topsoil, which will quickly become saturated. Stripped topsoil should be stored in separate resource bunds preferably 3-4 m high, kept grassed and free from construction traffic until required for re-use. The Construction Code of Practice for Sustainable Use of Soils on Construction Sites (Defra 2009) provides guidance on good practice in soil handling. 18

24 5.4.2 Soil Handling Soil quality can be impaired by incorrect handling, separation, storage and replacement. Particular problems arise from: Handling soils at inappropriate moisture content. Inappropriate use of machinery. Incorrect topsoil stripping depth resulting in dilution with underlying subsoil. Failure to separate contrasting subsoil layers resulting in impaired drainage and/or reduced soil moisture storage. Poor storage separation resulting in mixing. Excess stockpile height leading to compaction damage, runoff and erosion. The ease of soil handling is affected by soil type. Heavy clay soils are difficult to handle when wet without causing structural damage. Conversely sandy soils are resistant to handling damage across a range of moisture contents. Generally the risk of soil handling damage during wet conditions can be minimised by careful attention to the restrictions described in Section of this report. Stripping should only take place using an excavator as described by Sheet 1 in the MAFF Good Practice Guide for Handling Soils. Topsoil and subsoil resources should be stripped and stored separately in low heaps, avoiding overcompaction. Topsoil should be stripped to depths provided for each area of the site (see Appendix 7 of this report [to be completed]), which will avoid dilution with subsoil. In most places there is a distinct colour difference between topsoil and subsoil that should aid accurate stripping. Upper subsoil should be stripped to a depth of 25 cm and stockpiled separately from underlying material, taking care to replace in the correct order. The following stages should be followed to ensure that suitable conditions exist and that damage to soils is minimised: Machinery operation: a tracked hydraulic excavator should be used to load topsoil and subsoil. The soils should be stripped, stockpiled, removed from storage (Sheet 3 in the MAFF Good Practice Guide) and replaced by tracked hydraulic excavator using the loose tipping technique (Sheet 4 in MAFF Good Practice Guide), with only gentle firming by tracked vehicles. Rainfall during operations: during rainfall and soon after it ceases there will always be surplus water in the surface layers of soil. If earthmoving continues the surface layer will become compacted, ruts will be formed and any further rain will lie on the surface and tend to drain away far more slowly than previously. Conditions will then tend to deteriorate further during earthmoving with consequential damage to soils. Consequently, soil stripping should be suspended during heavy rainfall. After rainfall, the wetness of the soil should be checked (by the earthworks contractor) before recommencing mechanised soil handling. Detailed methods sheets for soil handling are provided in Appendix 7 [to be completed]. 19

25 5.4.3 Prevention of erosion Given the soil types present at the site, risk of erosion is generally low. However, soil erosion by water can be initiated even on gentle slopes and heavy soils where inappropriate management is applied. Even in the absence of significant erosion on these areas, surface runoff can initiate erosion on adjoining susceptible land, particularly when exacerbated by surface compaction or the creation of channels which concentrate runoff (e.g. furrows or vehicle tracks). General erosion management principles should apply across the site: Minimise the amount of bare soil. Avoid operations in heavy rainfall or commencing operations when heavy rainfall is predicted. Avoid soil compaction damage and loosen soils where this occurs (as detailed in soil handling plan Method Sheet see Appendix 7 [to be completed]). Leave bare surfaces rough to encourage infiltration and minimise surface runoff. Grass seeding of all soil stockpiles that would be in place for more than 12 months. This relates to temporary soil stockpiles in place for more than 12 months and permanent spoil storage mounds Compliance monitoring Compliance monitoring will be required during and after construction. An example programme for each stage is outlined below. During construction Visual observation of soil trafficking, stripping, storage and reinstatement methods should be made on the commencement of work by a suitably qualified professional. A limited number of pit excavations to quality-control newly reinstated soils following restoration. Audit of contractor against this SMP and if necessary suggested improvements provided to contractor Following completion Initial compliance monitoring following completion should include visual assessment at selected locations. Visual assessment should include evidence of erosion and of surface wetness which may indicate drainage/compaction problems. A limited number of pit excavations may be made to evaluate potential compaction/drainage problems where identified. Longer-term monitoring should include a rapid reconnaissance at selected locations within the site once restoration is complete and planting in areas of habitat or grass/crops in agricultural areas have established. Visual indicators of poor plant/crop performance (relative to surrounding areas outside the site) can be used to assess potential damage which may then be investigated in further detail. Should specific problems be reported by landowners, these need to be thoroughly investigated and remediation strategies employed as appropriate. Continuing monitoring can then be employed where necessary. 20

26 5.4.5 Mitigation and Remediation Remediation should not be necessary if the management plan detail is adhered to. However, should agricultural management problems be identified by landowners/operators in the season following restoration and returning of the site to its end use, it is important that the causes are correctly identified. Soil erosion Where erosion has initiated on disturbed areas it may be appropriate to install control structures or barriers to check the flow of runoff, and/or loosen compacted surfaces to encourage infiltration on vehicle traffic areas (details are provided in the accompanying Method Sheets; see Appendix 7 [to be completed]). In the event that major erosion has already occurred, specialist advice should be sought on remediation. Soil compaction Areas used as haul roads should be ripped (mechanical breaking up of the soil surface) to loosen subsoils prior to topsoil replacement. Compaction damage following soils reinstatement may be evidenced by standing water at the land surface, or by poor plant/crop growth, resulting either from soil waterlogging or drought stress due to inhibited rooting depth. Existence of over-compacted layers should be initially assessed by inspection of shallow pits. This is particularly important in establishing cause with reference to damage to drainage systems as described below. Where compacted subsoil layers are observed, they should be loosened/ripped using commercial subsoiling equipment (e.g. a winged tine). Specialist grassland subsoilers (which minimise vegetation disturbance) are also commercially available. Should compaction damage occur in grass fields, it may be additionally necessary to cultivate the topsoil and reseed to grass to remove near-surface compaction. Topsoil compaction will be removed automatically by cultivation in arable fields and is therefore unlikely to be an issue. Damaged drainage systems In temporary construction areas, breakage or blockage of field drainage systems is likely to be evidenced by wet patches at the soil surface upslope of excavation areas. These may be tens of metres away from the area of disturbance, but any wetness occurring downslope or more than 50 m upslope should be assumed to be unrelated to construction activities. Surface ponding can also be caused by soil compaction, but where ponding occurs in dry periods it is likely to be due to drain damage. Where the cause is uncertain it will be ascertained by a small pit excavation. Drainage problems unrelated to surface compaction will be referred to a specialist drainage contractor. A new drainage system will be installed under landscaped spoil deposition areas. There is some potential for damage to drainage systems outside of the working areas at Lockwood Beck. Any potential issues will be discussed with the landowner, and requirements for appropriate diversion structures agreed. 21

