CHA ELECTRON BEAM EVAPORATOR SYSTEM OPERATING MANUAL Version: 1.0 Jan 2012

Size: px
Start display at page:

Download "CHA ELECTRON BEAM EVAPORATOR SYSTEM OPERATING MANUAL Version: 1.0 Jan 2012"

Transcription

1 CHA ELECTRON BEAM EVAPORATOR SYSTEM OPERATING MANUAL Version: 1.0 Jan 2012 UNIVERSITY OF TEXAS AT ARLINGTON Nanofabrication Research and Teaching Facility

2 TABLE OF CONTENTS 1.0 DESCRIPTION SAFETY REQUIREMENTS/RESTRICTIONS STARTING THE CRYO PUMP LOADING A SAMPLE PROGRAMMING THE XTC THICKNESS MONITOR BRINGING UP THE ELECTRON BEAM FOR EVAPORATION SYSTEM SHUTDOWN

3 1.0 Description The CHA Industries Electron Beam Evaporator uses a four pocket carousel crucible selector. Users are allowed to evaporate/deposit Al, W, Ti, Ni, Ge, Au, Ag, Pt, Cr, Co, Fe and Cu. Any other materials will need NanoFab staff permission. Single or stack films can be evaporated on 1-6 diameter wafers, glass slides and small samples. 2.0 Safety This machine is connected to HIGH VOLTAGE. If any ARC FAULT, OVERLOAD, or SYSTEM FAULT lights come ON call NanoFab staff immediately. Be very careful and aware of electrical hazards. If you encounter any electrical malfunctions contact NanoFab staff immediately This machine uses HIGH VOLTAGE. DO NOT operate this machine with any cables disconnected, or component enclosures/panels open This machine uses HIGH VOLTAGE. DO NOT operate this machine with any cables disconnected, or component enclosures/panels open This machine has use water flow to prevent over heating the cryro pump, carousel source crucibles and quartz crystal.if you encounter any water flow malfunctions or leaks notify NanoFab staff immediately This machine has an EMO (Emergency Off) switch/button mounted on the top panel. The EMO switch should be pressed only in an emergency. An emergency would be fire, smoke, electrocution hazards, and an injury to anyone using this particular piece of equipment. If the EMO is pressed notify NanoFab staff immediately Use sunglasses when viewing the material heating/ evaporation process to prevent eye damage 3.0 Requirements/Restrictions You must be a qualified user on the CHA E-beam evaporator Users must supply their own deposition supplies on this system. See the Kurt J Lesker page below (Fig. A) for more details Substrate heating is limited to 500 o C maximum The evaporator can be used to deposit metal or oxide film on 1-4 diameter wafers, glass slides, and small samples by using the substrate holder clips. Extremely small pieces can be processed by using longer holder clips or bonding to larger carrier wafer (bond with drop silver paint, drop of baked photo resist, MUNG II paste or other approved bonding material) No substrate heating allowed if using bonding material. 3

4 3.1.6 If you are using the substrate heater be careful not to over heat your wafer/samples to prevent any wafer breakage, metal or any other material to flow If you are using the substrate heater make sure you wait until the substrate temperature is < 50C before venting the chamber. 4

5 4.0 Starting the Cryo Pump Set the ROTARY Switch to MANUAL (Fig 1). (Fig. 1) Check the CRYO PUMP CONTROLLER (Fig. 2) to see if the controller power is ON and if the cryo pump is at the proper operating temperature of < 18K. If the Cryo Pump Controller is currently ON and at the proper operating temperature then skip forward to Section 5.0. If the Cryo pump is OFF then proceed to the next step. (Fig 2) Read the CRYO ROUGHING PRESSURE (Fig. 3), if it is > 100 mtorr go to step If it 100 mtorr go to step (Fig. 3) 5

6 4.1.4 Turn the MECHANICAL PUMP breaker ON (Fig. 4). (Fig. 4) Open the FORE valve (See Fig. 1) and wait until the CRYO ROUGHING PRESSURE 100 mtorr (Fig. 5). Close the FORE valve and monitor the CRYO ROUGHING PRESSURE, if it rises to > 100mT open the FORE valve again and allow the pressure to drop to < 100mt. Repeat this cycle until the CRYO ROUGHING PRESSURE remains < 100mT when the FORE valve is closed. Leave the FORE valve closed and proceed to the next step. **Warning** Do not leave the system unattended with the FORE valve opened. Allowing the pressure to drop for extended periods of time to levels of < 100 mtorr can result in hydrocarbon oil backstreaming into the cryo and contamination of the system. If you must leave, then close the FORE valve before doing so. (Fig. 5) 6

7 4.1.6 Turn the CRYO-PUMP CONTROLLER power ON (Fig. 6). Write down in the logbook the cryo starting time. The cryo pump is not going to be operational until it reaches 18 ºK as displayed on the CRYO-PUMP CONTROLLER. This may take up to 2 hours. (Fig. 6) ***Note*** At this time you may load your samples and perform steps while you wait on the cryo pump to finish cooling to < 18 ºK. 5.0 Loading a Sample On the PRESSURE GAUGE CONTROLLER, (Fig. 7) press the POWER button. Open the VENT valve (See Fig. 1) and wait until the THERMO GAUGE pressure gets close to 1000 Torr. (Fig. 7) 7

8 5.1.2 Move the RAISE/LOWER button to the RAISE position to fully raise the Bell Jar. Once the Bell Jar has fully lifted and stops, move the RAISE/LOWER switch to its middle STOP position (Fig. 8) and close the VENT valve (Fig. 8). (Fig. 8) Load your sample(s) onto one of the Sample Plates (Fig. 9) and then you re your supplies for evaporation into the chamber. Change the microscope slides if necessary. While the chamber is opened inspect the chamber seal and base area for flakes. Clean all flakes from the seal areas. If there are too many flakes within the chamber, vacuum the chamber. You need to be careful around the high voltage electrodes and e-beam gun. Do not touch the vacuum nozzle to any wires or delicate components. If necessary ask a staff member to assist you. If flakes get in the wrong location arcing can occur. (Fig. 9) LOWER the Bell Jar by moving the RAISE/LOWER switch to the LOWER position (See Fig. 8). Once the Bell Jar has fully lowered and stops moving then move the RAISE/LOWER switch to the middle STOP position. 8

