1 Planning and Design Commission Report 915 I Street, 1 st Floor Sacramento, CA File ID: May 10, 2018 Public Hearing Item 03 Higher Ground Apostolic Church (P16-027) (Noticed on File ID: Location: 796 Del Paso Boulevard, District 2, APN#: Recommendation: Conduct a public hearing and upon conclusion approve: Item A. Environmental Exemption (Per CEQA Guidelines Section Infill Development Projects); Item B. Conditional Use Permit to establish a religious assembly use within an existing 5,000 square foot commercial building on a 1.41-acre parcel in the Light Industrial (M-1-SPD) zone, within the Del Paso/Arden Way Special Planning District; and Item C. Site Plan and Design Review for the construction of a new parking lot on a 1.41-acre parcel in the Light Industrial (M-1-SPD) zone within the Del Paso/Arden Way Special Planning District Contact: Ethan Meltzer, Assistant Planner, (916) , EMeltzer@cityosacramento.org; Teresa Haenggi, Senior Planner, (916) , THaenggi@cityofsacramento.org Presenter: Ethan Meltzer, Assistant Planner, (916) , EMeltzer@cityofsacramento.org Applicant: Tina Royer, (916) , 2030 Q Street, Rio Linda, CA, Property Owner: Same as Applicant Attachments: 1-Description/Analysis 2-Background 3-Findings of Fact and Conditions of Approval 4-Project Plans 5-Project Narrative 6-Letters from the Public 7-Land Use Map City of Sacramento May 10, 2018 powered by Legistar Page 1 of 36

2 File ID: Public Hearing Item 03 Description/Analysis Issue Detail: The applicant is requesting to establish an assembly use for a religious facility in the Light Industrial (M-1-SPD) zone within the Del Paso/Arden Way Special Planning District. The proposal is to use an existing 5,000 square-foot commercial building for a religious facility and construct a new parking lot with landscaping. The facility will be used for classes and various gatherings Monday through Saturday, with attendance of roughly 25 to 40 people per event. On a typical Sunday, the religious facility will have gatherings of guests. The applicant has indicated that typical Christian events and holidays will occur occasionally, and they expect these events could include up to 100 guests. In order to establish an assembly use, a Planning and Design Commission-level Conditional Use Permit (CUP) is required. All other entitlements associated with the request, including CEQA exemption, and Site Plan and Design Review, must also receive approval from the Planning and Design Commission. Public/Neighborhood Outreach and Comments: The project was routed to several community groups including: Twin Rivers South Community Council, North Sacramento Chamber of Commerce, Woodlake Neighborhood Association, Del Paso Boulevard Partnership, Woodlake Neighbors Creating Transparency, and Preservation Sacramento. The site has been posted and all property owners within a 300-foot radius of the subject site were notified of the hearing. Staff received two letters of support and one letter of opposition from the public for the proposal. Both the Del Paso Boulevard Partnership and Woodlake Neighborhood Association submitted letters of support for the project. The Woodlake Neighbors Creating Transparency group submitted a letter of opposition to the project proposal and stated there are too many other churches currently operating in the area, that there are several other event centers currently operating in the area, and that the Mayor and Councilmember have been promoting high tech hubs and technology businesses in the area, which the association feels would be a more appropriate use for the subject site. The three letters submitted to staff can be found as Attachment 6 of the staff report. Policy Considerations: General Plan: The 2035 General Plan Update was adopted by City Council on March 3, The 2035 General Plan s goals, policies, and implementation programs define a roadmap to achieving Sacramento s vision to be the most livable city in America. The 2035 General Plan designation of the subject site is Employment Center Low Rise. This designation provides for employment generating uses that generally do not produce loud noise or noxious odor; the assembly use is consistent with this designation. Some of the goals and policies supported by this project are as follows: City of Sacramento May 10, 2018 powered by Legistar Page 2 of 36

3 File ID: Public Hearing Item 03 Goal LU 1.1 Growth and Change. Support sustainable growth and change through orderly and well-planned development that provides for the needs of existing and future residents and businesses, ensures the effective and equitable provision of public services, and make efficient use of land and infrastructure. LU Leading Infill Growth. The City shall facilitate infill development through active leadership and the strategic provision of infrastructure and services and supporting land uses. Goal LU 8.1 Public/Quasi-Public. Provide for governmental, utility, institutional, educational, cultural, religious, and social facilities and services that are located and designed to complement Sacramento s neighborhoods, centers, and corridors and to minimize incompatibility with neighborhoods and other sensitive uses. LU Adequate Community Supporting Uses. The City shall seek to ensure that all manner of public and private community-supportive facilities and services are located throughout the city to provide places that serve the varied needs of the community, provide for community meeting places, and provide community and neighborhood landmark building and places. Goal LU 8.2 Special Uses. Provide for the development of Special Uses (e.g., assembly facilities, live-work studios, and care facilities) that are included within several Land Use and Urban Form Designations. LU Assembly Facilities and Event Centers. The City shall encourage and support development throughout the city of assembly facilities for social, cultural, entertainment, sports, educational, and religious activities. Del Paso/Arden Way Special Planning District: The Del Paso/Arden Way Special Planning District was established in The Del Paso Boulevard/Arden Way SPD consists of a number of different neighborhoods that include residential uses, light industrial uses, and commercial uses. The SPD zoning regulations are intended to assist in the preservation of the economic climate in these neighborhoods through the retention of existing businesses while accommodating new development. Goal 1. Maintain and improve the character, quality, and vitality of this unique commercial neighborhood, drawing on the opportunities for an arts and entertainment orientation. Goal 2. Provide the opportunity for a balanced mixture of uses in neighborhoods adjacent to transit facilities and transportation corridors. City of Sacramento May 10, 2018 powered by Legistar Page 3 of 36

4 File ID: Public Hearing Item 03 Goal 5. Provide the opportunity for reuse and rehabilitation of heavy commercial and industrial uses to take advantage of the light rail facilities in the area, thereby reducing the number of obsolete and underutilized buildings and sites. Goal 8. Discourage outdoor storage in the SPD by limiting stored materials to those that are incidental to primary business uses in the M-1 and C-2 zones and enforcing minimum standards for outdoor storage of materials and products. By discouraging outdoor storage, the city can reverse the adverse aesthetic conditions. The proposed project supports the goals and policies cited above by developing an underdeveloped and unused lot with a use that serves the community, encourages and supports an assembly facility for social, cultural, educational, and religious activities, improves the aesthetics of the unused site by constructing a new parking lot with landscaping, adding a use that will not require outdoor storage, and is designed to complement the area and minimize impacts on surrounding existing businesses and residents. Environmental Considerations: The Community Development Department, Environmental Planning Services Division has reviewed this project and determined that it is exempt from the provisions of the California Environmental Quality Act (CEQA) under Class 1, Section number 15332, Infill, because the site is less than five acres in size, is served by all urban services and is surrounded by urban uses. No habitat for endangered, rare or threatened species exists on the site, and the project would result in no significant effects relating to traffic, noise, air quality or water quality. The project is consistent with the general plan and zoning designations for the project site. 200-Year Flood Protection: State Law (SB 5) and Planning and Development Code chapter require that the City must make specific findings prior to approving certain entitlements for projects within a flood hazard zone. The purpose is to ensure that new development will have protection from a 200-year flood event or will achieve that protection by The project site is within a flood hazard zone and is an area covered by SAFCA s Improvements to the State Plan of Flood Control System, and specific findings related to the level of protection have been incorporated as part of this project. Even though the project site is within a flood hazard zone, the local flood management agency, SAFCA, has made adequate progress on the construction of a flood protection system that will ensure protection from a 200-year flood event or will achieve that protection by This is based on the SAFCA Urban level of flood protection plan, adequate progress baseline report, and adequate progress toward an urban level of flood protection engineer s report that were accepted by City Council Resolution No on June 21, City of Sacramento May 10, 2018 powered by Legistar Page 4 of 36

5 File ID: Public Hearing Item 03 Rationale for Recommendation: Staff recommends the Commission approve the requested entitlements based on the findings and subject to the conditions listed in Attachment 1. The proposal complies with the goals and policies in the General Plan in that it develops an unused lot with a use that serves the community, encourages and supports social, cultural, educational, and religious activities. The site is designed to complement the area and minimize impacts on existing businesses and neighbors in the area. As conditioned, the proposed project is compatible with the surrounding developments, and will not create a nuisance to the area. City of Sacramento May 10, 2018 powered by Legistar Page 5 of 36

6 Vicinity Map Page 6 of 36

7 Summary: The applicant is requesting to establish an assembly use for a religious facility within an existing 5,000 square-foot commercial building and construct a new parking lot on a 1.41-acre parcel in the Light Industrial (M-1-SPD) zone within the Del Paso/Arden Way Special Planning District. The project requires a Planning and Design Commission-level Conditional Use Permit and Site Plan and Design Review. Table 1: Project Information General Plan designation: Existing Zoning of Site: Special Planning District: Property Area: Parking District: Design Review Area: Community Plan Area: Employment Center Low Rise Light Industrial (M-1-SPD) Del Paso/Arden Way 1.41± acres Traditional North Sacramento North Sacramento Background Information: The subject site is located on the corner of Del Paso Boulevard and the Highway 160 off-ramp. The 1.41-acre site is currently developed with an existing 5,000 square-foot building constructed in Previous uses of this site include a church and an engineering contractor business. The subject site does not have any prior planning entitlement approvals. Figure 1 Looking west at Subject Site Page 7 of 36

