1 CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT HEARING DATE: August 12,2010 TO: BOARD OF ADJUSTMENT/DESIGN REVIEW BOARD CASE: Design Review Coastal Development Permit APPLICANT: LOCATION: ENVIRONMENTAL STATUS: PREPARED BY: Mojgan Momenan, Danielian Associates 29 Shreve Drive APN # Pursuant to the California Environmental Quality Act (CEQA) guidelines, the project is categorically exempt under Section 15303, Class 3(a) (New Construction) that allows construction of one single-family residence in a residential zone. Belinda Ann Riva, Planning Technician REQUESTED ACTION: The applicant requests design review and a coastal development permit for a new 7,748 square-foot single-family residence, 268 square feet of storage/mechanical area and 756 square feet of attached garage area in the Laguna Colony Treasure Island Specific Plan Area. Design review is required for the new structure, excess covered parking, grading, pool and spa, water feature, air conditioning units, landscaping and development in an environmentally sensitive area due to oceanfront proximity and water quality. BACKGROUND: The Design Review Board heard the proposed project on July 22,2010 and continued the project so the applicant could address the Board's concerns regarding basement level ceiling height, rear setback, mature height of landscaping, amount of impervious surfaces and number of exterior lights. RESPONSE: Ceiling heights in the lower level have been reduced to 9 feet in the basement area toward the front of the property. The remaining areas in the lower level have ceiling heights reduced to 9'-6" except in the areas toward the rear of the property where 11'-5" ceiling coffer heights are maintained in between mechanical duct routing. With lowered ceiling heights, the amount of grading inside of the structural footprint has been reduced from 2,820 to 2,710 cubic yards of net export. In reference to the setback from the park area at the rear of the structure, the applicant clarifies that the proposed rear setback is compatible with neighborhood development in relationship to other homes along Shreve Drive.

2 DR 1O-108/CDP e August 12,2010 Page 2 of2 The exterior lighting plan has been modified to remove all uplights on the main level with uplights to remain on the basement level. The applicant proposes to provide directional downlighting with a moonlighting effect to create a softer, diffused and natural effect. All lighting has been reduced to a 20 watt maximum. The landscaping plan has been modified to include planting replacements. Kentia palms will remain in the basement area, the building entry and the left corner of the front yard. The Carrotwood tree planted at the basement level shall be maintained not to exceed the roof height. The applicant has reduced the amount of impervious surfaces from 70.3 percent to 60.5 percent by removing hardscape areas in both side yards and basement patio areas. STAFF ANALYSIS: The applicant has modified the plans to address the Board's previous concerns. Please refer to the attached letter from the applicant summarizing the proposed changes. IDENTIFIED ISSUES: Basement level ceiling height, rear setback, mature height of landscaping, amount of impervious surfaces and number of exterior lights. COMMUNITY INTEREST: There have been no letters or telephone calls received by the City as of the date ofthis report. ATTACHMENTS: 1. Letter from Applicant 2. Minutes and Staff Report July 22, 2010 Meeting 3. Pre-Application Site Meeting Evaluation 4. Color and Materials Sample Board

3 DANIEUAN ASSOCIATES ARCHITECTURE + PLANNING SIXTY CORPORATE PARK IRVINE, CA 9 RECElv~!:n 06 P F ~~ COM }.,,,i!<, DATE: JULY 28,2010 TO: FROM: RE: JUL DESIGN REVIEW RESPONSES'N'NGDIVIS'ON CITY OF LAGUNA BEACH, CA.~... MEMB.ERS.OETHE.DESIGNREV~EWBOARD AND'PLANNINGSTAFF=CITY~OFtAGUNA BEACH,CA BRIAN D. MILLER, AlA, LEED AP - DANIELIAN ASSOCIATES DESCRIPTION OF REVISIOSN AND RESPONSES TO ORB COMMENTS FROM MEETING ON 7/22/2010 FOR 29 SHREVE DRIVE Dear Members of the Board, We respectfully submit the following description of revisions and responses to the comments made at the initial Design Review Board review of 29 Shreve Drive, Laguna Beach, CA. Landscape Comments: We have revised the landscapeplartsfor29shreve Drive in tnemontage (The Breeze Residence) to accommodate the comments made by the Board members at the ORB meeting on July 22, Due to the short time fuse for resubmittall contacted Michael Wilkes to clarify some ofthe issues which he was very helpful in doing. The following revisions have been made to the plans in response to the ORB comments: 1. All Kentia Palms have been removed from both side yards as well as the rear yard (ocean side of the lot). When speaking with Michael Wilkes I asked him if it was ok to keep the Kentia Palms that we have shown in the basement area and he said this should be fine since it will take many years before they would reach roof level. I also asked him if it would be ok to leave two Kentias in the front yard ( street side) ofthe lot. One is located at the front left comer ofthe building and one in the middle ofthe building at the entry. Michael felt that both ofthese would be good locations that would not block side yard corridor views which he would like to keep more open for the neighbors view from above. The Kentias in these locations would help to shield or soften the aerial view of the building roof. All ofthe Kentias in the side and rear yards have been changed to other slower growing and dwarf Palms such as Robelini and Raphis Excelsa as well a low growing trimable small scale trees such as Citrus and Pittosporum Tobira. 2. The two Grant Bird of Paradise on the right side yard have been revised to Pittosporum Tobira which are much lower growing and maintainable. 3. The Pittosporum Tenuifolium on the right front (street side) have been revised to Camelia Sasangua, a much lower growing shrub.

4 4. The two Hollywwod Junipers at the front right and left have been revised to Pittosporum Tobira, a more maintainable lower growing shrub.,:;;~ 5. The Carrotwood tree shown on the plan is planted at the basement level (which was not clear on the original plan). This is now clearly noted and it is also noted to be maintained at 15' max above pad grade which would allow the tree to grow to 28' high and not be above the roof. This height limit is also noted on the legend sheet #4. 6. Lighting Plan: All uplights have been removed on the main pad level except for mini upjights in pots and small planters. The uplights that were kept as is at the basement level since they won't be seen by neighbors. A new design concept ~~ hasfeen~useiffonhetteesotftnem1fin padievel using a"moonlighting~~effectwith~a<iirectionai-downlight~ mounted up within the tree to cast down upon the lower landscaping instead of shining up into the tree. Diffuser attachments called "gobo" lenses can also be added to the down lights to create a softer diffused natural moonlight effect. Other uplights have been changed to low level path lighting where possible. All lights have been reduced to a minimum required for safety and low key aesthetic effect. 7. The impervious surface percentage was previously at 70.3%. We have removed some of the hardscape areas and added planting on both side yards as well as the three basement patio areas. This brought the impervious surface percentage down to 60.5%.. Hopefully these revisions meet with the Boards satisfaction. Please call me on my cell phone 949~51 0~3438 or you can reach me by at Daniel@DanieIStewart.net with any questions or concerns. Sincerely, Daniel Stewart Daniel Stewart and Associates Architectural Comments: Basement Ceiling Height The Custom Residences at the Montage is an exclusive community within the wonderful city of Laguna Beach which through its development has garnered incredible land values. These values have dictated maximizing the buildable areas of the lots to the greatest degree feasible while maintaining a balance with the design guidelines, context of the community, and privacy of the home owners and general public. In conjunction with the compressed building heights (enforced to be lower the allowable maximum heights) and the values of the this land, the home owners in the community have extended below grade to create enhanced spaces at lower levels for truly value added living spaces with strong indoor/outdoor relationships. The spaces do not reflect the typical 'basement' feel but are living spaces of significance. To this point, each of the homes within the Montage community has a basement or lower level with the sole exception of 35 Shreve Drive. In fact 7 Atelier has a 2 level basement below grade. As a point of precedent related to land value and real estate comps, the basement level as become the rule rather than the exception.