27 6 Tocketts Lythe site Soil Management Plan 6.1 Description of baseline The soils at the Tocketts Lythe site were classified as clay loams over silty clays with a high capacity to absorb excess rainfall and to temper pollutants falling on the soil surface during the growing season. However, this capacity is limited in winter when the soil stands wet for long periods. Furthermore, run off risk is high. Observations made by hand augering confirmed the presence of topsoil which has the following characteristics: 0-0.1m Soils have a very dark greyish brown colour which are stoneless and as a well-developed heavy clay loam m The soil is silty clay, a greyish brown colour and with a coarse angular blocky structure m Soils are reddish brown, dense silty clay with a grey ped (soil structure) faces, stoneless and weak very coarse prismatic structure. Woodland areas within the site are limited to 0.01 ha at Tocketts Lythe see Table 16.6). Woodland soils have therefore not been considered further as a separate resource. 6.2 Summary of Proposed Earthworks The earthworks phasing plans, volume calculations and outline method statements are provided in Appendix 6. The outline method statements will be revised and updated following appointment of the earthworks contractors. Table xx Key features of the earthworks Tocketts Lythe Description Timescale Drawing reference One permanent landscaped spoil deposition bund will be formed and shallow excavations made for surface water attenuation ponds, building foundations and construction platforms. Material will be excavated from depth for the Mine shaft. Soils will be stored in temporary stockpiles. The bunds will be formed using spoil excavated from the Mine shaft, subsoil and topsoil. The volumes of each material to be taken from each excavation and used in each bund have been provided - YP-P2-CX YP-P2-CX-418 The earthworks will progress in 6 phases with topsoil and subsoil progressively stripped as required to accommodate spoil deposition and development infrastructure. A plan summarising the works within each stage and the locations of Month 3 to 46 YP-P2-CX

28 Description Timescale Drawing reference works within each stage has been provided. Further detail of the earthworks phasing within the spoil deposition mound has also been provided Months 3 to 30 YP-P2-CX-413 Volumes of materials movements are provided in the Earthworks Strategy Volumes spreadsheet in Appendix Summary of Restoration and End Use Operational phase infrastructure will be contained within an area covering 1 ha; the remainder will be returned to either agricultural use or habitat enhancement. It is intended that the majority of land at Tocketts Lythe would be returned to arable or grassland use. The operational phase site layout is shown on drawings YP-P2-CX-411 in Appendix Specific requirements for soil handling at the site Soil Management Topsoil The fine loamy topsoil of much of the land is a resource of moderate quality if retained for use in landscaping. It is susceptible to compaction if handled when wet and handling should therefore not occur during or within 24 hours after heavy rain. Other than heavy rainfall periods, soil conditions are usually suitable for topsoil stripping and stockpiling between late April and early October at this site. Outside of this period, soils are likely to be wet for long periods and therefore susceptible to structural damage. At these times mitigation techniques to avoid damage in wet conditions should be employed, as described in section Topsoils of the agricultural land may be treated as a single resource for stockpiling and reuse. Subsoil The site has naturally slowly permeable subsoils occurring either immediately below the topsoil or at shallow depth below the land surface. They are susceptible to compaction which can cause sealing and severe wetness problems. Where under storage areas subsoils require loosening (ripping) when dry to improve permeability before the topsoil is replaced, and where excavated and stockpiled they will also benefit from loosening after replacement to improve drainage. Soil handling should be performed according to the schedule described for topsoil above, including the use of mitigation techniques outside of the period from late April to early October. For most after-uses, subsoils may be treated as a single resource for stockpiling. These soils are well suited to mole drainage which will remove ponding in restored profiles where good drainage is desirable (e.g. restoration to agricultural use). 23

29 6.4.2 Soil Handling Soil quality can be impaired by incorrect handling, separation, storage and replacement. Particular problems arise from: Handling soils at inappropriate moisture content. Inappropriate use of machinery. Incorrect topsoil stripping depth resulting in dilution with underlying subsoil. Failure to separate contrasting subsoil layers resulting in impaired drainage and/or reduced soil moisture storage. Poor storage separation resulting in mixing. Excess stockpile height leading to compaction damage, runoff and erosion. The ease of soil handling is affected by soil type. Heavy clay soils are difficult to handle when wet without causing structural damage. Conversely sandy soils are resistant to handling damage across a range of moisture contents. Generally the risk of soil handling damage during wet conditions can be minimised by careful attention to the restrictions described in section Stripping should only take place using an excavator as described by Sheet 1 in the MAFF Good Practice Guide for Handling Soils. Topsoil and subsoil resources should be stripped and stored separately in low heaps, avoiding overcompaction. Topsoil should be stripped to depths provided for each field (see Appendix 7 of this report [to be completed]), which will avoid dilution with subsoil. In most places there is a distinct colour difference between topsoil and subsoil that should aid accurate stripping. Upper subsoil should be stripped to a depth of 60 cm and stockpiled separately from underlying material, taking care to replace in the correct order. The following stages should be followed to ensure that suitable conditions exist and that damage to soils is minimised: Machinery operation: a tracked hydraulic excavator should be used to load topsoil and subsoil. The soils should be stripped, stockpiled, removed from storage (Sheet 3 in the MAFF Good Practice Guide) and replaced by tracked hydraulic excavator using the loose tipping technique (Sheet 4 in MAFF Good Practice Guide), with only gentle firming by tracked vehicles. Rainfall during operations: during rainfall and soon after it ceases there will always be surplus water in the surface layers of soil. If earthmoving continues the surface layer will become compacted, ruts will be formed and any further rain will lie on the surface and tend to drain away far more slowly than previously. Conditions will then tend to deteriorate further during earthmoving with consequential damage to soils. Consequently, soil stripping should be suspended during heavy rainfall wherever possible. After rainfall, the wetness of the soil should be checked (by the earthworks contractor) before recommencing mechanised soil handling. Detailed methods sheets for soil handling are provided in Appendix 7 [to be completed]. 24

30 6.4.3 Prevention of erosion Given the soil types present at the site, risk of erosion is generally low. However, soil erosion by water can be initiated even on gentle slopes and heavy soils where inappropriate management is applied. Even in the absence of significant erosion on these areas, surface runoff can initiate erosion on adjoining susceptible land, particularly when exacerbated by surface compaction or the creation of channels which concentrate runoff (e.g. furrows or vehicle tracks). General erosion management principles should apply across the site: Minimise the amount of bare soil. Avoid operations in heavy rainfall or commencing operations when heavy rainfall is predicted. Avoid soil compaction damage and loosen soils where this occurs (as detailed in soil handling plan Method Sheet see Appendix 7 [to be completed]). Leave bare surfaces rough to encourage infiltration and minimise surface runoff. Grass seeding of all soil stockpiles that would be in place for more than 12 months. This relates to temporary soil stockpiles in place for more than 12 months and permanent spoil storage mounds Compliance monitoring Compliance monitoring will be required during and after construction. An example programme for each stage is outlined below. During construction Visual observation of soil trafficking, stripping, storage and reinstatement methods should be made on the commencement of work by a suitably qualified professional. A limited number of pit excavations to quality-control newly reinstated soils following restoration. Audit of contractor against this SMP and if necessary suggested improvements provided to contractor Following completion Initial compliance monitoring following completion should include visual assessment at selected locations. Visual assessment should include evidence of erosion and of surface wetness which may indicate drainage/compaction problems. A limited number of pit excavations may be made to evaluate potential compaction/drainage problems where identified. Longer-term monitoring should include a rapid reconnaissance at selected locations within the site once restoration is complete and planting in areas of habitat or grass/crops in agricultural areas have established. Visual indicators of poor plant/crop performance (relative to surrounding areas outside the site) can be used to assess potential damage which may then be investigated in further detail. Should specific problems be reported by landowners, these need to be thoroughly investigated and remediation strategies employed as appropriate. Continuing monitoring can then be employed where necessary. 25