8 Project Design: Land Use Table 2: Surrounding Uses Direction Zone Use North M-1-SPD (Light Industrial) Auto Parts Store & Auto Storage South M-1-SPD (Light Industrial) Vacant & Del Paso Blvd. East M-1-SPD (Light Industrial) Vacant, Del Paso Blvd., & Mobile Home Park West M-1-PC (Light Industrial) Train tracks, Auto Parts Store & Auto Storage The surrounding land uses include primarily industrial uses. The site will be used for religious events and gatherings on Sundays and special holidays; various classes will be held at the site throughout the week and on weekends. More detailed information about the church s proposed hours of operation and weekly gatherings can be found in Attachment 5. The western portion of the irregularly-shaped site will remain undeveloped. Development Standards The project proposal meets all development standards, including setbacks, landscaping, and paving. The applicant is not proposing any exterior modifications to the existing building. The proposed parking lot plan has been reviewed by various City Departments, providing feedback and conditions which have been incorporated into the project s plans and conditions of approval in Attachment 3. Table 3: Height, Area, and Open Space Standards Standard Required Existing Proposed Deviation? Front Setback (North) Rear Setback (South) Interior Side Setback (East) Interior Side Setback (West) None 0 feet No Change No None 15 feet No Change No None 40 feet No Change No None 140+ feet No Change No Page 8 of 36

9 Building Design, Signage, Fencing, and Landscaping The applicant is not proposing any modifications to the existing building. The applicant is also not proposing any signage at this time. All future signage will require Planning Review and a sign permit before installation. There is existing chain-link fencing surrounding the subject site. Design Review and the Police Department are both requiring that the applicant install a 6 -tall decorative tubular steel fence along the site s Del Paso Boulevard frontage for both aesthetic and security purposes. The applicant has incorporated this into their plans. The applicant provided a preliminary landscaping plan that shows a variety of plantings that will enhance the site and new parking lot. The applicant has proposed irrigated 6-foot wide planters along the proposed parking lot s Del Paso Boulevard frontage. There will also be smaller irrigated planters in between the new sidewalk and the existing building. The landscaping plan was reviewed by Urban Forestry and was determined to meet code requirements, including the City s tree shading requirement. Figure 2 Proposed Parking Lot Layout Access, Circulation, and Parking The site has one proposed driveway that provides site access from Del Paso Boulevard. The driveway will have a 24-foot decorative wrought-iron automatic sliding gate. The sliding gate has been reviewed and accepted by Public Works and the project has been conditioned to keep the gates open during normal operating hours of the religious facility. Page 9 of 36

10 Table 4: Parking Standards Type Required Proposed Deviation? Vehicles 1 space: 5 occupants of the 20 spaces No assembly area = 18 parking spaces Bicycles Long Term: 2 Short Term: 5 Long Term: 2 Short Term: 8 No The project is in the Traditional Parking District. The zoning code requires 1 space per 5 occupants in this parking district. Staff relies on the building code to establish maximum occupancy: the occupancy ratio is 1 occupant for 7 square feet. Based on the square footage of the assembly area in the existing building (619 square-feet), the approximate maximum occupancy is 88 people, therefore the vehicle parking requirement for this project is 18 spaces. The applicant is proposing 20 parking spaces which meets their minimum requirement. The bicycle parking requirement for this project is 2 long-term bicycle parking spaces and 5 short-term spaces. The required long-term bike parking will be provided within a room in the existing building and the applicant is proposing 8 short-term bike parking spaces which will be placed near the front entrance of the building. Page 10 of 36

11 Findings of Fact Attachment 1: City Planning and Design Commission Record of Decision Recommended Findings of Fact and Conditions of Approval for Higher Ground Apostolic Church (P16-027) A. Environmental Determination: Based on the determination and recommendation of the City s Environmental Planning Services Manager and the oral and documentary evidence received at the hearing on the Project, the Planning and Design Commission finds that the Project is exempt from review under the following sections of the CEQA Guidelines: Section (Infill) of the California Environmental Quality Act Guidelines as follows: 1. The project complies with all applicable policies of the General Plan, as well as with the applicable zoning regulations; 2. The proposed project occurs within City limits on a project site of no more than five (5) acres substantially surrounded by urban uses; 3. The project site has no value as habitat for endangered, rare or threatened species; 4. Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality; and 5. The site can be adequately served by all required utilities and public services. There are no unusual circumstances that would result in a significant effect, and all cumulative effects have been evaluated in the Master EIR prepared for the 2035 General Plan. B. The Conditional Use Permit to establish a religious assembly use within an existing 5,000 square foot commercial building on a 1.41-acre parcel in the Light Industrial (M-1-SPD) zone within the Del Paso/Arden Way Special Planning District is approved based on the following Findings of Fact: 1. The proposed use and its operating characteristics are consistent with the General Plan and the Del Paso/Arden Way Special Planning District. The assembly use is consistent with the General Plan designation of Employment Center Low Rise by providing a compatible public use. The assembly use is consistent with the Del Paso/Arden Way Special Planning District by providing a balanced Page 11 of 36

12 mixture of uses in a neighborhood adjacent to transit facilities, providing the opportunity for the reuse of a heavy commercial building and site, and discouraging outdoor storage. 2. The proposed use and its operating characteristics are consistent with the applicable standards, requirements, and regulations of the zoning district in which it is located, and of all other provisions of this title and this code, in that the assembly use will meet onsite parking requirements for both vehicles and bicycles, landscaping and tree shading requirements, and fencing requirements to ensure neighborhood compatibility. 3. The proposed use is situated on a parcel that is physically suitable in terms of location, size, topography, and access, and that is adequately served by public services and utilities, in that various departments reviewed and conditioned the project to ensure the site can be served by needed utilities; and in that the landscaping, parking lot design, and access provides for proper circulation and maneuvering. 4. The proposed use and its operating characteristics will not be detrimental to the public health, safety, convenience, or welfare of persons residing, working, visiting, or recreating in the surrounding neighborhood and will not result in the creation of a nuisance, in that the assembly use is located on a property that is not adjacent to any sensitive uses, the site provides adequate parking for the use and parking lot improvements will ensure safe maneuvering on and off the site, and the project is conditioned to minimize any potential conflicts with adjacent neighbors, including a restriction to outdoor amplified sound. C. The Site Plan and Design Review for the construction of a new parking lot on a 1.41-acre parcel in the Light Industrial (M-1-SPD) zone within the Del Paso/Arden Way Special Planning District is approved subject to the following Findings of Fact: 1. The design, layout, and physical characteristics of the proposed development are consistent with the General Plan and the Del Paso/Arden Way Special Planning District, in that the site improvements are consistent with the Employment Center Low Rise designation and the Special Planning District development standards. 2. The design, layout, and physical characteristics of the proposed development are consistent with all applicable design guidelines and with all applicable development standards, in that the site improvements are consistent with the requirements of the M-1 zone by providing adequate site access, open space, landscaping, and parking, and is consistent with all development standards. 3. All streets and other public access ways and facilities, parking facilities, Page 12 of 36

13 and utility infrastructure are adequate to serve the proposed development and comply with all applicable design guidelines and development standards, in that new parking facilities, driveways, and adequate utility infrastructure will be provided. 4. The design, layout, and physical characteristics of the proposed development are visually and functionally compatible with the surrounding neighborhood, in that the new parking lot will be landscaped and paved and the development standards used to analyze the construction of the parking lot will be consistent with the standards used for any future development in this area. 5. The design, layout, and physical characteristics of the proposed development ensure energy consumption is minimized and use of renewable energy sources is encouraged, in that the parking lot construction will be required to adhere to building code requirements and robust landscaping will be provided, including tree shading in the parking lot area. 6. The design, layout, and physical characteristics of the proposed development are not detrimental to the public health, safety, convenience, or welfare of persons residing, working, visiting, or recreating in the surrounding neighborhood and will not result in the creation of a nuisance in that the project will construct pedestrian infrastructure in an area that is lacking pedestrian connectivity and the project will provide adequate onsite circulation and parking for visitors. D. The 200-Year Flood Protection: 1. The project site is within an area for which the local flood management agency has made adequate progress (as defined in California Government Code section 65007) on the construction of a flood protection system that will result in flood protection equal to or greater than the urban level of flood protection in urban areas for property located within a flood hazard zone, intended to be protected by the system, as demonstrated by the SAFCA Urban level of flood protection plan, adequate progress baseline report, and adequate progress toward an urban level of flood protection engineer s report accepted by City Council Resolution No on June 21, Conditions of Approval B. Conditional Use Permit to establish a religious assembly use within an existing 5,000 square foot commercial building on a 1.41-acre parcel in the Light Industrial (M-1-SPD) zone within the Del Paso/Arden Way Special Planning District is approved subject to the following conditions of approval: Page 13 of 36

14 Planning B1. Development of this site shall be in compliance with the attached exhibits, except as conditioned. Any modifications to the project shall be subject to additional Planning review and may require subsequent entitlements prior to issuance of building permits. B2. The applicant shall obtain all necessary building permits and encroachment permits prior to commencing construction. B3. A minimum of 18 parking spaces shall be provided on the subject site. B4. The assembly use is required to provide two (2) long-term bicycle parking facilities and (5) short-term bicycle parking spaces. The location of the bicycle parking facilities is to be reviewed and approved by staff prior to submittal of building plans. B5. The Higher Ground Apostolic Church shall not have a main assembly area larger than 619 square-feet. If the applicant wishes to expand the assembly area, further Planning review and approval may be required. B6. The assembly use shall be conducted consistent with the following Good Neighbor conditions: a) Establish a process for neighbors to communicate directly with the management staff of the facility should there be any problems or issues; b) Establish a policy to provide information to neighbors surrounding the site regarding special events, operating dates and times that could impact parking; and c) Provide t h e n a m e o f an emergency contact person and onsite p h o n e number, in a clearly identified place, visible from the exterior of the building. B7. No amplified sound shall be used outside the buildings. B8. Any proposed signage requires a sign permit and is subject to site plan and design review approval. Public Works B9. All new and existing driveways shall be designed and constructed to City Standards to the satisfaction of the Department of Public Works. B10. Gates on entrance driveways shall be mechanical and equipped with a remote-control opener and shall remain open during operating hours of Page 14 of 36