5 With regard to the 'basement', or lower level height at 29 Shreve Drive, we have raised the floor elevatig,ds slightly in concession to the comments made by the board. It should be noted that the spaces at the lower level are not designed to be secondary spaces but are designed as integral living spaces within the home. Tti~ level includes a grand family room living space programmed with functions to foster family togetherness, growth, and expression of the owner's children together with bedrooms, office space and meditation space. As such, these spaces require natural light, ventilation, and height to express the openness found there. We, as a team, have spent careful attention to the design of multiple lower level courtyards (at the expense of first floor visible living space) to act as light shafts bringing natural light, air, landscaping and water to this lower level as a means to activate the spaces to inhabitants beyond feeling as if they are in a 'basement'. With this said, we have reduced the lower level ceiling heights to the lower levels rooms as shown below: ~-.. _ _..._ ,",.,...- " ~-,",-,-- 9'-0" ceiling heights: Bedroom 5! Bath 5! Maid's rooml Mechanical rooms 9'-6" ceiling heights: Remainder of the lower level spaces with increased ceiling coffer heights (11 '-5") were allowable in between mechanical duct routing at the Family! TV room! Office and Yoga room. We feel that with the adjustments we are clearly in line with the context of other homes in this community (most with 10' to 11' ceiling heights at the lower levels) and have done our best to maintain the quality of space at this level. In conjunction with this modification to the design, there is a strategy in place by the builder (Seacrest Development, builder of 8 of the 11 built homes at the Montage community) to keep as much earth as possible on site reducing export to a minimum. Seacrest Development will be building the adjacent residence at 27 Shreve Drive concurrently. By doing so, they have the opportunity to use earth from the excavation at 29 Shreve Drive (this project) for backfill of the basement level at 27 Shreve Drive and will have additional space to stockpile earth for the backfill and final grading at lot 29 Shreve reducing export and in turn saving construction costs. Setback from Park Area at Rear ofhome This home has been designed in a manner to maximize space and indoor!outdoor relationships while maintaining privacy to the greatest extent to both the home owners and the public enjoying the public parkway along the bluff of the ocean. As such, the rear of the home is oriented toward a rear porch space that has been recessed into the home at a central location internalizing the public facing functions of the home. The Master Retreat! Living Room! Kitchen and Dining Room all focus on this space generously set back within the home. By doing so, we have created relief in the rear fa9ade and have greatly reduced the glazing directly fronting the rear and rear-side facing areas in trade-off for more angular, buffered views. This strategy is evident by the comments made by the Board in appreciation of the restraint in the extent of glazing on the most rear facing facades. 40% of the linear pace adjacent to the rear setback is open court space within the envelope of the home. The situation of this lot with respect to the open parkway is also at the point where the distance to the walk path is most generous. It is our feeling that we have made a successful effort to reduce the impact of this development to the public open space to a level commensurate, if not beyond, the other homes fronting the parkway, all of which push up to (and beyond with allowed projections) the rear setback line as a means to maximize utility of the lot and find a balance in the investment in the land and the privacy of both the individual land owners and the general public.

6 Please also find attached exhibits further clarifying the conditions of the other previously approved lots fljong this ledge (our existing context). The areas portrayed in pink are living spaces with solid covered roof GQvering while those in yellow are buffer spaces open to the sky. Again, you will find that the homes to both sidescof 29 Shreve have pushed up to the setback at the corners adjacent to our lot setting a perceived datum line;ibat we will meet and then pull back from in the center. This strategy of relief in the middle of the rear fa~ade with the corners pulled forward, allowing better privacy from neighboring lots, is typical to all of the lots along the parkway with the exception of 33 Shreve which hugs the setback line to the entire extent of the rear fa~ade. In summary, the entire team involved in the development of this home would like to thank you for your time in reviewing-the submitted revisions and-re!fp6nses~-29 ShreveWillbethe-4 Itl lionfewitfliri1flemonfage-- community that we will be Architect of Record and we look forward to its successful completion in a manner that all involved can be proud of. If you should have any questions, concerns, or comments prior to the subsequent DRB meeting scheduled for August 12, please feel free to contact any of us at the phone or address included below. Sincerely, Brian D. Miller, AlA, LEED AP Principal Danielian Associates Brian D. Miller, AlA, LEED AP Principal Danielian Associates IArchitecture + Planning I 60 Corporate Park Irvine, CA P x124 F ,1422 bmiller@danielian.com Project Manager Danie/ian Associates IArchitecture + Planning I 60 Corporate Park Irvine, CA P x188 F mmomenan@danielian.com Landscape Architecture 2753 Camino Capistrano # B2 San Clemente, CA P (949) F(949) daniel@danie/stewart.net Mojgan Momenan Daniel Stewart, ASLA President Daniel Stewart &Associates

7 "«e """I!~AH~ ~~~ ~EA~~~~ i LOT 4 29 SHREVE OR I LAGUNA BEACH, CALIFORNIA.,"""rJ:

8 CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT HEARING DATE: TO: CASE: APPLICANT: LOCATION: ENVIRONMENTAL STATUS: PREPARED BY: July 22, 2010 BOARD OF ADJUSTMENTIDESIGN REVIEW BOARD Design Review Coastal Development Permit Mojgan Momenan, Danielian Associates 29 Shreve Drive APN # Pursuant to the California Environmental Quality Act (CEQA) guidelines, the project is categorically exempt under Section 15303, Class 3(a) (New Construction) that allows construction of one single-family residence in a residential zone. Belinda Ann Riva, Planning Technician REQUESTED ACTION: The applicant requests design review and a coastal development permit for a new 7,748 square-foot single-family residence, 268 square feet of storage/mechanical area and 756 square feet of attached garage area in the Laguna Colony Treasure Island Specific Plan Area. Design review is required for the new structure, excess covered parking, grading, pool and spa, water feature, air conditioning units, landscaping and development in an environmentally sensitive area due to oceanfront proximity and water quality. BACKGROUND: The proposed project is located in the Resort Development zone within the Laguna Colony Treasure Island Specific Plan Area. The 12,630 square-foot subject site is vacant. The topography of the property is characterized by a relatively large and level building pad with an average lot slope of approximately one percent. The new residence would consist of 3,657 square feet on the upper main level (exclusive of garage areas) and 4,091 square feet on the lower basement level. STAFF ANALYSIS: Design Review Criteria: Access: The Laguna Colony Treasure Island Specific Plan includes the Laguna Beach Colony Residential Design Guidelines and Maintenance Requirements ("Design Guidelines") that requires single-family dwellings to provide two covered parking spaces with a minimum area of 400 square feet. In addition, the applicant must provide a total of four parking spaces for singlefamily dwellings with four or more bedrooms. The project consists of five bedrooms, maid's quarters and an office (without closets). The applicant proposes two separate garages including a

9 e DESIGN REVIEW BOARD STAFF REPORT: DR 1O-108/CDP July 22, 2010 Page 2 of4 one-car garage to the (project) north, a two-car garage to the south (756 square feet total) and one onsite parking space in the driveway of the one-car garage. The Design Review Board must make the finding that the third covered parking space will not increase the appearance of mass and bulk. Three-car garages are common in the neighborhood. Design Articulation: The project includes construction of a one-story residence with a basement. Separation of the two-car and one-car garage helps to minimize the perceived mass of three covered parking spaces. Also, paneled garage doors reduce the massing of the garage appearance from street view. The applicant achieves design articulation by use of finely detailed materials and the variation in color and type of materials may help to reduce the appearance of mass. A color and material sample board reflects a mix of neutral-colored ledger stone, cedar shingles and a dark slate stone roof. The roof contains small roof fontis that decrease scale and give proportion to the design. Main ridge lines have been designed to run perpendicular to the ocean to maintain view corridors. Design Integrity: The applicant defines the architectural style of the structure as contemporary Craftsman. In order to achieve this style as specified by the Design Guidelines, the applicant uses shingle siding in a natural cedar color with brown window trims and sills. Natural stone in a horizontal pattern compliments the siding. The proposed style and materials are consistent throughout the design. The applicant obtained Homeowners' Association Design Review Committee approval prior to scheduling for Design Review. Environmental Context: This property is located in an environmentally sensitive area due to water quality and oceanfront proximity. The proposed project includes a total of 8,908 square feet of impervious surfaces and a Water Quality Management Plan will be required during structural plan check. The applicant proposes three gas-burning outdoor fireplaces and one outdoor barbecue in the rear patio area. Estimated grading outside the building footprint will occur with 40 cubic yards of cut and 20 cubic yards of fill for a net export of 20 cubic yards. Approximately 2,820 cubic yards of grading will take place inside the structural footprint to accommodate the entire basement level. Landscape/Hardscape: A landscape plan has been included with the project submittal. The applicant proposes 3,944 square feet of hardscape and 8,908 square feet of impervious surfaces, approximately 70.3 percent of the total lot area. A combination of stone paving and poured colored concrete in addition to reinforced turf make up the proposed driveways. Landscape is located along the perimeter of the property; hardscape makes up the majority of outdoor living areas. The Design Guidelines do not require a minimum percentage of the lot to be designated as landscaped open space. Plans indicate that no existing vegetation is to remain. In addition, all plantings including the Howea Forsterana, Juniper, Ligustrum and Schefflera are all to be maintained within height restrictions. The applicant proposes a new pool with infinity edge features and all pool equipment will be located in a vault toward the rear of the property. Four, double-stacked horizontal air conditioning units are located on the main level behind the prep kitchen. These units maintain a 15'-3" setback from the south property line. Lighting and Glare: Exterior materials of stone and wood siding help absorb light. In reference to exterior landscape lighting, down lighting is used with all wattage a maximum of 20