9 5.1.5 Open the ROUGH valve (See Fig 8). After the pressure in the chamber indicates < 100 mt as indicated on the Thermo Gauge (Fig 7 & 9) close the ROUGH valve. You must now wait until the cryo temperature is 18 ºK before proceeding to the next step. Fig Verify that the cryo pump temperature is 18 ºK as indicated on the CRYO PUMP CONTROLLER (See Fig. 6) once this temperature has been reached open the HIVAC valve (See Fig 8) Wait a few minutes, then go to the PRESSURE GAUGE CONTROLLER (See Fig. 7) and turn the RANGE switch to 4x10 -N and press the FILAMENT button to turn ON the Ionization Gauge Wait until the pressure in the Ionization Gauge reaches < 5x10-6 Torr before proceeding. 6.0 Programming the Inficon XTC Thickness Monitor Turn ON the THICKNESS FILM MONITOR (Fig. 8) and then press the STOP and then START button to clear any errors. (Fig. 8) Press the XTAL button to check the % of crystal life remaining. If the crystal life is > 15% then it must be changed before deposition Press the Pg button then the DOWN ARROW key until DENSITY is highlighted. 9

10 6.1.4 Enter the material density from the materials selection guide. Once the correct density has been entered continue by pressing the DOWN ARROW again until Z-Ratio is highlighted. Enter the correct Z-Ratio for the deposited material from the materials selection guide. ***Warning***- DO NOT PRESS THE UP ARROW AFTER ENTERING A NUMBER OR THE ENTRY WILL BE LOST Once completed press the Pg button again to save the entries and return to the main screen. 7.0 Bringing up the Electron Beam for Evaporation Turn the e-gun X - Y beam sweep controller ON (Fig. 10) by moving the toggle power switch to the ON position. (Fig. 9) Turn on the interlock key by turning the key from OFF to MAN, Do not put the key in AUTO or the system will not function properly. All the yellow interlock lights will turn on and the green READY light will be on. If all the lights are not on call NanoFab staff. (Fig. 10) Turn SOURCE 1 emission control knob on the front of the Interlock panel to 0 by turning knob CCW until it stops Turn the REMOTE BEAM CONTROLLER emission current to 0 by turning the EMISSION current potentiometer fully CCW until it 0. 10

11 7.1.6 Turn on MAINS power by moving switch/breaker to ON position (SEB-06 e-beam power supply). If any ARC FAULT, OVERLOAD, SYSTEM FAULT lights go on turn OFF MAINS switch/breaker and call NanoFab staff immediately. Only the MAINS ON and INTERLOCK lights should be on Turn on high voltage by pressing the white HV ON push-button switch (SEB-06). The HV ON light will turn on. If any ARC FAULT, OVERLOAD, SYSTEM FAULT lights go on press the green HV OFF push-button switch, turn OFF MAINS switch/breaker and call NanoFab staff immediately. Only the MAINS ON, INTERLOCK and HV ON lights should be on If necessary adjust the OUTPUT VOLTAGE to 9.0 KV by turning output voltage adjust potentiometer UP or DOWN until the display shows 9.0 KV While watching the X Y Beam sweep controller Green LED readouts, adjust both the amplitude and position potentiometers on the Remote Beam Controller to be centered (position pot) and approximately 3 to 5 LED s in width (Amplitude pot) Check to ensure the Remote Emission Controller emission current is at 0 by rotating emission potentiometer CCW until it Turn on the Remote Emission Controller by pressing the EMISSION ON pushbutton switch. The ON light will turn red Move the Source shutter switch to its OPEN position (Fig. 11). (Fig. 11) Slowly increase emission current by rotating EMISSION potentiometer CW to a setting of while looking through the source view port window to monitor the initial heating process (about 15 downward). If necessary use the filter lens when viewing the material heating/evaporation process to prevent eye damage. 11

12 While looking into the viewport window you should be able to see the blue e-beam spot or the material glowing hot near the center of the crucible. Make fine centering adjustments to the Horizontal and Lateral Position potentiometers On the Remote Beam Controller increase/decrease the Horizontal Amplitude potentiometer CW to generate an optimal e-beam sweep without encroaching on the crucible edge On the Remote Beam Controller increase/decrease the Lateral Amplitude potentiometer CW to generate an optimal e-beam sweep without encroaching on the crucible edge On the Remote Beam Controller increase/decrease the Horizontal and Lateral Frequency potentiometers CW to achieve an optimum sweep frequency/speed Very slowly increase emission current by rotating EMISSION potentiometer CW. When you have the desired evaporation rate (2-3A/sec is typical) then press the ZERO button on the Inficon XTC thickness monitor (See. Fig. 8) Open the Substrate shutter (Fig. 12) to begin the deposition. (Fig. 12) When you have deposited the desired thickness as shown on the Inficon XTC thickness monitor (See Fig. 8), quickly close both the SOURCE AND SUBSTRATE shutter s by moving both switches to their closed position s (See Fig. 12) Begin the emission current shut down by SLOWLY decreasing emission current by rotating EMISSION potentiometer CCW until it 0. This process should take a couple of minutes to allow the crucible and filament sufficient time to cool slowly Turn off the Remote Emission Controller by pressing the EMISSION OFF pushbutton switch. The OFF light will turn green. 12

13 Turn off high voltage by pressing the green HV OFF push-button switch (SEB-06) and then turn off the Mains power by moving the breaker to the OFF position Then turn off the X Y Beam sweep controller and turn the Interlock key to the OFF position. 8.0 System Shutdown If the substrate was heated then you must wait until the temperature displays < 50 deg before proceeding to the next step Close HIVAC valve (See Fig. 1) and wait 5 minutes before proceeding to the next step, this allows the crucible sufficient time to cool down Open the VENT valve (See Fig. 1) and allow the chamber pressure to rise to approximately 1000 mt as indicated on the THERMOGAUGE display (See Fig. 7) Press the RAISE button (See Fig. 1) to raise the bell jar. Once the bell jar has fully raised close the VENT valve Remove the Sample Carrier from the system, unload your sample(s) from the plate and then reinstall the empty sample plate into the system Press the LOWER button (See Fig. 1) to lower the bell jar until it stops moving. Move the Raise/Lower switch back to the middle position Move the open the ROUGH valve and pump the chamber to < 100 mt on the THERMOGAUGE display (See Fig. 7) Close the ROUGH valve and then turn the MECHANICAL PUMP switch off (See Fig. 3) If another user is going to use the CHA E-beam system after you then skip this step. If no other user will be running the CHA E-beam system then proceed. On the Cryo Pump Controller (See Fig. 5) turn the CRYO-PUMP power switch OFF Switch to the system controller from MANUAL to the OFF position (see Fig. 1) Pick up your belongings, clean and organize the table and complete your log entry in the system logbook. 13