31 6.4.5 Mitigation and Remediation Remediation should not be necessary if the management plan detail is adhered to. However, should agricultural management problems be identified by landowners/operators in the season following restoration and returning of the site to its end use, it is important that the causes are correctly identified. Soil erosion Where erosion has initiated on disturbed areas it may be appropriate to install control structures or barriers to check the flow of runoff, and/or loosen compacted surfaces to encourage infiltration on vehicle traffic areas (details are provided in the accompanying Method Sheets ; see Appendix 7 [to be completed]). In the event that major erosion has already occurred, specialist advice should be sought on remediation. Soil compaction Areas used as haul roads should be ripped (mechanical breaking up of the soil surface) to loosen subsoils prior to topsoil replacement. Compaction damage following soils reinstatement may be evidenced by standing water at the land surface, or by poor plant/crop growth, resulting either from soil waterlogging or drought stress due to inhibited rooting depth. Whether compaction damage has occurred as a result of the earthworks should be judged against the performance of the crop in the unaffected area of the field. Existence of over-compacted layers should be initially assessed by inspection of shallow pits. This is particularly important in establishing cause with reference to damage to drainage systems as described below. Where compacted subsoil layers are observed, they should be loosened/ripped using commercial subsoiling equipment (e.g. a winged tine). Specialist grassland subsoilers (which minimise vegetation disturbance) are also commercially available. Should compaction damage occur in grass fields, it may be additionally necessary to cultivate the topsoil and reseed to grass to remove near-surface compaction. Topsoil compaction will be removed automatically by cultivation in arable fields and is therefore unlikely to be an issue. Damaged drainage systems In temporary construction areas, breakage or blockage of field drainage systems is likely to be evidenced by wet patches at the soil surface upslope of excavation areas. These may be tens of metres away from the area of disturbance, but any wetness occurring downslope or more than 50 m upslope should be assumed to be unrelated to construction activities. Surface ponding can also be caused by soil compaction, but where ponding occurs in dry periods it is likely to be due to drain damage. Where the cause is uncertain it will be ascertained by a small pit excavation. Drainage problems unrelated to surface compaction will be referred to a specialist drainage contractor. 26

32 A new drainage system will be installed under landscaped spoil deposition areas. There is some potential for damage to drainage systems outside of the working areas at Tocketts Lythe. Any potential issues will be discussed with the landowner, and requirements for appropriate diversion structures agreed. 27

33 Figures Part 2 Chapter 16 Land Use and Soils Appendix 16.5 Outline Soil Management Plan 28

34 ± 76; )16: 9, 6)6+- ); ) B 97>6 +78@91/ 0; )6,, ); )*): - 91/ 0; - / - 6, 6; - 95-, 1); - 0).; )6, ; - C?; - 6; 7. $793: ), C? ; - 6; 7. $793: )6,! 79; )4 C?; - 6; 7. $793: )9*7<9 76= -@ - 5?; - 6; 7. $793: Tocketts Lythe!!< / 65-6; 8-9); 176)4 )93 1, - " ) " ) Lockwood Beck 76: ; 9<+; 176 #144)/ 7; - 6; 1)4 0).; 7+); 176: " ) Lady Cross Plantation 41-6; " ) ; &793 7; ): ; 714 )6)/ - 5-6; 4)6 &793 7; ): 0 151; -,!1; 4- &793 7; ): ; <; )6)/ - 5-6; 4)6 )9; / <9- - = ); , 16); )>16/ 7! 9)> , 1A- + )4-91; 1: 0 ); 176)4 91, ROYAL HASKONINGDHV INDUSTRY, ENERGY & MINING ; 9- : ' 8841+); 176: ' & ' % : ' )9; ( ( ), ' 0)8; - 9 ( )6, <: - ( 714: '714( )6)/ - 5-6; ( 4)6' 1/ ( ( ; <; 416- ( ( 5?, B ): 37616/ # " ;, B 97>6 + 78@91/ 0; )6,, ); )*): - 91/ 0; : 9, 6) RIGHTWELL HOUSE BRETTON PETERBOROUGH PE3 8DW +44 (0)

35 Appendix 1: Soil Resources, Agricultural Use and Quality of Land Reports Part 2 Chapter 16 Land Use and Soils Appendix 16.5 Outline Soil Management Plan 29

36 Appendix 2: Mine Surface Development Site Earthworks Phasing Documents 30

37 Appendix 3: YPP 100 Year Decommissioning Strategy report Part 2 Chapter 16 Land Use and Soils Appendix 16.5 Outline Soil Management Plan 31

38 Appendix 4: Lady Cross Plantation Site Earthworks Phasing Documents Part 2 Chapter 16 Land Use and Soils Appendix 16.5 Outline Soil Management Plan 32

39 Appendix 5: Lockwood Beck Site Earthworks Phasing Documents 33

40 Appendix 6: Tocketts Lythe Site Earthworks Phasing Documents 34

41 Appendix 7: Earthworks Best Practice Method Sheets Part 2 Chapter 16 Land Use and Soils Appendix 16.5 Outline Soil Management Plan 35

STATEMENT OF PHYSICAL CHARACTERISTICS AND AGRICULTURAL LAND CLASSIFICATION

STATEMENT OF PHYSICAL CHARACTERISTICS AND AGRICULTURAL LAND CLASSIFICATION STATEMENT OF PHYSICAL CHARACTERISTICS AND AGRICULTURAL LAND CLASSIFICATION BIRKWOOD FARM, ALTOFTS WEST YORKSHIRE Proposed Opencast Extraction of Clay and coal ADAS January 1990 Leeds Regional Office File

More information

PROPOSED OPEN CAST COAL SITE SEPTEMBER 1992

PROPOSED OPEN CAST COAL SITE SEPTEMBER 1992 AGRICULTURAL LAND CLASSIFICATION AND STATEMENT OF PHYSICAL CHARACTERISTICS SKIERS SPRING, HOYLAND, SOUTH YORKSHIRE PROPOSED OPEN CAST COAL SITE SEPTEMBER 1992 ADAS LEEDS STATUTORY GROUP Job No. 98/92 MAFF

More information

AGRICULTURAL LAND CLASSIFICATION AND STATEMENT OF PHYSICAL CHARACTERISTICS

AGRICULTURAL LAND CLASSIFICATION AND STATEMENT OF PHYSICAL CHARACTERISTICS AGRICULTURAL LAND CLASSIFICATION AND STATEMENT OF PHYSICAL CHARACTERISTICS SEGHILL, NORTHUMBERLAND PROPOSED VASTE DISPOSAL SITE ADAS January 1989 Leeds Regional Office REF: 3/89 2FCS 4191 lds.rpg3.seghill

More information

The entire site supports grass on which sheep had been grazing recently.

The entire site supports grass on which sheep had been grazing recently. PHYSICAL CHARACTERISTICS REPORT FOR LAND AT HORSEHAY A^ Agricultural Land Classification of approximately 14 hectares of land to the southwest of Horsehay was undertaken in November 1989. The site lies

More information

AGRICULTURAL LAND CLASSIFICATION AND STATEMENT OF PHYSICAL CHARACTERISTICS

AGRICULTURAL LAND CLASSIFICATION AND STATEMENT OF PHYSICAL CHARACTERISTICS AGRICULTURAL LAND CLASSIFICATION AND STATEMENT OF PHYSICAL CHARACTERISTICS DALE PIT FARM. HATFIELD VOODHOUSE PROPOSED EXTRACTION OF SAND AHD GRAVEL ADAS April 1989 Leeds Regional office File Ref: 2FCS

More information

SUMMARY. alcholnie.doc\ih\jk

SUMMARY. alcholnie.doc\ih\jk SUMMARY A detailed Statement of Physical Characteristics and Agricultural Land Classification survey of ha of land at Stainton ("Holme Hall Quarry Extension") was carried out in September 1994. At the

More information

AGRICULTURAL USE & QUALITY OF LAND NEAR MINDALE HOUSE PRESTATYN. Report 762/1

AGRICULTURAL USE & QUALITY OF LAND NEAR MINDALE HOUSE PRESTATYN. Report 762/1 AGRICULTURAL USE & QUALITY OF LAND NEAR MINDALE HOUSE PRESTATYN Report 762/1 11 th April, 2012 AGRICULTURAL USE & QUALITY OF LAND NEAR MINDALE HOUSE PRESTATYN F W Heaven, BSc, MISoilSci Report 762/1 Ltd