10 e DESIGN REVIEW BOARD STAFF REPORT: DR to-i08/cdp to-36 July 22, 20to Page 3 of4 watt halogen low-voltage light to minimize and avoid glare. No skylights are proposed at this time. Neighborhood Compatibility: Designed within the parameters of the Laguna Colony Treasure Island Specific Plan, the project adheres to the Design Guidelines that specify materials, landscaping, parking and access requirements. The proposed home appears to be neighborhood compatible in terms of program, parking, access and materials. Surrounding uses include onestory single-family residences with basements. The design of the proposed three covered parking spaces is consistent with the pattern of neighborhood development. Privacy: The applicant incorporates outdoor living areas into the design at the rear of the property. The design includes private courtyards that are either on grade or subterranean to maintain privacy for the property owners and the neighbors. Adjacent neighbors designed their outdoor living areas toward the rear of their property facing the oceanfront; therefore, the proposed outdoor living areas should not affect the neighbors' privacy in relationship to existing living areas. View Equity: All elements of the architecture and landscaping are designed within the required height and setback limits. In select areas, roof heights are below the required height limit by more than two feet in order to maintain and protect views for neighboring properties. Guideline Violations: No guideline violations noted. Requested Variances: No variances requested. Coastal Development Permit: A Coastal Development Permit is required for all new structures within the coastal zone. Finding 1: The project is in conformity with all the applicable provisions of the General Plan, including the Certified Local Coastal Program and any applicable specific plans in that the project provides an area of conservation which buffers the adjacent environmentally sensitive area from the proposed development and a landscape plan has been prepared which protects the existing native vegetation in the buffer area to the greatest extent possible. (lc); and Finding 2: Any development located between the sea and the first public road paralleling the sea is in conformity with the certified local coastal program and with the public access and public recreation policies of Chapter 3 ofthe Coastal Act in that vertical and lateral access exists to and along this portion of the coast and the proposed development will not create any adverse impacts to this access; therefore, no clear nexus can be demonstrated in this case for a public access dedication (2B). Finding 3: The proposed development will not have any significant adverse impacts on the environment within the meaning of the California Environmental Quality Act in that the proposed project is in compliance with the applicable rules and regulations set forth in the Municipal Code and will not cause any significant adverse impacts on the environment (3A).

11 e DESIGN REVIEW BOARD STAFF REPORT: DR /CDP July 22, 20 I 0 Page 4 of4 COMMUNITY INTEREST: There have been no letters or telephone calls received by the City as ofjuly 22, IDENTIFIED ISSUES: No issues identified. ATTACHMENTS: Pre-Application Site Meeting Report Lot 4 Property Development Standards Color and Material Sample Board Vicinity Map

12 City of Laguna Beach - Community Development Department Pre-Application Site Development Review Meeting Evaluation Evaluation Meeting Number: Date: 8/3/09 Planners: Nancy Csira met with Mojgan Momenan and Joe Digrado of Danielian Associates, Scott Franklin of Seacrest Developers, Inc. and the Angela Lee, the property owner. Site Address: 29 Shreve Drive Zone/Specific Plan: Resort Development/Treasure Island Specific Plan APN: Background: The property is currently a vacant building site and no prior applications for development have been received by the City. Environmentally Sensitive Areas: Oceanfront proximity & water quality Development Standards: Front Setback: Rear Setback: Side Setback: Height: Parking: 20 feet feet (varies) 15 feet each side 18 feet above the pad (pad elev. 52.0') For residences with 4 or more bedrooms - a 3-gar garage and one additional on-site parking space is required. The additional on-site space can be tandem and located within the required setbacks and driveway. Design Review Criteria 1. Access: Conflicts between vehicles, pedestrians and other modes of transportation should be minimized by specifically providing for each applicable mode of transportation. The applicant proposes to build a garages to accommodate three cars and provide additional on-site parking in the driveway to meet the parking requirements. 2. Design Articulation: Within the allowable envelope, the appearance of building and retaining wall mass should be minimized. Articulation techniques including, but not limited to, separation, offsets, terracing and reducing the size of anyone element in the structure may be used to reduce the appearance ofmass. The applicant proposes a one story home with a lower subterranean level that obtains natural light and ventilation from courtyards cut into the building pad. Exterior light wells, exiting stairs and enclosures shall be contained within the allowable building envelope. The design team proposes a reflecting pool cut into grade at the rear

13 elevation which is a new concept in this community. The proposed grade cut must be within the buildable area. 3. Design Integrity: Consistency with the applicant's chosen style of architecture should be achieved by the use of appropriate materials and details. The Treasure Island Specific Plan has strict guidelines for exterior finish materials and the applicant should obtain approval from the homeowner's association prior to submitting plans to the City. 4. Environmental Context: Development should preserve and, where possible, enhance the city's scenic natural setting. Natural features, such as existing heritage trees, rock out-cropping, ridgelines and significant watercourses should be protected. Existing terrain should be utilized in the design and grading should be minimized. The existing building pads were developed when the resort hotel was built. There are no natural features present. 5. General Plan Compliance: The development shall comply with all applicable policies of the general plan, including all of its elements, applicable specific plans, and the local coastal program. 6. Landscaping: Landscaping shall be incorporated as an integrated part of the structure's design and relate harmoniously to neighborhood and community landscaping themes. View equity shall be an important consideration in the landscape design. The relevant landscaping guidelines contained in the city's Landscape and Scenic Highways Resource Document should be incorporated, as appropriate, in the design and planned maintenance of proposed landscaping. The Treasure Island Specific Plan has strict guidelines for the proposed landscaping plans including maximum heights of trees in the front and rear yards (20 feet) and side yards (15 feet). 7. Lighting and Glare: Adequate lighting for individual and public safety shall be provided in a manner which does not significantly impact neighboring properties. Reflective materials and appurtenances that cause glare or a negative visual impact should be avoided or mitigated to a level of insignificance in those locations where those surfaces are visible from neighboring properties. The applicant proposes skylights which may impact the uphill neighbors. A typical solution for the impact include installing light sensitive night shades to prevent night lighting from escaping and hindering the night views from neighboring properties. 8. Neighborhood Compatibility: Development shall be compatible with the existing development in the neighborhood and respect neighborhood character. Neighborhood character is the sum of the qualities that distinguish areas within the city, including historical patterns of development (e.g., structural heights, mass, scale or size), village atmosphere, landscaping themes and architectural styles.