15 business. The gate shall be designed so that no portion of the gate shall encroach into the public right-of-way. B11. The applicant shall apply for and obtain a revocable encroachment permit for any portion of the pedestrian walkway adjacent to the existing building that will be located within the public right-of-way to the satisfaction of the Department of Public Works. Police B12. The design and construction of any proposed sidewalks/pedestrian pathway within the public right-of-way shall be per City standards to the satisfaction of the Department of Public Works. B13. The site plan shall conform to the parking requirements set forth in City Code (Development standards for off-street parking facilities, Zoning Ordinance). B14. The design of walls fences and signage near intersections and driveways shall allow stopping sight distance per Caltrans standards and comply with City Code Section (25' sight triangle). Walls shall be set back 3' behind the sight line needed for stopping sight distance to allow sufficient room for pilasters. Landscaping in the area required for adequate stopping sight distance shall be limited 3.5' in height at maturity. The area of exclusion shall be determined by the Department of Public Works. B15. Exterior lighting shall be white light using LED lamps with full cutoff fixtures to limit glare and light trespass. Color temperature shall be between 2700K and 4100K with a color rendering index of 75 or better and a light loss factor of.95 or better. B16. Light poles shall be no higher than 16. B17. Broken or damaged exterior lighting shall be repaired or replaced within 48 hours of being noted. B18. Entry drives, drive aisles, parking and bicycle parking shall be illuminated to a maintained minimum of 1.5 foot candles per square foot of parking area at a 6:1 average to minimum ratio. B19. Exterior walkways, alcoves and passageways shall be illuminated to a maintained minimum of 1/3 foot candles per square foot of surface area at a 6:1 average to minimum ratio. B20. Exterior lighting distribution and fixtures shall be approved by the Sacramento Police Department CPTED Sergeant (or designee) prior to issuance of a Page 15 of 36

16 SMUD building permit. B21. Exterior lighting shall be designed in coordination with the landscaping plan to minimize interference between the light standards and required illumination and the landscape trees and required shading. B22. Exterior lighting shall be shielded or otherwise designed to avoid spill-over illumination to adjacent streets and properties. B23. All mature landscaping shall follow the two-foot, six-foot rule. All landscaping shall be ground cover, two feet or less and lower tree canopies of mature trees shall be above six feet. This increases natural surveillance and eliminates hiding areas within the landscape. B24. Tree canopies shall not interfere with or block lighting. This creates shadows and areas of concealment. The landscaping plan shall allow for proper illumination and visibility regarding lighting and surveillance cameras through the maturity of trees and shrubs. B25. Fences shall be of transparent construction. New fences shall be of decorative tubular steel, no climb type. B26. The applicant is responsible for reasonably controlling the conduct of persons on the site and shall immediately disperse loiterers. B27. All dumpsters shall be kept locked or in locked enclosures. B28. Any graffiti painted or marked upon the premises or on any adjacent area under the control of the applicant shall be removed or painted over with matching paint within 72 hours of being applied. B29. The operator shall be responsible for the daily removal of all litter from the site. B30. Applicant shall install a Knox Box for police access to the exterior areas of the property after hours. B31. SMUD has existing 12kV facilities along Del Paso Boulevard on the north western property boundary, these facilities will need to remain in order to maintain existing services not part of the development. The Applicant shall be responsible for maintaining all CalOSHA and State of California Public Utilities Commission General Order No. 95 safety clearances during construction and upon building completion. If the required clearances cannot be maintained, the Applicant shall be responsible for the cost of Page 16 of 36

17 Fire relocation. B32. In the event the Applicant requires the relocation or removal of existing SMUD facilities on or adjacent to the subject property, the Applicant shall coordinate with SMUD. The Applicant shall be responsible for the cost of relocation or removal. B33. SMUD reserves the right to use any portion of its easements on or adjacent to the subject property that it reasonably needs and shall not be responsible for any damages to the developed property within said easement that unreasonably interferes with those needs. B34. The Applicant shall not place any building foundations within 5-feet of any SMUD trench to maintain adequate trench integrity. The Applicant shall verify specific clearance requirements for other utilities (e.g., Gas, Telephone, etc.). B35. In the event the City requires an Irrevocable Offer of Dedication (IOD) for future roadway improvements, the Applicant shall dedicate a foot public utility easement (PUE) for overhead and/or underground facilities and appurtenances adjacent to the City s IOD. B36. The Applicant shall comply with SMUD siting requirements (e.g., panel size/location, clearances from SMUD equipment, transformer location, service conductors). Information regarding SMUD siting requirements can be found at: Solutions-and- Rebates/Design-and-Construction-Services. B40. Any modifications to the facility must be done under permit by way of plan review for compliance to the Fire and Building Codes. B41. Obtain a Fire Clearance by requesting a fire and life safety inspection from the Sacramento City Fire Prevention Division. B42. Obtain any required operational permits from the Sacramento City Fire Prevention Division. C. Site Plan and Design Review for the construction of a new parking lot on a 1.41-acre parcel in the Light Industrial (M-1-SPD) zone within the Del Paso/Arden Way Special Planning District is approved subject to the following conditions of approval: Page 17 of 36

18 Planning C1. The buildings shall be sited as indicated in the report and attached plans. C2. Auto access and site layout shall be as indicated in the report and attached plans. C3. The project shall include landscaping elements as indicated on the reports and exhibits. Automatic irrigation shall be provided for all planting and landscaping. Final landscape plans and details shall be reviewed and approved by Design Review staff prior to Building Permit submittal. C4. Trees shall be planted and maintained throughout surface parking lots to ensure that, within fifteen (15) years after establishment of the parking lot, at least fifty (50) percent of the parking area will be shaded. C5. The minimum width of the landscape planter at the perimeter of the site, excluding curbing, shall be six feet, measured from the property line. C6. Walls and fencing shall be provided as indicated in the attached plans and as conditioned. C7. Decorative wrought iron fencing and gates shall be installed, per the approved plans. C8. Building permits shall not be issued until the expiration of the 10-day appeal period. Utilities C9. The onsite water, sewer and storm drain systems shall be private systems maintained by the property owner. C10. Per City Code, the applicant may not develop the project in any way that obstructs, impedes, or interferes with the natural flow of existing off-site drainage that crosses the property. The project shall construct the required public and/or private infrastructure to handle off-site runoff to the satisfaction of the Department of Utilities (DOU). If private infrastructure is constructed to handle off-site runoff, the applicant shall dedicate the required private easements, and/or, at the discretion of the DOU, the applicant shall enter into and record an Agreement for Maintenance of Drainage with the City, in a form acceptable to the City Attorney. C11. No more than 6,000 square feet is allowed to sheet drain over a public sidewalk. If the area is larger than 6,000 square feet, then an on-site surface drainage system is required and shall be connected to the street drainage system by means of a storm drain service tap or as otherwise Page 18 of 36

19 approved by the DOU. All on-site systems shall be designed to the standard specified in the DOU onsite manual. C12. A grading plan showing existing and proposed elevations is required. Adjacent off-site topography shall also be shown to the extent necessary to determine impacts to existing surface drainage paths. No grading shall occur until the grading plan has been reviewed and approved by the DOU. C13. The applicant must comply with the City of Sacramento's Grading, Erosion and Sediment Control Ordinance. This ordinance requires the applicant to show erosion and sediment control methods on the construction drawings. These plans shall also show the methods to control urban runoff pollution from the project site during construction. C14. The project will disturb less than one acre of land, therefore only source control measures are required. Improvement plans must include the source controls measures selected for the site. Refer to Stormwater Quality Design Manual for the Sacramento and South Placer Regions (May 2007) Chapter 4 for appropriate source control measures. Urban Forestry C15. The Sacramento Tree Protection Requirements shall appear on all future plans for this project. C16. Tree protection measures for this project should include, among other things, a six-inch deep layer of wood chips in the tree protection zone (TPZ) of protected trees to reduce the impact of construction traffic and tree protection fencing around the TPZ with the exception of areas to be surfaced for parking. C17. Any excavation within the TPZ shall be done under the direct supervision of an ISA Certified Arborist. C18. There shall be no pruning of roots or limbs greater than two inches in diameter without the approval of an ISA Certified Arborist. C19. Add one large canopy shade tree adjacent to parking space #3. This addition will satisfy the parking lot shade requirements. Regional Sanitation C20. Developing this property may require the payment of Regional San sewer impact fees. Regional San sewer impact fees shall be paid prior to the issuance of building permits. For questions pertaining to Regional San sewer impact fees, please contact the Sewer Fee Quote Desk at (916) Page 19 of 36