More information

Examining soils in the field. Examining soils in the field. Environment Agency thinksoils examining soils in the field

Examining soils in the field. Examining soils in the field. Environment Agency thinksoils examining soils in the field Examining soils in the field thinksoils Examining soils in the field Environment Agency thinksoils examining soils in the field 31 Examining soils in the field 32 Environment Agency thinksoils examining

More information

AGRICULTURAL LAND CLASSIFICATION AND SOIL PHYSICAL CHARACTERISTICS LAND NEAR SHIRE HILL FARM SAFFRON WALDEN ESSEX

AGRICULTURAL LAND CLASSIFICATION AND SOIL PHYSICAL CHARACTERISTICS LAND NEAR SHIRE HILL FARM SAFFRON WALDEN ESSEX AGRICULTURAL LAND CLASSIFICATION AND SOIL PHYSICAL CHARACTERISTICS LAND NEAR SHIRE HILL FARM SAFFRON WALDEN ESSEX AGRICULTURAL LAND CLASSIFICATION (ALC) AND SOIL PHYSICAL CHARACTERISTICS LAND NEAR SHIRE

More information

SOILS AND AGRICULTURAL USE & QUALITY OF LAND OFF HOLT ROAD, ROSSETT. Report 1067/1

SOILS AND AGRICULTURAL USE & QUALITY OF LAND OFF HOLT ROAD, ROSSETT. Report 1067/1 SOILS AND AGRICULTURAL USE & QUALITY OF LAND OFF HOLT ROAD, ROSSETT Report 1067/1 2 nd March, 2015 SOILS AND AGRICULTURAL USE AND QUALITY OF LAND OFF HOLT ROAD, ROSSETT M W Palmer, MSc, PhD, MISoilSci

More information

P/2014/00830 Received 27/06/2014 SOIL RESOURCES AND AGRICULTURAL USE & QUALITY OF LAND AT ROLLESTON PARK FARM TUTBURY, STAFFORDSHIRE.

P/2014/00830 Received 27/06/2014 SOIL RESOURCES AND AGRICULTURAL USE & QUALITY OF LAND AT ROLLESTON PARK FARM TUTBURY, STAFFORDSHIRE. P/2014/00830 Received 27/06/2014 SOIL RESOURCES AND AGRICULTURAL USE & QUALITY OF LAND AT ROLLESTON PARK FARM TUTBURY, STAFFORDSHIRE Report 953/1 28 th May, 2014 SOIL RESOURCES AND AGRICULTURAL USE & QUALITY

More information

MAFF Ministry of Ifinil Agriculture Rsheries and Food

MAFF Ministry of Ifinil Agriculture Rsheries and Food MAFF Ministry of Ifinil Agriculture Rsheries and Food STATEMENT OF PHYSICAL CHARACTERISTICS AND AGRICULTURAL LAND CLASSIFICATION SHILBOTTLE COLLIERY RECLAMATION SCHEME NORTHUMBERLAND DECEMBER 1994 ADAS

More information

AGRICULTURAL LAND CLASSIFICATION AND SOIL PHYSICAL CHARACTERISTICS BIRCH PIT, NEAR COLCHESTER ESSEX

AGRICULTURAL LAND CLASSIFICATION AND SOIL PHYSICAL CHARACTERISTICS BIRCH PIT, NEAR COLCHESTER ESSEX AGRICULTURAL LAND CLASSIFICATION AND SOIL PHYSICAL CHARACTERISTICS BIRCH PIT, NEAR COLCHESTER ESSEX AGRICULTURAL LAND CLASSIFICATION AND SOIL PHYSICAL CHARACTERISTICS SEMI-DETAILED SURVEY BIRCH PIT, NEAR

More information

Agricultural Land Classification and Statement of Physical Characteristics Higbfield Farm Whitley Bridge North Yorkshire October 1996

Agricultural Land Classification and Statement of Physical Characteristics Higbfield Farm Whitley Bridge North Yorkshire October 1996 Agricultural Land Classification and Statement of Physical Characteristics Higbfield Farm Whitley Bridge North Yorkshire October 1996 Resource Planning Team ADAS Reference: 82/96 Leeds Statutory Group

More information

PHYSICAL CHARACTERISTICS REPORT INCORPORATING AGRICULTURAL LAND CLASSIFICATION LAND AT BOLE INGS, WESTBURTON, NOTTINGHAMSHIRE (SK805875)

PHYSICAL CHARACTERISTICS REPORT INCORPORATING AGRICULTURAL LAND CLASSIFICATION LAND AT BOLE INGS, WESTBURTON, NOTTINGHAMSHIRE (SK805875) (krahs 2% I?5 PHYSICAL CHARACTERISTICS REPORT INCORPORATING AGRICULTURAL LAND CLASSIFICATION LAND AT BOLE INGS, WESTBURTON, NOTTINGHAMSHIRE (SK805875) 1.0 INTRODUCTION 1.1 The site, an area of 84.5 hectares,

More information

PHYSICAL CHAtlACTERISTICS REPORT FOR THE PROPOSED SAND AND GRAVEL SITE AT MANOR FARM, UFFINGTON

PHYSICAL CHAtlACTERISTICS REPORT FOR THE PROPOSED SAND AND GRAVEL SITE AT MANOR FARM, UFFINGTON PHYSICAL CHAtlACTERISTICS REPORT FOR THE PROPOSED SAND AND GRAVEL SITE AT MANOR FARM, UFFINGTON Introduction Following the" request for detailed information on the physical characteristics of soil at Manor

More information

HUMBLEBURN OCCS, CRAGHEAD, COUNTY DURHAM SURVEY OF RESTORED LAND OCTOBER RPT Job Number: 73/97 MAFF Reference: EL LURET Job Number: ME3RTP

HUMBLEBURN OCCS, CRAGHEAD, COUNTY DURHAM SURVEY OF RESTORED LAND OCTOBER RPT Job Number: 73/97 MAFF Reference: EL LURET Job Number: ME3RTP HUMBLEBURN OCCS, CRAGHEAD, COUNTY DURHAM SURVEY OF RESTORED LAND OCTOBER 1997 Resource Planning Team Northern Region FRCA, Leeds RPT Job Number: 73/97 MAFF Reference: EL 10387 LURET Job Number: ME3RTP

More information

2012 FINAL SOILS AREA 2 Envirothon Questions Answer KEY

2012 FINAL SOILS AREA 2 Envirothon Questions Answer KEY 2012 FINAL SOILS AREA 2 Envirothon Questions Answer KEY Questions 1-6 to be answered at the soil pit: 1. Soil scientists categorize soils by drainage classes. What is the drainage class of the soil at

More information

AGRICULTURAL LAND CLASSIFICATION AND STATEMENT OF SOIL PHYSICAL CHARACTERISTICS EXTENSION TO CLOUD HILL QUARRY, BREEDON ON THE HILL, LEICESTERSHIRE

AGRICULTURAL LAND CLASSIFICATION AND STATEMENT OF SOIL PHYSICAL CHARACTERISTICS EXTENSION TO CLOUD HILL QUARRY, BREEDON ON THE HILL, LEICESTERSHIRE AGRICULTURAL LAND CLASSIFICATION AND STATEMENT OF SOIL PHYSICAL CHARACTERISTICS EXTENSION TO CLOUD HILL QUARRY, BREEDON ON THE HILL, LEICESTERSHIRE 1.0 BACKGROUND 1.1 A site of approximately 14.5 ha in

