1 1. General: This summary is offered as a supplement to the 2015 Building Condition Survey being filed with SED on behalf of the District. All cost estimates are preliminary, and should be re-evaluated once a definite scope and schedule for each item is determined. 2. HS Pressbox BCS Item #58 Estimate: TBD Scope: Reconstruct, or remove and replace, existing HS Pressbox. Purpose: The existing HS Pressbox is nearing the end of its useful life, has areas of deteriorating materials, and lacks sufficient plumbing drainage. 3. HS Storage Shed BCS Item #58 Estimate: TBD Scope: Review use of existing Storage Shed at back of HS track. Purpose: The suitability of the existing Storage Shed needs to be reviewed. It currently does not have any secured doors. Review adding a secured man-door and larger access door, which would require submission to SED as a Discovered Building. 4. MS Wing Exterior Stairs BCS Item #65 Estimate: $25,000 Scope: Reconstruct or replace the existing concrete stairs at the end of the MS classroom wing. Purpose: The existing concrete stairs are deteriorating in places and in need of corrective work. 5. HS and ES Windows BCS Item #67 Estimate: $418,000 + Scope: Replace the existing steel windows in the 1958 and 1968 wings with new thermally-broken aluminum windows with insulated glass. Replace the HS Kitchen windows. Replace the balance of the Bus Garage windows (rear of building). Purpose: These existing windows are nearing the end or beyond their useful life, are not energy efficient, and many are difficult to operate. 1958/68 windows $400,000; Kitchen windows $TBD; Bus Garage windows $18,000.

2 6. ES Roofing BCS Item #68 Estimate: $400,000 Scope: Remove the 1995 built-up roofing system over the 1929 and 1949 areas of the building, and replace with a new 30 year warranty EPDM roofing system. Purpose: Roof reconstruction will address the existing roof leaks and potential wet insulation, will provide a 30 year warranty system, and will increase the roof s insulating value from R-11 to R-22. This area was last re-roofed 20 years ago (1995). 7. HS Ceilings BCS Item #75 Estimate: $152,100 Scope: Remove the existing tectum ceilings in the corridors of the 1958 and 1968 areas of the High School, and replace with new suspended acoustical ceiling panels. Purpose: The existing tectum ceiling panels are original to the building and are stained and damaged in areas from prior roof leaks and from age. New ceiling panels will improve aesthetics, acoustics and light reflectance properties. 8. HS, MS and ES Doors and Hardware BCS Item #77 (SMART Schools Project) Estimate: $43,000 Scope: Replace older interior door hardware at the High School, Middle School and Elementary School with intruder hardware that allows locking of classroom doors by key from inside the room (approx. 125 classrooms). Purpose: The older classroom door hardware is not handicap accessible, sometimes difficult to unlock, and requires locking from the corridor side, which is a security concern in lockdown situations. 9. HS, MS and ES Vestibule Door Access Controls BCS Item #77 (SMART Schools Project) Estimate: $85,000 Scope: Reconstruct all three main entrances at High School, Middle School and Elementary School, to provide access control at inner vestibule doors and provide security cameras in the vestibules. Purpose: The existing inner vestibule doors require access controls to allow them to be unlocked remotely from the main office for visitor screening. The existing camera coverage in the vestibules does not allow a visitor to be fully viewed. 10. MS Gymnasium Lighting BCS Item #81 Estimate: $55,000 Scope: Replace the existing HID (high intensity discharge) light fixtures in the Middle School Gymnasium with new LED light fixtures, new lighting controls & occupancy sensors. Purpose: New fluorescent light fixtures are more energy efficient, quieter, and more responsive turning on and off than the existing HID fixtures. Occupancy sensors will save energy by reducing unoccupied use. Energy Savings: Approx. $1,500/year in electrical savings (based on 2012/13 energy rates).

