Rockwell/Johnson School Renovations Project. Existing Conditions September, 2016
|
|
- Letitia McKinney
- 5 years ago
- Views:
Transcription
1 Rockwell/Johnson School Renovations Project Existing Conditions September, 2016
2 Rockwell School Conditions
3 RS - Custodial Closet Shared w/ Book Room.
4 RS - Aging Telephone Switch Gear/No Growth for Additional Phones/Communication
5 RS -Age of School/Settling Cracked Floors Throughout
6 RS Lack of Storage/Electrical Switch Room Used as Storage, Fire Violation
7 RS -Two of Four Air Handlers Operational/Two Un-repairable
8 RS -Nurse's Room Limited Abilities/ Treatment Area Cramped, Not Private.
9 RS -Main Stairwell ADA Issues w/ Railings & Supports
10 RS -Media Center Shelves Not Age Appropriate, Upper Shelf Unusable/Unsafe
11 RS - Media Center is too small.
12 RS -Only mechanical ventilation available. Lower blue unit/upper air conditioner unit has limited abilities. Struggles to keep the temp. from overheating in the computer lab.
13 RS -Additional electrical circuits are needed but are not available due to the age of the building abilities.
14 RS - Not enough outlets to support technology needs.
15 RS - Class size can be students along with all the furniture.
16 RS -One undersize exhaust fan serves the entire second floor hallway. Resulting in inadequately exhausting heat and humidity throughout the day.
17 RS -Restrooms not grade appropriate for the size of the students using them.
18 RS -Restrooms not grade appropriate for the size of the students using them.
19 RS -Current electrical panels have no growth potential.
20 RS - Elevator does not meet ADA and NFAP fire codes. Stretchers and wheelchairs are unable to maneuver.
21 RS - Paved walkways around the perimeter of the school require extensive grading to remove previous years of patching.
22 RS - 4 Specialist have to share space - up to 4 groups running at the same time.
23 RS - School Psychologist Office - No room to meet with students.
24 RS - Playground Equipment - Outdated and broken pieces.
25 RS - Playground - Cracked and sealed pavement.
26 RS - Only one Conference Room - Too small, no ventilation, and often double booked.
27 Johnson School Conditions
28 JS-Gym shower restroom spaces forced to be used for school storage.
29 JS-Gym toilets not suitable for current ADA requirements.
30 JS-Cafeteria air handlers lack ability to exhaust /heat the space as needed due to size and age of the equipment.
31 JS-Bus drop off area & parent drop offs lanes need to be separated with plastic barricades due to design issues.
32 JS-Service road that goes behind the building is not adequate for emergency vehicles.
33 JS-Stage cramped and has limited abilities for use.
34 JS-Guidance Office lobby cramped with space concerns.
35 JS-STEM classroom crammed, with space concerns.
36 JS-STEM classroom crammed, with space concerns.
37 JS-Student restrooms not grade appropriate fixtures for size of students.
38 JS-Paved walkways around perimeter of school require extensive grading to remove previous years of patching.
39 JS-Several classroom windows have broken thermal seals resulting in foggy condensation forming within the window.
40 JS-Several doorways throughout the building have locking bars in the middle of the travel path of the doors causing exiting issues and injuries.