More information

CORNFORTH EAST QUARRY COUNTY DURHAM

CORNFORTH EAST QUARRY COUNTY DURHAM CORNFORTH EAST QUARRY COUNTY DURHAM AgricuUural Land Classification (ALC) and Statement of Physical Characteristics Report and Map MARCH 1999 Resource Planning Team RPT Job Number: 5/99 Northern Region

More information

STATEMENT OF PHYSICAL CHARACTERISTICS OLDWICK FARM, WEST LAVANT, WEST SUSSEX

STATEMENT OF PHYSICAL CHARACTERISTICS OLDWICK FARM, WEST LAVANT, WEST SUSSEX STATEMENT OF PHYSICAL CHARACTERISTICS OLDWICK FARM, WEST LAVANT, WEST SUSSEX STATEMENT OF PHYSICAL CHARACTERISTICS OLDWICK FARM, WEST LAVANT, WEST SUSSEX 1. BACKGROUND 1.1 This 37.1 ha site was surveyed

More information

Topoclimate Southland Soil Technical Data Sheet No. 8. Sobig

Topoclimate Southland Soil Technical Data Sheet No. 8. Sobig This Technical Data Sheet describes the typical average properties of the specified soil. It is essentially a summary of information obtained from one or more profiles of this soil that were examined and

More information

M AFT Ministry of Ifin&l. Agriculture Rsheries and Food

M AFT Ministry of Ifin&l. Agriculture Rsheries and Food ^ M AFT Ministry of Ifin&l. Agriculture Rsheries and Food AGRICULTURAL LAND CLASSIFICATION BARNSLEY UDP (AREA OF SEARCH FOR AIRFIELD) SOUTH YORKSHIRE JANUARY 1995 ADAS Job No:- 9/95 Leeds Statutory Group

More information

ACRE NOOK EAST QUARRY, CHELFORD, CHESHIRE. Statement of Site Physical Characteristics January 1998

ACRE NOOK EAST QUARRY, CHELFORD, CHESHIRE. Statement of Site Physical Characteristics January 1998 ACRE NOOK EAST QUARRY, CHELFORD, CHESHIRE Statement of Site Physical Characteristics January 1998 J M LePage Resource Planning Team RPT Reference: 084/97 & 25/RPT/0863 Northern Region FRCA Reference: EL

More information

Horner-McLaughlin Woods: Soil Types

Horner-McLaughlin Woods: Soil Types Horner-McLaughlin Woods: Soil Types Not present at HMW Adrian Muck Conover Loam 0-4% Slopes Houghton Muck Miami Loam 2-6% Slopes Miami Loam 6-12% Slopes Miami Loam 12-18% Slopes t 0 0.125 0.25 Miles Mary

More information

MAFF I^inistry of IfiriEE Agriculture Fisheries and Food

MAFF I^inistry of IfiriEE Agriculture Fisheries and Food MAFF I^inistry of IfiriEE Agriculture Fisheries and Food AGRICULTURAL LAND CLASSIFICATION BROOMY HOLM FARM, EDMONDSLEY, CO DURHAM PROPOSED GOLF COURSE DECEMBER 1993 ADAS Leeds Statutory Group JobNo:- 168/93

More information

2014 Iowa FFA Soil Judging CDE Exam

2014 Iowa FFA Soil Judging CDE Exam 2014 Iowa FFA Soil Judging CDE Exam 1. Landscape position is one aspect of evaluating the surface features of a certain tract of land. Identifying the correct landscape position will indicate: a. If the

More information

Grade. % of Survey Area 1. Staplehay. 2 3a. 3a 3b Non Ag Organ Ag Bldgs. 1 Non Ag Urban

Grade. % of Survey Area 1. Staplehay. 2 3a. 3a 3b Non Ag Organ Ag Bldgs. 1 Non Ag Urban ^ ( ^ ^fcj 2JiOc^ TAUNTON LOCAL PUW FIRST ALTE31ATI0N AOtECULTURAL LAND CLASSIFICATION OF ALTERNATIVE SITES R^»rt of Survey 1. Introduction Agricultural Land Classification surveys were carried out at

More information

Terminology & Soil Science. Andy Spetch

Terminology & Soil Science. Andy Spetch Terminology & Soil Science Andy Spetch 1 Presentation Soil Profile Soil Structure Soil Texture Compaction Cation Exchange Capacity Soil ph Nutrients / Organic Matter / EC / PTE s 2 What is Soil: A blend

More information

AGRICULTURAL LAND CLASSIFICATION REPORT LAND AT BRANT FARM, STOURPORT-ON-SEVERN

AGRICULTURAL LAND CLASSIFICATION REPORT LAND AT BRANT FARM, STOURPORT-ON-SEVERN AGRICULTURAL LAND CLASSIFICATION REPORT LAND AT BRANT FARM, STOURPORT-ON-SEVERN INTRODUCTION 1. This report presents the findings of a detailed Agricultural Land Classification (ALC) survey on 12ha of

More information

Topoclimate Southland Soil Technical Data Sheet No. 11. Pukemutu

Topoclimate Southland Soil Technical Data Sheet No. 11. Pukemutu This Technical Data Sheet describes the typical average properties of the specified soil. It is essentially a summary of information obtained from one or more profiles of this soil that were examined and

More information

Topoclimate Southland Soil Technical Data Sheet No Waiau

Topoclimate Southland Soil Technical Data Sheet No Waiau This Technical Data Sheet describes the typical average properties of the specified soil. It is essentially a summary of information obtained from one or more profiles of this soil that were examined and

More information

Topoclimate Southland Soil Technical Data Sheet No. 23. Waikiwi

Topoclimate Southland Soil Technical Data Sheet No. 23. Waikiwi This Technical Data Sheet describes the typical average properties of the specified soil. It is essentially a summary of information obtained from one or more profiles of this soil that were examined and

More information

Land Capability Classifications

Land Capability Classifications Land Capability Classifications Unit: Soil Science Problem Area: Basic Principles of Soil Science Student Learning Objectives. Instruction in this lesson should result in students achieving the following

More information

AGRICULTURAL LAND CLASSIFICATION

AGRICULTURAL LAND CLASSIFICATION AGRICULTURAL LAND CLASSIFICATION GOOLE/HOOK LOCAL PLAN SITES SURVEYED FOR BOOTHFERRY BOROUGH COUNCIL'S INDUSTRIAL LAND SUITABILITY STUDY ADAS February 1991 Leeds Regional Office 2FCS 5205 CONTENTS 1. Introduction

More information

CAVIL HEAD OCCS ACKLINGTON NOVEMBER 1997

CAVIL HEAD OCCS ACKLINGTON NOVEMBER 1997 CAVIL HEAD OCCS ACKLINGTON Agricultural Land Classification (ALC) and Statement of Physical Characteristics Report NOVEMBER 1997 Resource Planning Team RPT Job Number: 67/97 Northern Region MAFF Reference:

More information

27/01/2017. This event is being run by SAC Consulting. What is Soil?