3 11. HS and MS Auditorium and LGI Upgrades BCS Item #81 Estimate: $195,000 Scope: Upgrade the HS Auditorium house lighting to dimmable LED fixtures with add l. switching, add 2 nd bank of lights to chorus, add lights for stage, add speaker system, & provide acoustical treatment in the LGI Room. Purpose: The existing Auditorium house lighting has short life, and is difficult to maintain and replace. The LGI Room needs sound treatment to deaden & lower decibel levels. Energy Savings: Approx. $7,500/year in electrical savings (based on 2012/13 energy rates). 12. HS Swimming Pool Ventilation BCS Item #83 Estimate:$50,000 Scope: Increase the capacity of the HS Swimming Pool Mechanical Room exhaust system. Purpose: The Pool Mechanical Room needs additional exhaust to address humidity and corrosion in the room 13. ES Hot Water Heater BCS Item #86 Estimate: $42,000 Scope: Replace the existing Elem. School hot water heater with new more energy efficient hot water heater. Purpose: The existing hot water heater is nearing the end of its useful life. 14. HS, MS and ES Boilers BCS Item #89 Estimate: $1,170,000 Scope: Replace the 25+ year old boilers serving both The High School/Middle School and Elementary School, last replaced during the gas conversion in the mid- 80 s. Elem. School Purpose: The existing older boilers are nearing the end of their useful lives, are more difficult to maintain, and are less energy efficient than newer models. High School Energy Savings: Approx. $5,000/year in High School natural gas savings (based on 2012/13 energy rates). Approx. $2,200/year in Elem. School natural gas savings (based on 2012/13 energy rates). National Grid Rebates could be up to $12,000/boiler; this could be $36,000/school if a listed boiler is used.

4 15. HS PAC Air Conditioning Condenser BCS Item #91 Estimate: $20,000 - $85,000 Scope: Mitigate noise at HS PAC air conditioning condenser unit by relocating unit, replacing unit, or enclosing unit. Purpose: When the compressors and fan motors on the condensing unit serving the HS PAC start up, the noise created by the unit is causing a disturbance in one or more classrooms. Options include relocating the unit ($20,000), enclosing the unit ($35,000), or replacing the unit ($85,000). 16. HS Unit Ventilators BCS Item #92 Estimate: $442,000 Scope: Replace the older unit ventilators in the building, specifically the 35 floormounted units located in the 1958 and 1968 areas of the building, as well as the ceiling-hung units in the 1958 Gymnasium. Purpose: The existing older unit ventilators are nearing the end of their useful lives, and are more difficult to maintain due to the increased difficulty in finding replacement parts. Maintenance Savings: New unit ventilators will provide approx. 50% or more in maintenance savings. 17. HS Temperature Controls BCS Item #95 Estimate: $292,000 Scope: Expand the existing digital temperature control system in the High School to include the older unit ventilators in the 1958 and 1968 areas of the building described in item 3. above. Purpose: The existing digital temperature control system does not extend to the older unit ventilators, and therefore they can not be remotely monitored and controlled on the same computer system as the other units. Energy Savings: Approx. $4,500/year in natural gas savings (based on 2012/13 energy rates). 18. HS and MS Fire Alarm BCS Item #96 Estimate: $390,000 Scope: Provide a new fully addressable fire alarm system, and increase the fire alarm and smoke detection coverage in the building by providing additional devices (i.e. smoke/heat detectors, horns/strobes, pull stations, etc.). Purpose: The existing fire alarm system in the 1958 and 1968 wings is functioning, but does not meet the standards of current Code requirements, and is not an addressable system (networked to locate alarms at specific zones/devices).