20 Fire C21. Provide appropriate Knox access for site. CFC Section 506. C22. An automatic fire sprinkler system shall be installed in any portion of a building where a change of use has occurred that creates a greater fire or life safety hazard and when the floor area of the building exceeds 3,599 square feet. CFC Fire Code Amendments (4). C23. An approved fire control room shall be provided for all buildings protected by an automatic fire extinguishing system. The room shall contain all system control valves, fire alarm control panels and other fire equipment required by the Fire Code Official. Fire Control rooms shall be located within the building at a location approved by the Fire Code Official, and shall be provided with a means to access the room directly from the exterior. Durable signage shall be provided on the exterior side of the access door to identify the fire control room. Fire Control rooms shall not be less than 50 square feet. CFC Amendments Advisory Notes ADV.1 ADV.2 ADV.3 ADV.4 Any necessary future SMUD facilities located on the Applicant s property shall require a dedicated SMUD easement. This will be determined prior to SMUD performing work on the Applicant s property. The City of Sacramento (City) is responsible for providing local sewer service to the proposed project site via their local sanitary sewer collection system. Regional San is responsible for the conveyance of wastewater from the City's collection system to the Sacramento Regional Wastewater Treatment Plant (SRWTP). The City has no sewer service record for this parcel. The property may be served with a septic system. Connections to the City s sewer system will require the applicant to properly abandon the septic system under permit from the County Environmental Health Division and provide a sewer main extension to the property. (The closest City sewer main is an existing 8 main located approximately midway of Railroad Drive.). There is an existing 30-inch City water transmission main running adjacent to the southeast property line of the subject project. No connections are allowed to the existing water transmission main. Page 20 of 36

21 ADV.5 ADV.6 ADV.7 The applicant is responsible for obtaining all necessary permits, easements, and approvals from federal, state, and local agencies for the construction of this project. The proposed project is located in a Shaded Zone X on the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Maps (FIRMs). Accordingly, the project site lies in an area with no requirements to elevate or flood proof. Prior to issuance of a Building Permit, payment of a Park Development Impact Fee (PIF) shall be required. The Park Development Impact Fee due for this project is estimated at $1,200 based on a 5,000 square foot building and the commercial services rate of $0.42 per square foot. This estimate includes a fee offset of $900 (based on the same size building and the industrial rate of $0.18 per square foot) for the previous industrial use. Any change in these factors will change the amount of the PIF due. The fee is calculated using factors at the time that the project is submitted for building permit. The fee is increased annually to keep pace with inflation; the fee will be adjusted 3.5% on July 1, Page 21 of 36

22 796 DEL PASO BLVD. SITE IMPROVEMENTS - PC #1 RESPONSE 05 APR 2018 N Site Parking Page 22 of 36

23 796 DEL PASO BLVD. SITE IMPROVEMENTS - PC #1 RESPONSE 05 APR 2018 Site Parking Page 23 of 36

24 796 DEL PASO BLVD. SITE IMPROVEMENTS - PC #1 RESPONSE 05 APR 2018 Site Parking Page 24 of 36

25 Page 25 of 36

26 Page 26 of 36

27 Higher Ground Page 1 of 6 NARRATIVE FOR CONDITIONAL USE PERMIT APPLICATION HIGHER GROUND APOSTOLIC CHURCH 796 DEL PASO BOULEVARD Introduction This narrative is to serve as supplementary information related to the CUP application submitted to conduct church services at 796 Del Paso Boulevard, Sacramento, CA The applicant is Higher Ground Apostolic Church. Nathaniel and Tina Royer are the representatives for Higher Ground Apostolic Church concerning this application. Summary of project Higher Ground Apostolic Church is proposing to utilize the above property for church related activities to include but not limited to Sunday worship services, including children s programming, junior high and high school programs as related to religious activities. Higher Ground intends to use the building as a family church and envisions hosting special events including weddings, holiday celebrations, and small group meetings. History Nathaniel and Tina Royer purchased the property in 2014, and at that time it was already being used as a church. Higher Ground commenced services alongside the other church, Jubilee Training Center, for several months. In 2015, Higher Ground was notified that the proper use permits had not been obtained by the previous church, and Higher Ground immediately began raising funds and obtaining plans in preparation for conditional use permit application. Our initial plans called for parking in front of the building, but the City denied those plans since part of the parking lot would fall on City property. As such, we have spent several months working with our engineer, the City, and the Del Paso Blvd. Partnership coming up with a design that is amenable to all. Church Operation Details As requested, following are answers to questions posed by the City: Normal schedule of services: Sunday school 4-5pm Page 27 of 36

28 Higher Ground Page 2 of 6 Main service 5-8pm Tuesday Bible study 6-8pm Thursday Celebrate Recovery 6:30-8:30pm Other days for special sessions and classes including (but not limited to): Financial Peace University Saturday 6:30-8:30pm Women s prayer one Friday per month Men s Bible study and prayer one Saturday per month Leadership classes two evenings per month (Questions from City Underlined below) Will there be classes held at the church? PLEASE SEE ABOVE What times? PLEASE SEE ABOVE How many expected attendees? For special classes, current attendance ranges from What are the normal operating hours of the church? On Monday-Friday? Weekdays, the church is currently not operating during normal business hours. We are what s called a church plant or home missions church, which means that we are in the process of building and growing a congregation that will eventually be open during such hours. On weekends? Saturdays vary depending on the class (see sessions and classes above) How many employees or members are expected to be working at the church at any given day and time? The church currently has no employees. How many members are in your church? Current membership is 30 adults What is your expected turn-out for a typical Sunday gathering? Typical Sunday gatherings are between people currently. Are there any large holidays or events that will be hosted at this site? If so please Page 28 of 36

29 Higher Ground Page 3 of 6 try to provide a rough calendar of events as well as a rough expected number of attendees for each event. Higher Ground is a Christian church, so most all Christian holidays, as would be expected, will be honored or celebrated in some way. In recent years, we ve had Easter egg hunts and bounce houses on the Saturday before Easter, and we ve had Christmas programs on the Sunday before Christmas, or on Christmas Eve, depending on the day of the week. In addition, we host a Thanksgiving dinner for our congregants, typically on the Tuesday before thanksgiving. In addition to religious holidays, we ve done 4 th of July, Memorial Day, and Labor Day celebrations over the past few years. These events, weather permitting, include bbq, cotton candy and sno-cones, and bounce houses. 4 th of July also has included a small (legal) fireworks show for the children. Because these events are ones we invite friends and family to, it s difficult to gauge expected attendance, but in the past, we ve had anywhere from people at these events. In addition to holiday events, it s possible we would host sectional meetings including prayer meetings and fellowship meetings. For these events, it s possible there may be 90 people present. Finally, because this is a church, it s likely that we will host weddings, celebrations of life, baby dedications. In short, Higher Ground plans to host events that normal churches host. Sacramento Municipal Code Compliance Following is a brief narrative addressing specific code sections: A. The proposed use is listed as a conditional use in the underlying zoning district or has been interpreted to be similar in use to other listed conditional uses. The property is zoned M-1, light industrial. Pursuant to The Planning and Development Code of the City of Sacramento ( ,) religious assembly use is permitted in this zoning, but requires the conditional use permit. Page 29 of 36

30 Higher Ground Page 4 of 6 The Planning and Development Code of the City of Sacramento ( ) uses the following to define a church: church or faith congregation means a structure or place used primarily for religious worship and related religious activities Higher Ground can also be considered an assembly. Based on , assembly cultural, religious, social means a meeting place at which the public or membership groups are assembled regularly or occasionally, including churches or faith congregations, auditoriums, stadiums, and similar places of assembly. By definition, Higher Ground Apostolic Church is a church. Additional codes or zoning that may impact the proposed church use for the property are noted in the Del Paso Boulevard SPD. Based on of the SPD, The SPD zoning regulations are intended to assist in the preservation of the economic climate in these neighborhoods through the retention of existing businesses while accommodating new development. The SPD also requires that it provide the opportunity for a balanced mixture of uses in neighborhoods adjacent to transit facilities and transportation corridors; and that it Maintain the neighborhood stability of existing commercial neighborhoods while allowing existing nonconforming uses to continue to serve the community needs in this area. Accommodating Higher Ground will ensure a balanced mixture of uses and serve the community needs of the area. B. The characteristics of the site are suitable for the proposed use considering the size, shape, location, topography, and natural features. The size and shape of the existing 5,000 square foot building and its land is ideal for use as a church. Most church activities will take place on off hours, during times when the adjacent business is closed or in off-peak times. Additionally, this property is at the western-most edge of the Del Paso neighborhood, located across from an auto dismantler on one side and the freeway onramp on another. The only other nearby neighbors are a senior mobile home park. Finally, this property is located near the Globe light rail station, which would allow Page 30 of 36

31 Higher Ground Page 5 of 6 congregants to use public transportation to arrive at church. Given the property s proximity to the American River Parkway Bike Trail, we have installed a 10-bike bicycle rack for parishioners who choose to bike to church. For these reasons, the impact of church usage would be minimal at this site. The existing building was used as a church, albeit without proper approval, when the present owners purchased it. It has been used in this capacity for appx. 5 years with minimal disruption to any nearby neighbors. C. The proposed use will not alter the character of the surrounding area in a manner which substantially limits, precludes, or impairs the use of the surrounding properties for the primary uses listed in the underlying zoning district. Granting a conditional use permit and allowing Higher Ground Apostolic Church to conduct church-related activities would likely enhance the use of surrounding properties. Congregants have frequented Little Caesars, Son of a Bean, Lil Joe s, and Sammy s in recent months. In addition, church members have shopped at Walgreens and the auto parts store places they would not have made purchases had they not been on their way to or from the proposed church location. D. The proposed use will not result in the use of land for any purpose which may create or cause to be created any public nuisance including, but not limited to, air, land, or water degradation, noise, glare, heat, vibration, or other consideration which may be injurious to the public health, safety, and welfare. Nothing conducted at any Higher Ground Apostolic Church related services, past, present, or future would be considered injurious to the public health, safety, or welfare. E. The proposed use will be reasonably compatible with existing or planned neighborhood uses based on review of the following: 1. Basic site design the basic design of the site is complete and had previously been reviewed and deemed appropriate. 2. Architectural and Visual elements (scale, structural design and form, materials, and so forth) except for exterior signs, no change of scale, structural design, form, or materials are planned. Page 31 of 36