AJA THERMAL EVAPOTOR STANDARD OPERATING PROCEDURE

AJA THERMAL EVAPOTOR STANDARD OPERATING PROCEDURE AJA THERMAL EVAPOTOR STANDARD OPERATING PROCEDURE Version: 2.0 MARCH 2013 UNIVERSITY OF TEXAS AT ARLINGTON Nanotechnology Research and Education Center AJA INTERNATIONAL THERMAL EVAPORATION SYSTEM Standard

More information

Nanoscale Fabrication & Characterization Facility. Thermionics E-Beam Evaporator Users Guide

Nanoscale Fabrication & Characterization Facility. Thermionics E-Beam Evaporator Users Guide Nanoscale Fabrication & Characterization Facility Thermionics E-Beam Evaporator Users Guide The model VE-180 provides thin film coating of virtually any material quickly, cleanly and efficiently. Our system

More information

Title: CHA E-Beam Evaporator Semiconductor & Microsystems Fabrication Laboratory Revision: C Rev Date: 01/13/2011

Title: CHA E-Beam Evaporator Semiconductor & Microsystems Fabrication Laboratory Revision: C Rev Date: 01/13/2011 Approved by: Process Engineer / / / / Equipment Engineer 1 SCOPE The purpose of this document is to detail the use of the CHA E-Beam Evaporator. All users are expected to have read and understood this

More information

1.0 Denton Thermal Evaporator

1.0 Denton Thermal Evaporator 1.0 Denton Thermal Evaporator View port shutter knob Touch screen View port Vacuum chamber Thickness monitor EMO Switch 1.1 Introduction Figure 1: Denton Thermal Evaporator. Denton Thermal Evaporator is

More information

Oerlikon Ebeam Evaporator SOP short. UNT Cleanroom

Oerlikon Ebeam Evaporator SOP short. UNT Cleanroom Oerlikon Ebeam Evaporator SOP short UNT Cleanroom 1. Transfer sample holder into process chambers: Log in FOM to access the software Go to the software and log in with user1 and password user1 Go to transport

More information

Vacuum Systems & Thin Films (Jaeger 6, Campbell 10&12, Ruska 7) Deposition of thin films involves vacuum system Direct Deposition from Source

Vacuum Systems & Thin Films (Jaeger 6, Campbell 10&12, Ruska 7) Deposition of thin films involves vacuum system Direct Deposition from Source Vacuum Systems & Thin Films (Jaeger 6, Campbell 10&12, Ruska 7) Deposition of thin films involves vacuum system Direct Deposition from Source Evaporation Sputter Building up layers Chemical Vapour Deposition

More information

Custom Products Gallery

Custom Products Gallery Custom Products Gallery KEY HIGH VACUUM PRODUCTS, INC., willingly customizes its standard product line to meet individual customer specifications. Customized products include but are not limited to, valves,

More information

Kurt J. Lesker in the Cryogenic Community. Dr. Glynn Dyson Cryogenics Cluster Day 19 th September 2014

Kurt J. Lesker in the Cryogenic Community. Dr. Glynn Dyson Cryogenics Cluster Day 19 th September 2014 Kurt J. Lesker in the Cryogenic Community Dr. Glynn Dyson 19 th September 2014 Overview Introduction to the Kurt J. Lesker Company (KJLC) KJLC in the Cryogenic Community Deposition Methods Axxis Coating

More information

Vacuum Systems & Thin Films (Jaeger 6, Campbell 10&12, Ruska 7) Deposition of thin films involves vacuum system Direct Deposition from Source

Vacuum Systems & Thin Films (Jaeger 6, Campbell 10&12, Ruska 7) Deposition of thin films involves vacuum system Direct Deposition from Source Vacuum Systems & Thin Films (Jaeger 6, Campbell 10&12, Ruska 7) Deposition of thin films involves vacuum system Direct Deposition from Source Evaporation Sputter Building up layers Chemical Vapour Deposition

More information

Manual Physical Vapour Deposition System

Manual Physical Vapour Deposition System Manual Physical Vapour Deposition System Wilhelmus Geerts, Debbie Koeck. 1.0 Content: Manual explaining how to operate the system. Background explaining the deposition technology. Trouble-shooting / FAQ.

More information

Denton Thermal Evaporator SOP. UNT Cleanroom

Denton Thermal Evaporator SOP. UNT Cleanroom Denton Thermal Evaporator SOP UNT Cleanroom Utility Checklist: The PCW water valve is open to the cryo compressor (in chase) N2 and CDA are on Cooling water valves to the tools are on 1. Mounting the substrate

More information

University of Minnesota Nano Fabrication Center Standard Operating Procedure

University of Minnesota Nano Fabrication Center Standard Operating Procedure Equipment Name: Ion Mill Coral Name: ionmill Revision Number: 4 Model: Intlvac Revisionist: K. Roberts Location: Bay 3 Date: 09/17/2013 1 Description The Intlvac Ion Mill is used for non-chemical etching

More information

Guide for Thin Film Evaporation Edited 7/22/13 by Stephen Albright, BJAM & Steven Palefsky

Guide for Thin Film Evaporation Edited 7/22/13 by Stephen Albright, BJAM & Steven Palefsky Guide for Thin Film Evaporation Edited 7/22/13 by Stephen Albright, BJAM & Steven Palefsky N.B. This guide is written largely for use with the Thin-Film Tunneling with Superconductors instructional lab.

More information

Standard Operating Procedure Glovebox and Thermal Evaporator

Standard Operating Procedure Glovebox and Thermal Evaporator Standard Operating Procedure Glovebox and Thermal Evaporator Aditya G. Baradwaj, Martha Hay (Superusers Spincoater side) Edward Tomlinson, Jennifer Laster (Superusers Evaporator side) March 2014 Purpose

More information

Plasma-Therm 790 RIE (Reactive Ion Etcher) Basic Operation Guide

Plasma-Therm 790 RIE (Reactive Ion Etcher) Basic Operation Guide Plasma-Therm 790 RIE (Reactive Ion Etcher) Basic Operation Guide Description: The Plasma-Therm 790 is configured for RIE (Reactive Ion Etching) processing of Silicon substrates. Substrates up to 8 inches

More information

Vacuum Systems & Thin Films (Jaeger 6, Campbell 10&12, Ruska 7) Deposition of thin films involves vacuum system Direct Deposition from Source

Vacuum Systems & Thin Films (Jaeger 6, Campbell 10&12, Ruska 7) Deposition of thin films involves vacuum system Direct Deposition from Source Vacuum Systems & Thin Films (Jaeger 6, Campbell 10&12, Ruska 7) Deposition of thin films involves vacuum system Direct Deposition from Source Evaporation Sputter Building up layers Chemical Vapour Deposition

More information

OXFORD PLASMALAB 100 PECVD

OXFORD PLASMALAB 100 PECVD Arizona State University NanoFab OXFORD PLASMALAB 100 PECVD Rev D Table of Contents Contents Table of Contents... 1 1. Purpose / Scope... 2 2. Reference Documents... 2 3. Equipment / Supplies / Material...