5 19. HS Exit and Emergency Lighting BCS Item #99 Estimate: $195,000 Scope: Provide new exit and emergency lighting fixtures in the 1958 and 1968 areas of the building to replace the older units and provide additional emergency lighting coverage. Purpose: The existing emergency lights in the 1958 and 1968 wings are functional, but consist of older, less energy efficient units, that do not meet the standards of current Code requirements for coverage area. 20. HS and MS Emergency Generator BCS Item #100 Estimate: $507,000 Scope: Provide emergency generator sized to serve the High School boilers, cooler, freezer and life safety systems, to maintain the essential needs of the building in a power failure. See also Item 23 for possible expansion of generator. Purpose: A new generator would maintain just the essential components of the building in the event of a power outage, to maintain the fire alarm system, emergency lighting, heat and conditioned food storage. 21. HS Teacher Workroom Estimate: $62,400 Scope: Relocate the existing High School Teacher Workroom, which also serves as the copy center, to the small group room down the hall, and renovate the new room to provide more space and better ventilation. Purpose: The existing Teacher Workroom is cramped and poorly ventilated, and has problems with humidity and noise. It is cited every year in the safety survey. Renovating the small group room will alleviate these concerns. 22. HS, MS and ES Kitchen Equipment Estimate: $92,300 Scope: Replace the 20 year old steam table at the Elementary School and replace the 15 year old double deck convection oven at the High School, and move the existing High School oven to the Elementary School. Purpose: The steam table at the Elementary school has holes in the bottom and leaks, and can work only on dry heat this year. The bottom oven of the HS double deck convection oven works on half heat only; the top oven works fine. 23. HS, Technology Labs Estimate: TBD Scope: Renovate both existing Technology Labs. Purpose: Full extent of scope of work still to be determined.

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological

More information

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert

More information

Florence High School / Middle School Page 1 of 3 Florence, WI

Florence High School / Middle School Page 1 of 3 Florence, WI Florence High School / Middle School Page 1 of 3 Florence, WI Plumbing Systems Review: The following report is the result of a site visit by Tim Kehoe of Muermann Engineering, LLC that occurred on October

More information

2014 Bond Project Guide

2014 Bond Project Guide 2014 Bond Project Guide Bush Elementary School Page 1 Instructional Technology Computers, Projectors, Mobile Carts, Document Cameras and Printers Wireless Connectivity New Construction New Tech Center

More information

Forest Hills Facilities Plan

Forest Hills Facilities Plan Forest Hills Facilities Plan Extensive updates to 8 of our 9 schools Replace Wilson Elementary Enhance learning environments across the district Build additional classrooms to accommodate gradual implementation

More information

PLATTEVILLE MIDDLE SCHOOL

PLATTEVILLE MIDDLE SCHOOL Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle

More information

Master Facility Planning Update School Board Meeting May 26, 2016

Master Facility Planning Update School Board Meeting May 26, 2016 Master Facility Planning Update School Board Meeting May 26, 2016 Master Facilities Committee Overview Reflection of Committee Work Review of District Wide Facility Issues Identified District Wide Facility

More information

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate Health & Safety 1,399,000 Academics & Program 17,140,800 Physical Education & Athletics 5,922,000 Building Infrastructure 3,103,800 Site Infrastructure 1,049,600 TOTAL SCOPE OF WORK 28,615,200 PROPOSED

More information

Briar Crest Elementary

Briar Crest Elementary Promises Kept This document includes partial lists of major projects completed at Pattonville Schools since 1986 as part of past bond issues approved by the Pattonville community. Briar Crest Elementary

More information

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS DECEMBER 3, 2013 KEY QUESTIONS 1. What is the time sequence for available funding? (In what years will the funding be available?) 2. What is the

More information

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect 1 Site Summary Address 7200 Bluff Springs Road Austin, TX 78744 Number of Permanent Campus Facilities 2 Original Year of Construction 2014 Total Campus Building Area (combined) 25,314 SF Introduction The

More information

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School North Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

Currently, all electrical upgrades would be voluntary, but there are situations in which upgrades would be required.

Currently, all electrical upgrades would be voluntary, but there are situations in which upgrades would be required. Executive Summary The current electrical system is functional but requires some understanding in order to avoid overloading circuits. Certain outlets can be used for space heaters while others cannot and

More information

PROPOSED SCOPE OF WORK

PROPOSED SCOPE OF WORK WATERTOWN CITY SCHOOL DISTRICT SCHOOL AND COMMUNITY WORKING TOGETHER SMART SCHOOLS PROJECT PROPOSED SCOPE OF WORK BCA PROJECT NO. 2017-100 NOVEMBER 2, 2017 Prepared By: & 327 Mullin Street 2136 Five Mile