32 Higher Ground Page 6 of 6 3. Noise there may be some ambient noise outside of the building related to singing and children, but nothing that would be unreasonable or out of the norm, and certainly within city codes for acceptable decibel levels. 4. Lighting the parking lot will be adequately illuminated. The building also currently has outdoor illumination. No other external lighting is planned. 5. Signage after approval is granted for conditional use, an external sign will be attached to the building in compliance with code. Conclusion We respectfully request approval of the conditional use permit based upon the facts presented herein. Higher Ground Apostolic Church will not only enhance what has been an eyesore for several years, but will help local businesses and serve the greater Old North Sacramento community. Page 32 of 36

33 March 26, 2018 Ethan Meltzer, Assistant Planner City of Sacramento Community Development 300 Richards Boulevard, 3 rd Floor Sacramento, CA Via - emeltzer@cityofsacramento.org RE: Higher Ground Apostolic Church 796 Del Paso Boulevard Dear Mr. Meltzer: On behalf of the Del Paso Boulevard Partnership and its Board of Directors, we are pleased to support the proposed Higher Ground Apostolic Church at 796 Del Paso Boulevard, in North Sacramento. A three member committee of the Partnership thoroughly reviewed the Church's plans and proposal and recommended support to the full Board. We appreciate Nate and Tina Royer's effort to reach out to the community around the project, to Councilmember Warren and his staff, and to the Partnership. As the Conditional Use Permit winds through the City's process, please let me know if the Partnership can be of any help or support for the Higher Ground Apostolic Church. Thank you for your effort, please feel free to give me a call if you have any questions. Best Regards, David W. Plag DAVID W. PLAG Executive Director Del Paso Boulevard Partnership Del Paso Boulevard Partnership 1219 Del Paso Boulevard * Sacramento, CA / * delpasoboulevard.com Page 33 of 36

34 Woodlake Neighborhood Association PO Box Sacramento, California City of Sacramento Community Development Department Ethan Meltzer - Assistant Planner 300 Richard Blvd, 3 rd Floor Sacramento, CA Submitted via January 31, 2018 Re: P Project Routing for Higher Ground Apostolic Church Dear Mr. Meltzer: I am writing to support the application for a Conditional Use Permit and parking lot at 796 Del Paso Boulevard. Nate Royer, the pastor of Higher Ground Apostolic Church, came to a Woodlake Neighborhood Association meeting to share his vision for the church and his plan for the property. This property is in a unique location and I believe that the proposed plans by Higher Ground Apostolic Church will greatly improve the look of a previously blighted area. Thank you. Sincerely, Larry Glover-Meade President, Woodlake Neighborhood Association Page 34 of 36

35 Ethan Meltzer, Junior Planner City of Sacramento Woodlake Neighbors Creating Transparency (WNCT) P.O. Box Sacramento CA May 23, 2016 TRANSMITTED VIA RE: Opposing Higher Ground Apostolic Church (P16-027) Dear Planning Commissioners, Woodlake Neighbors Creating Transparency (WNCT) opposes the application of the Higher Ground Church for a Conditional Use Permit to operate as one more religious facility in an area filled with religious facilities and other non-profit entities. The applicant states that they would operate in an existing commercial building in a Light Industrial Zone. Two members of our Board of Directors met with the applicant Ms. Royer, and she offered to persuade us by stating that the church has been operating on site for a year with no complaints, and she and her husband might expand the existing building to serve as an event center. Our research identified 18 other churches within the zip code, while the General Plan for North Sacramento promotes retail and commercial as well as industrial business development in available vacant business spaces. To Ms. Royer s proposal to add an event center to her property, we advise that we count four event centers available for rent: The Rink, the Masonic Hall, Gallery 2110, and Artspace 1616, to name a few. Further, the Mayor and Councilman Warren are promoting high tech hubs and related technology business development in North Sacramento that would create jobs and add to the tax base of the city. Former Councilwoman Sheedy strongly opposed the location of more churches in District 2. For the above reasons, our organization opposes granting the applicants a Conditional Use Permit to operate as one more church in an over-churched area of Sacramento. Please do not hesitate to contact us for more information. Yours Truly, Jane Macaulay, President rhmacaulay@aol.com Page 35 of 36

I Street, Sacramento, CA

I Street, Sacramento, CA REPORT TO PLANNING COMMISSION City of Sacramento 12 915 I Street, Sacramento, CA 95814-2671 To: Members of the Planning Commission PUBLIC HEARING March 10, 2011 Subject: El Dorado Savings Sign Variance

More information

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento 5 PUBLIC HEARING June 12, 2014 To: Members of the Planning and Design Commission Subject: Newman Center Sign (P14-017) A request to construct

More information

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento 915 I Street, Sacramento, CA 95814-2671 www. CityofSacramento.org 10 To: Members of the Planning and Design Commission PUBLIC HEARING November

More information

Planned Development Review Revisions (Project No. PLNPCM )

Planned Development Review Revisions (Project No. PLNPCM ) Planned Development Review Revisions (Project No. PLNPCM2014-00139) Standard residential development Planned Development Example: Smaller lot sizes than what is allowed to create open space amenity. What

More information

GENERAL INFORMATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa

GENERAL INFORMATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa To: Planning and Zoning Commission From: City Staff Date: November 15, 2016 Re: Case #16026 Raymore Activity Center Site Plan GENERAL INFORMATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa Applicant/ Property Owner:

More information

ARTICLE IX SPECIAL PERMIT USES

ARTICLE IX SPECIAL PERMIT USES ARTICLE IX SPECIAL PERMIT USES All special permit uses cited in Article IX and Attachment A of this Ordinance or any other Section of this Ordinance shall be subject to Site Plan Review. The procedures

More information

ARTICLE 17 SITE PLAN REVIEW

ARTICLE 17 SITE PLAN REVIEW ARTICLE 17 SITE PLAN REVIEW 17.01 INTENT AND PURPOSE The intent of this section is to provide for consultation and cooperation between the applicant and the township planning commission so that the applicant

More information

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1150 OF PUTNAM COUNTY, WEST VIRGINIA Page 95 ARTICLE 1150 SITE PLAN REVIEW

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1150 OF PUTNAM COUNTY, WEST VIRGINIA Page 95 ARTICLE 1150 SITE PLAN REVIEW OF PUTNAM COUNTY, WEST VIRGINIA Page 95 1150.01 PURPOSE 1150.02 APPLICABILITY 1150.03 APPLICATION PROCESS 1150.04 REVIEW PROCESS 1150.05 REVIEW CRITERIA 1150.06 SITE PLAN GUIDELINES 1150.01 PURPOSE ARTICLE

More information

CITY OF PLACERVILLE PLANNING COMMISSION STAFF REPORT

CITY OF PLACERVILLE PLANNING COMMISSION STAFF REPORT CITY OF PLACERVILLE PLANNING COMMISSION STAFF REPORT ITEM 4.1 APPLICATION Special Temporary Use Permit (TUP) 17-04 PUBLIC HEARING DATE December 19, 2017 SUMMARY OF REQUEST Applicant seeks approval from

More information

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G. 1 STAFF REPORT August 4, Staff Contact: Tricia Shortridge (707)

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G. 1 STAFF REPORT August 4, Staff Contact: Tricia Shortridge (707) CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G. 1 STAFF REPORT August 4, 2009 Staff Contact: Tricia Shortridge (707) 449-5140 TITLE: REQUEST: LONGS / CVS DRIVE-THRU PHARMACY & REMODEL TIME EXTENSION

More information

4 January 11, 2012 Public Hearing APPLICANT:

4 January 11, 2012 Public Hearing APPLICANT: . 4 January 11, 2012 Public Hearing APPLICANT: MID-ATLANTIC AUTO PROPERTY OWNER: DZR, LLC STAFF PLANNER: Leslie Bonilla REQUEST: Conditional Use Permit (truck rental, automobile service, and automotive/bulk

More information

D1 September 11, 2013 Public Hearing APPLICANT:

D1 September 11, 2013 Public Hearing APPLICANT: D1 September 11, 2013 Public Hearing APPLICANT: BEACH MUNICIPAL FEDERAL CREDIT UNION PROPERTY OWNER: SISTERS II, LLC STAFF PLANNER: Karen Prochilo REQUEST: Conditional Change of Zoning (AG-2 Agriculture

More information

Planning Commission Staff Report June 5, 2008

Planning Commission Staff Report June 5, 2008 Owner/Applicant Taylor Village Sacramento Investments Partners, LP c/o Kim Whitney 1792 Tribute Road #270 Sacramento, CA 95815 Staff Recommendation Planning Commission Staff Report Project: File: Request:

More information

Planning and Design Commission Report

Planning and Design Commission Report Planning and Design Commission Report 915 I Street, 1 st Floor Sacramento, CA 95814 www.cityofsacramento.org File ID: 2018-01388 October 11, 2018 Public Hearing Item 04 Title: ParkeBridge Lot K (P18-017)

More information

5.1.1 The streetscape along US Highway 64 (Brevard Road); and, The built environment within new residential developments; and,

5.1.1 The streetscape along US Highway 64 (Brevard Road); and, The built environment within new residential developments; and, Article 5. Landscaping 5.1 Purpose The Town of Laurel Park s landscape standards are designed to create a beautiful, aesthetically pleasing built environment that will complement and enhance community

More information

Staff Report CONDITIONAL USE

Staff Report CONDITIONAL USE Staff Report PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT To: From: Salt Lake City Planning Commission Daniel Echeverria, (801) 535-7165, daniel.echeverria@slcgov.com Date: May 21, 2015 Re: PLNPCM2015-00139