More information

PDS 2010 Parylene Coater SOP

PDS 2010 Parylene Coater SOP PDS 2010 Parylene Coater SOP PDS 2010 Parylene Coater SOP Page 1 of 11 1. Scope 1.1 This document provides the procedures and requirements to deposit a parylene film, using the Specialty Coating Systems

More information

Arizona State University Center for Solid State Electronic Research Title: Oxford Plasmalab 100 PECVD Page 1 of 7

Arizona State University Center for Solid State Electronic Research Title: Oxford Plasmalab 100 PECVD Page 1 of 7 Title: Oxford Plasmalab 100 PECVD Page 1 of 7 Table of Contents 1.0 Purpose/Scope... 2 2.0 Reference Documents... 2 3.0 Equipment/Supplies/Material... 2 4.0 Safety... 2 5.0 Set Up Procedures... 2 6.0 Procedure...

More information

C19 UNIVEX. High Vacuum Experimentation Systems UNIVEX 300, UNIVEX 450 UNIVEX 350, UNIVEX 450 B Special plants

C19 UNIVEX. High Vacuum Experimentation Systems UNIVEX 300, UNIVEX 450 UNIVEX 350, UNIVEX 450 B Special plants C19 UNIVEX UNIVEX 300, UNIVEX 450 UNIVEX 350, UNIVEX 450 B Special plants Contents General Applications and Accessories / Process Components.............................. C19.02 General................................................................

More information

Glovebox Usage Manual v1.4. When you enter the lab walk straight to the log book. Enter all information including N2 and O2/H2O levels.

Glovebox Usage Manual v1.4. When you enter the lab walk straight to the log book. Enter all information including N2 and O2/H2O levels. Logbook Glovebox Usage Manual v1.4 When you enter the lab walk straight to the log book. Enter all information including N2 and O2/H2O levels. Nitrogen tank Alert Daeri Tenery or Andre Gesquiere if the

More information

Operating Instructions for the SAMCO RIE800iPB

Operating Instructions for the SAMCO RIE800iPB Operating Instructions for the SAMCO RIE800iPB Tool Owner: Pat Watson x8-4626, cell: 732 996 2713 Backup: Bert Harrop, cell 848 459 2542 Introduction The SAMCO International RIE800iPB is a state of the

More information

Operating Instructions for the STS ICP Metal Etcher

Operating Instructions for the STS ICP Metal Etcher Operating Instructions for the STS ICP Metal Etcher Tool Owner: Pat Watson, gwatson@princeton.edu, x 8-4626, cell: 732 996 2713 Backup: Joe Palmer, jpalmer@princeton.edu, x 8-4706, cell: 609 751 1353 Introduction

More information

Compact Laser MBE system

Compact Laser MBE system Compact Laser MBE system Model : PA-C-PLMBE Our design priority, easy-to-use,brings better controllability of film growth condition This system is designed to deposit thin films on a substrate

More information

Standard Operating Manual

Standard Operating Manual Standard Operating Manual SOLITEC 5110-C/PD Manual Single-Head Coater Page 1 of 14 Contents 1 Picture and Location 2 Process Capabilities 2.1 Cleanliness Standard 2.2 Recipes 2.3 Performance of SOLITEC

More information

Standard Operating Procedure: Sputter

Standard Operating Procedure: Sputter Contents Hardware Description and Principle of Operation... 1 Procedure... 1 Check Targets... 1 Load Sample... 1 Sample Stage Transfer... 3 Recipe Creation... 4 Deposition Running a Recipe... 7 Deposition

More information

NMOS Fabrication Process Description

NMOS Fabrication Process Description NMOS Fabrication Process Description 1 Last modified by Alex Chediak on March 6, 2000. Please send comments and suggestions to him. Process Flow (Process Overview) Week 1: Starting Materials Week 2: Initial

More information

Nanoscale Fabrication & Characterization Facility. PVD Products PLD 3000 Deposition system User Guide

Nanoscale Fabrication & Characterization Facility. PVD Products PLD 3000 Deposition system User Guide Nanoscale Fabrication & Characterization Facility PVD Products PLD 3000 Deposition system User Guide PVD Products PLD-3000 System with dual wafer loadlock and Class 4 Coherent 110F series COMPex Pro excimer

More information

Chapter 3.1, 43 is subdivided into the following sections. System overview (Chapter 3.1.1, 43) and

Chapter 3.1, 43 is subdivided into the following sections. System overview (Chapter 3.1.1, 43) and 3. Design, Functions 3.1 General Chapter 3.1, 43 is subdivided into the following sections System overview (Chapter 3.1.1, 43) and Fundamentals of the evaporation technology (Chapter 3.1.2, 46). 3.1.1

More information

University of Minnesota Nano Fabrication Center Standard Operating Procedure

University of Minnesota Nano Fabrication Center Standard Operating Procedure Equipment Name: ALD Coral Name: ald Revision Number: 8 Model: Savannah Revisionist: T. Whipple Location: Bay 1 Date: 3/14/2017 1 Description The ALD, Atomic Layer Deposition system is a Savannah series

More information

EFM Evaporators. Electron Beam Evaporator for Ultra-Pure Submonolayer and Multilayer Thin Film Growth. Evaporation from Wires, Rods or Crucibles

EFM Evaporators. Electron Beam Evaporator for Ultra-Pure Submonolayer and Multilayer Thin Film Growth. Evaporation from Wires, Rods or Crucibles EFM Evaporators Electron Beam Evaporator for Ultra-Pure Submonolayer and Multilayer Thin Film Growth Evaporation from Wires, Rods or Crucibles Temperature Range up to 3300 C 300 nm Integrated Flux Monitor

More information

Process Equipment Division Overview

Process Equipment Division Overview Process Equipment Division Overview Enabling Technology for a Better World The Kurt J. Lesker Company is a leading global provider of high-quality vacuum products and thin film deposition systems with

More information

YES-3DR HMDS OVEN USERS GUIDE

YES-3DR HMDS OVEN USERS GUIDE YES-3DR HMDS OVEN USERS GUIDE HMDS(Hexamethyldisilazane, [(CH3)3Si]2NH) is widely used in the semiconductor industry to improve photoresist adhesion to oxides. The HMDS reacts with the oxide surface in