14 It appears that the proposed 7,800 square-foot single-family residence is consistent with the neighboring residences within the Treasure Island Specific Plan custom home lots. 9. Privacy: The placement of activity areas, (e.g., decks, picture windows and ceremonial or entertainment rooms) in locations that would result in a substantial invasion of privacy of neighboring properties should be minimized. The applicant assures that privacy concerns will be addressed with adjacent properties and homeowner's association approval will be obtained prior to submitting plans to the City. 10. Swimming Pools: Swimming pools, spas and water features shall be located, designed and constructed where: (a) Geology conditions allow; (b) Noise produced by circulatory mechanical pumps and equipment is mitigated; and (c) Any associated fencing or other site improvements are compatible with neighboring properties. The applicant proposes a spa and infinity edge water features. The pool equipment is proposed to be in the subterranean basement area. It air conditioning units are proposed they must be identified on the site plan and cannot be within the required side yards or front yard. 11. View Equity: The development, including its landscaping, shall be designed to protect existing views from neighboring properties without denying the subject property the reasonable opportunity to develop as described and illustrated in the city's "design guidelines." The "design guidelines" are intended to balance preservation of views with the right to develop property. The applicant is aware of view corridors from the surrounding properties. The applicant is required to contact all property owners within 300 feet of the site for a neighborhood meeting. Potential view issues could be from the Montage Condominiums, Montage custom homes/lots, and Blue Lagoon. The applicant asked about required approval for a play structure and staff provides the following policy: "Structure" Regulations The City's Zoning regulations regarding "structures" are stringent. Design Review Ordinance, Section (8), states: "All new buildings, structures and physical improvements and relocations, additions, extensions and exterior changes of or to existing buildings, structural and non-structural improvements, including landscaping and grading shall be subject to design review, except as otherwise provided in Section (8)(2)." Section defines a "structure" to mean "anything constructed or built, any edifice or building of any kind or any piece of work artificially built up or composed of parts joined together in some defined manner, which location on the ground or is attached to something having a location on the ground, except outdoor areas such as patios, paved areas, walks, tennis courts and other similar recreation areas." Notwithstanding the above, code enforcement does not regulate the following: Lawn furniture and umbrellas Portable 88Q's and fireplaces EZ-Up type canopies (except if used as a carport) Potted plants of any size

15 Flags (unless there is a new flag pole structurally installed in the ground - which is treated as a structure andrequiresapproval.).....".,.....>.., '."...,'.'.' sets and 'mtr:rqr' playequipm&111 (ume$s.theyal"(t;~ ~~ is.srnalllm" minor 5.05:~{S)(2~n), solves,and a heftt1t Iim./iiff1fat. rec~1f~k1 itta~ltrllct d.ln a~ili.alc~.e;$i; Potential Variance Issues: No variances are contemplated. Special Processing Requirements: Following zoning plan check, Design Review Board approval and a Coastal Development Permit will be required. Design review will be required for the new structure, skylights, chimney height spa, water features, air conditioning units (?), play structure (?), landscaping, and construction in an environmentally sensitive area due to oceanfront proximity and water quality. This preliminary evaluation is being provided to applicants and their design advisors to utilize as early as possible in the design stage of a contemplated project so that the ensuing design is more likely to meet the Design Review Board's approval before substantial time and resources have been expended. However, this preliminary evaluation provided by staff does not bind the Design Review Board in any manner in its review of or decisions on an application.

16 R... '-' Ic:/\j~ AND JU~ -. 2illI SHINGLE ~DlN6 5TONE THE 6REEzE HOME, LOT 4 LA,,-UNA 6EAC.H, CALIFORNIA 01.2"1.100'" aoqoo& PREPAAEO BY DANIE.UAN ~lare I'GTUAL. M"TERlAL. BOARDS ARe "vau..able AT THE.JOB SITE FOR ReVIEr"(

CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT DESIGN REVIEW BOARD. Design Review Coastal Development Permit 10-49

CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT DESIGN REVIEW BOARD. Design Review Coastal Development Permit 10-49 CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT HEARING DATE: TO: CASE: APPLICANT: LOCATION: ENVIRONMENTAL STATUS: PREPARED BY: September 9, 2010 DESIGN REVIEW BOARD Design Review 10-157

More information

CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT. Design Review Coastal Development Permit 10-63

CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT. Design Review Coastal Development Permit 10-63 CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT HEARING DATE: TO: CASE: APPLICANT: LOCATION: ENVIRONMENTAL STATUS: PREPARED BY: December 2, 2010 DESIGN REVIEW BOARD Design Review 10-198

More information

CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT DESIGN REVIEW BOARD IBOARD OF ADJUSTMENT Coast Highway APN

CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT DESIGN REVIEW BOARD IBOARD OF ADJUSTMENT Coast Highway APN CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT HEARING DATE: October 13,2011 TO: DESIGN REVIEW BOARD IBOARD OF ADJUSTMENT CASE: Variance 7717 Design Review 11-163 Coastal Development

More information

BOARD~ ADJUSTMENTIDESIGN RE ~WBOARD PROJECT OVERVIEW

BOARD~ ADJUSTMENTIDESIGN RE ~WBOARD PROJECT OVERVIEW BOARD~ ADJUSTMENTIDESIGN RE ~WBOARD PROJECT OVERVIEW LOCATION: REQUESTED ACTION: EXISTING APPROVALS: ZONING: ADDITIONAL REFERENCES: REQUIRED FINDINGS: STAFF COMMENTS: Site Address: 2165 Temple Hills Drive

More information

CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT DESIGN REVIEW BOARD

CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT DESIGN REVIEW BOARD CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT HEARING DATE: April 5,2012 TO: DESIGN REVIEW BOARD CASE: Design Review 12-347 APPLICANT: LOCATION: ENVIRONMENTAL STATUS: PREPARED BY:

More information

742 Barracuda Way APN #

742 Barracuda Way APN # CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT HEARING DATE: January 12,2012 TO: DESIGN REVIEW BOARD CASE: Design Review 11-217 Coastal Development Permit 11-39 APPLICANT: James Conrad,

More information

14825 Fruitvale Ave.

14825 Fruitvale Ave. REPORT TO THE PLANNING COMMISSION Meeting Date: August 26, 2015 Application: PDR14-0017 Location/APN: 14825 Fruitvale Ave. / 397-18-028 Applicant/Owner: Staff Planner: Sin Yong Michael Fossati 14825 Fruitvale

More information

Site Design (Table 2) Fact Sheet & Focus Questions:

Site Design (Table 2) Fact Sheet & Focus Questions: Site Design (Table 2) Fact Sheet & Focus Questions: BACKGROUND WHAT IS SITE DESIGN? Site design refers to the arrangement of buildings and open spaces on adjacent sites to maximize the shared benefits

More information

RESIDENTIAL GUIDELINES CHECKLIST

RESIDENTIAL GUIDELINES CHECKLIST RESIDENTIAL GUIDELINES CHECKLIST The following checklist was created to provide you with an easy way to ensure that your project complies with the Residential Design Guidelines. RESIDENTIAL DESIGN GUIDELINES

More information

PLANNING COMMISSION AGENDA REPORT SEPTEMBER 1, 2016

PLANNING COMMISSION AGENDA REPORT SEPTEMBER 1, 2016 PLANNING COMMISSION AGENDA REPORT SEPTEMBER 1, 2016 TO: Members of the Planning Commission FROM: Michael Klein, Planner FILE NO.: 150000780 PROPOSAL: APPLICANT: RECOMMENDATION: A request for a Site Plan

More information

Design Review Commission Report

Design Review Commission Report City of Beverly Hills Planning Division 455 N. Rexford Drive Beverly Hills, CA 90210 TEL. (310) 285-1141 FAX. (310) 858-5966 Design Review Commission Report Meeting Date: Thursday, March 2, 2017 Subject:

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: OCTOBER 17, 2012 TO: Chair Woollett and Members of the Design Review Committee THRU: FROM: SUBJECT: Leslie Aranda Roseberry, Planning Manager Daniel Ryan,

More information

BOARD OF ADJUSTMENT/DESIGN RE lew BOARD

BOARD OF ADJUSTMENT/DESIGN RE lew BOARD CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTlVIE STAFF REPORT HEARING DATE: January 13,2011 TO: CASE: APPLICANT: BOARD OF ADJUSTMENT/DESIGN RE lew BOARD 30801 Coast Highway (Montage Resort) APN #