27/01/2017. This event is being run by SAC Consulting. What is Soil? This event is being run by SAC Consulting What is Soil? 1 Soil Texture It describes the physical composition of the soil % of sand, silt and clay Refers to the mineral fragments of the soil only water

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland

More information

AGRICULTURAL LAND CLASSIFICATION AND STATEMENT OF SOIL PHYSICAL CHARACTERISTICS TYTTENHANGER QUARRY EXTENSION, LONDON COLNEY, HERTFORDSHIRE

AGRICULTURAL LAND CLASSIFICATION AND STATEMENT OF SOIL PHYSICAL CHARACTERISTICS TYTTENHANGER QUARRY EXTENSION, LONDON COLNEY, HERTFORDSHIRE AGRICULTURAL LAND CLASSIFICATION AND STATEMENT OF SOIL PHYSICAL CHARACTERISTICS TYTTENHANGER QUARRY EXTENSION, LONDON COLNEY, HERTFORDSHIRE 1.0 BACKGROUND 1.1 The site covers an area of 42.2 ha, and is

More information

SOIL SURVEY FOR PROPOSED WET ASH DISPOSAL FACILITY, HENDRINA POWER STATION, MPUMALANGA PROVINCE

SOIL SURVEY FOR PROPOSED WET ASH DISPOSAL FACILITY, HENDRINA POWER STATION, MPUMALANGA PROVINCE REPORT for Lidwala Environmental and Planning Servives by the INSTITUTE FOR SOIL CLIMATE AND WATER AGRICULTURAL RESEARCH COUNCIL SOIL SURVEY FOR PROPOSED WET ASH DISPOSAL FACILITY, HENDRINA POWER STATION,

More information

Soil Structure, Density, and Porosity. Laboratory #4

Soil Structure, Density, and Porosity. Laboratory #4 Soil Structure, Density, and Porosity Laboratory #4 Objectives Understand the concept of soil structure and how it differs from soil texture. Understand how soil structure influences other soil properties.

More information

MAFF Ministry of iflmll Agriculture Fisheries and Food

MAFF Ministry of iflmll Agriculture Fisheries and Food m MAFF Ministry of iflmll Agriculture Fisheries and Food AGRICULTURAL LAND CLASSIFICATION EAST YORKSHIRE BOROUGH LOCAL PLAN (SITES AROUND DRIFFIELD) FEBRUARY 1995 ADAS Job No:- 47-54/95 Leeds Statutory

More information

Topoclimate Southland Soil Technical Data Sheet No. 76. Mossburn

Topoclimate Southland Soil Technical Data Sheet No. 76. Mossburn This Technical Data Sheet describes the typical average properties of the specified soil. It is essentially a summary of information obtained from one or more profiles of this soil that were examined and

More information

SOIL SURVEY OF PORTIONS 81 AND 82 OFTHE FARM VAALBANK 512JQ, NEAR MAGALIESBURG, SOUTH-WEST OF PRETORIA

SOIL SURVEY OF PORTIONS 81 AND 82 OFTHE FARM VAALBANK 512JQ, NEAR MAGALIESBURG, SOUTH-WEST OF PRETORIA REPORT For Newtown Landscape Architects SOIL SURVEY OF PORTIONS 81 AND 82 OFTHE FARM VAALBANK 512JQ, NEAR MAGALIESBURG, SOUTH-WEST OF PRETORIA By N.M. Mushia, D.G. Paterson and S.D. Mkula Report Number

More information

5 RESULTS FOR THE REJECT EMPLACEMENT AREA

5 RESULTS FOR THE REJECT EMPLACEMENT AREA SPECIALIST CONSULTANT STUDIES 9b - 21 NARRABRI COAL OPERATIONS PTY LTD of the REA, BSA and Water Pipeline Report No. 674/17 5 RESULTS FOR THE REJECT EMPLACEMENT AREA 5.1 Introduction From the information

More information

ARROW BOWEN PIPELINE ENVIRONMENTAL MANAGEMENT PLAN OUTLINE SOIL MANAGEMENT PLAN

ARROW BOWEN PIPELINE ENVIRONMENTAL MANAGEMENT PLAN OUTLINE SOIL MANAGEMENT PLAN APPENDIX J ARROW BOWEN PIPELINE ENVIRONMENTAL MANAGEMENT PLAN OUTLINE SOIL MANAGEMENT PLAN Contents 1 Introduction... 1 1.1 Purpose of the Soil Management Plan... 1 1.2 Project description... 1 1.3 Legislation

More information

Girtridge Monitor Farm Meeting

Girtridge Monitor Farm Meeting Girtridge Monitor Farm Meeting 15 th August 2018 1 Managing Soil Drainage and Compaction in Pasture Key factors for movement of water in the soil Soil Texture Soil Structure Soil Compaction 2 1 Soil Texture

More information

STATEMENT OF PHYSICAL CHARACTERISTICS AND AGRICULTURAL LAND CLASSIFICATION

STATEMENT OF PHYSICAL CHARACTERISTICS AND AGRICULTURAL LAND CLASSIFICATION STATEMENT OF PHYSICAL CHARACTERISTICS AND AGRICULTURAL LAND CLASSIFICATION DRAX AND BARLOV: Proposed Waste (PFA) disposal and Industrial development site ADAS MAY 1989 LEEDS REGIONAL OFFICE FILE REF: 2FCS

More information

Iowa FFA Soil Career Development Event 2008

Iowa FFA Soil Career Development Event 2008 Iowa FFA Soil Career Development Event 2008 1. In Iowa, corn suitability ratings for soil mapping units specifies a. natural weather conditions b. surface and subsurface drainage installed where needed

More information

2016 Area 3 Envirothon Muskingum County Soils Test ANSWER KEY

2016 Area 3 Envirothon Muskingum County Soils Test ANSWER KEY 2016 Area 3 Envirothon Muskingum County Soils Test ANSWER KEY 1. The majority of the bedrock in Muskingum County is. a. sedimentary bedrock b. glacial bedrock c. igneous bedrock d. metamorphic bedrock

More information

1 Describe the concept of soil texture and its importance. 2 Determine the texture of a soil sample.

1 Describe the concept of soil texture and its importance. 2 Determine the texture of a soil sample. Interest Approach Provide students with various samples of soil. One sample should be nearly all sand, one nearly all clay, and one nearly all silt. Ask students to determine how the samples differ. Would

More information

AGRICULTURAL LAND CLASSIFICATION GREAT GRIMSBY LOCAL PLAN SITE AG 2. GREAT COATES AUGUST 1993

AGRICULTURAL LAND CLASSIFICATION GREAT GRIMSBY LOCAL PLAN SITE AG 2. GREAT COATES AUGUST 1993 AGRICULTURAL LAND CLASSIFICATION GREAT GRIMSBY LOCAL PLAN SITE AG 2. GREAT COATES AUGUST 1993 ADAS Job No:- 131/93 Leeds Statutory Group MAFF Ref- EL 51/5 SUMMARY An Agricultural Land Classification survey

More information

Vegetation Management

Vegetation Management Vegetation Management GENERAL CONSTRUCTION PRACTICE Best practice vegetation management involves giving appropriate consideration to the following issues. Not all the issues will be relevant on every site.

More information

WHITWELL QUARRY, DERBYSHIRE

WHITWELL QUARRY, DERBYSHIRE WHITWELL QUARRY, DERBYSHIRE PROPOSED NORTH, NORTH EAST, EAST AND SOUTH EAST EXTENSIONS TO WHITWELL QUARRY SOILS AND AGRICULTURAL LAND CLASSIFICATION REPORT March 2016 CONTENTS 1. Introduction 2. North

More information

SECTION AMENDED TOPSOIL

SECTION AMENDED TOPSOIL SECTION 02486 AMENDED TOPSOIL PART 1 - GENERAL 1.01 SUMMARY A. Work described in this section includes requirements for soil amendments, soil preparation, preparation and finish grading of turf restoration

More information

THE IMPORTANCE OF SOILS FOR SUCCESSFUL DEVELOPMENT HELEN SIMPSON

THE IMPORTANCE OF SOILS FOR SUCCESSFUL DEVELOPMENT HELEN SIMPSON THE IMPORTANCE OF SOILS FOR SUCCESSFUL DEVELOPMENT HELEN SIMPSON 1 NATURAL MINERAL SOILS The surface layer of the Earth s crust composed of weathered rock, organic matter, water and air. Soil is typically