More information

Planning Commission Staff Report February 19, 2009

Planning Commission Staff Report February 19, 2009 Planning Commission Staff Report February 19, 2009 Project: Warda Warehouse File: EG-08-051 Request: Design Review Location: 9260 Bendel Place APNs: 134-0660-004 Planner: Gerald Park Property Owner/Applicant

More information

STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT

STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT DATE: April 29, 2013 STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT 1100 Patricia Boulevard, Prince George, B.C., V2L 3V9 TO: FROM: SUBJECT: MAYOR AND COUNCIL JESSE DILL, PLANNER Development Variance

More information

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN) Central Permit Center 555 Santa Clara Street Vallejo CA 94590 Business License Building Fire Prevention Planning Public Works 707.648.4310 707.648.4374 707.648.4565 707.648.4326 707.651.7151 PLANNED DEVELOPMENT

More information

PLANNING APPROVAL & PLANNED UNIT DEVELOPMENT Date: November 2, 2017

PLANNING APPROVAL & PLANNED UNIT DEVELOPMENT Date: November 2, 2017 PLANNING APPROVAL & PLANNED UNIT DEVELOPMENT Date: November 2, 2017 DEVELOPMENT NAME LOCATION Mobile Christian School 5900 Cottage Hill Road (North side of Cottage Hill Road, 230 ± West of Freemont Drive

More information

Planning and Design Commission Report 915 I Street, 1 st Floor Sacramento, CA

Planning and Design Commission Report 915 I Street, 1 st Floor Sacramento, CA Planning and Design Commission Report 915 I Street, 1 st Floor Sacramento, CA 95814 www.cityofsacramento.org File ID: 2017-01296 October 26, 2017 Public Hearing Item 04 Title: 65 th Street Apartments (DR17-220)

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: March 15, 2012

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: March 15, 2012 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: March 15, 2012 DEVELOPMENT NAME SUBDIVISION NAME LOCATION OSR Subdivision OSR Subdivision 5559 Old Shell Road (South side of Old Shell Road, 570

More information

Chapter Master Planned Communities (MPC) District

Chapter Master Planned Communities (MPC) District Sections 14.53.010 Purpose and Intent 14.53.020 Applicability 14.53.030 Procedure 14.53.040 MPC Standards 14.53.050 Required Findings 14.53.010 Purpose and Intent Chapter 14.53 Master Planned Communities

More information

Planning Commission Staff Report March 15, 2007

Planning Commission Staff Report March 15, 2007 Planning Commission Staff Report Project: Request: Madeira East Tentative Subdivision Map, Design Review for Subdivision Layout & Abandonment of Easements Location: Phase IV of the Laguna Ridge Specific

More information

Application for Site Plan Review

Application for Site Plan Review Application for Site Plan Review City of Pontiac Office of Land Use and Strategic Planning 47450 Woodward Ave, Pontiac, MI 48342 T: 248.758.2800 F: 248.758.2827 Property/Project Address: Sidwell Number:

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 12-10-15 Leisure World Clubhouse II Addition Fitness Center, Limited Site Plan Amendment

More information

SPECIFIC PLAN Requirements

SPECIFIC PLAN Requirements CITY OF LANCASTER PLANNING DEPARTMENT 44933 Fern Avenue, Lancaster, California 93534 (661) 723-6100 SPECIFIC PLAN Requirements Purpose The purpose of a specific plan is to provide for the logical development

More information

CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL

CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL The following is a list of conditions requiring completion to the City s Satisfaction prior to Site Plan Approval being granted

More information

Staff Report. Conditional Use PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT. Salt Lake City Planning Commission

Staff Report. Conditional Use PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT. Salt Lake City Planning Commission Staff Report PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT To: From: Salt Lake City Planning Commission Maryann Pickering, Principal Planner (801) 535-7660 Date: December 10, 2014 Re: Church of Scientology

More information

P: Site Plan Approval

P: Site Plan Approval STAFF REPORT 2016-39P: Site Plan Approval Community Development Department Council Chambers, 7:30 PM, January 5, 2017 To: From: Re: Paul Luke, Plan Commission Chairperson Steve Marciani, AICP, Planning

More information

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST Applications: 5 copies of application - Applicant will reproduce the copies at his/her costs. The Township Clerk

More information

F. Driveways. Driveways which provide access to off-street parking or loading from public streets shall comply with the following:

F. Driveways. Driveways which provide access to off-street parking or loading from public streets shall comply with the following: Section 20.945.040 General Design Standards for Surface Parking Areas. A. Review Authority. Parking lot design and drainage shall be subject to review and approval of the City Transportation Manager. B.

More information

Urban Planning and Land Use

Urban Planning and Land Use Urban Planning and Land Use 701 North 7 th Street, Room 423 Phone: (913) 573-5750 Kansas City, Kansas 66101 Fax: (913) 573-5796 Email: planninginfo@wycokck.org www.wycokck.org/planning To: From: City Planning

More information

Request Conditional Rezoning (R-15 Residential to Conditional A-24 Apartment) Staff Recommendation Approval. Staff Planner Jimmy McNamara

Request Conditional Rezoning (R-15 Residential to Conditional A-24 Apartment) Staff Recommendation Approval. Staff Planner Jimmy McNamara Applicant Franklin Johnston Group Management & Development, LLC Property Owner Virginia Wesleyan College Public Hearing July 12, 2017 City Council Election District Bayside Agenda Item 3 Request Conditional

More information

Project phasing plan (if applicable) 12 copies of site plan

Project phasing plan (if applicable) 12 copies of site plan SITE PLAN REVIEW PERMIT APPLICATION City of Grand Haven, 11 N. Sixth Street, Grand Haven, MI 49417 Phone: (616) 847-3490 Fax: (616) 844-2051 Website: www.grandhaven.org 1. Project Information Address/location

More information

ARTICLE VI: SITE PLAN REVIEW

ARTICLE VI: SITE PLAN REVIEW Section 6.01 - Site Plan Review (All Districts) ARTICLE VI: SITE PLAN REVIEW Site plans give the Planning commission an opportunity to review development proposals in a concise and consistent manner. The

More information

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH 12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH STAFF PLANNER: Faith Christie REQUEST: Conditional Change of Zoning (from PD-H1 Planned

More information

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES The following 2019 information is based on the information available to staff at the time of creation. Dates & time may change

More information

REVISED AGENDA MATERIAL

REVISED AGENDA MATERIAL [First Last name] Councilmember District [District No.] REVISED AGENDA MATERIAL Meeting Date: March 15, 2015 Item Number: 7 Item Description: Adopt a First Reading of an Ordinance Revising BMC 14.48.200

More information

PLANNING APPROVAL & PLANNED UNIT DEVELOPMENT Date: April 6, 2017

PLANNING APPROVAL & PLANNED UNIT DEVELOPMENT Date: April 6, 2017 PLANNING APPROVAL & PLANNED UNIT DEVELOPMENT Date: April 6, 2017 DEVELOPMENT NAME LOCATION Mobile Christian School 5900 Cottage Hill Road (North side of Cottage Hill Road, 230 ± West of Freemont Drive

More information

PLANNING APPROVAL & SIDEWALK WAIVER STAFF REPORT Date: December 1, 2016

PLANNING APPROVAL & SIDEWALK WAIVER STAFF REPORT Date: December 1, 2016 PLANNING APPROVAL & SIDEWALK WAIVER STAFF REPORT Date: December 1, 2016 NAME Dennis P. Wilkins LOCATION. CITY COUNCIL DISTRICT District 6 7078 Bruns Drive (Northeast corner of Bruns Drive and Cody Road)

More information

CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT DESIGN REVIEW BOARD IBOARD OF ADJUSTMENT Coast Highway APN

CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT DESIGN REVIEW BOARD IBOARD OF ADJUSTMENT Coast Highway APN CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT HEARING DATE: October 13,2011 TO: DESIGN REVIEW BOARD IBOARD OF ADJUSTMENT CASE: Variance 7717 Design Review 11-163 Coastal Development

More information

PLANNING REPORT CITY OF EAGAN. APPLICANT: Cedar Grove Hospitality, LLC HEARING DATE: December 18, 2014

PLANNING REPORT CITY OF EAGAN. APPLICANT: Cedar Grove Hospitality, LLC HEARING DATE: December 18, 2014 PLANNING REPORT CITY OF EAGAN REPORT DATE: December 8, 2014 CASE: 19-PA-11-11-14 APPLICANT: Cedar Grove Hospitality, LLC HEARING DATE: PROPERTY OWNER: The Flats at Cedar APPLICATION DATE: Nov. 21, 2014

More information

Town of Windham. Planning Department 8 School Road Windham, ME voice fax

Town of Windham. Planning Department 8 School Road Windham, ME voice fax Town of Windham Planning Department 8 School Road Windham, ME 04062 voice 207.864-5960 fax 207.892.1916 MEMO DATE: TO: Staff Review Committee FROM: Amanda Lessard, Planner Cc: Ellen Rathbone, St. Germain

More information

CHAPTER SPECIAL PURPOSE AND OVERLAY ZONING DISTRICTS

CHAPTER SPECIAL PURPOSE AND OVERLAY ZONING DISTRICTS Special Purpose and Overlay Zoning Districts 106.28.010 CHAPTER 106.28 - SPECIAL PURPOSE AND OVERLAY ZONING DISTRICTS SPECIAL PURPOSE AND OVERLAY ZONING DISTRICTS Sections: 106.28.010 - Purpose 106.28.020