41 JS-Old cabinet heaters have become difficult to keep in operation due to age and condition of equipment.
42 JS- Pavement & concrete surfaces w/patched over mounds, broken & raised sections, w/potholes & cracks.
43 JS - Band room does not have storage and not large enough to hold ensemble.
44 JS - Shared classrooms - multiple groups going on at the same time.
45 JS - Lack of Space - ELL Instruction occurs in small office.
46 JS - Chorus room not large enough to hold 75+ students.
47 JS - School Counseling Office too small & poor ventilation.
48 JS - Conference room too small for parent meetings and poor ventilation.
Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767
Allisonville Elementary School Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 ADA improvements are Fire alarms need to be updated Playground equipment needs to be
More informationNew High School Concept
Approved Bond Projects for Alamance-Burlington Schools In November 2018, Alamance County citizens approved a $150 million bond project proposal. Bond funds will pay to construct a new high school and provide
More informationVOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED
Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological
More information3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000
1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert
More informationBriar Crest Elementary
Promises Kept This document includes partial lists of major projects completed at Pattonville Schools since 1986 as part of past bond issues approved by the Pattonville community. Briar Crest Elementary
More informationIEQ SCHOOL DATA BASE. School Name: Reservoir High School Principal: Patrick Saunderson DATE: 1/23/2017. WORK ORDER NUMBER of POTENTIAL IEQ
LOOK-FORS ROOM/LOCATION COMMENTS ADMIN FACILITIES WORK ORDER NUMBER of POTENTIAL IEQ DATE ASSIGNED COMPLETION DATE 30 DAY REVISIT CLOSED 1. No unusual or offensive odors, or temperature discomfort 316,
More informationFood needs to be in sealed containers 03. FOOD: Unsealed, left in
01A. ODOR: Unusual or 6/14/2017 14:15offensive Boys room Urine smell 01A. ODOR: Unusual or 6/14/2017 15:16offensive Office Odor and poor air flow x 01B. TEMPERATURE: 6/14/2017 13:42Uncomfortable 202 Warm
More informationCAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14
2014-2015 CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 School Item Amount a. Classroom A/R (Increase CR capacity to 804, add l Resource and tutoring spaces needed. Teacher
More informationMaster Facility Planning Update School Board Meeting May 26, 2016
Master Facility Planning Update School Board Meeting May 26, 2016 Master Facilities Committee Overview Reflection of Committee Work Review of District Wide Facility Issues Identified District Wide Facility
More informationPLATTEVILLE MIDDLE SCHOOL
Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle
More information30% Design Community Meeting
Monday, September 17, 2018 30% Design Community Meeting Site 85-E-W-4 Please sign in on your mobile device: http//communitymeeting.ocps.net/ Site 85-E-W-4 Meeting Agenda September 17, 2018, 6:45PM Welcome
More information2014 Bond Project Guide
2014 Bond Project Guide Bush Elementary School Page 1 Instructional Technology Computers, Projectors, Mobile Carts, Document Cameras and Printers Wireless Connectivity New Construction New Tech Center
More informationGreenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111
Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111 Year Opened 1958 Current Square Footage 50,504 Site Acreage 8.53 greenwood.cherrycreekschools.org $220,720 Electrical
More informationEmergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools
Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools 143 Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky
More informationNumber of persons with a disability that live with a disability in your community?
Building name: re Dame Location: Owen Sound Assessment by: Cathy Smart Date: August 25, 2003 Total number of students: 378 Number of students living with a disability? Deaf/Hard of hearing Blind/Low vision
More informationEMMS IEQ Walkthrough Summary Spring Room Observations (Responses)
01A. ODOR: Unusual or 5/15/2017 9:55:18 offensive 111 Stained floor, metal shelves with chemicals rusty WOID31122 5/15/17 01B. TEMPERATURE: 5/15/2017 9:24:45 Uncomfortable 2 Inconsistent temperature WOID31121
More informationSagebrush Elementary School East Temple Place Aurora, Colorado 80015
Sagebrush Elementary School 14700 East Temple Place Aurora, Colorado 80015 Year Opened 1977 Current Square Footage 57,100 Site Acreage 7.66 sagebrush.cherrycreekschools.org Asphalt and concrete work; electrical
More informationWILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST. PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly
WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly Collect & properly dispose of recycling as needed Dust, or wipe all
More informationHOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District
HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the
More informationForest Hills Facilities Plan
Forest Hills Facilities Plan Extensive updates to 8 of our 9 schools Replace Wilson Elementary Enhance learning environments across the district Build additional classrooms to accommodate gradual implementation