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: OCTOBER 3, 2012 TO: Chair Woollett and Members of the Design Review Committee THRU: FROM: SUBJECT: Leslie Aranda Roseberry, Planning Manager Daniel Ryan,

More information

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 2018- RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF BELMONT APPROVING A SINGLE-FAMILY DESIGN REVIEW AND TREE REMOVAL PERMIT FOR A VACANT LOT ON LOWER LOCK AVENUE (APN: 043-042-750,

More information

COMPLIANCE CHECKLIST HILLSIDE RESIDENTIAL DESIGN GUIDELINES MANUAL

COMPLIANCE CHECKLIST HILLSIDE RESIDENTIAL DESIGN GUIDELINES MANUAL COMPLIANCE CHECKLIST HILLSIDE RESIDENTIAL DESIGN GUIDELINES MANUAL The following checklist summarizes development guidelines and standards. See the appropriate section for a complete explanation of the

More information

B L A C K D I A M O N D D E S I G N G U I D E L I N E S for Multi-family Development

B L A C K D I A M O N D D E S I G N G U I D E L I N E S for Multi-family Development B L A C K D I A M O N D D E S I G N G U I D E L I N E S for Multi-family Development Adopted June 18, 2009 This section of the Design and focuses on site planning and design guidance for new multi-family

More information

CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT DESIGN REVIEW BOARD. Design Review Revocable Encroachment Permit 11-15

CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT DESIGN REVIEW BOARD. Design Review Revocable Encroachment Permit 11-15 CTY OF LAGUNA BEACH COMMUNTY DEVELOPMENT DEPARTMENT STAFF REPORT HEARNG DATE: TO: CASE: APPLCANT: LOCATON: ENVRONMENTAL STATUS: PREPARED BY: October 13, 2011 DESGN REVEW BOARD Design Review 11-167 Revocable

More information

City of Lafayette Study Session Staff Report Design Review Commission

City of Lafayette Study Session Staff Report Design Review Commission ++ City of Lafayette Study Session Staff Report Design Review Commission Meeting Date: January 08, 2018 Staff: Subject: Chris Juram, Planning Technician SS12-17 Miramar Homebuilders, R-20 Zoning: Request

More information

Infill Residential Design Guidelines

Infill Residential Design Guidelines Infill Residential Design Guidelines Adopted March 23, 2004 Amended September 10, 2013 City of Orange Community Development Department Planning Division Phone: (714) 744-7220 Fax: (714) 744-7222 www.cityoforange.org

More information

Architectural Review Board Report

Architectural Review Board Report Architectural Review Board Report Architectural Review Board Meeting: February 3, 2014 Agenda Item: 7.9 To: From: Subject: Architectural Review Board Steve Traeger, Principal Urban Designer Scott Albright,

More information

City of Lafayette Study Session Staff Report Design Review Commission

City of Lafayette Study Session Staff Report Design Review Commission City of Lafayette Study Session Staff Report Design Review Commission Meeting Date: April 24, 2017 Staff: Payal Bhagat, Senior Planner Subject: HDP18-15 & HDP31-15 Ramesh Patel & Melcor Development (Owners),

More information

Duplex Design Guidelines

Duplex Design Guidelines Duplex Design Guidelines Adopted by Council May 29, 2006 Prepared By: Table of Contents 1.0 Application and Intent 1 2.0 Areas of Application 2 3.0 Design Principles 3 4.0 Design Guidelines 4 4.1 Site

More information

Residential Design Guidelines

Residential Design Guidelines Residential Design Guidelines Single-Family Residential Design Guidelines Introduction These guidelines seek to provide property owners, designers and developers with a clear understanding of the City

More information

PLANNING COMMISSION AGENDA REPORT NOVEMBER 15, 2012

PLANNING COMMISSION AGENDA REPORT NOVEMBER 15, 2012 PLANNING COMMISSION AGENDA REPORT NOVEMBER 15, 2012 TO: FROM: Members of the Planning Commission Michael Klein, Associate Planner FILE NO.: 120000890 PROPOSAL: APPLICANT: Request for an Administrative

More information

PLANNING COMMISSION AGENDA REPORT APRIL 7, 2016

PLANNING COMMISSION AGENDA REPORT APRIL 7, 2016 PLANNING COMMISSION AGENDA REPORT APRIL 7, 2016 TO: FROM: Members of the Planning Commission Talyn Mirzakhanian, Senior Planner FILE NO.: 160001710 PROPOSAL: APPLICANT: RECOMMENDATION: A request for a

More information

DESIGN REVIEW BOARD. Steinert Residence. Belinda Ann Deines, Planning Technician (949)

DESIGN REVIEW BOARD. Steinert Residence. Belinda Ann Deines, Planning Technician (949) CITY OF LAGUNA BEACH COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT HEARING DATE: July 12,2012 TO: DESIGN REVIEW BOARD CASE: Design Review 12-779 Coastal Development Permit 12-781 Revocable Encroachment

More information

DATE: PLANNING COMMISSION MEETING OF FEBRUARY 24, 2016

DATE: PLANNING COMMISSION MEETING OF FEBRUARY 24, 2016 DATE: PLANNING COMMISSION MEETING OF FEBRUARY 24, 2016 TO: FROM: SUBJECT: THE PLANNING COMMISSION LISA COSTA SANDERS, TOWN PLANNER REQUEST FOR A SPECIAL STRUCTURES PERMIT FOR A POOL IN THE SIDE YARD AND

More information

March 24, 2010 ACKNOWLEDGEMENTS

March 24, 2010 ACKNOWLEDGEMENTS MULTI-FAMILY NEIGHBORHOOD RESIDENTIAL DESIGN GUIDELINES GATEWAY NEIGHBORHOOD ADOPTED MARCH 24, 2010 Culver City Planning Commission March 24, 2010 ACKNOWLEDGEMENTS John Kuechle Commission Chair Linda Smith-Frost

More information

OCEAN BOULEVARD PLANNED DEVELOPMENT DISTRICT (PD-5)

OCEAN BOULEVARD PLANNED DEVELOPMENT DISTRICT (PD-5) OCEAN BOULEVARD PLANNED DEVELOPMENT DISTRICT (PD-5) Ordinance History: C-5562, 1982 The intent of the Planned Development Plan is to provide a framework to guide new development in a way that is sensitive

More information

Planning Commission Staff Report June 5, 2008

Planning Commission Staff Report June 5, 2008 Owner/Applicant Taylor Village Sacramento Investments Partners, LP c/o Kim Whitney 1792 Tribute Road #270 Sacramento, CA 95815 Staff Recommendation Planning Commission Staff Report Project: File: Request:

More information

36.1. PURPOSE APPLICABILITY DESIGN REVIEW GUIDELINES

36.1. PURPOSE APPLICABILITY DESIGN REVIEW GUIDELINES CHAPTER 36: DESIGN STANDARDS 36.1. PURPOSE The purpose of this chapter is to ensure that projects are designed and constructed consistent with the Community Design Subelement of the Land Use Element and

More information

A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY

A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY RESOLUTION NO. A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF SIGNAL HILL, CALIFORNIA, RECOMMENDING CITY COUNCIL ADOPTION OF ZONING ORDINANCE AMENDMENT 16-03, A REQUEST TO AMEND THE OFFICIAL ZONING

More information

City of Lafayette Staff Report

City of Lafayette Staff Report City of Lafayette Staff Report For: By: Design Review Commission Greg Wolff, Senior Planner Meeting Date: April 27, 2015 Subject: SS03-15 Gundi & Peter Younger (Owners), R-40 Zoning: Request for a Study

More information

Concrete Flat Tile Roofs Large Exposed Overhangs Oversized Bracing Predominately Gable Roofs With Non-Plaster Gable End Treatments.