More information

CRU-S Series Stainless Steel Condensate Recovery Unit

CRU-S Series Stainless Steel Condensate Recovery Unit IM-UK-CRU-S UK Issue 1 CRU-S Series Stainless Steel Condensate Recovery Unit 1. Safety information 2. General product information 3. Installation 4. Commissioning 5. Storage, shutdown and equipment protection

More information

NANO 703-Notes. Chapter 8-Vacuum systems and TEM holders

NANO 703-Notes. Chapter 8-Vacuum systems and TEM holders 1 Chapter 8-Vacuum systems and TEM holders Vacuum terminology Many experimental techniques require low-pressure, vacuum conditions, instead of the high-pressure, oxygen-rich environment of the earth s

More information

O PE R AT I ON HO851G REVOLVING TRAY OVEN. MODEL HO851G GAS ML Pan ML Pan ML Pan ML Pan

O PE R AT I ON HO851G REVOLVING TRAY OVEN. MODEL HO851G GAS ML Pan ML Pan ML Pan ML Pan O PE R AT I ON HO851G REVOLVING TRAY OVEN MODEL HO851G GAS ML-132160 24 Pan ML-132161 18 Pan ML-132258 36 Pan ML-132259 30 Pan 701 S. RIDGE AVENUE TROY, OHIO 45374-0001 937-332-3000 www.hobartcorp.com

More information

BACK SCATTER ELECTRON (BSE) Rev. 0313

BACK SCATTER ELECTRON (BSE) Rev. 0313 Back-scatter Electron Secondary Electron BACK SCATTER ELECTRON (BSE) Rev. 0313 Contents BSE Introduction (3) Mounting the Detector (4) Load the Sample (5) Back-Scatter Settings (6-7) Optimize Image (8)

More information

Figure 1-1 Furnace Front Elevation

Figure 1-1 Furnace Front Elevation FURNACE EQUIPMENT 1.1 Furnace Description The LA-306 is a compact, near-infrared, conveyor belt furnace for laboratory and general purpose thermal processing in the range of 100-980 ⁰C in a controlled

More information

Experiment #6 Photolithography: Microprocessing Technology Fabrication of the microstructures with SPR photoresist

Experiment #6 Photolithography: Microprocessing Technology Fabrication of the microstructures with SPR photoresist Experiment #6 Photolithography: Microprocessing Technology Fabrication of the microstructures with SPR photoresist The Steps involved in Fabrication: Students will fabricate microstructures on the surface

More information

OPERATING INSTRUCTIONS FOR THE TP18SX-HP

OPERATING INSTRUCTIONS FOR THE TP18SX-HP OPERATING INSTRUCTIONS FOR THE TP18SX-HP PLEASE READ THIS INSTRUCTION MANUAL PRIOR TO USING THE MACHINE Version 07/11 OVERVIEW The TP18SX-HP is a professional carpet extractor, with excellent performance.

More information

Standard Operating Manual

Standard Operating Manual Standard Operating Manual CEE 100CB Spin Coater /Hotplate Version 1.1 Page 1 of 18 Contents 1. Picture and Location 2. Process Capabilities 2.1 Cleanliness Standard 2.2 Substrate Size 2.3 Hotplate Temperature

More information

E6700 Bench Top Evaporator Turbo Pumped Operating Manual

E6700 Bench Top Evaporator Turbo Pumped Operating Manual E6700 Bench Top Evaporator Turbo Pumped Operating Manual Document Number OM-E6700 Issue1 (01/02) For technical and applications advice plus our on-line shop for spares and consumable parts visit www.quorumtech.com

More information

General. Applications and Accessories for Oil Diffusion Pumps. leybold. Application. Accessories LEYBOJET 630 DIP DIP DIP DIP 30000

General. Applications and Accessories for Oil Diffusion Pumps. leybold. Application. Accessories LEYBOJET 630 DIP DIP DIP DIP 30000 General Applications and Accessories for Oil Diffusion Pumps Pumps Application DIP 3000 DIP 8000 DIP 12000 DIP 20000 DIP 30000 DIP 50000 Vacuum coating Research and development Metallurgy/furnaces Mechanical

More information

Operating instructions

Operating instructions Operating instructions Gas-fired condensing boiler Logano plus GB312 For the user Please read carefully before use 7 747 009 296-01/2007 EN Contents 1 For your safety..............................................

More information

MECHANICAL VACUUM BOOSTERS:-

MECHANICAL VACUUM BOOSTERS:- MECHANICAL VACUUM BOOSTERS:- Mechanical Vacuum Boosters are dry pumps that meet most of the ideal vacuum pump requirements. They work on positive displacement principle and are used to boost the performance

More information

4.8 FARADAY CUP ASSEMBLY OPTION

4.8 FARADAY CUP ASSEMBLY OPTION 4.8 FARADAY CUP ASSEMBLY OPTION The Faraday cup assembly, mounted on the front end of the Electron Gun, is positioned by either a rotary feedthrough or a pneumatic actuator assembly, located on one of

More information

OPERATION MANUAL Model 800 Nanoimprint Controller

OPERATION MANUAL Model 800 Nanoimprint Controller OPERATION MANUAL Model 800 Nanoimprint Controller 685 RIVER OAKS PARKWAY SAN JOSE, CA 95134 www.oainet.com sales@oainet.com 408/232-0600 0420-757-01, Rev. B 02/17/09 OAI Model 800 Nanolithosolution Nanoimprint

More information

Troubleshooting Thermo Scientific LevelPRO Gauges

Troubleshooting Thermo Scientific LevelPRO Gauges Troubleshooting Thermo Scientific LevelPRO Gauges Key Words Scintillation detector Current board Relay output Communications Level indication Purpose A chapter in the user guide for the Thermo Scientific

More information

Leica EM ACE600 Carbon & Iridium Coating System

Leica EM ACE600 Carbon & Iridium Coating System Leica EM ACE600 Carbon & Iridium Coating System Standard Operating Procedure Revision: 1.2 2017-0704 by Michael Paul Overview This document will provide a detailed operation procedure of the Leica EM ACE600

More information

WHEN TROUBLESHOOTING, PERFORM THE STEPS IN ORDER.

WHEN TROUBLESHOOTING, PERFORM THE STEPS IN ORDER. WHEN, PERFORM THE STEPS IN ORDER. BURNER WON T LIGHT Control System 1. Is the main interlock in auto? The burner will not light if the dryer is in manual mode b. No: Switch the main interlock to auto 2.