More informationFacility Improvements
AP-SI-03 BICYCLE RACK ADDITION AP-SI-05 EXTERIOR BENCH ADDITIONS Installation of bike rack will allow for designated and secure storage of bicycles. Installation of exterior benches will provide an outdoor
More informationSafety Checklist for Science Instruction, Preparation and Storage Area
Safety Checklist for Science Instruction, Preparation and Storage Area School: Date: Teacher(s): Room or Area: The Science Center of the Boston Public Schools would like to acknowledge both the Science
More informationMOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School
MOUNT PLEASANT MIDDLE SCHOOL HVAC M-01 Heating Plant: The existing boilers have recently been upgraded. (3) steam boilers (8660 mbh each) manufactured by Weil- McLain have been installed. Newer hot water
More informationNYC Department of Education
Asset: NEW UTRECHT AF - BROOKLYN, 1601 80 STREET, New York, 11214 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-10-31 4:06 PM 2018-06-13 10:51 AM AA : Architectural
More informationNYC Department of Education
Architectural Inspection Building Assessment Survey 2017-2018 Asset: LEHMAN AF - BRONX, 3000 EAST TREMONT AVENUE, New York, 10461 Inspection Id Inspection Type Time In Last Edited SA : Architectural -
More informationBeaufort County Community College. Maintenance and House Keeping Plan
Beaufort County Community College Maintenance and House Keeping Plan Summary: The College s facility management is handled by the Maintenance Department. The Director of Plant and Maintenance Operations
More informationElectrical Inspection Special Electrical
0941 Fire Alarm System Devices, panels, wiring, conduit, etc. The present fire alarm system manufactured by Gamewell was installed with the 1982 renovation. It is a non addressable, zoned system. It includes
More informationF. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15
ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:...2 2. EMERGENCY POWER...3 B. LIGHTING...4 1. GENERAL...4 2. AVERAGE MAINTAINED
More informationNEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 BEAVERTON SCHOOL DISTRICT SOUTH COOPER MOUNTAIN HIGH SCHOOL
NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 AGENDA NEIGHBORHOOD MEETING Design Criteria Review 3 Concepts Discussion Q&A DESIGN CRITERIA NEIGHBORHOOD MEETING IMAGE & IDENTITY CIVIC PRESENCE
More informationRoom Number or CUSTODIAL FACILITIES WORK ORDERS ADMINISTRATION IEQ WORK ORDERS ASSIGNED DATE COMPLETION DATE 30-DAY REVISIT CLOSED
5/17/2017 11:03:18 02. AIR FRESHENERS 3 Spray 5/17/2017 10:06:34 5/17/2017 10:20:09 5/17/2017 10:11:42 5/17/2017 10:45:45 5/17/2017 9:58:45 5/17/2017 10:02:26 5/17/2017 10:14:46 5/17/2017 10:15:30 5/17/2017
More informationUniversity of Delaware
KEY STATION Campus must have a key station minimum 20 x 16 1 Computer hook up for time and attendance Furniture Seating for 20 Employee mailbox 3 Key Boxes (2 boxes should hold 30 keys; 1 box should hold
More informationNYC Department of Education
Asset: COLUMBUS AF - BRONX, 925 ASTOR AVENUE, New York, 10469 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-10-31 9:21 AM 2017-11-29 8:45 AM AA : Architectural - Associate
More informationChabot College: Plan Kickoff and Visioning Session with Student Senate
Facilities Master Plan 2017 Chabot College: Plan Kickoff and Visioning Session with Student Senate February 05, 2018 Key issues, challenges and opportunities: Need more information on the projects that
More informationSchool District of Milton 5- Year Capital Maintenance and Improvement Plan
Updated - 02/21/17 School District of Milton 5- Year Capital Maintenance and Improvement Plan 101 East Elementary 1 Parking Lot/Traffic Flow Project 615,175 Includes Construction and Engineering 2 Bathroom
More informationPROCTOR TERRACE ELEMENTARY SCHOOL
SCHL DAA Address: Bryden Lane Santa Rosa, CA 95404 Established: 50 Permanent Classrooms: 3 Portable Classrooms: 9 Building Area: Site Area: 40, sq ft 5 acres Students in 5: 484 Students in (Projected):
More informationH107 Video Conference Room
Capacity: 20 persons White Board (1) Document Camera (1) Door (1) Network connections possible Layout: Seminar style with chairs and tables (moveable) Podium (1) Media Cart (1) Windows (4) Meets all ADA
More informationREPORT CARD TO THE COMMUNITY MAY 15, 2018
REPORT CARD TO THE COMMUNITY MAY 15, 2018 O On May 10, 2014 voters in Greenville ISD approved a $72,275,000 bond election. BOND PROPOSAL PROJECT BOND AMOUNT CONSTRUCT A NEW BOWIE ELEMENTARY SCHOOL $17,600,000
More informationMeadow Point Elementary School East Grand Avenue Aurora, Colorado 80015
Meadow Point Elementary School 17901 East Grand Avenue Aurora, Colorado 80015 Year Opened 1982 Current Square Footage 53,100 Site Acreage 7.48 meadowpoint.cherrycreekschools.org $2,081,600 Electrical system,
More informationMCB/DDS Partnership Orientation & Mobility/Low Vision Services
MCB/DDS Partnership Orientation & Mobility/Low Vision Services www.mass.gov/dds/visionloss Creating Safe Environments For People with Vision Loss: the Basics! Color and High Contrast Use of highly contrasting
More informationJanuary 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining.