Concrete Flat Tile Roofs Large Exposed Overhangs Oversized Bracing Predominately Gable Roofs With Non-Plaster Gable End Treatments. Avila Ranch Concrete Flat Tile Roofs Large Exposed Overhangs Oversized Bracing Predominately Gable Roofs With Non-Plaster Gable End Treatments Simple Trim Figure B-22: Craftsman Architectural Style Low

More information

ORDINANCE NO WHEREAS, the City of Kalama has many areas of timberland and open areas inside its City limits adjacent to residential areas;

ORDINANCE NO WHEREAS, the City of Kalama has many areas of timberland and open areas inside its City limits adjacent to residential areas; ORDINANCE NO. 1342 AN ORDINANCE OF THE CITY OF KALAMA, WASHINGTON ADOPTING A NEW KALAMA MUNICIPAL CODE CHAPTER 17.20 ESTATE LOT FLOATING ZONE TO PROVIDE TRANSITIONAL ZONING OPTIONS FOR RESIDENTIAL DEVELOPMENT

More information

Wide asphalt driveway abutting school property. garage built with incompatible materials, too close to park. incompatible fencing materials

Wide asphalt driveway abutting school property. garage built with incompatible materials, too close to park. incompatible fencing materials Wide asphalt driveway abutting school property incompatible fencing materials garage built with incompatible materials, too close to park Lack of plantings as a buffer between private property and open

More information

CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT

CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT Agenda Item: 2 March 9, 2011 Project: Description: Applicant: DSR11-004 The applicant is requesting approval to replace the existing exterior wood framed

More information

IV.B. VISUAL RESOURCES

IV.B. VISUAL RESOURCES IV.B. VISUAL RESOURCES ENVIRONMENTAL SETTING Existing Visual Character Project Site The project site is located at 17331-17333 Tramonto Drive in the Pacific Palisades community of the City of Los Angeles

More information

CHAPTER ADDITIONAL REQUIREMENTS IN THE NC, NEIGHBORHOOD COMMERCIAL ZONE

CHAPTER ADDITIONAL REQUIREMENTS IN THE NC, NEIGHBORHOOD COMMERCIAL ZONE CITY OF MOSES LAKE MUNICIPAL CODE CHAPTER 18.31 ADDITIONAL REQUIREMENTS IN THE NC, NEIGHBORHOOD COMMERCIAL ZONE Sections: 18.31.010 Purpose 18.31.020 Minimum Lot Area 18.31.030 Setbacks 18.31.040 Maximum

More information

Chapter RM MULTI FAMILY BUILDING ZONES

Chapter RM MULTI FAMILY BUILDING ZONES Chapter 19.17 RM MULTI FAMILY BUILDING ZONES 19.17.010 Established 19.17.020 Primary Permitted Uses 19.17.030 Accessory Permitted Uses 19.17.040 Secondary Permitted Uses 19.17.050 Conditional Property

More information

ASHLAND RANCH COMMUNITY ASSOCIATION ARCHITECTURAL / LANDSCAPE GUIDELINES

ASHLAND RANCH COMMUNITY ASSOCIATION ARCHITECTURAL / LANDSCAPE GUIDELINES ASHLAND RANCH COMMUNITY ASSOCIATION ARCHITECTURAL / LANDSCAPE GUIDELINES These Architectural/Landscape Guidelines are in addition to the Declaration and are binding on all Owners and Builders. These Architectural/Landscape

More information

Proposed for Vic West Neighbourhood Plan. Design Guidelines for Intensive Residential Development - Townhouse and Attached Dwelling

Proposed for Vic West Neighbourhood Plan. Design Guidelines for Intensive Residential Development - Townhouse and Attached Dwelling Proposed for Vic West Neighbourhood Plan Design Guidelines for Intensive Residential Development - Townhouse and Attached Dwelling Design Guidelines for Intensive Residential Development - Townhouse and

More information

Resolution : Exhibit A. Downtown District Design Guidelines March 2003

Resolution : Exhibit A. Downtown District Design Guidelines March 2003 Resolution 03-011: Exhibit A Downtown District Design Guidelines March 2003 DOWNTOWN DISTRICT DESIGN GUIDELINES CITY OF SOUTHLAKE, TEXAS Adopted March 2003 1 DOWNTOWN DISTRICT DESIGN GUIDELINES Adopted

More information

MULTIFAMILY RESIDENTIAL DESIGN PRINCIPLES Site Plan and Design Review Principles Checklist

MULTIFAMILY RESIDENTIAL DESIGN PRINCIPLES Site Plan and Design Review Principles Checklist MULTIFAMILY RESIDENTIAL DESIGN PRINCIPLES Site Plan and Design Review Principles Checklist Applicant s Name: Project Address: Phone: Email: Applicant shall fill out the design guidelines checklist for

More information

Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort District Form-Based Code. Staff Planner Kristine Gay

Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort District Form-Based Code. Staff Planner Kristine Gay Applicant/Owner Ocean Rental Properties, LLC Public Hearing April 13, 2016 City Council Election District Beach Agenda Item 1 Request Alternative Compliance to the prescribed criteria of the Oceanfront

More information

Standards (R-3) Figure B-11: R-3 Residential Standards Exhibit

Standards (R-3) Figure B-11: R-3 Residential Standards Exhibit Avila Ranch Avila Ranch Specific Plan Development Standards High Medium Density - High Residential Density Residential Lot and Building Lot and Standards Building (R-3) Standards (R-3) EXAMPLES These sketches

More information

DESIGN AND LANDSCAPE GUIDELINES FOR DEVELOPMENT

DESIGN AND LANDSCAPE GUIDELINES FOR DEVELOPMENT DESIGN AND LANDSCAPE GUIDELINES FOR DEVELOPMENT IN THE SECOND SUPERVISORIAL DISTRICT (REVISED) ADOPTED BY RIVERSIDE COUNTY BOARD OF SUPERVISORS ON SEPTEMBER 15, 1998 REVISED OCTOBER 23, 1998 REVISED AUGUST

More information

DESIGN REVIEW BOARD Staff Report

DESIGN REVIEW BOARD Staff Report DESIGN REVIEW BOARD Staff Report Agenda Item I.2 Meeting Date: February 24, 2015 TO: Goleta Design Review Board FROM: Michael Concepcion, Assistant Planner; (805) 961-7566 SUBJECT: 622 Dara Road (APN 069-371-007)

More information

Kensington Covenants Committee Guidelines

Kensington Covenants Committee Guidelines 1 Kensington Covenants Committee Guidelines The Covenants Committee will be appointed by the Board of Directors, with a membership of five association members, for a term of two years. The purpose of the

More information

ORDINANCE NO. 14,767

ORDINANCE NO. 14,767 ORDINANCE NO. 14,767 AN ORDINANCE to amend the Municipal Code of the City of Des Moines, Iowa, 2000, adopted by Ordinance No. 13,827, passed June 5, 2000, amended by Ordinance No. 13,878 passed November

More information

The broad range of permitted and special uses allowed in the district remain, but some descriptions have been clarified.

The broad range of permitted and special uses allowed in the district remain, but some descriptions have been clarified. Memorandum To: Emily Fultz, AICP City Planner, City of Edwardsville From: Michael Blue, FAICP Principal, Teska Associates Date: January 24, 2019 RE: B-1 Zoning District Update A draft, updated B-1 Central

More information

CHAPTER 530 SITE PLAN REVIEW

CHAPTER 530 SITE PLAN REVIEW ARTICLE I. GENERAL PROVISIONS CHAPTER 530 SITE PLAN REVIEW Community Planning and Economic Development Development Services Division 250 South 4 th Street, Room 300 Minneapolis MN 55415-1316 612-673-3000

More information

REZONING APPLICATION MPD SUPPLEMENT

REZONING APPLICATION MPD SUPPLEMENT REZONING APPLICATION MPD SUPPLEMENT For Staff Use Only: DATE/TIMESTAMP: ZA# RECEIVED BY: The intent of the Master Planned District (MPD) designation is to allow flexibility in the design and construction

More information

CHAPTER 13 DESIGN GUIDELINES

CHAPTER 13 DESIGN GUIDELINES CHAPTER 13 DESIGN GUIDELINES Section 1300.00 Section 1300.01 Design Guidelines Purpose The purposes of this section are to: A. The purpose of this Section is to establish procedures and standards to serve

More information

City of Vaughan Urban Design Guidelines for Infill Development in Established Low-Rise Residential Neighbourhoods

City of Vaughan Urban Design Guidelines for Infill Development in Established Low-Rise Residential Neighbourhoods City of Vaughan Urban Design Guidelines for Infill Development in Established Low-Rise Residential Neighbourhoods DRAFT - September 2016 Contents 1. Introduction 1 2. Policy Context 3 3. Characteristics

More information

II. SINGLE FAMILY RESIDENTIAL

II. SINGLE FAMILY RESIDENTIAL II. SINGLE FAMILY RESIDENTIAL Castle Rock is made up of numerous individually built houses and subdivision tracts that have been developed during the past century. Some of the tracts are diverse in architectural

More information

The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division

The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.