More information

HG DI

HG DI Sample Preparations 1. Leica CM1950 Cryostat 2. Hirayama HV-85 Autoclave 3. Hirayama HG-80 Autoclave 4. Freeze Dryer 5. Vacuum Oven 6. Sputtering Machine 7. Ultracentrifuge 8. Deep Freezer 9. DI & Ultra

More information

Vacuum Pumping process for Large Camera Dewars supplied by PixelVision of Oregon

Vacuum Pumping process for Large Camera Dewars supplied by PixelVision of Oregon Vacuum Pumping process for Large Camera Dewars supplied by PixelVision of Oregon MacOS9.2.1: :Eudora Folder:Attachments Folder:Process for vacuum pumping larg Edited:02.1.3 11:56 1 of 5 Process for vacuum

More information

0. Table of contents. Author: M.C.Martens

0. Table of contents. Author: M.C.Martens RWV nr. : MarMar-20121023-01V01 Page nr. : 0 Chapter : Table of contents Author: M.C.Martens 0. Table of contents 0. Table of contents... 0 1. Changes compared to previous versions... 1 2. Safety... 2

More information

UF424 and UN324. Technical Service

UF424 and UN324. Technical Service UF424 and UN324 Technical Service Technical Service 1-800-533-6006 Check out the new mobile ready website www.scotsman-ice.com/service Technical Service Virtual Business Card What you will learn Introduction

More information

Arizona State University NanoFab PARYLENE COATER. Rev D

Arizona State University NanoFab PARYLENE COATER. Rev D Arizona State University NanoFab PARYLENE COATER Rev D Table of Contents Contents Table of Contents... 1 1. Purpose / Scope... 2 2. Reference Documents... 2 3. Equipment / Supplies / Material... 2 4. Safety...

More information

Saintech Ion Beam Systems - Ion Current Monitor

Saintech Ion Beam Systems - Ion Current Monitor Saintech Ion Beam Systems - Ion Current Monitor The Saintech Ion Current Monitor (ICM) provides REAL TIME Monitoring of Ion Flux throughout Ion-based Deposition Processes The Sensor Head The sensor head

More information

Standard Operating Procedure: Spinner

Standard Operating Procedure: Spinner Contents Hardware Description and Principle of Operation... 2 Material Requirements... 2 Procedure... 2 Emergency Stop... 3 Allowed Activities... 4 Disallowed Activities... 4 What to watch out for during

More information

GAS RACK OVENS WITH ELECTRONIC OVEN CONTROL

GAS RACK OVENS WITH ELECTRONIC OVEN CONTROL GAS RACK OVENS WITH ELECTRONIC OVEN CONTROL MODELS DRO2G DRO2GH GAS GAS 701 S. RIDGE AVENUE TROY, OHIO 45374-0001 937-332-3000 www.hobartcorp.com FORM 19202 Rev. D (Dec. 2003) IMPORTANT FOR YOUR SAFETY

More information

Rules for Safe Operation

Rules for Safe Operation Rules for Safe Operation Important: Do not attempt to operate the CleanStation until you have read thoroughly and understand all instructions and safety rules contained in this manual. Failure to comply

More information

Light oil / kerosene burner

Light oil / kerosene burner Installation, use and maintenance instructions Light oil / kerosene burner One stage operation CODE MODEL TYPE 374445 G5 444T50 290238 (5) - 05/20 TECHNICAL DATA Thermal power output 28 60 kw 2.3 5 kg/h

More information

Maintenance and Troubleshooting of Oil Diffusion Pumps

Maintenance and Troubleshooting of Oil Diffusion Pumps Maintenance and Troubleshooting of Oil Diffusion Pumps Solution Note Agilent VHS-4 Diffusion Pump How Diffusion Pumps Work Operating Diffusion Pumps Diffusion Pump Maintenance Diffusion Pump Troubleshooting

More information

Standard Operating Manual

Standard Operating Manual Standard Operating Manual EVG 101 Spray Coater Version 1.1 Page 1 of 24 Contents 1. Picture and Location 2. Process Capabilities 2.1 Cleanliness Standard 2.2 Substrate Size 2.3 Spin speed 2.4 Spin ramp

More information

Standard Operating Manual. Semitool Spin Rinser Dryer SRD

Standard Operating Manual. Semitool Spin Rinser Dryer SRD Standard Operating Manual Semitool Spin Rinser Dryer SRD Version 1.1 Page 1 of 8 Contents 1. Picture and Location 2. Process Capabilities 2.1 Cleanliness Standard 2.2 Substrate Size 3. Contact List and

More information

Always keep this manual in a safe readily accessible location. MODEL SERIAL SERVICE COMPANY TELEPHONE NUMBER

Always keep this manual in a safe readily accessible location. MODEL SERIAL SERVICE COMPANY TELEPHONE NUMBER Always keep this manual in a safe readily accessible location. MODEL SERIAL SERVICE COMPANY TELEPHONE NUMBER For Operating Instructions or Technical Support Call 1-507-886-6666 Last Revision: 1/31/12 Starting

More information

OWNER S MANUAL. High-Wall Fan Coil Unit CONTENTS

OWNER S MANUAL. High-Wall Fan Coil Unit CONTENTS OWNER S MANUAL High-Wall Fan Coil Unit Page GENERAL 2,3 OPERATING MODES 2 REMOTE CONTROL 2 OPERATION 3-9 REMOTE CONTROL OPERATION 3 INDOOR UNIT DISPLAY 5 EMERGENCY OPERATION 5 PRESSING THE ON/OFF BUTTON

More information

TYCO VALVES & CONTROL Dual Painting System

TYCO VALVES & CONTROL Dual Painting System TYCO VALVES & CONTROL Dual Painting System Thierica Equipment #12095-010 OPERATION/SEQUENCE OF EVENTS INDEX START-UP... 3 LOAD / UNLOAD STATION OPERATIONS... 4 SHUT-DOWN... 5 PAGE DESCRIPTIONS... 6-25

More information

IMPORTANT CONSIDERATIONS

IMPORTANT CONSIDERATIONS NUMBER 6 SER VACUUM FURNACE REFERENCE I E S IMPORTANT CONSIDERATIONS When Purchasing a Vacuum Furnace Important Considerations When Purchasing A Vacuum Furnace There are many factors that should be considered

More information

REDI CONTROLS, INC. Installation, Operation & Maintenance Manual

REDI CONTROLS, INC. Installation, Operation & Maintenance Manual REDI CONTROLS, INC. Installation, Operation & Maintenance Manual Literature File No. 1151-00.113 Redi-Purge Microprocessor Controlled Ultra-High Efficiency Gravity Flow Non-Condensable Purge Unit For Use

More information

Originally prepared by B. Cheek Low Temperature Probe Station (LTPS) Assembly and Disassembly Procedures

Originally prepared by B. Cheek Low Temperature Probe Station (LTPS) Assembly and Disassembly Procedures Low Temperature Probe Station (LTPS) Assembly and Disassembly Procedures I. Introduction This is a new document detailing with pictures the procedure to disassemble, prep and clean, and reassemble the