Project Updates January 11, 2018 CENTERVILLE CHESAPEAKE ARBORETUM BELLS MILL CITY CREEKWOOD SOUTH DEEP CREEK LOCK WORK TO BE PERFORMED/UPDATES Improvements to the parking lot include installation of a
More informationCUSTODIAL SERVICES CUSTOMER SERVICE GUIDE
CUSTODIAL SERVICES CUSTOMER SERVICE GUIDE WHAT WE CLEAN AND HOW OFTEN WE CLEAN IT As part of an ongoing effort to improve custodial customer service, we developed the Custodial Services Customer Service
More informationTIFT COUNTY SCHOOLS E-SPLOST HISTORY
TIFT COUNTY SCHOOLS E-SPLOST HISTORY July 1, 1997 June 30, 2002 $28,766,187.16 collected July 1, 2002 June 30, 2007 $39,025,830.10 collected July 1, 2007 June 30, 2012 $41,886,155.46 collected July 1,
More informationHome Safety Checklist From Adaptive Remodeling Solutions, LLC Monona, WI
Home Safety Checklist From Adaptive Remodeling Solutions, LLC 608-234-7440 Monona, WI Are you able to use every part of your home efficiently and safely? Take a good look at the rooms in your home and
More informationCleaning Service Levels
Restrooms Empty waste receptacles and change liner, as needed. Restock dispensers: soap, paper towel and toilet tissue. Clean mirrors; clean and disinfect urinals, toilets, and sinks. Polish stainless
More informationTillamook High School Bond Projects
Tillamook High School Bond Projects School Project Description All Buildings Upgrade fire alarm H&S All Buildings Add door lock capability from inside rooms Security All Buildings Install card lock entry
More informationWold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN
Wold Architects and Engineers 332 Minnesota Street Suite W2000 Saint Paul, MN 55101 651 227 7773 PLANNERS ARCHITECTS ENGINEERS ISD #15 St. Francis Area Schools East Bethel Elementary School Additions and
More informationBuilding Self-Inspection Program
Building Self-Inspection Program www.tridentinsurance.net Lines of Business: Property, General Liability, Worker s Compensation, Public Official Liability Risk Control Strategy/Key Issues: Reduce physical
More informationdusty. Room shakes and Student restrooms across All vents need cleaning
Timestamp Observation: 01B. TEMPERATURE: Room Number or Location/Name: Comments for this room: ADMINISTRATION CUSTODIAL 6/1/2017 15:08:34 Uncomfortable 01B. TEMPERATURE: 310 Etremely warm 6/1/2017 15:11:42
More informationIf there are emergency situations they should be reported to Maintenance Department immediately.
To: From: Re: Mercer County Schools Principals Mercer County Schools Safety Committee Required Safety Reports Date: October 30, 2010 In order to work toward safer schools, two reports are required to be
More informationWorkplace Safety Observation Tour Notes
Workplace Safety Observation Tour Notes The following summary report highlights key observation findings noted during the 2012 COR Safety Audit. The intent of this document is to share the 2012 observation
More informationCENTRAL GEORGIA TECHNICAL COLLEGE. Maintenance, Custodial & Operation Plan Facilities & Equipment
CENTRAL GEORGIA TECHNICAL COLLEGE Maintenance, Custodial & Operation Plan Facilities & Equipment Central Georgia Technical College Maintenance, Custodial and Operation Plan In order that Central Georgia
More informationBethlehem University 2008 Projects Summary
2008 Projects Summary 2008 Projects Summary In Addition to following up daily engineering related issues and supervising the Maintenance and Security Departments the University Engineer is involved in
More informationGreater Albany Public Schools May 2017 Ballot Measure for School Repairs, Crowding and Job Training
PUBLIC SCHOOLS Greater Albany Public s for Repairs, Crowding and Job Training CRITICAL FACILITY UPGRADES ADA Improvements: Architectural Improvements: Envelope Improvements Including Roofs: Exterior Improvements:
More informationMASTER PLAN DIAGRAMS DISTRICT CAMPUS OVERVIEW
DISTRICT CAMPUS OVERVIEW Classrooms, CR Special Education Computer Lab INTERSTATE 5 FW - Faculty Work, FL - Faculty Physical Education / Athletics Support Spaces S - Storage, T - Toilets, U - Utility,
More informationLINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016
LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016 PROJECT OVERVIEW PROJECT OVERVIEW + PRE-DESIGN BEGAN IN FALL OF 2015 + EXISTING CONDITIONS ANALYSIS + PROJECTED GROWTH IN HIGH SCHOOL
More informationEMERGENCY RESPONSE PLAN MANUAL. Nursing
EMERGENCY RESPONSE PLAN MANUAL INDIANA STATE UNIVERSITY Nursing PAGE 2 TABLE OF CONTENTS BUILDING COORDINATOR 3 RESPONSE TEAM MEMBERS 3 NOTIFICATION 3 EVACUATION 4 ASSEMBLY POINTS 5 DISABLED SAFE AREAS
More informationAppendix B JPPSS Emergency Management Plan Template for Schools (Please type all information)
Appendix B JPPSS Emergency Management Plan Template for Schools (Please type all information) Directions for the Site Administrator/Principal This Emergency Management Plan must be completed at the beginning
More informationNYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS
NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS DECEMBER 3, 2013 KEY QUESTIONS 1. What is the time sequence for available funding? (In what years will the funding be available?) 2. What is the
More informationRADON PLAN. Eugene School District 4J Facilities Management 715 West Fourth Avenue Eugene, OR
RADON PLAN The 2015 Legislature passed House Bill (HB) 2931 so that if elevated radon levels in Oregon schools existed they would be known. House Bill 2931 later became Oregon Revised Statute (ORS) 332.166-167.
More informationProposed Bond Construction Projects
Proposed Bond Construction Projects The Facility Planning Process * September, 2006: - Board of Education established the Facilities and Asset Review Committee with the responsibility to evaluate all district
More informationALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660
ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660 Year Built 1960 // Age 58 years Building Area 31,688 Square Feet Student Capacity 389 Current Enrollment (2017-2018) 466 Priority
More informationIEQ SCHOOL DATA BASE
LOOK-FORS ROOM/LOCATION COMMENTS ADMIN FACILITIES WORK ORDER NUMBER of POTENTIAL IEQ ASSIGNED COMPLETION 30 DAY REVISIT CLOSED 1. No unusual or offensive odors, or temperature discomfort 15-21 - 8-2 -
More informationFACILITIES CONDITION ASSESSMENT WAGNER RANCH NATURE AREA. Orinda Union School District Facilities Master Plan
FACILITIES CNDITIN ASSESSMENT WAGNE ANCH NATE AEA 0 30 60 0 AT MAE CL SCI SP INT 4 IT 3 3 BASC BASC INCLSIN SPECIALIST M FW FL IT ADMIN C MP IT Property line shown is estimated. CE Core Curriculum (Language
More informationSPLOST I, II, III,IV
ACWORTH ES (OLD) ACWORTH INTERMEDIATE Construction projects not done due to school replacement Land Acquisition, 61 IU Replacement Elementary School Access Controls, Temperature monitors for walk in coolers
More informationDesign Review of Facility Improvement Projects
Design Review of Facility Improvement Projects Agenda Board Meeting Schedule Scope of Work Summary Overall Building Plans and Scope Summary Update on Areas of Design Development Programming and Space planning
More informationMAINE. Downloaded g. Maintain an effective pest control program so that the facility is free of pests and rodents;
Housekeeping/Laundry/Maintenance Each licensed facility shall: MAINE Downloaded 01.15.11 g. Maintain an effective pest control program so that the facility is free of pests and rodents; 20.J.2. Soiled
More informationChariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)
Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) School/Department FY 16 FY 17 FY18 FY19 FY20 Chariho Regional High School FY 16 FY 17 FY18 FY19 FY20 *Repair Bleachers
More informationMEDIA CENTER September 30, 2010
MEDIA CENTER September 30, 2010 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and for any requirements that may differ from the prototype
More informationENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING
Mechanical Systems Information The mechanical system at Reed Middle School is comprised of seventy six Trane DX/Gas rooftop units (RTUs). The recommended useful life for DX equipment is 15 years. Seventy
More informationMUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY
MUKWONAGO SCHOOL DISTRICT ARCHITECTURE PARK VIEW MIDDLE SCHOOL The original school building was dedicated in 1954 as the High School, with an addition in 1959, a library addition in 1970, and an addition/renovation
More informationEmergency Evacuation Plan
Emergency Evacuation Plan Oceanside Campus - Library & Information Hub Building 1200 Revised February 2011 Evacuation Plan - Building 1200 Overview Evacuation Plan - Building 1200 Campus Emergency and
More informationG W C C GREENMOUNT WEST COMMUNITY CENTER GWCA - COMMUNITY CENTER. design recommendations
G W C C GREENMOUNT WEST COMMUNITY CENTER design recommendations GWCA - COMMUNITY CENTER PROGRAM SIDEWALK 1... ENTRANCE/EXIT A... MECHANICAL 2... LOBBY B... ELECTRICAL 1 3... RECEPTION C... MEN S TOILET
More informationHELENA PUBLIC SCHOOLS FRONT STREET LEARNING CENTER CLEANING OUTCOMES ASSESSMENT. May 2013
HELENA PUBLIC SCHOOLS FRONT STREET LEARNING CENTER CLEANING OUTCOMES ASSESSMENT May 2013 HPS FRONT STREET LEARNING CENTER CLEANING OUTCOMES ASSESSMENT PURPOSE During the week of May 20th, 2013 BRUCO INC.
More informationPASS Security Plan Checklist
[School District Name] PASS Security Plan Checklist SCHOOL DISTRICT INFORMATION Address: Telephone Number: Fax Number: Number of Employees: Number of Students: School Resource Officer: TIER CONTINUUM:
More informationDEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students
DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students FACILITY NEEDS THE CHALLENGE Deerfield Middle School/High School building has served the community for
More informationEDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016
EDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016 Educational Specifications Page 1 Project Overview:
More informationGreen-Sea. Attendance Area
Green-Sea Attendance Area Green Sea Floyds Elementary Asset Summary and History Report Hierarchy Green Sea Floyds Elementary Inspection Date N/A Asset 23 Green Sea Floyds Elementary Deficiencies Count
More informationAugust 2012 CRISIS MANAGEMENT PLAN
August 2012 CRISIS MANAGEMENT PLAN 1 Table of Contents 1. DUTIES AND RESPONSIBILITIES OF CRISIS TEAM MEMBERS 2. FIRE ALARM PROCEDURES/ FALSE ALARM PROCEDURE 3. TORNADO / SEVERE STORMS / OTHER WEATHER 4.
More informationFacilities Procedure for Accessibility or Compliance Related Requests:
Facilities Procedure for Accessibility or Compliance Related Requests: All doorways, entry ways, equipment height, etc. will be checked to ensure compliance with the Americans with Disabilities Act (ADA)
More informationAging-in-Place Safety Checklist
Aging-in-Place Safety Checklist Use the checklist to find the hazardous conditions or safety risks for every room/area in your home: Entrance to Front Door and Front Yard: 1. Lack of railing or unstable
More informationCUSTODIAL CUSTOMER SERVICE GUIDE
CUSTODIAL CUSTOMER SERVICE GUIDE INSIDE what we clean & how often we clean it 2. Classrooms & Teaching Labs 3. Research Labs & Halls & Lobbies 4. Offices & Restrooms 5. Stairwells & Conference Rooms 6.
More informationFACILITIES CONDITION ASSESSMENT WAGNER RANCH ELEMENTARY SCHOOL. Orinda Union School District Facilities Master Plan
FACILITIES CNDITIN ASSESSMENT WAGNE ANCH ELEMENTAY SCHL 0 0 60 0 AT MAE CL SCI SP INT IT BASC BASC LIB INCLUSIN SPECIALIST MU FW FL IT U ADMIN C MP IT Property line shown is estimated. CE Core Curriculum
More informationbold/italic items are revisions to the previous program notes
bold/italic items are revisions to the previous program notes Future Meetings: - Dr. Caldwell - Students - Industry Partners (Mike Betts? Sam Geil? Kevin Harmon? TBD by SCCCD) A. Specific Room Requirements
More informationBuilding and Grounds Self-Inspection Program
www.alterisus.com Building and Grounds Self-Inspection Program Each building and its accompanying grounds should be inspected at regular intervals, ideally on a monthly or quarterly basis. In this way,
More informationMaster Project List Report
Blue Hills Elementary School 01-8215 Site Utilities Replacement $52,835 01-8502 Modernization $3,135,933 01-8525 Exterior Painting $181,478 01-8552 Kindergarden Fencing $13,180 Install new backflow preventer.