More information

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) School/Department FY 16 FY 17 FY18 FY19 FY20 Chariho Regional High School FY 16 FY 17 FY18 FY19 FY20 *Repair Bleachers

More information

REPORT CARD TO THE COMMUNITY MAY 15, 2018

REPORT CARD TO THE COMMUNITY MAY 15, 2018 REPORT CARD TO THE COMMUNITY MAY 15, 2018 O On May 10, 2014 voters in Greenville ISD approved a $72,275,000 bond election. BOND PROPOSAL PROJECT BOND AMOUNT CONSTRUCT A NEW BOWIE ELEMENTARY SCHOOL $17,600,000

More information

2014 Bond District-wide Facility Repairs

2014 Bond District-wide Facility Repairs Elementary Schools Aloha-Huber Park Fire Detector upgrade Replace electric backboard winches in gym Heating/cooling system controls upgrade Barnes Replace exterior windows Heating/cooling system and controls

More information

Design Presentation. Chief Operations Officer Willie Burroughs

Design Presentation. Chief Operations Officer Willie Burroughs Design Presentation Chief Operations Officer Willie Burroughs Agenda Introduction Community Feedback Project updates 2 Feedback Citizens Advisory Committee meetings Growth and Development meetings Community

More information

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Facility Condition Assessment Summary Report British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Submitted by: VFA Canada Corp. Burnaby Centre 4211 Kingsway Burnaby, BC V5H 1Z6

More information

Electrical Inspection Special Electrical

Electrical Inspection Special Electrical 0941 Fire Alarm System Devices, panels, wiring, conduit, etc. Description of the building system The school is equipped with a hard wired fire alarm control panel, and automatic dialer. The fire alarm

More information

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018 Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018 WHAT IS A BOND ELECTION? Provide communities an opportunity to vote to give the Board of Trustees authority

More information

2014 Bond District-wide Facility Repairs

2014 Bond District-wide Facility Repairs Elementary Schools Aloha-Huber Park Fire Detector upgrade Replace electric backboard winches in gym Heating/cooling system controls upgrade Barnes Replace exterior windows Heating/cooling system and controls

More information

New High School Concept

New High School Concept Approved Bond Projects for Alamance-Burlington Schools In November 2018, Alamance County citizens approved a $150 million bond project proposal. Bond funds will pay to construct a new high school and provide

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT YOUNG INTERNATIONAL PLOT NO. 32-36, SECTOR 5-CEPZ, CHITTAGONG OTHER FACTORIES: NONE July 20, 2014 Page 2 SUMMARY was surveyed for fire safety on 7/20/2014 by Hughes Associates,

More information

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 2014-2015 CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 School Item Amount a. Classroom A/R (Increase CR capacity to 804, add l Resource and tutoring spaces needed. Teacher

More information

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN Wold Architects and Engineers 332 Minnesota Street Suite W2000 Saint Paul, MN 55101 651 227 7773 PLANNERS ARCHITECTS ENGINEERS ISD #15 St. Francis Area Schools East Bethel Elementary School Additions and

More information

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School MOUNT PLEASANT MIDDLE SCHOOL HVAC M-01 Heating Plant: The existing boilers have recently been upgraded. (3) steam boilers (8660 mbh each) manufactured by Weil- McLain have been installed. Newer hot water

More information

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 Allisonville Elementary School Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 ADA improvements are Fire alarms need to be updated Playground equipment needs to be

More information

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek General Information: - Instructional, Child Care Development Center (West Wing) o (2) Infant/Toddler

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT PORTLAND TEXTILE LTD. ACCORD ID: 11873 PLOT NO. 14-15, SECTOR 6, CHITTAGONG EXPORT PROCESSING ZONE, CHITTAGONG OTHER FACTORIES: NONE November 3, 2015 Page 2 SUMMARY was surveyed

More information

Mechanical Inspection Plumbing

Mechanical Inspection Plumbing 0811 Fixtures Sinks, drinking fountains, water closets, showers, etc. Classroom Sinks. Classroom sinks (19) are enameled cast iron self rimming side ledge with gooseneck faucet trim with index handles,