More information

Waste Oil Fired Heater. Installation, operation and service instructions OWH v Manual

Waste Oil Fired Heater. Installation, operation and service instructions OWH v Manual Waste Oil Fired Heater Installation, operation and service instructions OWH-350 120v Manual EconoHeat 5714 E. First Avenue Spokane Valley, WA 99212 800.255.1363 www.econoheat.com Rev 01/2017 Table of Contents

More information

Thermo 230 / 231 / 300 / 301 / Troubleshooting

Thermo 230 / 231 / 300 / 301 / Troubleshooting Thermo 230 / 231 / 300 / 301 / 350 5 Troubleshooting 5 Troubleshooting 5.1 General This section describes troubleshooting procedures for the heaters Thermo 230, 231, 300, 301 and 350. CAUTION Troubleshooting

More information

Brandon Barrel Asher. Standard Operating Procedure

Brandon Barrel Asher. Standard Operating Procedure Brandon Barrel Asher Standard Operating Procedure The barrel asher is designed to give isotropic (non-directional) etches. There is no DC bias, so the cloud of plasma chemically etches uniformly across

More information

Labconco Small Stoppering Chamber

Labconco Small Stoppering Chamber LABCONCO CORPORATION 8811 Prospect Ave, Kansas City, MO 64132 (816) 333-8811, Fax (816) 363-0130, (800) 821-5525 Labconco Small Stoppering Chamber 7569000 Introduction- The Small Stoppering Chamber is

More information

Filabot EX6 Extruder. Operation Manual. CAUTION! Read Carefully. Filabot Vermont, USA, Earth

Filabot EX6 Extruder. Operation Manual. CAUTION! Read Carefully. Filabot Vermont, USA, Earth Filabot Vermont, USA, Earth 1-802-505-6772 CAUTION! Read Carefully HOT MATERIALS & SURFACES Use gloves and eye protection while operating the EX6 Extruder. The barrel and nozzle are HOT and melted plastic

More information

MODEL 421 NUCLEAR POWER PLANT TRITIUM MONITOR

MODEL 421 NUCLEAR POWER PLANT TRITIUM MONITOR PLANT "WIDE RANGE" TRITIUM NPPM This tritium monitor is a version of the OTC standard 321/421 series, configured for the special environmental conditions associated with nuclear power plants, especially

More information

VACUUM CHAMBER PM TECHNIQUE LAM 9600 METAL ETCH

VACUUM CHAMBER PM TECHNIQUE LAM 9600 METAL ETCH BEFORE VACUUM CHAMBER PM TECHNIQUE LAM 9600 METAL ETCH AFTER OBJECTIVE: TO PM THE LAM 9600 METAL ETCH IN AN EFFECTIVE AND TIMELY MANNER, WHILE IMPROVING PARTICLE PERFORMANCE, TOOL RECOVERY AND MAXIMIZE

More information

Installation Instructions

Installation Instructions 40MAQ High Wall Ductless Split System Sizes 09 to 36 Installation Instructions NOTE: Read the entire instruction manual before starting the installation TABLE OF CONTENTS PAGE SAFETY CONSIDERATIONS 2 PARTS

More information

Standard Operating Manual

Standard Operating Manual Standard Operating Manual RTP-600S Rapid Thermal Processing System Version 1.2 Page 1 of 11 Contents 1. Picture and Location 2. Process Capabilities 2.1 Cleanliness Standard 2.2 Process Temperatures, Time

More information

MODEL 321/421 NUCLEAR POWER PLANT TRITIUM MONITOR

MODEL 321/421 NUCLEAR POWER PLANT TRITIUM MONITOR MODEL 321/421 NPPM This tritium monitor is a version of the OTC standard 321/421 series, configured for the special environmental conditions associated with nuclear power plants, especially those of the

More information

Motorised Infrared Optical Beam Smoke Detector. User Guide

Motorised Infrared Optical Beam Smoke Detector. User Guide Motorised Infrared Optical Beam Smoke Detector User Guide EN 1. General Information 50cm 50cm 8-100m Ensure clear line of sight from Detector to Reflector Mount on solid surfaces (structural wall or girder)

More information

Operation Manual R205BV, R209BV

Operation Manual R205BV, R209BV Operation Manual R205BV, R209BV 1 Safety Instruction The rotary evaporator is manufactured according to current methods and accepted safety regulations. However, risks still exist during the installation,

More information

FOR VETERINARY USE ONLY

FOR VETERINARY USE ONLY OtoPet-USA Earigator Setup and Use Instructions FOR VETERINARY USE ONLY OtoPet-USA is a division of DermaZoo TM 8909 Iverleigh Court, Potomac, MD 20854 Office: 301-365-0192 Toll Free: 866-374-0897 Fax:

More information

AOYUE 968A+ INT. Deluxe Repairing System INSTRUCTION MANUAL

AOYUE 968A+ INT. Deluxe Repairing System INSTRUCTION MANUAL AOYUE INT 968A+ Deluxe Repairing System INSTRUCTION MANUAL Thank you for purchasing Aoyue INT 968A+ Repairing System. It is important to read the manual before using the equipment. Please keep manual in

More information

Tornado Operations & Maintenance Manual

Tornado Operations & Maintenance Manual TORNADO INDUSTRIES 7401 W. LAWRENCE AVENUE CHICAGO, IL 60706 (708) 867-5100 FAX (708) 867-6968 www.tornadovac.com Tornado Operations & Maintenance Manual MODEL NO. 99690 BD 22/14, 99720 BD 26/14 L9722

More information

Oil burners fuel unit with solenoid valve

Oil burners fuel unit with solenoid valve Oil burners fuel unit with solenoid valve Type VM www.deltapumps.com VM1 - VM4U flanged Certified Quality System Printed in Italy - DE112/0404 Oil burners fuel unit with solenoid valve Type VM The DELTA

More information

17 GALLON PROFESSIONAL RESTROOM CLEANER

17 GALLON PROFESSIONAL RESTROOM CLEANER CR2 COMPLETE RESTROOM RESTORATION 17 GALLON PROFESSIONAL RESTROOM CLEANER OWNER S/OPERATOR S MANUAL PROUDLY DESIGNED AND MANUFACTURED BY WWW.EDIC-USA.COM UNPACKING YOUR NEW CR2: When your machine is delivered,

More information

Motorised Infrared Optical Beam Smoke Detector. User Guide

Motorised Infrared Optical Beam Smoke Detector. User Guide Motorised Infrared Optical Beam Smoke Detector User Guide EN 1. General Information 50cm 50cm 8-100m Ensure clear line of sight from Detector to Reflector Mount on solid surfaces (structural wall or girder)

More information

STEAM MOP INSTRUCTION MANUAL CATALOG NUMBER BDH1765SM PLEASE READ BEFORE RETURNING THIS PRODUCT FOR ANY REASON. SAVE THIS MANUAL FOR FUTURE REFERENCE.