More informationPlant Operations Cleaning and Sanitation Audits.
Plant Operations Cleaning and Sanitation Audits http://plantoperations.dadeschools.net/ DISTRICT-WIDE SCHOOLS Cleaning & Sanitation Audit (4 years) Overall Scores % Fail % Pass 90% 63% 37% 54% 46% 45%
More informationFlorence High School / Middle School Page 1 of 3 Florence, WI
Florence High School / Middle School Page 1 of 3 Florence, WI Plumbing Systems Review: The following report is the result of a site visit by Tim Kehoe of Muermann Engineering, LLC that occurred on October
More informationMARY CRAPO CENTER Miller Road, Swartz Creek, Michigan
MARY CRAPO CENTER 8197 Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek General Information: - Instructional, Child Care Development Center (West Wing) o (2) Infant/Toddler
More informationFORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review
FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION Lake Erie Corridor Secondary Schools Accommodation Review November 2012 LAKE ERIE CORRIDOR SECONDARY SCHOOLS ACCOMMODATION REVIEW Fort Erie Secondary School
More informationAthletic Facilities Needs Assessment
PARKS AND RECREATION DEPARTMENT Athletic Facilities Needs Assessment Fiscal Year 2014 PROPOSED Needs Assessment Index 1. Andrew s Fields located at Margate Middle School pg. 2 2. Firefighters Park pg.
More informationLAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537
LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537 Buildings and Grounds Committee Minutes March 20, 2017 The meeting was called to order at 6:30 p.m. PRESENT: Board Members, Mr. Jeffrey A.
More informationPuyallup School District Emergency Response Procedures Supported by Communities In Schools of Puyallup
Puyallup School District Emergency Response Procedures Supported by Communities In Schools of Puyallup Approved November 17, 2016 Table of Contents: Page 2: Fire Evacuation Procedure Page 4: Earthquake
More informationRevised 06/07 EMERGENCY GUIDELINES
Revised 06/07 EMERGENCY GUIDELINES Emergency Information In the event of hazardous weather or other natural emergencies, medical alerts, or campus closings or delays employees should check their university
More informationExisting Facilities Assessment
DRAFT Patrick Henry Elementary School 4643 Taney Ave, Alexandria, VA 22304 Existing Facilities Assessment Alexandria City Public Schools Planning, Design & Construction Office 1340 Braddock Place Alexandria,
More information2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16
1. General: This summary is offered as a supplement to the 2015 Building Condition Survey being filed with SED on behalf of the District. All cost estimates are preliminary, and should be re-evaluated
More informationCommercial Properties
One of the innovations in community design is how to create regulations and requirements to require that commercial and residential places are designed to discourage crime. Below you can find some of the
More informationSCHEMATIC DESIGN PRESENTATION
August 5, 2014 SCHEMATIC DESIGN PRESENTATION ADDITIONS & RENOVATIONS Greenville Independent School District Acknowledgments 2 Narrative 3-6 Crockett Elementary School 7-12 L.P. Waters Early Childhood Center
More informationCampus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111
Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111 Year Opened 1971 Current Square Footage 175,743 Site Acreage (included in CCHS) 87.22 campus.cherrycreekschools.org $2,441,170
More informationMonthly Report of Consultants June 1, 2011 through June 30, 2011
Monthly Report of Consultants CONSULTANTS Name School/Dept of Service PO# Total Amount Type of Service Bridges, Jeff Santaluces 08/01/11-12/31/11 Internal $ 6,920.90 Marching Band Help Federal/State Catapult
More informationSJLES IEQ Walkthrough Summary Spring Room Observations (Responses)
01A. ODOR: Unusual or 4/28/2017 9:45:0offensive 19 Musty and dank 29837 5/5/2017 01B. TEMPERATURE: 4/28/2017 10:20: Uncomfortable 31 Etremely hot 03. FOOD: Unsealed, left in room, dirty lunch 4/28/2017
More information