More information

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111 Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111 Year Opened 1958 Current Square Footage 50,504 Site Acreage 8.53 greenwood.cherrycreekschools.org $220,720 Electrical

More information

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the

More information

White Bear Lake Area Schools District 624 ENERGY GUIDELINES

White Bear Lake Area Schools District 624 ENERGY GUIDELINES White Bear Lake Area Schools District 624 ENERGY GUIDELINES Developed by: White Bear Lake Area Schools Energy Steering Committee as part of the Schools for Energy Efficiency (SEE) Program ISD 624 Energy

More information

3520 A Energy Conservation Standards

3520 A Energy Conservation Standards 3520 A Energy Conservation Standards Regulation Original Adoption: 04/14/2009 Effective Date: 08/06/2009 Revision Dates: 08/05/2009 I. PURPOSE The purpose of this regulation is to establish the energy

More information

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION Lake Erie Corridor Secondary Schools Accommodation Review November 2012 LAKE ERIE CORRIDOR SECONDARY SCHOOLS ACCOMMODATION REVIEW Fort Erie Secondary School

More information

ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING

ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING Mechanical Systems Information The mechanical system at Duncanville High School is comprised entirely of DX/Gas rooftop units (RTUs) and DX split systems. A vast majority of the RTUs are Trane units that

More information

EXISTING CONDITIONS SUMMARY

EXISTING CONDITIONS SUMMARY SITE Fire alarm system does meet current requirements Accessible path of travel lacking throughout campus Announcer s booth at Football Field booth not ADA compliant Covered and non covered outdoor eating

More information

HVAC / Boilers / Hot Water. Expected Life Span. very rough estimates Condition/Issue Age. Athletics / Gyms

HVAC / Boilers / Hot Water. Expected Life Span. very rough estimates Condition/Issue Age. Athletics / Gyms $4,013,500.00 $4,013,500.00 $ 1,155,000.00 $ 1,000,000.00 $ 205,000.00 $ 275,000.00 $ 300,000.00 $ 360,000.00 $ 438,500.00 $ 280,000.00 School Status Item HS Boilers boiler controls replaced 2017 2002

More information

Existing Facilities Assessment

Existing Facilities Assessment DRAFT Patrick Henry Elementary School 4643 Taney Ave, Alexandria, VA 22304 Existing Facilities Assessment Alexandria City Public Schools Planning, Design & Construction Office 1340 Braddock Place Alexandria,

More information

Design Review of Facility Improvement Projects

Design Review of Facility Improvement Projects Design Review of Facility Improvement Projects Agenda Board Meeting Schedule Scope of Work Summary Overall Building Plans and Scope Summary Update on Areas of Design Development Programming and Space planning

More information

Electrical Inspection Special Electrical

Electrical Inspection Special Electrical 0941 Fire Alarm System Devices, panels, wiring, conduit, etc. The present fire alarm system manufactured by Gamewell was installed with the 1982 renovation. It is a non addressable, zoned system. It includes

More information

Electrical Inspection Lighting & Power

Electrical Inspection Lighting & Power 0921 Light Fixtures & Controls Fixtures, controls, conduit, wiring, etc. Interior classroom and corridor lighting consists of T12 fluorescent lamps with magnetic ballasts. In the classrooms the luminaires

More information

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students FACILITY NEEDS THE CHALLENGE Deerfield Middle School/High School building has served the community for

More information

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111 Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111 Year Opened 1971 Current Square Footage 175,743 Site Acreage (included in CCHS) 87.22 campus.cherrycreekschools.org $2,441,170

More information

Charles W Earle Elementary School

Charles W Earle Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Arena Elementary School 314 Willow St. Arena, WI 53503

Arena Elementary School 314 Willow St. Arena, WI 53503 FACILITIES PLANNING STUDY RIVER VALLEY SCHOOL DISTRICT Arena Elementary School 314 Willow St. Arena, WI 53503 7 South Dewey Street Eau Claire, Wisconsin 54701 715.83.1605 sdsarch.com ARENA General Overview

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 174 - QUEENS, 65-10 DIETERLE CRESCENT, New York, 11374 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-01-25