STEAM MOP INSTRUCTION MANUAL CATALOG NUMBER BDH1765SM PLEASE READ BEFORE RETURNING THIS PRODUCT FOR ANY REASON. SAVE THIS MANUAL FOR FUTURE REFERENCE. STEAM MOP INSTRUCTION MANUAL CATALOG NUMBER BDH1765SM Thank you for choosing BLACK+DECKER! PLEASE READ BEFORE RETURNING THIS PRODUCT FOR ANY REASON. SAVE THIS MANUAL FOR FUTURE REFERENCE. SAFETY GUIDELINES

More information

ACORE Filtration Co.,Ltd provides engineering,

ACORE Filtration Co.,Ltd provides engineering, Oil Filtration Systems For Every Demanding Application VLF Lube Oil Purifier ACORE Filtration Co.,Ltd provides engineering, manufacturing, sales of industrial oil filtration systems, we have been striving

More information

Standard Operating Procedures

Standard Operating Procedures CENTER FOR NANOSCALE SCIENCE AND ENGINEERING Standard Operating Procedures MMR Low Temperature Micro Probe Matt Deye and Brian Wajdyk Page 1 of 8 Important Gloves should be worn when handling stage, refrigerators,

More information

VACUUM OVEN. Model: VPX9-2. Installation and Operation Manual

VACUUM OVEN. Model: VPX9-2. Installation and Operation Manual VACUUM OVEN Model: VPX9-2 Installation and Operation Manual Sheldon Manufacturing, Inc. P.O. Box 627, 300 N 26 th Avenue, Cornelius, Oregon 97113 EMAIL: tech @ Shellab.com; www.shellab.com 1-800-322-4897

More information

YP7999A1000 ControLinks Fuel Air Ratio Control Panel

YP7999A1000 ControLinks Fuel Air Ratio Control Panel YP7999A1000 ControLinks Fuel Air Ratio Control Panel FEATURES INSTALLATION INSTRUCTIONS Pre-wired and ready to install Includes the R7999A control, wiring subbase and S7999D1048 touchscreen display Commission,

More information

PLEASE LEAVE THIS INSTRUCTION WITH THE USER ECOMFORT PLUS 25 HE. User instructions

PLEASE LEAVE THIS INSTRUCTION WITH THE USER ECOMFORT PLUS 25 HE. User instructions GB PLEASE LEAVE THIS INSTRUCTION WH THE USER ECOMFORT PLUS 25 HE User instructions All descriptions and illustrations provided in this manual have been carefully prepared but we reserve the right to make

More information

T-Series Air Conditioner T53 Model

T-Series Air Conditioner T53 Model INSTRUCTION MANUAL T-Series Air Conditioner T53 Model Protecting Electronics. Exceeding Expectations. McLean Cooling Technology 11611 Business Park Blvd N Champlin, MN 55316 USA Tel 763-323-8200 Fax 763-576-3200

More information

SHOT BLAST CABINET USER INSTRUCTIONS. Model No: CSB20B. Part No: GC05/13

SHOT BLAST CABINET USER INSTRUCTIONS. Model No: CSB20B. Part No: GC05/13 SHOT BLAST CABINET Model No: CSB20B Part No: 7640110 USER INSTRUCTIONS GC05/13 INTRODUCTION Thank you for purchasing this CLARKE Shot Blast Cabinet which is designed for professional workshop use. Please

More information

Fisher Scientific Isotemp Muffle Furnace 550 Series. Instruction Manual

Fisher Scientific Isotemp Muffle Furnace 550 Series. Instruction Manual Fisher Scientific Isotemp Muffle Furnace 550 Series Instruction Manual Model 14 Catalog No: 10-550-14 & 14A Model 58 Catalog No: 10-550-58 Model 126 Catalog No: 10-550-126 Service Division (Repairs):

More information

Power Flame Incorporated

Power Flame Incorporated Power Flame Incorporated SUGGESTED SPECIFICATION FOR MODEL NVC ULTRA LOW NOx GAS BURNERS SUB 9 PPM NOx THE POWER TO MANAGE ENERGY 2001 South 21st Street, Parsons, Kansas 67357 Telephone: 620-421-0480,

More information

Specification Sheet. Equipment Model: BVAC-1200 Vacuum Furnace. Type. Chamber. Maximum Temperature 1250 C. Hot Zone

Specification Sheet. Equipment Model: BVAC-1200 Vacuum Furnace. Type. Chamber. Maximum Temperature 1250 C. Hot Zone Specification Sheet Equipment Model: BVAC-1200 Vacuum Furnace Type Vertical / Top Loading, High Vacuum Chamber Electropolished Stainless Steel, Coldwall Maximum Temperature 1250 C. Hot Zone 12.5 (320 mm)

More information

DO NOT OPERATE THE MACHINE UNTIL YOU HAVE READ ALL SECTIONS OF THE INSTRUCTIONS IMPROPER USE OF THE MACHINE WILL VOID THE WARRANTY

DO NOT OPERATE THE MACHINE UNTIL YOU HAVE READ ALL SECTIONS OF THE INSTRUCTIONS IMPROPER USE OF THE MACHINE WILL VOID THE WARRANTY KING COBRA 500 120V INFORMATION & OPERATING INSTRUCTIONS DO NOT OPERATE THE MACHINE UNTIL YOU HAVE READ ALL SECTIONS OF THE INSTRUCTIONS IMPROPER USE OF THE MACHINE WILL VOID THE WARRANTY 1. Always use

More information

120V CAUTION: DO NOT OPERATE MACHINE UNTIL YOU HAVE READ ALL SECTIONS OF THIS INSTRUCTION MANUAL IMPROPER USE OF THE MACHINE WILL VOID THE WARRANTY

120V CAUTION: DO NOT OPERATE MACHINE UNTIL YOU HAVE READ ALL SECTIONS OF THIS INSTRUCTION MANUAL IMPROPER USE OF THE MACHINE WILL VOID THE WARRANTY KING COBRA 1200 120V INFORMATION & OPERATING INSTRUCTIONS CAUTION: DO NOT OPERATE MACHINE UNTIL YOU HAVE READ ALL SECTIONS OF THIS INSTRUCTION MANUAL IMPROPER USE OF THE MACHINE WILL VOID THE WARRANTY

More information