More information

Design Guidelines for Residential Subdivisions

Design Guidelines for Residential Subdivisions Design Guidelines for Residential Subdivisions Development Services 972-466-3225 cityofcarrollton.com This page intentionally left blank. Table of Contents Purpose... 1 Design Objectives... 1 Design Guidelines

More information

Planning Commission Staff Report February 19, 2009

Planning Commission Staff Report February 19, 2009 Planning Commission Staff Report February 19, 2009 Project: Warda Warehouse File: EG-08-051 Request: Design Review Location: 9260 Bendel Place APNs: 134-0660-004 Planner: Gerald Park Property Owner/Applicant

More information

PETITION NUMBER: V DISTRICT, LAND LOT 2/2, 454 OVERLAY DISTRICT HIGHWAY 9 EXISTING ZONING AG-1 ACRES 1

PETITION NUMBER: V DISTRICT, LAND LOT 2/2, 454 OVERLAY DISTRICT HIGHWAY 9 EXISTING ZONING AG-1 ACRES 1 PETITION NUMBER: V15-026 PROPERTY INFORMATION ADDRESS 440 Galloway Court, White Columns DISTRICT, LAND LOT 2/2, 454 OVERLAY DISTRICT HIGHWAY 9 EXISTING ZONING AG-1 ACRES 1 EXISTING USE FUTURE LAND USE

More information

CENTRAL CITY NEIGHBORHOOD Site Plan and Design Review Guidelines Checklist

CENTRAL CITY NEIGHBORHOOD Site Plan and Design Review Guidelines Checklist Applicant s Name: Project Address: NEIGHBORHOOD Phone: Email: Applicant shall fill out the design guidelines checklist for all guidelines applicable to the project. Check the box if meets guideline. Indicate

More information

CITY PLANNING COMMISSION AGENDA ITEM: C STAFF: ROBERT TEGLER FILE NO: CPC PUD QUASI-JUDICIAL

CITY PLANNING COMMISSION AGENDA ITEM: C STAFF: ROBERT TEGLER FILE NO: CPC PUD QUASI-JUDICIAL CPC AGENDA June 8, 2006 Page 37 CITY PLANNING COMMISSION AGENDA ITEM: C STAFF: ROBERT TEGLER FILE NO: CPC PUD 05-294 - QUASI-JUDICIAL PROJECT: APPLICANT: OWNER: PARKWOOD AT WOLF RANCH NASS DESIGN ASSOCIATES

More information

Preserve at Reed Mill Homeowners Association, Inc.

Preserve at Reed Mill Homeowners Association, Inc. Preserve at Reed Mill Homeowners Association, Inc. Thank you for your purchase of an Edward Andrews Home! Below you will find the Design Guidelines for the Preserve at Reed Mill Homeowners Association,

More information

PC RESOLUTION NO ARCHITECTURAL CONTROL (AC)

PC RESOLUTION NO ARCHITECTURAL CONTROL (AC) PC RESOLUTION NO. 16-07-26- ARCHITECTURAL CONTROL (AC) 15-035 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF SAN JUAN CAPISTRANO, CALIFORNIA APPROVING ARCHITECTURAL CONTROL (AC) 15-035, INN AT

More information

DESIGN GUIDELINES CONTENTS APPLICATION INFORMATION...2 COVENANT ENFORCEMENT PROCEDURE...2 GUIDELINES Patios and Walkways...

DESIGN GUIDELINES CONTENTS APPLICATION INFORMATION...2 COVENANT ENFORCEMENT PROCEDURE...2 GUIDELINES Patios and Walkways... DESIGN GUIDELINES CONTENTS APPLICATION INFORMATION...2 COVENANT ENFORCEMENT PROCEDURE...2 GUIDELINES...3 1. Patios and Walkways...3 2. Exterior Decorative Objects, Flower Pots, Benches, Lighting, Etc...3

More information

Chapter 4: Jordan Road Character District

Chapter 4: Jordan Road Character District 4: Jordan Road Character District 4.1 Introduction The Jordan Road character district encompasses much of the former Jordan orchard and farmstead, which was a significant part of Sedona s history. The

More information

STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001

STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001 STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP 2014-0030 FEBRUARY 26, 2015 CPA - 1 OWNER/APPLICANT: AGENT: REQUEST: HANS HEIM PO BOX 238 APTOS, CA 94001 JAMES HAY PO BOX 762 MENDOCINO, CA 95460

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: DECEMBER 16, 2015 TO: THRU: FROM: SUBJECT: Chair McCormick and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Kelly Christensen

More information

Chapter LANDSCAPING

Chapter LANDSCAPING Chapter 20.36 Sections: 20.36.010 Purpose 20.36.020 Applicability 20.36.030 Water Efficient Landscaping Ordinance 20.36.040 Landscape and Sprinkler Plans 20.36.050 Required Landscape Areas 20.36.060 Landscape

More information

WATERFRONT DISTRICT DESIGN STANDARDS

WATERFRONT DISTRICT DESIGN STANDARDS WATERFRONT DISTRICT DESIGN STANDARDS 20.25.080 WATERFRONT DISTRICT A. Purpose. This section is intended to implement The Waterfront District Subarea Plan by: 1. Creating a safe, vibrant mixed-use urban

More information

PC RESOLUTION NO

PC RESOLUTION NO PC RESOLUTION NO. 14-01-14-02 TENTATIVE TRACT MAP fttm) 17441. REZONE {RZ) 13-003, ARCHITECTURAL CONTROL (AC) 13-003, TREE REMOVAL PERMIT (TRP) 13-052. GRADING PLAN MODIFICATION (GPM) 13-002. CONDITIONAL

More information

SMALL LOT DESIGN STANDARDS. An Illustrated Working Draft for Test Implementation

SMALL LOT DESIGN STANDARDS. An Illustrated Working Draft for Test Implementation SMALL LOT DESIGN STANDARDS An Illustrated Working Draft for Test Implementation SMALL LOT DESIGN STANDARDS ILLUSTRATED WORKING FOR TEST IMPLEMENTATION OVERVIEW SMALL LOT CODE AMENDMENT & POLICY UPDATE

More information

Chapter 11. Industrial Design Guidelines 11.1 INTRODUCTION AND PURPOSE 11.3 SITE PLANNING GUIDELINES 11.2 GENERAL DESIGN OBJECTIVES

Chapter 11. Industrial Design Guidelines 11.1 INTRODUCTION AND PURPOSE 11.3 SITE PLANNING GUIDELINES 11.2 GENERAL DESIGN OBJECTIVES Chapter 11 Industrial Design Guidelines 11.1 INTRODUCTION AND PURPOSE The following industrial/design guidelines seek to assure high quality development in Santa Ana s industrial districts by: The design

More information

5.1.1 The streetscape along US Highway 64 (Brevard Road); and, The built environment within new residential developments; and,

5.1.1 The streetscape along US Highway 64 (Brevard Road); and, The built environment within new residential developments; and, Article 5. Landscaping 5.1 Purpose The Town of Laurel Park s landscape standards are designed to create a beautiful, aesthetically pleasing built environment that will complement and enhance community

More information

Required Internal Landscaping Percentage of Ground Cover in Living Materials Percentage of Tree Size

Required Internal Landscaping Percentage of Ground Cover in Living Materials Percentage of Tree Size CHAPTER 12-24 LANDSCAPE STANDARDS 12-24-101 Purpose 12-24-102 Landscaping Required 12-24-103 Parking Lot Screening 12-24-104 Parking Lot Trees 12-24-105 12-24-106 Landscaped Setbacks Buffers 12-24-107