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 135 - QUEENS, 207-11 89TH AVENUE, New York, 11427 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-03-20

More information

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015 Sagebrush Elementary School 14700 East Temple Place Aurora, Colorado 80015 Year Opened 1977 Current Square Footage 57,100 Site Acreage 7.66 sagebrush.cherrycreekschools.org Asphalt and concrete work; electrical

More information

Oxford Hills School District Capital Renewal Plan Updated March 2017

Oxford Hills School District Capital Renewal Plan Updated March 2017 Color Coding Guide Recently Completed In Progress FY 2017 Budget in FY 2018 Future Budgets/Projects 3/20/17 Capital Renewal Plan Updated March 2017 Capital Renewal Plan - Harrison Elementary Harrison add

More information

Draft. Security Study. Germantown School District Germantown, WI. PRA Project # February 2014

Draft. Security Study. Germantown School District Germantown, WI. PRA Project # February 2014 Draft Security Study Germantown School District Germantown, WI PRA Project # 114440 February 2014 February 2014 Germantown School District Facilities Security Study Page 1 Facilities Security Study Page

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT RAISA FASHIONS LTD. ACCORD ID: 11741 PLOT# B63, BSCIC INDUSTRIAL ESTATE, KANCHPUR, SONORGAON, NARAYANGANJ OTHER FACTORIES: NONE February 27, 2015 Page 2 SUMMARY was surveyed

More information

Edward Jenner Elementary Academy of the Arts

Edward Jenner Elementary Academy of the Arts Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved SCO # 1Punch listed items were noted below on

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT MAGPIE COMPOSITE TEXTILE LTD. 832/833, DEWAN IDRIS ROAD, AMTOLI, ASHULIA, SAVAR, DHAKA OTHER FACTORIES: NONE May 17, 2014 Page 2 SUMMARY was surveyed for fire safety on 5/17/2014

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 81 ANNEX (OLD 75) - QUEENS, 511 SENECA AVENUE, New York, 11385 Inspection Id Inspection Type Time In Last Edited EE : Electrical

More information

Library stacks and records storage 150 LB/SF live load

Library stacks and records storage 150 LB/SF live load SPACE TYPE: LIBRARY Construction Criteria The unit costs for Library space types are based on the construction quality and design features in the following table. This information has been generally organized

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: HS OF AMERICAN STUDIES - BRONX, 2925 GOULDEN AVENUE, New York, 10468 Inspection Id Inspection Type Time In Last Edited EE : Electrical

More information

MEDIA CENTER September 30, 2010

MEDIA CENTER September 30, 2010 MEDIA CENTER September 30, 2010 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and for any requirements that may differ from the prototype

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT M.S.ATTIRES LTD. ACCORD ID: 10887 A. RAHMAN PLAZA, SHANSHONGAON, FATULLAH, NARAYANGONJ OTHER FACTORIES: AISA FASHION LTD.; PRINT GARDEN LTD.; S.M. COLLECTION LTD. February

More information

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015 Meadow Point Elementary School 17901 East Grand Avenue Aurora, Colorado 80015 Year Opened 1982 Current Square Footage 53,100 Site Acreage 7.48 meadowpoint.cherrycreekschools.org $2,081,600 Electrical system,

More information

Appendix E: Photo Documentation

Appendix E: Photo Documentation Appendix E: Photo Documentation Brown County Library Central Branch Building Assessment Appendix E: Photo Documentation Architectural and Structural Brown County Library Central Branch Building Assessment

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 314 - BROOKLYN, 330 59 STREET, New York, 11220 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-04-23

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: PS 152 ANNEX -BROOKLYN, 1087 OCEAN AVENUE, New York, 11210 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-03-20

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 371 (OLD 615) - BROOKLYN, 355 37 STREET, New York, 11232 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-10-23

More information

Board of Education Meeting

Board of Education Meeting Geneva Community Unit School District #304 Operations and Maintenance-Security 7 Year Capital Improvement Plans Board of Education Meeting December 8 th, 2014 O&M-Security 7 Year Capital Improvement Plans