More information

Asbury Chapel Subdivision Sketch Plan

Asbury Chapel Subdivision Sketch Plan Asbury Chapel Subdivision Sketch Plan PART 1: PROJECT SUMMARY Applicant: NVR Inc. Project Size: +/- 76.13 acres Parcel Numbers: 02101112,02116101,02116112, 02116113 Current Zoning: Transitional Residential

More information

Glenborough at Easton Land Use Master Plan

Glenborough at Easton Land Use Master Plan Implementation 114 9.0 IMPLEMENTATION 9.1 OVERVIEW This chapter summarizes the administrative procedures necessary to implement the proposed land use plan, infrastructure improvements, development standards,

More information

DRAFT DESIGN GUIDELINES

DRAFT DESIGN GUIDELINES IHZ Booklet #7 May 6, 2010 DRAFT DESIGN GUIDELINES CANTERBURY 7 Overview During the recent planning process for the Plan of Conservation and Development community character was identified as an important

More information

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST City of Seminole 9199 113 th Street N. Seminole, FL 33772 Ph: (727) 392-1966 Fx: (727) 319-6583 SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST Note: This checklist is designed to aid designers in the review

More information

Request Conditional Use Permit (Car Wash Facility) Staff Recommendation Approval. Staff Planner Jonathan Sanders

Request Conditional Use Permit (Car Wash Facility) Staff Recommendation Approval. Staff Planner Jonathan Sanders Applicant Property Owner SunTrust Bank Public Hearing October 10, 2018 City Council Election District Princess Anne Agenda Item 2 Request Conditional Use Permit (Car Wash Facility) Staff Recommendation

More information

LANDSCAPE AND IRRIGATION PLAN PREPARATION GUIDELINES

LANDSCAPE AND IRRIGATION PLAN PREPARATION GUIDELINES LANDSCAPE AND IRRIGATION PLAN PREPARATION GUIDELINES The Parks Planning and Development Division of the City of Modesto s Parks, Recreation and Neighborhoods Department is responsible for the task of reviewing

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: DECEMBER 16, 2015 TO: THRU: FROM: SUBJECT: Chair McCormick and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Kelly Christensen

More information

Prepared by: Casey Kempenaar, Senior Planner

Prepared by: Casey Kempenaar, Senior Planner CITY OF CITRUS HEIGHTS PLANNING DIVISION STAFF REPORT PLANNING COMMISSION MEETING September 13, 2017 Prepared by: Casey Kempenaar, Senior Planner REQUEST The applicant requests a Design Review Permit Modification

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 & PUD-0000102-2017 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 NAME SUBDIVISION NAME Dauphin Creek Estates Subdivision Dauphin Creek Estates Subdivision LOCATION CITY COUNCIL

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of April 23, 2019 DATE: April 12, 2019 SUBJECT: SP #413 SITE PLAN AMENDMENT to permit a fixed bar in a private outdoor café space with associated

More information

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015 CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY Adopted by the Carver County Board of Commissioners March 3, 2015 Policy Statement Goals It is the goal of Carver County Public Works to provide

More information

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016 # 9 ZON2016-01032 PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016 DEVELOPMENT NAME JJT Properties LLC LOCATION 1147 & 1151 East I-65 Service Road South and 1180 Sledge Drive (Southeast corner

More information

Landscape and fencing requirements of this Chapter shall apply to all new landscaped areas.

Landscape and fencing requirements of this Chapter shall apply to all new landscaped areas. Chapter 19.06. Landscaping and Fencing. Sections: 19.06.01. Purpose. 19.06.02. Required Landscaping Improvements. 19.06.03. General Provisions. 19.06.04. Landscaping Plan. 19.06.05. Completion of Landscape

More information

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208)

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208) MEMORANDUM Archuleta County Development Services Planning Department 1122 HWY 84 P. O. Box 1507 Pagosa Springs, Colorado 81147 970-264-1390 Fax 970-264-3338 TO: Archuleta County Planning Commission FROM:

More information

6 July 9, 2014 Public Hearing

6 July 9, 2014 Public Hearing 6 July 9, 2014 Public Hearing APPLICANT: CAMERON JUSTIN MUNDEN PROPERTY OWNER: GRANTED WISH, L.L.C. STAFF PLANNER: Kevin Kemp REQUEST: Conditional Use Permit (Bulk Storage Yard) ADDRESS / DESCRIPTION:

More information

July 6 th, Re: The Sugarmont Apartments Planned Development. Dear John,

July 6 th, Re: The Sugarmont Apartments Planned Development. Dear John, July 6 th, 2016 Planning Division Community And Economic Development Salt Lake City Corporation c/o John Anderson 451 South State Street, Room 215 Salt Lake City, Utah 84114 Re: The Sugarmont Apartments

More information

PARKLET PROPOSAL PACKAGE & PROCESS

PARKLET PROPOSAL PACKAGE & PROCESS 500.3 I PARKLETS The term parklet refers to a small temporary constructed seating or community gathering area over an on-street parking space or an extension of the sidewalk into the operating State highway

More information

Landscaping Standards

Landscaping Standards CHAPTER 29 ARTICLE 403 29.403 Landscaping Standards Purpose: The purpose of this section is to protect and promote the public health, safety and general welfare by requiring landscaping in relation to

More information

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 2632 EAST WASHINGTON BOULEVARD ('ST. LUKE MEDICAL CENTER')

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 2632 EAST WASHINGTON BOULEVARD ('ST. LUKE MEDICAL CENTER') TO: FROM: Honorable Mayor and City Council Planning & Community Development Department SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 2632 EAST WASHINGTON BOULEVARD ('ST. LUKE MEDICAL CENTER')

More information

CITY OF MANHATTAN BEACH DEPARTMENT OF COMMUNITY DEVELOPMENT. TO: Parking and Public Improvements Commission

CITY OF MANHATTAN BEACH DEPARTMENT OF COMMUNITY DEVELOPMENT. TO: Parking and Public Improvements Commission Clay Curtin, Management Analyst (I the same walls at a maximum of 1 foot tall. Section 7.36.150 of the Municipal Code permits BY: Eric Haaland, Associate Planner right-of-way) between walkways leading

More information

Design Review Commission Report

Design Review Commission Report City of Beverly Hills Planning Division 455 N. Rexford Drive Beverly Hills, CA 90210 TEL. (310) 285-1141 FAX. (310) 858-5966 Design Review Commission Report Meeting Date: Thursday, March 2, 2017 Subject:

More information

Design Review Application *Please call prior to submittal meeting to determine applicable fees*

Design Review Application *Please call prior to submittal meeting to determine applicable fees* CITY OF EAGLE 660 E. Civic Lane, Eagle, ID 83616 Phone#: (208) 939-0227 Fax: (208) 938-3854 Design Review Application *Please call prior to submittal meeting to determine applicable fees* FILE NO.: CROSS

More information

2 August 14, 2013 Public Hearing APPLICANT: CRESCENT COMMUNITY CENTER CORP. PROPERTY OWNER: S. L. ETHERIDGE, LLC

2 August 14, 2013 Public Hearing APPLICANT: CRESCENT COMMUNITY CENTER CORP. PROPERTY OWNER: S. L. ETHERIDGE, LLC 2 August 14, 2013 Public Hearing APPLICANT: CRESCENT COMMUNITY CENTER CORP. PROPERTY OWNER: S. L. ETHERIDGE, LLC REQUEST: Conditional Use Permit (religious use) STAFF PLANNER: Karen Prochilo ADDRESS /

More information

CITY PLANNING COMMISSION AGENDA. ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK

CITY PLANNING COMMISSION AGENDA. ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK Page 34 CITY PLANNING COMMISSION AGENDA ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK FILE NOS: CPC ZC 12-00035 QUASI-JUDICIAL CPC NV 12-00036 QUASI-JUDICIAL AR DP 12-00039 QUASI-JUDICIAL PROJECT: APPLICANT: OWNER:

More information

8 October 14, 2015 Public Hearing

8 October 14, 2015 Public Hearing 8 October 14, 2015 Public Hearing APPLICANT & PROPERTY OWNER: PRICE S HOLDINGS, LLC STAFF PLANNER: Karen Lasley REQUEST: A. Conditional Use Permit (Automobile Repair Garage) B. Change in Nonconforming

More information

11 March 9, 2011 Public Hearing APPLICANT: BUDDHIST EDUCATION CENTER OF AMERICA DONG HUNG TEMPLE, INC. PROPERTY OWNER: MOY FAMILY, LLC

11 March 9, 2011 Public Hearing APPLICANT: BUDDHIST EDUCATION CENTER OF AMERICA DONG HUNG TEMPLE, INC. PROPERTY OWNER: MOY FAMILY, LLC 11 March 9, 2011 Public Hearing APPLICANT: BUDDHIST EDUCATION CENTER OF AMERICA DONG HUNG TEMPLE, INC. PROPERTY OWNER: MOY FAMILY, LLC REQUEST: Conditional Use Permit for Religious use STAFF PLANNER: Karen

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 3.10.2016 Site Plan 820160040 Nora School Parker Smith, Planning Technician, Area 1,

More information

SOUTH MAIN RIVER COMMUNITY REINVESTMENT PROJECT AREA PLAN DATED AUGUST 31, 2018

SOUTH MAIN RIVER COMMUNITY REINVESTMENT PROJECT AREA PLAN DATED AUGUST 31, 2018 SOUTH MAIN RIVER COMMUNITY REINVESTMENT PROJECT AREA PLAN DATED AUGUST 31, 2018 Redevelopment Agency of the City of Logan, Utah South Main River Community Reinvestment Project Area - 1 - INTRODUCTION 1.