More information

Assessment of Landscape, Visual and Natural Character Effects

Assessment of Landscape, Visual and Natural Character Effects Assessment of Landscape, Visual and Natural Character Effects Consent Footprint Amendments Mangamaunu Half Moon Bay Okiwi Bay South Report prepared for: New Zealand Transport Agency and KiwiRail Holdings

More information

LANDPKS TEACHING MANUAL

LANDPKS TEACHING MANUAL LANDPKS TEACHING MANUAL IMPLICATIONS FOR LAND DEGRADATION and RESTORATION FOR THE LandPKS LandInfo MODULE Contents: A description of LandPKS application indicators Indicators and how they impact land degradation

More information

Soil Reclamation and Site Reinstatement

Soil Reclamation and Site Reinstatement APPENDIX 6 Soil Reclamation and Site Reinstatement Purpose To undertake soil reclamation, erosion protection, Site restoration and reinstatement, taking into account natural processes, operational requirements

More information

AGRICULTURAL LAND CLASSIFICATION

AGRICULTURAL LAND CLASSIFICATION AGRICULTURAL LAND CLASSIFICATION STAINSBY HALL, MIDDLESBROUGH PROPOSED GOLF COURSE ADAS December 1990 Leeds Regional Office 2FCS 5100 CONTENTS 1. INTRODUCTION AND GENERAL SITE CHARACTERISTICS 2. AGRICULTURAL

More information

Team number Page 1 of Canon Envirothon Soils Station Test. Soils and Climate Change

Team number Page 1 of Canon Envirothon Soils Station Test. Soils and Climate Change Team number Page 1 of 9 2006 Canon Envirothon Soils Station Test Soils and Climate Change There are many kinds of soil on the surface of the earth. The kind of soil that is present at a given location

More information

The Nature of Soil Soil Conservation Sustainable Ag.

The Nature of Soil Soil Conservation Sustainable Ag. Chapter 6 & 7 The Nature of Soil Soil Conservation Sustainable Ag. Climate Soil Forming Factors Parent material Organisms Topography Time Value of Soil Soil is under appreciated Condition of soil affects

More information

Soils and Water in Your Landscape. Mary Hattendorf Northern Water Spring Fair 2016

Soils and Water in Your Landscape. Mary Hattendorf Northern Water Spring Fair 2016 Soils and Water in Your Landscape Mary Hattendorf Northern Water Spring Fair 2016 What is Soil? Hint: It s not dirt Soils are complex mixtures minerals, water, air, organic matter, and countless organisms

More information

64 Mineral Extraction Area Rules

64 Mineral Extraction Area Rules 64 Mineral Extraction Area Rules 64.1 Introduction For the purposes of this Chapter: Active Area, in relation to a Mineral Extraction Area (MEA), is that part of the Mineral Extraction Area which is owned

More information

STAFFORDSHIRE AND STOKE-ON- TRENT STRUCTURE PLAN Site 7: Priory Farm. Agricultural Land Classification ALC Map and Report November 1998

STAFFORDSHIRE AND STOKE-ON- TRENT STRUCTURE PLAN Site 7: Priory Farm. Agricultural Land Classification ALC Map and Report November 1998 STAFFORDSHIRE AND STOKE-ON- TRENT STRUCTURE PLAN Site 7: Priory Farm Agricultural Land Classification ALC Map and Report November 1998 A J Spalding Resource Planning Team RPT Reference: 008/98 & 25/RPT/Ol

More information

URBAN SOILS & SEATTLE EXAMPLES

URBAN SOILS & SEATTLE EXAMPLES Class Results - Mystery Soil #1 14 12 10 8 6 4 2 0 Sandy Clay Loam Sandy Loam Silty Loam Class Results - Mystery Soil #2 6 5 4 3 2 1 0 Silty Clay Clay Loam Sandy Sandy Silty Sandy Silty Loamy Loam Clay

More information

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures MARBLE RIVER WIND POWER PROJECT Siting Considerations 1. Locate access roads and, to the extent allowed by local laws, wetlands and topography, individual wind turbines and other structures along field

More information

Loam: About 40% sand, 40% silt, 20% clay. Mixture of pore sizes to balance water retention and aeration. Considered the best soil for growing crops.

Loam: About 40% sand, 40% silt, 20% clay. Mixture of pore sizes to balance water retention and aeration. Considered the best soil for growing crops. Soil Characteristics Soil is formed from a combination of two Primary sources: Weathering of Parent Rock ( ) = material introduced by plants, animals, and decomposers Minor sources: Nutrients incorporated

More information

3.1 This evidence is based on the landscape and visual impact assessment included in Chapter 10 and Appendix I of the EIS.

3.1 This evidence is based on the landscape and visual impact assessment included in Chapter 10 and Appendix I of the EIS. LANDSCAPE & VISUAL 1 QUALIFICATIONS AND EXPERIENCE 1.1 My name is Raymond Holbeach and I am a Regional Director for RPS Planning & Environment with full responsibility for management of the RPS Belfast

More information

Soil Maps for Production Agriculture. Jarrod O. Miller, Extension Agronomist

Soil Maps for Production Agriculture. Jarrod O. Miller, Extension Agronomist Soil Maps for Production Agriculture Jarrod O. Miller, Extension Agronomist Origination of Soil Mapping Originally mapped by Division of Soils Federal Bureau of Soils Soil Conservation Service (SCS) started

More information

Mitigation of PPP losses through runoff / erosion

Mitigation of PPP losses through runoff / erosion Mitigation of PPP losses through runoff / erosion Runoff Risk Diagnosis Methodology at catchment & plot scale Data collection Landscape, farm description, soil types, geology (incl. input by farmers) 1

More information

IOWA FFA STATE SOILS CDE SATURDAY, OCTOBER 13, 2007 AMES, IOWA

IOWA FFA STATE SOILS CDE SATURDAY, OCTOBER 13, 2007 AMES, IOWA IOWA FFA STATE SOILS CDE SATURDAY, OCTOBER 13, 2007 AMES, IOWA 1. Moderately sloping has what percent slope: a. 9-14% b. 2-5% c. 5-9% d. over 14% 2. Which of the following horizons is the loose underlying

More information

Appendix F Construction phase management

Appendix F Construction phase management Appendix F Construction phase management F.1. Introduction... 1 F.2. Core principles of sediment and erosion control... 2 F.3. Planning... 3 F.4. Occupational health and safety... 7 F.5. References / further

More information

4.6. Low Impact and Retentive Grading

4.6. Low Impact and Retentive Grading 4.6. Low Impact and Retentive Grading Low Impact Grading techniques focus on utilizing existing topography during Site layout to minimize cost. Proposing structures, roads, and other impervious surfaces

More information

Tree Pits Construction Guide

Tree Pits Construction Guide Tree Pits Construction Guide What are tree pits? Tree pits collect stormwater runoff from small carpark areas or roads. Runoff filters through the tree roots and surrounding soil mix, trapping sediment

More information

STATE TAX COMMISSION OF MISSOURI ASSESSOR MANUAL

STATE TAX COMMISSION OF MISSOURI ASSESSOR MANUAL STATE TAX COMMISSION OF MISSOURI ASSESSOR MANUAL CHAPTER: REVISION DATE: 10/1/2008 Page 1 of 18 7.3 The purpose of this section of the Assessor s Manual is to supplement the State Tax Commission s published

More information

Unit II Soil Management

Unit II Soil Management Unit II Soil Management Lesson 2: Using Soil Survey Manuals Soil survey manuals provide useful information for grassland management. Soil scientists evaluate the soil for chemical and physical properties,

More information

Soil characteristics that influence nitrogen and water management

Soil characteristics that influence nitrogen and water management Section C Soil characteristics that influence nitrogen and water management Soil characteristics vary across the landscape Soils vary from one field to another, and often within the same field. Soil differences

More information

HARRINGTON CEMENT WORKS, HASLINGFIELD ROAD, HARRINGTON, CAMBS. Agricultural Land Classification ALC Map and Soil Physical Characteristics Report

HARRINGTON CEMENT WORKS, HASLINGFIELD ROAD, HARRINGTON, CAMBS. Agricultural Land Classification ALC Map and Soil Physical Characteristics Report HARRINGTON CEMENT WORKS, HASLINGFIELD ROAD, HARRINGTON, CAMBS. Agricultural Land Classification ALC Map and Soil Physical Characteristics Report September 1997 Resource Planning Team Eastern Region FRCA

More information

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for APPROVED BY COUNCIL FEBRUARY 15, 1994 CITY OF BE CONVEYED TO THE CITY The Owner will be responsible to ensure that all lands which will be transferred to the City for parkland, drainage or boulevard purposes

More information

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.