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT COMFORT APPAREL, ( PVT ) LTD. 96, DARUS SALAM, MIRPUR, DHAKA OTHER FACTORIES: SALMA FASHION WEARS LTD, COMFORT KNIT FASHION LTD March 27, 2014 Page 2 SUMMARY was surveyed

More information

Josefa Ortiz De Dominguez Elementary School

Josefa Ortiz De Dominguez Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL) SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL) Basketball Courts 15 25 Built Improvements Playgrounds, Site Furniture, etc. 20 20 Catch Basin 40 40 Cold Water Lines 40 40 Compactors DHW Supply

More information

UBC Technical Guidelines Section Edition Interior Building Lighting Page 1 of 5

UBC Technical Guidelines Section Edition Interior Building Lighting Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Related UBC Guidelines.1 Section 27 05 05 Communication Rooms Design Guidelines 2.13 1.2 Coordination Requirements.1 UBC Energy & Water Services.2 UBC Building Operations Electrical

More information

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools 143 Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky

More information

5 Year Capital Improvement Plan Update

5 Year Capital Improvement Plan Update 5 Year Capital Improvement Plan Update Board Approved May 10, 2016 Collierville Schools Board of Education Wanda Chism Wright Cox Mark Hansen, Chairman Cathy Messerly Kevin Vaughan Superintendent John

More information

Cherry Hill Public Schools BUILDING A SOLID FUTURE

Cherry Hill Public Schools BUILDING A SOLID FUTURE Cherry Hill Public Schools BUILDING A SOLID FUTURE Who We Are The Cherry Hill School District is the 12 th largest in the state, serving 11,500 students 19 Locations 2 High Schools, 3 Middle Schools, 12

More information

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities

More information

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL DISTRIBUTION SYSTEM:?? The existing electrical service consists of an underground primary service originating at a utility pole on Cedar Street,

More information

FIRE SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH

FIRE SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH FIRE SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH January 3, 2014 Redpoint Jackets Ltd. PAGE 1 SUMMARY The four story factory housing Redpoint Jackets Ltd. located in Dhaka Export Processing

More information

CHURCH SELF-INSPECTION FORM

CHURCH SELF-INSPECTION FORM Questions about safety or risk control? Contact our specialists at customercare@adventistrisk.org CHURCH: INSPECTOR: DATE: TITLE: NOTE: The following list of inspection topics provides a form for identifying

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#56566/Page 1/May 23, 2017 HVAC Heating Plant The original Town Hall building and Addition building are primarily heated by a gas fired hot water plant that is located in the basement. The boiler plant

More information

Siemens Building Technology MEP Existing Conditions

Siemens Building Technology MEP Existing Conditions Electrical Existing Conditions Report Executive Summary: The electrical systems for the are generally of the original vintage. The site is primary metered with the meter located in the main Electric Room.

More information

Original Building Plans 1954

Original Building Plans 1954 Building Asbury Kitchen Chancel Sanctuary Pastor Study Narthex Original Building Plans 1954 4 Entrances Main Entry Building Evolution Original Building 1954 New Parking 5 Entrances Main Entry Building

More information

LIGHT LEVEL REQUIREMENTS MINIMUM ACCEPTABLE FOOT CANDLES

LIGHT LEVEL REQUIREMENTS MINIMUM ACCEPTABLE FOOT CANDLES LIGHT LEVEL REQUIREMENTS LOCATION Classrooms and instrumental areas- Study Halls, Lecture Rooms, Art Rooms, Offices, Libraries, Conference Rooms, Work Rooms, Shops, Laboratories and Secondary School Cafeterias.