More information

CITY OF SAN MATEO ORDINANCE NO

CITY OF SAN MATEO ORDINANCE NO CITY OF SAN MATEO ORDINANCE NO. 2012-4 AMENDING SECTION 27.38.090, OPEN SPACE REQUIREMENTS, OF CHAPTER 27.38, CBD DISTRICTS-CENTRAL BUSINESS DISTRICT, SECTION 27.64.023, PARKING PROHIBITED ON LAWNS, FLOWERS,

More information

Construction and Landscaping on Public Property

Construction and Landscaping on Public Property Construction and Landscaping on Public Property City of Manhattan Beach Community Development Department 1400 Highland Avenue 310-802-5504 www.citymb.info January, 2004 Construction and Landscaping on

More information

FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist

FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist Applicant s Name: Project Address: Phone: Email: Applicant shall fill out the design guidelines checklist for all guidelines applicable

More information

PLANNED UNIT DEVELOPMENT Date: April 5, 2018

PLANNED UNIT DEVELOPMENT Date: April 5, 2018 PLANNED UNIT DEVELOPMENT Date: April 5, 2018 DEVELOPMENT NAME SUBDIVISION NAME LOCATION Robert Myers Robert Myers 2955 and 2989 Dauphin Street (Southeast corner of Dauphin Street and Sage Avenue) CITY

More information

CITY OF SANTA ROSA PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT STAFF REPORT FOR PLANNING COMMISSION JUNE 23, 2016 APPLICANT. Joseph Rubin MJP15-005

CITY OF SANTA ROSA PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT STAFF REPORT FOR PLANNING COMMISSION JUNE 23, 2016 APPLICANT. Joseph Rubin MJP15-005 Item No. 9 CITY OF SANTA ROSA PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT STAFF REPORT FOR PLANNING COMMISSION JUNE 23, 2016 PROJECT TITLE ADDRESS/LOCATION 3785 Cleveland Avenue ASSESSOR S PARCEL NUMBER

More information

Applicant Name Phone / Fax / Address City State Zip Code . Property Owner Phone / Fax / Address City State Zip Code

Applicant Name Phone / Fax / Address City State Zip Code  . Property Owner Phone / Fax / Address City State Zip Code Master Development Plan Application Community Development Department City of Redmond 411 SW 9 th Street Redmond, Oregon 97756 541-923-7721 541-548-0706 FAX Master Development Plan Fee $38,862.52 File Number

More information

CITY OF ZEELAND PLANNING COMMISSION

CITY OF ZEELAND PLANNING COMMISSION APPLICATION FOR SITE PLAN REVIEW AND SPECIAL LAND USE Date City Official App. Filing Fee Rec'd ($350) NOTE TO APPLICANT: Please submit this application for Site Plan Review along with twenty (20) copies

More information

2 January 14, 2015 Public Hearing

2 January 14, 2015 Public Hearing 2 January 14, 2015 Public Hearing APPLICANT & PROPERTY OWNER: PEMBROKE SQUARE ASSOCIATES, LLC STAFF PLANNER: Kevin Kemp REQUEST: Conditional Use Permit (Indoor Commercial Recreation Facility) ADDRESS /

More information

TOP TEN LIST OF COMMUNITY CONCERNS REGARDING PROPOSED AMENDMENTS TO CHAPTER 42

TOP TEN LIST OF COMMUNITY CONCERNS REGARDING PROPOSED AMENDMENTS TO CHAPTER 42 TOP TEN LIST OF COMMUNITY CONCERNS REGARDING PROPOSED AMENDMENTS TO CHAPTER 42 1. Extend the urban area to Beltway 8 in stages, over say a three-year period, prioritizing development in transit and declining

More information

Request Conditional Use Permit (Automobile Service Station) Staff Recommendation Approval. Staff Planner Bill Landfair

Request Conditional Use Permit (Automobile Service Station) Staff Recommendation Approval. Staff Planner Bill Landfair Applicant Property Owner RTR Real Estate Associates, Tidewater Investments, LLC, Bruce Ranomski Public Hearing December 12, 2018 City Council Election District Centerville Agenda Item 7 Request Conditional

More information

KEIZER STATION PLAN INTRODUCTION

KEIZER STATION PLAN INTRODUCTION KEIZER STATION PLAN INTRODUCTION Planning for this area began in 1987 when the Keizer Comprehensive Plan established the Chemawa Activity Center and McNary Activity Center. The first Chemawa Activity Center

More information

Incentive Zoning Regulations Florida Municipal City of Orlando

Incentive Zoning Regulations Florida Municipal City of Orlando Topic: Resource Type: State: Jurisdiction Type: Municipality: Year (adopted, written, etc.): 2002 Community Type applicable to: Title: Incentive Zoning Regulations Florida Municipal City of Orlando Document

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 06-12-14 King of the Nations Christian Fellowship Church: Limited Site Plan Amendment

More information

CHAPTER 20: INSTITUTIONAL USE DEVELOPMENT STANDARDS

CHAPTER 20: INSTITUTIONAL USE DEVELOPMENT STANDARDS CHAPTER 20: INSTITUTIONAL USE DEVELOPMENT STANDARDS ARTICLE 1: GENERAL INSTITUTIONAL USE STANDARDS 320-01. Application The provisions of this Chapter shall apply to the following uses in any zone: (e)

More information

RECOMMENDATION REPORT

RECOMMENDATION REPORT DEPARTMENT OF CITY PLANNING RECOMMENDATION REPORT City Planning Commission Case No.: CPC-2012-1165-GPA-ZC Date: August 9, 2012 Time: After 8:30 AM Place: City Hall, Room 350 Public Hearing: Required CEQA

More information

REPORT TO COUNCIL City of Sacramento

REPORT TO COUNCIL City of Sacramento Honorable Mayor and Members of the City Council REPORT TO COUNCIL City of Sacramento 915 I ' Street, Sacramento, CA 95814-2604 www. CityofSacramento.org Consent April 1, 2010 Title: Initiation of the Establishment

More information

12 February 9, 2011 Public Hearing APPLICANT: WILDLIFE RESPONSE, INC.

12 February 9, 2011 Public Hearing APPLICANT: WILDLIFE RESPONSE, INC. 12 February 9, 2011 Public Hearing APPLICANT: WILDLIFE RESPONSE, INC. PROPERTY OWNER: CITY OF VIRGINIA BEACH REQUEST: Conditional Use Permit (Wildlife Rehabilitation Center) STAFF PLANNER: Karen Prochilo

More information

2 January 9, 2013 Public Hearing APPLICANT: BURNETTE DEVELOPMENT, LLC

2 January 9, 2013 Public Hearing APPLICANT: BURNETTE DEVELOPMENT, LLC 2 January 9, 2013 Public Hearing APPLICANT: BURNETTE DEVELOPMENT, LLC PROPERTY OWNER: PARETTA D MUDD REQUEST: Conditional Use Permit (Mini-Warehouse / Self-Storage Facility) STAFF PLANNER: Faith Christie

More information

EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS

EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS Name of Project: Poulsbo Meadows; A Planned Residential Development (PRD)/Plat Applicants Name: PBH Group LLC/Byron Harris PO Box 1010 Silverdale, WA 98038 Description

More information

City of Moline Sidewalk Café Guidelines

City of Moline Sidewalk Café Guidelines City of Moline Sidewalk Café Guidelines Table of Contents Private & Public Guide Outlines 2 Authority 3 Definition 3 Purpose 4 Sidewalk Café Elements 5 Chapter 1: Barriers 1.1 Barriers Required 6 1.2 Barrier

More information

THEMES, VISION, + PRINCIPLES

THEMES, VISION, + PRINCIPLES CHAPTER 2: THEMES, VISION, + PRINCIPLES This page intentionally left blank. 20 VISION DRAFT AUGUST 2018 2 2 THEMES, VISION, + GUIDING PRINCIPLES The Key Themes, Vision, and Guiding Principles presented

More information

Public Hearing, July 12, 2018

Public Hearing, July 12, 2018 Draft Lighting Ordinance Public Hearing, July 12, 2018 Planning and Development Services staff has developed a draft lighting ordinance for Winston-Salem and Forsyth County at the direction of the City-County

More information

I. Introduction. Prior Approvals

I. Introduction. Prior Approvals Statement of Justification First National Bank 19790 Crystal Rock Drive, Germantown, Maryland Application for Site Plan and Limited Preliminary Plan Amendment I. Introduction DPH Architecture, for First

More information

Venice Pumping Plant Dual Force Main Project Draft EIR

Venice Pumping Plant Dual Force Main Project Draft EIR City of Los Angeles 5.9 LAND USE PLANS 5.9.1 Environmental Setting Venice Pumping Plant Dual Force Main Project Draft EIR The Project lies within the bounds of Los Angeles County and the City of Los Angeles.

More information

R E S O L U T I O N. 2. Development Data Summary:

R E S O L U T I O N. 2. Development Data Summary: R E S O L U T I O N WHEREAS, the Prince George s County Planning Board has reviewed Departure from Design Standards DDS-631 requesting a departure to allow the loading space and the driveway to the loading

More information

Site Development Plan (SDP) Checklist

Site Development Plan (SDP) Checklist Development Services Department 100 N. Wilcox Street, Castle Rock CO 80104 303-660-1393 or CRGov.com Site Development Plan (SDP) Checklist A complete Site Development Plan (SDP) submittal will contain

More information

CITY OF PERRIS COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION FINAL CONDITIONS OF APPROVAL CITY COUNCIL

CITY OF PERRIS COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION FINAL CONDITIONS OF APPROVAL CITY COUNCIL CITY OF PERRIS COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION FINAL CONDITIONS OF APPROVAL CITY COUNCIL TENTATIVE PARCEL MAP 34199 (05 0378), DEVELOPMENT PLAN REVIEW 05 0379, March 14, 2006 PROJECT: