WASATCH HOLLOW PRESERVE PHASE II RIPARIAN RESTORATION JOB NO

Size: px
Start display at page:

Download "WASATCH HOLLOW PRESERVE PHASE II RIPARIAN RESTORATION JOB NO"

Transcription

1 WASATCH HOLLOW JOB NO SHEET SET ASSEMBLY ORDER VICINITY MAP OWNER DEPARTMENT OF: COMMUNITY AND ECONOMIC DEVELOPMENT DIVISION DIRECTOR - MARY DELAMARE SCHAEFER CITY ENGINEER - JEFF SNELLING, S.E. 349 SOUTH 200 EAST, SUITE 100, UTAH OFFICE FAX CITY OFFICIALS GI001 GI002 LD101 LS101 - LS103 LP101 - LP103 LI101 - LI103 LS401 - LS404 DT501 - DT506 CI101 - CI GENERAL INFORMATION COVER SHEET GENERAL INFORMATION NOTES LANDSCAPE DEMOLITION PLAN LANDSCAPE SITE PLAN LANDSCAPE PLANTING PLAN LANDSCAPE IRRIGATION PLAN LARGE SCALE VIEWS DETAILS CIVIL IMPROVEMENT PLAN 70% REVIEW NOT FOR CONSTRUCTION SITE ORIENTATION MAP DESIGNER LANDSCAPE ARCHITECT: 1063 WEST 1400 NORTH LOGAN, UTAH CIVIL ENGINEER: 370 EAS T 500 SOUTH, #200, U T PH: FAX: WASATCH HOLLOW JOB NO

2

3 70% REVIEW NOT FOR CONSTRUCTION WASATCH HOLLOW LANDSCAPE DEMOLITION PLAN LD101 3

4 KEY MAP LANDSCAPE SITE PLAN LS101 4

5 KEY MAP LANDSCAPE SITE PLAN LS102 5

6 KEY MAP LANDSCAPE SITE PLAN LS103 6

7 KEY MAP LANDSCAPE PLANTING PLAN LP101 7

8 KEY MAP LANDSCAPE PLANTING PLAN LP102 8

9 KEY MAP LANDSCAPE PLANTING PLAN LP103 9

10 POC WASATCH HOLLOW KEY MAP LANDSCAPE IRRIGATION PLAN LI101 10

11 KEY MAP LANDSCAPE IRRIGATION PLAN LI102 11

12 KEY MAP LANDSCAPE IRRIGATION PLAN LI103 12

13 LARGE SCALE VIEW WEST ACCESS AREA SOUTH ACCESS AREA LS401 -

14 PROPOSED GRADE EXISTING GRADE VEGETATED ROCK SWALE CROSS SECTION A - A' A LARGE SCALE VIEW EAST ACCESS AREA LS402 -

15 EXISTING GRADE PROPOSED GRADE CROSS SECTION B - B' 1" = 30'-0" A WASATCH HOLLOW LARGE SCALE VIEW WETLAND AREA LS403 -

16 PROPOSED GRADE EXISTING GRADE CROSS SECTION C - C' 1" = 30'-0" A WASATCH HOLLOW LARGE SCALE VIEW MAINTENANCE ACCESS AREA LS404 -

17 10'-0" 3.5" 4.5" SLOTS 4.5" 11" 4'-0" 11" 11" 2 1'-6" 1'-3" PERSPECTIVE VIEW FRONT VIEW DETAILS DT501 -

18 TOP VIEW POST SIDE VIEW FRONT VIEW WASATCH HOLLOW TRAIL LEFT OPEN EMBED ROCKS 1/3 MINIMUM DETAILS PLAN VIEW DT502 -

19 PLAN VIEW SECTION VIEW DETAILS DT503 -

20 PLAN VIEW, 1" = 12'=0" PROFILE VIEW, 1" = 12'=0" WASATCH HOLLOW CL CL DETAILS DT504 -

21 SECTION/ELEVATION SIDE VIEW END VIEW DETAILS DT505 -

22 DETAILS DT506 -

23 DETAILS DT507 -

24 INUNDATION LIMITS N EDGE OF CREEK 0' GRAPHIC SCALE 5' 10' 20' Scale: 1"=10' 30' BRIDGE ABUTMENT 70' 70' BRIDGE CONSTRUCTED FROM SURPLUS RAILCAR BRIDGE BRIDGE ABUTMENT 70% REVIEW NOT FOR CONSTRUCTION INUNDATION LIMITS WASATCH HOLLOW 70' BRIDGE CONSTRUCTED FROM SURPLUS RAILCAR BRIDGE EXISTING GRADE EXISTING GRADE PROPOSED GRADE CIVIL IMPROVEMENT PLAN CI 101

25 4'-4" 4'-4" 4'-4" TYP RAILING AS COORDINATED WITH OWNER POST TO HANDRAIL CONNECTON 5 1/8" x 9 1/2" GLULAM HANDRAIL 3/16" GALVANIZED CAP 2"x2" EWM WITH FRAME 6"x6" WOOD 5' MAX SPACING. (SPACING DEPENDS ON RAILING MATERIAL BETWEEN POSTS) 4x4 POST TYP 3" OR 4" GRAVEL WEARING SURFACE 3'-6" RAILCAR DECK 6" 24" 16" MAX 10" O.C. 16" MAX 6'-0" 18" (7) #5's SPACED EVENLY 10" O.C. 12" 8-1 2" (2) 5 8 " THROUGH BOLTS W/ WASHERS & NUT. ALTERNATE # 1 ALTERNATE # " PLATE EXISTING RAILCAR STRUCTURE. 70% REVIEW NOT FOR CONSTRUCTION HANDRAIL SCALE: N.T.S. H HANDRAIL ANCHORAGE TO RAILCAR BRIDGE SCALE: N.T.S. R WASATCH HOLLOW 5'-0" ± 12'-0" 2" 1-1 2" 2" 6" 2'-7-1 2" ± 1'-2-1 4" 12" HOOK J-BOLTS UNDER EXTRA #4 HORIZONTAL BAR 16" MAX 5'-0" 4'-8" O.C. 3 4 " BEARING PLATE ATOP 1 2 " NEOPRENE PAD (2) 3 4 " J-BOLTS EMBEDDED 10". SEE BRIDGE EACH SIDE SUPPORT DETAIL FOR LOCATION AND SIZE.PROVIDE (2) #5 STIRRUPS AROUND J-BOLT 2" 2" 15" FIELD VERIFY W/ BRIDGE DEPTH (2) 3 4 " J-BOLTS EMBEDDED 10". SEE BRIDGE EACH SIDE SUPPORT DETAIL FOR LOCATION AND SIZE.PROVIDE (2) #5 STIRRUPS AROUND J-BOLT 10" O.C. HOOK J-BOLTS UNDER EXTRA #4 HORIZONTAL BAR FINISHED GRADE 2" 2' 10" O.C. 10" O.C. NOTES: FIELD VERIFY TO FIT WITH ABUTMENT ANCHOR BOLT PLACEMENT. ADJUST WIDTH ACCORDINGLY BEARING PLATE SCALE: N.T.S. P FRONT NOTES: 1. CONCRETE COMPRESSIVE STRENGTH fc = 4,000 psi. 2. REINFORCEMENT GRADE 60. 3" 6' 3'-0" SIDE INSTALL 24" OF GRANULAR BORROW COMPACTED TO 95% OF MODIFIED PROCTOR DENSITY AS DETERMINED BY ASTM D EXTEND MIN. 24" BEYOND EDGE OF FOOTING ALL SIDES. CIVIL DETAILS 12' WIDE ABUTMENT SCALE: N.T.S. A CI 102

City of Bonita Springs Driveway Permit Information Packet

City of Bonita Springs Driveway Permit Information Packet City of Bonita Springs Driveway Permit Information Packet General: As stated in American Association of State Highway and Transportation Officials (AASHTO) Geometric Design of Highways and Streets A driveway

More information

Road Soil. Curtis F. Berthelot Ph.D., P.Eng. Department of Civil Engineering. Road Soil Introduction

Road Soil. Curtis F. Berthelot Ph.D., P.Eng. Department of Civil Engineering. Road Soil Introduction Road Soil Characterization ti By: Curtis F. Berthelot Ph.D., P.Eng. Department of Civil Engineering Road Soil Introduction Roads are constructed of layered heterogeneous multiphase geo-materials that exhibit

More information

DIVISION 10 SPECIALTIES

DIVISION 10 SPECIALTIES DIVISION 10 SPECIALTIES 11/11 SECTION 10 21 13.16 PLASTIC LAMINATE TOILET COMPARTMENTS PART 1 - GENERAL 1.01 SECTION INCLUDES Plastic laminate toilet compartments, urinal screens, head rail braced. 1.02

More information

SAPS GUARDRAIL CONCRETE

SAPS GUARDRAIL CONCRETE SAPS GUARDRAIL CONCRETE The SAPS guardrail for concrete applications attaches to an embedded anchor and provides a 5000 lb point of tie-off. The 42 inch and 60 inch models meet OSHA height requirements.

More information

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK 13440 DELTA PROJECT NO. 2017.226.001 SEPTEMBER 2017 ISSUED FOR BID INDEX OF DRAWINGS GENERAL CIVIL ARCHITECT/ENGINEER PROJECT

More information

Wayne State University WSU Project No Chatsworth Tower Apts. Misc. Bldg. Upgrades DSD Project No

Wayne State University WSU Project No Chatsworth Tower Apts. Misc. Bldg. Upgrades DSD Project No SECTION 213113 - ELECTRIC-DRIVE, CENTRIFUGAL FIRE PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

PLANTED-IN-PLACE GREEN ROOF DETAILS

PLANTED-IN-PLACE GREEN ROOF DETAILS PLANTED-IN-PLACE GREEN ROOF DETAILS TR1.01 TR1.02 TR1.03 TR1.04 TR1.05 TR1.06 TR1.07 GREEN ROOF TRAY TRAY LAYOUT TRAY CONNECTION TRAY CONNECTION AT CRICKET PLANTING METHOD- SEDUM TILE OR MAT PLANTING METHOD-

More information

Original Contract Amount $ 754, Change Order #1 $ 129, New Contract Amount $ 883, New Contract, Compared to Original 117.

Original Contract Amount $ 754, Change Order #1 $ 129, New Contract Amount $ 883, New Contract, Compared to Original 117. Agenda Item: 9. MEMORANDUM TO: Programs, Projects, and Operations Subcommittee FROM: Eric Williams, Natural Resources Planner SUBJECT: Hell Creek Grade Control Stabilization, Change Order 1 DATE: August

More information

Appendix E Preliminary Design

Appendix E Preliminary Design Appendix E Preliminary Design 1 1 0+080 0+100 0+200 0+240 LEGEND PROPOSED POOL PROPOSED RIFFLE PROPOSED COIR CLOTH BANK TREATMENT PROPOSED VEGETATED STONE BANK TREATMENT PROPOSED VEGETATED BLOCK BANK TREATMENT

More information

Appendix N. Preliminary Design

Appendix N. Preliminary Design Appendix N Preliminary Design Belfountain Dam and Headpond Class EA Preferred Alternative D4H5: Lower the spillway & backfill headpond & construct channel Preliminary Cost Estimate ITEM ITEM UNIT EST.

More information

2. HORIZONTAL DATUM = NAD 83. VERTICAL DATUM = NAVD 88.

2. HORIZONTAL DATUM = NAD 83. VERTICAL DATUM = NAVD 88. 1. EXISTING CONDITIONS AND UTILITY INFORMATION SHOWN ON THESE PLANS ARE BASED ON A SET OF PLANS ENTITLED "SCHOOL OF COMMUNICATIONS AND MEDIA BUILDING AND LIFE HALL RENOVATION" DATED MARCH 11, 2015 REVISED

More information

Request for an Exception to the Napa County Road and Street Standards

Request for an Exception to the Napa County Road and Street Standards F Request for an Exception to the Napa County Road and Street Standards Shed Creek Winery Use Permit P16-327 and Use Permit Exception to the Conservation Regulations P17-178 Planning Commission Hearing

More information

ColorMax Cyclone Cleaning Kit

ColorMax Cyclone Cleaning Kit Instruction Sheet P/N 637 0 WARNING: Allow only qualified personnel to perform the following tasks. Follow the safety instructions in this document and all other related documentation. Description See

More information

DATE: January 19, WCA Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer

DATE: January 19, WCA Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer DATE: January 9, 0 TO: FROM: THROUGH: SUBJECT: WCA Governing Board Johnathan Perisho, Project Manager Mark Stanley, Executive Officer : Consideration of a resolution to authorize Executive Officer, or

More information

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for detention furniture.

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for detention furniture. SECTION 125500-WALL BED SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1. SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers

More information

Legend 22'-2" Sta 10+43 Bark mulch (Typ) 4 R20'-6" Landscape Edging Schedule A Seed Mix - Mowable Schedule B Seed Mix (Typ) Schedule A Seed Mix (Typ) 3' width, 4" depth rock mulch (Typ) 5'-0" Schedule

More information

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT 8 8 CONCRETE RAMP WOOD STEPS SWIMMING POOL 8 METAL POOL ENCLOSURE FENCE 9 SINGLE LEAF METAL GATE 0 LAWN HANGING CANOPY WITH DOWN LIGHTS METAL & GLASS AWNING AMENITY ROOM WITH FOLDING GLASS WALLS CONCRETE

More information

PRESTO GEOTERRA GTO FAST DEPLOYMENT CONSTRUCTION MAT SYSTEM SPECIFICATION & INSTALLATION GUIDELINE

PRESTO GEOTERRA GTO FAST DEPLOYMENT CONSTRUCTION MAT SYSTEM SPECIFICATION & INSTALLATION GUIDELINE GEOTERRA GTO PRESTO GEOSYSTEMS 670 N Perkins Street, Appleton, Wisconsin, USA Ph: 920-738-1328; Fax: 920-738-1222 www.prestogeo.com GTO/001 1 Oct 2013 Table of Contents GEOTERRA GTO System... 1 GEOTERRA

More information

A0.1 TITLE SHEET. Santa Barbara, CA Suite C. 156 West Alamar Ave. 21 E. VICTORIA STREET ste 200 SANTA BARBARA, CA (805)

A0.1 TITLE SHEET. Santa Barbara, CA Suite C. 156 West Alamar Ave. 21 E. VICTORIA STREET ste 200 SANTA BARBARA, CA (805) PROJECT CODE: 1446 FILENAME: 1446 A0.1 Cover.dwg KKC APPROVALS: DATE: NO: DATE: Mar 31, 2016, 12:21pm COMMENTS: A0.1 TITLE SHEET MECH. ROOM DOOR VICINITY MAP N NORTH - PARKING SPACE STATISTICS SOUTH -

More information

BREWSTER SR173 PROPOSED: OKANOGAN RIVER PADDLERS CAMPGROUND WATERBODY: OKANOGAN RIVER NEAR: BREWSTER COUNTY: OKANOGAN STATE: WASHINGTON

BREWSTER SR173 PROPOSED: OKANOGAN RIVER PADDLERS CAMPGROUND WATERBODY: OKANOGAN RIVER NEAR: BREWSTER COUNTY: OKANOGAN STATE: WASHINGTON OKANOGAN RIVER PROJECT LOCATION SR53 COLUMBIA RIVER SR73 METHOW RIVER PATEROS SR7 SR7 BRIDGEPORT VICINITY MAP NEAR: VICINITY 2 GEBBERS FARMS INC APN 302570024 STATE HWY 7 DOUGLAS CO. PUD NO. APN 302570037

More information

GEOMEMBRANE FIELD INSTALLATION

GEOMEMBRANE FIELD INSTALLATION GEOMEMBRANE FIELD INSTALLATION CONTENTS Introduction Quality Control and Quality Assurance Types of lining systems Basic Lining Design Executive Lining Design Basic Lining Design Specification Executive

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES 01050-1 Construction Surveying 1 LS 01500-1 Temporary Fences & Barricades 1,500 LF 02600-1 Shoring, Cofferdam, Temp. Sheeting, & Dewatering 1 LS 01565-1 Storm Drainage & Erosion Sediment Control 1 LS 01565-2

More information

CITY OF BONITA SPRINGS PERMITTING FEES 9101 Bonita Beach Road Bonita Springs, FL

CITY OF BONITA SPRINGS PERMITTING FEES 9101 Bonita Beach Road Bonita Springs, FL CITY OF BONITA SPRINGS PERMITTING FEES 9101 Bonita Beach Road Bonita Springs, FL 34135 239-949-6246 DRIVEWAY PERMIT FEES Single Residential Driveway Connection/ Filling in Swale Permit Fee $215.00 After

More information

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS PART 0 A/E INSTRUCTIONS 0.01 Design Requirements A. Pumping system design 1. A primary-secondary pumping system is preferred. Redundant pipes are required for chillers and boilers. 2. Select pumps to operate

More information

3" TO 4" OF TOPSOIL 2:1 MIRAFI HP 565 GEO FABRIC OR EQUIVALENT 9' SPILLWAY EL=7147 2:1 SPILLWAY SECTION N.T.S. TOP OF POND EL=7149' RIP-RAP D 50 8" WRAPPED IN FILTER FABRIC 45 MIL HDPE POND LINER OR EQUIVALENT

More information

T_01 Cover.DGN 5/10/ :51:40 AM

T_01 Cover.DGN 5/10/ :51:40 AM T_01 Cover.DGN 5/10/2018 10:51:40 AM T_02 Note.DGN 2/27/2018 1:35:21 PM T_03 Blank.DGN 2/27/2018 1:36:34 PM T_04 Standard Symbols.DGN 2/27/2018 1:37:37 PM T_05 Signal Span Detail.DGN 2/27/2018 1:38:53

More information

Indirect Design Comparison of the structural strength of the pipe (Three- Edge-Bearing Test) to the field supporting strength of a buried pipe.

Indirect Design Comparison of the structural strength of the pipe (Three- Edge-Bearing Test) to the field supporting strength of a buried pipe. 2 Indirect Design Comparison of the structural strength of the pipe (Three- Edge-Bearing Test) to the field supporting strength of a buried pipe. Direct Design The design of pipe in the installed condition.

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017 SECTION 10 2800 - TOILET, BATH, AND LAUNDRY ACCESSORIES GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

South Fraser Perimeter Road (SFPR)

South Fraser Perimeter Road (SFPR) MSE WALLS & SLOPES PROJECT PROFILE South Fraser Perimeter Road (SFPR) Nilex provides multiple solutions for the new four-lane highway along Vancouver s Fraser River. LOCATION: Delta and Surrey, British

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018 SECTION 10 2800 - TOILET, BATH, AND LAUNDRY ACCESSORIES GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

Pullout of Geosynthetic Reinforcement with In-plane Drainage Capability. J.G. Zornberg 1 and Y. Kang 2

Pullout of Geosynthetic Reinforcement with In-plane Drainage Capability. J.G. Zornberg 1 and Y. Kang 2 Zornberg, J.G., Kang, Y. (2005). Pullout of Geosynthetic Reinforcement with In-plane Drainage Capability. Geosynthetics Research and Development in Progress, Eighteenth Geosynthetic Research Institute

More information

EVALUATION OF ANCHOR SYSTEMS THROUGH FULL SCALE PULLOUT TESTING

EVALUATION OF ANCHOR SYSTEMS THROUGH FULL SCALE PULLOUT TESTING Presented at Environmental Connections 2017, IECA, Atlanta, GA EVALUATION OF ANCHOR SYSTEMS THROUGH FULL SCALE PULLOUT TESTING James E. (Jay) Sprague, Laboratory Director, TRI/Environmental - Denver Downs

More information

SECTION AMENDED TOPSOIL

SECTION AMENDED TOPSOIL SECTION 02486 AMENDED TOPSOIL PART 1 - GENERAL 1.01 SUMMARY A. Work described in this section includes requirements for soil amendments, soil preparation, preparation and finish grading of turf restoration

More information

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS SECTION 23 34 16 CENTRIFUGAL HVAC FANS PART 1 - GENERAL 1.01 RELATED DOCUMENT A. Drawings and general provisions of the contract, including General and Special Conditions and Division 01 Specification

More information

MARQUETTE UNIVERSITY DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING LAB REPORT FORMAT

MARQUETTE UNIVERSITY DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING LAB REPORT FORMAT MARQUETTE UNIVERSITY DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING LAB REPORT FORMAT a. All reports must be typed and include the following sections in the order specified: Title Page Introduction

More information

INSTALLATION INSTRUCTIONS: VERTICAL WALL BED HARDWARE KIT WITH FRAME

INSTALLATION INSTRUCTIONS: VERTICAL WALL BED HARDWARE KIT WITH FRAME INSTALLATION INSTRUCTIONS: VERTICAL WALL BED HARDWARE KIT WITH FRAME MODEL CODES: 54877 (Single vertical wall bed) 55991 (Double vertical wall bed) 54386 (Queen vertical wall bed) *Our more compact model

More information

PS12 CITY OF TERRE HAUTE VIGO COUNTY, INDIANA DRAWING NO. EXISTING AND NEW STRUCTURE DATA TABLE JW, CM. No. DATE DESCRIPTION REVISED BY JLH ACS

PS12 CITY OF TERRE HAUTE VIGO COUNTY, INDIANA DRAWING NO. EXISTING AND NEW STRUCTURE DATA TABLE JW, CM. No. DATE DESCRIPTION REVISED BY JLH ACS C JW, CM EXISTING AND NEW STRUCTURE DATA TABLE PS12 #5933 NEW OUTFALL STRUCTURE #1 1"=60' EXISTING OPENING THROUGH TREE LINE ( SEWER AND OUTFALL STRUCTURE SHALL BE INSTALLED AT THIS LOCATION TO AVOID ANY

More information

National Register of Historic Places Continuation Sheet

National Register of Historic Places Continuation Sheet NPS Form 10-900-a (Rev. 8/2002) OMB No. 1024-0018 (Expires 5-31-2012) United States Department of the Interior National Park Service National Register of Historic Places Continuation Sheet Bridge No. 5721

More information

UMA-1020 Light Weight Suspended Ceiling Kit

UMA-1020 Light Weight Suspended Ceiling Kit INSTALLATION INSTRUCTIONS UMA-1020 Light Weight Suspended Ceiling Kit The provides a sturdy support for LCD/DLP hanging brackets (and certain other products weighing less than 50 pounds) when installing

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-02 66 00 (February 2010) ----------------------------- Preparing Activity: USACE Superseding UFGS-02 66 00 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

CMA-440 Light Weight Suspended Ceiling Kit

CMA-440 Light Weight Suspended Ceiling Kit INSTALLATION INSTRUCTIONS CMA-440 Light Weight Suspended Ceiling Kit The provides a sturdy support for LCD/DLP hanging brackets (and certain other products weighing less than 50 pounds) when installing

More information

NOVEMBER 14, 2016 BURRELL ENGINEERING TROY BURRELL N FLORIDA AVE DUNNELLON, FL 34434

NOVEMBER 14, 2016 BURRELL ENGINEERING TROY BURRELL N FLORIDA AVE DUNNELLON, FL 34434 NOVEMBER, 0 BURRELL ENGINEERING TROY BURRELL 005 N FLORIDA AVE DUNNELLON, FL 33 PROJECT NAME: SECO @ SR 00 PROJECT #9990079 APPLICATION: MAJOR SITE PLAN #9388 Dear Troy: The above referenced project was

More information

D-11 OUTLINE SPECIFICATION FOR HTHW (ABOVE GRADE) HYDRONIC PIPING

D-11 OUTLINE SPECIFICATION FOR HTHW (ABOVE GRADE) HYDRONIC PIPING D-11 OUTLINE SPECIFICATION FOR HTHW (ABOVE GRADE) HYDRONIC PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

1. RETAINING WALL SELECTION PROCEDURE

1. RETAINING WALL SELECTION PROCEDURE 1. RETAINING WALL SELECTION PROCEDURE a. Select the appropriate design table(s) depending on whether or not there are fences located above the retaining wall. Go to Section 3.1 or 4.1 of this document

More information

Roof Mounting System. Installation Manual. Light Rail (XRL) 2013 Edition v1.3. Solar Mounting Made Simple

Roof Mounting System. Installation Manual. Light Rail (XRL) 2013 Edition v1.3. Solar Mounting Made Simple R Roof Mounting System (XRL) 2013 Edition v1.3 A complete Manual for the installation of IronRidge s system. Table of Contents This was created to help with the assembly of the IronRidge Mounting System.

More information

SPECIAL SPECIFICATION 2242 LATH, STUCCO AND PLASTER

SPECIAL SPECIFICATION 2242 LATH, STUCCO AND PLASTER 2004 Specifications CSJ: 0921-02-314 SPECIAL SPECIFICATION 2242 LATH, STUCCO AND PLASTER 1.1 DESCRIPTION A. Section Includes 1. This Item shall govern for the installation of lath, stucco and plaster particularly

More information

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES SECTION 10 00 00 - SPECIALTIES 10 28 12 - TOILET PARTITIONS: Owner Preferences: Solid core phenolic, polymer based solid surfacing, and solid plastic toilet compartment and screen systems. No Stainless

More information

Roof Mounting System. Installation Manual. Standard Rail (XRS) 2013 Edition v1.3. Solar Mounting Made Simple

Roof Mounting System. Installation Manual. Standard Rail (XRS) 2013 Edition v1.3. Solar Mounting Made Simple R Roof Mounting System (XRS) 2013 Edition v1.3 A complete Manual for the installation of IronRidge s system. Table of Contents This was created to help with the assembly of the IronRidge Mounting System.

More information

Guardrail and Barrier Systems

Guardrail and Barrier Systems GUARDRAI LAND BARRI ERSYSTEMS 04 GUARDRAIL AND WALKWAY SYSTEMS Guardrail and Barrier Systems Contents KATTSAFE GW31 guardrail 78 KATTSAFE GW32 guardrail 80 KATTSAFE non-penetrating guardrail 82 KATTSAFE

More information

SECTION FINE GRADING AND SOIL PREPARATION

SECTION FINE GRADING AND SOIL PREPARATION SECTION 32 90 00 PART 1 GENERAL 1.01 SECTION INCLUDES A. Examination. B. Preparation. C. Subsoil Preparation. D. Placing Topsoil. E. Soil Tests. F. Coordination of Soil Amendments. G. Fine Grading. H.

More information

Pole Mounting System Installation & Certification Manual

Pole Mounting System Installation & Certification Manual Pole Mounting System Installation & Certification Manual IronRidge Pole Mount Installation Guide... 2 IronRidge Certification Letter... 14 IronRidge Wet Stamped Drawing... 15 IronRidge Foundation Addendum...

More information

BANK UNDERDRAIN (ALTERNATE LOCATION) (PIPE SHALL BE WRAPPED WITH GEOTEXTILE) DRAINAGE LAYER GRANULAR MATERIAL CLASS II 3" NOMINAL DEPTH

BANK UNDERDRAIN (ALTERNATE LOCATION) (PIPE SHALL BE WRAPPED WITH GEOTEXTILE) DRAINAGE LAYER GRANULAR MATERIAL CLASS II 3 NOMINAL DEPTH NATURAL GROUND WITH SEEPAGE LAYERS AND / OR PERVIOUS SOIL CAP MATERIAL FOR "GRANULAR BLANKET" SHALL BE GRANULAR MATERIAL CLASS II SOD AND TOPSOIL OR TOPSOIL, SEED, AND MULCH AS SPECIFIED ON PLANS CLASSED

More information

Request for Approval of Design Modification

Request for Approval of Design Modification March 7, 2017 Piper Peterson U. S. Environmental Protection Agency 1200 Sixth Avenue, ECL-122, Suite 900 Seattle, Washington 98101 Subject: Request for Approval of Design Modification T-117 Early Action

More information

POROUS CONVEYOR LINE PRINTER INDEXING ASSEMBLY POROUS CONVEYOR LINE PRINTER INDEXING ASSEMBLY PARTS LIST INDEX ASSEMBLY BLOCK A

POROUS CONVEYOR LINE PRINTER INDEXING ASSEMBLY POROUS CONVEYOR LINE PRINTER INDEXING ASSEMBLY PARTS LIST INDEX ASSEMBLY BLOCK A STENCILING & MARKING May, 00 SYSTEMS Parts List UNIVERSAL POROUS CONVEYOR LINE PRINTERS CLP-00, CLP-00, CLP-00 & CLP-00 SERIES POROUS CONVEYOR LINE PRINTER INDEXING ASSEMBLY 0 POROUS CONVEYOR LINE PRINTER

More information

X. Compact Condensers

X. Compact Condensers Mobile Climate Control 7 MCC Reference Manual 0 Electric Condenser Model 0-00 -00 Air Flow Condenser V Condenser V -to support a cooling capacity of 00 Btu/hr (7770 W) -0 CFM (7 m /h) -. Amps/.V -0. Amps/7V

More information

STS Directory Accreditation number: STS 0030

STS Directory Accreditation number: STS 0030 International standard: ISO/IEC 17025:2005 Swiss standard: SN EN ISO/IEC 17025:2005 BSL Baustofflabor AG Postgässli 23a 3661 Uetendorf Head: Felix Solcà Responsible for MS: Dr. Benjamin Kaeser Telephone:

More information

FLUSH MOUNT 6' SIDEWALK PAINTED WITH COURT DELINEATIONS REMOVABLE BOLLARD, TYP. PRIVATE ALLEY CURB AND GUTTER (STREET NAME TO BE DETERMINED)

FLUSH MOUNT 6' SIDEWALK PAINTED WITH COURT DELINEATIONS REMOVABLE BOLLARD, TYP. PRIVATE ALLEY CURB AND GUTTER (STREET NAME TO BE DETERMINED) P:\COLUMBIA GROVE\DWG\SHEETS\.. Submittal\L.0.dwg Xrefs: A-tb-W6 L-mp-W6-Phase L-sp-W6-Phase A-sp-W6-FP0 Phase 768L-SV L-tb-W6-Key Plan,) WALK TRASH AND RECYCLING RECEPTACLES WITH " STABILIZED MULCH PLAY

More information

INSTALLATION INSTRUCTIONS CARE AND MAINTENANCE

INSTALLATION INSTRUCTIONS CARE AND MAINTENANCE INSTALLATION INSTRUCTIONS CARE AND MAINTENANCE Estate VorMax Right Height Elongated 2-piece Toilet Model 207AA104 Thank you for selecting American Standard - the benchmark of fine quality for over 100

More information

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION Please read through this instruction completely before beginning your installation. Be sure the proper equipment, and safety precautions are in

More information

DIRECT EMBED POLE STANDARD DESIGNS GENERAL USE FEATURES

DIRECT EMBED POLE STANDARD DESIGNS GENERAL USE FEATURES P Pole Height Above Grade 0 Embedment Separation 1 () Jacking Lugs Splice 4 Port D Gravel Base Cap Plate Port C Port B Port A Aggregate Backfill DIRECT EMBED POLE STANDARD DESIGNS Ground Attachment Clips

More information

'' Stone Fireplace Model# SRFP41301 Instructions Manual

'' Stone Fireplace Model# SRFP41301 Instructions Manual 259-5069 47'' Stone Fireplace Model# SRFP430 Instructions Manual Questions, problems, missing parts? Before returning to your retailer, call our customer service department at -866-84-0585, 8 a.m. - 8

More information

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings. DIVISION 21 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 GENERAL 1.1 SECTION INCLUDES A. Pipe, fittings, sleeves, escutcheons, seals, and connections for sprinkler systems. 1.2 RELATED REQUIREMENTS

More information

M-231 and Water Quality. Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT

M-231 and Water Quality. Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT M-231 and Water Quality Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT M-231 Facts: 7-Miles long 2-Lane Limited Access Highway Connects I-96 and M-45 M-231 Facts: Includes Michigan

More information

Construction Standards Page

Construction Standards Page Construction Standards Page 236313-1 SECTION 236313 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

STORMWATER MANAGEMENT

STORMWATER MANAGEMENT STORMWATER MANAGEMENT LET S GET IT DONE STORMWATER MANAGEMENT Looking for a smarter way to manage stormwater runoff on your project? The R-Tank System provides the most efficient and versatile method of

More information

UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose

UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose UAA School of Engineering Parking Garage Master Plan Amendment 1. Purpose Since the UAA campus master plan was drafted in 2003, adopted in 2004, and amended in 2009 a number of significant changes regarding

More information

Coir Block System (fabric attached coir block) add New Dimension to Streambank Stabilization Projects

Coir Block System (fabric attached coir block) add New Dimension to Streambank Stabilization Projects Coir Block System (fabric attached coir block) add New Dimension to Streambank Stabilization Projects Using geotextiles to confine soil in lifts between layers of live plants has become an increasingly

More information

Spare Parts List (Kits) Model Ref.:- HM35 SERIES A Spare Parts List (Kits) Issue 8 Dated 10-February-2015 Reference Drawing 09-1108-0000 Issue B Dated 07-January 2014 Drawing Ref. Part Number DESCRIPTION

More information

Pole Mounting System Installation & Certification Manual

Pole Mounting System Installation & Certification Manual Pole Mounting System Installation & Certification Manual IronRidge Pole Mount Installation Guide... 2 IronRidge Certification Letter... 17 IronRidge Wet Stamped Drawing... 18 IronRidge Foundation Addendum...

More information

SHEET L-5 SHEET L-4 SHEET L-7

SHEET L-5 SHEET L-4 SHEET L-7 LEGEND COAL CREEK DRIVE 8' - 2' HT. BLOCK 32 30 EIGHTH AVENUE 35 29 28 5 TRACT 'C' 36 SHEET L-5 BLOCK SIXTH AVENUE 3 2 52 50 3 4 TRACT 'E' 49 37 5 TRACT 'A' BLOCK 38 26 6 48 25 SHEET L-3 39 24 BLOCK 23

More information

ARCHITECTURAL PAVING STONE PRODUCT CATALOG

ARCHITECTURAL PAVING STONE PRODUCT CATALOG ARCHITECTURAL PAVING STONE PRODUCT CATALOG ARCHITECTURAL PAVING STONES - 360, H STREET, WASHINGTON, D.C. ARCHITECTURAL PAVING STONE Nitterhouse s high strength Architectural Pavers combine durability with

More information

What Are Some Ways Erosion Can Be Managed?

What Are Some Ways Erosion Can Be Managed? Learning Set 3 The Basketball-Court Challenge 3.5 Case Studies What Are Some Ways Erosion Can Be Managed? Name: Case name Case description (include problem) Case solution (describe and sketch) You are

More information

***************************************************************************************************************

*************************************************************************************************************** 11062 THEATER CURTAINS AND TRACKS SPECIFIER: CSI MasterFormat 2004 number 11 61 43 PART 1 GENERAL 1.1 SUMMARY A. Related Sections: 1. 05500 - Metal Fabrications. 2. 06100 - Carpentry. 3. 11132 - Projection

More information

Installation Manual Universal Top-of-Pole Mount UNI-TP/08LL

Installation Manual Universal Top-of-Pole Mount UNI-TP/08LL Installation Manual Universal Top-of-Pole Mount UNI-TP/08LL Solar Mounting Solutions UNI-TP/08LL April 2010 www.ironridge.com 2010 IronRidge, Inc. All Rights Reserved Version 2.0 2 Universal Top-of-Pole

More information

BOND STRENGTH BEHAVIOR OF HEADED REINFORCEMENT BAR WITH VARYING EMBEDMENT LENGTH

BOND STRENGTH BEHAVIOR OF HEADED REINFORCEMENT BAR WITH VARYING EMBEDMENT LENGTH SECM/15/140 BOND STRENGTH BEHAVIOR OF HEADED REINFORCEMENT BAR WITH VARYING EMBEDMENT LENGTH S. Gond 1 and Prof. S. M. Kulkarni 1* 1 Parul Institute of Engineering and Technology, Limda, Vadodara, Gujarat,

More information

DUKE UNIVERSITY CONSTRUCTION & DESIGN STANDARDS

DUKE UNIVERSITY CONSTRUCTION & DESIGN STANDARDS 1 11 82 26 Waste Compactors and Destructors 1. Introduction A. This Construction and Design standard covers waste compactor guidelines including placement and access, pads, bollards, screening, drainage

More information

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION Adopted November 28, 2005 TABLE OF CONTENTS DEFINITION OF TERMS...II I. DESIGN CRITERIA... 1 A. GENERAL DESIGN CRITERIA... 1 B. ROADWAY CLASSIFICATION...

More information

Installation Manual. Top of Pole Mount Edition v1.01. For models:

Installation Manual. Top of Pole Mount Edition v1.01. For models: Top of Pole Mount Installation Manual 2014 Edition v1.01 For models: UNI-TP/02 UNI-TP/02A UNI-TP/03 UNI-TP/04 UNI-TP/04A UNI-TP/06 UNI-TP/06LL UNI-TP/08 UNI-TP/08LL UNI-TP/10 UNI-TP/10LL UNI-TP/12 UNI-TP/12LL

More information

SECTION GYPSUM PLASTER

SECTION GYPSUM PLASTER SECTION 09210 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work under this Section shall include all materials and installation for support of gypsum plaster used as a finish for partitions and ceilings

More information

Install the Fixture using a Stake (Pathway Models Only) Prepare the Fixture. Pathway and Bollards INSTALLATION OPTIONS: Installation Instructions for

Install the Fixture using a Stake (Pathway Models Only) Prepare the Fixture. Pathway and Bollards INSTALLATION OPTIONS: Installation Instructions for Installation Instructions for Pathway and Bollards 920OA_OB. OUTDOOR GENERAL PRODUCT I NFORMATION: This product is suitable for wet locations. Pathway models are 2VAC input only. Refer to product specsheet

More information

Modular Drawer Cabinets Installation Instructions

Modular Drawer Cabinets Installation Instructions Modular Drawer Cabinets Installation Instructions IMPORTANT PRODUCT LIABILITY INFORMATION Read all instructions before proceeding with installation or drawer loading. Vital product information pertaining

More information

Welcome. Mill Creek Ravine Pedestrian Bridges Rehabilitation. Public Information Session #1. Thursday, October 27, :00 8:00 p.m.

Welcome. Mill Creek Ravine Pedestrian Bridges Rehabilitation. Public Information Session #1. Thursday, October 27, :00 8:00 p.m. Welcome Mill Creek Ravine Pedestrian Bridges Rehabilitation Public Information Session #1 Thursday, October 27, 2016 5:00 8:00 p.m. Tonight you can: Learn about the rehabilitation of 5 pedestrian bridges

More information

Corridor Transformation Strategy

Corridor Transformation Strategy Corridor Transformation Strategy County Road 22 Special Planning Area Design Guidelines January 2012 D14-06017 Corridor Transformation Strategy County Road 22 Special Planning Area Corridor Design Guidelines

More information

DESIGN OF FOOTBRIDGES

DESIGN OF FOOTBRIDGES Civil Engineering Technical Requirement CIVIL-SR-006 DESIGN OF FOOTBRIDGES Revision: 9 Updated: 26/08/2015 Queensland Rail 2015 Reproduction by any means (including electronic, mechanical, photocopying,

More information

Assembly, Installation & Watering Guide VERTICAL GARDEN SYSTEM. Version 4. Product Version. Gro-Wall 4.0.

Assembly, Installation & Watering Guide VERTICAL GARDEN SYSTEM. Version 4.  Product Version. Gro-Wall 4.0. Product Version Gro-Wall 4.0 Document ID 06-09-2012/4:16PM/CU VERTICAL GARDEN SYSTEM Version 4 Assembly, Installation & Watering Guide www.atlantiscorp.com.au Contents Gro-Wall Components Additional Materials

More information

Ballast Paver Design & Installation Guide

Ballast Paver Design & Installation Guide Ballast Paver Design & Installation Guide To Order: Contact Your Local Firestone Building Products Representative. PRODUCT DESCRIPTIONS Size: 1 1 2" x 11 3 4" x 1 1 2" Weight: 12 0.5 lbs./sq. ft. Compressive

More information

INSTALLATION INSTRUCTIONS CARE AND MAINTENANCE

INSTALLATION INSTRUCTIONS CARE AND MAINTENANCE INSTALLATION INSTRUCTIONS CARE AND MAINTENANCE Heritage VorMax Right Height Elongated 2-piece Toilet Model 205AA104 Thank you for selecting American Standard - the benchmark of fine quality for over 100

More information

ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED

ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED SYMBOLS AND ABBREVIATIONS ABBREVIATIONS GENERAL NOTES LINE TYPE LEGEND CIRCUITS TELECOMMUNICATION SYSTEM ING EQUIPMENT POWER DEVICES FIRE ALARM SYSTEM NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED

More information

ENG COMPANY PROFILE. esimgroup.com

ENG COMPANY PROFILE. esimgroup.com ENG COMPANY PROFILE esimgroup.com 1. The history pag. 7 2. The Organization pag. 8 3. The Business Sector pag. 9 4. The Mission pag. 11 5. Offered services pag. 13 6. Diagnostics railway systems pag.

More information

Guidelines for Earthquake Bracing of Residential Water Heaters

Guidelines for Earthquake Bracing of Residential Water Heaters Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)

More information

Subsoil conditions are examined using test borings, provided by soil engineer (geotechnical).

Subsoil conditions are examined using test borings, provided by soil engineer (geotechnical). SOIL & FOUNDATION TYPES: Subsurface investigations: Subsoil conditions are examined using test borings, provided by soil engineer (geotechnical). Number of borings and location of borings depends on building

More information

Construction and Landscaping on Public Property

Construction and Landscaping on Public Property Construction and Landscaping on Public Property City of Manhattan Beach Community Development Department 1400 Highland Avenue 310-802-5504 www.citymb.info January, 2004 Construction and Landscaping on

More information

Roof Mounting System. Installation Manual. Standard (XRS) and Light (XRL) Rails with Integrated Grounding *ETL Listed Per UL Edition v1.

Roof Mounting System. Installation Manual. Standard (XRS) and Light (XRL) Rails with Integrated Grounding *ETL Listed Per UL Edition v1. Roof Mounting System Standard (XRS) and Light (XRL) *ETL Listed Per UL2703 2013 Edition v1.1 A complete manual for the installation of IronRidge s rail systems with integrated grounding. This Installation

More information

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE Prof. J. N. Mandal Department of civil engineering, IIT Bombay, Powai, Mumbai 400076, India. Tel.022-25767328 email: cejnm@civil.iitb.ac.in Module - 7

More information

PORT MACQUARIE RSL CENOTAPH RELOCATION PORT MACQUARIE CBD

PORT MACQUARIE RSL CENOTAPH RELOCATION PORT MACQUARIE CBD SHEET INDEX Layout _ Revison SK1.1_ C SK1.2_ C SK3.1_ C SK4.1_ B Layout Name COVER SHEET SITE LOCATION PLAN SITE LOCATION PLAN ENLARGED SOUTH ELEVATION PERSPECTIVE SHEET 1 N LOT 677 DP 722594 LOT 3 DP

More information

Key Issues and Budget Constraints with Replacing Rural, Low Traffic Volume Bridges.

Key Issues and Budget Constraints with Replacing Rural, Low Traffic Volume Bridges. Key Issues and Budget Constraints with Replacing Rural, Low Traffic Volume Bridges. Case Study: Steel I-Beam Bridge Replacements using Glued Laminated Timber By Patrick Bigg, General Manager of Introduction

More information

Stormwater Retrofits Made Practical City of Eugene Oregon. Doug Singer, P.E., CSM Principal Civil Engineer City of Eugene Public Works

Stormwater Retrofits Made Practical City of Eugene Oregon. Doug Singer, P.E., CSM Principal Civil Engineer City of Eugene Public Works Stormwater Retrofits Made Practical City of Eugene Oregon Doug Singer, P.E., CSM Principal Civil Engineer City of Eugene Public Works Doug Singer Introduction BS Civil Engineering from Oregon State University

More information

SECTION THEATER CURTAINS AND TRACKS. A. American Society for Testing and Materials (ASTM):

SECTION THEATER CURTAINS AND TRACKS. A. American Society for Testing and Materials (ASTM): SECTION 11062 THEATER CURTAINS AND TRACKS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 05500 - Metal Fabrications. 2. 06100 - Carpentry. 3. 11132 - Projection Screens. 4. Division 16 - Light Pipes.

More information

TOWN OF SPENCER FIRE and EMERGENCY SERVICES

TOWN OF SPENCER FIRE and EMERGENCY SERVICES TOWN OF SPENCER FIRE and EMERGENCY SERVICES Fire Prevention and Protection Regulations For Sub divisions 1. General requirements 2. Hydrants 3. Fire Cisterns Chapter 4. Dry Hydrants 5. Residential Sprinklers

More information