More information

The Park at Fifth Street The Providence Group Legal Description ALL THAT CERTAIN TRACT OF LAND LOCATED IN LAND LOT 279, 18TH DISTRICT, DEKALB COUNTY, GEORGIA, CONSISTING OF FIVE TRACTS: TRACT ONE (PIN:18

More information

HICKORY NUT FOREST DESIGN GUIDELINES

HICKORY NUT FOREST DESIGN GUIDELINES HICKORY NUT FOREST DESIGN GUIDELINES Introduction Hickory Nut Forest is a "net-zero energy", conservation development that is designed to protect and celebrate the property s unique ecology. A conservation

More information

Chapter PEDESTRIAN COMMERCIAL (PC) ZONING DISTRICT

Chapter PEDESTRIAN COMMERCIAL (PC) ZONING DISTRICT Chapter 11-17 PEDESTRIAN COMMERCIAL (PC) ZONING DISTRICT Sections: 11-17-01 GENERAL PURPOSE 11-17-02 PERMITTED BUILDING TYPES 11-17-03 USES PERMITTED WITH DESIGN REVIEW 11-17-04 USES PERMITTED BY CONDITIONAL

More information

PROPOSED WATERFRONT DISTRICT DESIGN STANDARDS

PROPOSED WATERFRONT DISTRICT DESIGN STANDARDS PROPOSED WATERFRONT DISTRICT DESIGN STANDARDS 20.25 DESIGN REVIEW. 20.25.080 WATERFRONT DISTRICT A. Purpose. This section is intended to implement The Waterfront District Subarea Plan by: 1. Creating a

More information

CHESAPEAKE LANDSCAPE ORDINANCE

CHESAPEAKE LANDSCAPE ORDINANCE CHESAPEAKE LANDSCAPE ORDINANCE CONSERVATION PRESERVATION CZO 19-600 Effective October 16, 2008 BUFFER YARD C PARKING LOT REFORESTATION YEAR 1 REFORESTATION YEAR 4 BUFFER YARD F CBPA REFORESTATION Page

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS B. AESTHETICS 1. VIEWS

IV. ENVIRONMENTAL IMPACT ANALYSIS B. AESTHETICS 1. VIEWS IV. ENVIRONMENTAL IMPACT ANALYSIS B. AESTHETICS 1. VIEWS ENVIRONMENTAL SETTING Existing Visual Character Project Site The project site is located at 10250 Wilshire Boulevard in the Westwood community of

More information

Bylaw A Bylaw to amend Bylaw 12800, as amended, The Edmonton Zoning Bylaw Amendment No. 2239

Bylaw A Bylaw to amend Bylaw 12800, as amended, The Edmonton Zoning Bylaw Amendment No. 2239 Bylaw 17672 A Bylaw to amend Bylaw 12800, as amended, The Edmonton Zoning Bylaw Amendment No. 2239 WHEREAS City Council at its meeting of February 22, 2001, gave third reading to Bylaw 12800, as amended;

More information

AMEND DMENT H HOSPITAL

AMEND DMENT H HOSPITAL AMEND DMENT TO LAND USE PLAN ELEMENT VILLAGE OF RIDGEWOOD MASTER PLAN H HOSPITAL ZONE DISTRICT Village of Ridgewood Planning Board February 28, 2014with technical revisions from June 9, 2014 Planning Board

More information

The Highway Overlay District applies to an area within the City of Papillion's zoning jurisdiction described as:

The Highway Overlay District applies to an area within the City of Papillion's zoning jurisdiction described as: ARTICLE XXVIII. HOD Highway Overlay District 205-164. Intent. The Highway Overlay District recognizes the strategic importance of the Highway 370 corridor as an entrance to Papillion from Interstate 80

More information

ORDINANCE NO /2008

ORDINANCE NO /2008 ORDINANCE NO. 2008-3-18 2007/2008 AN ORDINANCE AMENDING CHAPTER 7.01 (ZONING CODE) OF THE TOWN OF SHEBOYGAN MUNICIPAL CODE TO CREATE ARCHITECTURAL, EXTERIOR LIGHTING, AND LANDSCAPING STANDARDS WHEREAS,

More information

Bridleton HOA Design Guidelines

Bridleton HOA Design Guidelines Bridleton HOA Design Guidelines These Design Guidelines are provided to you to help establish what modifications would generally be approved, however, each modification is reviewed on a case-by-case basis

More information

The Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN

The Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN The Village SPECIFIC PLAN Chapter 3 3.1 INTRODUCTION 3.1.1 Purpose This Chapter describes the development regulations applicable to the Mixed-Use and Transit Center Planning Areas. These form-based regulations

More information

MONTECITO PLANNING COMMISSION Staff Report for McKinley Appeal of Webb Single Family Dwelling

MONTECITO PLANNING COMMISSION Staff Report for McKinley Appeal of Webb Single Family Dwelling MONTECITO PLANNING COMMISSION Staff Report for McKinley Appeal of Webb Single Family Dwelling Staff Report Date: June 29, 2016 Case No.: 16APL-00000-00011, 16APL- 00000-00016 Environmental Document: Notice

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: AUGUST 2, 2017 TO: THRU: FROM: SUBJECT: Chair Imboden and Members of the Design Review Committee Anna Pehoushek, Assistant Community Development Director

More information

DEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA

DEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA DEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA DESIGN REVIEW REPORT : SUMMAR NO.: 4469 (S) Paul Johnston AT LARGE: A Chris Roberts B Cynthia Lee-Sheng ADVERTISING DATES: PAB PUBLIC HEARING: HEARING:

More information

Rye City Planning Commission Minutes April 19, 2011

Rye City Planning Commission Minutes April 19, 2011 Rye City Planning Commission Minutes MEETING ATTENDANCE: Planning Commission Members: Nick Everett, Chair Martha Monserrate, Vice-Chair Carolyn Cunningham Barbara Cummings Hugh Greechan Peter Larr Other:

More information

4 Residential and Urban Living Zones

4 Residential and Urban Living Zones 4 Residential and Urban Living Zones Refer to Chapters 11 to 20 for additional rules that may apply to these zones. 4.1 OBJECTIVES AND POLICIES Objective Res1 Policy 1 Policy 2 Policy 3 Policy 4 Policy

More information

Cha p t e r 2: Ge n e r a l De s i g n Gu i d e l i n e s

Cha p t e r 2: Ge n e r a l De s i g n Gu i d e l i n e s Downtown Ann Arbor Design Guidelines Cha p t e r 2: Ge n e r a l De s i g n Gu i d e l i n e s This chapter presents general design guidelines for new site plan or PUD projects in downtown Ann Arbor. The

More information

(DC1) Direct Development Control Provision DC1 Area 4

(DC1) Direct Development Control Provision DC1 Area 4 . General Purpose (DC) Direct Development Control Provision DC Area 4 The purpose of this Provision is to provide for an area of commercial office employment and residential development in support of the

More information

Policies and Code Intent Sections Related to Town Center

Policies and Code Intent Sections Related to Town Center Policies and Code Intent Sections Related to Town Center The Town Center Vision is scattered throughout the Comprehensive Plan, development code and the 1994 Town Center Plan. What follows are sections

More information

Planned Development Review Revisions (Project No. PLNPCM )

Planned Development Review Revisions (Project No. PLNPCM ) Planned Development Review Revisions (Project No. PLNPCM2014-00139) Standard residential development Planned Development Example: Smaller lot sizes than what is allowed to create open space amenity. What

More information

Architectural Review Board Report

Architectural Review Board Report Architectural Review Board Report To: From: CC: Subject: Architectural Review Board Architectural Review Board Meeting: May 21, 2018 Agenda Item: 8-A Grace Page, Senior Planner Stephanie Reich, AIA, LEED

More information

File No (Continued)

File No (Continued) (Continued) Request for: (1) a Site Plan Review; (2) a Variance (to build on a significant ridgeline); (3) an Oak Tree Permit (to encroach into the protected zone of 25 oak trees and for potential thinning