More information

Landscaping Management Plan. Woodlawn Mechanical Biological Treatment Facility. Veolia Environmental Services Australia Pty Ltd

Landscaping Management Plan. Woodlawn Mechanical Biological Treatment Facility. Veolia Environmental Services Australia Pty Ltd Landscaping Management Plan Woodlawn Mechanical Biological Treatment Facility Veolia Environmental Services Australia Pty Ltd May 2014 THIS PAGE INTENTIONALLY LEFT BLANK Landscaping Management Plan Page

More information

2.1.4 Roof Downspout Rain Gardens

2.1.4 Roof Downspout Rain Gardens 2008 SWMM, 2010 Revision City of Tacoma 2.1.4 Roof Downspout Rain Gardens Purpose and Definition Bioretention areas are shallow stormwater retention facilities designed to mimic forested systems by controlling

More information

Section 1. Judging the soil pit (questions 1-4)

Section 1. Judging the soil pit (questions 1-4) CONNECTICUT ENVIROTHON 2009 SOILS QUESTIONS Please select the best response to the following questions. There are 25 questions; each question is worth 4 points. Section 1. Judging the soil pit (questions

More information

AGRICULTURAL LAND CLASSIFICATION KNOWSLEY UDP, SITE 45.01

AGRICULTURAL LAND CLASSIFICATION KNOWSLEY UDP, SITE 45.01 AGRICULTURAL LAND CLASSIFICATION KNOWSLEY UDP, SITE 45.01 MJW WOOD ADAS Ref: 25/RPT/OOll Resource Planning Team Job No: 016/95 ADAS Statutory Group MAFF Ref: EL 25/10763 WOLVERHAMPTON rnwtaiow2to»yyje

More information

LAND NORTH OF TAMWORTH. Agricultural Land Classification ALC Map and Report April 1998

LAND NORTH OF TAMWORTH. Agricultural Land Classification ALC Map and Report April 1998 LAND NORTH OF TAMWORTH Agricultural Land Classification ALC Map and Report April 1998 A,L Cooke Resource Planning Team RPT Reference: 130/97 & 25/RPT/Ol loa Northern Region FRCA Reference: EL 37/11747

More information

If A rr Ministry of. IfiriEI. Agriculture Fisheries and Food

If A rr Ministry of. IfiriEI. Agriculture Fisheries and Food If A rr Ministry of IfiriEI. Agriculture Fisheries and Food AGRJCULTURAL LAND CLASSIFICATION CLEETHORPES DISTRICT LOCAL PLAN SITE H2 (SOUTH WEST) OCTOBER 1993 ADAS Leeds Statutory Group Job No:- 164/93

More information

2018 Iowa FFA Soil Judging CDE Exam 1. Landscape positions characterizes the location of the soil on the landscape and identifies potential risks.

2018 Iowa FFA Soil Judging CDE Exam 1. Landscape positions characterizes the location of the soil on the landscape and identifies potential risks. 2018 Iowa FFA Soil Judging CDE Exam 1. Landscape positions characterizes the location of the soil on the landscape and identifies potential risks. Which landscape position is considered the floodplain

More information

Placement of the soil should be in lifts of mm and loosely compacted (tamped lightly with a backhoe bucket).

Placement of the soil should be in lifts of mm and loosely compacted (tamped lightly with a backhoe bucket). 6 Rain Gardens Rain Gardens 6.1 Introduction A rain garden is used to attenuate peak flows and to provide stormwater treatment. Rain gardens use the concept of bioretention, a water quality practice in

More information

If you are not able to turn in your notebook see me or Dan ASAP

If you are not able to turn in your notebook see me or Dan ASAP Notebook Collection Collecting hard copies now OR Electronic versions using Catalyst drop box Due by 5:30 pm today Use website for link If you are not able to turn in your notebook see me or Dan ASAP URBAN

More information

Soil Texture = %Sand, Silt & Clay in a soil.

Soil Texture = %Sand, Silt & Clay in a soil. Soils Soil Texture = %Sand, Silt & Clay in a soil. Soil texture is the single most important physical property of the soil. Knowing the soil texture alone will provide information about: 1) water flow

More information

HORT 102: Soil Properties. Cultivated Plants: Lecture 15. [Teresa Koenig] Slide #: 1 Slide Title: Intro Information Slide

HORT 102: Soil Properties. Cultivated Plants: Lecture 15. [Teresa Koenig] Slide #: 1 Slide Title: Intro Information Slide HORT 102: Soil Properties Cultivated Plants: Lecture 15 [Teresa Koenig] Slide #: 1 Slide Title: Intro Information Slide Title: Lecture 15 Soil Properties Speaker: Teresa Koenig Created by: Teresa Koenig,

More information

AGRICULTURAL LAND CLASSIFICATION FAVERSHAM LOCAL PLAN

AGRICULTURAL LAND CLASSIFICATION FAVERSHAM LOCAL PLAN AGRICULTURAL LAND CLASSIFICATION FAVERSHAM LOCAL PLAN - 1 - AGRICULTURAL LAND CLASSIFICATION FAVERSHAM LOCAL PLAN ' BACKGROUND 1.1 The local plan areas surveyed are divided into three separate sites in

More information

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Grass Linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] May be used on short, steep

More information

3.44b. Soil Classification AK & BR

3.44b. Soil Classification AK & BR 3.44b Soil Classification AK & BR Why look at soil? Because soil and its constituents are the base material for growing trees. History Why a Forestry Commission soil classification? There is a need for

More information

AGRICULTURAL LAND CLASSIFICATION VULCAN VILLAGE (PROPOSED GOLF COURSE) ST HELENS MBC

AGRICULTURAL LAND CLASSIFICATION VULCAN VILLAGE (PROPOSED GOLF COURSE) ST HELENS MBC AGRICULTURAL LAND CLASSIFICATION VULCAN VILLAGE (PROPOSED GOLF COURSE) ST HELENS MBC MJW WOOD ADAS Ref: 25/RPT/0709 Resource Planning Team Job No: 155/94 ADAS Statutory Group MAFF Ref: EL 25/10811 WOLVERHAMPTON

More information

*2301001* Pit #1 ontestant #1 Team #1 alifornia DE - Soil and Land Evaluation Group: 1 ontestant: 1 SURFE SOIL (Fill in ONE bubble for each item). D 1. OLOR (5) 2. TEXTURE (5) 3. GRVEL ND ROK (3) 4. THIKNESS

More information

2011 Wisconsin Envirothon Soils and Land Use Exam

2011 Wisconsin Envirothon Soils and Land Use Exam 2011 Wisconsin Envirothon Soils and Land Use Exam USE THE OCONTO COUNTY SOIL SURVEY TO ANSWER QUESTIONS 1-4 The Pensaukee River Wetland Complex is a mixture of state (Pensaukee Wildlife Area) and privately

More information