More information

Attendees/Absentees. Derek Gallagher DG. Delano Secondary School Additions and Renovations June 6, 2016 Technology User Group Meeting Minutes

Attendees/Absentees. Derek Gallagher DG. Delano Secondary School Additions and Renovations June 6, 2016 Technology User Group Meeting Minutes MEMORANDUM To: From: Attendees/Absentees Derek Gallagher DG Date: June 14, 2016 Comm. No: 152235 Subject: Independent School District #879 Delano Secondary School Additions and Renovations June 6, 2016

More information

Warren County Schools Plant and Operations

Warren County Schools Plant and Operations Warren County Schools Plant and Operations Buildings/Facilities/Energy Strategic Plan September 28, 2017 (Updated January 18, 2018) Donnie Caldwell; Facilities Director One Team, One Goal, High Levels

More information

Massachusetts School Building Authority

Massachusetts School Building Authority Massachusetts School Building Authority School District Revere District Contact Paul Dakin TEL: (781) 286-8226 Name of School Submission Date 3/6/2007 The following Priorities have been included in the

More information

BOABC Level III Exams 7, 8, 9 and 10 Beginning April 1, 2015

BOABC Level III Exams 7, 8, 9 and 10 Beginning April 1, 2015 Exam ID Examination Code Part BOABC Level III Exams 7, 8, 9 and 10 Beginning April 1, 2015 BC3-7 Level III Exam 7 BCBC Part 3 (Part 3 Buildings Classification & Construction) BC3-8 Level III Exam 8 BCBC

More information

West Hartford Public School District

West Hartford Public School District West Hartford Public School District Agenda Item: Adoption of Capital Improvement Plan for 2018-19 Meeting Date: February 6, 2018 From: Through: Andy Morrow, Assistant Superintendent for Administration

More information

Washington Irving Elementary School

Washington Irving Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Community Response Buchanan Elementary. December 13, 2016

Community Response Buchanan Elementary. December 13, 2016 Community Response Buchanan Elementary December 13, 2016 SITE EVALUATION FOLLOWING INITIAL COMMUNITY INPUT BUCHANAN ELEMENTARY SCHOOL Design Concepts for the new Buchanan Elementary School have been shared

More information

4. Plumbing fixtures. a) The plumbing fixtures are from the original building. They are appear old and not to comply with ADA requirements.

4. Plumbing fixtures. a) The plumbing fixtures are from the original building. They are appear old and not to comply with ADA requirements. From: Jian Zhang Sheet: 1 of 8 Date of Visit: 12/7/10 Coach House: Plumbing Systems b) All original building storm piping shows significant signs of aging. b) All original building sanitary piping shows

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT A-PLUS IND LTD PLOT # 28, MILK VITA ROAD, SECTION #07, MIRPUR, DHAKA - 1216, BANGLADESH March 10, 2014 Page 2 SUMMARY was surveyed for fire safety on 3/10/2014 by Hughes Associates,

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: NEW SCH FOR ARTS AND SCIENCE - X, 965 LONGWOOD AVENUE, New York, 10459 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-12-01 8:13 AM 2017-12-01

More information

WPUMC Capital Report Existing Facilities February 19, Maintenance Coordinator George Smit

WPUMC Capital Report Existing Facilities February 19, Maintenance Coordinator George Smit WPUMC Capital Report Existing Facilities February 19, 2017 Maintenance Coordinator George Smit Facility Overview Buildings Sanctuary Building (SB) Sanctuary, Narthex, Lobby Choir Room. Dr. Lee s Office,

More information

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012) Madeira City Schools Madeira, Ohio HVAC Assessment December 2011 (Revised February 2012) Prepared by: CMTA Engineering Consultants, Inc. 10411 Meeting Street Prospect, KY 40059 www.cmtaegrs.com (502) 326-3085

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 47 - QUEENS, 9 POWER ROAD, New York, 11693 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-04-20 12:40

More information

Appendix B. Facilities Assessment Report

Appendix B. Facilities Assessment Report Mile Lane Army Reserve Center Redevelopment Plan September 2008 Appendix B Facilities Assessment Report RKG Associates, Inc. Mile Lane Army Reserve Base Middletown, CT MEP System Evaluation For RKG Associates

More information

Arlington Public Schools Purchasing Office

Arlington Public Schools Purchasing Office Arlington Public Schools Purchasing Office NOTICE OF ADDENDUM NO. 1 Issued on March 30, 2018 TITLE: ITB NO.: YORKTOWN HIGH SCHOOL INTERIOR MODIFICATIONS PROJECT 57FY18 ITB CLOSING DATE PRIOR TO 2:00 P.

More information

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December